File 2313 Woodloe Steel Fabfications Tender Cartalogue Lot Year Serial

Total Page:16

File Type:pdf, Size:1020Kb

File 2313 Woodloe Steel Fabfications Tender Cartalogue Lot Year Serial File 2313 Woodloe Steel Fabfications Tender Cartalogue Lot Year Serial No Bid € 1 Vortman V600 Steel Beam Drill Line with 2005 042088-00 Horizontal Head, Travelling Cabin, Control Panel, Kaeser Compact 240/4W Compressor and 1,800mm x 16M Drilling Table 2 Cuoghi Affilatrici APE 40 Drill Sharpener 2005 405556 3 A quantity of Steel Fabrication Drill Bits in Steel Cabinet 4 Imet VTF 500 SHI-E/ESC Semi Automatic Vertical 2003 032504011 Hydraulic Bandsaw with Hydraulic Vice, 45 Deg Mitre Table, Integrated Control Panel and 2 x Roller Stands. Capacity 330mm Bar / 300mm x 500mm Rectangular. 5 Imet BS280 Plus SHI-E Semi Automatic Horizontal 1999 990037002 Bandsaw with Hydraulic Vice, Mitre Table, Control Panel and Roller Tables, c. 490mm x 4.6M / 2.5M. Includes spare blades. 6 Kingsland 115XS 115 Ton Hydraulic Universal 114898 Steelworker with Foot Pedal and Range of Tooling 7 Euromac Digibend 360 Hydraulic Cylinder Type 1999 17610599 Bender with Clamping, Indexing, Back Gauge, Foot Pedal and Integrated Control Panel 8 Super Condor DG32 240mm Throath 1.1KW Pedestal Drill with 400mm x 400mm Base Table, 380mm x 380mm Column Table and a Quantity of Drill Bits 9 Hoistech 2,500 Kg SWL Freestanding Single Girder Gantry Crane with Electric Chain Hoist and Pendant Control. c. 10.1M Span x 18M Travel x 4.1M Height Under Beam. Top Rails c.200mm x 210mm, Supporting Columns c. 200mm x 210mm with Base Plates Excluding lifting chains & swing arm boom Insurance & RAAMS mandatory. Page 1 of 7 File 2313 Woodloe Steel Fabfications Tender Cartalogue Lot Year Serial No Bid € 10 Demag 2,500 Kg SWL Freestanding Single Girder Gantry Crane with Electric Chain Hoist and Pendant Control. c. 10.7M Span x 11.4M Travel x 4.1M Height Under Beam. Top Rails c.200mm x 210mm, Supporting Columns c. 200mm x 210mm with Base Plates Excluding lifting chains Insurance & RAAMS mandatory. 11 Oerlikon Citroarc M401 CE 400 Amp Mig Welder H-02-154733 with F401 Wire Feed Unit and 6000i Calibox. Including 5M Swing Boom (Excluding Gas Bottles) 12 Kilkenny Flexible Arm Welding Extractor 13 Esab Origo Mig L405 400 Amp Mig Welder with 331-610-0744 4304 Wire Feed Unit (Excluding Gas Bottles) 14 Kemppi Fastmig Welder KM400/ Fast Cool 10, 400 2004 1567190 Amp Mig Welder with Fastmig MF33 Wire Feed Unit (Excluding Gas Bottles & Boom) 15 Oerlikon M403 400 Amp Mig Welder with F403 H-99-136583 Wire Feed and TA-UK Cali Mig. (Excluding Gas Bottles & Boom) 16 Oerlikon Citorac M401 400 Amp Mig Welder (No H-01-169903 Wire Feed Unit) (Excluding Gas Bottles) 17 Oerlikon Citorac M408 400 Amp Mig Welder (No H-99-136583 Wire Feed Unit) (Excluding Gas Bottles) 18 Rehm Synergic Pro 450-4 400 Amp Mig Welder 178016 with Synergic Pro Wire Feed Unit 19 SIP TurboWeld 6 300Amp Arc Welder with Trolley 20 SIP TurboWeld 6 300Amp Arc Welder with Trolley 21 Hypertherm Powermax 1250G3 Series Plasma 1250-00 5922 Cutting System Page 2 of 7 File 2313 Woodloe Steel Fabfications Tender Cartalogue Lot Year Serial No Bid € 22 Jasic Pro Arc 1800 Mini Arc Welder 23 Pickhill PT180 Amp Oil Filled Arc Welder 21145 24 Camarc 303 Arc Welder F2013253 25 GOS Multi Stage EN ISO 7291 / 