Glebe Society Bulletin 1997 Issue 06

Total Page:16

File Type:pdf, Size:1020Kb

Glebe Society Bulletin 1997 Issue 06 /) \: / • PO BOX 100, GLEBE NSW 2037 AUSTRALIA Print Post Approved - No: 234093/000 10 No 6 of 1997 July Annual General Social Activities Meeting After further discussion, we agreed that we had given ourselves too short a time to or- NOTICE is hereby given that the AN- ganise a Yulefest in July for our annual NUAL GENERAL MEET.ING of THE birthday party and decided instead to have a GLEBE SOCIETY INCORPORATED belated birthday in September, on Saturday, will be held at l1am on Sunday 31 Au- 20th. This will be close to the Solstice and gust, at 4 Boyce Street. we can celebrate the return of Spring too! Details and booking form are enclosed with The business to be dealt with at the meet- this Bulletin. ing is as follows: 1 To confirm the minutes of the last We also discovered that the Friends of Ben- annual general meeting of the So- ledi were arranging a Yulefest on 15th July, ciety held on 25 August, 1996 which would have meant rather an oversup- 2 To. receive from the management ply of turkey if we had also gone ahead! committee a report upon the activi- ties of the Societyduring the period from 25 August, 1996 3 To elect the new management Join other members of committee. A form of nomination the Glebe Society for is enclosed for this purpose. the AGM, at the home 4 To receive and consider the state- of Mavis and Bill ment which is required to be sub- McCarthy, 5 Boyce mitted to members pursuant to sub- Street, Glebe section 26(6) of the Associations Incorporation Act. 5 To resolve that two members of the committee be authorised to sign the certificate in clause 10 of the said statement. Jeanette Knox - Hon Secretary Sunday lunch Inside This Issue The next Sunday lunch will be held at BJ's Eatery on Sunday 10 August at 12:3Opm.Please contact John Hoddinott, 9692 0071, to make a booking. Page 2 The Glebe Society Bulletin The John Fletcher site, Ferry Rd/ Taylor Planning Report St! Forsyth St I attended a meeting at Glebe Town Hall, The former Children's Hospital Site, chaired by Cr Macindoe, where the owner's Bridge Road representative and the Leichhardt Council's I made a four page submission to South consultant had a hard time from some of the Sydney City Council (SSCC) noting the Blackwattle residents. Society's views about the future development of the site, with a copy to My impression is that the planning matters Leichhardt Council. for this roughly 2 hectare site still require an LEP and draft DEP to be approved. The concerns mentioned in the submission Hence again many of the decisions about were listed in the previous Bulletin, namely the density and aesthetics of the site are floor-space ratio, building heights, on-site months away. It was suggested at the parking and traffic issues. While the meeting that a smaller number of large projected car spaces per unit are reasonable units be proposed for the site, because this and within SSCC's regulations, there is concept would reduce the number of traffic very little off-site parking and I expressed movements in the final development - my concern that the car population could whatever it may be. perhaps increase over the next couple of decades, putting pressure on on-site space. My argument against the "rich" approach is that such people would be less likely to use Another traffic issue is turning from Bridge public transport and would tend to own Road across oncoming traffic. When more cars than in a "medium-rich" ambulances and cars carrying sick children development. A rough calculation for a two had to undertake this manoeuvre, there was hectare site would be about one hundred a matter of urgency involved and traffic units, so let's say about 150 to 200 cars, lights controlled the entrance. I suggested spread over a couple of hours morning and that Booth Street, rather than Bridge Road, evening. be the major ingress/egress. While I agree that the area is very difficult As the development is not under the control for traffic management, if on-site parking of Leichhardt Council, we have reduced can be properly provided for, I believe that influence on its final outcome, as I said last the streets can cope. The streets mentioned Bulletin. I did, however, make the point that above are low-key compared to the major the decision will influence the local thoroughfares in Glebe. community for many years to come. Local issues Sandra Nori, our local State member, has I have spoken to Jeanette Knox about the asked me to be her representative on bus frequency in Glebe, mainly the 431 & SSCC's Traffic Committee when issues 433 routes. Jeanette and I will try to plan a concerning the site arise. I was happy to strategy for this issue. My theory is that accept the position. Sandra's electorate buses travel in tandem because this includes this small local area under SSCC's decreases the chances of bushrangers control, and I will only attend committee holding them up. meetings when the former Hospital site's traffic management is under discussion. I Another local issue is cleanliness in Glebe would estimate this to be some months streets. This is a very much discussed away, after the LEP (rezoning matters) and matter, and is also almost intractable. Back the draft DCP (floor-space ratio, heights, lanes are used as garbage dumps, the small etc) have been approved by SSCc. number of litter bins are often used not for litter, but by some residents as garbage bins. Both these matters, buses and garbage, could perhaps be discussed at a public meeting. I would like Society members to think about this, and to talk to us. John Hoddinott Page 3 