Proposed Coal-Fired Power Stations and Associated Infrastructure in the Waterberg, Limpopo Report No: [4793A/402719] ENVIRONMENTAL IMPACT ASSESSMENT PROCESS: PROPOSED COAL-FIRED POWER STATIONS AND ASSOCIATED INFRASTRUCTURE IN THE WATERBERG, LIMPOPO FINAL SCOPING REPORT March 2009 LEAD CONSULTANT PROPONENT Ninham Shand (Pty) Ltd. Eskom Holdings Ltd. 81 Church Street Eskom Generation PO Box 1347 Megawatt Park Cape Town Maxwell Drive 8000 Sandton, 2199 Tel: (021) 481 2400 Tel: (011) 800 3501 Fax: (021) 424 5588 Fax : (011) 800 5140 Email: [email protected] Website : www.eskom.co.za PROPOSED COAL-FIRED POWER STATIONS IN THE WATERBERG, LIMPOPO: SCOPING REPORT Page i PROJECT DETAILS DEAT REFERENCE NO. : 12/12/20/1255 TITLE : FINAL SCOPING REPORT AUTHORS : Louise Corbett, Ashwin West, Brett Lawson SUBCONSULTANTS : AirShed Planning Professionals Golder Associates Groundwater Consulting Services InfoTox Ivuzi Johnny van Schalkwyk (Private Consultant) Jongens Keet Associates Makecha Development Association Ndodana Consulting Engineers Ptersa Environmental Management Consultants Riscom Smith, Summers, Ndlovu Associates Strategic Environmental Focus Urban-Econ Zitholele Consulting CLIENT : Eskom Holdings Limited (Generation Division) REPORT STATUS : Final REPORT NUMBER : 4793A/402719 REPORT DATE : 31 March 2009 ................................................ ………........................................... LOUISE CORBETT ASHWIN WEST (Pr. Sci Nat) Environmental Practitioner Associate: Environmental Discipline Group ................................................ BRETT LAWSON (Cert. EAPSA)(Pr Sci Nat) Associate: Environmental Discipline Group This report is to be referred to in bibliographies as: NINHAM SHAND 2008. Proposed coal-fired power stations and associated infrastructure in the Waterberg, Limpopo: Final Scoping Report. Report No. 4793A/402719 Ninham Shand (2008) No unauthorised reproduction, copy or adaptation, in whole or in part, may be made. PROPOSED COAL-FIRED POWER STATIONS IN THE WATERBERG, LIMPOPO: SCOPING REPORT Page ii CONTENTS NON TECHNICAL SUMMARY PROJECT DETAILS ................................................................................................................... I CONTENTS ............................................................................................................................... II LIST OF FIGURES .................................................................................................................... IV LIST OF TABLES ...................................................................................................................... V LIST OF ANNEXURES ............................................................................................................. VI GLOSSARY OF TERMS .......................................................................................................... VII ABBREVIATIONS ..................................................................................................................... IX 1 INTRODUCTION ............................................................................................................... 1 1.1 Introduction ............................................................................................................... 1 1.2 Legal requirements ................................................................................................... 3 1.2.1 National Environmental Management Act ............................................. 3 1.2.2 The Atmospheric Pollution Prevention Act ............................................ 6 1.2.3 National Environmental Management: Air Quality Act ........................... 7 1.2.4 National Heritage Resources Act .......................................................... 7 1.2.5 Other applicable legislation and policies ............................................... 8 1.3 Terms of reference and Scope of the EIA ............................................................... 13 1.4 Approach to the project ........................................................................................... 14 1.4.1 The Scoping Report phase ................................................................. 16 1.4.2 Authority involvement .......................................................................... 16 1.4.3 Decision making ................................................................................. 17 1.5 Assumptions and limitations .................................................................................... 18 1.5.1 Assumptions ....................................................................................... 18 1.5.2 Gaps in knowledge ............................................................................. 18 1.6 Independence ......................................................................................................... 