2503 Welding Regulators (On Wall) 26 Gensen Multiwork CE Molile Silent Diesel Welding 9700916 Generator 27 Mase 300/150 Mobile Diesel Welding Generator 28 Wescool Regulators & Torch 29 SIP Airmate P.5.5/200 4.oKW Receiver Mounted Air 0081923724 Compressor with Trolley (3 Phase) 30 Tritech Paint Spray Pump with Pot and 2 x Spray Guns 31 Kilkenny Flexible Arm Welding Extractor 32 Oxyacetylene Welding Torgs, Regulators , Leads & Trolley (Excluding Bottles) 33 Jungheinrich DFG 30BK 3,000Kg Capacity Diesel 2003 1000036768 Forklift Truck with 2.2M Two Stage Mast (C. 8,080 Hours) 34 Genie Superlift Advantage Vertical Manual Lift Unit 35 Hydraulic Engine Crane with Counter Weight Box. 254 > 508Kg SWL 36 Renault Master F3500 DCI 125 LWB Panel Van 12 D 22290 c.130,000 Kms, Tax 9-17, CVRT 7-17 Page 3 of 7 File 2313 Woodloe Steel Fabfications Tender Cartalogue Lot Year Serial No Bid € 37 Isuzu NPR Turbo Intercooled Pick Up Truck with 99 D 67830 4.4M Dropside Body (Excluding goods in carraige) Tax 1-18, CVRT 1-18 38 Robot Hydraulic Pipe Benderwith & Forms 1186 39 Contents of Stores including 8 Bays of Steel Shelving, Hilti Fixings, Grinding Disks, Welding wire, Kee Klamps, Lind Brackets, Chain, Nuts, Bolts, Rivets Etc. 40 Steel Anvil, c.700mm and a Recoed No 6, 150mm Vice on Stand 41 Steel Cabinet, c.1,030mm & Steel Stand c.1,150mm 42 Single Door Heavy Duty Steel Cabinet c. 1,900mm x 1,050mm x 700mm and a Steel Shelf 43 Six Port Low Voltage Site Transformer 44 Steel Banding Tool 45 Two Large Sodium Spotlights 46 Snapon Tool Chest & Under Cabinet 47 Flammable Liquids Double Door Steel Cabinet including Contents 48 Heavy Duty Double Door Steel Cabinet c. 2,200mm x 1,500mm x 600mm 49 Two Steel Cabinets 50 Eibenstock EHB 32/42 1,700 Watt Magnetic Drill (110V) 51 Alfra Rotabest DRP20WD 1,050 Watt Magnetic Drill (110V) Page 4 of 7 File 2313 Woodloe Steel Fabfications Tender Cartalogue Lot Year Serial No Bid € 52 Evolution Magnetic Drill (110V) A151U00074 53 Hitachi & Dewalt 230mm Diameter Angle Grinders (110V) 54 2 x Hitachi and 1 x Makita Wire Brush Grinders (110V) 55 3 x Hitachi and 1 x Makita 115mm Diameter Angle Grinders (110V) 56 Hilti DD130 Core Drill with DD130 Rig Stand, DD- 212789080804277 VPX Coolant Pump and 5x Various Diamond Drill Bits (110V) 57 Hilti DDEC-1 Core Drill with Water Supply Unit and 2782980701482 4x Various Diamoind Drill Bits 58 Hilti 90 TE-AC Degree Drill Head Attahment and 3x Diamond Drill Bits in Case 59 Hitachi DH Rotary Hammer Drill in Case (110V) 60 Hitachi SFH22-A Cordless Drill, Record DMS26 Drill Stand & Stanley Tec 3 Socket Set 61 7 x Various Large SDS Drill Bits 62 Manual Pulley Block Set 63 Hydraulic Trolley Jack, Stilson, Sledge Hammer, Crow Bar & Spirit Level 64 Steel Framed Work Bench c. 2,000mm (Excluding contents) 65 Liftingear 200Kg / 600 Kg Electormagnetic Steel 608600162 Lift 66 Elcometer G319-Sstandard Dewpoint Meter NF19036 (Recently Calibrated) Page 5 of 7 File 2313 Woodloe Steel Fabfications Tender Cartalogue Lot Year Serial No Bid € 67 Elcometer A456CFB Ferrous Separate Instrument PH00725 with Probe (Recently Calibrated) 68 Jobox Secure Steel Site Toolbox (Excluding Contents) 69 Jobox Secure Steel Site Toolbox (Excluding Contents) 70 Jobox Double Height Secure Steel Site Toolbox (Excluding Contents) 71 Desa BLP 70M Propane Space Heater