** New York State Department Of

Total Page:16

File Type:pdf, Size:1020Kb

** New York State Department Of ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 1 of 84 for REGION 10 4-YEAR PROGRAM (FFY) AGENCY PROJECT DESCRIPTION TOTAL Starting October 01, 2010 FUND SOURCES FFY 4-YEAR PHASE PIN PROGRAM FFY FFY FFY FFY in millions of dollars 2011 2012 2013 2014 AQ CODE COUNTY TOTAL PROJECT COST NYSDOT CONSTRUCT THE FIRST SECTION OF A 14.4 MILE SHARED-USE PATH FROM NFA 2012 0.600 CONINSP 0.600 THE WANTAGHSTATE PKWY TO TOBAY BEACH ON THE NORTH SIDE OF NFA 2012 5.500 CONST 5.500 000611 OCEAN PKWY TO PROVIDE MULTIMODAL ACCESS TOWNS OF OYSTERBAY AND HEMPSTEAD AQC:C2P NASSAU TPC : $4.6-$7.5 M TOTAL 4YR COST : 6.100 0.000 6.100 0.000 0.000 NYSDOT IMPROVE STRUCTURAL INTEGRITY OF THE ROBERT MOSES CAUSEWAY HBRR 2013 2.319 PRELDES 2.319 OVER FIRE ISLAND INLET BRIDGE TO ENSURE PUBLIC SAFETY TOWN OF NFA 2013 0.600 PRELDES 0.600 001756 ISLIP, SUFFOLK COUNTY (BIN#1058770) AQC:A19P SUFFOLK TPC : $175-$385 M TOTAL 4YR COST : 2.919 0.000 0.000 2.919 0.000 NYSDOT SPOT BRIDGE REPAIR TO MAINTAIN STRUCTURAL INTEGRITY ON ROBERT NFA 2011 0.808 CONINSP 0.808 MOSES CAUSEWAY OVER FIRE ISLAND INLET BRIDGE IN ISLIP TOWN, NFA 2011 8.080 CONST 8.080 001764 SUFFOLK COUNTY. AQC:A19S SUFFOLK TPC : $7.5-$12 M TOTAL 4YR COST : 8.888 8.888 0.000 0.000 0.000 NYSDOT CONSTRUCT RECHARGE BASIN TO ELIMINATE A FLOODING PROBLEM ON NFA 2012 0.429 CONINSP 0.429 NY454 BETWEEN LINCOLN AVE AND GRUNDY AVE, ISLIP TOWN, SUFFOLK NFA 2012 4.291 CONST 4.291 003012 COUNTY. AQC:A2P SUFFOLK TPC : $9.5-15.5 M TOTAL 4YR COST : 4.720 0.000 4.720 0.000 0.000 NYSDOT NY454 ITS - WILL INSTALL CLOSED CIRCUIT ITS CAMERAS,REMOTELY CMAQ 2014 0.548 DETLDES 0.548 ACCESSIBLE ITS DEVICES AND SIGNAL INTERFACE SOFTWARE AND NFA 2014 0.137 DETLDES 0.137 003016 HARDWARE ALONG NY454 CORRIDOR TO UPGRADE THE SYSTEM IN TOWN OF ISLIP AND BROOKHAVEN AQC:NON SUFFOLK TPC : $15-$25 M TOTAL 4YR COST : 0.685 0.000 0.000 0.000 0.685 NYSDOT NY25 PAVEMENT REPAIRS,SEALING OF CRACKS, RESURFACING, PROV. HSIP 2012 0.738 CONINSP 0.738 TURNING LANES @ INTERSECTIONS INCLUDING CENTER LEFT TURN LANE, NFA 2012 0.084 CONINSP 0.084 004195 MOD. TO TRAFFIC SIGNAL EQUIPMENT & OPERATIONS, REPAIRS TO CURB & HSIP 2012 7.381 CONST 7.381 SIDEWALK BET. : NYC LINE TO GLEN COVE RD TO PROV. FOR SAFETY NFA 2012 0.837 CONST 0.837 NHS 2012 0.992 CONINSP 0.992 NFA 2012 0.253 CONINSP 0.253 NHS 2012 9.921 CONST 9.921 NFA 2012 2.529 CONST 2.529 AQC:A10P NASSAU TPC : $32-$50 M TOTAL 4YR COST : 22.735 0.000 22.735 0.000 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 2 of 84 for REGION 10 4-YEAR PROGRAM (FFY) AGENCY PROJECT DESCRIPTION TOTAL Starting October 01, 2010 FUND SOURCES FFY 4-YEAR PHASE PIN PROGRAM FFY FFY FFY FFY in millions of dollars 2011 2012 2013 2014 AQ CODE COUNTY TOTAL PROJECT COST NYSDOT