PRODUCTS Clever Products Backed by Smart Advice We Live for the Challenge

Total Page:16

File Type:pdf, Size:1020Kb

PRODUCTS Clever Products Backed by Smart Advice We Live for the Challenge PRODUCTS Clever products backed by smart advice We live for the challenge SRG Global is an engineering-led specialist construction, maintenance and mining services group built to solve complex problems across the entire asset lifecycle. SRG Global was born out of Australia’s Few specialist services companies have greatest ever engineering and construction amassed the same knowledge, developed challenge, the Snowy Mountains Hydro- as many innovations or worked on as many electric Scheme, in 1961. Today, we are world-class projects as we have. As a result, an ASX listed company bringing a unique we have some of the best technical minds engineering mindset to every construction, and problem solvers, supported by a culture maintenance and mining project we touch. that encourages out of the box thinking and people working together to push boundaries Our specialist technical capabilities, on what’s considered possible. diversified services and global experience working on iconic skyscrapers, bridges, We are also relentless in the way we deliver. dams, structures, transport infrastructure, We know that people’s lives depend on us mining and oil and gas projects, means there executing with absolute precision, which is is no complex challenge we can’t resolve. why we never compromise on our systems, processes and safety standards. Working across the entire asset lifecycle, we provide bespoke engineer, construct We are SRG Global and we’re up for and sustain solutions, meaning you only ever the challenge. need one partner. We’re also self-performers because our team incorporates every discipline and skill required to meet the challenges our customers set. 02 PRODUCTS Building Vertically integrated solutions Civil Constructing complex infrastructure Asset Services Sustaining complex infrastructure Mining Services Comprehensive ground solutions Products Complementary products and technology PRODUCTS 03 04 PRODUCTS PRODUCTS Clever products backed by smart advice What we do We design, manufacture and supply Structural products advanced construction and ground support Reinforcing products products for improved productivity, cost and safety, and better structural integrity. Architectural and facade products The right facade materials, fixings, ground anchors, post-tensioning and Post-tensioning reinforcement products are crucial to products the structural integrity of the project, Ground support whether it’s a skyscraper, a bridge, or products mining infrastructure. Monitoring products SRG Global’s operational expertise and experience in commercial and civil construction, combined with our decades of engineering experience, means we know how to design and manufacture products that out-perform in real-world situations, and under all kinds of conditions. Most of all, we have the technical people to help answer all your design and installation questions, so you can be confident you’re using the right product for the right application. Key projects Construction Ground Support Mining Radar Monitoring PRODUCTS 05 PRODUCTS Structural products The complete engineered SureLok™️ Slab to Wall Macalloy 1030 Bars solution for temporary The SureLok™️ slab to wall range The Macalloy 1030 and S1030 movement joints encompasses three SureLok™️ Post-Tensioning bar systems products. The SureLok™️ 160W, the are high strength bar systems SRG Global have developed in-house SureLok™️ 160W+ and the SureLok™️ with superior fatigue properties. a complete engineered solution BRS (Basement Retention System). The Macalloy Post-Tension bar to temporary movement joints – All three products are designed to provides an ultimate yield strength SureLokTM. SureLokTM is the result provide a temporary movement of 1030 N/mm2. of years of experience, investment, joint between a wall and slab and research, development and testing. eliminate the requirement for The Macalloy Post-Tension bar is It has been developed for the post- pour strips. available in diameters from 20mm tensioning, construction and to 75mm. mining industries. The SureLok™️ 160W is used on applications where the anchor can Shear Connectors SureLokTM is revolutionary as it be fixed inside the wall cavity and offers a range of safety, cost, SRG Global offer a range of positioned and secured by local design and performance benefits. permanent movement shear reinforcement or is set into a connectors for both slab on grade precast wall. SureLok™️ Slab to Slab and suspended slab applications. The SureLok™️ 160W+ is used in These connectors cover a wide The SureLok™️ slab to slab range applications where the anchor is range of applications from light box encompasses two SureLok™️ attached to the inside of the shutter dowels to heavy duty shear dowels. products. The SureLok™️ 160S by way of the void former. and the SureLok™️ 200S. The SureLok™️ BRS is used for basement applications where the walls are formed using shotcrete. 