Pre-Qualification for D&B Tunnel – Contract 2 Date: 2013-05-15 Follo Line Project Page: 1 of 29 Norwegian National Rail Administration Pre-qualification for D&B Tunnel – contract 2 Date: 2013-05-15 Follo Line Project Page: 1 of 29 Reference number: 201302255 PRE-QUALIFICATION Pre-qualification for the Contract for Conventional Driving of Tunnels in the Ekebergåsen, Follo Line Project The Norwegian National Rail Administration, Infrastructure Construction unit (herein also referred to as Company) has commenced a procurement process with the intention to invite tenders for a contract for conventional driving of tunnels in the Ekebergåsen (Ekeberg Hill), where the tunnels meet close to the Oslo Central Station, as part of the Follo Line Project. The competition will be performed as a two-step process as follows: Pre-qualification - Issue of pre-qualification documents - Receipt and evaluation of tenderers’ replies to the pre-qualification Invitation to tender - Issue of invitation to tender to the qualified tenderers - Receipt and evaluation of tenders and negotiations with one or more tenderers - Contract award Questions to the pre-qualification documents must be submitted no later than one week prior to the delivery due date at stated in section 2.8 hereto. Questions regarding this pre-qualification process shall be sent on e-mail to: Norwegian National Rail Administration, attention: Merete Norli, e-mail: [email protected]. Norwegian National Rail Administration Erik Smith Project director Norwegian National Rail Administration Pre-qualification for D&B Tunnel – contract 2 Date: 2013-05-15 Follo Line Project Page: 2 of 29 Reference number: 201302255 Contents: 1. INTRODUCTION............................................................................................................................. 3 1.1 GENERAL INFORMATION ABOUT THE PROJECT ............................................................................................. 3 1.2 INFORMATION ABOUT THIS CONTRACT ....................................................................................................... 3 1.2.1 Scope of work description .............................................................................................................. 3 1.2.2 Options ........................................................................................................................................... 6 1.2.3 Main Quantities .............................................................................................................................. 6 1.2.4 Interface with other project activities ............................................................................................ 6 1.2.5 Compensation ................................................................................................................................ 6 1.2.6 Tentative schedule ......................................................................................................................... 7 1.3 COMPANY’S ORGANISATION ..................................................................................................................... 7 2. INFORMATION ABOUT THE PRE-QUALIFICATION PROCESS ........................................................................ 8 2.1 PROCEDURE .......................................................................................................................................... 8 2.2 CONTRACT NOTICE ................................................................................................................................. 8 2.3 RELEVANT REGULATIONS ......................................................................................................................... 8 2.4 THE CANDIDATE`S EXPENSES IN CONNECTION WITH THE COMPETITION ............................................................ 8 2.5 LANGUAGE REQUIREMENTS ...................................................................................................................... 8 2.6 PLACE OF DELIVERY ................................................................................................................................. 8 2.7 METHOD OF DELIVERY ............................................................................................................................. 8 2.8 REPLY DUE DATE .................................................................................................................................... 9 2.9 RESERVATIONS CONCERNING CANCELLATION OF THE COMPETITION ................................................................ 9 2.10 DEADLINE FOR APPLICATION FOR INTERIM INJUNCTION ............................................................................... 9 3. SELECTION CRITERIA ....................................................................................................................... 9 4. INFORMATION REQUIRED FROM THE CANDIDATE ................................................................................... 9 4.1 FORMAT ............................................................................................................................................... 9 4.2 RELIANCE ON THE CAPACITIES OF OTHER ENTITIES ........................................................................................ 9 4.3 SELECTION CRITERIA .............................................................................................................................. 10 5. ATTACHMENTS ........................................................................................................................... 