Newsletter the Follo Line Project

Total Page:16

File Type:pdf, Size:1020Kb

Newsletter the Follo Line Project Newsletter The Follo Line Project What is happening-when and where? In 2018 the first deliveries from the Follo Line Project will be completed. Bane NOR would like to thank all neighbours for their patience and coopiration during the construction • Work in 2018 period – we wish everyone a Merry Christmas! • Important dates • Where are the TBM now? Summer/early autumn of 2018, the first of the Follo Line-route about the construction • Contactinformation four tunnel boring machines will break work that is taking place from five rig areas through the Ekeberg mountain in central between Ski and Oslo. We look forward to Oslo. At the same time the opening of the half the travel time between Oslo And Ski first part of the new Ski public transport hub when the Follo Line opens in December is getting nearer. In this newsletter, Bane 2021. NOR will inform the neighbours along Photo : Bane NOR The Follo Line Project | December 2017 New Ski public transport hub Tunnel work between Langhus and Oslo We're pleased about the completion of the Nordbyveien bridge, the new landmark The four tunnel boring machines have now covered over half the distance between in Ski. In August 2018, the first section of the new Ski station is scheduled to open. central Oslo and Langhus. In 2018, two of them will finish their work. There will still be a lot of activity in Ski as we enter the new year. The two northbound machines will pass under the Tunneling near Gamlebyen According to plan the train traffic operations will run from the first neighbourhoods of Kastellet, Holtet and Bekkelaget in 2018, When the two northbound TBM machines break through in section of the new station in 2018. The west side of the station will before meeting the Northern end of the long tunnel under 2018, it will take place in the area under the EKT riding centre be ready for operation, with two new platforms for the new tracks Jomfrubråten. The two southbound machines will pass under the and Jomfrubråten. Early next year there will also be a 1, 2, 3 and 4 and access to the new platforms will be from the Bøleråsen, Vevelstadåsen and Ramstad areas during the period breakthrough from Tresporhallen to the concrete tunnel that will western side of the station. from January to August 2018. The residents in these areas have take the train tracks towards the Oslo Central Station. received information in advance of this work in November 2017. Tresporhallen is part of the Blix Tunnel inside Ekebergsåsen. It Public meeting in January measures 470 square metres and is where the tracks for the Follo Thursday, 11 January 2018, the Municipality of Ski invites What can the neighbours ecpect? Line and the inbound Østfold Line merge together. everyone to a public meeting at 19.00. Bane NOR will be present The sound from the tunnel boring machines can entail a at the meeting to inform about the progress of our work and the temporary nuisance to neighbours who live near the tunnel Noisy work road ahead. The Akershus Country Administration, Norwegian corridor. In these neighbourhoods, the closest residents will notice In the northern section of Tresporhallen work is progressing. This Public Roads Administration and Ruter will also participate, and a gradually increasing humming sound over a period of time for may affect some residents in Gamlebyen. Bane NOR apologises Photo you will have an opportunity to ask questions. The public meeting each of the two tunnel boring machines. Then the sound level will for any nuisance caused by this work and requests that will be held in the municipal council hall at the Ski Town Hall at : Bane NOR be at its highest level for a few weeks before the sound decreases neighbours who have questions or experience any Idrettsveien 8. More information will be available on our website New landmark: The new Nordbyveien bridge in Ski. slowly when the machines move away from the area. inconvenience, to contact us so that we can consider mitigating banenor.no/follobanen and on Facebook, after Christmas. measures. According to plan, the work in this area should be The period when the sound level is at its highest will vary from completed by the end of February 2018. timeline on the last page for the exact dates. More information will Several roads will be finished in 2018 neighbourhood to neighbourhood, depending, for example, on be distributed closer to summer next year. Photo Jernbaneveien will open for public transport, bicycles and the distance between the tunnel and the surface. Experience from : Bane NOR pedestrians next year, and Kirkeveien and Nordbyveien are well New access to the station similar projects shows that there is a great deal of variation in how on their way to being finished. According to plan the pavements After this summer's traffic