** New York State Department Of
Total Page:16
File Type:pdf, Size:1020Kb
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 1 of 84 for REGION 10 4-YEAR PROGRAM (FFY) AGENCY PROJECT DESCRIPTION TOTAL Starting October 01, 2010 FUND SOURCES FFY 4-YEAR PHASE PIN PROGRAM FFY FFY FFY FFY in millions of dollars 2011 2012 2013 2014 AQ CODE COUNTY TOTAL PROJECT COST NYSDOT CONSTRUCT THE FIRST SECTION OF A 14.4 MILE SHARED-USE PATH FROM NFA 2012 0.600 CONINSP 0.600 THE WANTAGHSTATE PKWY TO TOBAY BEACH ON THE NORTH SIDE OF NFA 2012 5.500 CONST 5.500 000611 OCEAN PKWY TO PROVIDE MULTIMODAL ACCESS TOWNS OF OYSTERBAY AND HEMPSTEAD AQC:C2P NASSAU TPC : $4.6-$7.5 M TOTAL 4YR COST : 6.100 0.000 6.100 0.000 0.000 NYSDOT IMPROVE STRUCTURAL INTEGRITY OF THE ROBERT MOSES CAUSEWAY HBRR 2013 2.319 PRELDES 2.319 OVER FIRE ISLAND INLET BRIDGE TO ENSURE PUBLIC SAFETY TOWN OF NFA 2013 0.600 PRELDES 0.600 001756 ISLIP, SUFFOLK COUNTY (BIN#1058770) AQC:A19P SUFFOLK TPC : $175-$385 M TOTAL 4YR COST : 2.919 0.000 0.000 2.919 0.000 NYSDOT SPOT BRIDGE REPAIR TO MAINTAIN STRUCTURAL INTEGRITY ON ROBERT NFA 2011 0.808 CONINSP 0.808 MOSES CAUSEWAY OVER FIRE ISLAND INLET BRIDGE IN ISLIP TOWN, NFA 2011 8.080 CONST 8.080 001764 SUFFOLK COUNTY. AQC:A19S SUFFOLK TPC : $7.5-$12 M TOTAL 4YR COST : 8.888 8.888 0.000 0.000 0.000 NYSDOT CONSTRUCT RECHARGE BASIN TO ELIMINATE A FLOODING PROBLEM ON NFA 2012 0.429 CONINSP 0.429 NY454 BETWEEN LINCOLN AVE AND GRUNDY AVE, ISLIP TOWN, SUFFOLK NFA 2012 4.291 CONST 4.291 003012 COUNTY. AQC:A2P SUFFOLK TPC : $9.5-15.5 M TOTAL 4YR COST : 4.720 0.000 4.720 0.000 0.000 NYSDOT NY454 ITS - WILL INSTALL CLOSED CIRCUIT ITS CAMERAS,REMOTELY CMAQ 2014 0.548 DETLDES 0.548 ACCESSIBLE ITS DEVICES AND SIGNAL INTERFACE SOFTWARE AND NFA 2014 0.137 DETLDES 0.137 003016 HARDWARE ALONG NY454 CORRIDOR TO UPGRADE THE SYSTEM IN TOWN OF ISLIP AND BROOKHAVEN AQC:NON SUFFOLK TPC : $15-$25 M TOTAL 4YR COST : 0.685 0.000 0.000 0.000 0.685 NYSDOT NY25 PAVEMENT REPAIRS,SEALING OF CRACKS, RESURFACING, PROV. HSIP 2012 0.738 CONINSP 0.738 TURNING LANES @ INTERSECTIONS INCLUDING CENTER LEFT TURN LANE, NFA 2012 0.084 CONINSP 0.084 004195 MOD. TO TRAFFIC SIGNAL EQUIPMENT & OPERATIONS, REPAIRS TO CURB & HSIP 2012 7.381 CONST 7.381 SIDEWALK BET. : NYC LINE TO GLEN COVE RD TO PROV. FOR SAFETY NFA 2012 0.837 CONST 0.837 NHS 2012 0.992 CONINSP 0.992 NFA 2012 0.253 CONINSP 0.253 NHS 2012 9.921 CONST 9.921 NFA 2012 2.529 CONST 2.529 AQC:A10P NASSAU TPC : $32-$50 M TOTAL 4YR COST : 22.735 0.000 22.735 0.000 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 2 of 84 for REGION 10 4-YEAR PROGRAM (FFY) AGENCY PROJECT DESCRIPTION TOTAL Starting October 01, 2010 FUND SOURCES FFY 4-YEAR PHASE PIN PROGRAM FFY FFY FFY FFY in millions of dollars 2011 2012 2013 2014 AQ CODE COUNTY TOTAL PROJECT COST NYSDOT IMPROVE NY110 SOUTHBOUND @ NY25 ,NY25 NY110 TO NEW YORK AVE NFA 2012 0.539 CONINSP 0.539 FOR TO PROVIDE SAFETY IMPROVEMENTS INCLUDING CONSTRUCT NFA 2012 5.393 CONST 5.393 004218 ONE-WAY NEW ROAD TO ALLOW FOR WESTBOUND LEFT TURNS; EASTBOUND LEFT TURNS WILL BE DIVERTED TO NEW YORK AVE, HUNTINGTON TOWN, SUFFOLK COUNTY. AQC:D3P SUFFOLK TPC : $7.5-$12 M TOTAL 4YR COST : 5.932 0.000 5.932 0.000 0.000 NYSDOT BRIDGE REHABILITATION OF NY25 OVER I495 AND CR58 IN RIVERHEAD TO IM 2013 0.868 CONINSP 0.868 MAINTAIN STATE OF GOOD REPAIR TOWN OF RIVERHEAD, SUFFOLK NFA 2013 0.096 CONINSP 0.096 004233 COUNTY.BIN#1056219,1056230 IM 2013 8.677 CONST 8.677 NFA 2013 0.965 CONST 0.965 AQC:A19P SUFFOLK TPC : $21-$31 M TOTAL 4YR COST : 10.606 0.000 0.000 10.606 0.000 NYSDOT RESURFACING; REPLACE STEEL MEDIAN BARRIER WITH CONCRETE MEDIAN NFA 2011 4.092 CONINSP 4.092 BARRIER TO MAINTAIN PAVEMENT AND PROVIDE SAFETY IMPROVEMENTS NFA 2012 40.919 CONST 40.919 005027 ON NY135 BETWEEN MERRICK RD AND NY24 IN THE TOWNS OF HEMPSTEAD & OYSTER BAY, NASSAU COUNTY. AQC:A10P NASSAU TPC : $40-$60 M TOTAL 4YR COST : 45.011 4.092 40.919 0.000 0.000 NYSDOT RECONSTRUCT NY347 FROM HALLOCK RD TO NICOLLS RD TO IMPROVE NFA 2014 6.408 DETLDES 6.408 SAFETY, OPERATION, AND MOBILITY FOR VEHICLES, PEDESTRIANS, NFA 2014 5.340 ROWACQU 5.340 005409 BICYCLISTS AND TRANSIT USERS IN BROOKHAVEN TOWN, SUFFOLK COUNTY. AQC:NON SUFFOLK TPC : $40-$60 M TOTAL 4YR COST : 11.748 0.000 0.000 0.000 11.748 NYSDOT RECONSTRUCT NY347 FROM NY111 TO TERRY RD TO IMPROVE SAFETY, NHS 2014 3.318 CONINSP 3.318 OPERATION, AND MOBILITY FOR VEHICLES, PEDESTRIANS, BICYCLISTS AND NFA 2014 3.729 CONINSP 3.729 005420 TRANSIT USERS IN BROOKHAVEN TOWN, SUFFOLK COUNTY. NHS 2014 33.181 CONST 33.181 NFA 2014 37.293 CONST 37.293 AQC:AQC SUFFOLK TPC : $70-$130 M TOTAL 4YR COST : 77.521 0.000 0.000 0.000 77.521 NYSDOT NY347 & NY112 INTERSECTION RECONSTRUCTION TO IMPROVE SAFETY, NFA 2011 0.100 DETLDES 0.100 OPERATION, AND MOBILITY FOR VEHICLES, PEDESTRIANS, BICYCLISTS AND NHS 2013 1.656 CONINSP 1.656 005421 TRANSIT USERS IN BROOKHAVEN TOWN, SUFFOLK COUNTY. NFA 2013 0.424 CONINSP 0.424 NHS 2013 16.565 CONST 16.565 NFA 2013 4.245 CONST 4.245 AQC:NON SUFFOLK TPC : $21-$31 M TOTAL 4YR COST : 22.990 0.100 0.000 22.890 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 3 of 84 for REGION 10 4-YEAR PROGRAM (FFY) AGENCY PROJECT DESCRIPTION TOTAL Starting October 01, 2010 FUND SOURCES FFY 4-YEAR PHASE PIN PROGRAM FFY FFY FFY FFY in millions of dollars 2011 2012 2013 2014 AQ CODE COUNTY TOTAL PROJECT COST NYSDOT INSTALL MEDIAN BARRIER ON NY27 FROM ROBERT MOSES CAUSEWAY TO NFA 2013 0.333 DETLDES 0.333 5TH AVENUE TO PREVENT CROSSING OF CENTER MEDIAN TOWN OF ISLIP, 005903 SUFFOLK COUNTY. AQC:A9P SUFFOLK TPC : $7.5-$12 M TOTAL 4YR COST : 0.333 0.000 0.000 0.333 0.000 NYSDOT INSTALL MEDIAN BARRIER ALONG I495 