06 PRODUCTS PRODUCTS Reinforcing products Helping you optimise your eliminates the need for welding Punching shear structural goals and/or lapping of rebars, making a reinforcement (PSR) guaranteed connection and reducing The key to meeting the structural rebar congestion in critical areas. SRG Global has their own forged goals of reinforcement is not to use SRG Global offers proven world class double head punching shear rail more, but to use the right product, coupler systems including a bar- system (PSR). PSR is a useful and correctly engineered and installed break taper thread standard coupler, efficient solution for overcoming by specialists. Our expertise in a precast inter-lock coupler and an areas of high shear in reinforced engineering the construction design in-situ splicing coupler. SRG Global concrete structures. A very common and our vast global experience in has invested in threading equipment application is around column heads iconic structures ensuring we can placed at its factory in Brisbane in post-tensioned (PT) slabs to optimise steel usage, and streamline and with a partner reinforcement counteract the high punching shear the build. company in Melbourne. around the column slab connection resulting from the thinner PT slab. Threaded reinforcement Reinforcement starter bars continuity boxes SRG Global supply threaded SRG Global supplies reinforcement reinforcement bars (rebars) which continuity boxes (or pull-out boxes) are used in the construction industry which are a commonly accepted to speed up construction over joints method of providing for continuous in reinforced concrete and eliminate reinforcement across a concrete the need to drill through formwork. joint. This product consists of reinforcement assembled into a box Reinforcement couplers which is fixed to formwork and cast into the concrete. On stripping of the SRG Global provide reinforcement formwork the box lid is removed and couplers which offer a better the reinforcement is straightened out alternative for splicing reinforcement into the area of the next pour. bars (rebars) in reinforced concrete construction. The use of couplers PRODUCTS 07 PRODUCTS Architectural and facade products Get the perfect finish to Macalloy Architectural your building We use and recommend Macalloy Meeting the aesthetic goals of Architectural high strength bar,cable the designers while maintaining systems and tension rod products structural integrity demands a for commercial buildings, hospitals, specialised knowledge of materials, bridges, apartments and stadiums. fixings and techniques. Our work on high rise commercial buildings Jordahl in environments from Dubai, to London and Sydney gives our team We use and recommend Jordahl the experience to specify the right fixings, reinforcement technology, materials and manufacturers for connectors and fasteners for every job. residential and commercial towers. We use and recommend Jordahl fixings, reinforcement technology, connectors and fasteners for residential and commercial towers, and Macalloy high strength bar and cable systems and post-tensioning products for commercial buildings, hospitals, bridges, apartments and stadiums. 08 PRODUCTS PRODUCTS 09 10 PRODUCTS PRODUCTS Post-tensioning products Made by one of the world Ducting Barrel & Wedges leaders in post-tensioning SRG Global manufacture and supply Barrel and wedges are used for Our reputation as one of the zinc coated, spirally wound steel locking strand in the hole of a barrel foremost post-tensioning ducting for all types of applications. or banana block. We manufacture contractors in the world is built in The corrugated duct is strong and two different sized barrel and part on our insistence on the very bendable and allows for changes in wedges, 12.7mm and 15.2mm. best barrels, wedges, anchors, profile not possible with PVC and ducts, dowels, chairs and other other ducts. Swage Plates post-tensioning products. We also manufacture flat duct in a Swage plates allow pressure to go to range of sizes and can custom-make The advantage of selecting SRG the end of the post-tensioned slab so solutions for particular customer Global for post-tensioning work is barrels do not pull through the slab, requirements such as elbows. that we can engineer the process, they come in one size which fits both specify the right products based 12.7mm and 15.2mm strand. on years of experience using those Duct Chairs products, and then supply, install and construct. We manufacture and supply steel Cast Iron Products and plastic duct chairs to suit a Anchor blocks, banana blocks If the product we need does wide range of construction and couplers are all
Recommended publications
  • Lapping Plate
    Lapping Plate 05M20.20 Patent Pending Lapping is the process of rubbing two surfaces together with an abrasive and a lubricant to improve the quality of at least one of the surfaces. Although lapping can be used to create fl at surfaces, in the context of woodworking, lapping better serves to minimize the roughness of a surface – known as surface conditioning. By minimizing the roughness in the sole of a plane, there is reduced friction between the plane and the workpiece, which in turn reduces abrasion. For blades or chisels, the cutting edge can be made sharper if both intersecting surfaces are free of scratches, even if the back of the blade isn’t perfectly fl at. Straight cutting edge on a lapped blade. Jagged cutting edge on a ground blade. Figure 1: A ground blade versus a lapped blade. Lapping can remove only small amounts of material. If the sole of your plane or the back of your blade is twisted, wavy or bowed, it will be necessary to sand or grind off the high points prior to lapping. Lapping is always performed with an abrasive oil slurry, which not only allows the object to slide Small Abrasive about the lapping plate (called a lap), but also Particles provides a means to remove abraded particles and worn abrasive. Oil Object Abraded Metal Lap Groove in Lap Large Abrasive Particles Figure 2: Lapping mechanics. 2 Important Notes The lapping plate is made of soft iron and will wear over time. These instructions provide information on how to ensure the lap remains fl at for a lifetime.