re-routing, Bane NOR will start the work one experiences sound and noise from construction work like this. will be completed in 2017, while the remaining asphalting will be on renewing the old tracks 1, 2 and 3, and the current side If you have questions or experience any nuisance, we request that completed in the spring of 2018. platform and middle platform. It will not be possible to use the old you contact us so that we can consider mitigating measures. tracks after this. The entry and exit areas will be moved to the west Replacement of rail transportation by busses side. Pedestrians will therefore have to allow more time from Breakthrough Inconveniently it will be necessary to stop the train operations central Ski to the new platforms. This summer/autumn the two northbound machines will break between Ski and Oslo during several periods in 2018 to perform through at Jomfrubråten, while the two southbound machines will engineering work. NSB will provide a replacement of rail Contact us if you experience any inconvinience finish their work in early 2019. However, in the last period, the transportation with bus service during these periods. Bane NOR apologises for any inconvenience caused by the works southbound machines will be boring under a sparsely populated and requests that neighbours, who have questions or experience area between Ramstad and Roås. From the end of June to the beginning of August, four new tracks any inconvenience, to contact us. The neighbours that are affected will be finished and extensive construction work will start on the the most will be offered alternative accommodation. More The tunnel underground at Mosseveien: Illustration eastern side of the station. This work will be performed around information will also be published, as the work progresses, on our the clock, and it will unfortunately entail some noise. See the website at banenor.no/follobanen and on our Facebook page. Day zone Timeline TBM Tunnel TBM Tunnel D & B Bekkelaget Kastellet Ljanselva Grønliåsen Åsland riggområde Assurdalen Vevelstad 116 meter 102 meter 37 meter 162 meter 106 meter 55 meter 60 meter Endepunkt TBM Nordstrand kirke Gjersrudbekken Taraldrud Bøleråsen Roåsbekken Endepunkt TBM Sloraveien Ski Middelalderparken Jomfrubråten Holtet Tangen 21 meter Oslo 2 TBM Oslo 2 TBM Ski Autumn 2018 Spring 2018 Autumn 2017 Spring 2017 Start September/October 2016 Start November/December 2016 Autumn 2017 Winter 2017/2018 Autumn 2018 Winter 2018/2019 Webmap tunnelroute: http://webgis.no/follobanen Photo : Bane NOR Christmas 2017 The work in the tunnel between Ekebergåsen and Langhus will stop from 22. December til 1 January 2018. We wish everyone Merry Christmas! Important dates 2018 • 10.01 – Meeting for neighbours in Bøleråsen • 11. 01 – Public meeting in Ski • 16.01 – Meeting for neighbours at Kastellet– Bekkelaget • 10.02–11.02 Concrete tunnel close to Oslo Central Station. Stop in the rail traffic • 03.03–04.03 Stop in the rail traffic • Påsken: 29.03–02.04 Stop in the rail traffic Next fase at Oslo S • 28.04–29.04 Over the last year the majority of the ground Stop in the rail traffic • 26.05–27.05 reinforcement at the construction area in Gamlebyen Stop in the rail traffic • Sommeren: 23.06–06.08 was completed. The next phase, construction of a Stop in the rail traffic concrete tunnel, is well under way. • 25.08–26.08 Stop in the rail traffic • 22.09–23.09 In recent months, construction work has • Construction of concrete tunnel Stop in the rail traffic started on a large tunnel structure from • Rock hammering and drilling at • 13.10–14.10 Bispegata towards Ekebergåsen. This is Mosseveien Stop in the rail traffic the first section of the 600-metre long • Groundwork: excavation and mass concrete tunnel that will link the Follo transport, as well as some minor sheet Line's long rock tunnel, the Blix Tunnel, piling and lime-cement stabilisation and the Østfold Line's new corridor to • Demolition and reconstruction of the platforms at Oslo Central Station. technical railway infrastructure at Oslo Contact information Central Station and Loenga. In addition, work is progressing in the Mosseveien area, and between Bispegata Stop of train operations Gunnar Børseth – Oslo Central Station and Oslo S. At Mosseveien rock In 2018, it will be necessary to stop the Tlf: 906 38 626 hammering and rock support is executed train operations to carry out important Nina Aasmundsen – in connection with the transition from work in or next to the train tracks at Oslo Tunnel Oslo S–Ekeberg the concrete tunnel to the rock tunnel. Central Station and Loenga for several Tlf: 412 23 139 North of Bispegata, the old bridge is periods. Unfortunately necessary to work Gro Elden – Tunnel Ekeberg–Langhus being demolished and groundwork is around the clock to take maximum Tlf: 477 94 866 carried out for the constructions of advantage of these periods.