IMPROVE NY110 SOUTHBOUND @ NY25 ,NY25 NY110 TO NEW YORK AVE NFA 2012 0.539 CONINSP 0.539 FOR TO PROVIDE SAFETY IMPROVEMENTS INCLUDING CONSTRUCT NFA 2012 5.393 CONST 5.393 004218 ONE-WAY NEW ROAD TO ALLOW FOR WESTBOUND LEFT TURNS; EASTBOUND LEFT TURNS WILL BE DIVERTED TO NEW YORK AVE, HUNTINGTON TOWN, SUFFOLK COUNTY. AQC:D3P SUFFOLK TPC : $7.5-$12 M TOTAL 4YR COST : 5.932 0.000 5.932 0.000 0.000 NYSDOT BRIDGE REHABILITATION OF NY25 OVER I495 AND CR58 IN RIVERHEAD TO IM 2013 0.868 CONINSP 0.868 MAINTAIN STATE OF GOOD REPAIR TOWN OF RIVERHEAD, SUFFOLK NFA 2013 0.096 CONINSP 0.096 004233 COUNTY.BIN#1056219,1056230 IM 2013 8.677 CONST 8.677 NFA 2013 0.965 CONST 0.965 AQC:A19P SUFFOLK TPC : $21-$31 M TOTAL 4YR COST : 10.606 0.000 0.000 10.606 0.000 NYSDOT RESURFACING; REPLACE STEEL MEDIAN BARRIER WITH CONCRETE MEDIAN NFA 2011 4.092 CONINSP 4.092 BARRIER TO MAINTAIN PAVEMENT AND PROVIDE SAFETY IMPROVEMENTS NFA 2012 40.919 CONST 40.919 005027 ON NY135 BETWEEN MERRICK RD AND NY24 IN THE TOWNS OF HEMPSTEAD & OYSTER BAY, NASSAU COUNTY. AQC:A10P NASSAU TPC : $40-$60 M TOTAL 4YR COST : 45.011 4.092 40.919 0.000 0.000 NYSDOT RECONSTRUCT NY347 FROM HALLOCK RD TO NICOLLS RD TO IMPROVE NFA 2014 6.408 DETLDES 6.408 SAFETY, OPERATION, AND MOBILITY FOR VEHICLES, PEDESTRIANS, NFA 2014 5.340 ROWACQU 5.340 005409 BICYCLISTS AND TRANSIT USERS IN BROOKHAVEN TOWN, SUFFOLK COUNTY. AQC:NON SUFFOLK TPC : $40-$60 M TOTAL 4YR COST : 11.748 0.000 0.000 0.000 11.748 NYSDOT RECONSTRUCT NY347 FROM NY111 TO TERRY RD TO IMPROVE SAFETY, NHS 2014 3.318 CONINSP 3.318 OPERATION, AND MOBILITY FOR VEHICLES, PEDESTRIANS, BICYCLISTS AND NFA 2014 3.729 CONINSP 3.729 005420 TRANSIT USERS IN BROOKHAVEN TOWN, SUFFOLK COUNTY. NHS 2014 33.181 CONST 33.181 NFA 2014 37.293 CONST 37.293 AQC:AQC SUFFOLK TPC : $70-$130 M TOTAL 4YR COST : 77.521 0.000 0.000 0.000 77.521 NYSDOT NY347 & NY112 INTERSECTION RECONSTRUCTION TO IMPROVE SAFETY, NFA 2011 0.100 DETLDES 0.100 OPERATION, AND MOBILITY FOR VEHICLES, PEDESTRIANS, BICYCLISTS AND NHS 2013 1.656 CONINSP 1.656 005421 TRANSIT USERS IN BROOKHAVEN TOWN, SUFFOLK COUNTY. NFA 2013 0.424 CONINSP 0.424 NHS 2013 16.565 CONST 16.565 NFA 2013 4.245 CONST 4.245 AQC:NON SUFFOLK TPC : $21-$31 M TOTAL 4YR COST : 22.990 0.100 0.000 22.890 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 3 of 84 for REGION 10 4-YEAR PROGRAM (FFY) AGENCY PROJECT DESCRIPTION TOTAL Starting October 01, 2010 FUND SOURCES FFY 4-YEAR PHASE PIN PROGRAM FFY FFY FFY FFY in millions of dollars 2011 2012 2013 2014 AQ CODE COUNTY TOTAL PROJECT COST NYSDOT INSTALL MEDIAN BARRIER ON NY27 FROM ROBERT MOSES CAUSEWAY TO NFA 2013 0.333 DETLDES 0.333 5TH AVENUE TO PREVENT CROSSING OF CENTER MEDIAN TOWN OF ISLIP, 005903 SUFFOLK COUNTY. AQC:A9P SUFFOLK TPC : $7.5-$12 M TOTAL 4YR COST : 0.333 0.000 0.000 0.333 0.000 NYSDOT INSTALL MEDIAN BARRIER