** STATE DEPARTMENT OF TRANSPORTATION ** Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 1 of 84 for REGION 10 4-YEAR PROGRAM (FFY) AGENCY PROJECT DESCRIPTION TOTAL Starting October 01, 2010 FUND SOURCES FFY 4-YEAR PHASE PIN PROGRAM FFY FFY FFY FFY in millions of dollars 2011 2012 2013 2014 AQ CODE COUNTY TOTAL PROJECT COST

NYSDOT CONSTRUCT THE FIRST SECTION OF A 14.4 MILE SHARED-USE PATH FROM NFA 2012 0.600 CONINSP 0.600 THE WANTAGHSTATE PKWY TO TOBAY BEACH ON THE NORTH SIDE OF NFA 2012 5.500 CONST 5.500 000611 OCEAN PKWY TO PROVIDE MULTIMODAL ACCESS TOWNS OF OYSTERBAY AND HEMPSTEAD AQC:C2P NASSAU TPC : $4.6-$7.5 M TOTAL 4YR COST : 6.100 0.000 6.100 0.000 0.000

NYSDOT IMPROVE STRUCTURAL INTEGRITY OF THE ROBERT MOSES CAUSEWAY HBRR 2013 2.319 PRELDES 2.319 OVER FIRE ISLAND INLET BRIDGE TO ENSURE PUBLIC SAFETY TOWN OF NFA 2013 0.600 PRELDES 0.600 001756 ISLIP, SUFFOLK COUNTY (BIN#1058770) AQC:A19P SUFFOLK TPC : $175-$385 M TOTAL 4YR COST : 2.919 0.000 0.000 2.919 0.000

NYSDOT SPOT BRIDGE REPAIR TO MAINTAIN STRUCTURAL INTEGRITY ON ROBERT NFA 2011 0.808 CONINSP 0.808 MOSES CAUSEWAY OVER FIRE ISLAND INLET BRIDGE IN ISLIP TOWN, NFA 2011 8.080 CONST 8.080 001764 SUFFOLK COUNTY. AQC:A19S SUFFOLK TPC : $7.5-$12 M TOTAL 4YR COST : 8.888 8.888 0.000 0.000 0.000

NYSDOT CONSTRUCT RECHARGE BASIN TO ELIMINATE A FLOODING PROBLEM ON NFA 2012 0.429 CONINSP 0.429 NY454 BETWEEN LINCOLN AVE AND GRUNDY AVE, ISLIP TOWN, SUFFOLK NFA 2012 4.291 CONST 4.291 003012 COUNTY. AQC:A2P SUFFOLK TPC : $9.5-15.5 M TOTAL 4YR COST : 4.720 0.000 4.720 0.000 0.000

NYSDOT NY454 ITS - WILL INSTALL CLOSED CIRCUIT ITS CAMERAS,REMOTELY CMAQ 2014 0.548 DETLDES 0.548 ACCESSIBLE ITS DEVICES AND SIGNAL INTERFACE SOFTWARE AND NFA 2014 0.137 DETLDES 0.137 003016 HARDWARE ALONG NY454 CORRIDOR TO UPGRADE THE SYSTEM IN TOWN OF ISLIP AND BROOKHAVEN AQC:NON SUFFOLK TPC : $15-$25 M TOTAL 4YR COST : 0.685 0.000 0.000 0.000 0.685

NYSDOT NY25 PAVEMENT REPAIRS,SEALING OF CRACKS, RESURFACING, PROV. HSIP 2012 0.738 CONINSP 0.738 TURNING LANES @ INTERSECTIONS INCLUDING CENTER LEFT TURN LANE, NFA 2012 0.084 CONINSP 0.084 004195 MOD. TO TRAFFIC SIGNAL EQUIPMENT & OPERATIONS, REPAIRS TO CURB & HSIP 2012 7.381 CONST 7.381 SIDEWALK BET. : NYC LINE TO GLEN COVE RD TO PROV. FOR SAFETY NFA 2012 0.837 CONST 0.837 NHS 2012 0.992 CONINSP 0.992 NFA 2012 0.253 CONINSP 0.253 NHS 2012 9.921 CONST 9.921 NFA 2012 2.529 CONST 2.529 AQC:A10P NASSAU TPC : $32-$50 M TOTAL 4YR COST : 22.735 0.000 22.735 0.000 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 2 of 84 for REGION 10 4-YEAR PROGRAM (FFY) AGENCY PROJECT DESCRIPTION TOTAL Starting October 01, 2010 FUND SOURCES FFY 4-YEAR PHASE PIN PROGRAM FFY FFY FFY FFY in millions of dollars 2011 2012 2013 2014 AQ CODE COUNTY TOTAL PROJECT COST

NYSDOT IMPROVE NY110 SOUTHBOUND @ NY25 ,NY25 NY110 TO NEW YORK AVE NFA 2012 0.539 CONINSP 0.539 FOR TO PROVIDE SAFETY IMPROVEMENTS INCLUDING CONSTRUCT NFA 2012 5.393 CONST 5.393 004218 ONE-WAY NEW ROAD TO ALLOW FOR WESTBOUND LEFT TURNS; EASTBOUND LEFT TURNS WILL BE DIVERTED TO NEW YORK AVE, HUNTINGTON TOWN, SUFFOLK COUNTY. AQC:D3P SUFFOLK TPC : $7.5-$12 M TOTAL 4YR COST : 5.932 0.000 5.932 0.000 0.000

NYSDOT BRIDGE REHABILITATION OF NY25 OVER I495 AND CR58 IN RIVERHEAD TO IM 2013 0.868 CONINSP 0.868 MAINTAIN STATE OF GOOD REPAIR TOWN OF RIVERHEAD, SUFFOLK NFA 2013 0.096 CONINSP 0.096 004233 COUNTY.BIN#1056219,1056230 IM 2013 8.677 CONST 8.677 NFA 2013 0.965 CONST 0.965 AQC:A19P SUFFOLK TPC : $21-$31 M TOTAL 4YR COST : 10.606 0.000 0.000 10.606 0.000

NYSDOT RESURFACING; REPLACE STEEL MEDIAN BARRIER WITH CONCRETE MEDIAN NFA 2011 4.092 CONINSP 4.092 BARRIER TO MAINTAIN PAVEMENT AND PROVIDE SAFETY IMPROVEMENTS NFA 2012 40.919 CONST 40.919 005027 ON NY135 BETWEEN MERRICK RD AND NY24 IN THE TOWNS OF HEMPSTEAD & OYSTER BAY, NASSAU COUNTY. AQC:A10P NASSAU TPC : $40-$60 M TOTAL 4YR COST : 45.011 4.092 40.919 0.000 0.000

NYSDOT RECONSTRUCT NY347 FROM HALLOCK RD TO NICOLLS RD TO IMPROVE NFA 2014 6.408 DETLDES 6.408 SAFETY, OPERATION, AND MOBILITY FOR VEHICLES, PEDESTRIANS, NFA 2014 5.340 ROWACQU 5.340 005409 BICYCLISTS AND TRANSIT USERS IN BROOKHAVEN TOWN, SUFFOLK COUNTY. AQC:NON SUFFOLK TPC : $40-$60 M TOTAL 4YR COST : 11.748 0.000 0.000 0.000 11.748

NYSDOT RECONSTRUCT NY347 FROM NY111 TO TERRY RD TO IMPROVE SAFETY, NHS 2014 3.318 CONINSP 3.318 OPERATION, AND MOBILITY FOR VEHICLES, PEDESTRIANS, BICYCLISTS AND NFA 2014 3.729 CONINSP 3.729 005420 TRANSIT USERS IN BROOKHAVEN TOWN, SUFFOLK COUNTY. NHS 2014 33.181 CONST 33.181 NFA 2014 37.293 CONST 37.293 AQC:AQC SUFFOLK TPC : $70-$130 M TOTAL 4YR COST : 77.521 0.000 0.000 0.000 77.521

NYSDOT NY347 & NY112 INTERSECTION RECONSTRUCTION TO IMPROVE SAFETY, NFA 2011 0.100 DETLDES 0.100 OPERATION, AND MOBILITY FOR VEHICLES, PEDESTRIANS, BICYCLISTS AND NHS 2013 1.656 CONINSP 1.656 005421 TRANSIT USERS IN BROOKHAVEN TOWN, SUFFOLK COUNTY. NFA 2013 0.424 CONINSP 0.424 NHS 2013 16.565 CONST 16.565 NFA 2013 4.245 CONST 4.245 AQC:NON SUFFOLK TPC : $21-$31 M TOTAL 4YR COST : 22.990 0.100 0.000 22.890 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 3 of 84 for REGION 10 4-YEAR PROGRAM (FFY) AGENCY PROJECT DESCRIPTION TOTAL Starting October 01, 2010 FUND SOURCES FFY 4-YEAR PHASE PIN PROGRAM FFY FFY FFY FFY in millions of dollars 2011 2012 2013 2014 AQ CODE COUNTY TOTAL PROJECT COST

NYSDOT INSTALL MEDIAN BARRIER ON NY27 FROM ROBERT MOSES CAUSEWAY TO NFA 2013 0.333 DETLDES 0.333 5TH AVENUE TO PREVENT CROSSING OF CENTER MEDIAN TOWN OF ISLIP, 005903 SUFFOLK COUNTY. AQC:A9P SUFFOLK TPC : $7.5-$12 M TOTAL 4YR COST : 0.333 0.000 0.000 0.333 0.000

NYSDOT INSTALL MEDIAN BARRIER ALONG I495 AND NY27 EAST OF NY112 TO IM 2014 0.167 CONINSP 0.167 PREVENT CROSSOVERS OF THE CENTER MEDIAN IN THE TOWNS OF NFA 2014 0.017 CONINSP 0.017 005909 BROOKHAVEN, RIVERHEAD & SOUTHAMPTON IN SUFFOLK COUNTY. IM 2014 1.675 CONST 1.675 NFA 2014 0.129 CONST 0.129 NHS 2014 0.396 CONINSP 0.396 NFA 2014 0.044 CONINSP 0.044 NHS 2014 3.958 CONST 3.958 NFA 2014 0.440 CONST 0.440 AQC:A9P SUFFOLK TPC : $6-$9.4 M TOTAL 4YR COST : 6.826 0.000 0.000 0.000 6.826

NYSDOT OPERATIONAL IMPROVEMENTS ON NASSAU EXPRESSWAY(NY878) TOWN OF NFA 2013 2.500 DETLDES 2.500 HEMPSTEAD, NASSAU COUNTY (SCOPE TO BE DETERMINED) NFA 2014 3.328 ROWACQU 3.328 007214

AQC:J1Z NASSAU TPC : $26-$40 M TOTAL 4YR COST : 5.828 0.000 0.000 2.500 3.328

NYSDOT RECONSTRUCT NY110 TO PROVIDE SAFETY IMPROVEMNTS AND INCREASED HSIP 2013 0.376 CONINSP 0.376 CAPACITY FROM I495 NORTH SERVICE ROAD TO ARLINGTON ROAD AND NFA 2013 1.776 CONINSP 1.776 011256 MELVILLE MALL TO ARROWWOOD IN HUNTINGTON TOWN, SUFFOLK HSIP 2013 3.765 CONST 3.765 COUNTY. HIGH ACCIDENT LOCATION DETERMINED AS OF MARCH 2010 NFA 2013 15.981 CONST 15.981 STP FLEX 2013 0.732 CONINSP 0.732 NFA 2013 0.429 CONINSP 0.429 STP FLEX 2013 7.320 CONST 7.320 NFA 2013 1.876 CONST 1.876 AQC:NON SUFFOLK TPC : $26-$40 M TOTAL 4YR COST : 32.255 0.000 0.000 32.255 0.000

NYSDOT I495 HOV ENFORCEMENT CONTRACTExit 48 to 64 SUFFOLKCOUNTY NHS 2011 0.630 OPER 0.630 NFA 2011 0.158 OPER 0.158 022871 NHS 2012 0.650 OPER 0.650 NFA 2012 0.162 OPER 0.162 NHS 2013 0.669 OPER 0.669 NFA 2013 0.167 OPER 0.167 NHS 2014 0.689 OPER 0.689 NFA 2014 0.172 OPER 0.172 AQC:A7P SUFFOLK TPC : $12.5-$19 M TOTAL 4YR COST : 3.297 0.788 0.812 0.836 0.861 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 4 of 84 for REGION 10 4-YEAR PROGRAM (FFY) AGENCY PROJECT DESCRIPTION TOTAL Starting October 01, 2010 FUND SOURCES FFY 4-YEAR PHASE PIN PROGRAM FFY FFY FFY FFY in millions of dollars 2011 2012 2013 2014 AQ CODE COUNTY TOTAL PROJECT COST

NYSDOT PARK & RIDE LOT SECURITY SURVEILLANCE CONTRACT TO PROVIDE FOR NFA 2011 0.250 OPER 0.250 SECURITY FORCES TO SURVEIL THE PARK AND RIDE LOTS IN NASSAU AND NFA 2012 0.250 OPER 0.250 022874 SUFFOLK COUNTIES NFA 2013 0.250 OPER 0.250 NFA 2014 0.250 OPER 0.250 AQC:C1P SUFFOLK TPC : $3.3-$5.6 M TOTAL 4YR COST : 1.000 0.250 0.250 0.250 0.250

NYSDOT TO PROVIDE FOR HIG OCCUPANCY VEHICLE LANE POLICE ENFORCEMENT NHS 2011 0.784 OPER 0.784 ON I495 BETWEEN EXIT 32 TO 48 NASSAU COUNTY NFA 2011 0.196 OPER 0.196 022903 NHS 2012 0.807 OPER 0.807 NFA 2012 0.202 OPER 0.202 NHS 2013 0.832 OPER 0.832 NFA 2013 0.208 OPER 0.208 NHS 2014 0.857 OPER 0.857 NFA 2014 0.214 OPER 0.214 AQC:C1P NASSAU TPC : $12.5-$19 M TOTAL 4YR COST : 4.100 0.980 1.009 1.040 1.071

NYSDOT REPLACE BRIDGE STRUCTURE OF CR19, PATCHOGUE/HOLBROOK RD OVER IM 2013 1.041 CONINSP 1.041 I495 STATE OF GOOD REPAIR IN BROOKHAVEN TOWN,SUFFOLK COUNTY. NFA 2013 0.116 CONINSP 0.116 022934 IM 2013 10.413 CONST 10.413 NFA 2013 1.156 CONST 1.156 AQC:A19P SUFFOLK TPC : $9.5-15.5 M TOTAL 4YR COST : 12.726 0.000 0.000 12.726 0.000

NYSDOT CREATE NEW HIGH OCCUPANCY VEHICLE LANE ACCESS POINT ON I495 IM 2011 0.280 CONINSP 0.280 BETWEEN EXITS 37 & 38 TO ALLOW SAFER INGRESS AND EGRESS. TOWN OF NFA 2011 0.031 CONINSP 0.031 022935 NORTH HEMPSTEAD, NASSAU COUNTY. IM 2011 2.336 CONST 2.336 NFA 2011 0.260 CONST 0.260 AQC:NON NASSAU TPC : $2-$4 M TOTAL 4YR COST : 2.907 2.907 0.000 0.000 0.000

NYSDOT ADD A SUPPLEMENTAL THIRD LANE OF I495 SERVICE ROADS FROM WALT NFA 2012 0.820 CONINSP 0.820 WHITMAN RD TO NY 110, TO IMPROVE THE FUNCTIONAL OPERATIONS NFA 2012 8.202 CONST 8.202 022938 HUNTINGTON TOWN, SUFFOLK COUNTY. AQC:D1 SUFFOLK TPC : $7.5-$12 M TOTAL 4YR COST : 9.022 0.000 9.022 0.000 0.000

NYSDOT ADDITIONAL WORK NEEDED TO COMPLETE ROSLYN VIADUCT BRIDGE NFA 2012 2.108 CONINSP 2.108 REPLACEMENT STATE OF GOOD REPAIRTOWN OF NORTH HEMPSTEAD, NFA 2012 21.079 CONST 21.079 032804 NASSAU COUNTY AQC:A6P NASSAU TPC : $21-$31 M TOTAL 4YR COST : 23.187 0.000 23.187 0.000 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 5 of 84 for REGION 10 4-YEAR PROGRAM (FFY) AGENCY PROJECT DESCRIPTION TOTAL Starting October 01, 2010 FUND SOURCES FFY 4-YEAR PHASE PIN PROGRAM FFY FFY FFY FFY in millions of dollars 2011 2012 2013 2014 AQ CODE COUNTY TOTAL PROJECT COST

NYSDOT SAGTIKOS STATE PKWY/SUNKEN MEADOW STATE PKWY STUDY: SOUTHERN NHS 2013 2.598 SCOPING 2.598 STATE PKWY TO NY25A INCLUDING THE PARALLEL ROADWAY TOWNS OF NFA 2013 0.812 SCOPING 0.812 033909 ISLIP AND SMITHTOWN, SUFFOLK COUNTY NHS 2014 8.744 PRELDES 8.744 NFA 2014 2.208 PRELDES 2.208 AQC:C3P SUFFOLK TPC : $15-$25 M TOTAL 4YR COST : 14.362 0.000 0.000 3.410 10.952

NYSDOT CONSTRUCT FIRST PHASE OF THE INTERMODAL FREIGHT FACILITY ON THE NFA 2011 2.500 DETLDES 2.500 PILGRIM STATE HOSPITAL PROPERTY WHICH MAY INVOLVE HIGHWAY NFA 2013 3.707 CONINSP 3.707 033912 INFRASTRUCTURE IMPROVEMENTS AND/OR RAIL FREIGHT IMPROVEMENTS NFA 2013 37.070 CONST 37.070 IN ISLIP TOWN, SUFFOLK COUNTY. AQC:NON SUFFOLK TPC : $40-$60 M TOTAL 4YR COST : 43.277 2.500 0.000 40.777 0.000

NYSDOT RECONSTRUCT NORTHERN STATE PARKWAY & NY110 INTERCHANGE AND NFA 2011 1.300 CONINSP 1.300 REPLACE THE NORTHERN STATE PARKWAY BRIDGE OVER NY110 TO NFA 2011 40.400 CONST 40.400 051641 PROVIDE INCREASED SAFETY AND STATE OF GOOD REPAIR IN HUNTINGTON NFA 2011 2.362 ROWACQU 2.362 TOWN, SUFFOLK COUNTY. NHS 2011 2.090 CONINSP 2.090 NFA 2011 3.420 CONINSP 3.420 NHS 2011 20.897 CONST 20.897 NFA 2011 7.781 CONST 7.781 AQC:NON SUFFOLK TPC : $70-$130 M TOTAL 4YR COST : 78.250 78.250 0.000 0.000 0.000

NYSDOT CONSTRUCT 13.5 MILE LONG - 4 METER WIDE SHARED USE BIKEPATH NFA 2011 0.240 ROWACQU 0.240 WHICH INCLUDES RE-TIMING OF SIGNALS, SIGNING, PAVEMENT MARKING, 051723 GUIDE RAIL, CONCRETE BARRIER INSTALL/RELOC & BIKE LOCKER INSTALLATIONS Town of Hempstead, Nassau County AQC:C2P NASSAU TPC : $21-$31 M TOTAL 4YR COST : 0.240 0.240 0.000 0.000 0.000

NYSDOT PROVIDE SAFETY IMPROVEMENTS TO RAMPS ON WANTAGH STATE NFA 2011 0.660 PRELDES 0.660 PARKWAY AT INTERCHANGE WITH OLD COUNTRY ROAD SCOPE TO BE NFA 2014 0.454 CONINSP 0.454 051735 DETERMINED TOWN OF NORTH HEMPSTEAD NFA 2014 4.540 CONST 4.540 AQC:A6P NASSAU TPC : $4.6-$7.5 M TOTAL 4YR COST : 5.654 0.660 0.000 0.000 4.994

NYSDOT MEADOWBROOK STATE PKWY/SOUTHERN STATE PKWY INTERCHANGE NFA 2012 1.000 DETLDES 1.000 RECONSTRUCTION TO ELIMINATE TRAFFIC BACKUP -- CONSTRUCT A WIDER 052323 RAMP FROM W/B SOUTHERN STATE PAKWY TO N/B MEADOWBROOK STATE PKWY INCLUDING WIDER BRIDGES AT MEADOWBROOK ROAD & NORTH JERUSALEM,HEMPSTEAD AQC:D3 NASSAU TPC : $26-$40 M TOTAL 4YR COST : 1.000 0.000 1.000 0.000 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 6 of 84 for REGION 10 4-YEAR PROGRAM (FFY) AGENCY PROJECT DESCRIPTION TOTAL Starting October 01, 2010 FUND SOURCES FFY 4-YEAR PHASE PIN PROGRAM FFY FFY FFY FFY in millions of dollars 2011 2012 2013 2014 AQ CODE COUNTY TOTAL PROJECT COST

NYSDOT EXTEND THE MULTI-USE BIKEPATH 6 MILES FROM BETHPAGE ST PK TO I495 NFA 2011 0.929 CONINSP 0.929 & THEN FOLLOWING I495 & NY135 ROW TO SYOSSET RR STATION; INCLUDES NFA 2011 9.287 CONST 9.287 053457 PED IMPVTS @ STREET CROSSINGS, REPLANTING OF ERODED AREAS, PARKING & SIGNING, TOWN OF OYSTER BAY, NASSAU CO. AQC:C2P NASSAU TPC : $9.5-15.5 M TOTAL 4YR COST : 10.216 10.216 0.000 0.000 0.000

NYSDOT UPGRADE LIGHTING CABLE ON VARIOUS STATE PARKWAYS AS A SAFETY STP LG URBAN 2014 1.097 DETLDES 1.097 IMPROVEMENT IN NASSAU AND SUFFOLK COUNTIES NFA 2014 0.274 DETLDES 0.274 053466

AQC:A18P MULTI TPC : $15-$25 M TOTAL 4YR COST : 1.371 0.000 0.000 0.000 1.371

NYSDOT REHABILITATE THE HECKSCHER STATE PARKWAY BRIDGE OVER NY27, HBRR 2012 0.594 CONINSP 0.594 STATE OF GOOD REPAIR ISLIP TOWN, SUFFOLK COUNTY. NFA 2012 0.148 CONINSP 0.148 053472 HBRR 2012 5.940 CONST 5.940 NFA 2012 1.485 CONST 1.485 AQC:A19P MULTI TPC : $7.5-$12 M TOTAL 4YR COST : 8.167 0.000 8.167 0.000 0.000

SUFFOLK CO. INTERSECTION REALIGNMENT OF CR 3, PINELAWN ROAD/WELLWOOD NFA 2012 1.300 CONINSP 1.300 ROAD WITH CONKLIN STREET AND LONG ISLAND AVENUE, TO IMPROVE NFA 2012 11.700 CONST 11.700 075656 SAFETY AND TRAFFIC CONGESTION, IN THE TOWN OF BABYLON. ACT NO.600 AQC:D1P SUFFOLK TPC : $15-$25 M TOTAL 4YR COST : 13.000 0.000 13.000 0.000 0.000

SUFFOLK CO. IMPROVE CR 39 FROM NY 27 TO NY 27A, SUFFOLK COUNTY: HPP 2011 0.300 CONINSP 0.300 RECONSTRUCTION FROM NORTH SEA ROAD WEST TO NY27A,CR39 (NORTH NFA 2011 0.075 CONINSP 0.075 075736 HIGHWAY) TO INCLUDE 4 LANE SECTION WITH FULL SHOULDERSTO HPP 2011 2.700 CONST 2.700 REDUCE THE TRAFFIC CONGESTION.(HPP#3232 ,NY 576) NFA 2011 0.675 CONST 0.675 NHS 2011 0.060 CONINSP 0.060 NFA 2011 0.015 CONINSP 0.015 NHS 2011 0.540 CONST 0.540 NFA 2011 0.135 CONST 0.135 STP LG URBAN 2011 0.320 CONINSP 0.320 NFA 2011 0.080 CONINSP 0.080 STP LG URBAN 2011 0.480 CONST 0.480 NFA 2011 0.120 CONST 0.120 STP LG URBAN 2011 0.001 DETLDES 0.001 AQC:NON SUFFOLK TPC : $4.6-$7.5 M TOTAL 4YR COST : 5.501 5.501 0.000 0.000 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 7 of 84 for REGION 10 4-YEAR PROGRAM (FFY) AGENCY PROJECT DESCRIPTION TOTAL Starting October 01, 2010 FUND SOURCES FFY 4-YEAR PHASE PIN PROGRAM FFY FFY FFY FFY in millions of dollars 2011 2012 2013 2014 AQ CODE COUNTY TOTAL PROJECT COST

LOCAL EXTENSION OF WEST AVENUE TO BEACH AVENUE TO PROVIDE A DIRECT HPP 2011 1.435 CONST 1.435 ACCESS TO FERRIES, LIRR & WATERFRONT, ACT #294. VILLAGE OF NFA 2011 0.359 CONST 0.359 075739 PATCHOGUE AQC:C2P SUFFOLK TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.794 1.794 0.000 0.000 0.000

LOCAL CONGESTION MITIGATION PROJECT, TOWN OF BROOKHAVEN. ACT NO. 748 . HPP 2011 2.512 CONST 2.512 EMERGENCY VEHICLE PREEMPTION SYSTEM FOR EXISTING TRAFFIC NFA 2011 0.628 CONST 0.628 075743 SIGNALS .TEA-21 SECTION 1600 AQC:A7P SUFFOLK TPC : $2-$4 M TOTAL 4YR COST : 3.140 3.140 0.000 0.000 0.000

SUFFOLK CO. CONSTRUCT 11 MILES OF PEDESTRIAN/BICYCLE TRAIL ALONG THE HPP 2011 0.359 DETLDES 0.359 ABANDONED PORT JEFFERSON-WADING RIVER RAILROAD CORRIDOR NFA 2011 0.090 DETLDES 0.090 075816 SECTION 1602 #1257, NY-139, NY 267 HPP 2012 0.500 CONINSP 0.500 NFA 2012 0.125 CONINSP 0.125 HPP 2012 5.970 CONST 5.970 NFA 2012 1.492 CONST 1.492 AQC:C14 SUFFOLK TPC : $7.5-$12 M TOTAL 4YR COST : 8.536 0.449 8.087 0.000 0.000

LOCAL CONSTRUCT TWO-WAY BIKEWAY ON RIVER ROAD FROM VICTORY AVENUE HPP 2011 0.112 CONINSP 0.112 TO MORICHES-MIDDLE ISLAND ROAD,INCLUDING ,NEW PAVEMENT NFA 2011 0.028 CONINSP 0.028 075827 MARKING DELINEATING BIKEWAY ALONG THE SIDE OF RIVER ROAD, NEW HPP 2011 1.126 CONST 1.126 BIKE WAY SIGNS ON RIVER ROAD & ADJOINING ROADWAYS,(TEA-21) NFA 2011 0.281 CONST 0.281 AQC:A7 SUFFOLK TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.547 1.547 0.000 0.000 0.000

LOCAL IMPROVE CR80, MONTAUK HIGHWAY, FROM NY112 TO CR101 IN THE TOWN HPP 2011 0.149 CONINSP 0.149 OF BROOKHAVEN. 05 APPROPRIATION SEC 117.NY232 NFA 2011 0.037 CONINSP 0.037 075850 HPP 2011 0.843 CONST 0.843 NFA 2011 0.149 CONST 0.149 AQC:A2P SUFFOLK TPC : $0.6-$1.5 M TOTAL 4YR COST : 1.178 1.178 0.000 0.000 0.000