Recommended publications
  • Report on Railway Accident with Freight Car Set That Rolled Uncontrolledly from Alnabru to Sydhavna on 24 March 2010
    Issued March 2011 REPORT JB 2011/03 REPORT ON RAILWAY ACCIDENT WITH FREIGHT CAR SET THAT ROLLED UNCONTROLLEDLY FROM ALNABRU TO SYDHAVNA ON 24 MARCH 2010 Accident Investigation Board Norway • P.O. Box 213, N-2001 Lillestrøm, Norway • Phone: + 47 63 89 63 00 • Fax: + 47 63 89 63 01 www.aibn.no • [email protected] This report has been translated into English and published by the AIBN to facilitate access by international readers. As accurate as the translation might be, the original Norwegian text takes precedence as the report of reference. The Accident Investigation Board has compiled this report for the sole purpose of improving railway safety. The object of any investigation is to identify faults or discrepancies which may endanger railway safety, whether or not these are causal factors in the accident, and to make safety recommendations. It is not the Board’s task to apportion blame or liability. Use of this report for any other purpose than for railway safety should be avoided. Photos: AIBN and Ruter As Accident Investigation Board Norway Page 2 TABLE OF CONTENTS NOTIFICATION OF THE ACCIDENT ............................................................................................. 4 SUMMARY ......................................................................................................................................... 4 1. INFORMATION ABOUT THE ACCIDENT ..................................................................... 6 1.1 Chain of events ...................................................................................................................
    [Show full text]
  • Upcoming Projects Infrastructure Construction Division About Bane NOR Bane NOR Is a State-Owned Company Respon- Sible for the National Railway Infrastructure
    1 Upcoming projects Infrastructure Construction Division About Bane NOR Bane NOR is a state-owned company respon- sible for the national railway infrastructure. Our mission is to ensure accessible railway infra- structure and efficient and user-friendly ser- vices, including the development of hubs and goods terminals. The company’s main responsible are: • Planning, development, administration, operation and maintenance of the national railway network • Traffic management • Administration and development of railway property Bane NOR has approximately 4,500 employees and the head office is based in Oslo, Norway. All plans and figures in this folder are preliminary and may be subject for change. 3 Never has more money been invested in Norwegian railway infrastructure. The InterCity rollout as described in this folder consists of several projects. These investments create great value for all travelers. In the coming years, departures will be more frequent, with reduced travel time within the InterCity operating area. We are living in an exciting and changing infrastructure environment, with a high activity level. Over the next three years Bane NOR plans to introduce contracts relating to a large number of mega projects to the market. Investment will continue until the InterCity rollout is completed as planned in 2034. Additionally, Bane NOR plans together with The Norwegian Public Roads Administration, to build a safer and faster rail and road system between Arna and Stanghelle on the Bergen Line (western part of Norway). We rely on close
    [Show full text]
  • Project Portfolio Infrastructure Construction Division
    1 Project portfolio Infrastructure Construction Division www.banenor.no | 2019 3 We rely on close cooperation In the upcoming years there will be a large increase in About Bane NOR rail investments in Norway. As described in this folder the investments will be spread out on several projects. Bane NOR is a state-owned company respon- These investments create great value for all travelers. In the coming sible for the national railway infrastructure. Our years, departures will be more frequent, with reduced travel time mission is to ensure accessible railway infra- within the InterCity operating area. We are living in an exciting and Photo: Anne-Mette Storvik structure and efficient and user-friendly ser- changing infrastructure environment, with a high activity level. Over Einar Kilde vices, including