It’s Alive! The Making of Subdivision Schematics
Jenni Moore, GISP The Woes of Dr. Victor Frankenstein
Frankentrain Railway
Scenes from Young Frankenstein (1974),Frankenstein (1931) Track charts Timetables
GIS data
Engineering drawings
Schematic drawings
http://graphic-engine.swarthmore.edu/tag/monsters/ Track Charts
Circa 1919
http://www.zekedev.com/sites/boston_line/ Track Charts
Circa 1951 Track Charts
Circa 1958 Timetable
http://www.readingmodeler.com/index.php/articles/96-downloads/199-downloads-timetables-etc Engineering Drawings GIS Data Scene from Young Frankenstein (1974) It’s Alive!
Scene from Young Frankenstein (1974) But what is it? Strength of network dataset Strength of schematic data
Track
Track
MainTrack Track
MainTrack
600
60.0 Geographic and Schematic Views of Data Same Data, Different Views: Geographic Selection
Geographic View
Schematic View Same Data, Different Views: Schematic Selection
Geographic View
Schematic View Strength of output composition principles
Data Driven Pages
Layout Data Index Layer
https://desktop.arcgis.com/en/desktop/latest/map/page-layouts/what-are-data-driven-pages-.htm Subdivision Schematics
Scene from Frankenstein (1931) Frankentrain SHELLEY DIVISION Railway PROMETHEUS SUBDIVISION WEST WALTON TO VICTOR LINE 1818
l
l TO WEST WALTON TO VICTOR
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 145 140 135 130 125 "
WEST WALTON CROSSOVER 147.9 WALTON EAST WALTON MP 139.9 WEST MARGARET EAST MARGARET HIGH CLERVAL CROSSOVER 134.4 CROSSOVER 131.4
MP 149.9 MP 147.9 MP 147.2 MP 144.5 MP 139.9 MP 138.2 MP 137.6 MP 136.4 MP 134.4 MP 131.4
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 125 120 115 110 105 100 "
MP 124.6 CROSSOVER 117.0 CROSSOVER 110.3
MP 124.6 MP 117.0 MP 110.3
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 100 95 90 85 80 75 "
CROSSOVER 97.2 CROSSOVER 89.7 ALPHONSE SAVILLE
MP 97.2 MP 89.7 MP 84.1 MP 78.8
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 75 70 65 60 55 50 "
CROSSOVER 73.3 LAVENZA CROSSOVER 66.3 CROSSOVER 60.0 CROSSOVER 54.8
MP 73.3 MP 70.7 MP 66.3 MP 60.0 MP 54.8
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 50 45 40 35 30"
BEAUFORT KIRWIN MP 28.8 KREMPE JCT VICTOR MP 44.6 MP 34.3 MP 28.8 MP 26.7 MP 26.1
EXISTING TRACK FOREIGN TRACK PAGE 1 OF 1 Frankentrain SHELLEY DIVISION Railway PROMETHEUS SUBDIVISION WEST WALTON TO VICTOR LINE 1818
l
l TO WEST WALTON TO VICTOR
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 145 140 135 130 125 "
WEST WALTON CROSSOVER 147.9 WALTON EAST WALTON MP 139.9 WEST MARGARET EAST MARGARET HIGH CLERVAL CROSSOVER 134.4 CROSSOVER 131.4
MP 149.9 MP 147.9 MP 147.2 MP 144.5 MP 139.9 MP 138.2 MP 137.6 MP 136.4 MP 134.4 MP 131.4
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 125 120 115 110 105 100 "
MP 124.6 CROSSOVER 117.0 CROSSOVERSimple 110.3 Area
MP 124.6 MP 117.0 MP 110.3
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 100 95 90 85 80 75 "
CROSSOVER 97.2 CROSSOVER 89.7 ALPHONSE SAVILLE
MP 97.2 MP 89.7 MP 84.1 MP 78.8
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 75 70 65 60 55 50 "
CROSSOVER 73.3 LAVENZA CROSSOVER 66.3 CROSSOVER 60.0 CROSSOVER 54.8
MP 73.3 MP 70.7 MP 66.3 MP 60.0 MP 54.8
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 50 45 40 35 30"
BEAUFORT KIRWIN MP 28.8 KREMPE JCT VICTOR MP 44.6 MP 34.3 MP 28.8 MP 26.7 MP 26.1
EXISTING TRACK FOREIGN TRACK PAGE 1 OF 1 Frankentrain SHELLEY DIVISION Railway PROMETHEUS SUBDIVISION WEST WALTON TO VICTOR Complex AreaLINE 1818
l
l TO WEST WALTON TO VICTOR
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 145 140 135 130 125 "
WEST WALTON CROSSOVER 147.9 WALTON EAST WALTON MP 139.9 WEST MARGARET EAST MARGARET HIGH CLERVAL CROSSOVER 134.4 CROSSOVER 131.4
MP 149.9 MP 147.9 MP 147.2 MP 144.5 MP 139.9 MP 138.2 MP 137.6 MP 136.4 MP 134.4 MP 131.4
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 125 120 115 110 105 100 "
MP 124.6 CROSSOVER 117.0 CROSSOVER 110.3
MP 124.6 MP 117.0 MP 110.3
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 100 95 90 85 80 75 "
CROSSOVER 97.2 CROSSOVER 89.7 ALPHONSE SAVILLE
MP 97.2 MP 89.7 MP 84.1 MP 78.8
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 75 70 65 60 55 50 "
CROSSOVER 73.3 LAVENZA CROSSOVER 66.3 CROSSOVER 60.0 CROSSOVER 54.8
MP 73.3 MP 70.7 MP 66.3 MP 60.0 MP 54.8
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 50 45 40 35 30"
BEAUFORT KIRWIN MP 28.8 KREMPE JCT VICTOR MP 44.6 MP 34.3 MP 28.8 MP 26.7 MP 26.1
EXISTING TRACK FOREIGN TRACK PAGE 1 OF 1 How do we make the monster smarter? Building a Smarter Monster
Integration of other data sources • Operations • Economic Development • Maintenance • Industrial Development
Effective coordination of planning efforts • Tangible savings in the field – materials, equipment • Resource savings in the field – crew time and mobilization • Intangible savings in the field – track time • Time savings in the office – research and coordination efforts