LOCAL RECONSTRUCT OLD NICHOLS ROAD FROM MORICHES ROAD TO HPP 2011 0.296 CONINSP 0.296 SMITHTOWN BOULEVARD IN THE TOWN OF SMITHTOWN. REPLACE CURBS, NFA 2011 0.074 CONINSP 0.074 075877 SIDEWALKS, DRAINAGE & ADA COMPLIANT RAMPS AS NEEDED FOR PED. HPP 2011 1.927 CONST 1.927 SAFETY,REPAIR DETERIORATED ROAD IN NISSEQUOQUE RIVER NFA 2011 0.482 CONST 0.482 WATERSHED IN SMITHTOWN. NY243 HPP 2011 0.200 DETLDES 0.200 NFA 2011 0.050 DETLDES 0.050 AQC:A10 SUFFOLK TPC : $2-$4 M TOTAL 4YR COST : 3.029 3.029 0.000 0.000 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 8 of 84 for REGION 10 4-YEAR PROGRAM (FFY) AGENCY PROJECT DESCRIPTION TOTAL Starting October 01, 2010 FUND SOURCES FFY 4-YEAR PHASE PIN PROGRAM FFY FFY FFY FFY in millions of dollars 2011 2012 2013 2014 AQ CODE COUNTY TOTAL PROJECT COST

LOCAL ENHANCE AND BEAUTIFY LIGHTING, INSTALL BIKE RACKS AND PLANT HPP 2011 0.043 CONINSP 0.043 STREET TREES ON NY 27/SUNRISE HIGHWAY FROM THE LINE TO NFA 2011 0.011 CONINSP 0.011 075886 THE LYNBROOK BORDER IN THE VILLAGE OF VALLEY STREAM.HPP#1686, HPP 2011 0.918 CONST 0.918 NY 427 NFA 2011 0.230 CONST 0.230 AQC:A18 NASSAU TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.202 1.202 0.000 0.000 0.000

LOCAL RELOCATE OAK BEACH ROAD NORTHWARD TO RESULT IN A HIGHWAY HPP 2011 0.456 CONINSP 0.456 INTERCHANGE AT OCEAN PARKWAY THAT MEETS MODERN DESIGN NFA 2011 0.140 CONINSP 0.140 075887 STANDARDS, IN THE TOWN OF BABYLON.HPP# 690,HPP-1441, HPP#4611 HPP 2011 4.076 CONST 4.076 NFA 2011 1.019 CONST 1.019 HPP 2011 0.001 DETLDES 0.001 HPP 2011 0.491 PRELDES 0.491 NFA 2011 0.200 PRELDES 0.200 AQC:D4 SUFFOLK TPC : $6-$9.4 M TOTAL 4YR COST : 6.383 6.383 0.000 0.000 0.000

LOCAL REHAB. OF VARIOUS VILLAGE STREETS WITHIN THE VILLAGE OF HPP 2011 0.117 CONINSP 0.117 PATCHOGUE.RESURFACING TOTAL OF 2.5 MILES ON VARIOUS VILLAGE NFA 2011 0.029 CONINSP 0.029 075888 ROADS. RESURFACING, EXIST. DRAINAGE SYSTEMS WILL BE REHAB.TO HPP 2011 0.975 CONST 0.975 PREVENT FLOODING, DAMAGED CURB & SIDEWALK WILL BE NFA 2011 0.244 CONST 0.244 REPAIRED.NY628, HPP#3600 HPP 2011 0.078 DETLDES 0.078 NFA 2011 0.020 DETLDES 0.020 HPP 2011 0.021 PRELDES 0.021 NFA 2011 0.005 PRELDES 0.005 AQC:A10 SUFFOLK TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.489 1.489 0.000 0.000 0.000

LOCAL VILLAGE OF PATCHOGUE MAIN STREET PEDESTRIAN SAFETY HPP 2011 0.048 CONINSP 0.048 IMPROVEMENTS INCLUDING CROSSWALKS LIGHTING AND ADA COMPLIANT NFA 2011 0.012 CONINSP 0.012 075889 CURB RAMPS. HPP#2445 HPP 2011 0.394 CONST 0.394 NFA 2011 0.098 CONST 0.098 HPP 2011 0.009 DETLDES 0.009 NFA 2011 0.002 DETLDES 0.002 AQC:C2 SUFFOLK TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.563 0.563 0.000 0.000 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 9 of 84 for REGION 10 4-YEAR PROGRAM (FFY) AGENCY PROJECT DESCRIPTION TOTAL Starting October 01, 2010 FUND SOURCES FFY 4-YEAR PHASE PIN PROGRAM FFY FFY FFY FFY in millions of dollars 2011 2012 2013 2014 AQ CODE COUNTY TOTAL PROJECT COST

LOCAL REPLACED INCOSISTANT AND UNATTRACTIVE SIGNAGE WITH NEW HPP 2011 0.009 CONINSP 0.009 SIGNAGE TO AVOID DETERMINETAL EFFECT TO RESIDENTS AND VISITORS NFA 2011 0.002 CONINSP 0.002 075890 ALONG NY25, CR48 AND SOUND AVE BETWEEN LAUREL TO ORIENT POINT HPP 2011 0.171 CONST 0.171 IN THE TOWN OFSOUTHOLD TOWN, SUFFOLK COUNTY.HPP#741 NFA 2011 0.043 CONST 0.043 HPP 2011 0.010 OPER 0.010 NFA 2011 0.002 OPER 0.002 AQC:C13 SUFFOLK TPC : < $0.75 M TOTAL 4YR COST : 0.237 0.237 0.000 0.000 0.000

LOCAL THE VILLAGE OF HEMPSTEAD IS REPAIRING DAMAGED AND MIS-ALIGNED HPP 2011 0.141 CONINSP 0.141 SIDEWALKS AND CURB AND INSTALLING LIGHTING TO PROVIDE A NFA 2011 0.035 CONINSP 0.035 075895 PEDESTRIAN FRIENDLY ENVIRONMENT& RESURFACE MAIN STREET. HPP 2011 1.180 CONST 1.180 (HPP#1396,NY 269) NFA 2011 0.295 CONST 0.295 AQC:C2 NASSAU TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.651 1.651 0.000 0.000 0.000

LOCAL IMPROVE DETERIORATED PAVEMENT, DRAINAGE TO PREVENT FLOODING, HPP 2011 0.080 CONINSP 0.080 REPLACED DETERIORATED SIDE WALKS FOR PEDESTRIAN SAFETY & NFA 2011 0.020 CONINSP 0.020 075899 IMPROVE TRAFFIC SIGNAL OPERATION ON EAST GATE & WEST GATE HPP 2011 0.669 CONST 0.669 AVENUES FROM STRONG AVE. TO DELAWARE AVE IN VILLAGE OF NFA 2011 0.167 CONST 0.167 LINDENHURST.(NY282) AQC:A10 SUFFOLK TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.936 0.936 0.000 0.000 0.000

LOCAL REHABILITATION OF DETERIORATED PAVEMENT, DRAINGAGE TO PREVENT HPP 2011 0.061 CONINSP 0.061 FLLODING, SIDE WALKS & CURBS FOR PEDESRIAN SAFETY IN NORTH NFA 2011 0.015 CONINSP 0.015 075900 QUEENS AVE FROM GRAND AVE TO FRANK ST AND FROM GRAND AVE HPP 2011 0.505 CONST 0.505 FROM NORTH RAILROAD TO FRANK STREET IN LINDENHURST VILLAGE.(NY NFA 2011 0.126 CONST 0.126 287,HPP#280 AQC:A10 SUFFOLK TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.707 0.707 0.000 0.000 0.000

LOCAL REHABILITATION & RECONSTRUCTION OF DETERIORATED SIDE WALKS, HPP 2011 0.082 CONINSP 0.082 PAVEMENT, DRAINAGE,CURBS TO REGAINS THE INTERGRETY OF ROADWAY NFA 2011 0.021 CONINSP 0.021 075901 IN EAST AND WEST JOHN STREETS FROM NEW YORK AVE TO CENTER HPP 2011 0.685 CONST 0.685 AVENUE IN VILLAGE OF LINDENHURST.(NY 344,HPP#876) NFA 2011 0.171 CONST 0.171 HPP 2011 0.034 DETLDES 0.034 NFA 2011 0.009 DETLDES 0.009 AQC:A10 SUFFOLK TPC : $0.6-$1.5 M TOTAL 4YR COST : 1.002 1.002 0.000 0.000 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 10 of 84 for REGION 10 4-YEAR PROGRAM (FFY) AGENCY PROJECT DESCRIPTION TOTAL Starting October 01, 2010 FUND SOURCES FFY 4-YEAR PHASE PIN PROGRAM FFY FFY FFY FFY in millions of dollars 2011 2012 2013 2014 AQ CODE COUNTY TOTAL PROJECT COST

LOCAL THE TOWN OF SMITHTOWN IS INSTALLING TRAFFIC SIGNAL PREEMPTION HPP 2011 0.008 CONINSP 0.008 DEVICES ON TRAFFIC SIGNALS THROUGHOUT THE TOWN. THESE DEVICES NFA 2011 0.002 CONINSP 0.002 075904 WILL AUTOMATICALLY CHANGE TRAFFIC SIGNALS TO GREEN FOR HPP 2011 0.352 CONST 0.352 EMERGENCY VEHICLE DURING EMERGENCIES. SAFETEA-LU# 3676 NFA 2011 0.088 CONST 0.088 AQC:A7 SUFFOLK TPC : < $0.75 M TOTAL 4YR COST : 0.450 0.450 0.000 0.000 0.000

LOCAL REHABILITATE PAVEMENT, DRAINAGE SYSTEM A, CURB & SIDEWALK TO HPP 2011 0.032 CONINSP 0.032 AVID FLOODING PROBLEM AND PEDESTRIAN SAFETY ON CHURCH STREET NFA 2011 0.008 CONINSP 0.008 075905 BETWEEN NY25A AND KOHR RD IN SMITHTOWN.(HPP#3590,NY622,HPP#2286, HPP 2011 0.336 CONST 0.336 NY 490) NFA 2011 0.084 CONST 0.084 HPP 2011 0.080 DETLDES 0.080 NFA 2011 0.020 DETLDES 0.020 HPP 2011 0.032 SCOPING 0.032 NFA 2011 0.008 SCOPING 0.008 AQC:A10 SUFFOLK TPC : < $0.75 M TOTAL 4YR COST : 0.600 0.600 0.000 0.000 0.000

LOCAL REHABILITATION OF DETERIORATED PAVEMENT,CURBS AND SIDEWALKS HPP 2011 0.236 CONINSP 0.236 FOR RIDERS, PEDESTRIAN SAFETY ON WEST NECK ROAD FROM THE NFA 2011 0.059 CONINSP 0.059 075913 HUNTINGTON-LLOYD HARBOR BOUNDARY TO THE END OF THE VILLAGE IN HPP 2011 1.967 CONST 1.967 THE VILLAGE OF LLOYD HARBOR.HPP # 1675 NFA 2011 0.492 CONST 0.492 HPP 2011 0.197 DETLDES 0.197 NFA 2011 0.049 DETLDES 0.049 AQC:A10 SUFFOLK TPC : $2-$4 M TOTAL 4YR COST : 3.000 3.000 0.000 0.000 0.000

NASSAU CO. REHABILITATION OF BROOKSIDE AVENUE FROM FOREST AVE TO STP LG URBAN 2012 0.400 CONINSP 0.400 GREENWICH STREET IN ROOSEVELT INCLUDES RESURFACING OF NFA 2012 0.100 CONINSP 0.100 075919 DETERIORATED PAVEMENT,DRAINAGE, NEW CURBS, SIDEWALK, DRAINAGE STP LG URBAN 2012 3.600 CONST 3.600 AS WELL AS INTERSECTION TURNING RADII MPROVEMENTS TO IMPROVE NFA 2012 0.900 CONST 0.900 DRIVER SAFETY AQC:D1P NASSAU TPC : $4.6-$7.5 M TOTAL 4YR COST : 5.000 0.000 5.000 0.000 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 11 of 84 for REGION 10 4-YEAR PROGRAM (FFY) AGENCY PROJECT DESCRIPTION TOTAL Starting October 01, 2010 FUND SOURCES FFY 4-YEAR PHASE PIN PROGRAM FFY FFY FFY FFY in millions of dollars 2011 2012 2013 2014 AQ CODE COUNTY TOTAL PROJECT COST

LOCAL RECONSTRUCTION OF BROOKSITE DRIVE FROM NY 25/25A TO RT. 347, HPP 2011 0.048 CONINSP 0.048 RESURFACE DETERIORATED PAVEMENT, REPAIR DRAINAGE SYSTEM NFA 2011 0.012 CONINSP 0.012 075928 PREVENT FLOODING .REPAIR DAMAGED CURBS & SIDEWALKS FOR HPP 2011 0.400 CONST 0.400 PEDESTRAIN AND TRAFFIC SAFETY(NY619 NFA 2011 0.100 CONST 0.100 HPP 2011 0.088 DETLDES 0.088 NFA 2011 0.022 DETLDES 0.022 HPP 2011 0.040 PRELDES 0.040 NFA 2011 0.010 PRELDES 0.010 AQC:A10 SUFFOLK TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.720 0.720 0.000 0.000 0.000

LOCAL HERB HILL/GARVIES POINT ROAD RECONSTRUCTION PROJECT INCLUDING STP LG URBAN 2011 1.497 DETLDES 1.497 PAVING, DRAINAGE AND SIDEWALKS. THIS PROJECT WILL GO FROM THE NFA 2011 0.374 DETLDES 0.374 075934 GLENCOVE CONNECTOR (075745) TO THE PROPOSED FERRY TERMINAL. THIS TCSP 2011 0.534 DETLDES 0.534 1.2 MILE SECTION ABUTTING GLEN COVE CREEK IS AN ACCESS ROAD NFA 2011 0.133 DETLDES 0.133 AQC:A10P NASSAU TPC : $7.5-$12 M TOTAL 4YR COST : 2.538 2.538 0.000 0.000 0.000

LOCAL REPLACE OCEAN BEACH FERRY TERMINAL , FIRE ISLAND NATIONAL FBD 2011 0.249 CONINSP 0.249 SEASHORE WITH NEW SUB & SUPERSTRUCTURE. NEW DECK WILL HOUSE NFA 2011 0.062 CONINSP 0.062 075950 STORAGE FACILITIES, PUBLIC RESTROOMS, BOARD ROOM & POLICE FBD 2011 2.339 CONST 2.339 BARRACKS. ELEVATE STRUCTURE TO RELIEVE MAJOR FLOODING NFA 2011 0.585 CONST 0.585 PROBLEM. FBD 2011 0.160 DETLDES 0.160 NFA 2011 0.040 DETLDES 0.040 FBD 2011 0.060 PRELDES 0.060 NFA 2011 0.015 PRELDES 0.015 AQC:B8 SUFFOLK TPC : $3.3-$5.6 M TOTAL 4YR COST : 3.510 3.510 0.000 0.000 0.000

SUFFOLK CO. DESIGN AND CONSTRUCTION OF NEW COMPRESSED NATURAL GAS FUELING CMAQ 2011 0.400 DETLDES 0.400 STATIONS & ACCESSORY FACILITIES THAT WILL FACILITATE THE NFA 2011 0.100 DETLDES 0.100 075961 CONVERSION OF SUFFOLK COUNTY FLEET VEHICLES TO "GREEN" LESS NFA 2014 2.000 CONST 2.000 POLLUTING VEHICLES AND COUNTY EMPLOYEE CNG FUEL TRAINING PROGRAM. AQC:K01P SUFFOLK TPC : $2-$4 M TOTAL 4YR COST : 2.500 0.500 0.000 0.000 2.000

NASSAU CO. NASSAU COUNTY INCIDENT MANAGEMENT SYSTEM PHASE 2. MAXIMIZES CMAQ 2011 0.144 CONINSP 0.144 THE EFFICIENCY OF TRAFFIC FLOW ALONG MAJOR ARTERIES BY NFA 2011 0.036 CONINSP 0.036 075963 INSTALLING AN INCIDENT MANAGEMENT SYSTEM (VIDEO CAMERAS). CMAQ 2011 1.296 CONST 1.296 (FORMERLY PIN: 0T1938) NFA 2011 0.324 CONST 0.324 AQC:A6P NASSAU TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.800 1.800 0.000 0.000 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 12 of 84 for REGION 10 4-YEAR PROGRAM (FFY) AGENCY PROJECT DESCRIPTION TOTAL Starting October 01, 2010 FUND SOURCES FFY 4-YEAR PHASE PIN PROGRAM FFY FFY FFY FFY in millions of dollars 2011 2012 2013 2014 AQ CODE COUNTY TOTAL PROJECT COST

LOCAL VILLAGE OF NEW HYDE PARK WILL INSTALL A PLANTED MEDIAN AREA FOR HPP 2011 0.160 CONINSP 0.160 .5 MILE AS WELL AS RECONSTRUCT EXISTING SIDEWALKS WITH BRICK NFA 2011 0.040 CONINSP 0.040 075973 PAVERS, INSTALL SIDEWALK LIGHTING AND BENCHES AND TREE PLANTING HPP 2011 1.440 CONST 1.440 FOR PEDESTRIAN SAFETY. NY398 NFA 2011 0.360 CONST 0.360 NFA 2011 0.450 DETLDES 0.450 AQC:C11 NASSAU TPC : $2-$4 M TOTAL 4YR COST : 2.450 2.450 0.000 0.000 0.000

LOCAL TOWN OF HEMPSTEAD REVITALIZE GENERAL BUSINESS DISTRICT IN THE TCSP 2011 0.133 CONST 0.133 VLG. OF CEDARHURST TO UPGRADE A DETERIORATED MAJOR REGIONAL NFA 2011 0.063 CONST 0.063 075976 SHOPPING HUB. THE PROJECT INCLUDES ADDITIONAL STREET LIGHTING,REFURBISH SIDEWALKS, REHAB.DRAINAGE, BRICK CROSS WALKS WAYS PED. & SIGN AQC:A10 NASSAU TPC : < $0.75 M TOTAL 4YR COST : 0.196 0.196 0.000 0.000 0.000

LOCAL MASONRY AND LIGHTING IMPROVEMENTS TO PEDESTRIAN SIDEWALKS TCSP 2011 0.043 CONINSP 0.043 ALONG HEMPSTEAD AVE. BETWEEN LAKEVIEW AVE AND OCEAN AVENUE NFA 2011 0.010 CONINSP 0.010 075977 IN THE VILLAGE OF MALVERNE, NASSAU COUNTY (FORMERLY PIN: 0T2399). TCSP 2011 0.313 CONST 0.313 THIS PROJECT WILL INCREASE PEDESTRIAN/BICYCLE ACTIVITY IN AN NFA 2011 0.078 CONST 0.078 ATTRACTIVE, SAFER, AND ADA COMPLIANT ENVIRONMENT. AQC:A18 NASSAU TPC : < $0.75 M TOTAL 4YR COST : 0.444 0.444 0.000 0.000 0.000

SUFFOLK CO. BRIDGE REPLACEMENT OF CR 46 (WILLIAM FLOYD PARKWAY) OVER STP LG URBAN 2011 0.800 PRELDES 0.800 NARROW BAY,DUE TO STRUCTURAL DEFICIENCIES AND IMPROVE NFA 2011 0.200 PRELDES 0.200 075978 ALIGNMENT, IN THE TOWN OF BROOKHAVEN. BIN 3300770. STP LG URBAN 2012 0.800 SCOPING 0.800 NFA 2012 0.200 SCOPING 0.200 HBRR 2014 6.000 DETLDES 6.000 NFA 2014 1.500 DETLDES 1.500 AQC:J1Z SUFFOLK TPC : $7.5-$12 M TOTAL 4YR COST : 9.500 1.000 1.000 0.000 7.500

SUFFOLK CO. CR16, HORSEBLOCK ROAD/LIRR BRIDGE REPLACEMENT DUE TO STP LG URBAN 2011 0.680 PRELDES 0.680 STRUCTURAL DEFICIENCIES, IN THE TOWN OF BROOKHAVEN. BIN 3300800. NFA 2011 0.170 PRELDES 0.170 075979 HBRR 2014 1.018 CONINSP 1.018 NFA 2014 0.254 CONINSP 0.254 HBRR 2014 10.182 CONST 10.182 NFA 2014 2.545 CONST 2.545 AQC:A19P SUFFOLK TPC : $21-$31 M TOTAL 4YR COST : 14.849 0.850 0.000 0.000 13.999 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 13 of 84 for REGION 10 4-YEAR PROGRAM (FFY) AGENCY PROJECT DESCRIPTION TOTAL Starting October 01, 2010 FUND SOURCES FFY 4-YEAR PHASE PIN PROGRAM FFY FFY FFY FFY in millions of dollars 2011 2012 2013 2014 AQ CODE COUNTY TOTAL PROJECT COST

NASSAU CO. CONSTRUCT ACCESS ROAD AND EXIT LANES FOR CENTER FOR ADVANCED HPP 2011 0.179 CONINSP 0.179 MEDICINE OF LIJ HOSPITAL ON LAKEVILLE ROAD. SAFETEA-LU #2575, NY NFA 2011 0.045 CONINSP 0.045 075980 525. THE PRIMARY ACCESS ROAD TO THE FACILITY ON THE WESTSIDE OF HPP 2011 1.433 CONST 1.433 LAKEVILLE ROAD WILL ENLARGED WITH EXTRA LANE. NFA 2011 0.358 CONST 0.358 HPP 2011 0.159 DETLDES 0.159 NFA 2011 0.040 DETLDES 0.040 HPP 2011 0.020 PRELDES 0.020 NFA 2011 0.005 PRELDES 0.005 AQC:J1Z NASSAU TPC : $2-$4 M TOTAL 4YR COST : 2.239 2.239 0.000 0.000 0.000

NASSAU CO. NASSAU COUNTY RESURFACING 2011. REHABILITAE EXISTING ROAD STP LG URBAN 2011 3.000 CONST 3.000 PAVEMENTS IN ORDER TO PROVIDE FOR BETTER AND SAFTER SURFACES NFA 2011 0.750 CONST 0.750 075981

AQC:A10P NASSAU TPC : $3.3-$5.6 M TOTAL 4YR COST : 3.750 3.750 0.000 0.000 0.000

LOCAL THE TOWN OF BROOKHAVEN IS RESURFACING VARIOUS ROADWAYS IN HPP 2011 0.027 CONINSP 0.027 MASTIC BEACH. THESE ROADS HAVE DETERIORATED TO THE POINT THAT NFA 2011 0.007 CONINSP 0.007 075982 PAVEMENT RESURFACING IS NECESSARY TO MAINTAIN THE CURRENT HPP 2011 0.248 CONST 0.248 TRANSPORTATION SYSTEM.HPP#3601,NY 629 NFA 2011 0.062 CONST 0.062 AQC:A10 SUFFOLK TPC : < $0.75 M TOTAL 4YR COST : 0.344 0.344 0.000 0.000 0.000

LOCAL THE TOWN OF BROOKHAVEN IS RESURFACING TOTAL 2.8 MILES IN OLD HPP 2011 0.029 CONINSP 0.029 TOWN RD. FROM RTE 347 TO SLATTERY RD.THESE ROADS ARE NFA 2011 0.007 CONINSP 0.007 075983 DETERIORATED TO THE POINT THAT PAVEMENT RESURFACING IS HPP 2011 0.261 CONST 0.261 NECESSARY TO MAINTAIN THE CURRENT TRANSPORTATION SYSTEM, NFA 2011 0.065 CONST 0.065 NY623 AQC:A10 SUFFOLK TPC : < $0.75 M TOTAL 4YR COST : 0.362 0.362 0.000 0.000 0.000

LOCAL THE TOWN OF BROOKHAVEN IS RESURFACING 3.33 MILES OF ROADWAYS IN HPP 2011 0.034 CONINSP 0.034 THE HAMLET OF MEDFORD. THESE ROADS ARE DETERIORATED TO THE NFA 2011 0.009 CONINSP 0.009 075984 POINT THAT PAVEMENT IMPROVEMENT IS NECESSARY TO MAINTAIN THE HPP 2011 0.310 CONST 0.310 CURRENT TRANSPORTATION SYSTEM. NY626 NFA 2011 0.077 CONST 0.077 AQC:A10 SUFFOLK TPC : < $0.75 M TOTAL 4YR COST : 0.430 0.430 0.000 0.000 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 14 of 84 for REGION 10 4-YEAR PROGRAM (FFY) AGENCY PROJECT DESCRIPTION TOTAL Starting October 01, 2010 FUND SOURCES FFY 4-YEAR PHASE PIN PROGRAM FFY FFY FFY FFY in millions of dollars 2011 2012 2013 2014 AQ CODE COUNTY TOTAL PROJECT COST

LOCAL THE TOWN OF BROOKHAVEN IN HAMLET OF GORDON HEIGHT INSTALLING HPP 2011 0.029 CONINSP 0.029 SIDE WALKS, CURBS WHERE DOES NOT EXIST AND DRAINGAGE SYSTEM TO NFA 2011 0.008 CONINSP 0.008 075985 PREVENT WATER FILTERATION ON SIDE WALKS AND CURBS. NY 627 HPP 2011 0.266 CONST 0.266 NFA 2011 0.067 CONST 0.067 AQC:C2 SUFFOLK TPC : < $0.75 M TOTAL 4YR COST : 0.370 0.370 0.000 0.000 0.000

LOCAL GLEN COVE FERRY TERMINAL & BOAT BASIN PHASE 2 - THE FBD 2011 0.195 CONINSP 0.195 CONSTRUCTION OF A FERRY TERMINAL BUILDING. NFA 2011 0.744 CONINSP 0.744 075986 FBD 2011 1.755 CONST 1.755 NFA 2011 0.439 CONST 0.439 AQC:B10 NASSAU TPC : $2-$4 M TOTAL 4YR COST : 3.133 3.133 0.000 0.000 0.000

SUFFOLK CO. INTERSECTION RECONSTRUCTION AT CR3, PINELAWN ROAD/RULAND HPP 2011 1.776 ROWACQU 1.776 ROAD/COLONIAL SPRINGS ROAD INCLUDING ADDING A LANE EACH NFA 2011 0.444 ROWACQU 0.444 075987 DIRECTION ON COLONIAL SPRING RD. APPROXIMATELY 3,500 FEET FROM STP LG URBAN 2012 1.025 CONINSP 1.025 THE INTERSECTION TO LITTLE EAST NECK ROAD, IN THE TOWN OF NFA 2012 0.256 CONINSP 0.256 HUNTINGTON ACT600 STP LG URBAN 2012 9.225 CONST 9.225 NFA 2012 2.306 CONST 2.306 AQC:D1P SUFFOLK TPC : $12.5-$19 M TOTAL 4YR COST : 15.032 2.220 12.812 0.000 0.000

LOCAL HOFSTRA UNIVERSITY IS RESURFACE AND UPGRADE THE PARKING LOTS, TCSP 2011 0.580 CONST 0.580 INSTALL SIGNAGE , PUT NEW SIDE WALKS TO ENHANCE PEDESTRIAN FLOW NFA 2011 0.145 CONST 0.145 075988 THROUGHOUT CAMPUS & PROMOTE SAFETY & BUILD PEDESTRIAN BRIDGE UNIFYING HOFSTRA UNIVERSITYS CAMPUS ON THE NORTH & SOUTH SIDE AQC:A10 NASSAU TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.725 0.725 0.000 0.000 0.000

LOCAL HOFSTRA UNIVERSITY SAFE AND SUSTANINABLE PROJECTS- PURCHASES TCSP 2011 0.184 CONST 0.184 CNG SHUTTLE BUSES FOR SOUTH AND NORTH CAMPUS. (SPLIT FROM NFA 2011 0.046 CONST 0.046 075989 PIN#075988)TCSP08NY001UNIFYING HOFSTRA UNIVERSITYS CAMPUS ON THE NORTH & SOUTH SIDE AQC:A10 NASSAU TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.230 0.230 0.000 0.000 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 15 of 84 for REGION 10 4-YEAR PROGRAM (FFY) AGENCY PROJECT DESCRIPTION TOTAL Starting October 01, 2010 FUND SOURCES FFY 4-YEAR PHASE PIN PROGRAM FFY FFY FFY FFY in millions of dollars 2011 2012 2013 2014 AQ CODE COUNTY TOTAL PROJECT COST