the development of hubs and the next three years Bane NOR plans to introduce contracts relating goods terminals. to a large number of mega projects to the market. Investment will Executive Vice President continue until the InterCity rollout is completed as planned in 2034. Infrastructure Construction Division As of today, the Follo Line and Venjar-Langset are in production, The company’s main responsible are: and Sandvika-Moss-Såstad, Drammen-Kobbervikdalen and Ny- • Planning, development, administration, operation and kirke-Barkåker are out for tender. In 2019 and 2020 our plan is to maintenance of the national railway network • Traffic management start the pre-qualification process for Kleverud-Sørli-Åkersvika and • Administration and development of railway property The Ringerike Line and E16 highway. Additionally, Bane NOR plans together with The Norwegian Bane NOR has approximately 4,500 employees and the head office is Public Roads Administration, to build a safer and faster rail and road based in Oslo, Norway.
    [Show full text]
  • Pre-Qualification for D&B Tunnel – Contract 2 Date: 2013-05-15 Follo Line Project Page: 1 of 29
    Norwegian National Rail Administration Pre-qualification for D&B Tunnel – contract 2 Date: 2013-05-15 Follo Line Project Page: 1 of 29 Reference number: 201302255 PRE-QUALIFICATION Pre-qualification for the Contract for Conventional Driving of Tunnels in the Ekebergåsen, Follo Line Project The Norwegian National Rail Administration, Infrastructure Construction unit (herein also referred to as Company) has commenced a procurement process with the intention to invite tenders for a contract for conventional driving of tunnels in the Ekebergåsen (Ekeberg Hill), where the tunnels meet close to the Oslo Central Station, as part of the Follo Line Project. The competition will be performed as a two-step process as follows: Pre-qualification - Issue of pre-qualification documents - Receipt and evaluation of tenderers’ replies to the pre-qualification Invitation to tender - Issue of invitation to tender to the qualified tenderers - Receipt and evaluation of tenders and negotiations with one or more tenderers - Contract award Questions to the pre-qualification documents must be submitted no later than one week prior to the delivery due date at stated in section 2.8 hereto. Questions regarding this pre-qualification process shall be sent on e-mail to: Norwegian National Rail Administration, attention: Merete Norli, e-mail: [email protected]. Norwegian National Rail Administration Erik Smith Project director Norwegian National Rail Administration Pre-qualification for D&B Tunnel – contract 2 Date: 2013-05-15 Follo Line Project Page: 2 of 29 Reference
    [Show full text]
  • On Track GLIMPSES from the NORWEGIAN NATIONAL RAIL ADMINISTRATION’S ACTIVITIES in 2013
    On track GLIMPSES FROM THE NORWEGIAN NATIONAL RAIL ADMINISTRATION’S ACTIVITIES IN 2013 The railways are developing fast Norwegian railways have rarely moved as fast as they are right now: Passengers are flocking on board, construction is at an all-time high and the trains are on schedule. "The really big lift comes with the InterCity development, which is in full swing". Contents EDITORIAL Editorial 3 Train traffic 4 04 Winning the fight against time 4 Maintenance and renewals 6 Battle against man-made waterways 6 Groundbreaking 10 A good year for the railway Those who move mountains 10 Tunnel project on rails 12 The railway achieved a number of great results throughout 2013. The most impressive Revolutionary double track 14 development was the growth in passenger traffic, which increased for the country as Arna–Bergen 15 a whole by more than seven percent compared with the previous year. The world looks to Follo 16 Records along Mjøsa 18 06 he largest increase was An additional lift in the north 19 seen in eastern Norway, Projects around the country 19 where the effect of the new T route model introduced in December 2012 really took The future 20 effect. The goal for passenger train InterCity: A planning job for the ages 20 punctuality was also achieved and ended up at 90.6 percent. How “the new railway” will be managed 22 The transport needs associated with More for the money 24 the population growth in and around the large cities must be solved through More trains for the people 24 investments in public transport.
