ECC Response to the Consultation by the Lee Valley Regional Park
Total Page:16
File Type:pdf, Size:1020Kb
Annex 1 ‐ ECC Response to the Consultation by the Lee Valley Regional Park Authority on Draft Proposals for the Regional Park from the River Lee Country Park to the Lee Navigation in Ware, Areas 6, 7 and 8 Annex 1 ‐ ECC Response to the Consultation by the Lee Valley Regional Park Authority on Draft Proposals for the Regional Park from the River Lee Country Park to the Lee Navigation in Ware, Areas 6, 7 and 8 Section 1 – Background Context The Lee Valley Park Authority (the Park Authority) is in the process of preparing a suite of documents, the Park Development Framework (PDF), which will establish aspirations and specific proposals for the future use and development of the Regional Park. ECC is aware that the Authority has already adopted the ‘Vision, Strategic Aims and Principles’ (July 2010) and the ‘Thematic Proposals’ (January 2011) set out within the development and management proposals on a broad Park‐wide thematic basis. The Authority is now working to translate the thematic proposals onto area based maps in line with Section 14 of the Lee Valley Regional Park Act 1966 (the Park Act). The adoption of the area based proposals is being undertaken in a phased process, with priority being given to areas where significant change within or adjacent to the Park is planned. Once adopted the area proposals will replace the Part Two Proposals of the Park Plan 2000. In the interim where an area is updated it will specify which parts of the Park Plan 2000 it is replacing, the rest remaining in place. For the local planning authorities with boundaries inside the Park Authority once the area based proposals are adopted, under section 14(2) of the Park Act requires their inclusion in respective Local Plans or Local Development Frameworks. The Park Authority has adopted Area Proposals for the section of the Park from Ruckholt Road/Hackney Marshes through to the M25/Rammey Marsh. The Park Authority is currently consulting on the proposals for the northern sections of the Park; Areas 6, 7 and 8 which start with the River Lee Country Park in Waltham Abbey, and continue through to the northern most tip of the Park adjacent to the Lee Navigation in Ware, East Hertfordshire. Each Area has specific opportunities and are set out below – Area 6 – River Lee Country Park The River Lee Country Park forms the majority of area 6, containing 1,000 acres of landscape created from restored mineral workings, managed gravel pits, lakes and marshland, with valley sides in the east in agricultural use. The Park Authority is seeking to ensure there are opportunities for visitors for informal recreation and countryside activities. The proposals set out within the Park Development Framework aim to maintain and enhance the provision of visitor facilities such as paths, cycle routes, wildlife trails, natural play, orienteering course, café, bird hides and information points. There is a range of opportunities for differing persons to partake in such as Lee Valley Park Farms at Hayes Hill and Holyfield which are popular with families and for educational trips. More active recreation is catered for at the Herts Young Mariners outdoor centre, by the extensive angling sites, and by the Fishers Green Sailing Club. Boat trips, canoeing and rowing are all popular activities on the River Lea Navigation with the Lee valley Boat Centre at Broxbourne providing hire facilities and support services. Page 1 Annex 1 ‐ ECC Response to the Consultation by the Lee Valley Regional Park Authority on Draft Proposals for the Regional Park from the River Lee Country Park to the Lee Navigation in Ware, Areas 6, 7 and 8 Area 7 ‐ Wetland Park ‐ Spitalbrook to Roydon Area 7 is located towards the north of the Regional Park, defined by the London and Cambridge Railway to the north, and the B194 between Broxbourne and Lower Nazeing to the south. The eastern boundary is less well defined, following the edge of Roydon in the north, Low Hill Road which links Roydon, Netherhall and Lower Nazeing and the edge of Lower Nazeing to the south. The area largely comprises a broad and flat valley floor, including large areas of reclaimed former gravel pits with important successional habitat and a number of large water bodies. The Park Authority recognises the key landscape features including water channels, with the confluence of the River Stort Navigation and River Lee Navigation at Fieldes Weir, Glen Faba Lake and the River Lee Navigation forming a corridor that links north to south across the area. It is recognised that landscape enhancement is required accompanied by investment for improvement. The Park Authority recognises existing opportunities focused on water based activities such as sailing, canoeing, leisure boating and angling. Proposals identify opportunities to enhance and consolidate the existing provision to improve the visitor offer. Area 8 Rye Meads to Ware Area 8 is located at the northern extent of the Regional Park this area benefits