with Cage (Excluding Gas Bottle) 72 Easi-Heat 150 Propane Space Heater with Cage (Excluding Gas Bottle) 73 Steel Cabinet & Steel Bench, c. 1,100mm 74 Six Port Low Voltage Site Transformer & Steel Table 75 6 x Various Steel Tressels (Excluding Contents) 76 Steel Stock Rack c. 6,150mm (Excluding Steel Stock) 77 North Type 2 6M Fall Arrester in Case, Harnesses & Canvass Slings (Buyer responsible for re-certification) 78 1,500Kg Chain Tirfor, Chain Block & Spring Balance 79 8 x Macalloy Solid Stainless Steel Tension Struts with Turnbuckle Fittings c. 250mm Diameter x 3,100mm and 1 x Solid Stainless Steel Round Bar c. 30mm Dia x 5M. 80 Forklift Boom, Adjustable to 2.6M 81 6 x Various Steel Tressels In Yard (Excluding Contents) 82 Plate Steel Waste Bin Page 6 of 7 File 2313 Woodloe Steel Fabfications Tender Cartalogue Lot Year Serial No Bid € 83 Pallet of Extension Leads 84 6 x Steel Framed Welding Screens (Various) 85 3 x Light Wood Veneer Desks, 2 x Side Extensions, 2 x Pedestals, 2 x Swivel Chairs and 2 x Visitors Chairs 86 Steel Framed Plans Suspension Rack 87 Hoover RushVacuum Cleaner 88 Black Ash Desk, Side Extension, Shelf & Swivel Chair 89 Beech Veneer Resctrion Counter, Circular Table, Double Dood Cabinet & Swivel Chairt 90 2 x Wave Form Light Wood Desks & 2 x Swivel Chairs 91 Siena Vacuum Cleaner 92 Canteen Table with Stainless Steel Top, c. 2.5M & 11 x Various Chairs 93 Beko Slim Dishwasher, Haler Microwave & Kettle 94 Aluiminium Extension Ladder ~ End ~ Page 7 of 7.
Recommended publications
  • MSL Engineering Limited Platinum Blue House 1St Floor, 18 the Avenue Egham, Surrey, TW20 9AB
    SMR Final Report 121404 Purpose of Issue Rev Date of Issue Author Agreed Approved Issued for information 0 Aug 2004 SM Issued for internal comment 1 November 2004 AFD DJM JB Issued as Final Report 2 December 2004 AFD DJM JB This Final report has been reviewed and approved by the Mineral Management Service. Approval does not signify that the contents necessarily reflect the views and policies of the Service, nor does mention of trade names or commercial products constitute endorsement or recommendation for use. This study was funded by the Mineral Management Service, U.S. Department of the Interior, Washington, D.C., under Contract Number 1435-01-04-CT-35320 ASSESSMENT OF REPAIR TECHNIQUES FOR AGEING OR DAMAGED STRUCTURES Project #502 DOC REF C357R001 Rev 1 NOV 2004 MSL Engineering Limited Platinum Blue House 1st Floor, 18 The Avenue Egham, Surrey, TW20 9AB Tel: +44 (0)1784 439194 Fax: +44 (0)1784 439198 E-mail: [email protected] C357R001Rev 2, December 2004 MMS Project #502 NUMBER DETAILS OF REVISION 0 Issued for information, August 2004 1 Issued for comment, November 2004. Extensive revisions throughout, including restructuring of report. 2 Issued as Final Report, December 2004. Conversion table added, Figure showing clamp details to avoid added, and general editorial revisions. C357R001Rev 2, December 2004 MMS Project #502 Assessment of Repair Techniques for Ageing or Damaged Structures By Dr. Adrian F Dier MSL Services Corporation Final Project Report: ASSESSMENT OF REPAIR TECHNIQUES FOR AGEING OR DAMAGED STRUCTURES MMS Project Number 502 November 2004 C357R001Rev 2, December 2004 i This Final report has been reviewed a nd approved by the Mineral Management Service.