    [Show full text]
  • The Follo Line Norwegian Railway: Building for the Future
    The Follo Line Norwegian railway: building for the future The Follo Line is currently the largest The Follo Line is planned as a high­ transport project in Norway. The new speed railline through twin tunnels double track line between Oslo Central for maximum tunnel capacity, safety Station and the public transport centre and availability for maintenance. The of Ski, includes the country's longest project also facilitates a potential railway tunnel (19.5 km). high-speed line to the continent. o New double track line Oslo-Ski Twa single bore tunnels will give the new double track line Oslo-Ski both a significant degree of flexibility and modern level of rail safety. Punctual service between cities Ski station: The new Ski station will be rebuilt and Four tracks to Oslo Central Station, as the hub of expanded to include six tracks and three centre plat­ Norway's passenger rail network, represents a new forms. Accessibility and transfer within the station area era for traffic between cities south-east of Oslo. From will be improved to make the journey efficient, comfort­ a railway engineering perspective, to incorporate two abie and easy for the passengers. new lines into this most densely trafficked area, is a complex challenge. Construction works is scheduled The tunnel: The long railway tunnel (19, 5 km), is the to commence 2014, but important preparations have first Norwegian rail tunnel to be built with two separate already started. The project is due to be completed tubes. The Norwegian National Rail Administration is in 2019. considering both blasting/drilling and tunnel boring machine.
    [Show full text]
  • We-Create-The-Railway-Of-The-Future
    1 We create the railway of the future 3 Norway on rails 4 This is Bane NOR 6 The Railway Reform in brief 8 More people choosing the train 10 Technology – the future for railways 16 Operation, maintenance and renewals in 2017 20 Building the railway of the future 22 Safety and the environment 26 5 4 | Bane NOR | Norway on rails Norway on rails Bane NOR’s job is to ensure that the national railway infrastructure is available for rail services. We have to supply efficient, user-friendly services, including the development of hubs and freight terminals. At Bane NOR, we have to do everything in our power to meet the social aims defined for the railway sector, and we accept these major tasks with utmost respect. We provide a railway that is already one of the safest, most punctual in Europe, and our aim is to be the best. The organisation focuses on providing as much railway for the money as possible. Our ambition is to put Norway on rails, and openness, commitment and professionalism are the guiding principles for our work. Bane NOR is responsible for a number of the country’s biggest public transport projects, such as the development of InterCity, the Follo Line and the joint Ringerike Line and E16 project. We own and manage areas five times larger than Drammen, making us one of the country’s largest property managers and developers. Our employees manage, operate and maintain 4,200 km of railway. We are responsible for the introduction of ERTMS, Norway’s biggest digitisation project.