    [Show full text]
  • File 2313 Woodloe Steel Fabfications Tender Cartalogue Lot Year Serial
    File 2313 Woodloe Steel Fabfications Tender Cartalogue Lot Year Serial No Bid € 1 Vortman V600 Steel Beam Drill Line with 2005 042088-00 Horizontal Head, Travelling Cabin, Control Panel, Kaeser Compact 240/4W Compressor and 1,800mm x 16M Drilling Table 2 Cuoghi Affilatrici APE 40 Drill Sharpener 2005 405556 3 A quantity of Steel Fabrication Drill Bits in Steel Cabinet 4 Imet VTF 500 SHI-E/ESC Semi Automatic Vertical 2003 032504011 Hydraulic Bandsaw with Hydraulic Vice, 45 Deg Mitre Table, Integrated Control Panel and 2 x Roller Stands. Capacity 330mm Bar / 300mm x 500mm Rectangular. 5 Imet BS280 Plus SHI-E Semi Automatic Horizontal 1999 990037002 Bandsaw with Hydraulic Vice, Mitre Table, Control Panel and Roller Tables, c. 490mm x 4.6M / 2.5M. Includes spare blades. 6 Kingsland 115XS 115 Ton Hydraulic Universal 114898 Steelworker with Foot Pedal and Range of Tooling 7 Euromac Digibend 360 Hydraulic Cylinder Type 1999 17610599 Bender with Clamping, Indexing, Back Gauge, Foot Pedal and Integrated Control Panel 8 Super Condor DG32 240mm Throath 1.1KW Pedestal Drill with 400mm x 400mm Base Table, 380mm x 380mm Column Table and a Quantity of Drill Bits 9 Hoistech 2,500 Kg SWL Freestanding Single Girder Gantry Crane with Electric Chain Hoist and Pendant Control. c. 10.1M Span x 18M Travel x 4.1M Height Under Beam. Top Rails c.200mm x 210mm, Supporting Columns c. 200mm x 210mm with Base Plates Excluding lifting chains & swing arm boom Insurance & RAAMS mandatory. Page 1 of 7 File 2313 Woodloe Steel Fabfications Tender Cartalogue Lot Year Serial No Bid € 10 Demag 2,500 Kg SWL Freestanding Single Girder Gantry Crane with Electric Chain Hoist and Pendant Control.
    [Show full text]
  • Hand-Forging and Wrought-Iron Ornamental Work
    This is a digital copy of a book that was preserved for generations on library shelves before it was carefully scanned by Google as part of a project to make the world’s books discoverable online. It has survived long enough for the copyright to expire and the book to enter the public domain. A public domain book is one that was never subject to copyright or whose legal copyright term has expired. Whether a book is in the public domain may vary country to country. Public domain books are our gateways to the past, representing a wealth of history, culture and knowledge that’s often difficult to discover. Marks, notations and other marginalia present in the original volume will appear in this file - a reminder of this book’s long journey from the publisher to a library and finally to you. Usage guidelines Google is proud to partner with libraries to digitize public domain materials and make them widely accessible. Public domain books belong to the public and we are merely their custodians. Nevertheless, this work is expensive, so in order to keep providing this resource, we have taken steps to prevent abuse by commercial parties, including placing technical restrictions on automated querying. We also ask that you: + Make non-commercial use of the files We designed Google Book Search for use by individuals, and we request that you use these files for personal, non-commercial purposes. + Refrain from automated querying Do not send automated queries of any sort to Google’s system: If you are conducting research on machine translation, optical character recognition or other areas where access to a large amount of text is helpful, please contact us.
