The Bays Urban Renewal Program The Bays Urban Renewal Program Project Corridor and Precincts Blackwattle BayDrummoyne / Rozelle Bay White Bay Rozelle Rail Yards White Bay Glebe Island Key Points 1 Wentworth Park 2 • Opportunity for mixed 3 Power Station 4 • New mixed use 5 • Port uses 6 • Port uses • World-scale global project that • Revitalised fresh food use development • Revitalisation of landmark residential village will be largest and most high marketplace • Maritime activities staged heritage asset into a Cultural • Green links to existing profile urban development project in Australia. • Opportunity for mixed use relocation landmark open space and development • Residential focus • Connection to water harbour foreshore Dawes •Point Will create harbour destinations in Blackwattle Bay (including the • Potential Fishmarket • Public access to • Connection to Railyards • Connectivity to adjoining Sydney Fish Markets), Rozelle redevelopment harbour foreshore precincts Balmain East Bay, Rozelle Rail Yards and the • Westconnex / Lightrail • Foreshore connectivity and • Connectivity to Railyards / Park iconic White Bay Power Station. activation • Community use Pool / Harbour Balmain • Constraints and opportunities • Improved public domain and access/walkways Millers Point work underway. open space • Light rail connectivity • Comprises 94ha of harbour and over 80ha of Government-owned Barangaroo and adjoining land. Camerons Cove 5 White Rozelle Bay Johnstons Bay 6 3 Sydney GLEBE ISLAND BRIDGE ANZAC BRIDGE SUPER YACHT MARINA Pyrmont Map Legend Lilyfield Darling 4 Rozelle FISH MARKETS 2 SYDNEY Harbour Bay Blackwattle Bay Existing Heavy Rail BICENTENNIAL PARK 1 Glebe JUBLILLE PARK Existing Light Rail Annandale WENTWORTH PARK CBD & South East Light Rail (committed) Urban Renewal Ultimo Concept Plan Area Forest Lodge Breecroft Open Space Haymarket Leichhardt Copyright UrbanGrowth NSW 2014 0 300 600 900 1200 Metres.
Recommended publications
  • Bays Community Coalition (Bacc) Comprises Community Representatives from Suburbs Surrounding the Bays - Annandale, Balmain, Glebe, Pyrmont, Rozelle, White Bay &Ultimo
    BaCC’s Submission – March 2017 Bays Community Coalition (BaCC) comprises community representatives from suburbs surrounding the Bays - Annandale, Balmain, Glebe, Pyrmont, Rozelle, White Bay &Ultimo. Subject: GSC’s Draft Central District Plan - November 2016 BaCC’s Submission – 31st March 2017 Page 1 BaCC’s Submission – March 2017 Table of Contents 1. Executive Summary ........................................................................................................................ 4 2. Preamble ......................................................................................................................................... 5 3. Draft Plan – Comments, Recommendations & Questions ............................................................ 5 1. Chief Commissioner’s Foreword ................................................................................................ 5 2. Our Vision ................................................................................................................................... 6 3. Productive City ........................................................................................................................... 7 4. Liveable City ................................................................................................................................ 8 5. The Liveable Framework .......................................................................................................... 10 6. The Central District’s People ...................................................................................................
    [Show full text]
  • 109. M4-M5 EIS Vol 2I App T Groundwater Part 1
    M4-M5 Link Environmental Impact Statement August 2017 Appendix T Volume 2I Since finalisation of the Environmental Impact Statement, the project has been declared by Ministerial Order to be State significant infrastructure and critical State significant infrastructure under sections 115U (4) and 115V of the Environmental Planning and Assessment Act 1979. The Ministerial Order also amended Schedule 5 of State Environmental Planning Policy (State and Regional Development) 2011. The project remains subject to assessment under Part 5.1 of the Environmental Planning and Assessment Act 1979 and requires the approval of the Minister for Planning. WestConnex speaks your language Greek Learn more by visiting µ www.westconnex.com.au/yourlanguage www.westconnex.com.au/yourlanguage to watch project videos in your language and read more about WestConnex. If you need an interpreter, call the Translating WestConnex. µ , µ 131 450. and Interpreting Service on 131 450. Italian Arabic Per saperne di più visiti il sito www.westconnex.com.au/yourlanguage www.westconnex.com.au/yourlanguage, dove potrà guardare i video del progetto in lingua italiana e trovare maggiori informazioni su WestConnex. Se ha bisogno di un interprete, contatti il Servizio di Traduzione ed Interpretariato (Translating ł ł .131 450 and Interpreting Service) al numero 131 450. Chinese Korean 了解詳情請上網 www.westconnex.com.au/yourlanguage 를 방문하여한국어로 www.westconnex.com.au/yourlanguage觀看(普通話) 된 프로젝트 비디오를 보고 WestConnex 에 관해 읽고 배우세요. 視頻, 並 查閱有關WestConnex的更多訊息。如需要傳譯員請 통역이 필요하시면 번역 및 통역 서비스 131 450 (TIS) 으로 전화 。。 撥電話傳譯服務 131 450 하십시오. Hindi Vietnamese : Hãy tìm hi u thêm và vi ng trang m ng www.westconnex.com.au/yourlanguage ( ) www.westconnex.com.au/yourlanguage xem phim nh b ng Vi t ng v công trình này và c thêm v WestConnex.