ALONG I495 AND NY27 EAST OF NY112 TO IM 2014 0.167 CONINSP 0.167 PREVENT CROSSOVERS OF THE CENTER MEDIAN IN THE TOWNS OF NFA 2014 0.017 CONINSP 0.017 005909 BROOKHAVEN, RIVERHEAD & SOUTHAMPTON IN SUFFOLK COUNTY. IM 2014 1.675 CONST 1.675 NFA 2014 0.129 CONST 0.129 NHS 2014 0.396 CONINSP 0.396 NFA 2014 0.044 CONINSP 0.044 NHS 2014 3.958 CONST 3.958 NFA 2014 0.440 CONST 0.440 AQC:A9P SUFFOLK TPC : $6-$9.4 M TOTAL 4YR COST : 6.826 0.000 0.000 0.000 6.826 NYSDOT OPERATIONAL IMPROVEMENTS ON NASSAU EXPRESSWAY(NY878) TOWN OF NFA 2013 2.500 DETLDES 2.500 HEMPSTEAD, NASSAU COUNTY (SCOPE TO BE DETERMINED) NFA 2014 3.328 ROWACQU 3.328 007214 AQC:J1Z NASSAU TPC : $26-$40 M TOTAL 4YR COST : 5.828 0.000 0.000 2.500 3.328 NYSDOT RECONSTRUCT NY110 TO PROVIDE SAFETY IMPROVEMNTS AND INCREASED HSIP 2013 0.376 CONINSP 0.376 CAPACITY FROM I495 NORTH SERVICE ROAD TO ARLINGTON ROAD AND NFA 2013 1.776 CONINSP 1.776 011256 MELVILLE MALL TO ARROWWOOD IN HUNTINGTON TOWN, SUFFOLK HSIP 2013 3.765 CONST 3.765 COUNTY. HIGH ACCIDENT LOCATION DETERMINED AS OF MARCH 2010 NFA 2013 15.981 CONST 15.981 STP FLEX 2013 0.732 CONINSP 0.732 NFA 2013 0.429 CONINSP 0.429 STP FLEX 2013 7.320 CONST 7.320 NFA 2013 1.876 CONST 1.876 AQC:NON SUFFOLK TPC : $26-$40 M TOTAL 4YR COST : 32.255 0.000 0.000 32.255 0.000 NYSDOT I495 HOV ENFORCEMENT CONTRACTExit 48 to 64 SUFFOLKCOUNTY NHS 2011 0.630 OPER 0.630 NFA 2011 0.158 OPER 0.158 022871 NHS 2012 0.650 OPER 0.650 NFA 2012 0.162 OPER 0.162 NHS 2013 0.669 OPER 0.669 NFA 2013 0.167 OPER 0.167 NHS 2014 0.689 OPER 0.689 NFA 2014 0.172 OPER 0.172 AQC:A7P SUFFOLK TPC : $12.5-$19 M TOTAL 4YR COST : 3.297 0.788 0.812 0.836 0.861 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 4 of 84 for REGION 10 4-YEAR PROGRAM (FFY) AGENCY PROJECT DESCRIPTION TOTAL Starting October 01, 2010 FUND SOURCES FFY 4-YEAR PHASE PIN PROGRAM FFY FFY FFY FFY in millions of dollars 2011 2012 2013 2014 AQ CODE COUNTY TOTAL PROJECT COST NYSDOT PARK & RIDE LOT SECURITY SURVEILLANCE CONTRACT TO PROVIDE FOR NFA 2011 0.250 OPER 0.250 SECURITY FORCES TO SURVEIL THE PARK AND RIDE LOTS IN NASSAU AND NFA 2012 0.250 OPER 0.250 022874 SUFFOLK COUNTIES NFA 2013 0.250 OPER 0.250 NFA 2014 0.250 OPER 0.250 AQC:C1P SUFFOLK TPC : $3.3-$5.6 M TOTAL 4YR COST : 1.000 0.250 0.250 0.250 0.250 NYSDOT TO PROVIDE FOR HIG OCCUPANCY VEHICLE LANE POLICE ENFORCEMENT NHS 2011 0.784 OPER 0.784 ON I495 BETWEEN EXIT 32 TO 48 NASSAU COUNTY NFA 2011 0.196 OPER 0.196 022903 NHS 2012 0.807 OPER 0.807 NFA 2012 0.202 OPER 0.202 NHS 2013 0.832 OPER 0.832 NFA 2013 0.208 OPER 0.208 NHS 2014 0.857 OPER 0.857 NFA 2014 0.214 OPER 0.214 AQC:C1P NASSAU TPC : $12.5-$19 M TOTAL 4YR COST : 4.100 0.980 1.009 1.040 1.071 NYSDOT REPLACE BRIDGE STRUCTURE OF CR19, PATCHOGUE/HOLBROOK RD OVER IM 2013 1.041 CONINSP 1.041 I495 STATE OF GOOD REPAIR IN BROOKHAVEN TOWN,SUFFOLK COUNTY.