NYSDOT LONG ISLAND COMMUTER CHOICE: CONTINUE TRAVEL DEMAND CMAQ 2011 2.000 OPER 2.000 MANAGEMENT CONSULTANT PROGRAM TO REDUCE TRAVEL DEMAND IN NFA 2011 0.500 OPER 0.500 080395 NASSAU AND SUFFOLK COUNTY CMAQ 2012 2.000 OPER 2.000 NFA 2012 0.500 OPER 0.500 CMAQ 2013 2.000 OPER 2.000 NFA 2013 0.500 OPER 0.500 CMAQ 2014 2.000 OPER 2.000 NFA 2014 0.500 OPER 0.500 AQC:NON MULTI TPC : $21-$31 M TOTAL 4YR COST : 10.000 2.500 2.500 2.500 2.500

NYSDOT PROVIDE ACCESS SIGNS ON LOCAL ROADS TO NY25 IN THE TOWN OF NFA 2012 0.322 CONINSP 0.322 OYSTER BAY, I495 IN THE TOWN OF ISLIP, NSP IN THE TOWN OF NFA 2012 3.225 CONST 3.225 080429 HUNTINGTON AND NY27 IN THE TOWNS OF BABYLON, BROOKHAVEN & SOUTHAMPTON , NASSAU & SUFFOLK COUNTIES. AQC:C13P MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 3.547 0.000 3.547 0.000 0.000

NYSDOT PROVIDE SAFETY IMPROVEMENTS AT INTERCHANGES (LOCATIONS NFA 2011 0.215 PRELDES 0.215 TO-BE-DETERMINED) ON VARIOUS STATE HIGHWAYS & PARKWAYS IN NFA 2012 0.506 CONINSP 0.506 080434 NASSAU & SUFFOLK COUNTIES. NFA 2012 5.058 CONST 5.058 AQC:A6P MULTI TPC : $4.6-$7.5 M TOTAL 4YR COST : 5.779 0.215 5.564 0.000 0.000

NYSDOT BRIDGE PARAPET REPLACEMENTS TO UPGRADE NON STANDARD PAPRAPET HBRR 2013 0.609 CONINSP 0.609 AND APPROACH GUIDERAIL AND INSTALLATION OF PEDESTRIAN FENCING NFA 2013 0.450 CONINSP 0.450 080495 (LOCATIONS TO BE DETERMINED) ON VARIOUS STATE HIGHWAYS & PKWYS HBRR 2013 6.090 CONST 6.090 IN THE TOWNS OF HEMPSTEAD, N. HEMPSTEAD & OYSTER BAY, NASSAU NFA 2013 4.501 CONST 4.501 COUNTY AQC:A19P MULTI TPC : $9.5-15.5 M TOTAL 4YR COST : 11.650 0.000 0.000 11.650 0.000

NYSDOT INCIDENT MANAGEMENT--HELP VEHICLES ON THE LONG ISLAND CMAQ 2011 2.400 OPER 2.400 EXPRESSWAY AND PARKWAYS TO REDUCE THE HIGHWAY CONGESTION. NFA 2011 0.600 OPER 0.600 080556 NASSAU AND SUFFOLK COUNTY CMAQ 2013 2.400 OPER 2.400 NFA 2013 0.600 OPER 0.600 AQC:A6P MULTI TPC : $9.5-15.5 M TOTAL 4YR COST : 6.000 3.000 0.000 3.000 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 16 of 84 for REGION 10 4-YEAR PROGRAM (FFY) AGENCY PROJECT DESCRIPTION TOTAL Starting October 01, 2010 FUND SOURCES FFY 4-YEAR PHASE PIN PROGRAM FFY FFY FFY FFY in millions of dollars 2011 2012 2013 2014 AQ CODE COUNTY TOTAL PROJECT COST

NASSAU CO. IMP. OF PRG TO REDUCE THE # OF SOV ON THE RD DURING COMM. HRS. ACT NFA 2011 0.160 MISC 0.160 AS AN INFORM. RESOURCE FOR LOC GOVTS AND PVT INDUSTRIES INT. IN 080634 EST. CAR/VANPOOLING, PREF PARKING, GUAR. RIDE HOME PGMS, FLEXTIME, ENC. EMP. USE OF PUB TRANSIT & THE ADOPT OF IRC SECT.132. THIS PROJECT ATTEMPTS TO PROMOTE ALTERNATIVES TO SOV USE THROUGH EMPLOYER/EMPLOYEE PROMOTIONAL CAMPAIGNS FOCUSED TOWARD LARGE EMPLOYERS (ORGANIZATIONS WITH OVER 500 EMPLOYEES) THROUGHOUT NASSAU COUNTY. AQC:C1P NASSAU TPC : $1.2-$2.5 M TOTAL 4YR COST : 0.160 0.160 0.000 0.000 0.000

NYSDOT SUFFOLK EXPRESS COMMUTER BUS SERVICE ALONG THE LONG ISLAND STP FLEX 2011 0.752 OPER 0.752 EXPRESSWAY I495 FROM CENTERAL SUFFOLK COUNTY TO THE HAUPPAUGE NFA 2011 0.300 OPER 0.300 080659 INDUSTRIAL PARK AND NY 110 CORRIDOR STP FLEX 2012 0.752 OPER 0.752 NFA 2012 0.188 OPER 0.188 STP FLEX 2013 0.752 OPER 0.752 NFA 2013 0.188 OPER 0.188 STP FLEX 2014 0.806 OPER 0.806 NFA 2014 0.200 OPER 0.200 AQC:B1P SUFFOLK TPC : $4.6-$7.5 M TOTAL 4YR COST : 3.938 1.052 0.940 0.940 1.006

NYSDOT INTELLIGENT TRANSPORTATION SERVICE PERSONAL SERVICE NHS 2011 4.000 OPER 4.000 CONSULTANT CONTRACT TO PROVIDE SUPPORT STAFF TO INFORM NFA 2011 1.000 OPER 1.000 080665 OPERATIONS NHS 2012 3.200 OPER 3.200 NFA 2012 0.800 OPER 0.800 NHS 2013 4.000 OPER 4.000 NFA 2013 1.000 OPER 1.000 NHS 2014 4.000 OPER 4.000 NFA 2014 1.000 OPER 1.000 AQC:A6P MULTI TPC : $26-$40 M TOTAL 4YR COST : 19.000 5.000 4.000 5.000 5.000

NYSDOT ANNUAL PROGRAM TO PROVIDE STAFF TO OPERATE THE INFORM CONTROL NHS 2011 1.440 OPER 1.440 CENTER IN HAUPPAUGUE, SUFFOLK COUNTY NFA 2011 0.360 OPER 0.360 080676 CMAQ 2014 2.800 OPER 2.800 NFA 2014 0.700 OPER 0.700 AQC:A7P MULTI TPC : $21-$31 M TOTAL 4YR COST : 5.300 1.800 0.000 0.000 3.500 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 17 of 84 for REGION 10 4-YEAR PROGRAM (FFY) AGENCY PROJECT DESCRIPTION TOTAL Starting October 01, 2010 FUND SOURCES FFY 4-YEAR PHASE PIN PROGRAM FFY FFY FFY FFY in millions of dollars 2011 2012 2013 2014 AQ CODE COUNTY TOTAL PROJECT COST

NYSDOT PROVIDE MAINTENANCE TO COMMUNICATION EQUIPMENT INCL. ALL NHS 2012 2.000 OPER 2.000 COMPUTERIZED TRAFFIC MANAGEMENT SYSTEMS, VIDEO SURVEILLANCE NFA 2012 0.500 OPER 0.500 080720 & DETECTORS, VARIABLE MESSAGE SIGNS, CLOSED CIRCUIT TELEVISIONS, NHS 2013 1.200 OPER 1.200 HIGHWAY ADVISORY RADIO & RELATED EQUIP. TO MAINT. STATE OF GOOD NFA 2013 0.300 OPER 0.300 REPAIR NHS 2014 1.200 OPER 1.200 NFA 2014 0.300 OPER 0.300 AQC:A10P MULTI TPC : $9.5-15.5 M TOTAL 4YR COST : 5.500 0.000 2.500 1.500 1.500

NYSDOT PROVIDE ENGINEERING SERVICES & CONSTRUCTION SUPPORT FOR THE NHS 2011 2.000 PRELDES 2.000 INFORM SYSTEM NFA 2011 0.500 PRELDES 0.500 080730 NHS 2012 2.000 PRELDES 2.000 NFA 2012 0.500 PRELDES 0.500 NHS 2013 2.000 PRELDES 2.000 NFA 2013 0.500 PRELDES 0.500 NHS 2014 2.200 PRELDES 2.200 NFA 2014 0.550 PRELDES 0.550 AQC:A7P MULTI TPC : $26-$40 M TOTAL 4YR COST : 10.250 2.500 2.500 2.500 2.750

NYSDOT TRAFFIC ENGINEERING AND SAFETY STUDIES, VARIOUS LOCATIONS HSIP 2012 1.827 SCOPING 1.827 THROUGHOUT NASSAU AND SUFFOLK COUNTIES. NFA 2012 0.203 SCOPING 0.203 080732

AQC:C3 MULTI TPC : $2-$4 M TOTAL 4YR COST : 2.030 0.000 2.030 0.000 0.000

NYSDOT TRAFFIC SIGNAL TIMING AND ARTERIAL OPTIMIZATION VARIOUS STATE CMAQ 2011 1.200 OPER 1.200 HIGHWAYS IN NASSAU COUNTY NFA 2011 0.300 OPER 0.300 080768 CMAQ 2013 1.200 OPER 1.200 NFA 2013 0.300 OPER 0.300 AQC:A7P NASSAU TPC : $3.3-$5.6 M TOTAL 4YR COST : 3.000 1.500 0.000 1.500 0.000

NYSDOT SIGNAL TIMING UPGRADE AND ARTERIAL OPTIMIZATION VARIOUS STATE CMAQ 2011 1.200 OPER 1.200 HIGHWAYS IN SUFFOLK COUNTY NFA 2011 0.300 OPER 0.300 080769 CMAQ 2013 1.200 OPER 1.200 NFA 2013 0.300 OPER 0.300 AQC:A7P SUFFOLK TPC : $3.3-$5.6 M TOTAL 4YR COST : 3.000 1.500 0.000 1.500 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 18 of 84 for REGION 10 4-YEAR PROGRAM (FFY) AGENCY PROJECT DESCRIPTION TOTAL Starting October 01, 2010 FUND SOURCES FFY 4-YEAR PHASE PIN PROGRAM FFY FFY FFY FFY in millions of dollars 2011 2012 2013 2014 AQ CODE COUNTY TOTAL PROJECT COST

NYSDOT DEDICATED STATE POLICE SERVICES TO HELP LANE CLOSURES DURING NFA 2011 0.400 MISC 0.400 MAINTENANCE OPERATIONS ON VARIOUS STATE PARKWAYS IN NASSAU NFA 2012 0.400 MISC 0.400 080787 AND SUFFOLK COUNTIES NFA 2013 0.400 MISC 0.400 NFA 2014 0.400 MISC 0.400 AQC:A2P MULTI TPC : $2-$4 M TOTAL 4YR COST : 1.600 0.400 0.400 0.400 0.400

NYSDOT CONSTRUCT REMAINING SECTIONS OF RECREATIONAL TRAIL ALONG THE NFA 2012 0.084 CONINSP 0.084 UNDEVELOPED NY25A BYPASS ROW - PHASE 2 POSSUM LANE TO NY112 AND NFA 2012 0.833 CONST 0.833 080797 NY25A TO GNARLED HOLLOW RD IN BROOKHAVEN TOWN, SUFFOLK COUNTY. AQC:C2P SUFFOLK TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.917 0.000 0.917 0.000 0.000

NYSDOT CORRECT PRIORITY HIGHWAY FLOODING LOCATIONS AND REPLACE CATCH STP FLEX 2011 0.759 CONINSP 0.759 BASINS WITHIN ESTUARY WATERSHED AREAS WITH VORTEX TYPE BASINS NFA 2011 0.190 CONINSP 0.190 080810 ON VARIOUS STATE HIGHWAYS IN NASSAU & SUFFOLK COUNTIES. STP FLEX 2011 7.589 CONST 7.589 NFA 2011 1.900 CONST 1.900 AQC:A2P MULTI TPC : $9.5-15.5 M TOTAL 4YR COST : 10.438 10.438 0.000 0.000 0.000

NYSDOT BRIDGE PARAPET REPLACEMENTS TO MAINTAIN STATE OF GOOD REPAIR IN NFA 2012 1.246 CONINSP 1.246 THE TOWNS OF BABYLON, HEMPSTEAD & ISLIP, NASSAU & SUFFOLK NFA 2012 12.460 CONST 12.460 080812 COUNTIES. AQC:A19P MULTI TPC : $12.5-$19 M TOTAL 4YR COST : 13.706 0.000 13.706 0.000 0.000

NYSDOT PROVIDE MAINTENANCE TO COMMUNICATION EQUIPMENT INCLUD. ALL NHS 2012 5.600 OPER 5.600 COMPUTERIZED TRAFFIC MANAGEMENT SYSTEMS, VIDEO SURVEILLANCE NFA 2012 1.400 OPER 1.400 080814 & DETECTORS, VARIABLE MESSAGE SIGNS, HIGHWAY ADVISORY RADIO & NHS 2013 5.600 OPER 5.600 RELATED EQUIP. TO MAINT. STATE OF GOOD REPAIR IN NASSAU AND NFA 2013 1.400 OPER 1.400 SUFFOLK CO. AQC:A6P MULTI TPC : $26-$40 M TOTAL 4YR COST : 14.000 0.000 7.000 7.000 0.000

NYSDOT CORRECT PRIORITY HIGHWAY FLOODING LOCATIONS AND REPLACE CATCH STP FLEX 2012 0.430 CONINSP 0.430 BASINS WITHIN ESTUARY WATERSHED AREAS WITH VORTEX TYPE BASINS NFA 2012 0.107 CONINSP 0.107 080821 ON VARIOUS STATE HIGHWAYS IN NASSAU & SUFFOLK COUNTIES. STP FLEX 2012 4.300 CONST 4.300 NFA 2012 1.075 CONST 1.075 AQC:A2P MULTI TPC : $6-$9.4 M TOTAL 4YR COST : 5.912 0.000 5.912 0.000 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 19 of 84 for REGION 10 4-YEAR PROGRAM (FFY) AGENCY PROJECT DESCRIPTION TOTAL Starting October 01, 2010 FUND SOURCES FFY 4-YEAR PHASE PIN PROGRAM FFY FFY FFY FFY in millions of dollars 2011 2012 2013 2014 AQ CODE COUNTY TOTAL PROJECT COST

NYSDOT INTERSECTION SAFETY IMPROVEMENTS TO EXTEND ACCELERATION AND CMAQ 2011 0.209 PRELDES 0.209 DECELERATION LANES NORTHERN STATE PARKWAY AT NY135, SOUTHERN NFA 2011 0.052 PRELDES 0.052 080823 STATE PARKWAY AT EAGLE AVENUE, NSP AT WILLIS AVENUE, SUNKEN CMAQ 2013 0.172 CONINSP 0.172 MEADOW PARKWAY AT NORTHERN STATE PARKWAY, NSP AT SO OYSTER NFA 2013 0.043 CONINSP 0.043 BAY RD CMAQ 2013 1.720 CONST 1.720 NFA 2013 0.430 CONST 0.430 HSIP 2013 0.270 CONINSP 0.270 NFA 2013 0.068 CONINSP 0.068 HSIP 2013 2.700 CONST 2.700 NFA 2013 0.300 CONST 0.300 AQC:D2P MULTI TPC : $4.6-$7.5 M TOTAL 4YR COST : 5.964 0.261 0.000 5.703 0.000

NYSDOT REIMBURSEMENTS FOR NASSAU POLICE FOR CONSTRUCTION AND NFA 2011 0.650 MISC 0.650 MAINTENANCE OPERATIONS NFA 2012 0.650 MISC 0.650 080825 NFA 2013 0.650 MISC 0.650 NFA 2014 0.650 MISC 0.650 AQC:A2S NASSAU TPC : $3.3-$5.6 M TOTAL 4YR COST : 2.600 0.650 0.650 0.650 0.650

NYSDOT REIMBURSEMENT FOR SUFFOLK COUNTY POLICE WORK FOR NFA 2011 0.650 MISC 0.650 CONSTRUCTION AND MAINTENANCE OPERATIONS NFA 2012 0.650 MISC 0.650 080826 NFA 2013 0.650 MISC 0.650 NFA 2014 0.650 MISC 0.650 AQC:A2S SUFFOLK TPC : $3.3-$5.6 M TOTAL 4YR COST : 2.600 0.650 0.650 0.650 0.650

NYSDOT RESTORE THE STRUCTURAL INTEGRITY OF DRAINAGE BASINS AND PIPES, NFA 2011 0.743 PRELDES 0.743 AND CONTROL FLOODING AT 8 LOCATIONS ON VARIOUS STATE ROADWAYS STP FLEX 2014 0.441 CONINSP 0.441 080838 IN THE TOWNS OF BABYLON, HUNTINGTON & ISLIP IN SUFFOLK COUNTY. NFA 2014 0.110 CONINSP 0.110 STP FLEX 2014 4.407 CONST 4.407 NFA 2014 1.102 CONST 1.102 AQC:C11P MULTI TPC : $6-$9.4 M TOTAL 4YR COST : 6.803 0.743 0.000 0.000 6.060

NYSDOT PROVIDE LANDSCAPE RESTORATION & MAINTAIN EXISTING LANDSCAPE NFA 2011 0.238 CONINSP 0.238 AREAS, TRIM OR REMOVE TREES THAT IMPEDE VISIBILITY ON VARIOUS NFA 2011 1.983 CONST 1.983 080847 STATE HIGHWAYS IN NASSAU & SUFFOLK COUNTIES. LOCATIONS TO BE DETERMINED. AQC:C11S MULTI TPC : $2-$4 M TOTAL 4YR COST : 2.221 2.221 0.000 0.000 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 20 of 84 for REGION 10 4-YEAR PROGRAM (FFY) AGENCY PROJECT DESCRIPTION TOTAL Starting October 01, 2010 FUND SOURCES FFY 4-YEAR PHASE PIN PROGRAM FFY FFY FFY FFY in millions of dollars 2011 2012 2013 2014 AQ CODE COUNTY TOTAL PROJECT COST

NYSDOT REPAIR AND REPLACE GUIDERAIL SECTIONS ON SOUTHERN STATE NFA 2011 1.040 CONINSP 1.040 PARKWAY AND OCEAN PARKWAY TO MAINTAIN A STATE OF GOOD REPAIR NFA 2011 10.400 CONST 10.400 080852 IN THE TOWNS OF BABYLON, HEMPSTEAD, ISLIP & OYSTER BAY - NASSAU & SUFFOLK COUNTIES. AQC:A9P NASSAU TPC : $9.5-15.5 M TOTAL 4YR COST : 11.440 11.440 0.000 0.000 0.000

NYSDOT DRAINAGE IMPROVEMENT BLOCK - CORRECT DEBILITATED DRAINAGE STP LG URBAN 2011 0.199 CONINSP 0.199 SYSTEMS OR INDIVIDUAL BASINS, RESTORE STRUCTURAL INTEGRITY OF NFA 2011 0.050 CONINSP 0.050 080857 DRAINAGE STRUCTURES/PIPES, CONTROL FLOODING ON ROUTES 24, 102 STP LG URBAN 2011 1.616 CONST 1.616 AND 25 IN HEMPSTEAD & N. HEMPSTEAD TOWNS IN NASSAU COUNTY. NFA 2011 0.404 CONST 0.404 AQC:A2P NASSAU TPC : $2-$4 M TOTAL 4YR COST : 2.269 2.269 0.000 0.000 0.000

NYSDOT DRAINAGE IMPROVEMENT BLOCK - CORRECT DEBILITATED DRAINAGE STP LG URBAN 2011 0.068 CONINSP 0.068 SYSTEMS OR INDIVIDUAL BASINS, RESTORE STRUCTURAL INTEGRITY OF NFA 2011 0.340 CONINSP 0.340 080858 DRAINAGE STRUCTURES/PIPES, CONTROL FLOODING ON ROUTES 25 AND STP LG URBAN 2011 0.675 CONST 0.675 908K IN SUFFOLK COUNTY NFA 2011 3.537 CONST 3.537 AQC:A2P SUFFOLK TPC : $4.6-$7.5 M TOTAL 4YR COST : 4.620 4.620 0.000 0.000 0.000

NYSDOT REPAIR DETERIORATED STEEL GIRDER, INCREASE STRUCTURAL IM 2011 0.594 CONINSP 0.594 CONDITION, REMOVAL STRUCTURE FLAGS AND INCREASE THEIR RATINGS NFA 2011 1.192 CONINSP 1.192 080860 ON 16 BRIDGES IN NASSAU AND SUFFOLK COUNTIES. IM 2011 5.374 CONST 5.374 NFA 2011 11.929 CONST 11.929 AQC:C19P MULTI TPC : $15-$25 M TOTAL 4YR COST : 19.089 19.089 0.000 0.000 0.000

NYSDOT REPLACE PANELS OF OVERHEAD SIGNS WITH NEWER MORE RETRO NFA 2012 1.180 CONINSP 1.180 REFLECTIVE SIGNS TO MAINTAIN STATE OF GOOD REPAIR ON FEDERAL AID NFA 2012 11.800 CONST 11.800 080861 HIGHWAYS IN NASSAU AND SUFFOLK COUNTIES. AQC:C13P MULTI TPC : $9.5-15.5 M TOTAL 4YR COST : 12.980 0.000 12.980 0.000 0.000

NYSDOT REHABILITATION AND REPAIR 10 CONCRETE ARCH BRIDGES TO MAINTAIN NFA 2011 0.700 CONINSP 0.700 STRUCTURAL INTEGRITY IN BABYLON TOWN, HEMPSTEAD TOWN, NFA 2011 7.000 CONST 7.000 080863 HUNTINGTON TOWN & OYSTER BAY TOWN IN NASSAU & SUFFOLK COUNTIES. AQC:A19Z MULTI TPC : $7.5-$12 M TOTAL 4YR COST : 7.700 7.700 0.000 0.000 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 21 of 84 for REGION 10 4-YEAR PROGRAM (FFY) AGENCY PROJECT DESCRIPTION TOTAL Starting October 01, 2010 FUND SOURCES FFY 4-YEAR PHASE PIN PROGRAM FFY FFY FFY FFY in millions of dollars 2011 2012 2013 2014 AQ CODE COUNTY TOTAL PROJECT COST

NYSDOT PREVENTATIVE MAINTENANCE BRIDGE REPAIRS TO MAINTAIN HBRR 2012 0.207 CONINSP 0.207 STRUCTURAL INTEGRITY IN NASSAU & SUFFOLK COUNTIES. (FORMERLY NFA 2012 0.052 CONINSP 0.052 080865 PIN: 0T1465) HBRR 2012 1.721 CONST 1.721 NFA 2012 0.431 CONST 0.431 AQC:A19P MULTI TPC : $2-$4 M TOTAL 4YR COST : 2.411 0.000 2.411 0.000 0.000

NYSDOT REHABILITATE 15 RECHARGE BASINS TO MAINTAIN STATE OF GOOD REPAIR NFA 2011 0.253 CONINSP 0.253 ON VARIOUS STATE HIGHWAYS IN BABYLON TOWN & HUNTINGTON TOWN NFA 2011 2.112 CONST 2.112 080866 IN SUFFOLK COUNTY. AQC:A2S MULTI TPC : $2-$4 M TOTAL 4YR COST : 2.365 2.365 0.000 0.000 0.000

NYSDOT CLEAN CULVERTS FILLED WITH DEBRIS, REPAIR DAMAGED OR IN-NEED NFA 2011 0.238 CONINSP 0.238 CULVERTS TO PREVENT HIGHWAY FLOODING ON VARIOUS STATE NFA 2011 1.984 CONST 1.984 080870 HIGHWAYS IN NASSAU & SUFFOLK COUNTIES. AQC:A6S MULTI TPC : $2-$4 M TOTAL 4YR COST : 2.222 2.222 0.000 0.000 0.000

NYSDOT REMOVAL OR PAINT OVER OF GRAF, REPAIR NOISE WALLS WHERE WOOD NFA 2011 0.322 CONINSP 0.322 &/OR PLASTIC PLANKING HAS WARPED, MAINTAIN THE 7 PARK & RIDE LOTS NFA 2011 3.219 CONST 3.219 080872 ALONG I495, ALL NYS BIKEWAYS, REST AREAS, PUBLIC TELEPHONE AREAS ALONG PARKWAYS & BUS SHELTERS ON NYS RIGHT-OF-WAY NAS&SUF CO. AQC:C8S MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 3.541 3.541 0.000 0.000 0.000

NYSDOT IMPROVE DEBILITATED DRAINAGE SYSTEMS AND ISOLATED FLOODING NFA 2011 0.638 DETLDES 0.638 AREAS; CONTROL FLOODING TO PROMOTE SAFER TRAFFIC MOVEMENT; NFA 2011 0.051 SCOPING 0.051 080874 IMPROVE QUALITY OF HIGHWAY RUNOFF TO ADJACENT SURFACE WATERS NFA 2013 1.150 ROWACQU 1.150 IN THE TOWNS OF E. HAMPTON, RIVERHEAD, SOUTHAMPTON & SOUTHOLD, NFA 2014 0.681 CONINSP 0.681 SUFFOLK CO. NFA 2014 6.809 CONST 6.809 AQC:A2P SUFFOLK TPC : $7.5-$12 M TOTAL 4YR COST : 9.329 0.689 0.000 1.150 7.490

NYSDOT RESPOND TO EMERGENCIES THAT ARE BEYOND THE CAPABILITIES OF NYS NFA 2011 0.249 CONINSP 0.249 MAINTENANCE FORCES TO ENSURE THE SAFETY OF THE PUBLIC ON NFA 2011 2.077 CONST 2.077 080875 VARIOUS STATE HIGHWAYS IN NASSAU & SUFFOLK COUNTIES. AQC:A2S MULTI TPC : $2-$4 M TOTAL 4YR COST : 2.326 2.326 0.000 0.000 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 22 of 84 for REGION 10 4-YEAR PROGRAM (FFY) AGENCY PROJECT DESCRIPTION TOTAL Starting October 01, 2010 FUND SOURCES FFY 4-YEAR PHASE PIN PROGRAM FFY FFY FFY FFY in millions of dollars 2011 2012 2013 2014 AQ CODE COUNTY TOTAL PROJECT COST

NYSDOT PROVIDE BRIDGE REPAIRS ON AN AS-NEEDED OR EMERGENCY BASIS ON NFA 2011 0.258 CONINSP 0.258 VARIOUS STATE HIGHWAYS IN NASSAU & SUFFOLK COUNTIES. NFA 2011 2.147 CONST 2.147 080876

AQC:A19S MULTI TPC : $2-$4 M TOTAL 4YR COST : 2.405 2.405 0.000 0.000 0.000

NYSDOT PROVIDE FOR AMERICANS WITH DISABILITES ACT REQUIREMENTS, NFA 2012 0.267 CONINSP 0.267 INCLUDING ADDITIONAL SIGNING, PAVEMENT MARKINGS, REPAIR NFA 2012 2.223 CONST 2.223 080877 DRAINAGE GRATES ALONG EXISTING ON STREET BIKEPATHS CONST OR REHAB PEDESTRIAN FACILITIES IN NASSAU & SUFFOLK COUNTIES. AQC:C2P MULTI TPC : $2-$4 M TOTAL 4YR COST : 2.490 0.000 2.490 0.000 0.000