    [Show full text]
  • Strengthening and Repair of Steel Bridges
    Strengthening and repair of steel bridges Techniques and management Master of Science Thesis in the Master’s Programme Structural Engineering and Building Performance Design HASAN DEMIR Department of Civil and Environmental Engineering Division of Structural Engineering Steel and Timber Structures CHALMERS UNIVERSITY OF TECHNOLOGY Göteborg, Sweden 2011 Master’s Thesis 2011:139 MASTER’S THESIS 2011:139 Strengthening and repair of steel bridges Techniques and management Master of Science Thesis in the Master’s Programme Structural Engineering and Building Performance Design HASAN DEMIR Department of Civil and Environmental Engineering Division of Structural Engineering Steel and Timber Structures CHALMERS UNIVERSITY OF TECHNOLOGY Göteborg, Sweden 2011 Strengthening and repair of steel structures Techniques and management Master of Science Thesis in the Master’s Programme Structural Engineering and Building Performance Design HASAN DEMIR © HASAN DEMIR, 2011 Examensarbete/Institutionen för bygg- och miljöteknik, Chalmers tekniska högskola 2011:139 Department of Civil and Environmental Engineering Division of Structural Engineering Steel and Timber Structures Chalmers University of Technology SE-412 96 Göteborg Sweden Telephone: + 46 (0)31-772 1000 Cover: Maintenance of a bridge in Blekinge in Sweden. BaTMan. Chalmers reproservice Göteborg, Sweden 2011 Strengthening and repair of steel bridges Techniques and management Master of Science Thesis in the Master’s Programme HASAN DEMIR Department of Civil and Environmental Engineering Division of Structural Engineering Steel and Timber Structures Chalmers University of Technology ABSTRACT In modern society, well designed and working infrastructure is important. For this reason large investment is made/making to build roads, railways and of course bridges. Bridges play a key factor in road and railway networks.
    [Show full text]
  • Nscsep17digi.Pdf
    www.newsteelconstruction.com Regenerating Liverpool Vol 25 No 8 September 2017 Vol High-rise lifts Elephant & Castle Complex services accommodated Steel married with wrought iron Leisure boost for County Down In this issue Cover Image Highpoint crown steelwork, London Main client: Newington Butts Developments Design Architect: Rogers Stirk Harbour + Associates Delivery Architect: Axis Main contractor: Mace Structural engineer: AKT II Steelwork contractor: Bourne Steel Steel tonnage: 55.5t September 2017 Vol 25 No 8 EDITOR Nick Barrett Tel: 01323 422483 Editor’s comment Editor Nick Barrett says the steel construction supply chain is [email protected] 5 showing a lead by confidently investing for the future against a background of DEPUTY EDITOR Martin Cooper Tel: 01892 538191 uncertainty that is pushing others’ plans to the backburner. [email protected] PRODUCTION EDITOR Andrew Pilcher Tel: 01892 553147 News The Steel Construction Certification Scheme has successfully achieved the [email protected] PRODUCTION ASSISTANT 6 revised ISO 14001 standard. Alastair Lloyd Tel: 01892 553145 [email protected] COMMERCIAL MANAGER Headline Sponsor Investment-led growth is consolidating Barrett Steel’s leading Fawad Minhas Tel: 01892 553149 [email protected] 10 market position. NSC IS PRODUCED BY BARRETT BYRD ASSOCIATES ON BEHALF OF THE BRITISH CONSTRUCTIONAL Sector Focus: Steelmaking NSC looks at the two main steelmaking processes used STEELWORK ASSOCIATION AND STEEL FOR LIFE IN ASSOCIATION WITH THE STEEL CONSTRUCTION 12 by today’s modern industrialised economies. INSTITUTE The British Constructional Steelwork Association Ltd 4 Whitehall Court, Westminster, London SW1A 2ES Retail Preston’s historic covered market will get a new lease of life with the addition Telephone 020 7839 8566 Website www.steelconstruction.org 14 of steel-framed stalls.