    [Show full text]
  • Annual Report 2006
    Annual Report 2006 Contents A new era 3 About Jernbaneverket 6 Who are we? 6 What do we do? 6 Key figures 31 December 2006 6 How do we operate? 7 Organizational structure 8 Key events in 006 0 Competitiveness and Socioeconomic Benefit Capacity and utilization of the national rail network 3 Operating parameters of the rail sector 19 Railways and the environment 0 International activities Jernbaneverket’s image 3 Safety, Punctuality and Customer Satisfaction 4 Safety 5 Punctuality 9 Customer Satisfaction 30 Productivity and Process Quality 34 Jernbaneverket’s accounts 35 Human Resources and Organizational Development 40 Skills development in the rail sector 4 Management development 4 HR management and monitoring systems 43 Personnel and working environment 43 Accounting Policies 46 Contact details 67 A new era In many ways, 006 was the beginning of a new era for Norwegian railways. For the first time ever, Parliament approved a rail budget in line with the National Transport Plan. Steinar Killi, Director General Photo: Sindre Ånonsen With one billion kroner extra for capital expenditure in 2007 and a Government that is promising to maintain funding at this level, Jernbaneverket has been given the start- ing point we need to fulfil our side of the deal: delivering a competitive railway that pays dividends for society in the form of greater mobility and a better environment. We are already making good progress. In the Oslo area, construction of the new station at Lysaker continues, and in the Sandnes/Stavanger area a new freight terminal and double-track line are taking shape. These are all key projects in the process of strengthening rail’s competitive position at regional and national level.
    [Show full text]
  • AKERSHUS 2019 Experience Akershus Akershus County Surrounds Oslo Like a Green Belt
    ENGLISH AKERSHUS 2019 www.VisitAkershus.no Experience Akershus Akershus county surrounds Oslo like a green belt. Akershus consists of the three regions; Asker/Bærum/Røyken, Follo and Romerike. Here you will find a wide selection of different, exciting experiences. Well-developed roads and good communication makes for short distan- ces between the capital, the coastal diamonds, the small intimate city centres, exciting coun- tryside experiences and closeness to nature.If you want to enjoy the good things in life, play golf, visit the fjords, experience the beautiful landscape by bicycle, try some of the fast and exciting experiences Tusenfryd or the Oslofjord has to offer. Dive into the ocean from one of the many rocks, or go fishing in one of the many lakes, this is just the region for you. And you will find all of this just a short distance from the urban capital. Akershus has a large selection of galleries and cultural events that are suitable for all ages. You can also visit historical monuments, such as Bærums verk, Eidsvoll 1814 or Oscarsborg Fortress. We welcome you to the capital region – Akershus. Tourist Information Tourist Information Romerike Eidsverket – Eidsbekken Café, Drøbak Tourist Information Tel +47 67 20 97 40. Open Mon – Fri 9-15, mid June – mid August E-mail: [email protected] also Sat/Sun 10 - 14 Sjøtorget, Havnegt 4, 1440 Drøbak.Tel +47 64 93 50 87. Other Tourist information’s E-mail: turistinformasjonen@frogn. Oslo Visitor Centre kommune.no www.visitdrobak.no Jernbanetorget 1, Østbanehallen – Oslo S Sandvika Shopping Center (Storsenter) 0154 OsloTel 815 30 555.
    [Show full text]
  • The Follo Line Project International Presentation Conference 2012 Tuesday 27Th November the Follo Line Project International Presentation Conference 2012
    The Follo Line Project International Presentation Conference 2012 Tuesday 27th november The Follo Line Project International Presentation Conference 2012 Facts, scope & strategy Mr. Erik Smith Project Director The Follo Line - Background The Follo Line will be built to meet the increased demand for rail capacity south of Oslo • 1,1 million residents in the Oslo region • 30 % population increase by 2025 • Currently no spare capacity on neither rail nor road • 150 000 passengers every day • Great potential for increased freight traffic The Follo Line – Facts and scope • The largest railway project in Norway • New double-track railway line between Oslo Central Station and the public transport centre of Ski • The whole Follo Line project will comprise around 64 km of track, while the new double track Oslo-Ski line will be 2x22 km long. • Extensive works at Oslo Central Station • Construction of a new station at Ski • The longest railway tunnel in Norway - approximately 19,5 km Efficient transport • The Follo Line will reach speeds of up to 250 km/h through the tunnel, • The new tunnel will make it possible to reduce the journey time between Oslo and Ski by 50% (from 22 to 11 minutes) • The double track line will form the core part of InterCity development southwards from Oslo and will be a safe, efficient and environmentally-friendly transport system Growth and improved passenger satisfaction The Follo Line will pave the way for: • more passenger trains and freight trains • a more predictable service By 2025 the target is: • 11,000 more passengers every day • Almost 70% increase in rail passengers to Oslo Central Station during the rush hour • More than 40% increase in rail passengers to Oslo Central Station outside the rush hour • Approximately 5,800 fewer car journeys per day • Approximately 750 fewer heavy freight vehicle journeys per day • Less CO2 emission: a reduction of around 39,000 tons of CO2 per year (passenger and freight traffic) Present schedule Prop.