AND NY27 EAST OF NY112 TO IM 2014 0.167 CONINSP 0.167 PREVENT CROSSOVERS OF THE CENTER MEDIAN IN THE TOWNS OF NFA 2014 0.017 CONINSP 0.017 005909 BROOKHAVEN, RIVERHEAD & SOUTHAMPTON IN SUFFOLK COUNTY. IM 2014 1.675 CONST 1.675 NFA 2014 0.129 CONST 0.129 NHS 2014 0.396 CONINSP 0.396 NFA 2014 0.044 CONINSP 0.044 NHS 2014 3.958 CONST 3.958 NFA 2014 0.440 CONST 0.440 AQC:A9P SUFFOLK TPC : $6-$9.4 M TOTAL 4YR COST : 6.826 0.000 0.000 0.000 6.826 NYSDOT OPERATIONAL IMPROVEMENTS ON NASSAU EXPRESSWAY(NY878) TOWN OF NFA 2013 2.500 DETLDES 2.500 HEMPSTEAD, NASSAU COUNTY (SCOPE TO BE DETERMINED) NFA 2014 3.328 ROWACQU 3.328 007214 AQC:J1Z NASSAU TPC : $26-$40 M TOTAL 4YR COST : 5.828 0.000 0.000 2.500 3.328 NYSDOT RECONSTRUCT NY110 TO PROVIDE SAFETY IMPROVEMNTS AND INCREASED HSIP 2013 0.376 CONINSP 0.376 CAPACITY FROM I495 NORTH SERVICE ROAD TO ARLINGTON ROAD AND NFA 2013 1.776 CONINSP 1.776 011256 MELVILLE MALL TO ARROWWOOD IN HUNTINGTON TOWN, SUFFOLK HSIP 2013 3.765 CONST 3.765 COUNTY. HIGH ACCIDENT LOCATION DETERMINED AS OF MARCH 2010 NFA 2013 15.981 CONST 15.981 STP FLEX 2013 0.732 CONINSP 0.732 NFA 2013 0.429 CONINSP 0.429 STP FLEX 2013 7.320 CONST 7.320 NFA 2013 1.876 CONST 1.876 AQC:NON SUFFOLK TPC : $26-$40 M TOTAL 4YR COST : 32.255 0.000 0.000 32.255 0.000 NYSDOT I495 HOV ENFORCEMENT CONTRACTExit 48 to 64 SUFFOLKCOUNTY NHS 2011 0.630 OPER 0.630 NFA 2011 0.158 OPER 0.158 022871 NHS 2012 0.650 OPER 0.650 NFA 2012 0.162 OPER 0.162 NHS 2013 0.669 OPER 0.669 NFA 2013 0.167 OPER 0.167 NHS 2014 0.689 OPER 0.689 NFA 2014 0.172 OPER 0.172 AQC:A7P SUFFOLK TPC : $12.5-$19 M TOTAL 4YR COST : 3.297 0.788 0.812 0.836 0.861 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 4 of 84 for REGION 10 4-YEAR PROGRAM (FFY) AGENCY PROJECT DESCRIPTION TOTAL Starting October 01, 2010 FUND SOURCES FFY 4-YEAR PHASE PIN PROGRAM FFY FFY FFY FFY in millions of dollars 2011 2012 2013 2014 AQ CODE COUNTY TOTAL PROJECT COST NYSDOT PARK & RIDE LOT SECURITY SURVEILLANCE CONTRACT TO PROVIDE FOR NFA 2011 0.250 OPER 0.250 SECURITY FORCES TO SURVEIL THE PARK AND RIDE LOTS IN NASSAU AND NFA 2012 0.250 OPER 0.250 022874 SUFFOLK COUNTIES NFA 2013 0.250 OPER 0.250 NFA 2014 0.250 OPER 0.250 AQC:C1P SUFFOLK TPC : $3.3-$5.6 M TOTAL 4YR COST : 1.000 0.250 0.250 0.250 0.250 NYSDOT TO PROVIDE FOR HIG OCCUPANCY VEHICLE LANE POLICE ENFORCEMENT NHS 2011 0.784 OPER 0.784 ON I495 BETWEEN EXIT 32 TO 48 NASSAU COUNTY NFA 2011 0.196 OPER 0.196 022903 NHS 2012 0.807 OPER 0.807 NFA 2012 0.202 OPER 0.202 NHS 2013 0.832 OPER 0.832 NFA 2013 0.208 OPER 0.208 NHS 2014 0.857 OPER 0.857 NFA 2014 0.214 OPER 0.214 AQC:C1P NASSAU TPC : $12.5-$19 M TOTAL 4YR COST : 4.100 0.980 1.009 1.040 1.071 NYSDOT REPLACE BRIDGE STRUCTURE OF CR19, PATCHOGUE/HOLBROOK RD OVER IM 2013 1.041 CONINSP 1.041 I495 STATE OF GOOD REPAIR IN BROOKHAVEN TOWN,SUFFOLK COUNTY.