Recommended publications
  • Training Front Line Personnel to Provide Quality Customer Service
    Best Foot Forward: Training Front Line Personnel to Provide Quality Customer Service NOVEMBER 2003 Katherine Brower Associate Director Ellyn Shannon Transportation Planner Karyl Berger Research Associate Permanent Citizens Advisory Committee to the MTA 347 Madison Avenue, New York, NY 10017 ACKNOWLEDGEMENTS The authors would like to acknowledge the professional and courteous customer assistance provided to them by personnel at all the transportation agencies contacted during the preparation of this report. This report has been a work in progress for many months and there are many people the authors would like to recognize for their time, assistance and perseverance in obtaining and sharing volumes of information with us. At the LIRR, special thanks go to Director of Government Affairs Janet Lewis who helped coordinate meetings and garnered the information from a variety of departments and personnel. Also at the LIRR, we would like to thank: Robert Cividanes, Donald Corkery, James Coumatos, Dr. John Diekman, Nathaniel Ham, Raymond P. Kenny, Rosanne Neville, Chris Papandreou, William E. Sellerberg and Fred Wedley. Metro-North staff were instrumental in pulling together a mountain of information and we want to acknowledge and thank: Margarita Almonte, Delana Glenn, Gus Meyers, George Okvat, Mario Riccobon, John Roberto, Mark Stoessner, Tom Tendy and Diana Tucker. The authors would also like to specially thank Lois Tendler, NYC Transit director of Government and Community Relations and Deborah Hall-Moore, Assistant director of Government and Community Relations. Without them, we would have never been able to complete this report. Also at NYC Transit, we would like to thank: Ralph Agritelley, Fred Benjamin, Rocco Cortese, Nathaniel Ford, Termaine Garden, John Gaul, Daniel Girardi, Anthony Giudice, John Grass, Kevin Hyland, Christopher Lake, Robert Newhouser, Louis Nicosia, Millard Seay, Barbara Spencer, Jennifer Sinclair and Steve Vidal.
    [Show full text]
  • April 2018 Amendment CPRB
    SubmittedInterior_April2018_CapProg_Ex SummFEB_2018 4/23/18 12:16 PM Page 1 MTA Capital Program 2015–2019 Renew. Enhance. Expand. CAPITAL PROGRAM Amendment No. 3 mta.info/capital As Submitted to the Capital Program Review Board April 2018 1 18 Table of Contents Executive Summary……………………………………….……………………………………………………………………………….. 1 Overview……………………………………….……………………………………………………………………………………………….. 21 Program Evolution and Proposed Changes ……………………..………………………………………………..………..…………….… 24 Investment Summary……………………………………………………………………..………..……………………………….………………… 25 Program Funding……………………………………………………………………………………………………………..………..…………..…… 26 MTA Core……………………………………….……………………………………………….……………………………………………... 29 MTA New York City Transit……………………………………………………………………………………………………………………………..…… 29 MTA Long Island Rail Road………………………………………………………………………………………………………………………….. 49 MTA Metro-North Railroad…………………………………………………………………………………………………………………………… 63 MTA Bus Company……………………………………………………………………………………………………………………………………… 75 MTA Interagency…………………………………………………………………………………………………………………………………………. 79 MTA Network Expansion……………………………………………………………….………………………..……………………….. 85 MTA Bridges and Tunnels……………………………………………………….………………………………………………...…….. 97 Project Listings………………………………………………………..……………………………………………………………...……… 107 MTA New York City Transit…………………....…………………………………….……………………………………………………………………….. 111 MTA Long Island Rail Road……………………………………………………………………………………………………………..…………… 135 MTA Metro-North Railroad……………………………………………………………………………………………..……..….….….….….…… 143 MTA Bus Company…………………………………………………………………………………………………………………..………….….….