    [Show full text]
  • Rail Engineering and Consultancy Services
    MOBILISING PUBLIC TRANSPORT RAIL ENGINEERING AND CONSULTANCY SERVICES WWW.RAMBOLL.COM CONTENT SELECTED SERVICES Rail Engineering 4 Capacity Analysis 6 European rail traffic management system (ERTMS) 8 Intercity and High Speed Railways 12 Metro and light rail 14 World class train station 16 Track renewals and upgrades 20 Rail safety 24 Rail engineering 26 Rail service 27 FEATURE PROJECTS Europe’s largest Re-Signalling Scheme 10 Copenhagen Ring 3 18 Safer train stations with 3D technology 22 Ramboll january 2020 MOBILISING PUBLIC TRANSPORT 3 SUSTAINABLE MOBILITY Mobility and transport is essential for the development of any modern society. With people and goods crossing ABOUT RAMBOLL borders every day, globalisation has increased the importance of an efficient and sustainable transport system. Ramboll is a leading engineering, design and consultancy company founded in Denmark in 1945. It is expected that in near future the number of people living The company employs 13,000 in cities globally will exceed the number of people living globally and has especially strong in the countryside. This means that everywhere, more and representation in the Nordics, UK, more cities will be crammed with people. In order to avoid North America, Continental Europe, Middle East and Asia-Pacific. congestion and a complete standstill of traffic, a functional and attractive public transport system is needed. Big cities With more than 300 offices in will have to adapt to this new reality. Balanced solutions are 35 countries, Ramboll combines needed to improve city infrastructure while not isolating the local experience with a global countryside. knowledgebase constantly striving to achieve inspiring and exacting solutions that make a genuine With increasing urbanisation, road congestion and a focus difference to our clients, the on the environment and energy consumption, railways offer end-users, and society at large.
    [Show full text]
  • The Follo Line Longest
    The Follo Line LONGEST. URBAN. COMPLEX. FASTER. Norwegian National Rail Administration Efficient transport less CO2 emission: a reduction of around 39,000 tons of During the construction phase, a large scale project of this The Follo Line Project is the largest transport project in Norway The Follo Line will reach speeds of up to 250 km/h through CO2 per year (passenger and goods traffic) nature can affect people, nature and the environment. Thus, the tunnel, which will be excavated using four large tunnel thorough planning is essential in order to restrict the nega- and will include the country’s longest railway tunnel. The Follo boring machines. tive impact on the surroundings. At the same time, progress An urban challenge and costs must be closely monitored. The whole Follo Line project will comprise around 64 km of The Follo Line will comprise four tracks into Oslo Central Sta- Line tunnel will be the first twin bore tunnel in Norway and the new railway track, while the new double track Oslo-Ski line will tion, which is Norway’s largest public transport hub. Trains be 22 km long. The double track line will form the core part on the new Follo Line will run directly between Oslo and the first to be constructed using tunnel boring machines. The new of InterCity development southwards from Oslo and will be a public transport hub at Ski. In tandem with the Østfold Line, safe, efficient and environmentally-friendly transport system. the Follo Line will provide rail passengers with a much better The Follo Line will link residential and working areas together service than they are currently offered.
    [Show full text]