The Glebe Society Bulletin Creek. However he became noticeably more Aircraft and Glebe fluent and enthused when talking about the KSA - Sydney (Kingsford Smith) Airport Holdsworthy site. It is my understanding Aircraft Noise and Other Complaints: new that the Badgerys Creek airport site is more phone number 1800818017 elevated than its surrounding areas which would mean aircraft would achieve greater he Transport Minister has fast- height before passing over heavily tracked moving the third runway populated areas. What height will they be? T I was interested to know the height of a threshold, where aircraft can touch down from a point further south on particular aircraft movement north west of the runway to a point one quarter of a Glebe because its noise was almost kilometre northwards, closer to us. Aircraft imperceptible. If the track provided by will now be at a height of only 115 metres Airservices Australia correctly identified on their landing approach in the vicinity of the movement it was at an altitude of 7 900 the airport's domestic terminals and a feet with a possible error margin of 300 feet. nearby hotel. We are advised that no procedures are implemented at the airport The location and impact of Sydney's second until they have safety clearance from the airport have become much tougher issues. Civil Aviation Safety Authority. We are The Federal government's failure to advised also that the third runway proceed with Badgerys Creek airport environment impact statement no longer development in 1989 (aided by the applies to KSA with regard to aircraft noise. Opposition, the NSW government and It follows that the EIS has ceased to apply at airlines) is reflected in KSA's over all. development and has resulted in greater western Sydneybeing less prepared to shape Aircraft noise is to be shared but there will its future. The compromises that will need be more noise to be shared. The Federal to be made are becoming larger. government is likely to legislate a cap of 80 movements per hour on KSA. So if the Where does the argument that the airport airport became very busy with 80 should be outside the Sydney region place movements per hour and if only the north- us? If a single, replacement airport were to south flight paths were in use there would be built outside Sydney, John Hoddinott be an aircraft every one and a half minutes calculated it would need four fast-rail tracks over the suburbs north of the airport. If (300 passengers per train according to landings from the north were the operating Speedrail's information) to service airport mode it would mean an aircraft landing on passengers, most of whom would require the third runway every three minutes, a Sydney as their origin or destination condition that would particularly affect (workers' access, cargo and luggage Glebe and Forest Lodge. The Society has requirements were not included in the written to ask the Minister if 80 movements guess). How would such a major corridor as per hour would be shared with the east-west this be achieved in the Sydney area? We do runway. We really want to know whether not know of any studies being undertaken to the airport's operations would result in solid address the issues (these points have been use of north-south flight paths, returning raised in earlier articles). Municipal suburbs north of the airport to the Councils who are calling for an airport 'Benelong Funnel' conditions of 1994/95. outside Sydney do not appear to have The Society has called in the past for created a joint initiative to gather facts in legislation with a sunset clause on the support of their call. The issue of air number of aircraft movements - that aircraft pollution resulting from operating a western movements per hour would be reduced Sydney airport was earlier addressed by the when the second Sydneyairport commences community opposing the third runway.
Recommended publications
  • Bays Community Coalition (Bacc) Comprises Community Representatives from Suburbs Surrounding the Bays - Annandale, Balmain, Glebe, Pyrmont, Rozelle, White Bay &Ultimo
    BaCC’s Submission – March 2017 Bays Community Coalition (BaCC) comprises community representatives from suburbs surrounding the Bays - Annandale, Balmain, Glebe, Pyrmont, Rozelle, White Bay &Ultimo. Subject: GSC’s Draft Central District Plan - November 2016 BaCC’s Submission – 31st March 2017 Page 1 BaCC’s Submission – March 2017 Table of Contents 1. Executive Summary ........................................................................................................................ 4 2. Preamble ......................................................................................................................................... 5 3. Draft Plan – Comments, Recommendations & Questions ............................................................ 5 1. Chief Commissioner’s Foreword ................................................................................................ 5 2. Our Vision ................................................................................................................................... 6 3. Productive City ........................................................................................................................... 7 4. Liveable City ................................................................................................................................ 8 5. The Liveable Framework .......................................................................................................... 10 6. The Central District’s People ...................................................................................................