    [Show full text]
  • Submission on the Bays Precinct Report on Consultation
    SUBMISSION ON THE BAYS PRECINCT REPORT ON CONSULTATION FEBRUARY 2011 SUBMISSION ON THE BAYS PRECINCT Infrastructure Partnerships Australia is REPORT ON CONSULTATION 2011 a national forum, comprising public and private sector CEO M embers, advocating the public policy interests of Australia’s infrastructure industry . FOR MORE INFORMATION PLEASE CONTACT: BRENDAN LYON ERIC MILLER CHIEF EXECUTIVE OFFICER TRANSPORT POLICY OFFICER INFRASTRUCTURE PARTNERSHIPS AUSTRALIA INFRASTRUCTURE PARTNERSHIPS AUSTRALIA Level 8, 8-10 Loftus Street, Sydney NSW 2000 Level 8, 8-10 Loftus Street, Sydney NSW 2000 PO Box R1804, Royal Exchange NSW 1225 PO Box R1804, Royal Exchange NSW 1225 P | 02 9240 2051 P | 02 9240 2062 E | [email protected] E | [email protected] SUBMISSION ON THE BAYS PRECINCT REPORT ON CONSULTATION 2011 EXECUTIVE SUMMARY Infrastructure Partnerships Australia (IPA) is pleased to provide this submission to Sydney Harbour Foreshore Authority in response to ‘Report on Outcomes: Stage 1 Consultation Process February 2011’. IPA supports the planning principles that have resulted from the first phase of consultation on the Bays Precinct and looks forward to seeing them implemented during Stage 2 and into the future. IPA particularly supports the position on the Rozelle Rail Yards – the yards should remain reserved for future transport infrastructure is vital to Sydney’s future public transport provision. Much of the Bays Precinct will be utilised for mixed land-use such as residential, commercial and open space. However, the decision to set aside potential transport and infrastructure corridors and bases, including the rail yards at Rozelle and possible ferry infrastructure at White Bay and Glebe Island, demonstrates a coordinated strategic approach to land-use planning - an approach that has been lacking in NSW’s recent history.
    [Show full text]
  • Sydney Harbour a Systematic Review of the Science 2014
    Sydney Harbour A systematic review of the science 2014 Sydney Institute of Marine Science Technical Report The Sydney Harbour Research Program © Sydney Institute of Marine Science, 2014 This publication is copyright. You may download, display, print and reproduce this material provided that the wording is reproduced exactly, the source is acknowledged, and the copyright, update address and disclaimer notice are retained. Disclaimer The authors of this report are members of the Sydney Harbour Research Program at the Sydney Institute of Marine Science and represent various universities, research institutions and government agencies. The views presented in this report do not necessarily reflect the views of The Sydney Institute of Marine Science or the authors other affiliated institutions listed below. This report is a review of other literature written by third parties. Neither the Sydney Institute of Marine Science or the affiliated institutions take responsibility for the accuracy, currency, reliability, and correctness of any information included in this report provided in third party sources. Recommended Citation Hedge L.H., Johnston E.L., Ayoung S.T., Birch G.F., Booth D.J., Creese R.G., Doblin M.A., Figueira W.F., Gribben P.E., Hutchings P.A., Mayer Pinto M, Marzinelli E.M., Pritchard T.R., Roughan M., Steinberg P.D., 2013, Sydney Harbour: A systematic review of the science, Sydney Institute of Marine Science, Sydney, Australia. National Library of Australia Cataloging-in-Publication entry ISBN: 978-0-646-91493-0 Publisher: The Sydney Institute of Marine Science, Sydney, New South Wales, Australia Available on the internet from www.sims.org.au For further information please contact: SIMS, Building 19, Chowder Bay Road, Mosman NSW 2088 Australia T: +61 2 9435 4600 F: +61 2 9969 8664 www.sims.org.au ABN 84117222063 Cover Photo | Mike Banert North Head The light was changing every minute.