    [Show full text]
  • Long Island Committee Meeting
    Long Island Committee Meeting March 2015 Members M. Pally, Chair J. Ballan F. Ferrer, MTA Vice Chairman I. Greenberg J. Kay C. Moerdler J. Molloy J. Sedore V. Tessitore, Jr. C. Wortendyke N. Zuckerman Long Island Committee Meeting 2 Broadway, 20th Floor New York, New York Monday, 3/23/2015 9:30 - 10:30 AM ET 1. PUBLIC COMMENTS PERIOD 2. Approval of Minutes - February 23, 2015 LIRR Minutes - Page 4 3. 2015 WORK PLAN LIRR 2015 WORK PLAN - Page 10 4. AGENCY PRESIDENTS’/CHIEF’S REPORTS a. LIRR President’s Report (no material) b. MTA Capital Construction Report MTA Capital Construction Report - Page 16 c. MTA Police Report MTA Police Report - Page 22 5. INFORMATION ITEMS a. Annual Strategic Investments & Planning Study Annual Strategic Investments & Planning Study - Page 27 b. Track Work Program Schedule Changes Track Work Program Schedule Changes - Page 45 c. Annual Elevator/Escalator Report Annual Escalator/Elevator Report - Page 46 6. ACTION ITEM a. Amendment to Gateway Agreement Amendment to Gateway Agreement - Page 54 7. PROCUREMENTS a. LIRR Procurements LIRR Procurements - Page 58 i. Non-Competitive (No Items) ii. Competitive LIRR Competitive Procurements - Page 62 iii. Ratifications (No Items) b. MTA CC Procurements MTACC Procurements - Page 65 i. Non-Competitive (No Items) ii. Competitive (No Items) iii. Ratifications MTACC Ratifications - Page 68 8. PERFORMANCE SUMMARIES a. Operations i. Transportation Operations-Transportation Report - Page 70 ii. Mechanical Operations - Mechanical Report - Page 75 iii. Safety Operations - Safety Report - Page 78 iv. Enhanced Safety Memo Enhanced Safety Memo - Page 82 b. Financial Financial Report - Page 83 c. Ridership Ridership Report - Page 104 d.
    [Show full text]
  • Proposed MTA Capital Program 2010-2014
    Proposed MTA Capital Program 2010-2014 September 23, 2009 TABLE OF CONTENTS Page OVERVIEW 1 The MTA 2010-2014 Capital Program-- “Preserving the Transportation System’s Rich Heritage for Future Generations” INTRODUCTION 15 Investment Summary and Program Funding CORE CPRB CAPITAL PROGRAM: 2010-2014 MTA NYC Transit Capital Program 25 Overview Program Plan MTA Long Island Rail Road Capital Program 53 Overview Program Plan MTA Metro-North Railroad Capital Program 77 Overview Program Plan MTA Bus Company Capital Program 101 Overview Program Plan MTA-Wide Security and Safety Capital Program 109 Overview Introduction MTA Interagency Capital Program 115 Overview Program Plan NETWORK EXPANSION: 2010-2014 MTA Capital Construction Capital Program 125 Overview Program plan MTA BRIDGES AND TUNNELS CAPITAL PROGRAM: 2010-2014 143 Overview Program Plan PROGRAM PROJECT LISTINGS: 2010-2014 165 Proposed 2010-2014 Capital Program (This page intentionally left blank.) Proposed 2010-2014 Capital Program THE 2010-2014 CAPITAL PROGRAM: Preserving the Transportation System’s Rich Heritage for Future Generations Introduction The MTA’s network of subways, buses and railroads move 2.6 billion New Yorkers a year, about one in every three users of mass transit in the United States and two thirds of the nation’s rail riders. MTA bridges and tunnels carry nearly 300 million vehicles annually—more than any bridge and tunnel authority in the nation. This vast transportation network –North America’s largest— serves a population of 14.5 million people in the 5,000 square–mile area fanning out from New York City through Long Island, southeastern New York State and Connecticut.