13 APPENDIX 1 Brief Technical Description of Contract Works (preliminary to give the prequalification candidates an impression of the Contract work) Norwegian National Rail Administration Pre-qualification for D&B Tunnel – contract 2 Date: 2013-05-15 Follo Line Project Page: 3 of 29 Reference number: 201302255 1. Introduction 1.1 General information about the project The 22 km long Follo Line Project includes a new double track line between Oslo Central Station and the public transport hub at Ski. The project includes a 19.5 km railway tunnel (twin bore), extensive works at Oslo Central Station, construction of a new station at Ski and necessary realignment of the existing Østfold Line (on the approach to Oslo Central Station with a new tunnel and between the new Ski station and the tunnel). The Follo Line will be built for speed up to 250 km/hr. The Follo Line Project is split into four EPC contracts: Contract for work in connection with the Oslo Central Station (Oslo S) Contract for TBM driving of the twin Follo Line tunnels Contract for conventional driving of tunnels in Ekebergåsen (the Ekeberg Hill). Contract for the new Ski Station and the surface section from Ski to Langhus. The scheduled start of construction for the project is mid 2014 and completion is scheduled in 2020. Preparatory works at Oslo Central Station and close to Ski Station and preparation of rig areas and access tunnels at Åsland (about midway between Oslo Central Station and Ski Station), and in Klypen (close to Oslo Central Station) is scheduled to commence in 2013. In the following description “the Company” shall mean the Norwegian Railroad Authority/Follo Line Project, and “the Contract” shall mean the contract for which this Prequalification Questionnaire applies. Further information about the project is available here: http://www.jernbaneverket.no/en/startpage1/Projects/New-double-track-Oslo-Ski/ 1.2 Information about this contract 1.2.1 Scope of work description The Contract comprises all conventional tunnels driving scope (Drill & Blast) in the Follo Line Project, i.e. the Inbound Østfold Line (IØL), inner part of the twin Follo Line tunnels, a number of crossings with existing tunnels and roads and the 3-Track tunnel at the interface with the EPC contract for modification work at the Oslo S Station. The preliminary technical scope of work is described in more detail in Appendix 1 hereto. The main design data for the tunnels are; Line Train Speed Net sectional Area Inside Lining Track Type (km/hr) (m2) FB 250 52 Cast in-situ concrete Slab Track lining as water and frost protection. IØL 130 54 Same as FB Ballast Track Norwegian National Rail Administration Pre-qualification for D&B Tunnel – contract 2 Date: 2013-05-15 Follo Line Project Page: 4 of 29 Reference number: 201302255 3-Track Tunnel Bækkelaget rig area & access tunnel Access tunnels &Rig area Sjursøya Fig. 1 Overview of the project area of the Contract. BASE CASE SCOPE OF WORK: The work will start with establishment of the access tunnels, including a reloading station, to the IØL main tunnel (shown in green in Fig.2) and preparation of the rig area, i.e; o Two access tunnels from the Sjursøya tunnel to the alignment of the main IØL Tunnel. o One reloading station. o About 30 m of the main IØL Tunnel to each side of the access tunnels and reloading station, altogether 150m. o Prepare the rig area at Oslo Harbour‟s property, including hook-up of utilities for use in the preparatory work and later for the main contract work. The 3-Track Tunnel from km. 1.630 to 1.770 (140 m) , routing the 3 new tunnel lines of the project into a similar size concrete culvert at „Klypen‟, being part of the Oslo S Contract. Excavated material to be taken out at the Oslo S side. The new Inbound Østfold Line (IØL) Tunnel from the 3-track tunnel at km 1.715 (IØL ref. system) to km. 2.915 (length about 1.200 m), exiting to the south at a crossing with the main southbound road E18 out of Oslo. The D&B part of the Follo Line Twin Tunnels from the 3-track tunnel to km. 2.300, where it meets the two northbound TBM‟s
Recommended publications
  • Report on Railway Accident with Freight Car Set That Rolled Uncontrolledly from Alnabru to Sydhavna on 24 March 2010
    Issued March 2011 REPORT JB 2011/03 REPORT ON RAILWAY ACCIDENT WITH FREIGHT CAR SET THAT ROLLED UNCONTROLLEDLY FROM ALNABRU TO SYDHAVNA ON 24 MARCH 2010 Accident Investigation Board Norway • P.O. Box 213, N-2001 Lillestrøm, Norway • Phone: + 47 63 89 63 00 • Fax: + 47 63 89 63 01 www.aibn.no • [email protected] This report has been translated into English and published by the AIBN to facilitate access by international readers. As accurate as the translation might be, the original Norwegian text takes precedence as the report of reference. The Accident Investigation Board has compiled this report for the sole purpose of improving railway safety. The object of any investigation is to identify faults or discrepancies which may endanger railway safety, whether or not these are causal factors in the accident, and to make safety recommendations. It is not the Board’s task to apportion blame or liability. Use of this report for any other purpose than for railway safety should be avoided. Photos: AIBN and Ruter As Accident Investigation Board Norway Page 2 TABLE OF CONTENTS NOTIFICATION OF THE ACCIDENT ............................................................................................. 4 SUMMARY ......................................................................................................................................... 4 1. INFORMATION ABOUT THE ACCIDENT ..................................................................... 6 1.1 Chain of events ...................................................................................................................