19 1.7 Structure of the Scoping Report .............................................................................. 19 2 STRATEGIC OVERVIEW OF ELECTRICITY DEMAND AND SUPPLY IN SOUTH AFRICA .......................................................................................................................... 23 2.1 South Africa’s Electricity requirements .................................................................... 23 2.2 Policy framework for the Supply of Electricity .......................................................... 25 2.2.1 White Paper on the Energy Policy of the Republic of South Africa ...... 26 2.2.2 Integrated Energy Plan ....................................................................... 27 2.2.3 National Integrated Resource Plan ..................................................... 27 2.2.4 Integrated Strategic Electricity Planning .............................................. 28 2.3 Selection of the waterberg region for further coal-driven development .................... 30 2.4 Overview of the potential future electricity related development in the Waterberg region .............................................................................................................................. 36 Ninham Shand (2008) No unauthorised reproduction, copy or adaptation, in whole or in part, may be made. PROPOSED COAL-FIRED POWER STATIONS IN THE WATERBERG, LIMPOPO: SCOPING REPORT Page iii 3 THE SITE SELECTION PROCESS ................................................................................. 39 3.1 Background ............................................................................................................. 39 3.2 Selection of potential sites....................................................................................... 39 3.2.1 Determining the boundaries of the Waterberg region .......................... 39 3.2.2 Selection of potential sites .................................................................. 43 3.2.3 Other considerations ........................................................................... 45 4 THE PROPOSED ACTIVITY ........................................................................................... 47 4.1 The need for the proposed activity .......................................................................... 47 4.2 Description of the proposed activity ......................................................................... 47 4.3 Consideration of alternatives ................................................................................... 52 4.3.1 Introduction ......................................................................................... 52 4.3.2 Activity alternatives ............................................................................. 53 4.3.3 Site location alternatives ..................................................................... 53 4.3.4 Process alternatives ............................................................................ 54 4.3.5 Site layout alternatives ........................................................................ 60 5 THE PUBLIC PARTICIPATION PROCESS .................................................................... 61 5.1 Introduction ............................................................................................................. 61 5.2 Initiation of the public process ................................................................................. 62 5.2.1 Compilation of the I&AP database ...................................................... 62 5.2.2 Compilation and distribution of Background Information Document .... 63 5.2.3 Advertising in the national, regional and local newspapers ................. 63 5.2.4 Initial landowner and key stakeholder meetings .................................. 63 5.2.5 Issues and concerns raised ................................................................ 64 5.2.6 Minutes of the initial public meetings ................................................... 65 5.3 Comment on the Draft Scoping Report.................................................................... 65 5.4 Review and Decision period .................................................................................... 66 6 DESCRIPTION OF THE AFFECTED ENVIRONMENT AND POTENTIAL IMPACTS ..... 67 6.1 Introduction ............................................................................................................. 67 6.2 Operational phase impacts on the biophysical environment .................................... 67 6.2.1 Impact on terrestrial fauna and flora .................................................... 67 6.2.2 Impact on aquatic flora and fauna ....................................................... 70 6.2.3 Impact on ambient air quality .............................................................