Goal: Multiple departments working together for enterprise success New construction
Future Construction
Economic Development
Scene from Frankenstein (1931) Frankentrain SHELLEY DIVISION Railway PROMETHEUS SUBDIVISION WEST WALTON TO VICTOR LINE 1818
l
l TO WEST WALTON TO VICTOR
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 145 140 135 130 125 "
WEST WALTON CROSSOVER 147.9 WALTON EAST WALTON MP 139.9 WEST MARGARET EAST MARGARET HIGH CLERVAL CROSSOVER 134.4 CROSSOVER 131.4
MP 149.9 MP 147.9 MP 147.2 MP 144.5 MP 139.9 MP 138.2 MP 137.6 MP 136.4 MP 134.4 MP 131.4
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 125 120 115 110 105 100 "
MP 124.6 CROSSOVER 117.0 CROSSOVER 110.3
MP 124.6 MP 117.0 MP 110.3
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 100 95 90 85 HENRY SIDING (NEW) 80 75 " BUDGET YEAR: 2015 COST: $4,500,000 CUT OVER DATE: 11/15/2015
CROSSOVER 97.2 CROSSOVER 89.7 ALPHONSE SAVILLE
MP 97.2 MP 89.7 MP 84.1 MP 78.8
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 75 70 65 60 55 50 "
CROSSOVER 73.3 LAVENZA CROSSOVER 66.3 CROSSOVER 60.0 CROSSOVER 54.8
MP 73.3 MP 70.7 MP 66.3 MP 60.0 MP 54.8
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 50 45 40 35 30"
BEAUFORT KIRWIN MP 28.8 KREMPE JCT VICTOR MP 44.6 MP 34.3 MP 28.8 MP 26.7 MP 26.1
CURRENT CONSTRUCTION FUTURE CONSTRUCTION ECONOMIC DEVELOPMENT
REMOVE UPGRADE EXISTING TRACK FOREIGN TRACK PAGE 1 OF 1 Frankentrain SHELLEY DIVISION Railway PROMETHEUS SUBDIVISION WEST WALTON TO VICTOR LINE 1818
l
l TO WEST WALTON TO VICTOR
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 145 140 135 130 125 "
WEST WALTON CROSSOVER 147.9 WALTON EAST WALTON MP 139.9 WEST MARGARET EAST MARGARET HIGH CLERVAL CROSSOVER 134.4 CROSSOVER 131.4
MP 149.9 MP 147.9 MP 147.2 MP 144.5 MP 139.9 MP 138.2 MP 137.6 MP 136.4 MP 134.4 MP 131.4
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 125 120 115 110 105 100 "
Current Construction
MP 124.6 CROSSOVER 117.0 CROSSOVER 110.3
MP 124.6 MP 117.0 MP 110.3
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 100 95 90 85 HENRY SIDING (NEW) 80 75 " BUDGET YEAR: 2015 COST: $4,500,000 CUT OVER DATE: 11/15/2015
CROSSOVER 97.2 CROSSOVER 89.7 ALPHONSE SAVILLE
MP 97.2 MP 89.7 MP 84.1 MP 78.8
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 75 70 65 60 55 50 "
CROSSOVER 73.3 LAVENZA CROSSOVER 66.3 CROSSOVER 60.0 CROSSOVER 54.8
MP 73.3 MP 70.7 MP 66.3 MP 60.0 MP 54.8
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 50 45 40 35 30"
BEAUFORT KIRWIN MP 28.8 KREMPE JCT VICTOR MP 44.6 MP 34.3 MP 28.8 MP 26.7 MP 26.1
CURRENT CONSTRUCTION FUTURE CONSTRUCTION ECONOMIC DEVELOPMENT
REMOVE UPGRADE EXISTING TRACK FOREIGN TRACK PAGE 1 OF 1 Frankentrain SHELLEY DIVISION Railway PROMETHEUS SUBDIVISION WEST WALTON TO VICTOR LINE 1818
l
l TO WEST WALTON TO VICTOR
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 145 140 135 130 125 "
WEST WALTON CROSSOVER 147.9 WALTON EAST WALTON MP 139.9 WEST MARGARET EAST MARGARET HIGH CLERVAL CROSSOVER 134.4 CROSSOVER 131.4
MP 149.9 MP 147.9 MP 147.2 MP 144.5 MP 139.9 MP 138.2 MP 137.6 MP 136.4 MP 134.4 MP 131.4
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 125 120 115 110 105 100 "
MP 124.6 CROSSOVER 117.0 CROSSOVER 110.3
MP 124.6 MP 117.0 MP 110.3
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 100 95 90 85 80 75 "
CROSSOVER 97.2 CROSSOVER 89.7 ALPHONSE SAVILLE
MP 97.2 MP 89.7 MP 84.1 MP 78.8
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 75 70 65 60 55 50 "
CROSSOVER 73.3 LAVENZA CROSSOVER 66.3 CROSSOVER 60.0 CROSSOVER 54.8
MP 73.3 MP 70.7 MP 66.3 MP 60.0 MP 54.8
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 50 45 BEAUFORT SIDING EXTENSION 40 35 30" BUDGET YEAR: 2017 COST: $8,250,000 CUT OVER DATE: 03/31/2017
BEAUFORT KIRWIN MP 28.8 KREMPE JCT VICTOR MP 44.6 MP 34.3 MP 28.8 MP 26.7 MP 26.1
CURRENT CONSTRUCTION FUTURE CONSTRUCTION ECONOMIC DEVELOPMENT
REMOVE UPGRADE EXISTING TRACK FOREIGN TRACK PAGE 1 OF 1 Frankentrain SHELLEY DIVISION Railway PROMETHEUS SUBDIVISION WEST WALTON TO VICTOR LINE 1818
l
l TO WEST WALTON TO VICTOR
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 145 140 135 130 125 "
WEST WALTON CROSSOVER 147.9 WALTON EAST WALTON MP 139.9 WEST MARGARET EAST MARGARET HIGH CLERVAL CROSSOVER 134.4 CROSSOVER 131.4
MP 149.9 MP 147.9 MP 147.2 MP 144.5 MP 139.9 MP 138.2 MP 137.6 MP 136.4 MP 134.4 MP 131.4
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 125 120 115 110 105 100 "
MP 124.6 CROSSOVER 117.0 CROSSOVER 110.3
MP 124.6 MP 117.0 MP 110.3
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 100 95 90 85 80 75 "
CROSSOVER 97.2 CROSSOVER 89.7 ALPHONSE SAVILLE
MP 97.2 MP 89.7 MP 84.1 MP 78.8
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 75 70 65 60 55 50 "
Future Construction
CROSSOVER 73.3 LAVENZA CROSSOVER 66.3 CROSSOVER 60.0 CROSSOVER 54.8
MP 73.3 MP 70.7 MP 66.3 MP 60.0 MP 54.8
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 50 45 BEAUFORT SIDING EXTENSION 40 35 30" BUDGET YEAR: 2017 COST: $8,250,000 CUT OVER DATE: 03/31/2017