    [Show full text]
  • BULLETIN - JUNE, 2013 Bulletin Electric Railroaders’ Association, Incorporated Vol
    The ERA BULLETIN - JUNE, 2013 Bulletin Electric Railroaders’ Association, Incorporated Vol. 56, No. 6 June, 2013 The Bulletin MANHATTAN RAILWAY ELECTRIFICATION Published by the Electric COMPLETED 110 YEARS AGO Railroaders’ Association, Incorporated, PO Box 3323, New York, New York 10163-3323. At the turn of the 20th century, most transit was tested on Sixth Avenue, transporting a systems were converting to electric traction, train with 192 invited guests from Rector to th For general inquiries, but Manhattan Railway was still operating 58 Streets in 19 minutes. contact us at bulletin@ reliable little Forney steam locomotives. The Compressed air locomotives were also test- erausa.org or by phone company’s officials were reluctant to experi- ed on the Second Avenue Elevated. On Oc- at (212) 986-4482 (voice ment with the new invention—electricity. tober 27, 1881, four cars weighing 81 tons in mail available). ERA’s Meanwhile, several inventors were testing a train propelled by a compressed air loco- website is www.erausa.org. electric motor devices on Manhattan Rail- motive were able to keep to their schedule way’s lines. On August 27, 1885 the first while operating from Harlem to South Ferry, Editorial Staff: electric train ran on the Ninth Avenue’s mid- with the air pressure diminishing from 600 Editor-in-Chief: dle track between 14th and 50th Streets. Dur- PSI to 195 PSI en route. On September 1, Bernard Linder News Editor: ing intervening years, several such test trains 1897 a five-car train with a load representa- Randy Glucksman were then operated. Before making a perma- tive of 100 passengers per car compared the Contributing Editor: nent installation the company also experi- performance of steam to compressed air.
    [Show full text]
  • Long Island Committee Meeting
    Long Island Committee Meeting March 2018 Members M. Pally, Chair R. Glucksman I. Greenberg S. Metzger C. Moerdler J. Molloy S. Rechler V. Tessitore V. Vanterpool J. Vitiello C. Wortendyke N. Zuckerman Long Island Rail Road Committee Meeting 2 Broadway 20th Floor Board Room New York, NY Monday, 3/19/2018 9:30 - 10:30 AM ET 1. PUBLIC COMMENTS PERIOD 2. Approval of Minutes - February 20, 2018 Approval of Minutes - February 20, 2018 - Page 4 3. LIRR 2018 WORK PLAN LIRR 2018 Work Plan - Page 18 4. AGENCY PRESIDENTS’/CHIEF’S REPORTS LIRR President’s Report (no material) MTA Capital Construction Report MTA Capital Construction Report - Page 25 MTA Police Report MTA Police Report - Page 29 5. ACTION ITEMS Extension of Refund Period for Railroad Tickets Extension of Refund Period for Railroad Tickets - Page 35 6. INFORMATION ITEMS Annual Strategic Investments & Planning Study Annual Strategic Investments & Planning Study - Page 38 Annual Elevator/Escalator Report Annual Elevator/Escalator Report - Page 61 Spring Trackwork Programs Spring Trackwork Programs - Page 68 Customer Satisfaction Survey Customer Satisfaction Survey - Page 70 PTC Status Report PTC Status Report - Page 96 7. PROCUREMENTS LIRR Procurements LIRR Procurements - Page 114 Competitive LIRR Competitive - Page 118 Non-Competitive (No Items) Ratifications LIRR Ratifications - Page 127 MTA CC Procurements (No Items) Competitive Non-Competitive Ratifications 8. PERFORMANCE SUMMARIES Operations - Transportation Operations - Transportation - Page 130 Operations - Mechanical Operations - Mechanical - Page 135 Operations - Safety Operations - Safety - Page 140 Financial Report Financial Report - Page 143 Ridership Report Ridership Report - Page 163 Capital Program Report Capital Programs Report - Page 170 Next Committee Meeting: Joint MNR/LIRR Monday, April 23rd at 8:30 a.m.