Recommended publications
  • The Case of Kusile FINAL
    THE EXTERNAL COST OF COAL -FIRED POWER GENERATION: The case of Kusile Prepared by: • Business Enterprises at University of Pretoria (Pty(Pty)) LLtLtdtdd Prepared for: • Greenpeace Africa and Greenpeace International DATE: 29 September 2011 PO Box 14679 Hatfield 0028 University of Pretoria Main Campus, Prospect Street, Hatfield, Graduate Centre, Ground Floor, Entrance 1.82 T: +27 (12) 420 4245 F: +27 (12) 362 5270 TABLE OF CONTENTS 1. Introduction 5 2. Background, problem statement and study limitations 7 3. The externality cost of coal-fired power generation: a sectoral overview 9 3.1 Health 9 3.2 Climate change 11 3.3 Water 13 3.4 Mining 15 4. Results 17 5. Conclusion 19 6. References 21 NOTE: For access to the annexes listed below, please refer to the Greenpeace Africa website: www.greenpeaceafrica.org Annex 0 (Background): Coal and coal-fired power generation in South Africa Annex 1: The health costs of coal-fired power generation in South Africa Annex 2: Climate change: the opportunity cost of Medupi and Kusile power stations Annex 3: Estimating the opportunity cost of water for the Kusile and Medupi coal-fired electricity power plants in South Africa Annex 4: The external costs of coal mining: the case of collieries supplying Kusile power station ACKNOWLEDGEMENTS The authors gratefully acknowledge comments provided by the Greenpeace Africa and Greenpeace International review teams, and by four workshop panellists, Prof Jane Olwoch, Prof Kuku Voyi, Prof Ban Farrell and Mr Meiring du Plessis. This research was financially supported
    [Show full text]
  • Construction First in Portable Sanitation
    Construction First in Portable Sanitation Sanitech is the leading portable sanitation company in South Africa with branches nationwide and is renowned for its service excellence and superior product technology. Sanitech was the first portable toilet hire company to supply sanitation facilities to areas where no sanitation infrastructure existed. Experience counts and Sanitech understands the importance of choosing a trusted supplier with an outstanding track record. With more than two decades of local experience and the global support of Waco International, Sanitech is the only toilet hire company with the necessary national fleet to maintain a competitive edge. Fast and Efficient Site Solutions Sanitech currently provides ablution facilities to a substantial number of construction and industrial projects throughout the country, improving both the hygiene standards and productivity on these sites. Their services include: • Supply of fresh, clean water to the units • On-site toilet cleaning and servicing to agreed timescales • Short and long term rental of portable toilets and mobile • Replenishment of toilet rolls and soap and paper hand towels ablution units Current industry projects include: • Braamhoek Dam • Glencore Mines • Aveng Mine • Avon Power Station • Anglo Mines • Xstrata Mine • Thukela Water Project • Impumelelo Mine • Shiva Uranium • Cornubia Development • Shondoni Mine • Sasol Sigma Mine • Dube Tradeport • Total Coal Mine • Sasol Wax Phase 1 & 2 • Kouga Wind Farm • Kusile Power Station • Matlosana Mall • Dedisa Power Plant Special Projects • Sibanye Mine Construction • Sasol Synfuels • Wescoal Mine • Lethabo Power Station • PetroSA Orca Rig • Stefanutti Stocks Mine • R377 Road Construction Comprehensive Health and Safety Programme Sanitech’s world-class SHE management system is driven by Waco International Corporate Standards and helps to meet health and safety responsibilities by protecting their most valuable resources – employees, customers, communities and the environment that sustains us all.
    [Show full text]
  • Sub-National Governments and Foreign Policy: the Case of the Limpopo Province in South Africa
    SUB-NATIONAL GOVERNMENTS AND FOREIGN POLICY: THE CASE OF THE LIMPOPO PROVINCE IN SOUTH AFRICA by Vhulenda Edna Matshili Submitted in accordance with the requirements of the degree of Masters of Arts in the subject Politics at the University of South Africa Supervisor: Professor Jo-Ansie van Wyk 2013 DECLARATION I declare that “Sub-national governments and foreign policy: The case of the Limpopo province in South Africa ” is my own work and that all the sources that I have used or quoted have been indicated and acknowledged by means of complete references. ________________________ _____________________ Signature Date (Miss Vhulenda Edna Matshili) i ABSTRACT The aim of this study is to analyse and describe the role of sub-national governments (SNG’s) in foreign policy and how the conduct of diplomacy has developed in the South African context, and to assess why and how provinces engage in this phenomenon. The theoretical approach to this study is embedded in neo- functionalism. In order to illustrate this, the South African province, the Limpopo Province is used as an illustrative case study. In particular, the study will analyse the role of the International Relations Unit (IRU) within the Office of the Premier (OtP) in the Limpopo Province as a case study. Limpopo is the main focus of this study because it, inter alia, borders on three sovereign states (Botswana, Mozambique and Zimbabwe) which place the province in a good position to engage in international relations, mutual intentions and friendly relations with its neighbouring and other distant countries. The results of this study is that provinces have become important foreign policy and international relations actors in the area of low politics; however the national government remains as the main actor in the international relations and foreign policy making process.