    [Show full text]
  • Sydney Harbour Superyacht Guidelines
    Sydney Harbour superyacht guidelines Guidelines for Masters operating Superyachts on Sydney Harbour Contents Executive Summary 1 Qualifications and registration 9 Port procedures 2 Boat licences and certificates of competency 9 Directions for navigation 2 Registration of vessels 9 Directions and regulations to be observed 2 Protected animals 10 Required charts 2 Approach distances 10 Port services 2 Speed 10 Pilotage requirements 2 Approach directions 10 Wind and weather 3 Action if a marine mammal approaches 11 Port Authority of NSW Vessel Traffic Service 3 Communications 11 Pilot boarding place 3 VHF channels 11 Sydney Harbour – general considerations 3 Important contact details 11 General 3 Useful websites 12 Speed limits 3 Photographs 13 Speed restricted areas 4 Anzac Bridge 13 Conduct within Sydney Harbour 7 Rozelle Bay Superyacht Marina 13 Prohibited areas for general navigation 7 Campbells Cove 14 General 7 Sydney Cove – Circular Quay 15 Restricted access areas 7 Fort Denison 15 Collision or incident reports 8 Garden Island Naval Base 15 Berthing at commercial wharves 8 Walsh Bay 16 Pollution, nuisance or danger 8 Sydney Harbour Bridge 17 Marine Pollution Act 1987 8 Jones Bay Wharf, Pyrmont 17 Pump-out facilities 8 Kirribilli Point 17 Garbage 9 Anzac Bridge 18 Causing of nuisance or danger 9 Glebe Island Bridge 18 Farm Cove 18 Wind frequency analyses 19 FRONT COVER PHOTO: ANDREA FRANCOLINI Executive Summary Welcome to Sydney. The aim of these guidelines is to assist superyacht masters Superyachts are free to enter and move around with their preparations for a visit to Sydney Harbour and to Sydney Harbour subject to compliance with the provide a reference document during the visit.
    [Show full text]
  • Bridge Types in NSW Historical Overviews 2006
    Bridge Types in NSW Historical overviews 2006 These historical overviews of bridge types in NSW are extracts compiled from bridge population studies commissioned by RTA Environment Branch. CONTENTS Section Page 1. Masonry Bridges 1 2. Timber Beam Bridges 12 3. Timber Truss Bridges 25 4. Pre-1930 Metal Bridges 57 5. Concrete Beam Bridges 75 6. Concrete Slab and Arch Bridges 101 Masonry Bridges Heritage Study of Masonry Bridges in NSW 2005 1 Historical Overview of Bridge Types in NSW: Extract from the Study of Masonry Bridges in NSW HISTORICAL BACKGROUND TO MASONRY BRIDGES IN NSW 1.1 History of early bridges constructed in NSW Bridges constructed prior to the 1830s were relatively simple forms. The majority of these were timber structures, with the occasional use of stone piers. The first bridge constructed in NSW was built in 1788. The bridge was a simple timber bridge constructed over the Tank Stream, near what is today the intersection of George and Bridge Streets in the Central Business District of Sydney. Soon after it was washed away and needed to be replaced. The first "permanent" bridge in NSW was this bridge's successor. This was a masonry and timber arch bridge with a span of 24 feet erected in 1803 (Figure 1.1). However this was not a triumph of colonial bridge engineering, as it collapsed after only three years' service. It took a further five years for the bridge to be rebuilt in an improved form. The contractor who undertook this work received payment of 660 gallons of spirits, this being an alternative currency in the Colony at the time (Main Roads, 1950: 37) Figure 1.1 “View of Sydney from The Rocks, 1803”, by John Lancashire (Dixson Galleries, SLNSW).