BEAUFORT KIRWIN MP 28.8 KREMPE JCT VICTOR MP 44.6 MP 34.3 MP 28.8 MP 26.7 MP 26.1
CURRENT CONSTRUCTION FUTURE CONSTRUCTION ECONOMIC DEVELOPMENT
REMOVE UPGRADE EXISTING TRACK FOREIGN TRACK PAGE 1 OF 1 Frankentrain SHELLEY DIVISION Railway PROMETHEUS SUBDIVISION WEST WALTON TO VICTOR LINE 1818
l
l TO WEST WALTON TO VICTOR
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 145 140 135 130 125 " JUSTINE SERVICES, LLC BUDGET YEAR: 2016 CUT OVER DATE: 05/01/2016
WEST WALTON CROSSOVER 147.9 WALTON EAST WALTON MP 139.9 WEST MARGARET EAST MARGARET HIGH CLERVAL CROSSOVER 134.4 CROSSOVER 131.4
MP 149.9 MP 147.9 MP 147.2 MP 144.5 MP 139.9 MP 138.2 MP 137.6 MP 136.4 MP 134.4 MP 131.4
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 125 120 115 110 105 100 "
MP 124.6 CROSSOVER 117.0 CROSSOVER 110.3
MP 124.6 MP 117.0 MP 110.3
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 100 95 90 85 80 75 "
CROSSOVER 97.2 CROSSOVER 89.7 ALPHONSE SAVILLE
MP 97.2 MP 89.7 MP 84.1 MP 78.8
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 75 70 65 60 55 50 "
CROSSOVER 73.3 LAVENZA CROSSOVER 66.3 CROSSOVER 60.0 CROSSOVER 54.8
MP 73.3 MP 70.7 MP 66.3 MP 60.0 MP 54.8
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 50 45 40 35 30"
BEAUFORT KIRWIN MP 28.8 KREMPE JCT VICTOR MP 44.6 MP 34.3 MP 28.8 MP 26.7 MP 26.1
CURRENT CONSTRUCTION FUTURE CONSTRUCTION ECONOMIC DEVELOPMENT
REMOVE UPGRADE EXISTING TRACK FOREIGN TRACK PAGE 1 OF 1 Frankentrain SHELLEY DIVISION Railway PROMETHEUS SUBDIVISION Economic Development WEST WALTON TO VICTOR LINE 1818
l
l TO WEST WALTON TO VICTOR
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 145 140 135 130 125 " JUSTINE SERVICES, LLC BUDGET YEAR: 2016 CUT OVER DATE: 05/01/2016
WEST WALTON CROSSOVER 147.9 WALTON EAST WALTON MP 139.9 WEST MARGARET EAST MARGARET HIGH CLERVAL CROSSOVER 134.4 CROSSOVER 131.4
MP 149.9 MP 147.9 MP 147.2 MP 144.5 MP 139.9 MP 138.2 MP 137.6 MP 136.4 MP 134.4 MP 131.4
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 125 120 115 110 105 100 "
MP 124.6 CROSSOVER 117.0 CROSSOVER 110.3
MP 124.6 MP 117.0 MP 110.3
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 100 95 90 85 80 75 "
CROSSOVER 97.2 CROSSOVER 89.7 ALPHONSE SAVILLE
MP 97.2 MP 89.7 MP 84.1 MP 78.8
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 75 70 65 60 55 50 "
CROSSOVER 73.3 LAVENZA CROSSOVER 66.3 CROSSOVER 60.0 CROSSOVER 54.8
MP 73.3 MP 70.7 MP 66.3 MP 60.0 MP 54.8
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 50 45 40 35 30"
BEAUFORT KIRWIN MP 28.8 KREMPE JCT VICTOR MP 44.6 MP 34.3 MP 28.8 MP 26.7 MP 26.1
CURRENT CONSTRUCTION FUTURE CONSTRUCTION ECONOMIC DEVELOPMENT
REMOVE UPGRADE EXISTING TRACK FOREIGN TRACK PAGE 1 OF 1 Frankentrain SHELLEY DIVISION Railway PROMETHEUS SUBDIVISION WEST WALTON TO VICTOR LINE 1818
l
l TO WEST WALTON TO VICTOR
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 145 140 135 130 125 " JUSTINE SERVICES, LLC BUDGET YEAR: 2016 CUT OVER DATE: 05/01/2016
WEST WALTON CROSSOVER 147.9 WALTON EAST WALTON MP 139.9 WEST MARGARET EAST MARGARET HIGH CLERVAL CROSSOVER 134.4 CROSSOVER 131.4
MP 149.9 MP 147.9 MP 147.2 MP 144.5 MP 139.9 MP 138.2 MP 137.6 MP 136.4 MP 134.4 MP 131.4
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 125 120 115 110 105 100 "
MP 124.6 CROSSOVER 117.0 CROSSOVER 110.3
MP 124.6 MP 117.0 MP 110.3
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 100 95 90 85 HENRY SIDING (NEW) 80 75 " BUDGET YEAR: 2015 COST: $4,500,000 CUT OVER DATE: 11/15/2015
CROSSOVER 97.2 CROSSOVER 89.7 ALPHONSE SAVILLE
MP 97.2 MP 89.7 MP 84.1 MP 78.8
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 75 70 65 60 55 50 "
CROSSOVER 73.3 LAVENZA CROSSOVER 66.3 CROSSOVER 60.0 CROSSOVER 54.8
MP 73.3 MP 70.7 MP 66.3 MP 60.0 MP 54.8
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 50 45 BEAUFORT SIDING EXTENSION 40 35 30" BUDGET YEAR: 2017 COST: $8,250,000 CUT OVER DATE: 03/31/2017
BEAUFORT KIRWIN MP 28.8 KREMPE JCT VICTOR MP 44.6 MP 34.3 MP 28.8 MP 26.7 MP 26.1
CURRENT CONSTRUCTION FUTURE CONSTRUCTION ECONOMIC DEVELOPMENT
REMOVE UPGRADE EXISTING TRACK FOREIGN TRACK PAGE 1 OF 1 Smarter Monster = Angry monster
Scene from Frankenstein (1931) Frankentrain SHELLEY DIVISION Railway PROMETHEUS SUBDIVISION WEST WALTON TO VICTOR LINE 1818
l
l TO WEST WALTON TO VICTOR
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 145 140 135 130 125 "
X X XX XX X XX X X XX XX X XXX XX X X XX X XX
WEST WALTON CROSSOVER 147.9 WALTON EAST WALTON MP 139.9 WEST MARGARET EAST MARGARET HIGH CLERVAL CROSSOVER 134.4 CROSSOVER 131.4
MP 149.9 MP 147.9 MP 147.2 MP 144.5 MP 139.9 MP 138.2 MP 137.6 MP 136.4 MP 134.4 MP 131.4
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 125 120 115 110 105 100 "
XX XXXX X X XX X XXXXXX XXXXXXXXXX X X X X X X X
MP 124.6 CROSSOVER 117.0 CROSSOVER 110.3
MP 124.6 MP 117.0 MP 110.3
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 100 95 90 85 80 75 "
XX XXXX XXX X XX XX X
CROSSOVER 97.2 CROSSOVER 89.7 ALPHONSE SAVILLE