NYSDOT INSTALLATION AND REPLACEMENT OF DETERIORATED PAVEMENT NFA 2011 0.496 CONINSP 0.496 MARKINGS & PLOWABLE REFLECTIVE MARKERS ON VARIOUS STATE NFA 2011 4.958 CONST 4.958 080878 HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK COUNTIES. AQC:A10P MULTI TPC : $4.6-$7.5 M TOTAL 4YR COST : 5.454 5.454 0.000 0.000 0.000

NYSDOT BRIDGE PARAPET RECONSTRUCTION TO UPGRADE NON STANDARD NFA 2011 0.505 CONINSP 0.505 PARAPET, TOWN OF HEMPSTEAD, NASSAU COUNTY. BIN # 1057651, 1057652, NFA 2011 5.050 CONST 5.050 080879 1058550, 1058560, 1059651 & 1059652. AQC:A19S MULTI TPC : $4.6-$7.5 M TOTAL 4YR COST : 5.555 5.555 0.000 0.000 0.000

NYSDOT BRIDGE PARAPET RECONSTRUCTION TO UPGRADE NON STANDARD NFA 2011 0.278 DETLDES 0.278 PARAPET IN THE TOWNS OF HEMPSTEAD, OYSTER BAY & SMITHTOWN, NFA 2012 0.523 CONINSP 0.523 080880 NASSAU & SUFFOLK COUNTIES. BIN # 1058260, 1059080, 1059189, 1059440 & NFA 2012 5.228 CONST 5.228 5059069. AQC:A10S MULTI TPC : $4.6-$7.5 M TOTAL 4YR COST : 6.029 0.278 5.751 0.000 0.000

NYSDOT CLEAN BASINS FILLED W/ DEBRIS, REPAIR, REPLACE OR PROVIDE MISSING STP FLEX 2011 0.100 CONINSP 0.100 COLLARS, REPAIR BASIN WALLS, CLEAN CLOGGED PIPES, REPAIR OR NFA 2011 0.025 CONINSP 0.025 080881 REPLACE GRATES, REPLACE BASINS, PROVIDE NEW BASINS, CONNECT STP FLEX 2011 0.830 CONST 0.830 ISOLATED BASINS TO DRAINAGE SYSTEM NAS/SUF CO. TO PREVENT NFA 2011 0.211 CONST 0.211 FLOODING AQC:A10P MULTI TPC : $2-$4 M TOTAL 4YR COST : 1.166 1.166 0.000 0.000 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 23 of 84 for REGION 10 4-YEAR PROGRAM (FFY) AGENCY PROJECT DESCRIPTION TOTAL Starting October 01, 2010 FUND SOURCES FFY 4-YEAR PHASE PIN PROGRAM FFY FFY FFY FFY in millions of dollars 2011 2012 2013 2014 AQ CODE COUNTY TOTAL PROJECT COST

NYSDOT RESPOND TO EMERGENCIES AND NEEDED REPAIRS THAT ARE BEYOND THE NFA 2011 0.120 CONINSP 0.120 CAPABILITIES OF NYS MAINTENANCE FORCES TO ENSURE THE SAFETY OF NFA 2011 1.000 CONST 1.000 080882 THE PUBLIC ON VARIOUS STATE HIGHWAYS IN NASSAU & SUFFOLK COUNTIES. (FORMERLY PIN: 0T2011) AQC:C14P NASSAU TPC : $2-$4 M TOTAL 4YR COST : 1.120 1.120 0.000 0.000 0.000

NYSDOT FUNDING FOR NEW BUS SERVICE TO REDUCE VMT AND IMPROVE AIR CMAQ 2012 1.000 OPER 1.000 QUALITY TO BE DEVELOPED BY PUBLIC TRANSIT OPERATORS NFA 2012 0.250 OPER 0.250 080883 CMAQ 2013 1.000 OPER 1.000 NFA 2013 0.250 OPER 0.250 CMAQ 2014 1.000 OPER 1.000 NFA 2014 0.250 OPER 0.250 AQC:C1P MULTI TPC : $7.5-$12 M TOTAL 4YR COST : 3.750 0.000 1.250 1.250 1.250

NYSDOT REPLACE OR UPGRADE SIGNALS AND/OR APPURTENANCES & INSTALL NEW NFA 2011 0.316 CONINSP 0.316 SIGNALS TO MAINTAIN STATE OF GOOD REPAIR ON VARIOUS STATE NFA 2011 3.162 CONST 3.162 080884 HIGHWAYS IN NASSAU & SUFFOLK COUNTIES (FORMERLY PIN: 0T1517) AQC:D2P MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 3.478 3.478 0.000 0.000 0.000

NYSDOT PROVIDE EMERGENCY SAFETY & PAVEMENT IMPROVEMENTS REPAIRS ON NFA 2011 0.400 CONINSP 0.400 AN AS-NEEDED-BASIS ON VARIOUS STATE HIGHWAYS IN NASSAU & NFA 2011 4.000 CONST 4.000 080885 SUFFOLK COUNTIES. AQC:A10P MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 4.400 4.400 0.000 0.000 0.000

NYSDOT SIGN REPAIRS & INSTALLATIONS TO MAINTAIN STATE OF GOOD REPAIR ON STP FLEX 2011 0.202 CONINSP 0.202 VARIOUS STATE HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK NFA 2011 0.050 CONINSP 0.050 080886 COUNTIES(FORMERLY PIN: 0T1700) STP FLEX 2011 1.687 CONST 1.687 NFA 2011 0.422 CONST 0.422 AQC:C13P MULTI TPC : $2-$4 M TOTAL 4YR COST : 2.361 2.361 0.000 0.000 0.000

NYSDOT ROUT & SEAL ASPHALT PAVEMENT CRACKS AND JOINT OVERLAY REPAIR STP FLEX 2011 0.192 CONINSP 0.192 ON NY27 FROM NY106 TO MSP, NY27 MSP TO WSP, I495 EX 52 TO EX 57, SSP NFA 2011 0.169 CONINSP 0.169 080888 NY135 TO SGSP TO MAINTAIN PAVEMENT. TOWNS OF OYSTER BAY, STP FLEX 2011 1.603 CONST 1.603 HEMPSTEAD, BABYLON, HUNTINGTON, ISLIP AND SMITHTOWN,NASSAU & NFA 2011 1.688 CONST 1.688 SUFFOLK COUNTIES AQC:A10P MULTI TPC : $4.6-$7.5 M TOTAL 4YR COST : 3.652 3.652 0.000 0.000 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 24 of 84 for REGION 10 4-YEAR PROGRAM (FFY) AGENCY PROJECT DESCRIPTION TOTAL Starting October 01, 2010 FUND SOURCES FFY 4-YEAR PHASE PIN PROGRAM FFY FFY FFY FFY in millions of dollars 2011 2012 2013 2014 AQ CODE COUNTY TOTAL PROJECT COST

NYSDOT REHABILITATE RECHARGE BASINS INCLUDING SLOPE STABILIZATION, HEAD NFA 2011 0.149 DETLDES 0.149 WALL REPAIR, ET AL(LOCATIONS TO-BE-DETERMINED) TO MAINTAIN STATE NFA 2012 0.258 CONINSP 0.258 080889 OF GOOD REPAIR ON VARIOUS STATE HIGHWAYS IN NASSAU & SUFFOLK NFA 2012 2.151 CONST 2.151 COUNTIES. AQC:A2P MULTI TPC : $2-$4 M TOTAL 4YR COST : 2.558 0.149 2.409 0.000 0.000

NYSDOT REHABILITATE RECHARGE BASINS INCLUDING SLOPE STABILIZATION, HEAD NFA 2012 0.152 DETLDES 0.152 WALL REPAIR, ET AL(LOCATIONS TO-BE-DETERMINED) TO MAINTAIN STATE NFA 2013 0.265 CONINSP 0.265 080891 OF GOOD REPAIR ON VARIOUS STATE HIGHWAYS IN NASSAU & SUFFOLK NFA 2013 2.206 CONST 2.206 COUNTIES. AQC:A2P MULTI TPC : $2-$4 M TOTAL 4YR COST : 2.623 0.000 0.152 2.471 0.000

NYSDOT BRIDGE CLEANING CONTRACT ON VARIOUS STATE HIGHWAYS TO HBRR 2011 0.101 CONINSP 0.101 MAINTAIN STRUCTURAL INTEGRITY IN NASSAU & SUFFOLK COUNTIES. NFA 2011 0.025 CONINSP 0.025 080892 0T1713 HBRR 2011 0.843 CONST 0.843 NFA 2011 0.211 CONST 0.211 NFA 2011 0.056 DETLDES 0.056 AQC:A19P MULTI TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.236 1.236 0.000 0.000 0.000

NYSDOT CORRECT PRIORITY HIGHWAY FOODING LOCATIONS, PROVIDE NFA 2013 0.160 DETLDES 0.160 STORMWATER RUN-OFF IMPROVEMENTS INCLUDING 1 LOC IN TOWN OF 080894 RIVERHEAD FOR SAFETEA-LU EARMARK & OTHER LOC NAS & SUF. AQC:C11P MULTI TPC : $6-$9.4 M TOTAL 4YR COST : 0.160 0.000 0.000 0.160 0.000

NYSDOT CLEAN BASINS FILLED W/DEBRIS, REPAIR, REPLACE OR PROVIDE MISSING NFA 2011 0.090 DETLDES 0.090 COLLARS, REPAIR BASIN WALLS, CLEAN CLOGGED PIPES, REPAIR OR STP FLEX 2012 0.103 CONINSP 0.103 080895 REPLACE BROKEN PIPES, REPLACE GRATES, REPLACE BASINS, PROVIDE NFA 2012 0.026 CONINSP 0.026 CONNECT ISOLATED BASINS TO DRAINAGE SYSTEM TO PREVENT HIGHWAY STP FLEX 2012 0.860 CONST 0.860 FLOODING NASSAU AND SUFFOLK COUNTY NFA 2012 0.215 CONST 0.215 AQC:A10P MULTI TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.294 0.090 1.204 0.000 0.000

NYSDOT CONSULTANT CONTRACT TO PROVIDETRAFFIC SIGNAL & MISC DESIGN NFA 2011 0.300 DETLDES 0.300 TASKS.TRAFFIC SIGNAL & MISC. DESIGN TASKS CONULTANT CONTRACT NFA 2012 0.300 DETLDES 0.300 080896 (LOCATIONS TO BE DETEREMINED) AT VARIOUS HIGHWAYS AND NFA 2013 0.300 DETLDES 0.300 PARKWAYS IN NASSAU & SUFFOLK COUNTIES. NFA 2014 0.300 DETLDES 0.300 0T2398 AQC:A7P MULTI TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.200 0.300 0.300 0.300 0.300 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 25 of 84 for REGION 10 4-YEAR PROGRAM (FFY) AGENCY PROJECT DESCRIPTION TOTAL Starting October 01, 2010 FUND SOURCES FFY 4-YEAR PHASE PIN PROGRAM FFY FFY FFY FFY in millions of dollars 2011 2012 2013 2014 AQ CODE COUNTY TOTAL PROJECT COST

NYSDOT INSTALLATION AND REPLACEMENT OF DETERIORATED PAVEMENT NFA 2011 0.449 DETLDES 0.449 MARKINGS & PLOWABLE REFLECTIVE MARKERS ON VARIOUS STATE STP FLEX 2012 0.422 CONINSP 0.422 080898 HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK COUNTIES. NFA 2012 0.406 CONINSP 0.406 STP FLEX 2012 4.216 CONST 4.216 NFA 2012 4.066 CONST 4.066 AQC:A10P MULTI TPC : $7.5-$12 M TOTAL 4YR COST : 9.559 0.449 9.110 0.000 0.000

NASSAU CO. THE COUNTY HAS INITIATED AN ALTERNATIVES ANALYSIS TO EXAMINE FTA 5309 2011 0.990 SCOPING 0.990 OPPORTUNITIES FOR INTRODUCING TRANSIT IMPROVEMENTS AND NFA 2011 0.247 SCOPING 0.247 082498 IDENTIFY LAND USE STRATEGIES TO PROMOTE ECONOMIC DEVELOPMENT, HPP 2011 5.771 SCOPING 5.771 AND IMPROVE ACCESS, REGIONAL CONNECTIVITY AND MOBILITY IN THE NFA 2011 1.443 SCOPING 1.443 NASSAU HUB. AQC:C3P NASSAU TPC : $7.5-$12 M TOTAL 4YR COST : 8.451 8.451 0.000 0.000 0.000

MTA-LI BUS / PURCHASE 48 REPLACEMENT CNG 40' BUSES INSPECTION SERVICES & CMAQ 2011 4.500 MISC 4.500 NASSAU SPARE PARTS - TO MAINTAIN OPERATING EFFICIENCY, CAPACITY, AND THE NFA 2011 1.126 MISC 1.126 082565 CONTINUED USE OF ALTERNATIVE FUEL FTA 5307 2011 1.200 MISC 1.200 NFA 2011 0.300 MISC 0.300 CMAQ 2013 1.500 MISC 1.500 NFA 2013 0.376 MISC 0.376 FTA 5307 2013 0.368 MISC 0.368 NFA 2013 0.092 MISC 0.092 AQC:B10P NASSAU TPC : $15-$25 M TOTAL 4YR COST : 9.462 7.126 0.000 2.336 0.000

MTA-LI BUS / ENGINEERING/DESIGN SERVICES - TO PROVIDE GENERAL ENGINEERING FTA 5307 2011 0.240 MISC 0.240 NASSAU NEEDS TO SUPPORT THE CAPITAL PROGRAM NFA 2011 0.060 MISC 0.060 082572 FTA 5307 2012 0.240 MISC 0.240 NFA 2012 0.060 MISC 0.060 FTA 5307 2013 0.240 MISC 0.240 NFA 2013 0.060 MISC 0.060 AQC:C7P NASSAU TPC : $2-$4 M TOTAL 4YR COST : 0.900 0.300 0.300 0.300 0.000

MTA-LI BUS / ITS CUSTOMER INFORMATION & VEHICLE LOCATION/MONITORING SYSTEM FTA 5307 2011 6.720 MISC 6.720 NASSAU - TO INSTALL A NEW CUSTOMER INFORMATION SYSTEM AND UPGRADE THE NFA 2011 1.680 MISC 1.680 082577 VEHICLE LOCATION AND MONITORING SYSTEMS FTA 5307 2012 3.200 MISC 3.200 NFA 2012 0.800 MISC 0.800 AQC:B6P NASSAU TPC : $9.5-15.5 M TOTAL 4YR COST : 12.400 8.400 4.000 0.000 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 26 of 84 for REGION 10 4-YEAR PROGRAM (FFY) AGENCY PROJECT DESCRIPTION TOTAL Starting October 01, 2010 FUND SOURCES FFY 4-YEAR PHASE PIN PROGRAM FFY FFY FFY FFY in millions of dollars 2011 2012 2013 2014 AQ CODE COUNTY TOTAL PROJECT COST

MTA-LI BUS / PURCHASE NEW/REPLACEMENT SERVICE SUPPORT EQUIPMENT, AND FTA 5307 2011 0.720 MISC 0.720 NASSAU VEHICLES THAT ARE BEYOND THEIR USEFUL LIVES NFA 2011 0.180 MISC 0.180 082582 FTA 5307 2012 0.720 MISC 0.720 NFA 2012 0.180 MISC 0.180 FTA 5307 2013 1.072 MISC 1.072 NFA 2013 0.268 MISC 0.268 FTA 5307 2014 0.400 MISC 0.400 NFA 2014 0.100 MISC 0.100 AQC:B1P NASSAU TPC : $3.3-$5.6 M TOTAL 4YR COST : 3.640 0.900 0.900 1.340 0.500

MTA-LI BUS / FACILITY CAPITAL REPLACEMENT/IMPROVEMENT - TO MAINTAIN THE FTA 5307 2011 1.600 MISC 1.600 NASSAU FACILITIES IN A STATE OF GOOD REPAIR NFA 2011 0.400 MISC 0.400 082584 FTA 5307 2012 1.280 MISC 1.280 NFA 2012 0.320 MISC 0.320 FTA 5307 2013 1.000 MISC 1.000 NFA 2013 0.250 MISC 0.250 FTA 5307 2014 0.400 MISC 0.400 NFA 2014 0.100 MISC 0.100 AQC:B8P NASSAU TPC : $9.5-15.5 M TOTAL 4YR COST : 5.350 2.000 1.600 1.250 0.500

MTA-LI BUS / PREVENTIVE MAINTENANCE - TO MAINTAIN THE OPERATION IN A STATE OF FTA 5307 2011 6.000 MISC 6.000 NASSAU GOOD REPAIR NFA 2011 1.500 MISC 1.500 082588 FTA 5307 2012 6.124 MISC 6.124 NFA 2012 1.531 MISC 1.531 FTA 5307 2013 6.000 MISC 6.000 NFA 2013 1.500 MISC 1.500 FTA 5307 2014 6.000 MISC 6.000 NFA 2014 1.500 MISC 1.500 AQC:B1P NASSAU TPC : $40-$60 M TOTAL 4YR COST : 30.155 7.500 7.655 7.500 7.500

MTA-LI BUS / MITCHEL FIELD CNG FACILITY MODIFICATIONS - TO REPLACE CNG FTA 5308 2011 5.810 MISC 5.810 NASSAU OPERATING SYSTEMS THAT HAVE REACHED THE END OF THEIR USEFUL NFA 2011 1.190 MISC 1.190 082593 LIFE AQC:B8P NASSAU TPC : $6-$9.4 M TOTAL 4YR COST : 7.000 7.000 0.000 0.000 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 27 of 84 for REGION 10 4-YEAR PROGRAM (FFY) AGENCY PROJECT DESCRIPTION TOTAL Starting October 01, 2010 FUND SOURCES FFY 4-YEAR PHASE PIN PROGRAM FFY FFY FFY FFY in millions of dollars 2011 2012 2013 2014 AQ CODE COUNTY TOTAL PROJECT COST

MTA-LI BUS / PURCHASE 40 CNG 40' BUSES, INSPECTION SERVICES & SPARE PARTS - 37 CMAQ 2012 8.000 MISC 8.000 NASSAU REPL/3 EXP - TO MAINTAIN OPERATING EFFICIENCY, CAPACITY, AND THE NFA 2012 2.000 MISC 2.000 082594 CONTINUED USE OF ALTERNATIVE FUEL FTA 5307 2012 0.380 MISC 0.380 NFA 2012 0.092 MISC 0.092 FTA 5309 2013 5.920 MISC 5.920 NFA 2013 1.480 MISC 1.480 AQC:B10Z NASSAU TPC : $15-$25 M TOTAL 4YR COST : 17.872 0.000 10.472 7.400 0.000

MTA-LI BUS / PURCHASE 80 CNG 40' REPLACEMENT BUSES, INSPECTION SERVICES & CMAQ 2014 5.000 MISC 5.000 NASSAU SPARE PARTS - TO MAINTAIN OPERATING EFFICIENCY, CAPACITY, AND THE NFA 2014 1.250 MISC 1.250 082595 CONTINUED USE OF ALTERNATIVE FUEL FTA 5307 2014 3.944 MISC 3.944 NFA 2014 0.986 MISC 0.986 FTA 5309 2014 1.600 MISC 1.600 NFA 2014 0.400 MISC 0.400 AQC:B10P NASSAU TPC : $32-$50 M TOTAL 4YR COST : 13.180 0.000 0.000 0.000 13.180

MTA-LI BUS / PURCHASE 63 REPLACEMENT PARATRANSIT VEHICLES -TO MAINTAIN FTA 5307 2013 4.104 MISC 4.104 NASSAU OPERATING EFFICIENCY, AND CAPACITY NFA 2013 1.026 MISC 1.026 082596

AQC:B10P NASSAU TPC : $4.6-$7.5 M TOTAL 4YR COST : 5.130 0.000 0.000 5.130 0.000

MTA-LI BUS / PURCHASE 33 PARATRANSIT VEHICLES -30 REPL/3 EXP - TO MAINTAIN FTA 5307 2014 2.040 MISC 2.040 NASSAU OPERATING EFFICIENCY, AND CAPACITY NFA 2014 0.510 MISC 0.510 082597

AQC:B10P NASSAU TPC : $3.3-$5.6 M TOTAL 4YR COST : 2.550 0.000 0.000 0.000 2.550

SUFFOLK CO. PURCHASE OF AN ELECTRONIC FARE COLLECTION SYSTEM FOR BUSES FTA 5307 2012 1.800 MISC 1.800 TRANSIT UTILIZED ON THE FIXED BUS ROUTES THROUGHOUT SUFFOLK COUNTY AND NFA 2012 0.600 MISC 0.600 082600 OEPRATED TO UPGRADE FARE COLLECTION BOX CAPABILITIES FTA 5307 2013 0.560 MISC 0.560 NFA 2013 0.140 MISC 0.140 AQC:B5P SUFFOLK TPC : $2-$4 M TOTAL 4YR COST : 3.100 0.000 2.400 0.700 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 28 of 84 for REGION 10 4-YEAR PROGRAM (FFY) AGENCY PROJECT DESCRIPTION TOTAL Starting October 01, 2010 FUND SOURCES FFY 4-YEAR PHASE PIN PROGRAM FFY FFY FFY FFY in millions of dollars 2011 2012 2013 2014 AQ CODE COUNTY TOTAL PROJECT COST

SUFFOLK CO. PURCHASE OF DUAL-MODE HYBRID-ELECTRIC TRANSIT BUSES FOR FTA 5307 2011 5.500 MISC 5.500 TRANSIT REPLACEMENT PURPOSES TO BE UTILIZED ON FIXED BUS ROUTES NFA 2011 1.376 MISC 1.376 082602 THROUGHOUT SUFFOLK COUNTY. NY-03-0448 FTA 5307 2012 4.000 MISC 4.000 NFA 2012 1.000 MISC 1.000 FTA 5307 2013 5.500 MISC 5.500 NFA 2013 1.375 MISC 1.375 FTA 5307 2014 5.600 MISC 5.600 NFA 2014 1.400 MISC 1.400 AQC:B10P SUFFOLK TPC : $32-$50 M TOTAL 4YR COST : 25.751 6.876 5.000 6.875 7.000

SUFFOLK CO. PURCHASE PARATRANSIT VEHICLES FOR COMPLEMENTARY SERVICES ADA FTA 5307 2011 0.480 MISC 0.480 TRANSIT WHICH ARE OPERATED IN CONJUCTION WITH THE FIXED BUS ROUTE NFA 2011 0.120 MISC 0.120 082603 OPERATIONS. PRE FY 11NY 90-X648 FTA 5307 2012 0.480 MISC 0.480 NFA 2012 0.120 MISC 0.120 FTA 5307 2013 0.640 MISC 0.640 NFA 2013 0.160 MISC 0.160 FTA 5307 2014 0.800 MISC 0.800 NFA 2014 0.200 MISC 0.200 AQC:B10P SUFFOLK TPC : $4.6-$7.5 M TOTAL 4YR COST : 3.000 0.600 0.600 0.800 1.000

SUFFOLK CO. PREVENTIVE MAINTENANCE FOR SUFFOLK COUNTY TRANSIT BUSES AND FTA 5307 2011 0.720 MISC 0.720 TRANSIT PARATRANSIT VANS. NY-90-X648 NFA 2011 0.180 MISC 0.180 082604 FTA 5307 2012 0.720 MISC 0.720 NFA 2012 0.180 MISC 0.180 FTA 5307 2013 0.800 MISC 0.800 NFA 2013 0.200 MISC 0.200 FTA 5307 2014 0.800 MISC 0.800 NFA 2014 0.200 MISC 0.200 AQC:B3P SUFFOLK TPC : $4.6-$7.5 M TOTAL 4YR COST : 3.800 0.900 0.900 1.000 1.000

SUFFOLK CO. PURCHASE AND INSTALL BUS SHELTERS AT VARIOUS LOCATIONS FTA 5307 2011 0.160 MISC 0.160 TRANSIT THROUGHOUT SUFFOLK COUNTY TO IMPORVE SYSTEM VISIBILITY AND NFA 2011 0.040 MISC 0.040 082606 CUSTOMER COMFORT AND CONVINIENCE. NY-90-X602 FTA 5307 2012 0.160 MISC 0.160 NFA 2012 0.040 MISC 0.040 FTA 5307 2013 0.160 MISC 0.160 NFA 2013 0.040 MISC 0.040 FTA 5307 2014 0.160 MISC 0.160 NFA 2014 0.040 MISC 0.040 AQC:B7P SUFFOLK TPC : $1.2-$2.5 M TOTAL 4YR COST : 0.800 0.200 0.200 0.200 0.200 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 29 of 84 for REGION 10 4-YEAR PROGRAM (FFY) AGENCY PROJECT DESCRIPTION TOTAL Starting October 01, 2010 FUND SOURCES FFY 4-YEAR PHASE PIN PROGRAM FFY FFY FFY FFY in millions of dollars 2011 2012 2013 2014 AQ CODE COUNTY TOTAL PROJECT COST

SUFFOLK CO. COMPLEMENTARY SERVICE -ADA WHICH IS PROVIDED IN CONJUCTION FTA 5307 2011 0.240 MISC 0.240 TRANSIT WITH THE FIXED BUS ROUTE OPERATIONS. NY-90X-648 NFA 2011 0.060 MISC 0.060 082621 FTA 5307 2012 0.240 MISC 0.240 NFA 2012 0.060 MISC 0.060 FTA 5307 2013 0.240 MISC 0.240 NFA 2013 0.060 MISC 0.060 FTA 5307 2014 0.240 MISC 0.240 NFA 2014 0.060 MISC 0.060 AQC:B1P SUFFOLK TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.200 0.300 0.300 0.300 0.300

SUFFOLK CO. CONTINGENCIES FOR SUFFOLKCOUNTY SECTION 5307 GRANT FTA 5307 2011 0.177 MISC 0.177 TRANSIT APPLICATIONS. PRE FFY11 NY-90X-648, FOR FFY2012 EARMARK# NFA 2011 0.044 MISC 0.044 082629 E2010-BUSP-151 FTA 5307 2012 0.179 MISC 0.179 NFA 2012 0.045 MISC 0.045 FTA 5307 2013 0.176 MISC 0.176 NFA 2013 0.044 MISC 0.044 FTA 5307 2014 0.234 MISC 0.234 NFA 2014 0.058 MISC 0.058 AQC:B1 SUFFOLK TPC : $1.2-$2.5 M TOTAL 4YR COST : 0.957 0.221 0.224 0.220 0.292

SUFFOLK CO. PROJECT ADMINISTRATION FOR SUFFOLK COUNTY SECTION 5307 GRANT FTA 5307 2011 0.240 MISC 0.240 TRANSIT APPLICATIONS.PRE FFY11 GRANT# NY-90X-648, NFA 2011 0.060 MISC 0.060 082630 FTA 5307 2012 0.269 MISC 0.269 NFA 2012 0.067 MISC 0.067 FTA 5307 2013 0.270 MISC 0.270 NFA 2013 0.068 MISC 0.068 FTA 5307 2014 0.320 MISC 0.320 NFA 2014 0.080 MISC 0.080 AQC:B1 SUFFOLK TPC : $2-$4 M TOTAL 4YR COST : 1.374 0.300 0.336 0.338 0.400

