E 711 21 Appendix A.Xlsx
Total Page:16
File Type:pdf, Size:1020Kb
Project Title Location PDF Theme PDF Theme objective Summary of Project Details Project Lead Team Delivery Options Council or Borough Funding Source Ref Comments Café/Visitor Centre BIP and Seventy Acres Lake Visitors Visitor Facilities Feasibility of café locations starting at FG or Projects Delivery planned within 5 years Epping Forest District Not yet known No development Phase 2 of Fishers Green development proposals progress and not - Visitor centre/café, new toilets etc. Business shovel ready plan to be developed after Phase 1 replacement of current BIP. Improve entrance to Bow Creek Bow Creek Visitors Access to the Park Includes proposals for better link from Cannin PDF No Delivery Plan - Aspirational Newham London Borough Not yet known No development Town Station and improvemnets for Youth and progress and not Schools team to run more education programmes shovel ready on this site. Delive strategy for Carthagena including Carthagena Landscape and Recreation and A landscape strategy developed and delivered for Rangers No Delivery Plan - Aspiratinoal Epping Forest District and Potentially capital Funding from Authority Some work outdoor informal camping Heritage Leisure the Carthagena area. A range of improvements to Broxbourne District completed by Alex be delivered around access, leisure and Farris. Some recreation. drawings but no narrative or project proposal available. Documents at: - \\mh- fslv\FS03Projects$\B iodiversity\LVRPA sites and facilities\Sites\Carthe gena Table on the marshes Coppermill Fields Visitors Recreation and LeisureProject group established 2020 after significant Ranger Team No Delivery Plan - Aspiratinoal Waltham Forest London Borough Not yet known No development damage caused by vandalism and bbqs during progress and not lockdown. Important focal point for visitors and shovel ready very visible. Public funding strategy currently being put in place. it would be supportive of park if we could provide some funding contribution. repairs - £1,000 Feasibility study into improvements to EIDB East India Dock Basin Biodiversity Fauna and Flora Range of studies undertaken to understand Projects Delivery planned within 5 years Tower Hamlets London Borough Not yet known Potential for 2021/22 options for improvements at EIDB if funding becomes available Dock habitat enhancement East India Dock Basin Biodiversity Fauna and Flora Removal silt, re-profile north bank install floating Projects No Delivery Plan - Aspirational Tower Hamlets London Borough Not yet known No development reed beds/ interpretation Desilting of Dock Basin progress and not to improve habitat quality and visitor experience shovel ready delivering the CMP for the site Glen Faba Gateway - habitat restoration Glen Faba Biodiversity Fauna and Flora Lake edge habitat enhancements including scrub Biodiversity Delivery planned within 5 years Epping Forest District No development removal and establishment of emergent progress and not vegetation shovel ready Route provision across Hackney Marshes Hackney Marshes Visitors Routes Rout improvments and linking on to Hackney PDF No Delivery Plan - Aspiratinoal Hackney London Borough Not yet known No development Marshes progress and not shovel ready HVM - VeloPark Lee Valley VeloPark Sport and Recreation Visitor Facilities Works to Velo Plaza to protect the venue from HV APMD Delivery Planned this year Newham London Borough Capital No development attack. progress and not shovel ready Path improvements on Walthamstow MarshesLeyton Marsh Visitors Recreation and LeisurePath construction ( significant erosion to surface Ranger Team ASAP Waltham Forest London Borough Not yet known Potential for 2021/22 cutting across from Kings Head Bridge to path if funding allocated behind Ice Centre ) potentially new lighting and safety features. Water Abstraction Middlesex Filter Beds Environment Water Instillation of sluice and pipe linking to river, Rangers Delivery within 3 years? Hackney London Borough Not yet known Potential for 2021/22 Installation of permanent solution to water supply if funding allocated issues on the Filter Beds Visitor infrastructure River Lee Country Park Visitors Routes Improvements to the network of footpaths and Rangers Delivery planned within 3 years Epping Forest District and Not yet known No development redevelopment of the Pindar Toilet block Broxbourne District progress and not shovel ready Outdoor Gyms River Lee Country Park Sport and Recreation Health We have had previous conversations with the Active Communities No Delivery Plan - Aspirational, although Broxbourne District Not yet known No development Great Outdoor Gym Company about installation of the current climate suggests that this progress and not one, maybe two outdoor gyms in the