    [Show full text]
  • R E V I T a L I Z I N G N Y G Å R D F a C T O
    R E V I T A L I Z I N G N Y G Å R D F A C T O R Y A makerspace in Oslo Abstract Mari Burheim Supervisor: Bente Kleven Oslo School of Architecture and Design Fall 2020 THESIS My thesis is to transform an old industry building into a space for our current production habits. The transformation will follow the building’s premises. BACKGROUND Oslo, capital of Norway, has gradually expanded along its rivers and valleys since its foundation in 1048. When industry was introduced, the population growth exploded due to the need for labor. Most factories were placed along rivers for power utilization, and later along railways for accessibility. This was the best option until electricity was introduced. Throughout the last century, factories started to disappear from the city. This has a two-sided explanation. First, large scale industry was outsourced to low-cost economies. This is a result of expensive labor in Norway, and cheap material cost and shipping. Second, smaller manufacturing jobs moved to the periphery. This was due to easier mobility (railways, highways) and lower rent. Today, Oslo city is largely a big housing estate, scattered with cafés and culture institutions. The producing city has become the recreational city. I would like to reintroduce production into the city. SITE AND STRUCTURE During my pre-diploma I mapped the city development from industrialization and until today. I searched for an interesting site and structure, one that does not reach its full potential today. I wanted to work with transformation, but I did not know at which site or to which program.
    [Show full text]
  • Priority Substances and Emerging Contaminants in Selected Norwegian Rivers
    REPORT SNO 7450-2019 Priority substances and emerging contaminants in selected Norwegian rivers The River Monitoring Programme 2018 Photo: NIVA Photo: Norwegian Institute for Water Research REPORT Main Office NIVA Region South NIVA Region East NIVA Region West NIVA Denmark Gaustadalléen 21 Jon Lilletuns vei 3 Sandvikaveien 59 Thormøhlensgate 53 D Njalsgade 76, 4th floor NO-0349 Oslo, Norway NO-4879 Grimstad, Norway NO-2312 Ottestad, Norway NO-5006 Bergen Norway DK 2300 Copenhagen S, Denmark Phone (47) 22 18 51 00 Phone (47) 22 18 51 00 Phone (47) 22 18 51 00 Phone (47) 22 18 51 00 Phone (45) 39 17 97 33 Internet: www.niva.no Title Serial number Date Priority substances and emerging contaminants in selected Norwegian 7450-2019 28.11.2019 rivers – The River Monitoring Programme 2018 Author(s) Topic group Distribution Ian Allan, Marthe Torunn Solhaug Jenssen, Hans Fredrik Veiteberg Braaten Environmental Open contaminants - freshwater Geographical area Pages Norway 52 + appendix Client(s) Client's reference Gunn Lise Haugestøl Norwegian Environment Agency and Eivind Farmen Client's publication: Printed NIVA Miljødirektoratet report Project number 16384 Summary Riverine inputs and direct discharges to Norwegian coastal waters in 2018 have been estimated in accordance with the OSPAR Commission’s principles. This report focuses on EU Water Framework Directive priority substances as well as river basin-specific pollutants (trace metals and organic pollutants) that were monitored with bottle sampling in water and biota sampling (fish). Levels observed were compared with annual average environmental quality standards (AA-EQS) or EQS(biota). A more detailed study of the distribution of emerging contaminants in the river Alna was undertaken.