    [Show full text]
  • ETA-07/0046 with Abg, Bar Tensioning Method 835/1030
    EUROPEAN TECHNICAL ASSESSMENT ETA-07/0046 mit nationalen Zulassungsbescheiden POST-TENSIONING BAR TENDON SYSTEM BONDED / UNBONDED / EXTERNAL In cooperation with: EUROPEAN TECHNICAL ASSESSMENT ETA-07/0046 mit nationalen Zulassungsbescheiden Inhaltsverzeichnis I. Nationale Zulassungsbescheide Z-13.71-700461: Vorspannung mit nachträglichem Verbund Z-13.72-700462: Vorspannung ohne Verbund Z-13.73-700463: Externe Vorspannung II. European Technical Assessment ETA-07/0046: Vorspannung mit nachträglichem Verbund und ohne Verbund Member of www.eota.eu Pembroke House, 21 Pembroke Road Sevenoaks, Kent, TN13 1XR Tel: 00 44 1732 450000 Website: www.ukcares.com European Technical ETA 07/0046 Assessment of 20/09/2017 Technical Assessment Body issuing the ETA and designated according to Article 29 of the Regulation (EU) No 305/2011: UK CARES Trade name of the construction product Macalloy 1030 Post-Tensioning System Product family to which the construction PAC 16 – Reinforcing and pre-stressing steel for product belongs concrete (and ancillaries). Post tensioning kits. Manufacturer MACALLOY LTD Caxton Way Dinnington S25 3QE, United Kingdom Manufacturing plant(s) MACALLOY LTD Caxton Way Dinnington S25 3QE, United Kingdom This European Technical Assessment contains 38 pages including Annexes A to D which form an integral part of this assessment. This European Technical Assessment is issued ETAG 013: Edition June 2002, used as European in accordance with regulation (EU) No Assessment Document (EAD) 305/2011, on the basis of This European Technical Assessment replaces: European Technical Assessment (ETA) 07/0046 of 09.05.2012 ETA 07/0046 of 20.09.17 Page 1 of 38 Translations of this European Technical Assessment in other languages shall fully correspond to the original issued document and should be identified as such.
    [Show full text]
  • Infra Mancrichard Brook + Martin Dodge PICC-VIC TUNNEL
    Futurebound Services HELIPORT MANCUNIAN WAY Infra_MANCRichard Brook + Martin Dodge PICC-VIC TUNNEL GUARDIAN EXCHANGE Catalogue to accompany the exhibition CUBE Gallery | RIBA Hub Spring 2012 Infra_MANC Infra_MANC Post-war infrastructures of Manchester The catalogue of Infra_MANC. An exhibition at the RIBA Hub / CUBE Gallery, Portland Street Manchester from 27th February – 17th March 2012. Curated by Richard Brook and Martin Dodge Richard Brook Manchester School of Architecture, John Dalton West, Chester Street, Manchester. M1 5GD, UK. Martin Dodge Department of Geography, University of Manchester, Oxford Road, Manchester, M13 9PL, UK. Infra_MANC Prelims Second edition 2012 © Richard Brook and Martin Dodge 2012 All rights reserved. No part of this publication may be reproduced, stored in a retrieval system or transmitted in any form or by any means, electronic, mechanical, photocopying, recording or otherwise without the prior permission of the publisher. Richard Brook and Martin Dodge have asserted their right under the Copyright, Designs and Patents Act, 1988, to be identified as the authors and editors of this work. Published by bauprint 34 Milton Road Prestwich Manchester M25 1PT ISBN 978-0-9562913-2-5 Prelims Infra_MANC Table of contents Acknowledgements Curator biographies Introduction and overview map Timeline Ch.001 Helicopter Dreaming Ch.002 Mancunian Way [A57(M)] Our Highway in the Sky Ch.003 The Picc-Vic Tunnel Ch.004 Guardian Underground Telephone Exchange Bibliography List of exhibits Exhibition photos Infra_MANC Prelims ACKNOWLEDGEMENTS Copyright The exhibition and catalogue are an academic project and were undertaken on a non-commercial basis. We have assembled visual materials from a large number of sources and have endeavoured to secure suitable permissions.