    [Show full text]
  • Lapping Kit Lappin
    Lapping Kit 05M01.01Lapping Kit 05M01.01 Contents Contents Five 2-ounce containers of 90x, 180x, 280x, 400x and 600x silicon Five 2-ounce containers of 90x, 180x, 280x, 400x and 600x silicon carbide particles. carbide particles. Background Background Lapping is the process of rubbing two surfaces together with an abrasive Lapping is the process of rubbing two surfaces together with an abrasive and a lubricant to improve the quality of at least one of the surfaces. and a lubricant to improve the quality of at least one of the surfaces. Lapping can be used for fl attening (or truing) a surface, such as a worn Lapping can be used for fl attening (or truing) a surface, such as a worn sharpening stone. Lapping can also minimize the roughness of a surface sharpening stone. Lapping can also minimize the roughness of a surface (i.e., surface conditioning), such as a plane sole or blade. By minimizing (i.e., surface conditioning), such as a plane sole or blade. By minimizing the roughness in the sole of a plane, there is reduced friction between the the roughness in the sole of a plane, there is reduced friction between the plane and the workpiece, which in turn reduces abrasion. For blades or plane and the workpiece, which in turn reduces abrasion. For blades or chisels, the cutting edge can be made sharper if both intersecting surfaces chisels, the cutting edge can be made sharper if both intersecting surfaces are free of scratches. are free of scratches. Choosing an Abrasive Choosing an Abrasive Although any grit will provide adequate results for any application, each is Although any grit will provide adequate results for any application, each is best suited to a particular application.
    [Show full text]
  • MSL Engineering Limited Platinum Blue House 1St Floor, 18 the Avenue Egham, Surrey, TW20 9AB
    SMR Final Report 121404 Purpose of Issue Rev Date of Issue Author Agreed Approved Issued for information 0 Aug 2004 SM Issued for internal comment 1 November 2004 AFD DJM JB Issued as Final Report 2 December 2004 AFD DJM JB This Final report has been reviewed and approved by the Mineral Management Service. Approval does not signify that the contents necessarily reflect the views and policies of the Service, nor does mention of trade names or commercial products constitute endorsement or recommendation for use. This study was funded by the Mineral Management Service, U.S. Department of the Interior, Washington, D.C., under Contract Number 1435-01-04-CT-35320 ASSESSMENT OF REPAIR TECHNIQUES FOR AGEING OR DAMAGED STRUCTURES Project #502 DOC REF C357R001 Rev 1 NOV 2004 MSL Engineering Limited Platinum Blue House 1st Floor, 18 The Avenue Egham, Surrey, TW20 9AB Tel: +44 (0)1784 439194 Fax: +44 (0)1784 439198 E-mail: [email protected] C357R001Rev 2, December 2004 MMS Project #502 NUMBER DETAILS OF REVISION 0 Issued for information, August 2004 1 Issued for comment, November 2004. Extensive revisions throughout, including restructuring of report. 2 Issued as Final Report, December 2004. Conversion table added, Figure showing clamp details to avoid added, and general editorial revisions. C357R001Rev 2, December 2004 MMS Project #502 Assessment of Repair Techniques for Ageing or Damaged Structures By Dr. Adrian F Dier MSL Services Corporation Final Project Report: ASSESSMENT OF REPAIR TECHNIQUES FOR AGEING OR DAMAGED STRUCTURES MMS Project Number 502 November 2004 C357R001Rev 2, December 2004 i This Final report has been reviewed a nd approved by the Mineral Management Service.
    [Show full text]
  • Strengthening and Repair of Steel Bridges
    Strengthening and repair of steel bridges Techniques and management Master of Science Thesis in the Master’s Programme Structural Engineering and Building Performance Design HASAN DEMIR Department of Civil and Environmental Engineering Division of Structural Engineering Steel and Timber Structures CHALMERS UNIVERSITY OF TECHNOLOGY Göteborg, Sweden 2011 Master’s Thesis 2011:139 MASTER’S THESIS 2011:139 Strengthening and repair of steel bridges Techniques and management Master of Science Thesis in the Master’s Programme Structural Engineering and Building Performance Design HASAN DEMIR Department of Civil and Environmental Engineering Division of Structural Engineering Steel and Timber Structures CHALMERS UNIVERSITY OF TECHNOLOGY Göteborg, Sweden 2011 Strengthening and repair of steel structures Techniques and management Master of Science Thesis in the Master’s Programme Structural Engineering and Building Performance Design HASAN DEMIR © HASAN DEMIR, 2011 Examensarbete/Institutionen för bygg- och miljöteknik, Chalmers tekniska högskola 2011:139 Department of Civil and Environmental Engineering Division of Structural Engineering Steel and Timber Structures Chalmers University of Technology SE-412 96 Göteborg Sweden Telephone: + 46 (0)31-772 1000 Cover: Maintenance of a bridge in Blekinge in Sweden. BaTMan. Chalmers reproservice Göteborg, Sweden 2011 Strengthening and repair of steel bridges Techniques and management Master of Science Thesis in the Master’s Programme HASAN DEMIR Department of Civil and Environmental Engineering Division of Structural Engineering Steel and Timber Structures Chalmers University of Technology ABSTRACT In modern society, well designed and working infrastructure is important. For this reason large investment is made/making to build roads, railways and of course bridges. Bridges play a key factor in road and railway networks.