SUFFOLK CO. COMPRESSED NATURAL GAS (CNG) FLEET VEHICLE PROGRAM- REPLACE CMAQ 2011 1.800 MISC 1.800 APPROXIMATELY 60 COUNTY HEAVY, LIGHT DUTY TRUCKS AND OTHER NFA 2011 0.450 MISC 0.450 082633 FLEET VEHICLES WITH CNG POWERED VEHICLES OR ENGINES AS PART OF THE SUFFOLK COUNTY GREEN VEHICLE INITIATIVE. AQC:C14P SUFFOLK TPC : $2-$4 M TOTAL 4YR COST : 2.250 2.250 0.000 0.000 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 30 of 84 for REGION 10 4-YEAR PROGRAM (FFY) AGENCY PROJECT DESCRIPTION TOTAL Starting October 01, 2010 FUND SOURCES FFY 4-YEAR PHASE PIN PROGRAM FFY FFY FFY FFY in millions of dollars 2011 2012 2013 2014 AQ CODE COUNTY TOTAL PROJECT COST

SUFFOLK CO. HYBRID ELECTRIC-REPLACE 45 COUNTY FLEET VEHICLES WITH ELECTRIC CMAQ 2011 1.100 MISC 1.100 HYBRID VEHICLES AS PART OF THE SUFFOLK COUNTY GREEN VEHICLE NFA 2011 0.275 MISC 0.275 082635 INITIATIVE AQC:C14P SUFFOLK TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.375 1.375 0.000 0.000 0.000

SUFFOLK CO. COMPRESSED NATUAL GAS (CNG) FLEET VEHICLE - REPLACE 6 COUNTY CMAQ 2012 1.250 MISC 1.250 HEAVY DIESEL TRUCKS WITH CNG TRUCKS AS PART OF THE SUFFOLK NFA 2012 0.313 MISC 0.313 082636 COUNTY GREEN VEHICLE INITIATIVE AQC:C14P SUFFOLK TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.563 0.000 1.563 0.000 0.000

SUFFOLK CO. COMPRESSED NATURAL GAS (CNG) ENGINE REPLACEMENT- RE-ENGINE 22 CMAQ 2012 1.250 MISC 1.250 COUNTY HEAVY DIESEL TRUCKS WITH CNG ENGINES AS PART OF THE NFA 2012 0.313 MISC 0.313 082637 SUFFOLK COUNTY GREEN VEHICLE INITIATIVE AQC:K01P SUFFOLK TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.563 0.000 1.563 0.000 0.000

SUFFOLK CO. HYBRID ELECTRIC-REPLACE 52 COUNTY FLEET VEHICLESWITH ELECTRIC CMAQ 2012 1.250 MISC 1.250 HYBRID VEHICLES AS PART OF THE SUFFOLK COUNTY GREEN VEHICLE NFA 2012 0.313 MISC 0.313 082638 INITIATIVE AQC:C14P SUFFOLK TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.563 0.000 1.563 0.000 0.000

SUFFOLK CO. COMPRESSED NATURAL GAS (CNG) FLEET VEHICLE - REPLACE 6 COUNTY CMAQ 2013 1.250 MISC 1.250 HEAVY DIESEL TRUCKS WITH CNG TRUCKS AS PART OF THE SUFFOLK NFA 2013 0.313 MISC 0.313 082639 COUNTY GREEN INITIATIVE AQC:C14P SUFFOLK TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.563 0.000 0.000 1.563 0.000

SUFFOLK CO. COMPRESSED NATURAL GAS (CNG) ENGINE REPLACEMENT- RE-ENGINE 22 CMAQ 2013 1.250 MISC 1.250 COUNTY HEAVY DIESEL TRUCKS WITH CNG ENGINES AS PART OF THE NFA 2013 0.313 MISC 0.313 082640 SUFFOLK COUNTY GREEN VEHICLE INITIATIVE AQC:K01P SUFFOLK TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.563 0.000 0.000 1.563 0.000

SUFFOLK CO. HYBRID ELECTRIC-REPLACE 52 COUNTY FLEET VEHICLES WITH ELECTRIC CMAQ 2013 1.250 MISC 1.250 HYBRID VEHICLES AS PART OF THE SUFFOLK COUNTY GREEN INITIATIVE NFA 2013 0.313 MISC 0.313 082641

AQC:K01P SYSTEM-WIDE TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.563 0.000 0.000 1.563 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 31 of 84 for REGION 10 4-YEAR PROGRAM (FFY) AGENCY PROJECT DESCRIPTION TOTAL Starting October 01, 2010 FUND SOURCES FFY 4-YEAR PHASE PIN PROGRAM FFY FFY FFY FFY in millions of dollars 2011 2012 2013 2014 AQ CODE COUNTY TOTAL PROJECT COST

SUFFOLK CO. COMPRESSED NATURAL GAS (CNG) FLEET VEHICLE-REPLACE 6 COUNTY CMAQ 2014 1.350 MISC 1.350 HEAVY DIESEL TRUCKS WITH CNG TRUCKS AS PART OF THE SUFFOLK NFA 2014 0.338 MISC 0.338 082642 COUNTY GREEN VEHICLE INITIATIVE. AQC:C14P SUFFOLK TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.688 0.000 0.000 0.000 1.688

SUFFOLK CO. COMPRESSED NATURAL GAS (CNG) ENGINE REPLACEMENT - RE-ENGINE 24 CMAQ 2014 1.350 MISC 1.350 COUNTY HEAVY DIESELTRUCKS WITH CNG ENGINES AS PART OF THE NFA 2014 0.338 MISC 0.338 082643 SUFFOLK COUNTY GREEN VEHICLE INITIATIVE AQC:C14P SUFFOLK TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.688 0.000 0.000 0.000 1.688

SUFFOLK CO. HYBRID ELECTRIC-REPLACE 56 COUNTY HEAVY DIESEL TRUCKS WITH CNG CMAQ 2014 1.350 MISC 1.350 ENGINES AS PART OF THE SUFFOLK COUNTY GREEN VEHICLE INITIATIVE NFA 2014 0.338 MISC 0.338 082644

AQC:C14P SUFFOLK TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.688 0.000 0.000 0.000 1.688

LOCAL SUFFOLK COUNTY UNITED VETERANS (SUFFOLK) – PROVIDE FLEXIBLE FTA 5317 2011 0.286 MISC 0.286 TRANSPORTATION SERVICE HAVING TWO SERVICE ROUTES WESTERN AND NFA 2011 0.292 MISC 0.292 082648 EASTERN WILL COVER APPROXIMATELY 70 MILES ROUND TRIPS FOR BOTH ROUTES TO AND MEETS THE MOBILITY NEEDS OF PEOPLE WITH DISABILITIES AQC:B1P SUFFOLK TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.578 0.578 0.000 0.000 0.000

NYSERDA NY02 PACKAGED DELIVERY DEMO. PROJECT : USPS ACQUIRE AND DEPLOY HPP 2012 0.716 MISC 0.716 FIVE NEW ADVANCED TECHNOLOGY (HYBRID ELECTRICAL) VEHICLES FOR 082649 THE PURPOSE OF DEMONSTRATION OF GREEN VEHICLE INITIATIVE. (REDUCTION IN EMISSIONS AND FOSSIL FUEL)OMNIBUS APPROPRIATION ACT 09, AQC:K1P MULTI TPC : $2-$4 M TOTAL 4YR COST : 0.716 0.000 0.716 0.000 0.000

LONG BEACH REPLACE FOUR ADA PARATRANSIT BUS FTA 5307 2011 0.148 MISC 0.148 NFA 2011 0.035 MISC 0.035 082700

AQC:B10P NASSAU TPC : < $0.75 M TOTAL 4YR COST : 0.183 0.183 0.000 0.000 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 32 of 84 for REGION 10 4-YEAR PROGRAM (FFY) AGENCY PROJECT DESCRIPTION TOTAL Starting October 01, 2010 FUND SOURCES FFY 4-YEAR PHASE PIN PROGRAM FFY FFY FFY FFY in millions of dollars 2011 2012 2013 2014 AQ CODE COUNTY TOTAL PROJECT COST

LONG BEACH PURCHASE MISCELLANEOUS EQUIPMENT,SUPPLIES AND MATERIALS FOR FTA 5307 2012 0.010 MISC 0.010 THE TRANSIT SYSTEM. NFA 2012 0.003 MISC 0.003 082707

AQC:B4 NASSAU TPC : < $0.75 M TOTAL 4YR COST : 0.013 0.000 0.013 0.000 0.000

LONG BEACH PURCHASE AND INSTALL A SECURITY AND SURVEILLANCE SYSTEM IN THE FTA 5307 2011 0.016 MISC 0.016 CITY OF BUS GARAGE. NFA 2011 0.004 MISC 0.004 082711

AQC:B4P NASSAU TPC : < $0.75 M TOTAL 4YR COST : 0.020 0.020 0.000 0.000 0.000

LONG BEACH PURCHASE ONE REPLACEMENT SUPERVISORY VEHICLE FOR THE TRANSIT FTA 5307 2011 0.026 MISC 0.026 SYSTEM. NFA 2011 0.006 MISC 0.006 082712

AQC:B2P NASSAU TPC : < $0.75 M TOTAL 4YR COST : 0.032 0.032 0.000 0.000 0.000

LONG BEACH PURCHASE NEW BUS SHELTER FTA 5307 2014 0.170 MISC 0.170 NFA 2014 0.042 MISC 0.042 082714

AQC:B8P NASSAU TPC : < $0.75 M TOTAL 4YR COST : 0.212 0.000 0.000 0.000 0.212

LONG BEACH ITS CUSTOMER REAL TIME INFORMATION & VEHICLE FTA 5307 2012 0.208 MISC 0.208 LOCATION/MONITORING SYSTEM AT BUS STOPS NFA 2012 0.052 MISC 0.052 082715

AQC:B6P NASSAU TPC : < $0.75 M TOTAL 4YR COST : 0.260 0.000 0.260 0.000 0.000

LONG BEACH PURCHASE 2 NEW HYBRID ELECTRIC 35 FEET BUSES.REPLACEMENT OF OLD FTA 5307 2011 0.960 MISC 0.960 DIESEL BUSES WITH NEW HYBRID BUSES WHICH ARE MORE NFA 2011 0.240 MISC 0.240 082716 ENVIROMENTLY FRIENDLY AND GET MORE MPG AQC:B10 NASSAU TPC : $0.6-$1.5 M TOTAL 4YR COST : 1.200 1.200 0.000 0.000 0.000

LONG BEACH PURCHASE ADA ROUTING & LOCATION COMMUNICATION EQUIPMENT FTA 5307 2011 0.128 MISC 0.128 SOFTWARE FOR PARATRANSIT BUS TO LOCATE ADDRESS OF DISABLE NFA 2011 0.032 MISC 0.032 082717 PASSENGER. AQC:B4P NASSAU TPC : < $0.75 M TOTAL 4YR COST : 0.160 0.160 0.000 0.000 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 33 of 84 for REGION 10 4-YEAR PROGRAM (FFY) AGENCY PROJECT DESCRIPTION TOTAL Starting October 01, 2010 FUND SOURCES FFY 4-YEAR PHASE PIN PROGRAM FFY FFY FFY FFY in millions of dollars 2011 2012 2013 2014 AQ CODE COUNTY TOTAL PROJECT COST

LONG BEACH RENOVATE BUS GARAGE INCLUDING WIDENING GARAGE DOORS AND FTA 5307 2012 0.080 MISC 0.080 EXPANSION OF OFFICE AND STORAGE SPACE NFA 2012 0.020 MISC 0.020 082719

AQC:B4P NASSAU TPC : < $0.75 M TOTAL 4YR COST : 0.100 0.000 0.100 0.000 0.000

HART PURCHASE AND INSTALLATION OF OPERATING OR MAINTENANCE FTA 5307 2011 0.062 MISC 0.062 EQUIPMENT TO BE LOCATED WITHIN THE TRANSIT FACILITY AND WITH NO NFA 2011 0.016 MISC 0.016 082808 SIGNIFICANT IMPACTS OFF THE SITE.. ADDITIONAL FUNDING REQUIRED FOR THIS IS ONGOING PROJECT UNDER GRANT #NY-90X-581 AQC:B1P SUFFOLK TPC : < $0.75 M TOTAL 4YR COST : 0.078 0.078 0.000 0.000 0.000

HART REPLACE AND/OR REHABILITATE EXISTING EQUIPMENT AND FACILITIES FTA 5307 2011 0.006 MISC 0.006 LOCATED AT THE HART BUS STORAGE BUILDING BECAUSE ELEMENTS NFA 2011 0.002 MISC 0.002 082809 HAVE REACHED THE END OF THEIR USEFUL LIFE. ADDITIONAL FUNDING REQUIRED FOR PROJECT STARTED IN GRANT #NY-90-581 AQC:B8P SUFFOLK TPC : $1.2-$2.5 M TOTAL 4YR COST : 0.008 0.008 0.000 0.000 0.000

HART CONTINGENCIES/PROGRAM RESERVE TO AUGMENT CAPITAL PROJECTS FTA 5307 2011 0.032 MISC 0.032 STARTED IN GRANT #NY-90-581 THAT MAY REQUIRE ADDITIONAL FUNDING NFA 2011 0.008 MISC 0.008 082811 TO COMPLETE. AQC:B1P SUFFOLK TPC : < $0.75 M TOTAL 4YR COST : 0.040 0.040 0.000 0.000 0.000

HART HUNTINGTON AREA RAPID TRANSIT WILL PURCHASE 9 30FOOT HYBRID FTA 5307 2011 0.864 MISC 0.864 BUSES TO REPLACE EXISTING 9 DIESEL BUSES IN THEIR FLEET. (2 IN 2011 NFA 2011 0.216 MISC 0.216 082813 AND 7 IN 2012) FTA 5307 2012 3.400 MISC 3.400 NFA 2012 0.864 MISC 0.864 AQC:B10P SUFFOLK TPC : $4.6-$7.5 M TOTAL 4YR COST : 5.344 1.080 4.264 0.000 0.000

HART HUNTINGTON AREA RAPID TRANSIT WILL PURCHASE TWO REPLACEMENT FTA 5307 2011 0.044 MISC 0.044 GASOLINE-ELECTRIC HYBRID VEHICLES FOR SUPERVISORY AND SUPPORT NFA 2011 0.011 MISC 0.011 082814 PURPOSES AQC:B2P SUFFOLK TPC : < $0.75 M TOTAL 4YR COST : 0.055 0.055 0.000 0.000 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 34 of 84 for REGION 10 4-YEAR PROGRAM (FFY) AGENCY PROJECT DESCRIPTION TOTAL Starting October 01, 2010 FUND SOURCES FFY 4-YEAR PHASE PIN PROGRAM FFY FFY FFY FFY in millions of dollars 2011 2012 2013 2014 AQ CODE COUNTY TOTAL PROJECT COST

HART HUNTINGTON AREA RAPID TRANSIT WILL PURCHASE PARA TRANSIT VANS FTA 5307 2011 0.156 MISC 0.156 TO REPLACE EXISTING VANS IN THEIR FLEET. NFA 2011 0.040 MISC 0.040 082815 FTA 5307 2012 0.358 MISC 0.358 NFA 2012 0.089 MISC 0.089 FTA 5307 2014 0.253 MISC 0.253 NFA 2014 0.063 MISC 0.063 AQC:B10P SUFFOLK TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.959 0.196 0.447 0.000 0.316

LOCAL PURCHASE OF TWO ALTERNATIVE FUEL (CNG) BUSES, VILLAGE OF EAST FTA 5309 2011 0.380 MISC 0.380 ROCKAWAY IN TOWN OF HEMPSTEAD. NFA 2011 0.089 MISC 0.089 082902

AQC:B10 NASSAU TPC : < $0.75 M TOTAL 4YR COST : 0.469 0.469 0.000 0.000 0.000

LOCAL PROJECT INDEPENDENCE (NASSAU) – MOBILITY MANAGEMENT SERVICES, FTA 5317 2011 0.854 MISC 0.854 MEDICALTRANSPORTATION, AND TRANSPORTATION TO GROCERY NFA 2011 0.447 MISC 0.447 082903 SHOPPING SERVICES TARGETING THE DISABLED ELDERLY POPULATION IN THE TOWN OF NORTH HEMPSTEAD. AQC:C1P NASSAU TPC : $2-$4 M TOTAL 4YR COST : 1.301 1.301 0.000 0.000 0.000

NYSDOT UPGRADE TRAFFIC SIGNAL SYSTEM /RAILROAD GRADE CROSSING STP RAIL 2011 0.100 CONST 0.100 WARNING SYSTEM AT SOUTH HAVEN RD IN BROOKVILLE. NASSAU COUNTY NFA 2011 0.025 CONST 0.025 093292

AQC:A1S SUFFOLK TPC : < $0.75 M TOTAL 4YR COST : 0.125 0.125 0.000 0.000 0.000

NYSDOT UPGRADE TRAFFIC SIGNAL SYSTEM/ RAILROAD GRADE CROSSING STP RAIL 2011 0.125 CONST 0.125 WARNING SYSTEM AT EAST GATE DRIVE IN TOWN OF HUNTINGTON, NFA 2011 0.031 CONST 0.031 093426 SUFFOLK COUNTY AQC:A1S SUFFOLK TPC : < $0.75 M TOTAL 4YR COST : 0.156 0.156 0.000 0.000 0.000

NYSDOT UPGRADE TRAFFIC SIGNAL SYSYTEM/ RAILROAD GRADE CROSSING AT STP RAIL 2011 0.125 CONST 0.125 WAVERLY AVENUE IN THE TOWN OF BROOKHAVEN, SUFFOLK COUNTY NFA 2011 0.031 CONST 0.031 093427

AQC:A1S SUFFOLK TPC : < $0.75 M TOTAL 4YR COST : 0.156 0.156 0.000 0.000 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 35 of 84 for REGION 10 4-YEAR PROGRAM (FFY) AGENCY PROJECT DESCRIPTION TOTAL Starting October 01, 2010 FUND SOURCES FFY 4-YEAR PHASE PIN PROGRAM FFY FFY FFY FFY in millions of dollars 2011 2012 2013 2014 AQ CODE COUNTY TOTAL PROJECT COST

NYSDOT UPGRADE TRAFFIC SIGNAL SYSTEM / RAILROAD GRADE CROSSING STP RAIL 2011 0.100 CONST 0.100 WARNING SYSTEM IN NASSAU AND SUFFOLK COUNTIES NFA 2011 0.025 CONST 0.025 093428

AQC:A1S MULTI TPC : < $0.75 M TOTAL 4YR COST : 0.125 0.125 0.000 0.000 0.000

NYSDOT UPGRADE TRAFFIC SIGNAL SYSTEM / RAILROAD GRADE CROSSING STP RAIL 2012 0.951 CONST 0.951 WARNING SYSTEM IN NASSAU AND SUFFOLK COUNTIES- FFY12 NFA 2012 0.238 CONST 0.238 093429

AQC:A1S MULTI TPC : $0.6-$1.5 M TOTAL 4YR COST : 1.189 0.000 1.189 0.000 0.000

NYSDOT UPGRADE TRAFFIC SIGNAL CROSSING SYSTEM / RAILROAD GRADE STP RAIL 2013 1.110 CONST 1.110 CROSSING WARNING SYSTEM IN NASSAU AND SUFFOLK COUNTIES -FFY13 NFA 2013 0.278 CONST 0.278 093430

AQC:A1S MULTI TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.388 0.000 0.000 1.388 0.000

NYSDOT UPGRADE TRAFFIC SIGNAL SYSTEM/ RAILROAD GRADE CROSSING STP RAIL 2014 1.121 DETLDES 1.121 WARNING SYSTEM IN NASSAU AND SUFFOLK COUNTIES- FFY 14 NFA 2014 0.280 DETLDES 0.280 093431

AQC:A1S MULTI TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.401 0.000 0.000 0.000 1.401

NYSDOT STATE BRIDGE INSPECTIONS AS REQUIRED BY FHWA ON STATE HIGHWAYS HBRR 2011 0.480 DETLDES 0.480 TO MAINTAIN THE SAFETY OF THE STRUCTURES FOR PUBLIC USE. IN NFA 2011 0.120 DETLDES 0.120 0B1001 NASSAU AND SUFFOLK COUNTIES AQC:A19P MULTI TPC : < $0.75 M TOTAL 4YR COST : 0.600 0.600 0.000 0.000 0.000

NYSDOT STATE FORCES BRIDGE INSPECTION IN SUFFOLK AND NASSAU COUNTY ON HBRR 2011 0.560 DETLDES 0.560 STATE HIGHWAYS 1/1/2012 - 12/31/3013 NFA 2011 0.140 DETLDES 0.140 0B1101

AQC:A19P MULTI TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.700 0.700 0.000 0.000 0.000

NYSDOT BIENNIAL CONSULTANT BRIDGE INSPECTIONS AS REQUIRED BY FHWA TO HBRR 2011 2.880 DETLDES 2.880 MAINTAIN THE SAFETY OF THE STRUCTURES FOR PUBLIC USENASSAU AND NFA 2011 0.720 DETLDES 0.720 0B1102 SUFFOLK COUNTY AQC:A2S MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 3.600 3.600 0.000 0.000 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 36 of 84 for REGION 10 4-YEAR PROGRAM (FFY) AGENCY PROJECT DESCRIPTION TOTAL Starting October 01, 2010 FUND SOURCES FFY 4-YEAR PHASE PIN PROGRAM FFY FFY FFY FFY in millions of dollars 2011 2012 2013 2014 AQ CODE COUNTY TOTAL PROJECT COST

NYSDOT NYSDOT REGION 10 : UNDERWATER INSPECTIONS FOR BRIDGES TO HBRR 2011 1.400 DETLDES 1.400 MAINTAIN THE SAFETY OF THE STRUCTURES FOR PUBLIC USE IN NASSAU NFA 2011 0.350 DETLDES 0.350 0B1103 AND SUFFOLK COUNTIES AQC:A2S MULTI TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.750 1.750 0.000 0.000 0.000

NYSDOT BRIDGE INSPECTION FOR SCOUR MONITORING IN NASSAU AND SUFFOLK HBRR 2012 0.480 DETLDES 0.480 COUNTY NFA 2012 0.120 DETLDES 0.120 0B1104

AQC:A19S MULTI TPC : < $0.75 M TOTAL 4YR COST : 0.600 0.000 0.600 0.000 0.000

NYSDOT STATE BRIDGE INSPECTIONS AS REQUIRED BY FHWA ON STATE HIGHWAYS HBRR 2012 0.560 DETLDES 0.560 TO MAINTAIN THE SAFETY OF THE STRUCTURES FOR PUBLIC USE. IN NFA 2012 0.140 DETLDES 0.140 0B1201 NASSAU AND SUFFOLK COUNTIES AQC:A2S MULTI TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.700 0.000 0.700 0.000 0.000

NYSDOT STATE BRIDGE INSPECTIONS AS REQUIRED BY FHWA ON STATE HIGHWAYS HBRR 2013 0.560 DETLDES 0.560 TO MAINTAIN THE SAFETY OF THE STRUCTURES FOR PUBLIC USE. IN NFA 2013 0.140 DETLDES 0.140 0B1301 NASSAU AND SUFFOLK COUNTIES AQC:A2S MULTI TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.700 0.000 0.000 0.700 0.000

NYSDOT BIENNIAL CONSULTANT BRIDGE INSPECTIONS AS REQUIRED BY FHWA TO HBRR 2013 2.880 DETLDES 2.880 MAINTAIN THE SAFETY OF THE STRUCTURES FOR PUBLIC USENASSAU AND NFA 2013 0.720 DETLDES 0.720 0B1302 SUFFOLK COUNTY AQC:A2S MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 3.600 0.000 0.000 3.600 0.000

NYSDOT NYSDOT REGION 10 : UNDERWATER INSPECTIONS FOR BRIDGES TO HBRR 2013 1.400 DETLDES 1.400 MAINTAIN THE SAFETY OF THE STRUCTURES FOR PUBLIC USE IN NASSAU NFA 2013 0.350 DETLDES 0.350 0B1303 AND SUFFOLK COUNTIES AQC:A2S MULTI TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.750 0.000 0.000 1.750 0.000

NYSDOT BRIDGE INSPECTION FOR SCOUR MONITORING IN NASSAU AND SUFFOLK HBRR 2014 0.480 DETLDES 0.480 COUNTY NFA 2014 0.120 DETLDES 0.120 0b1304

AQC:A19S MULTI TPC : < $0.75 M TOTAL 4YR COST : 0.600 0.000 0.000 0.000 0.600 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 37 of 84 for REGION 10 4-YEAR PROGRAM (FFY) AGENCY PROJECT DESCRIPTION TOTAL Starting October 01, 2010 FUND SOURCES FFY 4-YEAR PHASE PIN PROGRAM FFY FFY FFY FFY in millions of dollars 2011 2012 2013 2014 AQ CODE COUNTY TOTAL PROJECT COST

NYSDOT STATE BRIDGE INSPECTIONS AS REQUIRED BY FHWA ON STATE HIGHWAYS HBRR 2014 0.560 DETLDES 0.560 TO MAINTAIN THE SAFETY OF THE STRUCTURES FOR PUBLIC USE. IN NFA 2014 0.140 DETLDES 0.140 0B1401 NASSAU AND SUFFOLK COUNTIES AQC:A2S MULTI TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.700 0.000 0.000 0.000 0.700

NYSDOT PURCHASE TRAFFIC SIGNAL EQUIPMENT NASSAU AND SUFFOLK COUNTY NFA 2011 0.650 CONST 0.650 NFA 2012 0.650 CONST 0.650 0SIP00 NFA 2013 0.650 OPER 0.650 NFA 2014 0.650 OPER 0.650 AQC:D2P MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 2.600 0.650 0.650 0.650 0.650

NYSDOT CONCRETE PAVEMENT REPAIR INCLUDING JOINT SEALING, DIAMOND STP FLEX 2011 0.202 CONINSP 0.202 GRINDING ET AL ON NY27 BETWEEN PHYLLIS DR AND CR21 TO MAINTAIN NFA 2011 0.050 CONINSP 0.050 0T1376 STATE OF GOOD REPAIR, TOWN OF BROOKHAVEN, SUFFOLK COUNTY STP FLEX 2011 1.687 CONST 1.687 NFA 2011 0.422 CONST 0.422 AQC:A10P MULTI TPC : $2-$4 M TOTAL 4YR COST : 2.361 2.361 0.000 0.000 0.000

NYSDOT BRIDGE PAINTING, CLEANING, RUST REMOVAL & DISPOSAL (LOCATIONS HBRR 2011 0.217 DETLDES 0.217 TO-BE-DETERMINED) TO MAINTAIN STRUCTURAL INTEGRITY ON VARIOUS NFA 2011 0.055 DETLDES 0.055 0T1460 STATE HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK COUNTIES. HBRR 2012 0.213 CONINSP 0.213 NFA 2012 0.053 CONINSP 0.053 HBRR 2012 2.103 CONST 2.103 NFA 2012 0.526 CONST 0.526 AQC:A19P MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 3.167 0.272 2.895 0.000 0.000

NYSDOT PREVENTATIVE MAINTENANCE BRIDGE REPAIRS TO MAINTAIN NFA 2011 0.192 DETLDES 0.192 STRUCTURAL INTEGRITY (LOCATIONS TO-BE-DETERMINED) ON VARIOUS NFA 2013 0.351 CONINSP 0.351 0T1467 STATE HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK COUNTIES. NFA 2013 3.512 CONST 3.512 AQC:A19P MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 4.055 0.192 0.000 3.863 0.000