MP 97.2 MP 89.7 MP 84.1 MP 78.8
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 75 70 65 60 55 50 "
X XX XX X XXX XX X X XXX X X X
CROSSOVER 73.3 LAVENZA CROSSOVER 66.3 CROSSOVER 60.0 CROSSOVER 54.8
MP 73.3 MP 70.7 MP 66.3 MP 60.0 MP 54.8
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 50 45 40 35 30"
X X XXX XXXX XXX XX
BEAUFORT KIRWIN MP 28.8 KREMPE JCT VICTOR MP 44.6 MP 34.3 MP 28.8 MP 26.7 MP 26.1
2015 DEFECTS
EXISTING TRACK FOREIGN TRACK PAGE 1 OF 1 Frankentrain SHELLEY DIVISION Railway PROMETHEUS SUBDIVISION WEST WALTON TO VICTOR Defects LINE 1818
l
l TO WEST WALTON TO VICTOR
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 145" 140 135 130 125
X X XXX XXX X XX X X XX XX X XXX XX X XX XX X XXX
WEST WALTON CROSSOVER 147.9 WALTON EAST WALTON MP 139.9 WEST MARGARET EAST MARGARET HIGH CLERVAL CROSSOVER 134.4 CROSSOVER 131.4
MP 149.9 MP 147.9 MP 147.2 MP 144.5 MP 139.9 MP 138.2 MP 137.6 MP 136.4 MP 134.4 MP 131.4
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 125 120 115 110 105 100
XXX XXXX X X XX X XXXXXX XXXXXXXXXX X X X X X X X
MP 124.6 CROSSOVER 117.0 CROSSOVER 110.3
MP 124.6 MP 117.0 MP 110.3
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 100 95 90 85 80 75
XX XXXXX XXX X XX XX X
CROSSOVER 97.2 CROSSOVER 89.7 ALPHONSE SAVILLE
MP 97.2 MP 89.7 MP 84.1 MP 78.8
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 75 70 65 60 55 50
X XX XX X XXX XX X X XXX X X X
CROSSOVER 73.3 LAVENZA CROSSOVER 66.3 CROSSOVER 60.0 CROSSOVER 54.8
MP 73.3 MP 70.7 MP 66.3 MP 60.0 MP 54.8
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 50 45 40 35 30
X X XXX XXXX XXX XX
BEAUFORT KIRWIN MP 28.8 KREMPE JCT VICTOR MP 44.6 MP 34.3 MP 28.8 MP 26.7 MP 26.1
2015 DEFECTS
EXISTING TRACK FOREIGN TRACK PAGE 1 OF 1 Frankentrain SHELLEY DIVISION Railway PROMETHEUS SUBDIVISION WEST WALTON TO VICTOR LINE 1818
l
l TO WEST WALTON TO VICTOR
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 145 140 135 130 125 "
WEST WALTON CROSSOVER 147.9 WALTON EAST WALTON MP 139.9 WEST MARGARET EAST MARGARET HIGH CLERVAL CROSSOVER 134.4 CROSSOVER 131.4
MP 149.9 MP 147.9 MP 147.2 MP 144.5 MP 139.9 MP 138.2 MP 137.6 MP 136.4 MP 134.4 MP 131.4
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 125 120 115 2015 RAIL REPLACEMENT 110 105 100 " MARCH 1 - JUNE 30 136 LB CONTINUOUS WELD 50,000 LINEAR FEET
MP 124.6 CROSSOVER 117.0 CROSSOVER 110.3
MP 124.6 MP 117.0 MP 110.3
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 100 95 2015 RAIL REPLACEMENT 90 85 80 75 " MARCH 1 - JUNE 30 136 LB CONTINUOUS WELD 50,000 LINEAR FEET
CROSSOVER 97.2 CROSSOVER 89.7 ALPHONSE SAVILLE
MP 97.2 MP 89.7 MP 84.1 MP 78.8
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 75 70 65 60 55 50 "
CROSSOVER 73.3 LAVENZA CROSSOVER 66.3 CROSSOVER 60.0 CROSSOVER 54.8
MP 73.3 MP 70.7 MP 66.3 MP 60.0 MP 54.8
" " " " " " " " " " " " " " " " " " " " " " " 2015 TIE REPLACEMENT " " " " " " " " " " " " " " " " " " " " " " " " 50 45 40 35 30" NOVEMBER 1 - DECEMBER 31 CONCRETE TIES 35,000 LINEAR FEET
BEAUFORT KIRWIN MP 28.8 KREMPE JCT VICTOR MP 44.6 MP 34.3 MP 28.8 MP 26.7 MP 26.1
RAIL MAINTENANCE TIE MAINTENANCE
EXISTING TRACK FOREIGN TRACK PAGE 1 OF 1 Frankentrain SHELLEY DIVISION Railway PROMETHEUS SUBDIVISION WEST WALTON TO VICTOR LINE 1818
l
l TO WEST WALTON TO VICTOR
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 145 140 135 130 125 "
Rail Maintenance WEST WALTON CROSSOVER 147.9 WALTON EAST WALTON MP 139.9 WEST MARGARET EAST MARGARET HIGH CLERVAL CROSSOVER 134.4 CROSSOVER 131.4
MP 149.9 MP 147.9 MP 147.2 MP 144.5 MP 139.9 MP 138.2 MP 137.6 MP 136.4 MP 134.4 MP 131.4
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 125 120 115 2015 RAIL REPLACEMENT 110 105 100 " MARCH 1 - JUNE 30 136 LB CONTINUOUS WELD 50,000 LINEAR FEET
MP 124.6 CROSSOVER 117.0 CROSSOVER 110.3
MP 124.6 MP 117.0 MP 110.3
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 100 95 2015 RAIL REPLACEMENT 90 85 80 75 " MARCH 1 - JUNE 30 136 LB CONTINUOUS WELD 50,000 LINEAR FEET
CROSSOVER 97.2 CROSSOVER 89.7 ALPHONSE SAVILLE
MP 97.2 MP 89.7 MP 84.1 MP 78.8
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 75 70 65 60 55 50 "
CROSSOVER 73.3 LAVENZA CROSSOVER 66.3 CROSSOVER 60.0 CROSSOVER 54.8
MP 73.3 MP 70.7 MP 66.3 MP 60.0 MP 54.8
" " " " " " " " " " " " " " " " " " " " " " " 2015 TIE REPLACEMENT " " " " " " " " " " " " " " " " " " " " " " " " 50 45 40 35 30" NOVEMBER 1 - DECEMBER 31 CONCRETE TIES 35,000 LINEAR FEET
BEAUFORT KIRWIN MP 28.8 KREMPE JCT VICTOR MP 44.6 MP 34.3 MP 28.8 MP 26.7 MP 26.1
RAIL MAINTENANCE TIE MAINTENANCE
EXISTING TRACK FOREIGN TRACK PAGE 1 OF 1 Frankentrain SHELLEY DIVISION Railway PROMETHEUS SUBDIVISION WEST WALTON TO VICTOR LINE 1818
l
l TO WEST WALTON TO VICTOR
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 145 140 135 130 125 "
WEST WALTON CROSSOVER 147.9 WALTON EAST WALTON MP 139.9 WEST MARGARET EAST MARGARET HIGH CLERVAL CROSSOVER 134.4 CROSSOVER 131.4