    [Show full text]
  • Nscsep17digi.Pdf
    www.newsteelconstruction.com Regenerating Liverpool Vol 25 No 8 September 2017 Vol High-rise lifts Elephant & Castle Complex services accommodated Steel married with wrought iron Leisure boost for County Down In this issue Cover Image Highpoint crown steelwork, London Main client: Newington Butts Developments Design Architect: Rogers Stirk Harbour + Associates Delivery Architect: Axis Main contractor: Mace Structural engineer: AKT II Steelwork contractor: Bourne Steel Steel tonnage: 55.5t September 2017 Vol 25 No 8 EDITOR Nick Barrett Tel: 01323 422483 Editor’s comment Editor Nick Barrett says the steel construction supply chain is [email protected] 5 showing a lead by confidently investing for the future against a background of DEPUTY EDITOR Martin Cooper Tel: 01892 538191 uncertainty that is pushing others’ plans to the backburner. [email protected] PRODUCTION EDITOR Andrew Pilcher Tel: 01892 553147 News The Steel Construction Certification Scheme has successfully achieved the [email protected] PRODUCTION ASSISTANT 6 revised ISO 14001 standard. Alastair Lloyd Tel: 01892 553145 [email protected] COMMERCIAL MANAGER Headline Sponsor Investment-led growth is consolidating Barrett Steel’s leading Fawad Minhas Tel: 01892 553149 [email protected] 10 market position. NSC IS PRODUCED BY BARRETT BYRD ASSOCIATES ON BEHALF OF THE BRITISH CONSTRUCTIONAL Sector Focus: Steelmaking NSC looks at the two main steelmaking processes used STEELWORK ASSOCIATION AND STEEL FOR LIFE IN ASSOCIATION WITH THE STEEL CONSTRUCTION 12 by today’s modern industrialised economies. INSTITUTE The British Constructional Steelwork Association Ltd 4 Whitehall Court, Westminster, London SW1A 2ES Retail Preston’s historic covered market will get a new lease of life with the addition Telephone 020 7839 8566 Website www.steelconstruction.org 14 of steel-framed stalls.
    [Show full text]
  • ETA-07/0046 with Abg, Bar Tensioning Method 835/1030
    EUROPEAN TECHNICAL ASSESSMENT ETA-07/0046 mit nationalen Zulassungsbescheiden POST-TENSIONING BAR TENDON SYSTEM BONDED / UNBONDED / EXTERNAL In cooperation with: EUROPEAN TECHNICAL ASSESSMENT ETA-07/0046 mit nationalen Zulassungsbescheiden Inhaltsverzeichnis I. Nationale Zulassungsbescheide Z-13.71-700461: Vorspannung mit nachträglichem Verbund Z-13.72-700462: Vorspannung ohne Verbund Z-13.73-700463: Externe Vorspannung II. European Technical Assessment ETA-07/0046: Vorspannung mit nachträglichem Verbund und ohne Verbund Member of www.eota.eu Pembroke House, 21 Pembroke Road Sevenoaks, Kent, TN13 1XR Tel: 00 44 1732 450000 Website: www.ukcares.com European Technical ETA 07/0046 Assessment of 20/09/2017 Technical Assessment Body issuing the ETA and designated according to Article 29 of the Regulation (EU) No 305/2011: UK CARES Trade name of the construction product Macalloy 1030 Post-Tensioning System Product family to which the construction PAC 16 – Reinforcing and pre-stressing steel for product belongs concrete (and ancillaries). Post tensioning kits. Manufacturer MACALLOY LTD Caxton Way Dinnington S25 3QE, United Kingdom Manufacturing plant(s) MACALLOY LTD Caxton Way Dinnington S25 3QE, United Kingdom This European Technical Assessment contains 38 pages including Annexes A to D which form an integral part of this assessment. This European Technical Assessment is issued ETAG 013: Edition June 2002, used as European in accordance with regulation (EU) No Assessment Document (EAD) 305/2011, on the basis of This European Technical Assessment replaces: European Technical Assessment (ETA) 07/0046 of 09.05.2012 ETA 07/0046 of 20.09.17 Page 1 of 38 Translations of this European Technical Assessment in other languages shall fully correspond to the original issued document and should be identified as such.
