KPC A4 flyer 2 folds 2019 ENG.qxp_Layout 1 23/10/2019 10:49 AM Page 1

NORTH AMERICA

EUROPE JAPAN ASIA CHINA SOUTH KOREA ECRL INDIA TAIWAN PRIMARY ROADS MYANMAR LAOS B&R - ECONOMIC BELT B&R - MARITIME ROAD AFRICA THAILAND VIETNAM

SRI LANKA PHILIPPINES SOUTH AMERICA

MALAYSIA SINGAPORE

INDONESIA

AUSTRALIA

KUANTAN PORT

Kuantan Port is managed by Kuantan PORT KLANG Port Consortium Sdn. Bhd. (KPC) which is jointly owned by IJM Corporation Berhad and Beibu Gulf Holding (Hong Kong) Co. Ltd. Wisma KPC, KM25 Tanjung Gelang P.O. Box 199, 25720 Kuantan Distance from Kuantan Darul Makmur, Malaysia

to Kuala Lumpur: T : +60 9 586 3888 F : +60 9 586 3777 E : [email protected] 45 mins flight 3 hours drive 120 mins* * for future ECRL www.kuantanport.com.my FACILITIES AND EQUIPMENT

Multipurpose Berth Transit Warehouse Container Storage (Break Bulk & Dry Bulk) • Total ground area: 29,189sqm • Total ground slots: 1,750 slots • 11 Multipurpose Berths • Reefer points: 120 points • 11.2m Draught (Maximum) Open Storage Yard • Accommodate Vessels: 45,000 • Total ground area: 41,250sqm Container Freight Station (CFS) displacements tonnes • Total ground area: 9,600sqm • Stevedore supplied by main force Class 2 Dangerous Goods Yard contractors • Maximum capacity: 18 TEUs Liquid Bulk • 4 Liquid Berths Conventional Equipment Container Berth • 4 Liquid Chemical Berths • Forklifts • 3 container berths measuring • Prime Movers 600 metres Marine Equipment • Conventional Trailers • 4 container cranes • Tug Boats • Level Luffing Cranes • Capacity of 400,000 TEUs per year. • Pilot Boats • Portable Hoppers and Conveyors Connect to Opportunities Container Equipment Warehouse Storage • Reach Stackers Driving the Economy • 5 x 5,000sqm Warehouses • Rubber Tyred Gantry • 2 x 3,375sqm Warehouses • Container Trailers • Total ground area: 32,500sqm • Terminal Tractors

KPC A4 flyer 2 folds 2019 ENG.qxp_Layout 1 23/10/2019 10:49 AM Page 4

WHERE BUSINESS At the heart of global trade and industrial By sea it’s strategic location is en route from activity, stands the port. Kuantan Port is a deep the Asia Pacific to the Straits of Malacca, which THRIVES water, all-weather, multi-cargo seaport, run by is used to reach the Middle East and Europe. PORT LAYOUT a dedicated team of professionals that Already serving as the fastest shipping route conduct the port’s operations around the from Malaysia to China, Kuantan Port will clock, 365 days a year. be a maritime gateway into the country under China’s, The Belt and Road Initiative (B&R). The NDWT BREAKWATER 4.63 KM With a history that goes back more than four B&R is the reactivation of the ancient silk trade decades, Kuantan Port has developed into a routes leading from China to Europe and is set E major petrochemical, bulk and container to become the world’s largest infrastructure N terminal for the East Coast region of Malaysia. project. FUTURE PHASE Our track record has proven us to be efficient and inno-vative at linking the region’s This is expected to bring a diverse range of products and services to global trade. new investment opportunities to the region S and further increase trade. Also under the B&R, W Supported with a strong network of global joint investment with local partners will see shipping connections, backing from the local the construction of the East Coast Rail Line government and close links with China, (ECRL), which will link the port directly by train Kuantan Port is on course for growth and set to the nation’s capital, Kuala Lumpur and the to become a crucial multi-purpose port in the country’s largest port located in Klang, region. Selangor.