NYSDOT PREVENTATIVE MAINTENANCE BRIDGE REPAIRS TO MAINTAIN NFA 2012 0.837 DETLDES 0.837 STRUCTURAL INTEGRITY (LOCATIONS TO-BE-DETERMINED) ON VARIOUS NFA 2014 1.113 CONINSP 1.113 0T1468 STATE HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK COUNTIES. NFA 2014 11.133 CONST 11.133 AQC:A19P MULTI TPC : $12.5-$19 M TOTAL 4YR COST : 13.083 0.000 0.837 0.000 12.246 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 38 of 84 for REGION 10 4-YEAR PROGRAM (FFY) AGENCY PROJECT DESCRIPTION TOTAL Starting October 01, 2010 FUND SOURCES FFY 4-YEAR PHASE PIN PROGRAM FFY FFY FFY FFY in millions of dollars 2011 2012 2013 2014 AQ CODE COUNTY TOTAL PROJECT COST

NYSDOT PREVENTATIVE MAINTENANCE BRIDGE REPAIRS TO MAINTAIN NFA 2013 1.501 DETLDES 1.501 STRUCTURAL INTEGRITY (LOCATIONS TO-BE-DETERMINED) ON VARIOUS 0T1469 STATE HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK COUNTIES. AQC:A19P MULTI TPC : $12.5-$19 M TOTAL 4YR COST : 1.501 0.000 0.000 1.501 0.000

NYSDOT BRIDGE IMPROVEMENTS (LOCATIONS TO-BE-DETERMINED) TO MAINTAIN NFA 2013 1.179 PRELDES 1.179 STRUCTURAL INTEGRITY ON VARIOUS STATE HIGHWAYS & PARKWAYS IN 0T1472 NASSAU & SUFFOLK COUNTIES AQC:A19P MULTI TPC : $15-$25 M TOTAL 4YR COST : 1.179 0.000 0.000 1.179 0.000

NYSDOT TRAFFIC SIGNAL REQUIREMENTS CONTRACT 042006 NFA 2013 0.316 CONINSP 0.316 NFA 2013 3.610 CONST 3.610 0T1517

AQC:D2P MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 3.926 0.000 0.000 3.926 0.000

NYSDOT BLOCKOUT FOR FUTURE PAVEMENT REHABILITATION PROJECTS NFA 2013 0.591 DETLDES 0.591 (LOCATIONS TO-BE-DETERMINED) ON VARIOUS STATE HIGHWAYS & 0T1535 PARKWAYS IN NASSAU & SUFFOLK COUNTIES. AQC:A10P MULTI TPC : $9.5-15.5 M TOTAL 4YR COST : 0.591 0.000 0.000 0.591 0.000

NYSDOT BLOCKOUT FOR FUTURE PAVEMENT REHABILITATION PROJECTS TO NFA 2011 0.607 DETLDES 0.607 MAINTAIN STATE OF GOOD REPAIR(LOCATIONS TO-BE-DETERMINED) ON 0T1537 VARIOUS STATE HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK COUNTIES. AQC:A10P MULTI TPC : $12.5-$19 M TOTAL 4YR COST : 0.607 0.607 0.000 0.000 0.000

NYSDOT SAFETY IMPROVEMENTS TO ADRESS A A PRIORITY INVESTIGATION NFA 2013 0.804 DETLDES 0.804 LOCATION (TO-BE-DETERMINED) ON VARIOUS STATE HIGHWAYS & 0T1543 PARKWAYS IN NASSAU & SUFFOLK COUNTIES. AQC:A6P MULTI TPC : $12.5-$19 M TOTAL 4YR COST : 0.804 0.000 0.000 0.804 0.000

NYSDOT SAFETY IMPROVEMENTS TO ADRESS A A PRIORITY INVESTIGATION NFA 2013 1.174 ROWACQU 1.174 LOCATION (TO-BE-DETERMINED) ON VARIOUS STATE HIGHWAYS & NFA 2014 0.218 DETLDES 0.218 0T1544 PARKWAYS IN NASSAU & SUFFOLK COUNTIES. AQC:A6P MULTI TPC : $7.5-$12 M TOTAL 4YR COST : 1.392 0.000 0.000 1.174 0.218 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 39 of 84 for REGION 10 4-YEAR PROGRAM (FFY) AGENCY PROJECT DESCRIPTION TOTAL Starting October 01, 2010 FUND SOURCES FFY 4-YEAR PHASE PIN PROGRAM FFY FFY FFY FFY in millions of dollars 2011 2012 2013 2014 AQ CODE COUNTY TOTAL PROJECT COST

NYSDOT SAFETY IMPROVEMENTS TO ADRESS A A PRIORITY INVESTIGATION NFA 2014 0.217 DETLDES 0.217 LOCATION (TO-BE-DETERMINED) ON VARIOUS STATE HIGHWAYS & NFA 2014 1.174 ROWACQU 1.174 0T1545 PARKWAYS IN NASSAU & SUFFOLK COUNTIES. AQC:A6P MULTI TPC : $7.5-$12 M TOTAL 4YR COST : 1.391 0.000 0.000 0.000 1.391

NYSDOT REHABILITATE RECHARGE BASINS INCLUDING SLOPE STABILIZATION, HEAD NFA 2011 0.149 DETLDES 0.149 WALL REPAIR, ET AL(LOCATIONS TO-BE-DETERMINED) ON VARIOUS STATE NFA 2012 0.258 CONINSP 0.258 0T1584 HIGHWAYS IN NASSAU & SUFFOLK COUNTIES. NFA 2012 2.151 CONST 2.151 AQC:A2P MULTI TPC : $2-$4 M TOTAL 4YR COST : 2.558 0.149 2.409 0.000 0.000

NYSDOT BLOCKOUT OF FUNDS FOR FUTURE SAFETY PROJECTS ON VARIOUS STATE NFA 2012 0.282 DETLDES 0.282 HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK COUNTIES. THE PROJECT HSIP 2014 0.298 CONINSP 0.298 0T1594 DEVELOPMENT WILL OCCUR BASED OFF OF THE STRATEGIC HIGHWAY NFA 2014 0.033 CONINSP 0.033 SAFETY PLAN (LOCATIONS TO-BE-DETERMINED) HSIP 2014 2.975 CONST 2.975 NFA 2014 0.331 CONST 0.331 AQC:A6P MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 3.919 0.000 0.282 0.000 3.637

NYSDOT BLOCKOUT OF FUNDS FOR FUTURE SAFETY PROJECTS ON VARIOUS STATE HSIP 2013 1.929 DETLDES 1.929 HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK COUNTIES. THE PROJECT NFA 2013 0.214 DETLDES 0.214 0T1595 DEVELOPMENT WILL OCCUR BASED OFF OF THE STRATEGIC HIGHWAY SAFETY PLAN (LOCATIONS TO-BE-DETERMINED) AQC:A6P MULTI TPC : $15-$25 M TOTAL 4YR COST : 2.143 0.000 0.000 2.143 0.000

NYSDOT SAFETY IMPROVEMENT PROJECT SCOPE TO-BE-DETERMINED BASED ON NFA 2014 0.943 DETLDES 0.943 STUDY OF NY25 FROM ROUND SWAMP RD TO NY454, TOWNS OF 0T1651 HUNTINGTON AND SMITHTOWN, SUFFOLK COUNTY AQC:A6P SUFFOLK TPC : $9.5-15.5 M TOTAL 4YR COST : 0.943 0.000 0.000 0.000 0.943

NYSDOT CONCRETE PAVEMENT REPAIR INCLUDING JOINT SEALING, DIAMOND IM 2011 0.101 DETLDES 0.101 GRINDING ETC ON I495 TO MAINTAIN STATE OF GOOD REPAIR AT VARIOUS NFA 2011 0.011 DETLDES 0.011 0T1679 LOCATIONS IN NASSAU & SUFFOLK COUNTIES. IM 2012 0.232 CONINSP 0.232 NFA 2012 0.026 CONINSP 0.026 IM 2012 1.937 CONST 1.937 NFA 2012 0.215 CONST 0.215 AQC:A10P MULTI TPC : $2-$4 M TOTAL 4YR COST : 2.522 0.112 2.410 0.000 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 40 of 84 for REGION 10 4-YEAR PROGRAM (FFY) AGENCY PROJECT DESCRIPTION TOTAL Starting October 01, 2010 FUND SOURCES FFY 4-YEAR PHASE PIN PROGRAM FFY FFY FFY FFY in millions of dollars 2011 2012 2013 2014 AQ CODE COUNTY TOTAL PROJECT COST

NYSDOT MILLING, CONCRETE & ASPHALT PAVEMENT REPAIRS, SINGLE COURSE NFA 2011 0.278 DETLDES 0.278 OVERLAY ON I495 (LOCATIONS TO-BE-DETERMINED) TO MAINTAIN STATE IM 2012 0.484 CONINSP 0.484 0T1684 OF GOOD REPAIR IN NASSAU & SUFFOLK COUNTIES NFA 2012 0.185 CONINSP 0.185 IM 2012 4.836 CONST 4.836 NFA 2012 1.844 CONST 1.844 AQC:A10P MULTI TPC : $6-$9.4 M TOTAL 4YR COST : 7.627 0.278 7.349 0.000 0.000

NYSDOT CONCRETE PAVEMENT REPAIR INCLUDING JOINT SEALING, DIAMOND NFA 2012 0.113 DETLDES 0.113 GRINDING ET AL(LOCATIONS TO-BE-DETERMINED) TO MAINTAIN STATE OF STP LG URBAN 2013 0.212 CONINSP 0.212 0T1686 GOOD REPAIR ON VARIOUS STATE HIGHWAYS & PARKWAYS IN NASSAU & NFA 2013 0.053 CONINSP 0.053 SUFFOLK COUNTIES. STP LG URBAN 2013 1.764 CONST 1.764 NFA 2013 0.441 CONST 0.441 AQC:A10P MULTI TPC : $2-$4 M TOTAL 4YR COST : 2.583 0.000 0.113 2.470 0.000

NYSDOT REHABILITATE RECHARGE BASINS INCLUDING SLOPE STABILIZATION, HEAD NFA 2013 0.184 DETLDES 0.184 WALL REPAIR, ET AL(LOCATIONS TO-BE-DETERMINED) TO MAINTAIN STATE NFA 2014 0.272 CONINSP 0.272 0T1689 OF GOOD REPAIRON VARIOUS STATE HIGHWAYS & PARKWAYS IN NASSAU NFA 2014 2.720 CONST 2.720 & SUFFOLK COUNTIES. AQC:A2P MULTI TPC : $2-$4 M TOTAL 4YR COST : 3.176 0.000 0.000 0.184 2.992

NYSDOT MILLING, CONCRETE & ASPHALT PAVEMENT REPAIRS, SINGLE COURSE NFA 2012 0.282 DETLDES 0.282 OVERLAY ON I495 (LOCATIONS TO-BE-DETERMINED) TO MAINTAIN STATE STP LG URBAN 2013 0.088 CONINSP 0.088 0T1691 OF GOOD REPAIR IN NASSAU & SUFFOLK COUNTIES NFA 2013 0.462 CONINSP 0.462 STP LG URBAN 2013 0.882 CONST 0.882 NFA 2013 4.628 CONST 4.628 AQC:A10P MULTI TPC : $6-$9.4 M TOTAL 4YR COST : 6.342 0.000 0.282 6.060 0.000

NYSDOT REMOVAL OR PAINT OVER OF GRAFITTI, REPAIR NOISE WALLS, MAINTAIN NFA 2011 0.180 DETLDES 0.180 THE 7 PARK & RIDE LOTS ALONG I495, ALL NYS BIKEWAYS, REST AREAS, NFA 2013 0.333 CONINSP 0.333 0T1694 PUBLIC TELEPHONE AREAS ALONG PARKWAYS & BUS SHELTERS ON NYS NFA 2013 3.333 CONST 3.333 RIGHT-OF-WAY TO MAINTAIN STATE OF GOOD REPAIR NASSAU AND SUFFOLK AQC:C8P MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 3.846 0.180 0.000 3.666 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 41 of 84 for REGION 10 4-YEAR PROGRAM (FFY) AGENCY PROJECT DESCRIPTION TOTAL Starting October 01, 2010 FUND SOURCES FFY 4-YEAR PHASE PIN PROGRAM FFY FFY FFY FFY in millions of dollars 2011 2012 2013 2014 AQ CODE COUNTY TOTAL PROJECT COST

NYSDOT RESPOND TO EMERGENCIES THAT ARE BEYOND THE CAPABILITIES OF NYS NFA 2011 0.180 DETLDES 0.180 MAINTENANCE FORCES TO ENSURE THE SAFETY OF THE PUBLIC ON NFA 2013 0.258 CONINSP 0.258 0T1697 VARIOUS STATE HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK NFA 2013 2.152 CONST 2.152 COUNTIES. AQC:A2P MULTI TPC : $2-$4 M TOTAL 4YR COST : 2.590 0.180 0.000 2.410 0.000

NYSDOT REPLACE OR UPGRADE SIGNALS AND/OR APPURTENANCES & INSTALL NEW NFA 2011 0.135 DETLDES 0.135 SIGNALS TO MAINTAIN STATE OF GOOD REPAIR OR SAFETY IMPROVEMENT STP FLEX 2012 0.290 CONINSP 0.290 0T1699 ON VARIOUS STATE HIGHWAYS IN NASSAU & SUFFOLK COUNTIES NFA 2012 0.072 CONINSP 0.072 STP FLEX 2012 2.903 CONST 2.903 NFA 2012 0.726 CONST 0.726 AQC:D2P MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 4.126 0.135 3.991 0.000 0.000

NYSDOT INSTALLATION AND REPLACEMENT OF DETERIORATED PAVEMENT NFA 2012 0.250 DETLDES 0.250 MARKINGS & PLOWABLE REFLECTIVE MARKERS ON VARIOUS STATE STP LG URBAN 2013 0.430 CONINSP 0.430 0T1701 HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK COUNTIES. NFA 2013 0.107 CONINSP 0.107 STP LG URBAN 2013 4.300 CONST 4.300 NFA 2013 1.075 CONST 1.075 AQC:A10P MULTI TPC : $4.6-$7.5 M TOTAL 4YR COST : 6.162 0.000 0.250 5.912 0.000

NYSDOT REPLACE OR UPGRADE SIGNALS AND/OR APPURTENANCES & INSTALL NEW NFA 2012 0.293 DETLDES 0.293 SIGNALS TO MAINTAIN STATE OF GOOD REPAIR OR SAFETY IMPROVEMENT STP FLEX 2013 0.264 CONINSP 0.264 0T1702 ON VARIOUS STATE HIGHWAYS IN NASSAU & SUFFOLK COUNTIES NFA 2013 0.066 CONINSP 0.066 STP FLEX 2013 2.644 CONST 2.644 NFA 2013 0.661 CONST 0.661 AQC:D2P MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 3.928 0.000 0.293 3.635 0.000

NYSDOT CORRECT PRIORITY HIGHWAY FOODING LOCATIONS, PROVIDE NFA 2013 0.160 DETLDES 0.160 STORMWATER RUN-OFF IMPROVEMENTS INCLUDING 1 LOC IN TOWN OF 0T1706 RIVERHEAD FOR SAFETEA-LU EARMARK & OTHER LOC NAS & SUF. AQC:C11P MULTI TPC : $6-$9.4 M TOTAL 4YR COST : 0.160 0.000 0.000 0.160 0.000

NYSDOT CORRECT PRIORITY HIGHWAY FLOODING LOCATIONS AND REPLACE CATCH STP LG URBAN 2013 0.077 DETLDES 0.077 BASINS WITHIN ESTUARY WATERSHED AREAS WITH VORTEX TYPE BASINS NFA 2013 0.018 DETLDES 0.018 0T1707 IN NASSAU & SUFFOLK COUNTIES. (LOCATIONS TO BE DETERMINED) AQC:C11P MULTI TPC : $6-$9.4 M TOTAL 4YR COST : 0.095 0.000 0.000 0.095 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 42 of 84 for REGION 10 4-YEAR PROGRAM (FFY) AGENCY PROJECT DESCRIPTION TOTAL Starting October 01, 2010 FUND SOURCES FFY 4-YEAR PHASE PIN PROGRAM FFY FFY FFY FFY in millions of dollars 2011 2012 2013 2014 AQ CODE COUNTY TOTAL PROJECT COST

NYSDOT BRIDGE PAINTING, CLEANING, RUST REMOVAL & DISPOSAL (LOCATIONS NFA 2012 0.265 DETLDES 0.265 TO-BE-DETERMINED) TO MAINTAIN STRUCTURAL INTEGRITY ON VARIOUS HBRR 2014 0.529 CONINSP 0.529 0T1714 STATE HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK COUNTIES. NFA 2014 0.132 CONINSP 0.132 HBRR 2014 5.289 CONST 5.289 NFA 2014 1.322 CONST 1.322 AQC:A19P MULTI TPC : $7.5-$12 M TOTAL 4YR COST : 7.537 0.000 0.265 0.000 7.272

NYSDOT REHABILITE SIDEWALK & CURB RAMPS (LOCATIONS TO-BE-DETERMINED) NFA 2011 0.180 DETLDES 0.180 ON VARIOUS STATE ROADS TO MAINTAIN STATE OF GOOD REPAIR IN NFA 2013 0.322 CONINSP 0.322 0T1718 NASSAU & SUFFOLK COUNTIES. NFA 2013 3.225 CONST 3.225 . AQC:A6P MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 3.727 0.180 0.000 3.547 0.000

NYSDOT PROVIDE LANDSCAPE RESTORATION & MAINTAIN EXISTING LANDSCAPE NFA 2013 0.189 DETLDES 0.189 AREAS, TRIM OR REMOVE TREES THAT IMPEDE VISIBILITY (LOCATIONS 0T1722 TO-BE-DETERMINED) ON VARIOUS STATE HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK COUNTIES. AQC:C11P MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 0.189 0.000 0.000 0.189 0.000

NYSDOT SIDEWALK CONSTRUCTION: CONNECT FRAGMENTENTED SIDEWALKS ON STP FLEX 2012 0.151 DETLDES 0.151 STATE HIGHWAYS AND LINK SIDEWALKS WITH OTHER MODES OF NFA 2012 0.038 DETLDES 0.038 0T1733 TRANSPORTATION AS REQUIRED BY AMERICANS WITH DISABILITIES ACT. STP FLEX 2014 0.091 CONINSP 0.091 NASSAU AND SUFFOLK COUNTY NFA 2014 0.023 CONINSP 0.023 STP FLEX 2014 0.911 CONST 0.911 NFA 2014 0.228 CONST 0.228 AQC:A6P MULTI TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.442 0.000 0.189 0.000 1.253

NYSDOT MILLING, CONCRETE & ASPHALT PAVEMENT REPAIRS, SINGLE COURSE NFA 2013 0.271 DETLDES 0.271 OVERLAY ON I495 (LOCATIONS TO-BE-DETERMINED) TO MAINTAIN STATE STP FLEX 2014 0.544 CONINSP 0.544 0T1765 OF GOOD REPAIR IN NASSAU & SUFFOLK COUNTIES NFA 2014 0.136 CONINSP 0.136 STP FLEX 2014 5.447 CONST 5.447 NFA 2014 1.362 CONST 1.362 AQC:A10P MULTI TPC : $6-$9.4 M TOTAL 4YR COST : 7.760 0.000 0.000 0.271 7.489

NYSDOT MILLING, CONCRETE & ASPHALT PAVEMENT REPAIRS, SINGLE COURSE NFA 2013 0.482 DETLDES 0.482 OVERLAY ON I495 (LOCATIONS TO-BE-DETERMINED) TO MAINTAIN STATE 0T1766 OF GOOD REPAIR IN NASSAU & SUFFOLK COUNTIES AQC:A19P MULTI TPC : $9.5-15.5 M TOTAL 4YR COST : 0.482 0.000 0.000 0.482 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 43 of 84 for REGION 10 4-YEAR PROGRAM (FFY) AGENCY PROJECT DESCRIPTION TOTAL Starting October 01, 2010 FUND SOURCES FFY 4-YEAR PHASE PIN PROGRAM FFY FFY FFY FFY in millions of dollars 2011 2012 2013 2014 AQ CODE COUNTY TOTAL PROJECT COST

NYSDOT SIGN REPAIRS & INSTALLATIONS TO MAINTAIN STATE OF GOOD REPAIR ON NFA 2012 0.100 DETLDES 0.100 VARIOUS STATE HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK COUNTIES STP FLEX 2013 0.212 CONINSP 0.212 0T1768 NFA 2013 0.053 CONINSP 0.053 STP FLEX 2013 1.764 CONST 1.764 NFA 2013 0.441 CONST 0.441 AQC:C13P MULTI TPC : $2-$4 M TOTAL 4YR COST : 2.570 0.000 0.100 2.470 0.000

NYSDOT INSTALLATION AND REPLACEMENT OF DETERIORATED PAVEMENT NFA 2013 0.314 DETLDES 0.314 MARKINGS & PLOWABLE REFLECTIVE MARKERS ON VARIOUS STATE STP FLEX 2014 0.441 CONINSP 0.441 0T1769 HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK COUNTIES. NFA 2014 0.650 CONINSP 0.650 STP FLEX 2014 4.407 CONST 4.407 NFA 2014 6.500 CONST 6.500 AQC:A10P MULTI TPC : $9.5-15.5 M TOTAL 4YR COST : 12.312 0.000 0.000 0.314 11.998

NYSDOT BRIDGE CLEANING (LOCATIONS TO-BE-DETERMINED) TO MAINTAIN NFA 2013 0.049 DETLDES 0.049 STRUCTURAL INTEGRITY ON VARIOUS STATE HIGHWAYS & PARKWAYS IN STP FLEX 2013 0.112 CONINSP 0.112 0T1770 NASSAU & SUFFOLK COUNTIES. NFA 2013 0.028 CONINSP 0.028 STP FLEX 2013 0.937 CONST 0.937 NFA 2013 0.235 CONST 0.235 AQC:A19P MULTI TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.361 0.000 0.000 1.361 0.000

NYSDOT PROVIDE SAFETY & PAVEMENT IMPROVEMENTS AND EMERGENCY REPAIRS NFA 2012 0.245 DETLDES 0.245 ON AN AS-NEEDED-BASIS AS AN EMERGENCY RESPONSE ON VARIOUS NFA 2013 0.468 CONINSP 0.468 0T1771 STATE HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK COUNTIES. NFA 2013 4.684 CONST 4.684 AQC:A10P MULTI TPC : $4.6-$7.5 M TOTAL 4YR COST : 5.397 0.000 0.245 5.152 0.000

NYSDOT ROUT & SEAL ASPHALT PAVEMENT CRACKS AND JOINT OVERLAY REPAIR NFA 2012 0.184 DETLDES 0.184 TO MAINTAIN STATE OF GOOD REPAIR (LOCATIONS TO-BE-DETERMINED) ON STP FLEX 2013 0.106 CONINSP 0.106 0T1773 VARIOUS STATE HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK COUNTIES NFA 2013 0.158 CONINSP 0.158 STP FLEX 2013 0.882 CONST 0.882 NFA 2013 1.324 CONST 1.324 AQC:A10P MULTI TPC : $2-$4 M TOTAL 4YR COST : 2.654 0.000 0.184 2.470 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 44 of 84 for REGION 10 4-YEAR PROGRAM (FFY) AGENCY PROJECT DESCRIPTION TOTAL Starting October 01, 2010 FUND SOURCES FFY 4-YEAR PHASE PIN PROGRAM FFY FFY FFY FFY in millions of dollars 2011 2012 2013 2014 AQ CODE COUNTY TOTAL PROJECT COST

NYSDOT CONCRETE PAVEMENT REPAIR INCLUDING JOINT SEALING, DIAMOND NFA 2013 0.115 DETLDES 0.115 GRINDING ET AL TO MAINTAIN STATE OF GOOD REPAIR (LOCATIONS STP LG URBAN 2014 0.212 CONINSP 0.212 0T1774 TO-BE-DETERMINED) ON VARIOUS STATE HIGHWAYS & PARKWAYS IN NFA 2014 0.053 CONINSP 0.053 NASSAU & SUFFOLK COUNTIES. STP LG URBAN 2014 1.764 CONST 1.764 NFA 2014 0.441 CONST 0.441 AQC:A10P MULTI TPC : $2-$4 M TOTAL 4YR COST : 2.585 0.000 0.000 0.115 2.470

NYSDOT REHABILITATE RECHARGE BASINS INCLUDING SLOPE STABILIZATION, HEAD NFA 2013 0.157 DETLDES 0.157 WALL REPAIR, ET AL TO MAINTAIN STATE OF GOOD REPAIR (LOCATIONS 0T1775 TO-BE-DETERMINED) ON VARIOUS STATE HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK COUNTIES. AQC:A2P MULTI TPC : $2-$4 M TOTAL 4YR COST : 0.157 0.000 0.000 0.157 0.000

NYSDOT CLEAN BASINS FILLED W/DEBRIS, REPAIR, REPLACE OR PROVIDE MISSING NFA 2012 0.774 DETLDES 0.774 COLLARS, REPAIR BASIN WALLS,REPAIR OR REPLACE BROKEN PIPES, STP FLEX 2013 0.088 CONINSP 0.088 0T1776 REPLACE GRATES, REPLACE BASINS, PROVIDE CONNECT ISOLATED BASINS NFA 2013 0.690 CONINSP 0.690 TO DRAINAGE SYSTEM TO PREVENT HIGHWAY FLOODING IN NASSAU STP FLEX 2013 0.881 CONST 0.881 &SUFFOLK NFA 2013 6.900 CONST 6.900 AQC:A10P MULTI TPC : $7.5-$12 M TOTAL 4YR COST : 9.333 0.000 0.774 8.559 0.000

NYSDOT ENVIRONMENTAL INITIATIVES CONTRACT -WILL PROVIDE STORMWATER NFA 2013 0.198 DETLDES 0.198 RUNOFF IMPROVEMENTS, IMPROVE ACCESS TO FISHING AREAS, RESTORE 0T1777 WETLAND AREAS AND CLEAN DRIANAGE ON VARIOUS STATE HIGHWAYS NASSAU AND SUFFOLK COUNTY AQC:C11P MULTI TPC : < $0.75 M TOTAL 4YR COST : 0.198 0.000 0.000 0.198 0.000

NYSDOT PREVENTATIVE MAINTENANCE BRIDGE REPAIRS TO MAINTAIN NFA 2013 0.318 DETLDES 0.318 STRUCTURAL INTEGRITY (LOCATIONS TO-BE-DETERMINED) ON VARIOUS 0T1778 STATE HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK COUNTIES. AQC:A19P MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 0.318 0.000 0.000 0.318 0.000

NYSDOT BRIDGE PAINTING, CLEANING, RUST REMOVAL & DISPOSAL TO MAINTAIN STP LG URBAN 2013 0.277 DETLDES 0.277 STRUCTURAL INTEGRITY (LOCATIONS TO-BE-DETERMINED) ON VARIOUS NFA 2013 0.340 DETLDES 0.340 0T1779 STATE HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK COUNTIES. AQC:A19P MULTI TPC : $9.5-15.5 M TOTAL 4YR COST : 0.617 0.000 0.000 0.617 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 45 of 84 for REGION 10 4-YEAR PROGRAM (FFY) AGENCY PROJECT DESCRIPTION TOTAL Starting October 01, 2010 FUND SOURCES FFY 4-YEAR PHASE PIN PROGRAM FFY FFY FFY FFY in millions of dollars 2011 2012 2013 2014 AQ CODE COUNTY TOTAL PROJECT COST

NYSDOT REMOVAL OR PAINT OVER OF GRAFITTI, REPAIR NOISE WALLS, MAINTAIN NFA 2013 0.189 DETLDES 0.189 THE 7 PARK & RIDE LOTS ALONG I495, ALL NYS BIKEWAYS, REST AREAS, 0T1781 PUBLIC TELEPHONE AREAS ALONG PARKWAYS & BUS SHELTERS ON NYS RIGHT-OF-WAY TO MAINTAIN STATE OF GOOD REPAIR NASSAU & SUFFOLK AQC:C8P MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 0.189 0.000 0.000 0.189 0.000