    [Show full text]
  • Contextual Analysis and Urban Design Objectives
    Rozelle Interchange Urban Design and Landscape Plan Contextual Analysis and Urban Design Objectives Artists impression: Pedestrian view along Victoria Road Caption(Landscape - Image shown description at full maturity and is indicative only). 03 White Bay Power Station Urban Design Objectives 3 Contextual analysis 3.1 Contextual analysis Local context WestConnex will extend from the M4 Motorway at The Rozelle Interchange will be a predominately Parramatta to Sydney Airport and the M5 underground motorway interchange with entry and Motorway, re-shaping the way people move exit points that connect to the wider transport through Sydney and generating urban renewal network at City West Link, Iron Cove and Anzac opportunities along the way. It will provide the Bridge. critical link between the M4 and M5, completing Sydney’s motorway network. Iron Cove and Rozelle Rail Yards sit on and are adjacent to disconnected urban environments. While the character varies along the route, the These conditions are the result of the historically WestConnex will be sensitively integrated into the typical approach to building large individual road built and natural environments to reconnect and systems which disconnect suburbs and greatly strengthen local communities and enhance the reduce the connectivity and amenity of sustainable form, function, character and liveability of Sydney. modes of transport such as cycling and walking. Rather than adding to the existing disconnection, An analysis of the Project corridor was undertaken the Project will provide increased
    [Show full text]
  • Appendix 5 Customer Induction and Fact Sheet
    Appendix 5 Customer induction and fact sheet Welcome to the Sydney Superyacht Marina, Rozelle Bay. Rozelle Bay offers deep water24/7 access and a sheltered, calm water environment. The predominant wind direction in summer is North-East, where the Anzac Bridge offers good protection. In winter we experience South-Easterly and Westerly winds which sometimes can whip-up a bit and make berthing challenging. These SE’ly and W’ly wind conditions generally don’t last long and settle around sunset. The Bay also accommodates a number of other commercial and recreational users including charter boat and barge operators, rowing clubs (including the famous Sydney Dragons). The Marina is considered “private property” and access to the marina is for boat owners (including nominated crew) and their guests only. Marina operating hours are from 8am to 5pm, 7 days a week. The general public is welcome along the foreshore, but not on the marina pontoons. Rozelle Bay is a No-Wash / 4 knots zone, and it is a requirement that powered vessels give way to passive recreational craft at all times. Especially Superyachts must keep a proper look-out when arriving and departing at the marina. The marina notifies marina clients of the weather conditions and the anticipated level of recreational use within Rozelle Bay via our notice board. On this board you’ll also find information about upcoming marina events, aquatic events and other notices that are relevant. The Glebe Island Bridge (1903) shall remain in the open position for the passage of vessels. Yacht owners should approach the Bridge with extreme caution.
    [Show full text]
  • The Bays Precinct Reference Group – Meeting 5 Questions and Answers
    The Bays Precinct Reference Group – Meeting 5 Questions and Answers Queries regarding ideas from the ‘Call for Great Ideas The Call for Great Ideas submissions are published on our website. This is so they can be openly considered by the NSW Government, community and industry as Destinations are progressed. The submissions are provided to the various consultants to be incorporated into their respective studies. Queries regarding the number of dwellings proposed for Bays Market District Detailed design and planning for the Bays Market District is still to be undertaken. There will be residential development in the area but the exact numbers will be determined through the detailed design phase. UrbanGrowth NSW will undertake consultation with stakeholders throughout the planning process. Queries regarding the Affordable Housing Policy UrbanGrowth’s NSW Sustainability Policy has been recently made available for public comment (http://www.urbangrowth.nsw.gov.au/sustainability). One of the priorities of the Sustainability Policy is the release of a Draft Housing Affordability and Diversity Policy for public comment. Queries regarding procurement for the new Sydney Fish Market and Bays Market District masterplan In November 2016 we commenced a Registration of Interest process to seek designers and engineers to design the new Sydney Fish Market. We expect to appoint a designer by the middle of 2017. Separately, we issued an ROI for firms to develop a masterplan for the Bays Market District. Relevant supporting documentation is provided to all tenderers depending on the type of goods and services being procured. UrbanGrowth NSW uses VendorPanel for all procurement as it enables us to track interest in the tender and monitor the distribution of documents.
    [Show full text]
  • Proposal to Demolish Glebe Island Bridge Ignores Strategic Links
    CEO Roads and Maritime Services SYDNEY 2000 Proposal to demolish Glebe Island Bridge ignores strategic links It is economically inept, environmentally unsustainable and culturally insensitive to demolish the Glebe Island Bridge. The asset provides future opportunity that has not been considered in any analysis so far. The Glebe Island Bridge is a vital link in Sydney’s transport system for it can provide low level city access for cycle, pedestrian and public transport. The Cost Benefit Analysis Report has relied upon current cycle and pedestrian use of the ANZAC Bridge for its calculation of transport benefit. It has not projected use of Glebe Island Bridge as a low level safe alternative, which is likely to induce considerably increased demand. Increased cycle and pedestrian traffic is noted by Transport NSW in its City Access Strategy as directly economically beneficial to Sydney and NSW. It shows that safe pedestrian and cycle ways induce demand, if they interconnect with the transport network. In further detailing the NSW Long Term Transport Plan it prominently mentions increased pedestrian and cycle access as providing substantial economic benefits, The Glebe Island Bridge is a vital potential feeder link to the network of transport options. The City of Sydney, Leichhardt Municipal Council and the community in its submissions to the Bays Precinct Taskforce have all emphasised the need to retain this Bridge as low level access for cycle, pedestrian and public transport. The Glebe Island Bridge has been recommended for inclusion on the State Heritage Register by the NSW Heritage Council. “The swing bridges [designed by engineer Percy Allan]… at Pyrmont and Glebe Island are among the structures standing as monuments to his skill.”1 Through a trick of timing and geography, the former has been declared a National Engineering Landmark; the latter, despite its LEP listing, has suffered years of neglect.