    [Show full text]
  • AGREEMENT Between
    AGREEMENT between MILLWRIGHTS LOCAL UNION 1121 of the EASTERN MILLWRIGHT REGIONAL COUNCIL UNITED BROTHERHOOD OF CARPENTERS AND JOINERS OF AMERICA, and LABOR RELATIONS DIVISION OF THE ASSOCIATED GENERAL CONTRACTORS OF MASSACHUSETTS, INC. and BUILDING TRADES EMPLOYERS' ASSOCIATION OF BOSTON AND EASTERN MASSACHUSETTS, INC. and CONNECTICUT CONSTRUCTION INDUSTRIES ASSOCIATION, INC. and AGC/CCIA BUILDING CONTRACTORS LABOR DIVISION OF CONNECTICUT, INC. EFFECTIVE: OCTOBER 1, 2015 THROUGH SEPTEMBER 30,2019 Expires September 30, 2019 Eastern Millwright Regional Council UNITED BROTHERHOOD OF CARPENTERS AND JOINERS OF AMERICA, EASTERN MILLWRIGHT REGIONAL COUNCIL MILLWRIGHTS LOCAL UNION 1121 ROBERT LOUBIER, Executive Secretary Treasurer 1661 Worcester Road, Suite 302 Framingham, Massachusetts 01701-5402 Phone 617-254-1655 Fax 617-783-5554 LABOR RELATIONS DIVISION OF THE ASSOCIATED GENERAL CONTRACTORS OF MASSACHUSETTS, INC. BRIAN O'DONNELL, Director of Labor Relations 888 Worcester Street - #40 Wellesley, Massachusetts 02482-3793 Phone 781-235-2680 Fax 781-235-6020 BUILDING TRADES EMPLOYERS' ASSOCIATION OF BOSTON AND EASTERN MASSACHUSETTS, INC. THOMAS J GUNNING, Executive Director 150 Grossman Drive, Suite 313 Braintree, Massachusetts 02184 Phone 781-431-7440 Fax 781-235-6020 CONNECTICUT CONSTRUCTION INDUSTRIES ASSOCIATION, INC. DONALD SHUBERT, President 912 Silas Deane Highway Wethersfield, CT 06109 Phone 860-529-6855 Fax 860-563-0616 AGCICCIA BUILDING CONTRACTORS LABOR DIVISION OF CONNECTICUT, INC. DONALD SHUBERT, President 912 Silas Deane Highway
    [Show full text]
  • Infra Mancrichard Brook + Martin Dodge PICC-VIC TUNNEL
    Futurebound Services HELIPORT MANCUNIAN WAY Infra_MANCRichard Brook + Martin Dodge PICC-VIC TUNNEL GUARDIAN EXCHANGE Catalogue to accompany the exhibition CUBE Gallery | RIBA Hub Spring 2012 Infra_MANC Infra_MANC Post-war infrastructures of Manchester The catalogue of Infra_MANC. An exhibition at the RIBA Hub / CUBE Gallery, Portland Street Manchester from 27th February – 17th March 2012. Curated by Richard Brook and Martin Dodge Richard Brook Manchester School of Architecture, John Dalton West, Chester Street, Manchester. M1 5GD, UK. Martin Dodge Department of Geography, University of Manchester, Oxford Road, Manchester, M13 9PL, UK. Infra_MANC Prelims Second edition 2012 © Richard Brook and Martin Dodge 2012 All rights reserved. No part of this publication may be reproduced, stored in a retrieval system or transmitted in any form or by any means, electronic, mechanical, photocopying, recording or otherwise without the prior permission of the publisher. Richard Brook and Martin Dodge have asserted their right under the Copyright, Designs and Patents Act, 1988, to be identified as the authors and editors of this work. Published by bauprint 34 Milton Road Prestwich Manchester M25 1PT ISBN 978-0-9562913-2-5 Prelims Infra_MANC Table of contents Acknowledgements Curator biographies Introduction and overview map Timeline Ch.001 Helicopter Dreaming Ch.002 Mancunian Way [A57(M)] Our Highway in the Sky Ch.003 The Picc-Vic Tunnel Ch.004 Guardian Underground Telephone Exchange Bibliography List of exhibits Exhibition photos Infra_MANC Prelims ACKNOWLEDGEMENTS Copyright The exhibition and catalogue are an academic project and were undertaken on a non-commercial basis. We have assembled visual materials from a large number of sources and have endeavoured to secure suitable permissions.