    [Show full text]
  • Management Has Reviewed the Request for Inspection of the Republic of South Africa Eskom Investment Support Project (Lbrd Loan No
    BANK MANAGEMENT RESPONSE TO REQUEST FOR INSPECTION PANEL REVIEW OF THE REPUBLIC OF SOUTH AFRICA ESKOM INVESTMENT SUPPORT PROJECT (IBRD Loan No. 78620) Management has reviewed the Request for Inspection of the Republic of South Africa Eskom Investment Support Project (lBRD Loan No. 78620), received by the Inspection Panel on April 6, 2010 and registered on April 7, 2010 (RQI0/03). Management has prepared the following response. May 25,2010 Eskom Investment Support Project CONTENTS Abbreviations and Acronyms ......................................................................................... iii Executive Summary ......................................................................................................... iv I. INTRODUCTION.................................................................................................... 1 II. THE REQ VEST ....................................................................................................... 1 III. COUNTRY CONTEXT AND PROJECT BACKGROUND ............................... 2 IV. SPECIAL ISSUES ................................................................................................... 7 V. MANAGEMENT'S RESPONSE .......................................................................... 20 ANNEXES Annex 1. Claims and Responses MAPS IBRD 37886 South Africa - Eskom Investment Support Project, Request for Inspection (project area) IBRD 37853 South Africa - Eskom Investment Support Project, Request for Inspection (detail) ii Republic ofSouth Africa ABBREVIATIONS AND ACRONYMS
    [Show full text]
  • Positive Actions in Turbulent Times
    positive actions in turbulent times Our strategy remains unchanged and our value proposition intact. Balancing short-term needs and long-term sustainability, we have continued to renew our business basics, preserving Sasol’s robust fundamentals and delivering a solid performance in deteriorating markets. Our pipeline of growth projects remains strong, even though we have reprioritised capital spending. With our shared values as our guide, we have dealt decisively with disappointments and unprecedented challenges. We are confident that our positive actions will help us navigate the storm and emerge stronger than before. About Sasol sasol annual review and summarised financial information 2009 financial information and summarised review sasol annual Sasol is an energy and chemicals company. We convert coal and gas into liquid fuels, fuel components and chemicals through our proprietary Fischer-Tropsch (FT) processes. We mine coal in South Africa, and produce gas and condensate in Mozambique and oil in Gabon. We have chemical manufacturing and marketing operations in South Africa, Europe, the Middle East, Asia and the Americas. In South Africa, we refine imported crude oil and retail liquid fuels through our network of Sasol convenience centres. We also supply fuels to other distributors in the region and gas to industrial customers in South Africa. Based in South Africa, Sasol has operations in 38 countries and employs some 34 000 people. We continue to pursue international opportunities to commercialise our gas-to-liquids (GTL) and coal-to-liquids (CTL) technology. In partnership with Qatar Petroleum we started up our first international GTL plant, Oryx GTL, in Qatar in 2007.
    [Show full text]
  • Transmission Ten-Year Development Plan 2013-2022 Transmission Ten-Year Plan 2013 – 2022 > FOREWORD by GROUP EXECUTIVE
    Transmission Ten-Year Development Plan 2013-2022 Transmission Ten-Year Plan 2013 – 2022 > FOREWORD BY GROUP EXECUTIVE “I would also like to take this opportunity to thank the team that has worked and continues to work on the development of these plans.” A reliable electricity supply of acceptable quality is essential for the developed by Eskom and IPPs must be connected to the network. economic development of South Africa. It is also a prerequisite The first two phases of preferred bidders for the Department for socio-economic development, as it paves the way to access to of Energy’s REFIT renewable energy programme (wind, solar education, improved nutrition and health care, and jobs, amongst photovoltaic, solar thermal, etc.) have been announced to help others. The transmission system plays a vital role in the delivery meet South Africa’s commitment to reduce carbon emissions. of a reliable, high quality electricity supply throughout South Africa Thirdly, new loads need to be connected to the network. and the region, by delivering electricity in bulk to load centres The provision of a reliable electricity supply, which will enable South and very large end-users. From there, the distribution networks Africa to meet its economic growth targets, requires significant owned by Eskom and municipalities deliver electricity to end-users. capital investment, which is ultimately funded by electricity The transmission system needs to be well-maintained to deliver a consumers through the tariff. There is a need for stakeholders reliable supply of electricity, and it also needs to be strengthened to understand what is required to ensure a reliable and secure to meet changing customer needs.