    [Show full text]
  • Glebe Society Bulletin 2012 Issue 05
    Bays Precinct Task Force About the online Glebe Society Bulletin ... How to view the online Bulletin Last ditch negotiations The three rounds of com- The pages of the online Bulletin are almost identical to In this issue ... munity consultation on the the printed version except for the use of colour. Click on the headings below to jump to the item Bays Precinct are over, the You can use the index (In this issue) on this page to Bays Precinct Task Force - last ditch 1-3 penultimate Task Force jump to individual stories, or you can scroll through negotiations meeting was on 26 June and the second version of the the edition using the scroll wheel on your mouse, or OAM for Neil Macindoe 1-2 the page-up/page-down keys on your keyboard. To . draft Task Force Report has 1 return to the index, click on the blue triangle at the Planning matters 3 emerged . The Task Force bottom of any page. is now focussed on the Foreshore walk – a mad scramble along 4 5/2012 June/July production of a report that The layout is optimised for wide screen monitors so Pyrmont Bridge Road? all members are prepared to you can read two pages together. Quieter cables for Glebe Island Bridge? 4 sign off on. The online Bulletin also features links to websites or Jane Marceau and I face From the terraces 5 email addresses referred to in the text. To follow one very intensive work over the of these links hover over the URL or email address Are you high-tech - planning the future of 5 next two weeks to ensure A view corridor from Wentworth Park to Blackwattle Bay.
    [Show full text]
  • AN Opera Houseto Parramatta Pathway
    THE McKell Institute Insti tute McKell THE MCKELLTHE INSTITUTE Activating the Harbour City DISCUSSION PAPER DISCUSSION The case for AN Opera House to Parramatta Pathway LILIANA TAI OCTOBER 2020 About the McKell Institute Insti tute The McKell Institute is an independent, McKell not-for-profit, public policy institute dedicated THE MCKELLTHE INSTITUTE to developing practical policy ideas and contributing to public debate. For more information phone (02) 9113 0944 or visit Activating the www.mckellinstitute.org.au Harbour City The case for AN Opera House to Parramatta Pathway THE McKell Institute The opinions in this report are those of the author and do not necessarily represent the views of the McKell Institute’s members, affiliates, individual board members or research committee LILIANA TAI Insti members. Any remaining errors or omissions are the responsibility of the authors. tute OCTOBER 2020 McKell THE 4 THE MCKELL INSTITUTE Activating the Harbour City The case for AN opera House to Parramatta pathway 5 Contents Introduction 7 The Opera House to ParRamatta Pathway 8 Phase 1: Revitalising Blackwattle Bay and the Rozelle Bay Area, and Reopening Glebe Island Bridge .........................................................................................................................12 Phase 2: A 10km Foreshore Loop Around Canada Bay ........................................................................16 Phase 3: Connecting Canada Bay to the Homebush Bay Circuit ..............................................20 Phase 4: Completing
    [Show full text]
  • Construction of the Gladesville Bridge Summary Report
    R T A Roads and Traffic Authority Oral History Program Construction of the Gladesville Bridge Summary Report Written and compiled by Martha Ansara from interviews by Frank Heimans and Martha Ansara August 2001 ISBN 0 7313 0130 7 Published Auf ust 2001 RTA/Pub 01.087 Prepared by. Martha Ansara and Cinetel Productions Pty Ltd (Frank Heimans) fir. RTA Environment and Community Policy Branch Level 6 RTA 260 Elizabeth St SURRY HILLS NSW 2010 Telephone (02)9218 6083 Fax (02)9218 6970 Roads and Traffic Authority Copyright® NSW Roads and Traffic Authority, 2001 www.rta.nsw.gov.au RTA V Some comments about Oral History,.. Oral history has been described as "a picture of the past in people's own words". It reveals what you often won't find in the files and the history books - the facts and the real reasons things happened. It is told by the people who were there - those who were involved, who made it happen, who were affected - in the colour, passion and inflection of their own voices. Oral history accounts can also tell about relationships, perceptions, social and political climates, all of which are part of life and influence our actions and those of others. It often reveals the unsung heroes, the names of those actually responsible for innovations and important changes. So, oral history provides a counterbalance to the formal written record by providing the personal, intimate, human and social account of events and why they happened. The RTA Environment and Community Policy Branch established an Oral History Program in 1997, to investigate various topics of historical interest.