    [Show full text]
  • Sydney Harbour Superyacht Guidelines
    Sydney Harbour superyacht guidelines Guidelines for Masters operating Superyachts on Sydney Harbour Contents Executive Summary 1 Qualifications and registration 9 Port procedures 2 Boat licences and certificates of competency 9 Directions for navigation 2 Registration of vessels 9 Directions and regulations to be observed 2 Protected animals 10 Required charts 2 Approach distances 10 Port services 2 Speed 10 Pilotage requirements 2 Approach directions 10 Wind and weather 3 Action if a marine mammal approaches 11 Port Authority of NSW Vessel Traffic Service 3 Communications 11 Pilot boarding place 3 VHF channels 11 Sydney Harbour – general considerations 3 Important contact details 11 General 3 Useful websites 12 Speed limits 3 Photographs 13 Speed restricted areas 4 Anzac Bridge 13 Conduct within Sydney Harbour 7 Rozelle Bay Superyacht Marina 13 Prohibited areas for general navigation 7 Campbells Cove 14 General 7 Sydney Cove – Circular Quay 15 Restricted access areas 7 Fort Denison 15 Collision or incident reports 8 Garden Island Naval Base 15 Berthing at commercial wharves 8 Walsh Bay 16 Pollution, nuisance or danger 8 Sydney Harbour Bridge 17 Marine Pollution Act 1987 8 Jones Bay Wharf, Pyrmont 17 Pump-out facilities 8 Kirribilli Point 17 Garbage 9 Anzac Bridge 18 Causing of nuisance or danger 9 Glebe Island Bridge 18 Farm Cove 18 Wind frequency analyses 19 FRONT COVER PHOTO: ANDREA FRANCOLINI Executive Summary Welcome to Sydney. The aim of these guidelines is to assist superyacht masters Superyachts are free to enter and move around with their preparations for a visit to Sydney Harbour and to Sydney Harbour subject to compliance with the provide a reference document during the visit.
    [Show full text]
  • Act No. 108, 1902. an Act to Authorise the Raising of a Loan for the Public Service of the State, and for Other Purposes
    Act No. 108, 1902. An Act to authorise the raising of a Loan for the Public Service of the State, and for other purposes. [22nd December, 1902.] E it enacted by the King's Most Excellent Majesty, by and with B the advice and consent of the Legislative Council and Legisla­ tive Assembly of New South Wales in Parliament assembled, and by the authority of the same, as follows :— 1. It shall be lawful for the Governor to raise by the issue of Debentures or Inscribed Stock, secured upon the Consolidated Revenue of the State, and bearing interest at a rate not exceeding four per centum per annum, such sums of money not exceeding in the whole the the sum of Three millions and seventy thousand four hundred and seventy-two pounds, as are respectively set against the following Public Works and Services, that is to say :— PERMANENT AND REPRODUCTIVE WORKS. HOSPITALS— Country Hospitals—Towards erection of New Buildings to meet the demands for increased accommodation ... ... ... £10,000 0 0 North Shore Hospital, towards New Building—further sum ... 10,000 0 0 £20,000 0 0 GOVERNMENT ASYLUMS FOR THE INFIRM AND DESTITUTE—Towards erection of Buildings, &c 20,000 0 0 INEBRIATES HOME—Towards erection of Buildings, &c.; improvements to Island, &c.— further sum 5,000 0 0 FIRE BRIGADES—Sites for, and erection of, Branch Stations under control of Metro­ politan Fire Brigade Board 25,000 0 0 SYDNEY HARBOUR TRUST—Towards construction of new Berthing Accommodation and new Jetties, Sheds, &c.; new Punts for Dredges ; general reconstruction of Wharfs and Jetties ; erection of Office accommodation ; and generally for the improvement of the Port 50,000 0 0 GOVERNMENT PRINTER—-For purchase of extra Machinery and Plant ..