    [Show full text]
  • Tied-Arch Bridges with Jumbo Shapes As Arch Member – State of the Art and Developments
    TIED-ARCH BIOGRAPHY arrangement allows amongst other for lower bending BRIDGES WITH Riccardo Zanon, S.E., MBA, moments in the tie and the arch. JUMBO SHAPES AS is Senior Research Engineer – ArcelorMittal Global R&D, The use of high-strength steel ARCH MEMBER – Luxembourg. for the arch permits weight STATE OF THE Mehdi ASSAD, S.E., Assistant savings translating into project ART AND Research Engineer - economies. The hangers are DEVELOPMENTS ArcelorMittal Global R&D, attached to the arch simply via Luxembourg. gusset plates welded directly Dennis Rademacher, S.E., into the profile’s chamber PhD is Bridge Development between flanges and web. Leader – ArcelorMittal The arch members are spliced Steligence, Luxembourg. by means of full penetration Wojciech Lorenc, S.E., PhD, is groove welds, knowing that the Associate Professor for Steel challenge of welding such thick Construction at the Wrocław steel requires preparation and RICCARDO ZANON University of Technology, the availability of skilled Poland. workmanship. The choice of the steel grade must be appropriate in terms of toughness, keeping SUMMARY in consideration that the welded The tied-arch bridge is a connection may result in stricter structural solution developed toughness requirements at the since over a century, but steel purchase. Recent welding MEHDI ASSAD recently has experienced a tests have been performed to considerable renaissance thanks further qualify the butt-weld to its aesthetic value as a joints of Jumbo sections, aiming landmark object with a relative also at quantifying the residual cost efficiency compared to stress patterns after welding other landmark solutions of the procedure. Some studies same span category.
    [Show full text]
  • Compoforging of Al-Si Metal Matrix Composites Reinforced with -Sic: an Alternative Technique
    The Open Industrial & Manufacturing Engineering Journal, 2010, 3, 1-6 1 Open Access Compoforging of Al-Si Metal Matrix Composites Reinforced with -SiC: An Alternative Technique M. F. Valencia García1,*, H. V. Martínez2 and A. Morales Ortiz2 1Escuela de Ingeniería de Antioquia; Grupo Productividad hacia la Competitividad GPC – A.A. 7516 Medellín, Colombia 2Universidad Pontificia Bolivariana; Facultad de Ingeniería Mecánica. Grupo de Investigación sobre Nuevos Materiales GINUMA – A.A. 56006 Medellín, Colombia Abstract: This paper reports the -SiC particles surface modification by copper Electroless Plating (EP), as well as a morphological characterization of Al-Si reinforced composite obtained with such modified particles and consolidated by compoforging. The -SiC particles were obtained by thermal degradation of organic waste. The compoforging technique is a hybrid between the compocasting process and semi-solid forging. The properties of the obtained composite material derive from its globular structure, which is achieved by mixing the semi-solid alloy and the reinforcing particles. This method produced an almost perfect distribution of the reinforce particles. Furthermore, it is possible to achieve minimum defects (i.e. porosity) by applying pressures up to 60MPa. Keywords: Silicon carbide, electroless plating, superficial modification, mechanical mixing, compoforging. INTRODUCTION Table 1. Process Conditions for -SiC Synthesis About 35 years ago, semi-solid metallurgy, or semi-solid processing of alloys (SSM and SSP, respectively), was origi- Variable Value Unit nated. This technology combines the advantages of tradi- o tional forging and foundry processes. Nowadays such tech- Process temperature 1370 C nology and the development of Metal Matrix Composites Atmosphere process 1.5 L/min (MMC’s) have been strong, combining dispersion process to obtain Particulate reinforced Metal Matrix Composites Processing times 40 min (PRMCs).
    [Show full text]