NYSDOT INSTALLATION AND REPLACEMENT OF DETERIORATED PAVEMENT NFA 2013 0.405 DETLDES 0.405 MARKINGS & PLOWABLE REFLECTIVE MARKERS ON VARIOUS STATE 0T1782 HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK COUNTIES. AQC:A10P MULTI TPC : $6-$9.4 M TOTAL 4YR COST : 0.405 0.000 0.000 0.405 0.000

NYSDOT ROUT & SEAL ASPHALT PAVEMENT CRACKS AND JOINT OVERLAY REPAIR NFA 2013 0.160 DETLDES 0.160 TO MAINTAIN STATE OF GOOD REPAIR (LOCATIONS TO-BE-DETERMINED) ON NFA 2013 0.160 DETLDES 0.160 0T1784 VARIOUS STATE HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK COUNTIES STP FLEX 2014 0.106 CONINSP 0.106 NFA 2014 0.027 CONINSP 0.027 STP FLEX 2014 0.883 CONST 0.883 NFA 2014 0.227 CONST 0.227 AQC:A10P NASSAU TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.563 0.000 0.000 0.320 1.243

NYSDOT CONCRETE PAVEMENT REPAIR INCLUDING JOINT SEALING, DIAMOND NFA 2014 0.117 DETLDES 0.117 GRINDING ET AL TO MAINTAIN STATE OF GOOD REPAIR (LOCATIONS 0T1785 TO-BE-DETERMINED) ON VARIOUS STATE HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK COUNTIES. AQC:A10P MULTI TPC : $2-$4 M TOTAL 4YR COST : 0.117 0.000 0.000 0.000 0.117

NYSDOT CLEAN BASINS FILLED W/DEBRIS, REPAIR, REPLACE OR PROVIDE MISSING NFA 2013 0.776 DETLDES 0.776 COLLARS, REPAIR OR REPLACE BROKEN PIPES, REPLACE GRATES, REPLACE STP FLEX 2014 0.088 CONINSP 0.088 0T1787 BASINS, PROVIDE CONNECT ISOLATED BASINS TO DRAINAGE SYSTEM TO NFA 2014 0.023 CONINSP 0.023 PREVENT HIGHWAY FLOODING IN NASSAU & SUFFOLK STP FLEX 2014 0.881 CONST 0.881 NFA 2014 0.227 CONST 0.227 AQC:A10P MULTI TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.995 0.000 0.000 0.776 1.219

NYSDOT REPLACE OR UPGRADE SIGNALS AND/OR APPURTENANCES & INSTALL NEW NFA 2013 0.285 DETLDES 0.285 SIGNALS TO MAINTAIN STATE OF GOOD REPAIR OR SAFETY IMPROVEMENT STP LG URBAN 2014 0.264 CONINSP 0.264 0T1788 ON VARIOUS STATE HIGHWAYS IN NASSAU & SUFFOLK COUNTIES NFA 2014 0.068 CONINSP 0.068 STP LG URBAN 2014 2.645 CONST 2.645 NFA 2014 0.681 CONST 0.681 AQC:D2P MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 3.943 0.000 0.000 0.285 3.658 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 46 of 84 for REGION 10 4-YEAR PROGRAM (FFY) AGENCY PROJECT DESCRIPTION TOTAL Starting October 01, 2010 FUND SOURCES FFY 4-YEAR PHASE PIN PROGRAM FFY FFY FFY FFY in millions of dollars 2011 2012 2013 2014 AQ CODE COUNTY TOTAL PROJECT COST

NYSDOT RESPOND TO EMERGENCIES THAT ARE BEYOND THE CAPABILITIES OF NYS NFA 2013 0.160 DETLDES 0.160 MAINTENANCE FORCES TO ENSURE THE SAFETY OF THE PUBLIC 0T1789 (LOCATIONS TO-BE-DETERMINED) ON VARIOUS STATE HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK COUNTIES. AQC:D2P MULTI TPC : $2-$4 M TOTAL 4YR COST : 0.160 0.000 0.000 0.160 0.000

NYSDOT NY135 NORTHBOUND TO NY25 EASTBOUND RAMP IMPROVEMENTS (SCOPE NFA 2014 0.160 DETLDES 0.160 TO BE DETERMINED) TO MAINTAIN STATE OF GOOD REPAIR TOWN OF 0T1792 OYSTER BAY, NASSAU COUNTY AQC:A19P NASSAU TPC : $1.2-$2.5 M TOTAL 4YR COST : 0.160 0.000 0.000 0.000 0.160

NYSDOT ROUT & SEAL ASPHALT PAVEMENT CRACKS AND JOINT OVERLAY REPAIR NFA 2014 0.192 DETLDES 0.192 TO MAINTAIN STATE OF GOOD REPAIR (LOCATIONS TO-BE-DETERMINED) ON 0T1860 VARIOUS STATE HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK COUNTIES AQC:A10S MULTI TPC : $2-$4 M TOTAL 4YR COST : 0.192 0.000 0.000 0.000 0.192

NYSDOT ROUT & SEAL ASPHALT PAVEMENT CRACKS AND JOINT OVERLAY REPAIR NFA 2014 0.198 DETLDES 0.198 TO MAINTAIN STATE OF GOOD REPAIR (LOCATIONS TO-BE-DETERMINED) ON 0T1861 VARIOUS STATE HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK COUNTIES AQC:A10S MULTI TPC : $2-$4 M TOTAL 4YR COST : 0.198 0.000 0.000 0.000 0.198

NYSDOT MILLING, CONCRETE & ASPHALT PAVEMENT REPAIRS, SINGLE COURSE NFA 2014 0.292 DETLDES 0.292 OVERLAY ON I495 (LOCATIONS TO-BE-DETERMINED) TO MAINTAIN STATE 0T1866 OF GOOD REPAIR IN NASSAU & SUFFOLK COUNTIES AQC:A10S MULTI TPC : $7.5-$12 M TOTAL 4YR COST : 0.292 0.000 0.000 0.000 0.292

NYSDOT MILLING, CONCRETE & ASPHALT PAVEMENT REPAIRS, SINGLE COURSE NFA 2014 0.301 DETLDES 0.301 OVERLAY ON I495 (LOCATIONS TO-BE-DETERMINED) TO MAINTAIN STATE 0T1867 OF GOOD REPAIR IN NASSAU & SUFFOLK COUNTIES AQC:A10S MULTI TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.301 0.000 0.000 0.000 0.301

NYSDOT INSTALLATION AND REPLACEMENT OF DETERIORATED PAVEMENT NFA 2014 0.486 DETLDES 0.486 MARKINGS & PLOWABLE REFLECTIVE MARKERS ON VARIOUS STATE 0T1869 HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK COUNTIES. AQC:A10S MULTI TPC : $1.2-$2.5 M TOTAL 4YR COST : 0.486 0.000 0.000 0.000 0.486 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 47 of 84 for REGION 10 4-YEAR PROGRAM (FFY) AGENCY PROJECT DESCRIPTION TOTAL Starting October 01, 2010 FUND SOURCES FFY 4-YEAR PHASE PIN PROGRAM FFY FFY FFY FFY in millions of dollars 2011 2012 2013 2014 AQ CODE COUNTY TOTAL PROJECT COST

NYSDOT CLEAN BASINS FILLED W/DEBRIS, REPAIR, REPLACE OR PROVIDE MISSING NFA 2014 0.093 DETLDES 0.093 COLLARS, REPAIR BASIN WALLS, CLEAN CLOGGED PIPES, REPAIR OR 0T1872 REPLACE BROKEN PIPES, PROVIDE CONNECT ISOLATED BASINS TO DRAINAGE SYSTEM TO PREVENT HIGHWAY FLOODING IN NASSAU&SUFFOLK CO. AQC:A2S MULTI TPC : $7.5-$12 M TOTAL 4YR COST : 0.093 0.000 0.000 0.000 0.093

NYSDOT BRIDGE PAINTING, CLEANING, RUST REMOVAL & DISPOSAL (LOCATIONS NFA 2014 0.268 DETLDES 0.268 TO-BE-DETERMINED) TO MAINTAIN STRUCTURAL INTEGRITY ON VARIOUS 0T1878 STATE HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK COUNTIES. AQC:A19S MULTI TPC : $7.5-$12 M TOTAL 4YR COST : 0.268 0.000 0.000 0.000 0.268

NYSDOT REHABILITATE RECHARGE BASINS INCLUDING SLOPE STABILIZATION, HEAD NFA 2014 0.157 DETLDES 0.157 WALL REPAIR, ET AL TO MAINTAIN STATE OF GOOD REPAIR(LOCATIONS 0T1882 TO-BE-DETERMINED) ON VARIOUS STATE HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK COUNTIES. AQC:A2S MULTI TPC : $2-$4 M TOTAL 4YR COST : 0.157 0.000 0.000 0.000 0.157

NYSDOT REPLACE OR UPGRADE SIGNALS AND/OR APPURTENANCES & INSTALL NEW NFA 2014 0.140 DETLDES 0.140 SIGNALS TO MAINTAIN STATE OF GOOD REPAIR OR SAFETY IMPROVEMENT 0T1885 ON VARIOUS STATE HIGHWAYS IN NASSAU & SUFFOLK COUNTIES AQC:D2S MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 0.140 0.000 0.000 0.000 0.140

NYSDOT PREVENTATIVE MAINTENANCE BRIDGE REPAIRS TO MAINTAIN NFA 2014 0.325 DETLDES 0.325 STRUCTURAL INTEGRITY (LOCATIONS TO-BE-DETERMINED) ON VARIOUS 0T1888 STATE HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK COUNTIES. AQC:A19S MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 0.325 0.000 0.000 0.000 0.325

NYSDOT SIGN REPAIRS & INSTALLATIONS TO MAINTAIN STATE OF GOOD REPAIR OR NFA 2014 0.120 DETLDES 0.120 SAFETY IMPROVEMENT ON VARIOUS STATE HIGHWAYS & PARKWAYS IN 0T1891 NASSAU & SUFFOLK COUNTIES AQC:A7P MULTI TPC : $2-$4 M TOTAL 4YR COST : 0.120 0.000 0.000 0.000 0.120 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 48 of 84 for REGION 10 4-YEAR PROGRAM (FFY) AGENCY PROJECT DESCRIPTION TOTAL Starting October 01, 2010 FUND SOURCES FFY 4-YEAR PHASE PIN PROGRAM FFY FFY FFY FFY in millions of dollars 2011 2012 2013 2014 AQ CODE COUNTY TOTAL PROJECT COST

NYSDOT REMOVAL OR PAINT OVER OF GRAFITTI, REPAIR NOISE WALLS, MAINTAIN NFA 2014 0.198 DETLDES 0.198 THE 7 PARK & RIDE LOTS ALONG I495, ALL NYS BIKEWAYS, REST AREAS, 0T1896 PUBLIC TELEPHONE AREAS ALONG PARKWAYS & BUS SHELTERS ON NYS RIGHT-OF-WAY TO MAINTAIN STATE OF GOOD REPAIR NASSAU AND SUFFOLK AQC:C8S MULTI TPC : $4.6-$7.5 M TOTAL 4YR COST : 0.198 0.000 0.000 0.000 0.198

NYSDOT PROVIDE LANDSCAPE RESTORATION & MAINTAIN EXISTING LANDSCAPE NFA 2014 0.192 DETLDES 0.192 AREAS, TRIM OR REMOVE TREES THAT IMPEDE VISIBILITY (LOCATIONS 0T1897 TO-BE-DETERMINED) ON VARIOUS STATE HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK COUNTIES. AQC:C11S MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 0.192 0.000 0.000 0.000 0.192

NYSDOT LOCAL SAFE STREETS AND TRAFFIC CALMING BLOCK OUT LOCATIONS TO STP FLEX 2011 0.016 CONINSP 0.016 BE DETERMINED NASSAU AND SUFFOLK COUNTY NFA 2011 0.004 CONINSP 0.004 0T1902 STP FLEX 2011 0.135 CONST 0.135 NFA 2011 0.034 CONST 0.034 AQC:A7P MULTI TPC : $1.2-$2.5 M TOTAL 4YR COST : 0.189 0.189 0.000 0.000 0.000

NYSDOT LOCAL SAFE STREETS AND TRAFFIC CALMING BLOCK OUT LOCATIONS TO STP FLEX 2012 0.095 CONINSP 0.095 BE DETERMINED NASSAU AND SUFFOLK COUNTY NFA 2012 0.024 CONINSP 0.024 0T1903 STP FLEX 2012 0.857 CONST 0.857 NFA 2012 0.214 CONST 0.214 AQC:A7P MULTI TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.190 0.000 1.190 0.000 0.000

NYSDOT LOCAL SAFE STREETS AND TRAFFIC CALMING BLOCK OUT LOCATIONS TO STP FLEX 2013 0.048 CONINSP 0.048 BE DETERMINED NASSAU AND SUFFOLK COUNTY NFA 2013 0.012 CONINSP 0.012 0T1904 STP FLEX 2013 0.431 CONST 0.431 NFA 2013 0.108 CONST 0.108 AQC:A7P MULTI TPC : $1.2-$2.5 M TOTAL 4YR COST : 0.599 0.000 0.000 0.599 0.000

NYSDOT LOCAL SAFE STREETS AND TRAFFIC CALMING BLOCK OUT LOCATIONS TO STP FLEX 2014 0.110 CONINSP 0.110 BE DETERMINED NASSAU AND SUFFOLK COUNTY NFA 2014 0.027 CONINSP 0.027 0T1905 STP FLEX 2014 1.100 CONST 1.100 NFA 2014 0.275 CONST 0.275 AQC:A7P MULTI TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.512 0.000 0.000 0.000 1.512 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 49 of 84 for REGION 10 4-YEAR PROGRAM (FFY) AGENCY PROJECT DESCRIPTION TOTAL Starting October 01, 2010 FUND SOURCES FFY 4-YEAR PHASE PIN PROGRAM FFY FFY FFY FFY in millions of dollars 2011 2012 2013 2014 AQ CODE COUNTY TOTAL PROJECT COST

NASSAU CO. NASSAU COUNTY TRAFFIC SIGNAL SYSTEM OPERATION PHASE 4. THIS STP LG URBAN 2012 0.950 OPER 0.950 PROJECT WILL ENSURE THAT THE SYSTEM THAT WAS EXPANDED NFA 2012 0.238 OPER 0.238 0T1929 OPERATES AS EFFICIENTLY AS POSSIBLE STP LG URBAN 2013 0.700 OPER 0.700 NFA 2013 0.175 OPER 0.175 AQC:A7P NASSAU TPC : $1.2-$2.5 M TOTAL 4YR COST : 2.063 0.000 1.188 0.875 0.000

NASSAU CO. THE MONEY FOR THIS PROJECT WAS MOVED INTO A NC HIGHWAYS NFA 2011 0.100 CONINSP 0.100 RESURFACING PROJECT IN 2011. NFA 2011 1.200 CONST 1.200 0T1933

AQC:A10P NASSAU TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.300 1.300 0.000 0.000 0.000

NASSAU CO. NASSAU COUNTY INCIDENT MANAGEMENT SYSTEM PHASE 3. MAXIMIZES CMAQ 2011 0.144 CONINSP 0.144 THE EFFICIENCY OF TRAFFIC FLOW ALONG MAJOR ARTERIES BY NFA 2011 0.036 CONINSP 0.036 0T1939 INSTALLING AN INCIDENT MANAGEMENT SYSTEM (VIDEO CAMERAS). CMAQ 2011 1.296 CONST 1.296 NFA 2011 0.324 CONST 0.324 AQC:A6P NASSAU TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.800 1.800 0.000 0.000 0.000

NYSDOT PROVIDE FOR AMERICANS WITH DISABILITEIS ACT REQUIREMENTS NFA 2012 0.179 DETLDES 0.179 INCLUDING ADDITIONAL SIGNING, PAVEMENT MARKINGS, REPAIR NFA 2014 0.276 CONINSP 0.276 0T1953 DRAINAGE GRATES ALONG EXISTING ON STREET BIKEPATHS. CONST OR NFA 2014 2.300 CONST 2.300 REHAB PEDESTRIAN FACILITIES IN NASSAU & SUFFOLK COUNTIES. AQC:C2P MULTI TPC : $2-$4 M TOTAL 4YR COST : 2.755 0.000 0.179 0.000 2.576

LOCAL RECONSTRUCT PAVEMENT, INSTALL CURBS, SIDEWALK AND DRAINAGE ON HPP 2011 0.298 DETLDES 0.298 TOWN LINE RD BETWEEN NY25 AND CLAY PITTS RD TO IMPROVE NFA 2011 0.074 DETLDES 0.074 0T1994 PEDESTRIAN SAFETY AND PREVENT FLOODING.NY224 SECTION 117 NFA 2011 0.140 CONINSP 0.140 NFA 2011 1.060 CONST 1.060 AQC:A10P SUFFOLK TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.572 1.572 0.000 0.000 0.000

LOCAL REHABILITATE WEST SHORE RD BETWEEN CREEK ROAD AND WENDOVER HPP 2011 0.546 CONST 0.546 DR IN HUNTINGTON TOWN INCLUDING REPLACEMENT OF BULKHEADS AND NFA 2011 1.375 CONST 1.375 0T1999 NEW DRAINAGE. (NY225 SECTION 117) HPP 2011 0.248 DETLDES 0.248 NFA 2011 0.062 DETLDES 0.062 HPP 2011 0.198 SCOPING 0.198 NFA 2011 0.049 SCOPING 0.049 AQC:A10P SUFFOLK TPC : $2-$4 M TOTAL 4YR COST : 2.478 2.478 0.000 0.000 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 50 of 84 for REGION 10 4-YEAR PROGRAM (FFY) AGENCY PROJECT DESCRIPTION TOTAL Starting October 01, 2010 FUND SOURCES FFY 4-YEAR PHASE PIN PROGRAM FFY FFY FFY FFY in millions of dollars 2011 2012 2013 2014 AQ CODE COUNTY TOTAL PROJECT COST

LOCAL STREET SCAPE ENHANCEMENTS ALONG NY27 IN VILLAGE OF FREEPORT. HPP 2011 0.400 CONST 0.400 (NY225 SECTION 117) NFA 2011 1.479 CONST 1.479 0T2024 NFA 2011 0.094 MISC 0.094 AQC:C2 NASSAU TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.973 1.973 0.000 0.000 0.000

LOCAL RECONSTRUCTION OF 3.9 MILES OF EXISTING ROADWAYS WITHIN THE HPP 2011 0.800 CONST 0.800 VILLAGE OF ROCKVILLE CENTRE. STRUCTURAL REHABILITATION OF NFA 2011 1.600 CONST 1.600 0T2026 EXISTINGROADS TO MEET ANTICIPATED TRAFFIC VOLUME INCREASES NFA 2011 0.100 CONINSP 0.100 OVER THE NEXT SEVERAL DECADES. HPP#869 AQC:A6P NASSAU TPC : $2-$4 M TOTAL 4YR COST : 2.500 2.500 0.000 0.000 0.000

LOCAL UNGRADE & REPAVE NORTH SIDE OF MINEOLA HPP 2011 0.072 CONST 0.072 STATION BETWEEN MINEOLA BOULEVARD AND THIRD AVENUE IN THE NFA 2011 0.100 CONST 0.100 0T2027 VILLAGE OF MINEOLA.IN ORDER TO ATTAIN ADA ACCESIBLE DESIGN HPP 2011 0.038 DETLDES 0.038 COMPLIANCE WITH TITLE III HPP#714 NFA 2011 0.015 DETLDES 0.015 HPP 2011 0.010 SCOPING 0.010 NFA 2011 0.010 SCOPING 0.010 NFA 2011 0.005 CONINSP 0.005 AQC:C14 NASSAU TPC : < $0.75 M TOTAL 4YR COST : 0.250 0.250 0.000 0.000 0.000

NYSDOT REPAIR AND REPLACE GUIDERAIL SECTIONS (LOCATIONS NFA 2012 0.180 DETLDES 0.180 TO-BE-DETERMINED) AS SAFETY IMPROVEMENT ON VARIOUS STATE NFA 2014 1.102 CONINSP 1.102 0T2033 HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK COUNTIES. NFA 2014 11.019 CONST 11.019 AQC:A9P MULTI TPC : $9.5-15.5 M TOTAL 4YR COST : 12.301 0.000 0.180 0.000 12.121

NYSDOT REPAIR AND REPLACE GUIDERAIL SECTIONS (LOCATIONS NFA 2013 0.184 DETLDES 0.184 TO-BE-DETERMINED) AS SAFETY IMPROVEMENT ON VARIOUS STATE 0T2034 HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK COUNTIES. AQC:A9P MULTI TPC : $9.5-15.5 M TOTAL 4YR COST : 0.184 0.000 0.000 0.184 0.000

NYSDOT REPAIR AND REPLACE GUIDERAIL SECTIONS (LOCATIONS NFA 2013 0.189 DETLDES 0.189 TO-BE-DETERMINED) AS SAFETY IMPROVEMENT ON VARIOUS STATE 0T2035 HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK COUNTIES. AQC:A9P MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 0.189 0.000 0.000 0.189 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 51 of 84 for REGION 10 4-YEAR PROGRAM (FFY) AGENCY PROJECT DESCRIPTION TOTAL Starting October 01, 2010 FUND SOURCES FFY 4-YEAR PHASE PIN PROGRAM FFY FFY FFY FFY in millions of dollars 2011 2012 2013 2014 AQ CODE COUNTY TOTAL PROJECT COST

NYSDOT REPAIR AND REPLACE GUIDERAIL SECTIONS (LOCATIONS NFA 2014 0.194 DETLDES 0.194 TO-BE-DETERMINED) AS SAFETY IMPROVEMENT ON VARIOUS STATE 0T2036 HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK COUNTIES. AQC:A9P MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 0.194 0.000 0.000 0.000 0.194

NYSDOT REPAIR AND REPLACE GUIDERAIL SECTIONS (LOCATIONS NFA 2014 0.194 DETLDES 0.194 TO-BE-DETERMINED) AS SAFETY IMPROVEMENT ON VARIOUS STATE 0T2037 HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK COUNTIES. AQC:A9P MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 0.194 0.000 0.000 0.000 0.194

NYSDOT RESPOND TO EMERGENCIES AND NEEDED REPAIRS THAT ARE BEYOND THE NFA 2011 0.113 DETLDES 0.113 CAPABILITIES OF NYS MAINTENANCE FORCES TO ENSURE THE SAFETY OF NFA 2012 0.320 CONINSP 0.320 0T2051 THE PUBLIC ON VARIOUS STATE HIGHWAYS & PARKWAYS IN NASSAU & NFA 2012 3.196 CONST 3.196 SUFFOLK COUNTIES. AQC:C14P NASSAU TPC : $3.3-$5.6 M TOTAL 4YR COST : 3.629 0.113 3.516 0.000 0.000

NYSDOT RESPOND TO EMERGENCIES AND NEEDED REPAIRS THAT ARE BEYOND THE NFA 2012 0.113 DETLDES 0.113 CAPABILITIES OF NYS MAINTENANCE FORCES TO ENSURE THE SAFETY OF NFA 2013 0.265 CONINSP 0.265 0T2052 THE PUBLIC (LOCATIONS TO BE DETERMINED) ON VARIOUS STATE NFA 2013 2.206 CONST 2.206 HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK COUNTIES. AQC:C14P NASSAU TPC : $2-$4 M TOTAL 4YR COST : 2.584 0.000 0.113 2.471 0.000

NYSDOT RESPOND TO EMERGENCIES AND NEEDED REPAIRS THAT ARE BEYOND THE NFA 2013 0.118 DETLDES 0.118 CAPABILITIES OF NYS MAINTENANCE FORCES TO ENSURE THE SAFETY OF NFA 2014 0.273 CONINSP 0.273 0T2053 THE PUBLIC (LOCATIONS TO BE DETERMINED) ON VARIOUS STATE NFA 2014 2.272 CONST 2.272 HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK COUNTIES. AQC:C14P NASSAU TPC : $2-$4 M TOTAL 4YR COST : 2.663 0.000 0.000 0.118 2.545

NYSDOT RESPOND TO EMERGENCIES AND NEEDED REPAIRS THAT ARE BEYOND THE NFA 2014 0.118 DETLDES 0.118 CAPABILITIES OF NYS MAINTENANCE FORCES TO ENSURE THE SAFETY OF 0T2054 THE PUBLIC (LOCATIONS TO-BE-DETERMINED) ON VARIOUS STATE HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK COUNTIES. AQC:A10S MULTI TPC : $2-$4 M TOTAL 4YR COST : 0.118 0.000 0.000 0.000 0.118 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 52 of 84 for REGION 10 4-YEAR PROGRAM (FFY) AGENCY PROJECT DESCRIPTION TOTAL Starting October 01, 2010 FUND SOURCES FFY 4-YEAR PHASE PIN PROGRAM FFY FFY FFY FFY in millions of dollars 2011 2012 2013 2014 AQ CODE COUNTY TOTAL PROJECT COST

NYSDOT CLEAN CULVERTS FILLED WITH DEBRIS, REPAIR DAMAGED OR IN-NEED NFA 2012 0.174 DETLDES 0.174 CULVERTS TO MAINTAIN STATE OF GOOD REPAIR ON VARIOUS STATE NFA 2013 0.265 CONINSP 0.265 0T2074 HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK COUNTIES. LOCATIONS TO NFA 2013 2.206 CONST 2.206 BE DETERMINED. AQC:A6P MULTI TPC : $2-$4 M TOTAL 4YR COST : 2.645 0.000 0.174 2.471 0.000

NYSDOT PREVENTIVE MAINTENANCE CULVERT CLEAN/REPAIR/REPLACE CONTRACT NFA 2012 0.174 DETLDES 0.174 NFA 2013 0.265 CONINSP 0.265 0T2075 NFA 2013 2.206 CONST 2.206 AQC:A6P MULTI TPC : $2-$4 M TOTAL 4YR COST : 2.645 0.000 0.174 2.471 0.000

NYSDOT CLEAN CULVERTS FILLED WITH DEBRIS, REPAIR DAMAGED OR IN-NEED NFA 2013 0.471 DETLDES 0.471 CULVERTS TO MAINTAIN STATE OF GOOD REPAIR ON VARIOUS STATE NFA 2014 0.552 CONINSP 0.552 0T2076 HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK COUNTIES. LOCATIONS TO NFA 2014 5.520 CONST 5.520 BE DETERMINED. AQC:A6P MULTI TPC : $6-$9.4 M TOTAL 4YR COST : 6.543 0.000 0.000 0.471 6.072

NYSDOT CLEAN CULVERTS FILLED WITH DEBRIS, REPAIR DAMAGED OR IN-NEED NFA 2014 0.509 DETLDES 0.509 CULVERTS TO MAINTAIN STATE OF GOOD REPAIR ON VARIOUS STATE 0T2077 HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK COUNTIES. LOCATIONS TO BE DETERMINED. AQC:A6P MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 0.509 0.000 0.000 0.000 0.509

NYSDOT CLEAN CULVERTS FILLED WITH DEBRIS, REPAIR DAMAGED OR IN-NEED NFA 2014 0.182 DETLDES 0.182 CULVERTS TO MAINTAIN STATE OF GOOD REPAIR ON VARIOUS STATE 0T2078 HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK COUNTIES. LOCATIONS TO BE DETERMINED. AQC:A6S MULTI TPC : $2-$4 M TOTAL 4YR COST : 0.182 0.000 0.000 0.000 0.182