    [Show full text]
  • Tied-Arch Bridges with Jumbo Shapes As Arch Member – State of the Art and Developments
    TIED-ARCH BIOGRAPHY arrangement allows amongst other for lower bending BRIDGES WITH Riccardo Zanon, S.E., MBA, moments in the tie and the arch. JUMBO SHAPES AS is Senior Research Engineer – ArcelorMittal Global R&D, The use of high-strength steel ARCH MEMBER – Luxembourg. for the arch permits weight STATE OF THE Mehdi ASSAD, S.E., Assistant savings translating into project ART AND Research Engineer - economies. The hangers are DEVELOPMENTS ArcelorMittal Global R&D, attached to the arch simply via Luxembourg. gusset plates welded directly Dennis Rademacher, S.E., into the profile’s chamber PhD is Bridge Development between flanges and web. Leader – ArcelorMittal The arch members are spliced Steligence, Luxembourg. by means of full penetration Wojciech Lorenc, S.E., PhD, is groove welds, knowing that the Associate Professor for Steel challenge of welding such thick Construction at the Wrocław steel requires preparation and RICCARDO ZANON University of Technology, the availability of skilled Poland. workmanship. The choice of the steel grade must be appropriate in terms of toughness, keeping SUMMARY in consideration that the welded The tied-arch bridge is a connection may result in stricter structural solution developed toughness requirements at the since over a century, but steel purchase. Recent welding MEHDI ASSAD recently has experienced a tests have been performed to considerable renaissance thanks further qualify the butt-weld to its aesthetic value as a joints of Jumbo sections, aiming landmark object with a relative also at quantifying the residual cost efficiency compared to stress patterns after welding other landmark solutions of the procedure. Some studies same span category.
    [Show full text]
  • Contractor Goes Dutch the BIM Environment
    www.newsteelconstruction.com Long span at St Michael’s Vol 23 No 2 February 2015 23 No 2 February Vol On The Curve in Slough Regent Street façade retained New phase at Longbridge New High Wycombe hub In this issue Cover Image The Curve cultural and learning centre, Slough Main client: Slough Borough Council Structural engineer: Peter Brett Associates Steelwork contractor: Caunton Engineering Steel tonnage: 370t February 2015 Vol 23 No 2 Editor’s comment Editor Nick Barrett says good news on steel’s market share and positive forecasts 5 for demand have brightened the outlook for steelwork contractors and their clients News The 2014 Market Share survey has confirmed that steel is still the preferred framing solution for 6 the UK and Ireland. Retail The regeneration of the former Longbridge car plant continues with the construction of the 10 region’s largest Marks & Spencer store. Commercial Redeveloping 169-183 Regent Street, London involves an extensive façade retention 12 scheme. Community Church and community groups in Bristol will have a new church facility, with a multi- 14 purpose auditorium seating up to 550 people. Civic A uniquely shaped cultural centre is the latest development in Slough’s town centre 16 regeneration. Embodied emissions The SCI has carried out an audit to quantify the carbon footprint of the 19 fabrication process. Retail & Leisure The Handy Cross hub development will deliver retail, commercial and leisure facilities 20 on the outskirts of High Wycombe. 22 CE Marking Dr David Moore explains the concept of Execution Class. Technical The SCI explains the design of runway beams carrying an underslung hoist or crane to 24 BS EN 1993-6.
    [Show full text]
  • PRODUCTS Clever Products Backed by Smart Advice We Live for the Challenge
    PRODUCTS Clever products backed by smart advice We live for the challenge SRG Global is an engineering-led specialist construction, maintenance and mining services group built to solve complex problems across the entire asset lifecycle. SRG Global was born out of Australia’s Few specialist services companies have greatest ever engineering and construction amassed the same knowledge, developed challenge, the Snowy Mountains Hydro- as many innovations or worked on as many electric Scheme, in 1961. Today, we are world-class projects as we have. As a result, an ASX listed company bringing a unique we have some of the best technical minds engineering mindset to every construction, and problem solvers, supported by a culture maintenance and mining project we touch. that encourages out of the box thinking and people working together to push boundaries Our specialist technical capabilities, on what’s considered possible. diversified services and global experience working on iconic skyscrapers, bridges, We are also relentless in the way we deliver. dams, structures, transport infrastructure, We know that people’s lives depend on us mining and oil and gas projects, means there executing with absolute precision, which is is no complex challenge we can’t resolve. why we never compromise on our systems, processes and safety standards. Working across the entire asset lifecycle, we provide bespoke engineer, construct We are SRG Global and we’re up for and sustain solutions, meaning you only ever the challenge. need one partner. We’re also self-performers because our team incorporates every discipline and skill required to meet the challenges our customers set.