    [Show full text]
  • Best Practices Report for Volunteers Working with Children Motivate. Support. Strengthen
    Best Practices Report for Volunteers Working with Children Motivate. Support. Strengthen Project Title: Motivate. Support. Strengthen. Educational Programme for Volunteers Working with Children Working together for a green, competitive and inclusive Europe Working together for a green, competitive and inclusive Europe Index Abbreviations .......................................................................................................................................... 3 1. Backgroud: from the project ........................................................................................................... 4 2. Context: Norwegian NGO and Sagene Municipality ....................................................................... 4 2.1 Voluntary work in Norway: (From Norwegian Helsinki Committee) .......................................... 4 2.2 Introduction to the Municipality of Sagene ............................................................................... 5 3. Best Practice Research Methodology ............................................................................................. 6 4. Overview of the sample .................................................................................................................. 7 5. Presentation of best practices ........................................................................................................ 8 5.1 Neighborhood improvement on Drøbakgata Street .................................................................. 8 5.2 Sagene Club – Torshov ............................................................................................................
    [Show full text]
  • Upcoming Projects Infrastructure Construction Division About Bane NOR Bane NOR Is a State-Owned Company Respon- Sible for the National Railway Infrastructure
    1 Upcoming projects Infrastructure Construction Division About Bane NOR Bane NOR is a state-owned company respon- sible for the national railway infrastructure. Our mission is to ensure accessible railway infra- structure and efficient and user-friendly ser- vices, including the development of hubs and goods terminals. The company’s main responsible are: • Planning, development, administration, operation and maintenance of the national railway network • Traffic management • Administration and development of railway property Bane NOR has approximately 4,500 employees and the head office is based in Oslo, Norway. All plans and figures in this folder are preliminary and may be subject for change. 3 Never has more money been invested in Norwegian railway infrastructure. The InterCity rollout as described in this folder consists of several projects. These investments create great value for all travelers. In the coming years, departures will be more frequent, with reduced travel time within the InterCity operating area. We are living in an exciting and changing infrastructure environment, with a high activity level. Over the next three years Bane NOR plans to introduce contracts relating to a large number of mega projects to the market. Investment will continue until the InterCity rollout is completed as planned in 2034. Additionally, Bane NOR plans together with The Norwegian Public Roads Administration, to build a safer and faster rail and road system between Arna and Stanghelle on the Bergen Line (western part of Norway). We rely on close
    [Show full text]
  • Sydhavna (Sjursøya) – an Area with Increased Risk
    REPORT Sydhavna (Sjursøya) – an area with increased risk February 2014 Published by: Norwegian Directorate for Civil Protection (DSB) 2015 ISBN: 978-82-7768-350-8 (PDF) Graphic production: Erik Tanche Nilssen AS, Skien Sydhavna (Sjursøya) – an area with increased risk February 2014 CONTENTS Preface ............................................................................................................................................................................................................................................ 7 Summary ...................................................................................................................................................................................................................................... 8 01 Introduction ........................................................................................................................................................................................ 11 1.1 Mandat .............................................................................................................................................................................................. 12 1.2 Questions and scope ............................................................................................................................................................... 13 1.3 Organisation of the project ................................................................................................................................................. 13 1.4
    [Show full text]
  • Project Portfolio Infrastructure Construction Division
    1 Project portfolio Infrastructure Construction Division www.banenor.no | 2019 3 We rely on close cooperation In the upcoming years there will be a large increase in About Bane NOR rail investments in Norway. As described in this folder the investments will be spread out on several projects. Bane NOR is a state-owned company respon- These investments create great value for all travelers. In the coming sible for the national railway infrastructure. Our years, departures will be more frequent, with reduced travel time mission is to ensure accessible railway infra- within the InterCity operating area. We are living in an exciting and Photo: Anne-Mette Storvik structure and efficient and user-friendly ser- changing infrastructure environment, with a high activity level. Over Einar Kilde vices, including the development of hubs and the next three years Bane NOR plans to introduce contracts relating goods terminals. to a large number of mega projects to the market. Investment will Executive Vice President continue until the InterCity rollout is completed as planned in 2034. Infrastructure Construction Division As of today, the Follo Line and Venjar-Langset are in production, The company’s main responsible are: and Sandvika-Moss-Såstad, Drammen-Kobbervikdalen and Ny- • Planning, development, administration, operation and kirke-Barkåker are out for tender. In 2019 and 2020 our plan is to maintenance of the national railway network • Traffic management start the pre-qualification process for Kleverud-Sørli-Åkersvika and • Administration and development of railway property The Ringerike Line and E16 highway. Additionally, Bane NOR plans together with The Norwegian Bane NOR has approximately 4,500 employees and the head office is Public Roads Administration, to build a safer and faster rail and road based in Oslo, Norway.