    [Show full text]
  • Focused and Energised About Sasol
    sustainable development report 2010 focused and energised about sasol Sasol is an energy and chemicals company. We are technology driven, converting gas and coal into liquid fuels, fuel components and chemicals through our proprietary processes. We are focused on commercialising our gas-to-liquids (GTL) and coal- to-liquids (CTL) technology internationally. We mine coal in South Africa, and produce gas and condensate in Mozambique and oil in Gabon. We continue to advance our upstream oil and gas activities in Mozambique, Nigeria, Gabon, South Africa, Papua New Guinea and Australia. In South Africa, we refi ne imported crude oil and retail liquid fuels through our network of Sasol convenience centres, and supply gas to industrial customers. We also supply fuel to other distributors in the region. We have chemical manufacturing and marketing operations in South Africa, Europe, the Middle East, Asia and the Americas. Formed in 1950, Sasol has been producing liquid fuels since 1955. Sasol is listed on the JSE Limited in South Africa and the New York Stock Exchange. our vision A more detailed review of Sasol’s primary brands, products and services, its operational structure, the countries in which it operates, and the primary markets served To grow profi tably, sustainably and inclusively is provided on our website while delivering value to stakeholders http://sasolsdr.com through proprietary technology and the talent of our people in the energy GRI – 2.1 – 2.8 and chemical markets in Southern Africa and worldwide. sasol’s values The Sasol group’s vision, strategic growth drivers and daily business operations are founded on, and inspired by, six shared values: Customer focus Safety Continuous improvement We meet customers’ needs by providing We commit to eliminate all incidents Our innovative spirit drives us as we world-class service, optimal product and work to world-class safety standards.
    [Show full text]
  • South African Police Service South African Police Service Annual Report 2017/2018 Annual Report 2017/2018 Part A
    SOUTH AFRICAN POLICE SERVICE SOUTH AFRICAN POLICE SERVICE ANNUAL REPORT 2017/2018 ANNUAL REPORT 2017/2018 PART A A SOUTH AFRICAN POLICE SERVICE SOUTH AFRICAN POLICE SERVICE PART A ANNUAL REPORT 2017/2018 ANNUAL REPORT 2017/2018 B SOUTH AFRICAN POLICE SERVICE SOUTH AFRICAN POLICE SERVICE ANNUAL REPORT 2017/2018 ANNUAL REPORT 2017/2018 Compiled by South African Police Service (SAPS) Strategic Management Layout and Design SAPS Corporate Communication and Liaison Photographs SAPS Corporate Communication and Liaison Language Editing SAPS Strategic Management Further information on the Annual Report for the National Commissioner of the South African Police Service, for 2017/2018, can be obtained from: SAPS Strategic Management (Head Office) Telephone: 012 393 3082 RP Number: 328/2018 ISBN Number: 978-0-621-46664-5 i SOUTH AFRICAN POLICE SERVICE SOUTH AFRICAN POLICE SERVICE ANNUAL REPORT 2017/2018 ANNUAL REPORT 2017/2018 SUBMISSION OF THE ANNUAL REPORT TO THE MINISTER OF POLICE Mr BH Cele, MP MINISTER OF POLICE I have the honour of submitting the Annual Report of the Department of Police, for the period 1 April 2017 to 31 March 2018. GENERAL KJ SITOLE (SOEG) 31 August 2018 ii SOUTH AFRICAN POLICE SERVICE SOUTH AFRICAN POLICE SERVICE ANNUAL REPORT 2017/2018 ANNUAL REPORT 2017/2018 TABLE OF CONTENTS PART A: GENERAL INFORMATION 1 1. General Information of the Department 1 2. List of Abbreviations/Acronyms 2 3. Foreword by the Minister 6 4. Deputy Minister’s Statement 9 5. Report of the Accounting Officer 11 6. Statement of Responsibility and Confirmation of Accuracy of the Annual Report 24 7.