    [Show full text]
  • Recycling Program
    O f f i c e O f t h e N e w Y O r k S t a t e c O m p t r O l l e r DiviSiON Of State GOverNmeNt accOuNtabilitY Metropolitan Transportation Authority Long Island Rail Road Recycling Program Report 2009-S-91 thomas p. DiNapoli Table of Contents Page Authority Letter .............................................................................................................................5 Executive Summary .......................................................................................................................7 Introduction ....................................................................................................................................9 Background ..............................................................................................................................9 Audit Scope and Methodology ..............................................................................................10 Authority .................................................................................................................................11 Reporting Requirements .......................................................................................................11 Contributors to the Report ...................................................................................................12 Audit Findings and Recommendations ......................................................................................13 Recycling Program .................................................................................................................13
    [Show full text]
  • September 2012 ERA Bulletin.Pub
    The ERA BULLETIN - SEPTEMBER, 2012 Bulletin Electric Railroaders’ Association, Incorporated Vol. 55, No. 9 September, 2012 The Bulletin HIGH-SPEED NYW&B CARS IN SERVICE 100 YEARS Published by the Electric AGO Railroaders’ Association, Incorporated, PO Box The New York, Westchester & Boston Rail- spaced so that a lamp was directly above 3323, New York, New way was a high-speed suburban line. There each seat. These lamps were wired in multi- York 10163-3323. were no steep grades, no sharp curves, and ple on a 110-volt circuit fed from a tap on the no grade crossings. All bridges were made of main transformer. Emergency lighting was For general inquiries, concrete and steel and were designed to car- supplied by 10 10-watt tungsten lamps con- contact us at bulletin@ ry heavy traffic at high speeds. nected to the 32-volt battery circuit. erausa.org or by phone at (212) 986-4482 (voice The cars were just as modern as the layout. Each car was equipped with two single- mail available). ERA’s The initial order was for 28 steel passenger phase motors operated with forced draft ven- website is coaches seating 78 passengers and two tilation. Each motor had an hourly rating of www.erausa.org. combination steel baggage and passenger 175 HP and a continuous rating of 145 HP, coaches built by the Pressed Steel Car Com- and was able to develop an acceleration of 1 Editorial Staff: Editor-in-Chief: pany and designed by L.B. Stillwell. mile per hour per second on straight, level Bernard Linder Cars had full vestibule platforms and center track.
    [Show full text]
  • Reported It to the Department
    State of New York Office of the Inspector General Metropolitan Transportation Authority Two Penn Plaza, 5th Floor New York, New York 10121 212-878-0000 Barry L. Kluger Inspector General March 22, 2018 Owen Monaghan Chief MTA Police Department 420 Lexington Avenue New York, NY 10170 Re: Investigation as to whether Assistant Chief Thomas Odessa Complied with Applicable MTA All-Agency/Police Department Policies, Rules, and Procedures Dear Chief Monaghan: As you know, in November 2017 the Office of the MTA Inspector General (OIG) received a request from the MTA Police Department (the Department) to assist it in investigating whether Assistant Chief Thomas Odessa (Odessa) was in compliance with various MTA All- Agency/Department policies, rules, and procedures. As a result, the OIG provided the requested assistance as described below. Background As reflected in past reports, the OIG has established to agency management the many benefits of GPS-based automatic vehicle location monitoring technology. These benefits include: determining the optimal size and utilization of an agency’s automotive fleet; providing data for accident/incident investigation; reducing operating expense by monitoring idling and maintenance cycles; allowing for audits of potentially risky driving behavior such as speeding and hard braking; and improving management and accountability of a widespread workforce. Given these benefits, in 2016 the MTA Inspector General recommended to the then-Director of Safety and Security at MTA Headquarters, who had supervisory and oversight authority over the Department, that the Department install GPS systems in agency vehicles. The Director agreed. Thereafter, the Department infonned the OIG that the Department had determined to have those of its Radio Motor Patrol vehicles (RMPs) assigned to primary operators on a 24/7 basis retrofitted with GPS tracking devices, beginning in January 2017.
    [Show full text]
  • 2010-2014 Capital Program Amendment All Agency Summary ($ in Millions)
    10_14Cover.qxp_CapProg_Ex Summ 9/9/19 10:43 AM Page 1 MTA Capital Program Protecting and Improving Service for 2010-2014 Customers CAPITAL CAPITAL PROGRAM PROGRAM As Approved by the MTA Board September 25, 2019 mta.info/capital mta.info/capital As Approved by the CPRB February 21, 2020 10_14Cover.qxp_CapProg_Ex Summ 9/9/19 10:43 AM Page 2 Background: 2010-2014 Capital Program Adoption and Prior Program Amendments On April 28, 2010, the MTA Board approved a proposed $23.812 billion 2010-2014 Capital Program. The Capital Program Review Board (CPRB) approved the program on June 1, 2010. The MTA Bridges and Tunnels (B&T) portion of the original 2010-2014 Capital Program, which does not require CPRB approval, was $2.453 billion. Together, these capital programs totaled $26.265 billion. On December 21, 2011, the MTA Board approved an amendment that reduced the program to $22.195 billion. This amendment, approved by the CPRB on March 27, 2012, provided full funding for the program through future efficiency initiatives and revised financing. The amendment did not identify specific savings at the project level, but noted that the savings would be identified in a future amendment and were expected to be achieved without impacts to customer benefits. (The B&T 2010-2014 Capital Program was revised to $2.078 billion. Together, these capital programs totaled $24.274 billion for 2010-2014.) On December 19, 2012, the MTA Board approved an amendment to the CPRB 2010-2014 Capital Program to add projects totaling $3.977 billion for the repair and restoration of MTA agency assets damaged because of Superstorm Sandy, which struck the region on October 29, 2012.