    [Show full text]
  • First Five Year Review Report Macalloy Corporation
    First Five-Year Review Report Macalloy Corporation National Priorities List Site Cfiarfeston, Charleston County, South Carolina Prepared By: U.S. EPA Region 4 Superfund Division 61 Forsyth Street, SW Atlanta, GA 30303 June 24, 2010 10760299 First Five-Year Review Report Macalloy Corporation National Priorities List Site Charleston, Charleston County, South Carolina Prepared By: U.S. EPA Region 4 Superfund Division 61 Forsyth Street, SW Atlanta, GA 30303 June 24, 2010 Approved by: Date: (jli M mklin E. Hill, Director Superfund Division US EPA Region 4 Table of Contents EXECUTIVE SUMMARY viii 1. INTRODUCTION XI 2. SITE CHRONOLOGY 2 3.0 BACKGROUND 4 3.1 Physical Characteristic 4 3.2 Land and Resource Use 4 3.3 History of Contamination 5 3.4 Initial Response 5 3.5. Basis for Taking Action 7 3.5.1 Summary of RI Conclusions by Media 7 3.5.2 Summary of Site Risks 8 3.5.2.1 Human Health Risks 8 3.5.2.2 Ecological Risks 9 3.5.2.3 Fate and Transport Summary 10 4.0 REMEDIAL ACTIONS ; 12 4.1 Radiological Material: Excavation and Offsite Disposal 13 4.1.1 Remedy Selection 13 4.1.2 Remedy Implementation 13 4.1.3 Operation and Maintenance 14 4.2 Zone A Sediment Removal 14 4.2.1 Remedy Selection 14 4.2.2 Remedy Implementation 15 4.2.3 O&M 16 4.2.3.1 001 Tidal Creek Cap Monitoring 16 4.2.3.2 Tidal Marsh Plant Surveys 17 4.2.4 Five-Year Costs 18 4.3 Zone C Sediment 18 4.3.1 Remedy Selection 18 4.3.2 Operationa & Maintenance (O&M) 18 4.3.3 Five-Year Costs 19 4.4 Groundwater: Enhanced In Situ Chemical Reduction 19 4.4.1 Remedy Selection 19 4.4.2 Remedy Implementation
    [Show full text]
  • Macalloy 1030 Post Tensioning System Design Data
    MACALLOY 1030 POST TENSIONING SYSTEM DESIGN DATA Macalloy Caxton Way, Dinnington, Sheffield, S25 3QE. Telephone: (01909) 519200, Fax: (01909) 519201 Page 2 of 19 CONTENTS 1. INTRODUCTION ............................................................................................................. 3 2. LOSS OF PRESTRESS .................................................................................................. 4 2.1 RELAXATION OF THE STEEL .................................................................................................. 5 2.2 ELASTIC DEFORMATION OF THE CONCRETE ........................................................................... 5 2.3 SHRINKAGE OF THE CONCTETE ............................................................................................ 6 2.4 CONCRETE CREEP .............................................................................................................. 6 2.5 LOSS AT THE ANCHORAGE ON TRANSFER OF LOAD FROM THE JACK ......................................... 6 2.6 FRICTION IN THE JACKS ....................................................................................................... 7 2.7 FRICTION IN THE ANCHORAGE .............................................................................................. 7 2.8 FRICTION DUE TO VARIATIONS IN THE DUCT PROFILE OR WOBBLE OF THE DUCT ........................ 7 2.9 FRICTION DUE TO CURVATURE OF THE TENDON PROFILE ........................................................ 8 3. TENDON AND ANCHORAGE ARRANGEMENT ..........................................................