Park. A could be high priority. shovel ready couple of sites have been identified, including a strip of land at the back of the WWC and a piece of land on Tottenham Marshes. The ambition is to create a network of physical activity stations through the Park, to help support our strategic aim of increasing usage of outdoor spaces, for the benefit of health and mental well being. The outdoor gyms can not only be used by individuals on a day to day basis, but we would plan to activate these spaces with 'activators' working with targeted groups in most need. There would still need to be a lot of consultation with Authority Rye House Gate House Rye House Visitors Access to the Park Working with Historic England to enahnce the PDF No Delivery Plan - Aspirational East Hertfordshire District Not yet known No development heritage interest and visitor experience progress and not shovel ready Interpretation South Park Visitors Learning 19 Boards and structures order raised text and art Rangers No Delivery Plan - Aspiratinoal Newham London Borough, Not yet known Potential for 2021/22 works being produced, wating for Coms assined Tower Hamlets London Borough, if funding allocated person to sort scaning Bow Creek,Walthamstow Hackney Lonton Borough Marshes, Middlesex Filter Beds, Gun Powder Walthamstow London Borough. Park Floating reedbeds South Park Biodiversity Fauna and Flora Installation of floating reedbeds in the lower lea Biodiversity No Delivery Plan - Aspiratinoal Newham London Borough, Not yet known No development Tower Hamlets London Borough, progress and not Hackney Lonton Borough shovel ready Walthamstow London Borough. Green Waste Compactor for South of Park South Park Environment Waste Feasibility of Green Waste compactor in South of Ranger Team No Delivery Plan - Aspiratinoal Waltham Forest London Borough Not yet known No development Park progress and not shovel ready Spitalbrook - creation of a wetland park - Spitalbrook Visitors Access to the Park Creation of a Wetland Park PDF No Delivery Plan - Aspirational Broxbourne District Not yet known No development build on outline work in 2013 linked to progress and not education and improved access with shovel ready 'gateway' from Broxbourn station. Site improvements for events Three Mills Green Visitors Visitor Facilities Additional improvements to the infrastructure of Events Team No Delivery Plan - Aspiratinoal Newham London Borough Not yet known No development the site, will support potential income increases progress and not for event hires. A cost effective solution to shovel ready creating a more durable surface at the entrance to the site, to provide vehicle access for event infrastructure. The creation of mains water points on site to support event infrastructure. Additional improvements to the infrastructure of the site, will support potential income increases. Some larger events companies are currently reluctant to hire the site due to the amount of infrastructure they need to bring on site. Re-turfing of circle area on green and roll Three Mills Green Environment Fauna and Flora Existing grass is quite sparse and thin, and is Ranger Team ASAP Newham London Borough Not yet known No development exposed to heavy trampling, wet conditions etc. progress and not Also takes longer to recover after the annual shovel ready music event. DH Not convinced, will get damaged again with more music events – poss needs another option/centrally funded as due to events happening . Aeration of soil Three Mills Green Environment Fauna and Flora Pooling of water in grass area causes some Ranger Team ASAP Newham London Borough Not yet known No development patches to be waterlogged. Aeration reduces progress and not compaction and helps drain the water – DH Again shovel ready Rev rather than project? Restore meadows Three Mills Green Biodiversity Fauna and Flora Rotavating and reseeding. Mound meadows look Ranger Team ASAP Newham London Borough Not yet known No development a bit neglected, and could do with some colour. progress and not shovel ready Sculpture trail Tottenham Marshes Community Art Linking three sites and Stonebridge hub Rangers Delivery planned within 3 years Harringey London Borough Not yet known Potential for 2021/22 interactive sculpture if funding allocated Restoration of grassland at Turnford Turnford Marsh Biodiversity Fauna and Flora This a part of an on-going project on this Local Biodiversity Delivery planned within 5 years Broxbourne District Not yet known No development Wildlife Site on the west side of River Lee Country progress and not Park. It is proposed that selected scrub be shovel ready removed to retain and regain areas of grassland, a Lee Valley BAP priority habitat. Habitat restoration Walthamstow Marshes Biodiversity Fauna and Flora Railway Triangles, scrub removal scrapes,