    [Show full text]
  • Spatial Transformation: Are Intermediate Cities Different? South African Cities Network: Johannesburg
    CENTRE FOR DEVELOPMENT SUPPORT SENTRUM VIR ONTWIKKELINGSTEUN ACKNOWLEDGEMENTS Lead authors: Lochner Marais (University of the Free State) Danie Du Plessis (Stellenbosch University) Case study authors: Drakenstein: Ronnie Donaldson (Stellenbosch University) King Sabata Dalindyebo: Esethu Ndzamela (Nelson Mandela University) and Anton De Wit (Nelson Mandela University Lephalale: Kgosi Mocwagae (University of the Free State) Matjhabeng: Stuart Denoon-Stevens (University of the Free State) Mahikeng: Verna Nel (University of the Free State) and James Drummond (North West University) Mbombela: Maléne Campbell (University of the Free State) Msunduzi: Thuli Mphambukeli (University of the Free State) Polokwane: Gemey Abrahams (independent consultant) Rustenburg: John Ntema (University of South Africa) Sol Plaatje: Thomas Stewart (University of the Free State) Stellenbosch: Danie Du Plessis (Stellenbosch University) Manager: Geci Karuri-Sebina Editing by Write to the Point Design by Ink Design Photo Credits: Page 2: JDA/SACN Page 16: Edna Peres/SACN Pages 18, 45, 47, 57, 58: Steve Karallis/JDA/SACN Page 44: JDA/SACN Page 48: Tanya Zack/SACN Page 64: JDA/SACN Suggested citation: SACN. 2017. Spatial Transformation: Are Intermediate Cities Different? South African Cities Network: Johannesburg. Available online at www.sacities.net ISBN: 978-0-6399131-0-0 © 2017 by South African Cities Network. Spatial Transformation: Are Intermediate Cities Different? is made available under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License. To view a copy of this license, visit http://creativecommons.org/licenses/by-nc-sa/4.0/. 2 SPATIAL TRANSFORMATION: ARE INTERMEDIATE CITIES DIFFERENT? Foreword As a network whose primary stakeholders are the largest cities, the South African Cities Network (SACN) typically focuses its activities on the “big” end of the urban spectrum (essentially, mainly the metropolitan municipalities).
    [Show full text]
  • Written Statement of Mxolisi Mgojo, the Chief Executive Officer Of
    1 PUBLIC ENTERPRISES PORTFOLIO COMMITTEE INQUIRY INTO ESKOM, TRANSNET AND DENEL WRITTEN STATEMENT OF MXOLISI MGOJO, THE CHIEF EXECUTIVE OFFICER OF EXXARO RESOURCES LIMITED INTRODUCTION ...................................................................................................... 2 COST-PLUS MINES VERSUS COMMERCIAL MINES .......................................... 5 THE SO-CALLED “PRE-PAYMENT” FOR COAL ................................................. 9 PREJUDICE TO EXXARO’S COST-PLUS MINES AND MAFUBE ..................... 11 Introduction ........................................................................................................... 11 Arnot mine ............................................................................................................. 12 Eskom’s failure to fund land acquisition ................................................................. 12 Non-funding of operational capital at Arnot ............................................................ 14 The termination of Arnot’s CSA .............................................................................. 15 Conclusion of the Arnot matters ............................................................................. 19 Mafube mine.......................................................................................................... 19 Matla mine ............................................................................................................. 21 Non-funding of capital of R1.8 billion for mine 1 ...................................................