    [Show full text]
  • The Arup Journal
    2/2005 The Arup Journal CCTV Headquarters, Beijing, China: Structural engineering design and approvals Chris Carroll, Paul Cross, Xiaonian Duan, Craig Gibbons, Goman Ho, Michael Kwok, Richard Lawson, Alexis Lee, Andrew Luong, Rory McGowan, Chas Pope The Scottish Parliament Building, Edinburgh David Hadden, Don Henning, Patricia Johnstone, David Lewis, Duncan Richards, Alan Tweedie, Simon Webster. Robin Wilkinson Constitutional Court, Johannesburg Altstair Avern-Taplin 'The Hub' Community Resource Centre, London Chris Trott Making knowledge work Dominique Poole, Tony Sheehan Plantation Place development, City of London 35 Plantation Place Mick Brundle 39 Plantation Lane Lee Hosking, Dec/an O'Carro/1 41 Plantation Place South Graham Goymour Miami Airport QTA: ri sk-informed performance­ based fire protection Richard Custer. Matthew Johann Brian McLaughlin, Brian Meacham, Jeffrey Tubbs, Christopher Wood, Eileen Wood Designing buildings for a wireless world Bob Cather. Alan Newbold, Edwin Stokes Caltrans District 7 Headquarters, Los Angeles Eugene Desouza, Andy Howard, Teena Videriksen CClV Headquarters, Beijing China: Structural engineering design and approvals Chris Carroll Paul Cross Xiaonian Duan Craig Gibbons Goman Ho Michael Kwok Richard Lawson Alexis Lee Andrew Luong Rory McGowan Chas Pope Introduction Growth in China is happening at an historically unparalleled rate. China Central Television (CCTV), the principal state-run broadcaster, currently has 13 channels, but by 2008 it plans to be operating over 200 channels and competing successfully with CNN, NBC, Sky, and the BBC in the global market. To enable this expansion, and to place CCTV firmly on the global map, a new headquarters facility was needed, with the entire television-making process housed in one location within Beijing's newly-designated Central Business District (Fig 1).
    [Show full text]
  • Steel Car Parks Just the Ticket Warm Wellcome for Corporate HQ Cardington Fire Test Results 2 NSC March 2005 CONTENTS
    MARCH 2005 VOL13 NO3 NEW STEEL CONSTRUCTION www.new-steel-construction.com Steel car parks just the ticket Warm Wellcome for corporate HQ Cardington fire test results 2 NSC March 2005 CONTENTS MARCH 2005 VOL13 NO3 NEW STEEL CONSTRUCTION www.new-steel-construction.com Cover Image CROYDON CENTRALE CAR RAMPS Structural Engineer: Waterman Partnership Steelwork Contractor: Severfield-Rowen plc 5 Editor’s comment EDITOR Nick Barrett Tel: 01323 422483 6 News: Corus announces major investment at Scunthorpe [email protected] DEPUTY EDITOR 10 Letters and Diary David Fowler Tel: 01892 538191 [email protected] 11 Comment: BCSA’s Derek Tordoff returns from a fact-finding trip with CONTRIBUTING EDITOR Ty Byrd Tel: 01892 524455 suggestions for improving steel’s market share. [email protected] PRODUCTION EDITOR Andrew Pilcher Tel: 01892 524481 [email protected] PROFILE ISDN: 01892 557302 ADVERTISING SALES MANAGER 12 Kingspan is throwing its weight behind industry drives towards off- Sally Devine Tel: 01474 833871 site construction with substantial investments. Nick Barrett asks if [email protected] off-site’s time has finally arrived. PUBLISHED BY The British Constructional Steelwork Association Ltd 4 Whitehall Court, Westminster, London SW1A 2ES FEATURES Telephone 020 7839 8566 Fax 020 7976 1634 Website www.steelconstruction.org 16 Medical charity The Wellcome Trust wanted a prestigious but not Email [email protected] ostentatious building for its London headquarters. David Fowler The Steel Construction Institute heard how early involvement with steelwork contractors helped the Silwood Park, Ascot, Berkshire SL5 7QN Telephone 01344 623 345 Fax 01344 622 944 designers deliver.
    [Show full text]