MP 149.9 MP 147.9 MP 147.2 MP 144.5 MP 139.9 MP 138.2 MP 137.6 MP 136.4 MP 134.4 MP 131.4
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 125 120 115 2015 RAIL REPLACEMENT 110 105 100 " MARCH 1 - JUNE 30 136 LB CONTINUOUS WELD 50,000 LINEAR FEET
MP 124.6 CROSSOVER 117.0 CROSSOVER 110.3
MP 124.6 MP 117.0 MP 110.3
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 100 95 2015 RAIL REPLACEMENT 90 85 80 75 " MARCH 1 - JUNE 30 136 LB CONTINUOUS WELD 50,000 LINEAR FEET
CROSSOVER 97.2 CROSSOVER 89.7 ALPHONSE SAVILLE
MP 97.2 MP 89.7 MP 84.1 MP 78.8
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 75 70 65 60 55 50 "
Tie Maintenance CROSSOVER 73.3 LAVENZA CROSSOVER 66.3 CROSSOVER 60.0 CROSSOVER 54.8
MP 73.3 MP 70.7 MP 66.3 MP 60.0 MP 54.8
" " " " " " " " " " " " " " " " " " " " " " " 2015 TIE REPLACEMENT " " " " " " " " " " " " " " " " " " " " " " " " 50 45 40 35 30" NOVEMBER 1 - DECEMBER 31 CONCRETE TIES 35,000 LINEAR FEET
BEAUFORT KIRWIN MP 28.8 KREMPE JCT VICTOR MP 44.6 MP 34.3 MP 28.8 MP 26.7 MP 26.1
RAIL MAINTENANCE TIE MAINTENANCE
EXISTING TRACK FOREIGN TRACK PAGE 1 OF 1 Frankentrain SHELLEY DIVISION Railway PROMETHEUS SUBDIVISION WEST WALTON TO VICTOR LINE 1818
l
l TO WEST WALTON TO VICTOR
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 145 140 135 130 125 "
X X XX XX X XX X X XX XX X XXX XX X X XX X XX
WEST WALTON CROSSOVER 147.9 WALTON EAST WALTON MP 139.9 WEST MARGARET EAST MARGARET HIGH CLERVAL CROSSOVER 134.4 CROSSOVER 131.4
MP 149.9 MP 147.9 MP 147.2 MP 144.5 MP 139.9 MP 138.2 MP 137.6 MP 136.4 MP 134.4 MP 131.4
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 125 120 115 2015 RAIL REPLACEMENT 110 105 100 " MARCH 1 - JUNE 30 136 LB CONTINUOUS WELD 50,000 LINEAR FEET
XX XXXX X X XX X XXXXXX XXXXXXXXXX X X X X X X X
MP 124.6 CROSSOVER 117.0 CROSSOVER 110.3
MP 124.6 MP 117.0 MP 110.3
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 100 95 2015 RAIL REPLACEMENT 90 85 80 75 " MARCH 1 - JUNE 30 136 LB CONTINUOUS WELD 50,000 LINEAR FEET
XX XXXX XXX X XX XX X
CROSSOVER 97.2 CROSSOVER 89.7 ALPHONSE SAVILLE
MP 97.2 MP 89.7 MP 84.1 MP 78.8
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 75 70 65 60 55 50 "
X XX XX X XXX XX X X XXX X X X
CROSSOVER 73.3 LAVENZA CROSSOVER 66.3 CROSSOVER 60.0 CROSSOVER 54.8
MP 73.3 MP 70.7 MP 66.3 MP 60.0 MP 54.8
" " " " " " " " " " " " " " " " " " " " " " " 2015 TIE REPLACEMENT " " " " " " " " " " " " " " " " " " " " " " " " 50 45 40 35 30" NOVEMBER 1 - DECEMBER 31 CONCRETE TIES 35,000 LINEAR FEET
X X XXX XXXX XXX XX
BEAUFORT KIRWIN MP 28.8 KREMPE JCT VICTOR MP 44.6 MP 34.3 MP 28.8 MP 26.7 MP 26.1
2015 DEFECTS RAIL MAINTENANCE TIE MAINTENANCE
EXISTING TRACK FOREIGN TRACK PAGE 1 OF 1 Frankentrain SHELLEY DIVISION Railway PROMETHEUS SUBDIVISION WEST WALTON TO VICTOR LINE 1818
l
l TO WEST WALTON TO VICTOR
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 145 140 135 130 125 "
X X XXX XXX X XX X X XX XX X XXX XX X XX XX X XXX
WEST WALTON CROSSOVER 147.9 WALTON EAST WALTON MPRail 139.9 MaintenanceWEST MARGARET and EASTDefects MARGARET HIGH CLERVAL CROSSOVER 134.4 CROSSOVER 131.4
MP 149.9 MP 147.9 MP 147.2 MP 144.5 MP 139.9 MP 138.2 MP 137.6 MP 136.4 MP 134.4 MP 131.4
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 125 120 115 2015 RAIL REPLACEMENT 110 105 100 " MARCH 1 - JUNE 30 136 LB CONTINUOUS WELD 50,000 LINEAR FEET
XXX XXXX X X XX X XXXXXX XXXXXXXXXX X X X X X X X
MP 124.6 CROSSOVER 117.0 CROSSOVER 110.3
MP 124.6 MP 117.0 MP 110.3
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 100 95 2015 RAIL REPLACEMENT 90 85 80 75 " MARCH 1 - JUNE 30 136 LB CONTINUOUS WELD 50,000 LINEAR FEET
XX XXXXX XXX X XX XX X
CROSSOVER 97.2 CROSSOVER 89.7 ALPHONSE SAVILLE
MP 97.2 MP 89.7 MP 84.1 MP 78.8
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 75 70 65 60 55 50 "
X XX XX X XXX XX X X XXX X X X
CROSSOVER 73.3 LAVENZA CROSSOVER 66.3 CROSSOVER 60.0 CROSSOVER 54.8
MP 73.3 MP 70.7 MP 66.3 MP 60.0 MP 54.8
" " " " " " " " " " " " " " " " " " " " " " " 2015 TIE REPLACEMENT " " " " " " " " " " " " " " " " " " " " " " " " 50 45 40 35 30" NOVEMBER 1 - DECEMBER 31 CONCRETE TIES 35,000 LINEAR FEET
X X XXX XXXX XXX XX
BEAUFORT KIRWIN MP 28.8 KREMPE JCT VICTOR MP 44.6 MP 34.3 MP 28.8 MP 26.7 MP 26.1
2015 DEFECTS RAIL MAINTENANCE TIE MAINTENANCE
EXISTING TRACK FOREIGN TRACK PAGE 1 OF 1 Frankentrain SHELLEY DIVISION Railway PROMETHEUS SUBDIVISION WEST WALTON TO VICTOR LINE 1818
l
l TO WEST WALTON TO VICTOR
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 145 140 135 130 125 "
X X XXX XXX X XX X X XX XX X XXX XX X XX XX X XXX
WEST WALTON CROSSOVER 147.9 WALTON EAST WALTON MP 139.9 WEST MARGARET EAST MARGARET HIGH CLERVAL CROSSOVER 134.4 CROSSOVER 131.4
MP 149.9 MP 147.9 MP 147.2 MP 144.5 MP 139.9 MP 138.2 MP 137.6 MP 136.4 MP 134.4 MP 131.4
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 125 120 115 2015 RAIL REPLACEMENT 110 105 100 " MARCH 1 - JUNE 30 136 LB CONTINUOUS WELD 50,000 LINEAR FEET
XXX XXXX X X XX X XXXXXX XXXXXXXXXX X X X X X X X