    [Show full text]
  • Newsletter the Follo Line Project
    Newsletter The Follo Line Project What is happening-when and where? In 2018 the first deliveries from the Follo Line Project will be completed. Bane NOR would like to thank all neighbours for their patience and coopiration during the construction • Work in 2018 period – we wish everyone a Merry Christmas! • Important dates • Where are the TBM now? Summer/early autumn of 2018, the first of the Follo Line-route about the construction • Contactinformation four tunnel boring machines will break work that is taking place from five rig areas through the Ekeberg mountain in central between Ski and Oslo. We look forward to Oslo. At the same time the opening of the half the travel time between Oslo And Ski first part of the new Ski public transport hub when the Follo Line opens in December is getting nearer. In this newsletter, Bane 2021. NOR will inform the neighbours along Photo : Bane NOR The Follo Line Project | December 2017 New Ski public transport hub Tunnel work between Langhus and Oslo We're pleased about the completion of the Nordbyveien bridge, the new landmark The four tunnel boring machines have now covered over half the distance between in Ski. In August 2018, the first section of the new Ski station is scheduled to open. central Oslo and Langhus. In 2018, two of them will finish their work. There will still be a lot of activity in Ski as we enter the new year. The two northbound machines will pass under the Tunneling near Gamlebyen According to plan the train traffic operations will run from the first neighbourhoods of Kastellet, Holtet and Bekkelaget in 2018, When the two northbound TBM machines break through in section of the new station in 2018.
    [Show full text]
  • The Rivers and Landscapes of Oslo
    THE MUNICIPALITY OF OSLO APPLICATION FOR CANDIDACY TO THE LANDSCAPE AWARD OF THE COUNCIL OF EUROPE 2016-2017 THE RIVERS AND LANDSCAPES OF OSLO Oslo's landscape is rich and varied – its topography, geology as well as biology. The fjord and water form the base of the landscape, which is surrounded by an amphitheatre and a valley (The Grorud Valley). Here, the city has grown and developed through a thousand years. A continuous belt of forested hills and ridges – the so-called “Marka” – encircles the city, providing a green and lush backdrop. Significant height differences between the forest and the fjord, combined with a climate that provides regular rainfall, has given rise to 10 rivers, which are considered the main waterways of Oslo. These urban waterways have largely defined, shaped and structured the development of the Norwegian capital, and has given the city its character and identity. However, the significance and valuation of the city’s rivers has varied through history. During the last century, several sections of the rivers were culverted, in an attempt to put a lid on and rise above the natural landscape. During the past 20-30 years, however, this attitude has changed dramatically, as the appreciation of the value and importance of the city’s rivers flowing openly and freely through the cityscape has grown. Today, when developing the city, Oslo has a clear ambition and a goal to emerge as the a blue and green city between the fjord and the forest, where living rivers form a city web, binding everything together into an organic, logical, functional and attractive whole.