    [Show full text]
  • 1.0 Introduction 2.0 Background 3.0 Existing Waterway Navigation and Usage
    Hanson Construction Materials Pty Ltd ABN 90 009 679 734 Level 18 2 ‐ 12 Macquarie Street Parramatta NSW 2150 Tel +612 9354 2600 Fax +612 9325 2695 www.hanson.com.au 1.0 Introduction This report is prepared in relation to a State Significant Development Application (SSDA) for an Aggregate Handling and Concrete Batching facility at Glebe Island (SSD 8854). Glebe Island currently operates as a working industrial port under the management of Ports Authority of NSW (Port Authority). The aggregate handling and concrete batching facility is proposed adjacent to the existing Glebe Island Berth 1 (GLB1) terminal. Aggregate is proposed to be delivered by ship to the GLB1 berth at Glebe Island. This report provides information relating to marine traffic, navigation and safety and outlines any potential maritime safety issues, and measures required to minimise and mitigate any impacts resulting from the proposed development. 2.0 Background The SSDA was submitted to the Department of Planning and Environment (DP&E) in March 2018 and subsequently placed on formal public exhibition for 5 weeks, between 11 April 2018 and 15 May 2018. On 20 August 2018, a Request for Additional Information (RFI) was issued by the DP&E. This report responds to the additional information sought in relation to the maritime traffic, safety and navigation impact assessment (Issues 30 – 32 under Schedule 1) for the new facility at Glebe Island. For the purposes of this SSDA, this statement provides a preliminary navigation impact assessment and outlines the general processes and guidelines in place that governs marine traffic flow within the context of the site at GLB1, Glebe Island and Sydney Harbour.
    [Show full text]
  • Bays West Draft Place Strategy
    Draft Bays West Place Strategy NSW Department of Planning, Industry and Environment March 2021 Welcome to Country The stretch of Country now known as Bays West Welcome to Country provided by Shannon Foster, has been known for millennia as Gari Gurad/ D'harawal Sydney Traditional Owner and Knowledge Nura (Saltwater Country) and Nattai Gurad/ Keeper. Artwork titled 'Guriwal Dreaming' by Shannon Nura (Freshwater Country). This Country is Foster. celebrated for vast expanses of garaban (rock Within the Bays West Place Strategy, you will and sandstone) which in some places provides encounter stories of the Bays West location gibbaragunya (stone/cave shelters), and in other specifically. These are a small selection of the places creates yiningmah (steep cliffs) where D'harawal stories of this place. They are shared by a ceremony can be performed privately without contributor to this document, D'harawal Knowledge uninitiated onlookers. Keeper Shannon Foster, whose Ancestors kept these knowledges alive, and whose Elders and Knowledge For thousands of generations, local Aboriginal Keepers still celebrate, live by and share them today. people have lived an abundant and sustainable lifestyle within a complex kinship system of The cultural Intellectual Property (IP) of all Aboriginal numerous families and clans on this Country peoples, including the cultural IP of these stories, including the D’harawal, Dharug, Eora, Gai- remains with the people they belong to and can never maragal, Gundangara and Guringai peoples, be vested or assigned. In this case the stories belong among others. We pay our respects to their to the D'harawal people of the Sydney region who Ancestors and Elders past, present and know themselves as Iyora here, and these stories emerging and acknowledge that through may not be duplicated or used without the express honouring Country, we also honour their timeless permission of Sydney D'harawal Elders or Knowledge connections to Country.
    [Show full text]
  • Contaminant Chemistry and Toxicity of Sediments in Sydney Harbour, Australia: Spatial Extent and Chemistry–Toxicity Relationships
    Vol. 363: 71–87, 2008 MARINE ECOLOGY PROGRESS SERIES Published July 15 doi: 10.3354/meps07445 Mar Ecol Prog Ser Contaminant chemistry and toxicity of sediments in Sydney Harbour, Australia: spatial extent and chemistry–toxicity relationships Gavin F. Birch1,*, Stephanie McCready1, Edward R. Long2, Stuart S. Taylor1, 3, Gina Spyrakis1 1School of Geosciences, Environmental Geology Group, The University of Sydney, New South Wales, 2006, Australia 2ERL Environmental, 3691 Cole Road South, Salem, Oregon 97306, USA 3URS, 116 Miller St., North Sydney, New South Wales, 2060, Australia ABSTRACT: The spatial distribution of chemical contamination and toxicity of surficial sediments in Sydney Harbour, Australia, was investigated in a 3-tiered, hierarchical approach. An initial chemical investigation throughout the entire estuary (Stage 1) indicated wide ranges and different spatial patterns in sediment chemical concentrations. Sediment quality guidelines (SQGs) were used as a preliminary estimate of possible toxicity in Stage 2 of the investigation. Assessment of chemical mixtures indicated that sediments in a small part (~2%) of the harbour had the highest probability of being toxic (~75%), whereas sediment in almost 25% of the port was estimated to have an inter- mediate (~50%) probability of being toxic. The SQG assessment in Stage 2 enabled careful stratifica- tion of the harbour into areas with different toxicity risks, reducing cost and time commitments in the final tier of assessment. The spatial survey carried out in Stage 3 involved concurrent chemical and ecotoxicological analyses. In this final stage, the degree of response in tests of amphipod survival in whole sediment samples, as well as in tests of microbial metabolism (Microtox©) and sea urchin egg fertilisation and embryo development in pore waters, generally increased with increasing chemical concentrations.