    [Show full text]
  • Conservation Management Plan
    PHILIP LEESON ARCHITECTS Main Truss Spans Charles Dearling 2006 CONSERVATION MANAGEMENT PLAN THARWA BRIDGE for ROADS ACT by PHILIP LEESON ARCHITECTS PTY LTD ENDORSED BY THE ACT HERITAGE COUNCIL ON 5TH MARCH 2009 THARWA BRIDGE CMP MARCH 2009 PHILIP LEESON ARCHITECTS pg.1 CONTENTS PAGE 1.0 EXECUTIVE SUMMARY 2 2.0 INTRODUCTION 3 3.0 HISTORICAL BACKGROUND 6 4.0 PHYSICAL ASSESSMENT 21 5.0 ASSESSMENT OF SIGNIFICANCE 40 6.0 OPPORTUNITIES & CONSTRAINTS 44 7.0 CONSERVATION POLICIES 45 8.0 IMPLEMENTATION STRATEGIES 49 9.0 REFERENCES 55 10.0 APPENDICES 59 1 Timeline of the Murrumbidgee River Crossing 60 and Tharwa Bridge 2 Discussion of Reconstruction Proposals 78 3 Typical Cyclical Maintenance Schedule 84 4 Problems Encountered with Timber Truss Bridges 88 5 Tharwa Bridge Heritage Significance Study 95 THARWA BRIDGE CMP MARCH 2009 PHILIP LEESON ARCHITECTS pg.2 1.0 EXECUTIVE SUMMARY 1.1 This Conservation Management Plan has been prepared for Roads ACT in accordance with the conservation principles outlined in the Australia ICOMOS Burra Charter 1999. 1.2 The Plan consists of a comprehensive conservation analysis based on historical and physical overview, an assessment of cultural significance, conservation policies for the bridge and surrounds and strategies for implementation of those policies. Appendices provide a detailed chronology of historical events, a brief discussion of the heritage impact of likely proposals and a typical maintenance program. 1.3 Tharwa Bridge was listed on the ACT Heritage Register in 1998 at which time a brief assessment of significance was undertaken and a citation written. It was listed on the Register of the National Estate in 1983.
    [Show full text]
  • Gladesville Bridge, Acl~>> River Connecting Drurnmoyne and Gladesville and the Original Across the Parramatta River in the Locality Was by Ferry
    I Denis Gojak f PO Box457 Newtown NSW 2042 i HER ROYAL HIGHNESS DUCHESS OF KENT r ORDER OF PROCEEDINGb The Honourable P. D. Hills, M.L.A., Minister for Highways 1 will open proceedings New Bridge over the Parramatta River Minister for Industrial Development between Gladesville and Drummoyne, and Decentralisation Sydney I will speak Friday, 2nd October, 1964, Her Royal Highness, Princess Marina, Duchess of Kent, at I 1.00 a.m. will reply I BY Her Royal Highness, Princess Marina, Duchess of Kent A Duchess of Kent . " Advance Australia Fair " A LENGTH 1,901 feet 6 inches including a four-ribbed concrete arch with a clear span of 1,000 feet and, on each side of the arch, four pre-stressed concrete girder spans, each loo feet long. WIDTH The roadway is 72 feet between kerbs. CLEARANCE The underside of the arch is more than 120 feet above high water level for a width of zoo feet in the middle of the arch, the maximum clearance being 134 feet. GRADE The roadway rises on a grade of 6 feet in each loo feet from either side and the grades are connected by a vertical curve 300 feet long over the centre of the structure. FOOTWAYS There is a footway, 6 feet wide on each side of the roadway. Inner and outer protective barriers flank each footway. The inner protective barriers divide the footways from the vehicular roadway, providing complete safety for pedestrians and preventing splashing from vehicles in wet weather. b'-ogf/m crkdipw, LIGHTING Steel standards set in the line of the outer protective barriers carry lanterns ,$"-, CD-M with 400-watt lights over the roadway.
    [Show full text]