    [Show full text]
  • Grorud Valley Park (Bike)
    GRORUD VALLEY PARK (BIKE) IFLA 2019 Common Ground / Walks + Talks #1b A river bikeride along the reopened Alna River in Grorud valley, through waterfalls, wetlands, a water cathedral and more. Time: 08:45 – 12:00 Please make sure to be on time, as the tour begins at 08:45 NB: biking experience is required for this tour Meeting point: Narvesen Grorud, Bergensveien, Oslo Remember to bring: • a bottle of water • an umbrella/raincoat (if the weather is unreliable) • a return ticket for local transportation “Ruter Impuls”, distributed upon registration in Oslo Congress Centre If you have any tour related questions, please contact: Maja Kozak Dehlin Taran Anderaa Saji Ahi t: +45 60605279 t: +47 45671221 t: +47 46161230 m: [email protected] Grorud initiative / Ammerud Outdoor Gym (breakfast) 1 Narvesen Grorud (START) 2 Ammerud Tunnel 3 Urban Nature + Ecology Activism + Volunteer Work 5 4 Svartdal Park This bike-ride will take you on a journey through the Grorud-Valley along Oslo’s longest river, the wild and green Alna. It is a journey making a cross-section through the history of Oslo. Starting in modernist housing suburbs, we will follow Alna as it is meandering between industrial areas, highways and car-based retail, through a primeval forest and ending up in the Old Town, where Oslo was founded a 1000 years ago. STOP 1: GRORUD INITIATIVE / AMMERUD OUTDOOR GYM + BREAKFAST Time: 08.50 - 09.30 Theme: Groruddal initiative and the participation project Speaker: Grorud initiative, District of Grorud, Oslo municipality - Cecilie Kjølnes Skar The Outdoor Gym at Ammerud – Iwan Thomson, Lala.
    [Show full text]
  • On Track GLIMPSES from the NORWEGIAN NATIONAL RAIL ADMINISTRATION’S ACTIVITIES in 2013
    On track GLIMPSES FROM THE NORWEGIAN NATIONAL RAIL ADMINISTRATION’S ACTIVITIES IN 2013 The railways are developing fast Norwegian railways have rarely moved as fast as they are right now: Passengers are flocking on board, construction is at an all-time high and the trains are on schedule. "The really big lift comes with the InterCity development, which is in full swing". Contents EDITORIAL Editorial 3 Train traffic 4 04 Winning the fight against time 4 Maintenance and renewals 6 Battle against man-made waterways 6 Groundbreaking 10 A good year for the railway Those who move mountains 10 Tunnel project on rails 12 The railway achieved a number of great results throughout 2013. The most impressive Revolutionary double track 14 development was the growth in passenger traffic, which increased for the country as Arna–Bergen 15 a whole by more than seven percent compared with the previous year. The world looks to Follo 16 Records along Mjøsa 18 06 he largest increase was An additional lift in the north 19 seen in eastern Norway, Projects around the country 19 where the effect of the new T route model introduced in December 2012 really took The future 20 effect. The goal for passenger train InterCity: A planning job for the ages 20 punctuality was also achieved and ended up at 90.6 percent. How “the new railway” will be managed 22 The transport needs associated with More for the money 24 the population growth in and around the large cities must be solved through More trains for the people 24 investments in public transport.
    [Show full text]
  • The Follo Line Norwegian Railway: Building for the Future
    The Follo Line Norwegian railway: building for the future The Follo Line is currently the largest The Follo Line is planned as a high­ transport project in Norway. The new speed railline through twin tunnels double track line between Oslo Central for maximum tunnel capacity, safety Station and the public transport centre and availability for maintenance. The of Ski, includes the country's longest project also facilitates a potential railway tunnel (19.5 km). high-speed line to the continent. o New double track line Oslo-Ski Twa single bore tunnels will give the new double track line Oslo-Ski both a significant degree of flexibility and modern level of rail safety. Punctual service between cities Ski station: The new Ski station will be rebuilt and Four tracks to Oslo Central Station, as the hub of expanded to include six tracks and three centre plat­ Norway's passenger rail network, represents a new forms. Accessibility and transfer within the station area era for traffic between cities south-east of Oslo. From will be improved to make the journey efficient, comfort­ a railway engineering perspective, to incorporate two abie and easy for the passengers. new lines into this most densely trafficked area, is a complex challenge. Construction works is scheduled The tunnel: The long railway tunnel (19, 5 km), is the to commence 2014, but important preparations have first Norwegian rail tunnel to be built with two separate already started. The project is due to be completed tubes. The Norwegian National Rail Administration is in 2019. considering both blasting/drilling and tunnel boring machine.
    [Show full text]