    [Show full text]
  • Eskom Presentation
    Presentation to Portfolio Committee on Energy 15 March 2011 Eskom Holdings Ltd Update of Eskom’s Capital Expansion Programme Paul O’Flaherty Finance Director 2 1. Business overview 2. South Africa requirements and the capital expansion programme 3. Alignment with SA macro-economic principles 4. Costs and funding 5. Conclusion 3 Eskom at a glance • Strategic 100% state-owned electricity utility, strongly Eskom power grid(1) supported by the government • Vertically integrated across generation, transmission and distribution • Supplies approximately 95% of South Africa’s electricity (45% of the total electricity consumed in Africa) • 40 887 employees as at 31 December 2010 • Serves 3 000 industrial, 1 000 mining, 48 000 commercial, 84 000 agricultural and more than 4 million residential customers • 27 (including 1 nuclear) operational power stations with a Existing grid system Thermal power station Possible future grid system Future interconnection substation net maximum capacity of 40.87GW as at 31 March 2010 Future hydroelectric power station Nuclear power station Future thermal power station Future gas station Hydroelectric power station Gas power station • Total electricity sales of 218 591GWh and total revenues of Interconnection substation Town R71.21bn for the year ended 31 March 2010 (R71,6bn for 9 months ended 31 December 2010) Eskom’s net capacity mix – 31 March 2010 • Infrastructure includes 390,338km of power lines and Total: 40.87GW cables (all voltages) as at 31 March 2010 • Committed to build 17GW new generation capacity expected
    [Show full text]
  • Accreditated Shooting Ranges
    A C C R E D I T A T E D S H O O T I N G R A N G E S CONTACT CONTACT PHYSICAL POSTAL NAME E-MAIL PERSON DETAILS ADDRESS ADDRESS EASTERN CAPE PROVINCE D J SURRIDGE T/A ALOE RIDGE SHOOTING RANGE DJ SURRIDGE TEL: 046 622 9687 ALOE RIDGE MANLEY'S P O BOX 12, FAX: 046 622 9687 FLAT, EASTERN CAPE, GRAHAMSTOWN, 6140 6140 K V PEINKE (SOLE PROPRIETOR) T/A BONNYVALE WK PEINKE TEL: 043 736 9334 MOUNT COKE KWT P O BOX 5157, SHOOTING RANGE FAX: 043 736 9688 ROAD, EASTERN CAPE GREENFIELDS, 5201 TOMMY BOSCH AND ASSOCIATES CC T/A LOCK, T C BOSCH TEL: 041 484 7818 51 GRAHAMSTAD ROAD, P O BOX 2564, NOORD STOCK AND BARREL FAX: 041 484 7719 NORTH END, PORT EINDE, PORT ELIZABETH, ELIZABETH, 6056 6056 SWALLOW KRANTZ FIREARM TRAINING CENTRE CC WH SCOTT TEL: 045 848 0104 SWALLOW KRANTZ P O BOX 80, TARKASTAD, FAX: 045 848 0103 SPRING VALLEY, 5370 TARKASTAD, 5370 MECHLEC CC T/A OUTSPAN SHOOTING RANGE PL BAILIE TEL: 046 636 1442 BALCRAIG FARM, P O BOX 223, FAX: 046 636 1442 GRAHAMSTOWN, 6140 GRAHAMSTOWN, 6140 BUTTERWORTH SECURITY TRAINING ACADEMY CC WB DE JAGER TEL: 043 642 1614 146 BUFFALO ROAD, P O BOX 867, KING FAX: 043 642 3313 KING WILLIAM'S TOWN, WILLIAM'S TOWN, 5600 5600 BORDER HUNTING CLUB TE SCHMIDT TEL: 043 703 7847 NAVEL VALLEY, P O BOX 3047, FAX: 043 703 7905 NEWLANDS, 5206 CAMBRIDGE, 5206 EAST CAPE PLAINS GAME SAFARIS J G GREEFF TEL: 046 684 0801 20 DURBAN STREET, PO BOX 16, FORT [email protected] FAX: 046 684 0801 BEAUFORT, FORT BEAUFORT, 5720 CELL: 082 925 4526 BEAUFORT, 5720 ALL ARMS FIREARM ASSESSMENT AND TRAINING CC F MARAIS TEL: 082 571 5714