MP 124.6 CROSSOVER 117.0 CROSSOVER 110.3
MP 124.6 MP 117.0 MP 110.3
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 100 95 2015 RAIL REPLACEMENT 90 85 80 75 " MARCH 1 - JUNE 30 136 LB CONTINUOUS WELD 50,000 LINEAR FEET
XX XXXXX XXX X XX XX X
CROSSOVER 97.2 CROSSOVER 89.7 ALPHONSE SAVILLE
MP 97.2 MP 89.7 MP 84.1 MP 78.8
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 75 70 65 60 55 50 "
X XX XX X XXX XX X X XXX X X X Tie Maintenance and Defects CROSSOVER 73.3 LAVENZA CROSSOVER 66.3 CROSSOVER 60.0 CROSSOVER 54.8
MP 73.3 MP 70.7 MP 66.3 MP 60.0 MP 54.8
" " " " " " " " " " " " " " " " " " " " " " " 2015 TIE REPLACEMENT " " " " " " " " " " " " " " " " " " " " " " " " 50 45 40 35 30" NOVEMBER 1 - DECEMBER 31 CONCRETE TIES 35,000 LINEAR FEET
X X XXX XXXX XXX XX
BEAUFORT KIRWIN MP 28.8 KREMPE JCT VICTOR MP 44.6 MP 34.3 MP 28.8 MP 26.7 MP 26.1
2015 DEFECTS RAIL MAINTENANCE TIE MAINTENANCE
EXISTING TRACK FOREIGN TRACK PAGE 1 OF 1 A Bride for Our Monster
Scene from Bride of Frankenstein (1935) Frankentrain SHELLEY DIVISION Railway PROMETHEUS SUBDIVISION WEST WALTON TO VICTOR LINE 1818
l
l TO WEST WALTON TO VICTOR
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 145 140 135 130 125 " JUSTINE SERVICES, LLC BUDGET YEAR: 2016 CUT OVER DATE: 05/01/2016
X X XX XX X XX X X XX XX X XXX XX X X XX X XX
WEST WALTON CROSSOVER 147.9 WALTON EAST WALTON MP 139.9 WEST MARGARET EAST MARGARET HIGH CLERVAL CROSSOVER 134.4 CROSSOVER 131.4
MP 149.9 MP 147.9 MP 147.2 MP 144.5 MP 139.9 MP 138.2 MP 137.6 MP 136.4 MP 134.4 MP 131.4
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 125 120 115 110 105 100 "
XX XXXX X X XX X XXXXXX XXXXXXXXXX X X X X X X X
MP 124.6 CROSSOVER 117.0 CROSSOVER 110.3
MP 124.6 MP 117.0 MP 110.3
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 100 95 90 85 HENRY SIDING (NEW) 80 75 " BUDGET YEAR: 2015 COST: $4,500,000 CUT OVER DATE: 11/15/2015
XX XXXX XXX X XX XX X
CROSSOVER 97.2 CROSSOVER 89.7 ALPHONSE SAVILLE
MP 97.2 MP 89.7 MP 84.1 MP 78.8
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 75 70 65 60 55 50 "
X XX XX X XXX XX X X XXX X X X
CROSSOVER 73.3 LAVENZA CROSSOVER 66.3 CROSSOVER 60.0 CROSSOVER 54.8
MP 73.3 MP 70.7 MP 66.3 MP 60.0 MP 54.8
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 50 45 BEAUFORT SIDING EXTENSION 40 35 30" BUDGET YEAR: 2017 COST: $8,250,000 CUT OVER DATE: 03/31/2017
X X XXX XXXX XXX XX
BEAUFORT KIRWIN MP 28.8 KREMPE JCT VICTOR MP 44.6 MP 34.3 MP 28.8 MP 26.7 MP 26.1
2015 DEFECTS CURRENT CONSTRUCTION FUTURE CONSTRUCTION ECONOMIC DEVELOPMENT
REMOVE UPGRADE EXISTING TRACK FOREIGN TRACK PAGE 1 OF 1 Frankentrain SHELLEY DIVISION Railway PROMETHEUS SUBDIVISION WEST WALTON TO VICTOR LINE 1818
l
l TO WEST WALTON TO VICTOR
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 145 140 135 130 125 " JUSTINE SERVICES, LLC BUDGET YEAR: 2016 CUT OVER DATE: 05/01/2016
X X XXX XXX X XX X X XX XX X XXX XX X XX XX X XXX
WEST WALTON CROSSOVER 147.9 WALTON EAST WALTON MP 139.9 WEST MARGARET EAST MARGARET HIGH CLERVAL CROSSOVER 134.4 CROSSOVER 131.4
MP 149.9 MP 147.9 MP 147.2 MP 144.5 MP 139.9 MP 138.2 MP 137.6 MP 136.4 MP 134.4 MP 131.4
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 125 120 115 110 105 100 "
XXX XXXX X X XX X XXXXXX XXXXXCurrentXXXXX Construction XwithX DefectsX X X X X
MP 124.6 CROSSOVER 117.0 CROSSOVER 110.3
MP 124.6 MP 117.0 MP 110.3
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 100 95 90 85 HENRY SIDING (NEW) 80 75 " BUDGET YEAR: 2015 COST: $4,500,000 CUT OVER DATE: 11/15/2015
XX XXXXX XXX X XX XX X
CROSSOVER 97.2 CROSSOVER 89.7 ALPHONSE SAVILLE
MP 97.2 MP 89.7 MP 84.1 MP 78.8
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 75 70 65 60 55 50 "
X XX XX X XXX XX X X XXX X X X
CROSSOVER 73.3 LAVENZA CROSSOVER 66.3 CROSSOVER 60.0 CROSSOVER 54.8
MP 73.3 MP 70.7 MP 66.3 MP 60.0 MP 54.8
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 50 45 BEAUFORT SIDING EXTENSION 40 35 30" BUDGET YEAR: 2017 COST: $8,250,000 CUT OVER DATE: 03/31/2017
X X XXX XXXX XXX XX
BEAUFORT KIRWIN MP 28.8 KREMPE JCT VICTOR MP 44.6 MP 34.3 MP 28.8 MP 26.7 MP 26.1
2015 DEFECTS CURRENT CONSTRUCTION FUTURE CONSTRUCTION ECONOMIC DEVELOPMENT
REMOVE UPGRADE EXISTING TRACK FOREIGN TRACK PAGE 1 OF 1 Frankentrain SHELLEY DIVISION Railway PROMETHEUS SUBDIVISION WEST WALTON TO VICTOR LINE 1818
l
l TO WEST WALTON TO VICTOR
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 145 140 135 130 125 " JUSTINE SERVICES, LLC BUDGET YEAR: 2016 CUT OVER DATE: 05/01/2016
WEST WALTON CROSSOVER 147.9 WALTON EAST WALTON MP 139.9 WEST MARGARET EAST MARGARET HIGH CLERVAL CROSSOVER 134.4 CROSSOVER 131.4
MP 149.9 MP 147.9 MP 147.2 MP 144.5 MP 139.9 MP 138.2 MP 137.6 MP 136.4 MP 134.4 MP 131.4
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 125 120 115 2015 RAIL REPLACEMENT 110 105 100 " MARCH 1 - JUNE 30 136 LB CONTINUOUS WELD 50,000 LINEAR FEET
MP 124.6 CROSSOVER 117.0 CROSSOVER 110.3
MP 124.6 MP 117.0 MP 110.3