    [Show full text]
  • Bridge Types in NSW Historical Overviews 2006
    Bridge Types in NSW Historical overviews 2006 These historical overviews of bridge types in NSW are extracts compiled from bridge population studies commissioned by RTA Environment Branch. CONTENTS Section Page 1. Masonry Bridges 1 2. Timber Beam Bridges 12 3. Timber Truss Bridges 25 4. Pre-1930 Metal Bridges 57 5. Concrete Beam Bridges 75 6. Concrete Slab and Arch Bridges 101 Masonry Bridges Heritage Study of Masonry Bridges in NSW 2005 1 Historical Overview of Bridge Types in NSW: Extract from the Study of Masonry Bridges in NSW HISTORICAL BACKGROUND TO MASONRY BRIDGES IN NSW 1.1 History of early bridges constructed in NSW Bridges constructed prior to the 1830s were relatively simple forms. The majority of these were timber structures, with the occasional use of stone piers. The first bridge constructed in NSW was built in 1788. The bridge was a simple timber bridge constructed over the Tank Stream, near what is today the intersection of George and Bridge Streets in the Central Business District of Sydney. Soon after it was washed away and needed to be replaced. The first "permanent" bridge in NSW was this bridge's successor. This was a masonry and timber arch bridge with a span of 24 feet erected in 1803 (Figure 1.1). However this was not a triumph of colonial bridge engineering, as it collapsed after only three years' service. It took a further five years for the bridge to be rebuilt in an improved form. The contractor who undertook this work received payment of 660 gallons of spirits, this being an alternative currency in the Colony at the time (Main Roads, 1950: 37) Figure 1.1 “View of Sydney from The Rocks, 1803”, by John Lancashire (Dixson Galleries, SLNSW).
    [Show full text]
  • Contextual Analysis and Urban Design Objectives
    Rozelle Interchange Urban Design and Landscape Plan Contextual Analysis and Urban Design Objectives Artists impression: Pedestrian view along Victoria Road Caption(Landscape - Image shown description at full maturity and is indicative only). 03 White Bay Power Station Urban Design Objectives 3 Contextual analysis 3.1 Contextual analysis Local context WestConnex will extend from the M4 Motorway at The Rozelle Interchange will be a predominately Parramatta to Sydney Airport and the M5 underground motorway interchange with entry and Motorway, re-shaping the way people move exit points that connect to the wider transport through Sydney and generating urban renewal network at City West Link, Iron Cove and Anzac opportunities along the way. It will provide the Bridge. critical link between the M4 and M5, completing Sydney’s motorway network. Iron Cove and Rozelle Rail Yards sit on and are adjacent to disconnected urban environments. While the character varies along the route, the These conditions are the result of the historically WestConnex will be sensitively integrated into the typical approach to building large individual road built and natural environments to reconnect and systems which disconnect suburbs and greatly strengthen local communities and enhance the reduce the connectivity and amenity of sustainable form, function, character and liveability of Sydney. modes of transport such as cycling and walking. Rather than adding to the existing disconnection, An analysis of the Project corridor was undertaken the Project will provide increased
    [Show full text]
  • Existing Port Facilities CHAPTER 3
    Existing Port Facilities CHAPTER 3 Summary of key outcomes: Sydney’s ports provide a vital economic gateway for the Australian and NSW economies. In 2001/02, Sydney’s ports handled approximately $42 billion worth of international trade which represents 17% of Australia’s total international trade and 56% of NSW’s international air and sea cargo trade by value. Due to its proximity to the Sydney market, Port Botany is and will remain the primary port for the import and export of containerised cargo in NSW. Currently, over 90% of container trade passing through Sydney’s ports is handled at Port Botany. Port Botany Expansion Environmental Impact Statement – Volume 1 Existing Port Facilities CHAPTER 3 3 Existing Port Facilities 3.1 Role and Significance of Sydney’s Ports The port facilities of Sydney are located at Port Botany and within Sydney Harbour. These ports, along with the airport, are the economic gateways to NSW. This is reflected by the fact that in 2001/02 Sydney’s ports handled approximately $42 billion worth of international trade. This represents: $10,000 for each person in the greater Sydney region, which has a population of close to 4 million; 56% of NSW’s total international air and sea cargo trade by value; and 17% of Australia’s total international trade. Cargo throughput through Sydney’s ports (Sydney Ports Corporation owned and private berths) during 2001/02 was 24.3 million mass tonnes, with containerised cargo accounting for 43.9%. This trade comprised more than 1 million TEUs, 183,000 motor vehicles and about 13.6 million mass tonnes of bulk and general cargo.
    [Show full text]