from its attractive rural setting and strong rural character. It is within Hertfordshire. ECC Interest in the Lee Valley Park Authority – Park Framework ECC has an interest in shaping future growth and development throughout Essex, and this includes spatial development proposals at the county border and those outside that may impact our community. The County Council responds to and shapes future spatial policy for the Lee Valley and commenting on this Consultation. ECC offers substantial annual funding to the Lee Valley Park Authority, and therefore aims to ensure that the spatial, environmental, social and economic priorities are consistent. Section 2 – Strategic Context A range of strategies produced solely or in collaboration with the Essex borough, city and district councils as well as the Greater Essex unitary authorities of Thurrock and Southend‐on‐Sea provide the strategic context for the response to this Consultation. The relevant strategies are set out below – Vision for Essex 2013‐2017 The Vision for Essex sets out the principles that will support the community of Essex. A key principle is to ‘work in partnership’ to deliver the best outcomes for service users. We assist in developing emerging spatial and planning policies to ensure that positive impacts for Essex are delivered and mitigation measures minimise potential negative impacts. The Vision for Essex sets out the core purpose and key challenges for Essex. The key challenges from the vision that are relevant to ECC’s response to the Lee Valley Park Authority – Park Framework consultation include: ‐ increase educational achievement and enhance skills; Page 2 Annex 1 ‐ ECC Response to the Consultation by the Lee Valley Regional Park Authority on Draft Proposals for the Regional Park from the River Lee Country Park to the Lee Navigation in Ware, Areas 6, 7 and 8 ‐ develop and maintain the infrastructure that enables our residents to travel and our businesses to grow; ‐ support employment and entrepreneurship across our economy; ‐ improve public health and wellbeing across Essex; ‐ safeguard vulnerable people of all ages; and ‐ Respect Essex’s environment. Council’s Outcomes Framework In February 2014 the Council adopted the Outcomes Framework for Essex ‐ a statement of seven outcomes that set out ECC’s ambition based on its Vision for Essex 2013‐17. The Outcomes that are specifically relevant to this consultation include – ‐ Children in Essex get the best start in life; ‐ People in Essex enjoy good health and wellbeing; ‐ People have aspirations and achieve their ambitions through education, training and lifelong‐learning; ‐ Sustainable economic growth for Essex communities and businesses; and ‐ People in Essex experience a high quality and sustainable environment. The outcomes reflect ECC aspirations for Essex residents and communities, guiding action in the short, medium and long term hence the importance of ensuring the outcomes inform emerging spatial policy. Essex Economic Strategy The Economic Growth Strategy (EGS) for Essex sets out EEC’s economic vision and how this may be delivered. All of the proposals in the EGS are designed to achieve five objectives: ‐ Essex businesses are enabled and supported to be more productive, innovate and grow, creating jobs for the local economy; ‐ Essex businesses are enabled to compete and trade internationally; ‐ Individuals are equipped and able to access better paid jobs through an education and skills offer that meets the needs of businesses; ‐ The life chances of people in our most deprived areas are improved be ensuring that residents are able to access jobs and public services; and ‐ Securing the highways, infrastructure and environment to enable businesses to grow. Essex Economic Plan The Economic Plan for Essex is based on the collective ambitions of all local authorities in Essex. It identifies the steps that local partners will take together, alongside the private sector and HM Government to accelerate local growth over the next seven years (2014‐2021). Furthermore it lays the foundation for long‐term sustainable growth in the years to follow. Following analysis of the challenges and opportunities facing the Essex economy, and discussions with partners and local businesses, key issues that need to be addressed to facilitate sustainable economic growth were agreed and identified. The key issues that have some relevance to this consultation include ‐ Page 3 Annex 1 ‐ ECC Response to the Consultation by the Lee Valley Regional Park Authority on Draft Proposals for the Regional Park from the River Lee Country Park to the Lee Navigation in Ware, Areas 6, 7 and 8 ‐ Issue 1: Enhancing the Essex workforce – To ensure Essex can compete, the workforce should be developed to ensure there are the right skills to support existing and future employers as well as the needs of businesses in Essex’s key growth sectors. ‐ Issue 2: unlocking growth in Essex’s strategic growth corridors ‐ Investment to enable growth and development in established corridors offers a greater return on investment.