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 100 95 2015 RAIL REPLACEMENT 90 85 HENRY SIDING (NEW) 80 75 " MARCH 1 - JUNE 30 BUDGET YEAR: 2015 136 LB CONTINUOUS WELD COST: $4,500,000 50,000 LINEAR FEET CUT OVER DATE: 11/15/2015
CROSSOVER 97.2 CROSSOVER 89.7 ALPHONSE SAVILLE
MP 97.2 MP 89.7 MP 84.1 MP 78.8
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 75 70 65 60 55 50 "
CROSSOVER 73.3 LAVENZA CROSSOVER 66.3 CROSSOVER 60.0 CROSSOVER 54.8
MP 73.3 MP 70.7 MP 66.3 MP 60.0 MP 54.8
" " " " " " " " " " " " " " " " " " " " " " " 2015 TIE REPLACEMENT " " " " " " " " " " " " " " " " " " " " " " " " 50 45 BEAUFORT SIDING EXTENSION 40 35 30" BUDGET YEAR: 2017 NOVEMBER 1 - DECEMBER 31 COST: $8,250,000 CONCRETE TIES CUT OVER DATE: 03/31/2017 35,000 LINEAR FEET
BEAUFORT KIRWIN MP 28.8 KREMPE JCT VICTOR MP 44.6 MP 34.3 MP 28.8 MP 26.7 MP 26.1
RAIL MAINTENANCE TIE MAINTENANCE
CURRENT CONSTRUCTION FUTURE CONSTRUCTION ECONOMIC DEVELOPMENT
REMOVE UPGRADE EXISTING TRACK FOREIGN TRACK PAGE 1 OF 1 Frankentrain SHELLEY DIVISION Railway PROMETHEUS SUBDIVISION WEST WALTON TO VICTOR LINE 1818
l
l TO WEST WALTON TO VICTOR
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 145 140 135 130 125 " JUSTINE SERVICES, LLC BUDGET YEAR: 2016 CUT OVER DATE: 05/01/2016
WEST WALTON CROSSOVER 147.9 WALTON EAST WALTON MP 139.9 WEST MARGARET EAST MARGARET HIGH CLERVAL CROSSOVER 134.4 CROSSOVER 131.4
MP 149.9 MP 147.9 MP 147.2 MP 144.5 MP 139.9 MP 138.2 MP 137.6 MP 136.4 MP 134.4 MP 131.4
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 125 120 115 2015 RAIL REPLACEMENT 110 105 100 " MARCH 1 - JUNE 30 136 LB CONTINUOUS WELD 50,000 LINEAR FEET Current Construction with Rail Maintenance
MP 124.6 CROSSOVER 117.0 CROSSOVER 110.3
MP 124.6 MP 117.0 MP 110.3
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 100 95 2015 RAIL REPLACEMENT 90 85 HENRY SIDING (NEW) 80 75 " MARCH 1 - JUNE 30 BUDGET YEAR: 2015 136 LB CONTINUOUS WELD COST: $4,500,000 50,000 LINEAR FEET CUT OVER DATE: 11/15/2015
CROSSOVER 97.2 CROSSOVER 89.7 ALPHONSE SAVILLE
MP 97.2 MP 89.7 MP 84.1 MP 78.8
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 75 70 65 60 55 50 "
CROSSOVER 73.3 LAVENZA CROSSOVER 66.3 CROSSOVER 60.0 CROSSOVER 54.8
MP 73.3 MP 70.7 MP 66.3 MP 60.0 MP 54.8
" " " " " " " " " " " " " " " " " " " " " " " 2015 TIE REPLACEMENT " " " " " " " " " " " " " " " " " " " " " " " " 50 45 BEAUFORT SIDING EXTENSION 40 35 30" BUDGET YEAR: 2017 NOVEMBER 1 - DECEMBER 31 COST: $8,250,000 CONCRETE TIES CUT OVER DATE: 03/31/2017 35,000 LINEAR FEET
BEAUFORT KIRWIN MP 28.8 KREMPE JCT VICTOR MP 44.6 MP 34.3 MP 28.8 MP 26.7 MP 26.1
RAIL MAINTENANCE TIE MAINTENANCE
CURRENT CONSTRUCTION FUTURE CONSTRUCTION ECONOMIC DEVELOPMENT
REMOVE UPGRADE EXISTING TRACK FOREIGN TRACK PAGE 1 OF 1 Frankentrain SHELLEY DIVISION Railway PROMETHEUS SUBDIVISION WEST WALTON TO VICTOR LINE 1818
l
l TO WEST WALTON TO VICTOR
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 145 140 135 130 125 " JUSTINE SERVICES, LLC BUDGET YEAR: 2016 CUT OVER DATE: 05/01/2016
WEST WALTON CROSSOVER 147.9 WALTON EAST WALTON MP 139.9 WEST MARGARET EAST MARGARET HIGH CLERVAL CROSSOVER 134.4 CROSSOVER 131.4
MP 149.9 MP 147.9 MP 147.2 MP 144.5 MP 139.9 MP 138.2 MP 137.6 MP 136.4 MP 134.4 MP 131.4
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 125 120 115 2015 RAIL REPLACEMENT 110 105 100 " MARCH 1 - JUNE 30 136 LB CONTINUOUS WELD 50,000 LINEAR FEET
MP 124.6 CROSSOVER 117.0 CROSSOVER 110.3
MP 124.6 MP 117.0 MP 110.3
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 100 95 2015 RAIL REPLACEMENT 90 85 HENRY SIDING (NEW) 80 75 " MARCH 1 - JUNE 30 BUDGET YEAR: 2015 136 LB CONTINUOUS WELD COST: $4,500,000 50,000 LINEAR FEET CUT OVER DATE: 11/15/2015
CROSSOVER 97.2 CROSSOVER 89.7 ALPHONSE SAVILLE
MP 97.2 MP 89.7 MP 84.1 MP 78.8
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 75 70 65 60 55 50 "
Future Construction with Tie Maintenance
CROSSOVER 73.3 LAVENZA CROSSOVER 66.3 CROSSOVER 60.0 CROSSOVER 54.8
MP 73.3 MP 70.7 MP 66.3 MP 60.0 MP 54.8
" " " " " " " " " " " " " " " " " " " " " " " 2015 TIE REPLACEMENT " " " " " " " " " " " " " " " " " " " " " " " " 50 45 BEAUFORT SIDING EXTENSION 40 35 30" BUDGET YEAR: 2017 NOVEMBER 1 - DECEMBER 31 COST: $8,250,000 CONCRETE TIES CUT OVER DATE: 03/31/2017 35,000 LINEAR FEET
BEAUFORT KIRWIN MP 28.8 KREMPE JCT VICTOR MP 44.6 MP 34.3 MP 28.8 MP 26.7 MP 26.1
RAIL MAINTENANCE TIE MAINTENANCE
CURRENT CONSTRUCTION FUTURE CONSTRUCTION ECONOMIC DEVELOPMENT
REMOVE UPGRADE EXISTING TRACK FOREIGN TRACK PAGE 1 OF 1 A Monster Family
Scenes from Bride of Frankenstein (1935); Frankenweenie (2012) Frankentrain SHELLEY DIVISION Railway PROMETHEUS SUBDIVISION WEST WALTON TO VICTOR LINE 1818
l
l TO WEST WALTON TO VICTOR
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 145 140 135 130 125 " JUSTINE SERVICES, LLC BUDGET YEAR: 2016 CUT OVER DATE: 05/01/2016
X X XX XX X XX X X XX XX X XXX XX X X XX X XX
WEST WALTON CROSSOVER 147.9 WALTON EAST WALTON MP 139.9 WEST MARGARET EAST MARGARET HIGH CLERVAL CROSSOVER 134.4 CROSSOVER 131.4