    [Show full text]
  • 1 NEW YORK STATE RAILROADS (5) – SL 122 25.10.20 Page 1 of 8
    1 NEW YORK STATE RAILROADS (5) – SL 122 25.10.20 page 1 of 8 PASSENGER STATIONS & STOPS Long Island RR (LI) (250-278) & Short Lines on Long Island (279-284) Local steam lines in Brooklyn eventually incorporated in BRT/BMT are included in New York City Subway list, SL 123 Based on LI public TTs 1844 (x), Official Guide (G) 1868 (y), SSLI 1869 (y2), 1879 (z), 1902 (a), 1919/1920 (b), 1939 (c), 1963 (d), 1975 (e) & current TTs (f). Also, Dinsmores Guides 1851 (n), 1852 (n2) & 1858 (n3), Appletons 1863 (p), Appletons/ Knickerbockers 1886 (r3) & 1897 (s) and LI public TTs 1873 (q), 1874 (n4), 1875 (q2), 1877 (q3), 1879 (r), 1884 (r2),1899 (h), 1903 (h2), 1916 (t), 1941 (u), 1952 (u2), 1957 (u3) & 1959G (v). [ j ]: current MTA stations (adjacent); y+: 1870t Other public TTs as noted: date(t). w: working TT. (date)AG/KG: Appletons/Kennys Guide Former names: [ ] Distances in miles Gauge 4’ 8½” unless noted (date)>(date) start/end of passenger service 0op. opened; cl. closed; rn. renamed; rl. relocated; tm. terminus of service at date shown; pass?: passenger service? Certain non-passenger locations shown in italics thus: (name) # Histories (incldg Arrts Archive web site, which includes illustrations of many old LI TTs). www.trainsarefun.com for alphabetical all-time LIRR station list with op./cl/elevation dates Reference letters in brackets: (a), location shown in public timetable, but no trains stop. x-f = xyzabcdef etc. The LIRR and its predecessors lines were mainly built at ground level. Parts of the system in west Long Island were later elevated or lowered, around 1890/1920 in Brooklyn, generally after 1940 eastwards to Babylon etc.
    [Show full text]
  • Metropolitan Transportation Authority (MTA) Capital Dashboard Project Locations
    Metropolitan Transportation Authority (MTA) Capital Dashboard Project Locations Project Number Project Number Sequence Plan Series ET060102 1 6 ET070209 1 6 ET090201 1 6 G5090115 1 5 T5060405 2 5 T6070342 1 6 T7080620 35 7 T6060307 6 6 ET090207 2 6 G7090105 1 7 D701BW07 1 7 T6070307 1 6 T6160611 13 6 M6030116 1 6 T5090412 1 5 L60204UW 1 6 T6100406 1 6 T6080649 15 6 T7080613 21 7 Page 1 of 1428 10/01/2021 Metropolitan Transportation Authority (MTA) Capital Dashboard Project Locations Capital Plan Agency Name Capital Plan 2010 - 2014 Security / Disaster Recovery Capital Plan 2010 - 2014 Security / Disaster Recovery Capital Plan 2010 - 2014 Security / Disaster Recovery Capital Plan 2005 - 2009 Capital Construction Company Capital Plan 2005 - 2009 New York City Transit Capital Plan 2010 - 2014 New York City Transit Capital Plan 2015 - 2019 New York City Transit Capital Plan 2010 - 2014 New York City Transit Capital Plan 2010 - 2014 Security / Disaster Recovery Capital Plan 2015 - 2019 Capital Construction Company Capital Plan 2015 - 2019 Bridges And Tunnels Capital Plan 2010 - 2014 New York City Transit Capital Plan 2010 - 2014 New York City Transit Capital Plan 2010 - 2014 Metro-North Railroad Capital Plan 2005 - 2009 New York City Transit Capital Plan 2010 - 2014 Long Island Rail Road Capital Plan 2010 - 2014 New York City Transit Capital Plan 2010 - 2014 New York City Transit Capital Plan 2015 - 2019 New York City Transit Page 2 of 1428 10/01/2021 Metropolitan Transportation Authority (MTA) Capital Dashboard Project Locations Category Description
    [Show full text]