By road the port is connected to East Coast BERTH PHASE 1A (400M) BERTH PHASE 1B (600M) Kuantan Port is managed by Kuantan Port Expressway, making the trans-portation of 6 KM Consortium Sdn. Bhd. (KPC) which is jointly goods to Kuala Lumpur only 3 hours drive. 1. ER owned by IJM Corporation Berhad and Beibu Just 35km away is Kuantan Airport, that AT Gulf Holding (Hong Kong) Co. Ltd. schedules daily flights to Kuala Lumpur NDWT PHASE 1A NDWT PHASE 1B NDWT PHASE 2 EAKW International Airport and direct flights to BR Malaysia is located at the centre of Southeast Singapore. TO & EAST COAST HIGHWAY Asia and Kuantan Port sits on it’s Eastern MAIN ACCESSWAY TO N seaboard, in the middle of country’s natural DWT resources and petrochemical heartland. RAILWAY RESERVE 23 24 PORT CONTROL 25 Y 26 T 27 2 T # B E J 16 LC Statutory government body, East Coast EQUIPEMENT E THE NEW DEEP WATER 17 19 33 HS IC 18 V RT R Economic Region Develop-ment Council E BE M.O.B S L 1 I # TERMINAL S B 2 (ECERDC), invested in the port’s new 4.63km • 2 Ship Unloader Cranes O O # 13 21 H 20 P B T M O L P R breakwater which has already been - Maximum capacity: 2,000 tonne/hour A E 15 LCB#1 P JET 22 TY The East Coast has been growing fast and its completed. crane L B 1A A ROYAL growth is set to continue. To meet the IC M RTH 1 MALAYSIAN E E 14 H B S T H D expected increase in demand, Kuantan Port Terminal Phase 1A: • 2 Stacker Reclaimer 12 H C NAVY

T R BER A E ID R B 2 is expanding its operations with the • Commence Operations: Q3 2018 - Reclaiming Capacity: 2,000 tonne/hour LCB E 28 #3 T Y H M B T N R E LIQU E E construction of a New Deep Water Terminal. B • Berth: 400m - Stacking Capacity: 4,000 tonne/hour S P O 3 P # O

B • Basin Depth: 16m R 31 O & U 3 P E IP Upon completion, the new terminal is • Cargo Yard: 20 Hectares • Conveyor Belt MULTI S PURPOSE BER T RTH T L E U HS B 29 11 CB6 U expected to double its cargo capacity to 52 CB5 CONTAIN O - Maximum capacity: 4,000 tonne per C ER BER M B4 THS H C B3 E CB2 4 million tonnes and position Kuantan Port as Terminal Phase 1B: hour crane CB1 R H 8 10 T A R E W LEGEND the main gateway to the Asia Pacific and • Commence Operations: Q2 2019 B 32 BERTH 6 BERTH 5 China. • Berth: 600m -RO 9 7 RO 30 6 ROAD M AIN • Basin Depth: 16m GA TE CUSTOM FENCE The new terminal is being constructed in 2 • Dry Bulk Yard: 22.5 Hectares 5 PIPE LINE phases with Phase 1A to be operational in Q3 1 RAILWAY 2018 and 1B to be operational in Q2 2019. Terminal Phase 2: 4 MAIN GATE • Berth: 1,000m 2 • Basin Depth: 18m 3 • Container Terminal: 47 Hectares 500M 1KM

TO KUANTAN & INDUSTRIAL AREA TO KUANTAN

1 Wisma KPC 7 Container Yard 13 PK Fertilizers 19 Petron Fuel International 25 Shell Malaysia Trading 31 Felda (FVOP) 2 Kuantan Port Authority 8 Bredero Shaw 14 YAL Resources Holdings 20 BASF Services 26 Asta Chemicals 32 FPG Oleochemicals 3 FPM 9 FGV Green Energy 15 Enten Oil & Fat Specialties 21 CSA Chemicals 27 Petronas Dagangan 33 Kuantan Bulking Sdn Bhd 4 KP Depot Services 10 FGV Biotechnologies 16 Kaneka 22 UPC Chemicals 28 Felda Bulkers (KBI) 5 CFS 11 Wilmar Kuantan Edible Oils Sdn Bhd 17 RP Chemicals 23 Union Harvest 29 Kuantan Flour Mill 6 Container Yard 12 Bredero Shaw 18 MTBE Malaysia 24 Petron Fuel International 30 Felda Bulkers