MP 149.9 MP 147.9 MP 147.2 MP 144.5 MP 139.9 MP 138.2 MP 137.6 MP 136.4 MP 134.4 MP 131.4
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 125 120 115 2015 RAIL REPLACEMENT 110 105 100 " MARCH 1 - JUNE 30 136 LB CONTINUOUS WELD 50,000 LINEAR FEET
XX XXXX X X XX X XXXXXX XXXXXXXXXX X X X X X X X
MP 124.6 CROSSOVER 117.0 CROSSOVER 110.3
MP 124.6 MP 117.0 MP 110.3
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 100 95 2015 RAIL REPLACEMENT 90 85 HENRY SIDING (NEW) 80 75 " MARCH 1 - JUNE 30 BUDGET YEAR: 2015 136 LB CONTINUOUS WELD COST: $4,500,000 50,000 LINEAR FEET CUT OVER DATE: 11/15/2015
XX XXXX XXX X XX XX X
CROSSOVER 97.2 CROSSOVER 89.7 ALPHONSE SAVILLE
MP 97.2 MP 89.7 MP 84.1 MP 78.8
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 75 70 65 60 55 50 "
X XX XX X XXX XX X X XXX X X X
CROSSOVER 73.3 LAVENZA CROSSOVER 66.3 CROSSOVER 60.0 CROSSOVER 54.8
MP 73.3 MP 70.7 MP 66.3 MP 60.0 MP 54.8
" " " " " " " " " " " " " " " " " " " " " " " 2015 TIE REPLACEMENT " " " " " " " " " " " " " " " " " " " " " " " " 50 45 BEAUFORT SIDING EXTENSION 40 35 30" BUDGET YEAR: 2017 NOVEMBER 1 - DECEMBER 31 COST: $8,250,000 CONCRETE TIES CUT OVER DATE: 03/31/2017 35,000 LINEAR FEET
X X XXX XXXX XXX XX
BEAUFORT KIRWIN MP 28.8 KREMPE JCT VICTOR MP 44.6 MP 34.3 MP 28.8 MP 26.7 MP 26.1
2015 DEFECTS RAIL MAINTENANCE TIE MAINTENANCE
CURRENT CONSTRUCTION FUTURE CONSTRUCTION ECONOMIC DEVELOPMENT
REMOVE UPGRADE EXISTING TRACK FOREIGN TRACK PAGE 1 OF 1 Frankentrain SHELLEY DIVISION Railway PROMETHEUS SUBDIVISION WEST WALTON TO VICTOR LINE 1818
l
l TO WEST WALTON TO VICTOR
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 145 140 135 130 125 " JUSTINE SERVICES, LLC BUDGET YEAR: 2016 CUT OVER DATE: 05/01/2016
X X XXX XXX X XX X X XX XX X XXX XX X XX XX X XXX
WEST WALTON CROSSOVER 147.9 WALTON EAST WALTON MP 139.9 WEST MARGARET EAST MARGARET HIGH CLERVAL CROSSOVER 134.4 CROSSOVER 131.4
MP 149.9 MP 147.9 MP 147.2 MP 144.5 MP 139.9 MP 138.2 MP 137.6 MP 136.4 MP 134.4 MP 131.4
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 125 120 115 2015 RAIL REPLACEMENT 110 105 100 " MARCH 1 - JUNE 30 136 LB CONTINUOUS WELD 50,000 LINEAR FEET
XXX XXXX X X XX X XXXXXX XXXXXXXXCurrentXX ConstructionX withX X DefectsX X X X and Rail Maintenance MP 124.6 CROSSOVER 117.0 CROSSOVER 110.3
MP 124.6 MP 117.0 MP 110.3
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 100 95 2015 RAIL REPLACEMENT 90 85 HENRY SIDING (NEW) 80 75 " MARCH 1 - JUNE 30 BUDGET YEAR: 2015 136 LB CONTINUOUS WELD COST: $4,500,000 50,000 LINEAR FEET CUT OVER DATE: 11/15/2015
XX XXXXX XXX X XX XX X
CROSSOVER 97.2 CROSSOVER 89.7 ALPHONSE SAVILLE
MP 97.2 MP 89.7 MP 84.1 MP 78.8
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 75 70 65 60 55 50 "
X XX XX X XXX XX X X XXX X X X
CROSSOVER 73.3 LAVENZA CROSSOVER 66.3 CROSSOVER 60.0 CROSSOVER 54.8
MP 73.3 MP 70.7 MP 66.3 MP 60.0 MP 54.8
" " " " " " " " " " " " " " " " " " " " " " " 2015 TIE REPLACEMENT " " " " " " " " " " " " " " " " " " " " " " " " 50 45 BEAUFORT SIDING EXTENSION 40 35 30" BUDGET YEAR: 2017 NOVEMBER 1 - DECEMBER 31 COST: $8,250,000 CONCRETE TIES CUT OVER DATE: 03/31/2017 35,000 LINEAR FEET
X X XXX XXXX XXX XX
BEAUFORT KIRWIN MP 28.8 KREMPE JCT VICTOR MP 44.6 MP 34.3 MP 28.8 MP 26.7 MP 26.1
2015 DEFECTS RAIL MAINTENANCE TIE MAINTENANCE
CURRENT CONSTRUCTION FUTURE CONSTRUCTION ECONOMIC DEVELOPMENT
REMOVE UPGRADE EXISTING TRACK FOREIGN TRACK PAGE 1 OF 1 Subdivision Schematics
Strong
Smart
Unstoppable
Scene from Frankenstein (1931) Oh! Be men, or be more than men… Return as heroes who have fought and conquered, and who know not what it is to turn their backs on the foe.
Victor Frankenstein, Mary Shelley’s Frankenstein (1818)
Scene from Young Frankenstein (1974) Scene from Frankenstein (1931) Subdivision Schematics
Frankentrain SHELLEY DIVISION Railway PROMETHEUS SUBDIVISION WEST WALTON TO VICTOR LINE 1818
l
l TO WEST WALTON TO VICTOR
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 145" 140 135 130 125
WEST WALTON CROSSOVER 147.9 WALTON EAST WALTON MP 139.9 WEST MARGARET EAST MARGARET HIGH CLERVAL CROSSOVER 134.4 CROSSOVER 131.4
MP 149.9 MP 147.9 MP 147.2 MP 144.5 MP 139.9 MP 138.2 MP 137.6 MP 136.4 MP 134.4 MP 131.4
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 125 120 115 110 105 100 Jenni Moore, GISP
MP 124.6 CROSSOVER 117.0 CROSSOVER 110.3
MP 124.6 MP 117.0 MP 110.3 [email protected]
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 100 95 90 85 80 75
CROSSOVER 97.2 CROSSOVER 89.7 ALPHONSE SAVILLE
MP 97.2 MP 89.7 MP 84.1 MP 78.8
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 75 70 65 60 55 50
CROSSOVER 73.3 LAVENZA CROSSOVER 66.3 CROSSOVER 60.0 CROSSOVER 54.8
MP 73.3 MP 70.7 MP 66.3 MP 60.0 MP 54.8
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " 50 45 40 35 30
BEAUFORT KIRWIN MP 28.8 KREMPE JCT VICTOR MP 44.6 MP 34.3 MP 28.8 MP 26.7 MP 26.1
EXISTING TRACK FOREIGN TRACK PAGE 1 OF 1