LOCAL ELEVATE AND CONSTRUCT DRAINAGE IMPROVEMENTS TO BEACH ROAD, HPP 2011 0.300 DETLDES 0.300 CANAL ROAD,&SEA BREEZE ROAD IN MASSAPEQUA, THE TOWN OF OYSTER NFA 2011 0.075 DETLDES 0.075 0T2148 BAY WANTS TO IMPROVE VEHICULAR &PEDESTRIAN TRAFFIC FLOW IN AN HPP 2012 0.167 CONINSP 0.167 EXISITNG RESIDENTIAL LOCATION EXPERIENCING CHRONIC FLOODING. NFA 2012 0.042 CONINSP 0.042 NY404 HPP 2012 1.932 CONST 1.932 NFA 2012 0.483 CONST 0.483 AQC:A2P NASSAU TPC : $2-$4 M TOTAL 4YR COST : 2.999 0.375 2.624 0.000 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 53 of 84 for REGION 10 4-YEAR PROGRAM (FFY) AGENCY PROJECT DESCRIPTION TOTAL Starting October 01, 2010 FUND SOURCES FFY 4-YEAR PHASE PIN PROGRAM FFY FFY FFY FFY in millions of dollars 2011 2012 2013 2014 AQ CODE COUNTY TOTAL PROJECT COST

LOCAL THE TOWN OF SMITHTOWN IS RESURFACING DETERIORATED PAVEMENT. HPP 2011 0.048 CONINSP 0.048 THE DRAINGAGE SYSTEM WILL BE REHABILITATED TO PREVENT FLOODING, NFA 2011 0.012 CONINSP 0.012 0T2150 REPLACED DAMAGED CURBS ,SIDEWALKS WILL BE REPAIRED, NEW HPP 2011 0.560 CONST 0.560 CURBS,SIDEWALKS & GUIDERAIL INSTALLATION FOR SAFETY, NY 624 NFA 2011 0.140 CONST 0.140 HPP 2011 0.088 DETLDES 0.088 NFA 2011 0.022 DETLDES 0.022 HPP 2011 0.040 PRELDES 0.040 NFA 2011 0.010 PRELDES 0.010 AQC:A10P SUFFOLK TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.920 0.920 0.000 0.000 0.000

NYSDOT PROVIDE BRIDGE REPAIRS ON AN AS-NEEDED OR EMERGENCY BASIS AS AN NFA 2012 0.226 DETLDES 0.226 EMERGENCY RESPONSE ON VARIOUS STATE HIGHWAYS & PARKWAYS IN NFA 2013 0.267 CONINSP 0.267 0T2168 NASSAU & SUFFOLK COUNTIES. NFA 2013 2.223 CONST 2.223 AQC:A19P MULTI TPC : $2-$4 M TOTAL 4YR COST : 2.716 0.000 0.226 2.490 0.000

NYSDOT PROVIDE BRIDGE REPAIRS ON AN AS-NEEDED OR EMERGENCY BASIS AS AN NFA 2013 0.200 DETLDES 0.200 EMERGENCY RESPONSE ON VARIOUS STATE HIGHWAYS & PARKWAYS IN 0T2169 NASSAU & SUFFOLK COUNTIES. AQC:A19P MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 0.200 0.000 0.000 0.200 0.000

NYSDOT PROVIDE SAFETY&PAVEMENT IMPROVEMENTS AND EMERGENCY REPAIRS NFA 2014 0.243 DETLDES 0.243 ON AN AS-NEEDED-BASIS AS AN EMERGENCY REPSONSE ON VARIOUS 0T2173 STATE HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK COUNTIES AQC:A2P MULTI TPC : $6-$9.4 M TOTAL 4YR COST : 0.243 0.000 0.000 0.000 0.243

NYSDOT PROVIDE STORMWATER RUN-OFF IMPROVEMENTS, IMPROVE ACCESS TO NFA 2012 0.184 DETLDES 0.184 FISHING AREAS, RESTORE WETLAND AREAS, CLEAN DRAINAGE NFA 2014 0.273 CONINSP 0.273 0T2181 STRUCTURES @ ENVIRONMENTALLY SENSITIVE LOCATIONS ON VARIOUS NFA 2014 2.272 CONST 2.272 STATE HIGHWAYS IN NASSAU AND SUFFOLK COUNTIES AQC:C11P MULTI TPC : $2-$4 M TOTAL 4YR COST : 2.729 0.000 0.184 0.000 2.545

NYSDOT ENVIRONMENTAL INITIATIVE- WILL PROVIDE STORMWATER RUN-OFF NFA 2014 0.189 DETLDES 0.189 IMPROVEMENTS, IMPROVE ACCES TO FISHING AREAS, RESTORE WETLAND 0T2182 AREAS AND CLEAN DRAINAGE STRUCTURES. LOCATIONS TO BE DETERMINED. NASSAU AND SUFFOLK COUNTY AQC:C11P MULTI TPC : $2-$4 M TOTAL 4YR COST : 0.189 0.000 0.000 0.000 0.189 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 54 of 84 for REGION 10 4-YEAR PROGRAM (FFY) AGENCY PROJECT DESCRIPTION TOTAL Starting October 01, 2010 FUND SOURCES FFY 4-YEAR PHASE PIN PROGRAM FFY FFY FFY FFY in millions of dollars 2011 2012 2013 2014 AQ CODE COUNTY TOTAL PROJECT COST

NYSDOT ENVIRONMENTAL INITIATIVE- WILL PROVIDE STORMWATER RUN-OFF NFA 2014 0.189 DETLDES 0.189 IMPROVEMENTS, IMPROVE ACCES TO FISHING AREAS, RESTORE WETLAND 0T2183 AREAS AND CLEAN DRAINAGE STRUCTURES. LOCATIONS TO BE DETERMINED. NASSAU AND SUFFOLK COUNTY AQC:C11P MULTI TPC : $2-$4 M TOTAL 4YR COST : 0.189 0.000 0.000 0.000 0.189

NYSDOT ENVIRONMENTAL INITIATIVE- WILL PROVIDE STORMWATER RUN-OFF NFA 2014 0.194 DETLDES 0.194 IMPROVEMENTS, IMPROVE ACCES TO FISHING AREAS, RESTORE WETLAND 0T2184 AREAS AND CLEAN DRAINAGE STRUCTURES. LOCATIONS TO BE DETERMINED. NASSAU AND SUFFOLK COUNTY AQC:C11S MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 0.194 0.000 0.000 0.000 0.194

NYSDOT OVERHEAD SIGN REPAIR CONTRACT (LOCATIONS TO-BE-DETERMINED) TO NFA 2013 0.184 DETLDES 0.184 MAINTAIN STRUCTURAL INTEGRITY ON VARIOUS STATE HIGHWAYS & NFA 2014 0.420 CONINSP 0.420 0T2190 PARKWAYS IN NASSAU & SUFFOLK COUNTIES. NFA 2014 4.200 CONST 4.200 AQC:A6P MULTI TPC : $4.6-$7.5 M TOTAL 4YR COST : 4.804 0.000 0.000 0.184 4.620

NYSDOT RECONSTRUCT SIGNALS AND/OR APPURTENANCES & INSTALL NEW NFA 2013 0.187 DETLDES 0.187 SIGNALS AS A SAFETY IMPROVEMENT OR MAINTAIN STATE OF GOOD STP FLEX 2014 0.272 CONINSP 0.272 0T2191 REAPIR ON VARIOUS STATE HIGHWAYS IN NASSAU & SUFFOLK COUNTIES NFA 2014 0.068 CONINSP 0.068 STP FLEX 2014 2.724 CONST 2.724 NFA 2014 0.681 CONST 0.681 AQC:D2P MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 3.932 0.000 0.000 0.187 3.745

NYSDOT RECONSTRUCT SIGNALS AND/OR APPURTENANCES & INSTALL NEW NFA 2014 0.192 DETLDES 0.192 SIGNALS AS A SAFETY IMPROVEMENT OR MAINTAIN STATE OF GOOD 0T2192 REAPIR ON VARIOUS STATE HIGHWAYS IN NASSAU & SUFFOLK COUNTIES AQC:D2S MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 0.192 0.000 0.000 0.000 0.192

NYSDOT RECONSTRUCT SIGNALS AND/OR APPURTENANCES & INSTALL NEW NFA 2014 0.187 DETLDES 0.187 SIGNALS AS A SAFETY IMPROVEMENT OR MAINTAIN STATE OF GOOD 0T2194 REAPIR ON VARIOUS STATE HIGHWAYS IN NASSAU & SUFFOLK COUNTIES AQC:D2S MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 0.187 0.000 0.000 0.000 0.187 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 55 of 84 for REGION 10 4-YEAR PROGRAM (FFY) AGENCY PROJECT DESCRIPTION TOTAL Starting October 01, 2010 FUND SOURCES FFY 4-YEAR PHASE PIN PROGRAM FFY FFY FFY FFY in millions of dollars 2011 2012 2013 2014 AQ CODE COUNTY TOTAL PROJECT COST

NYSDOT REPLACE GUIDESIGN PANELS THAT ARE WORN, DAMAGED OR DEFICIENT NFA 2013 0.182 DETLDES 0.182 TO MAINTAIN STATE OF GOOD REPAIR ON VARIOUS STATE HIGHWAYS & NFA 2014 0.136 CONINSP 0.136 0T2204 PARKWAYS IN NASSAU AND SUFFOLK COUNTIES NFA 2014 1.135 CONST 1.135 AQC:C13P MULTI TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.453 0.000 0.000 0.182 1.271

NYSDOT REPLACE GUIDESIGN PANELS THAT ARE WORN, DAMAGED OR DEFICIENT NFA 2014 0.738 DETLDES 0.738 TO MAINTAIN STATE OF GOOD REPAIR ON VARIOUS STATE HIGHWAYS & 0T2205 PARKWAYS IN NASSAU AND SUFFOLK COUNTIES AQC:C13S MULTI TPC : $7.5-$12 M TOTAL 4YR COST : 0.738 0.000 0.000 0.000 0.738

NYSDOT REPLACE GUIDESIGN PANELS THAT ARE WORN, DAMAGED OR DEFICIENT NFA 2014 0.140 CONINSP 0.140 TO MAINTAIN STATE OF GOOD REPAIR ON VARIOUS STATE HIGHWAYS & 0T2207 PARKWAYS IN NASSAU AND SUFFOLK COUNTIES AQC:C13S MULTI TPC : $1.2-$2.5 M TOTAL 4YR COST : 0.140 0.000 0.000 0.000 0.140

NYSDOT PROVIDE FOR AMERICANS WITH DISABILITEIS ACT REQUIREMENTS NFA 2012 0.182 DETLDES 0.182 INCLUDING ADDITIONAL SIGNING, PAVEMENT MARKINGS, REPAIR HPP 2013 0.223 CONINSP 0.223 0T2219 DRAINAGE GRATES ALONG EXISTING ON STREET BIKEPATHS. CONST OR NFA 2013 0.056 CONINSP 0.056 REHAB PEDESTRIAN FACILITIES IN NASSAU & SUFFOLK COUNTIES. HPP 2013 2.112 CONST 2.112 HPP#2951,NY554" NFA 2013 0.528 CONST 0.528 STP FLEX 2013 0.189 CONINSP 0.189 NFA 2013 0.047 CONINSP 0.047 STP FLEX 2013 1.887 CONST 1.887 NFA 2013 0.471 CONST 0.471 AQC:C2P MULTI TPC : $4.6-$7.5 M TOTAL 4YR COST : 5.695 0.000 0.182 5.513 0.000

NYSDOT PROVIDE FOR AMERICANS WITH DISABILITEIS ACT REQUIREMENTS NFA 2014 0.192 DETLDES 0.192 INCLUDING ADDITIONAL SIGNING, PAVEMENT MARKINGS, REPAIR 0T2220 DRAINAGE GRATES ALONG EXISTING ON STREET BIKEPATHS. CONST OR REHAB PEDESTRIAN FACILITIES IN NASSAU & SUFFOLK COUNTIES. AQC:C2P MULTI TPC : $2-$4 M TOTAL 4YR COST : 0.192 0.000 0.000 0.000 0.192

SUFFOLK CO. CLOSED LOOP SIGNAL SYSTEM, PH6. UPDATE AND INTERCONNECT THE CMAQ 2011 0.100 CONINSP 0.100 TRAFFIC SIGNAL SYSTEM ON VARIOUS COUNTY ROADS SO THEY CAN BE NFA 2011 0.025 CONINSP 0.025 0T2252 CONTROLLED & OPTIMIZED BY THE COUNTYS COMPUTERIZED CONTROL CMAQ 2011 0.900 CONST 0.900 SYSTEM ON CR012, CR017, CR047, CR093, CR80,CR16 NFA 2011 0.225 CONST 0.225 AQC:A6P SUFFOLK TPC : $2-$4 M TOTAL 4YR COST : 1.250 1.250 0.000 0.000 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 56 of 84 for REGION 10 4-YEAR PROGRAM (FFY) AGENCY PROJECT DESCRIPTION TOTAL Starting October 01, 2010 FUND SOURCES FFY 4-YEAR PHASE PIN PROGRAM FFY FFY FFY FFY in millions of dollars 2011 2012 2013 2014 AQ CODE COUNTY TOTAL PROJECT COST

SUFFOLK CO. CLOSED LOOP SIGNAL SYSTEM, PH7. UPDATE AND INTERCONNECT THE CMAQ 2012 0.800 CONST 0.800 TRAFFIC SIGNAL SYSTEM ON VARIOUS COUNTY ROADS SO THEY CAN BE NFA 2012 0.200 CONST 0.200 0T2253 CONTROLLED & OPTIMIZED BY THE COUNTYS COMPUTERIZED CONTROL SYSTEM ON CR004, CR013, CR058,CR67, CR083, CR096, CR97, CR057, CR111. AQC:NON SUFFOLK TPC : $0.6-$1.5 M TOTAL 4YR COST : 1.000 0.000 1.000 0.000 0.000

NASSAU CO. OLD COUNTRY ROAD TRAFFIC SIGNAL HEAD REPLACEMENT TO REPLACE NFA 2011 2.875 CONST 2.875 THE EXISTING LENSES WITH 12" SIGNAL HEAD 0T2256

AQC:A6P NASSAU TPC : $2-$4 M TOTAL 4YR COST : 2.875 2.875 0.000 0.000 0.000

NASSAU CO. PURPOSE OF THIS PROJECT IS TO REPLACE EXISING 8 INCH TRAFFIC SIGNAL STP LG URBAN 2013 6.200 CONST 6.200 INDICATORS WITH NEW 12 INCH LED SIGNAL DISPLAYS WHICH WILL NFA 2013 1.550 CONST 1.550 0T2257 IMPROVE MOTORISTS VISABILTY OF THE SIGNAL, REDUCE ACCIDENTS, AND REDUCE ENERTY CONSUMPTION AND MAINTENANCE COSTS. LOCATIONS INCLUDE ALL TRAFFIC SIGNALS ON MERRICK ROAD FROM THE QUEENS BORDER TO THE SUFFOLK BORDER. AQC:A6P NASSAU TPC : $6-$9.4 M TOTAL 4YR COST : 7.750 0.000 0.000 7.750 0.000

NASSAU CO. 2011 NASSAU COUNTY PAVEMENT MARKING TO MAINTAIN PAVEMENT NFA 2011 0.200 CONINSP 0.200 DELINEATION AT INTERSECTIONS. INCLUDING STOP BARS,CROSSWALKS NFA 2011 0.800 CONST 0.800 0T2258 AND ROAD MARKING PHASE 5 AQC:A10P NASSAU TPC : $0.6-$1.5 M TOTAL 4YR COST : 1.000 1.000 0.000 0.000 0.000

NASSAU CO. 2012 NASSAU COUNTY PAVEMENT MARKING TO MAINTAIN PAVEMENT STP LG URBAN 2012 1.000 CONST 1.000 MARKING TO MAINTAIN PAVEMENT DELINEATION AT INTERSECTIONS. NFA 2012 0.250 CONST 0.250 0T2259 INCLUDING STOP BARS,CROSSWALKS AND ROAD MARKING PHASE 6 AQC:A10P NASSAU TPC : $0.6-$1.5 M TOTAL 4YR COST : 1.250 0.000 1.250 0.000 0.000

NASSAU CO. NASSSAU COUNTY TRAFFIC SIGNAL EXPANSION, PH 6: VARIOUS CMAQ 2011 2.200 CONST 2.200 INTERSECTIONS ON ROSLYN RD, MAIN ST, OLD NORTHERN BLVD, BRYANT NFA 2011 0.550 CONST 0.550 0T2260 ST, & W SHORE RD. UPDATE THE SIGNALS SO THEY CAN BE CONTROLLED & OPTIMIZED BY THE COUNTYS COMPUTERIZED CONTROL SYSTEM. AQC:NON NASSAU TPC : $2-$4 M TOTAL 4YR COST : 2.750 2.750 0.000 0.000 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 57 of 84 for REGION 10 4-YEAR PROGRAM (FFY) AGENCY PROJECT DESCRIPTION TOTAL Starting October 01, 2010 FUND SOURCES FFY 4-YEAR PHASE PIN PROGRAM FFY FFY FFY FFY in millions of dollars 2011 2012 2013 2014 AQ CODE COUNTY TOTAL PROJECT COST

NASSAU CO. NASSAU COUNTY TRAFFIC SIGNAL TIMING IMPROVEMENTS PHASE 3. CMAQ 2012 0.200 DETLDES 0.200 MAXIMIZE THE EFFICIENCY OF THE COUNTY'S EXISTING ROADWAY SYSTEM NFA 2012 0.050 DETLDES 0.050 0T2261 BY PROMOTING SAFE,EFFICIENT TRAFFIC FLOW VIA IMPROVED TRAFFIC SIGNAL. AQC:A7P NASSAU TPC : < $0.75 M TOTAL 4YR COST : 0.250 0.000 0.250 0.000 0.000

NASSAU CO. NASSAU COUNTY INCIDENT MANAGEMENT SYSTEM PHASE 4. MAXIMIZE CMAQ 2012 0.112 CONINSP 0.112 THE EFFICIENCY OF THE TRAFFIC FLOW ALONG MAJOR ARTRIES BY NFA 2012 0.028 CONINSP 0.028 0T2262 INSTALLING AN INCIDENT MANAGEMENT SYSTEM (VIDEO CAMERAS) CMAQ 2012 1.008 CONST 1.008 NFA 2012 0.252 CONST 0.252 AQC:A6P NASSAU TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.400 0.000 1.400 0.000 0.000

NASSAU CO. NASSAU COUNTY RESURFACING 2012. REHABILITATE EXISTING ROAD STP LG URBAN 2011 0.399 CONINSP 0.399 PAVEMENTS IN ORDER TO PROVIDE FOR BETTER AND SAFER SURFACES. NFA 2011 0.100 CONINSP 0.100 0T2264 STP LG URBAN 2011 3.592 CONST 3.592 NFA 2011 0.898 CONST 0.898 STP LG URBAN 2012 4.250 CONST 4.250 NFA 2012 1.063 CONST 1.063 AQC:A10P NASSAU TPC : $9.5-15.5 M TOTAL 4YR COST : 10.302 4.989 5.313 0.000 0.000

NASSAU CO. PURPOSE OF THIS PROJECT IS TO REPLACE EXISING 8 INCH TRAFFIC SIGNAL STP LG URBAN 2012 3.200 CONST 3.200 INDICATORS WITH NEW 12 INCH LED SIGNAL DISPLAYS TO IMPROVE NFA 2012 0.800 CONST 0.800 0T2266 MOTORISTS VISABILTY , REDUCE ACCIDENTS, ENERGY SAVINGS & MAINTENANCE COSTS ON OLD COUNTRY ROAD FROM APEX RD TO ROUND SWAMP RD AQC:A6P NASSAU TPC : $3.3-$5.6 M TOTAL 4YR COST : 4.000 0.000 4.000 0.000 0.000

SUFFOLK CO. SUFFOLK COUNTY 2011 PAVEMENT MAINTENANCE PROGRAM. PROJECT STP LG URBAN 2011 0.440 CONINSP 0.440 WILL PROVIDE FUNDING TO RESURFACE (IMPROVE RIDING SURFACE) AND NFA 2011 0.110 CONINSP 0.110 0T2271 REPAIR DAMAGED DRAINAGE STRUCTURES ON COUNTY ROADS. STP LG URBAN 2011 2.860 CONST 2.860 NFA 2011 0.715 CONST 0.715 AQC:A10P SUFFOLK TPC : $3.3-$5.6 M TOTAL 4YR COST : 4.125 4.125 0.000 0.000 0.000

NYSDOT REPLACE IN-NEED OR DAMAGED CULVERTS (LOCATIONS TO BE NFA 2013 1.346 DETLDES 1.346 DETERMINED) TO MAINTAIN STATE OF GOOD REPAIR ON VARIOUS STATE NFA 2013 1.139 ROWACQU 1.139 0T2274 HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK COUNTIES. AQC:A6P MULTI TPC : $9.5-15.5 M TOTAL 4YR COST : 2.485 0.000 0.000 2.485 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 58 of 84 for REGION 10 4-YEAR PROGRAM (FFY) AGENCY PROJECT DESCRIPTION TOTAL Starting October 01, 2010 FUND SOURCES FFY 4-YEAR PHASE PIN PROGRAM FFY FFY FFY FFY in millions of dollars 2011 2012 2013 2014 AQ CODE COUNTY TOTAL PROJECT COST

NASSAU CO. PURPOSE OF THIS PROJECT IS TO REPLACE TRAFFIC SIGNAL INDICATORS CMAQ 2012 0.270 CONINSP 0.270 WITH NEW LED INDICATORS IN ORDER TO REDUCE ENERGY COSTS, NFA 2012 0.067 CONINSP 0.067 0T2276 IMPROVE VISABILITY AND DECREASE MAINTENANCE COSTS. BY USING CMAQ 2012 2.680 CONST 2.680 LED SIGNAL INDICATORS, LESS ENERGY IS UTILIZED TO OPERATE THE NFA 2012 0.600 CONST 0.600 SIGNAL RESULTING IN DECREASED AIR POLLUTION. . AQC:A6P NASSAU TPC : $3.3-$5.6 M TOTAL 4YR COST : 3.617 0.000 3.617 0.000 0.000

NASSAU CO. PURPOSE OF THIS PROJECT IS TO REPLACE TRAFFIC SIGNAL INDICATORS CMAQ 2013 0.270 CONINSP 0.270 WITH NEW LED INDICATORS IN ORDER TO REDUCE ENERGY COSTS, NFA 2013 0.067 CONINSP 0.067 0T2277 IMPROVE VISABILITY AND DECREASE MAINTENANCE COSTS. BY USING CMAQ 2013 2.430 CONST 2.430 LED SIGNAL INDICATORS, LESS ENERGY IS UTILIZED TO OPERATE THE NFA 2013 0.607 CONST 0.607 SIGNAL. AQC:A6P NASSAU TPC : $2-$4 M TOTAL 4YR COST : 3.374 0.000 0.000 3.374 0.000

NYSDOT BICYCLE AND PEDESTRIAN SAFETY IMPROVEMENTS, TO IMPROVE SAFETY HPP 2013 0.120 CONINSP 0.120 MAIN STREET, RIVERHEAD HPP#2951, NY 554 NFA 2013 0.030 CONINSP 0.030 0T2296 HPP 2013 1.080 CONST 1.080 NFA 2013 0.270 CONST 0.270 AQC:A2 SUFFOLK TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.500 0.000 0.000 1.500 0.000

LOCAL THE TOWN OF BROOKHAVEN IS RESURFACING TOTAL OF 1.8 MILES , HPP 2011 0.019 CONINSP 0.019 CLOVER LANE FROM BAY AVE. TO BAY RD. THESE ROADS ARE NFA 2011 0.005 CONINSP 0.005 0T2300 DETERIORATED TO THE POINT THAT PAVEMENT RESURFACING IS HPP 2011 0.167 CONST 0.167 NECESSARY TO MAINTAIN THE CURRENT TRANSPORTATION SYSTEM, NFA 2011 0.042 CONST 0.042 NY 620 AQC:A10 SUFFOLK TPC : < $0.75 M TOTAL 4YR COST : 0.233 0.233 0.000 0.000 0.000

LOCAL THE TOWN OF BROOKHAVEN IS RESURFACING DARE RD. FROM OLD TOWN HPP 2011 0.031 CONINSP 0.031 RD. TO RTE 25.THESE ROADS ARE DETERIORATED TO THE POINT THAT NFA 2011 0.008 CONINSP 0.008 0T2301 PAVEMENT RESURFACING IS NECESSARY TO MAINTAIN THE CURRENT HPP 2011 0.272 CONST 0.272 TRANSPORTATION SYSTEM.NY621 NFA 2011 0.068 CONST 0.068 AQC:A10 SUFFOLK TPC : < $0.75 M TOTAL 4YR COST : 0.379 0.379 0.000 0.000 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 59 of 84 for REGION 10 4-YEAR PROGRAM (FFY) AGENCY PROJECT DESCRIPTION TOTAL Starting October 01, 2010 FUND SOURCES FFY 4-YEAR PHASE PIN PROGRAM FFY FFY FFY FFY in millions of dollars 2011 2012 2013 2014 AQ CODE COUNTY TOTAL PROJECT COST

LOCAL THE TOWN OF BROOKHAVEN IS RESURFACING 1.2 MILES FROM PIPE STAVE HPP 2011 0.017 CONINSP 0.017 HOLLOW RD. FROM HARBOR BEACH RD TO OLD COUNTRY ROAD.THESE NFA 2011 0.004 CONINSP 0.004 0T2303 ROADS ARE DETERIORATED TO THE POINT THAT PAVEMENT RESURFACING HPP 2011 0.155 CONST 0.155 IS NECESSARY TO MAINTAIN THE CURRENT TRANSPORTATION SYSTEM NFA 2011 0.039 CONST 0.039 AQC:A10 SUFFOLK TPC : < $0.75 M TOTAL 4YR COST : 0.215 0.215 0.000 0.000 0.000

NYSDOT OPERATIONAL IMPROVEMENTS ON NASSAU EXPRESSWAY(NY878) (SCOPE NFA 2014 2.500 DETLDES 2.500 TO BE DETERMINED) TOWN OF HEMPSTEAD, NASSAU COUNTY 0T2307

AQC:J1Z NASSAU TPC : $32-$50 M TOTAL 4YR COST : 2.500 0.000 0.000 0.000 2.500

LIRR SCOPE: DESIGN AND CONSTRUCT A NEW HIGHWAY BRIDGE TO CARRY HBRR 2013 10.000 CONST 10.000 VEHICULAR TRAFFIC OVER THE LONG ISLAND RAIL ROAD PORT NFA 2013 2.500 CONST 2.500 0T2308 WASHINGTON BRANCH RIGHT OF WAY. THE AGING COLONIAL ROAD BRIDGE WILL BE REMOVED AND DEMOLISHED TO INCREASE SAFETY OF TRAVELERS AQC:A19P NASSAU TPC : $9.5-15.5 M TOTAL 4YR COST : 12.500 0.000 0.000 12.500 0.000

NYSDOT BRIDGE REPAIRS ON CARLLS STRIAGHT PATH AND HALF HOLLOW RD OVER IM 2012 0.425 CONINSP 0.425 I495 TO MAINTAIN STRUCTURAL INTEGRITY IN HUNTINGTON TOWN, NFA 2012 0.127 CONINSP 0.127 0T2318 SUFFOLK COUNTY. IM 2012 4.251 CONST 4.251 BIN#1049350,1049350 NFA 2012 1.200 CONST 1.200 AQC:A19 SUFFOLK TPC : $6-$9.4 M TOTAL 4YR COST : 6.003 0.000 6.003 0.000 0.000

NYSDOT PAVEMENT MATERIALS & EQUIPMENT PURCHASE FOR MAINTENANCE NFA 2013 1.200 MISC 1.200 NASSAU AND SUFFOLK COUNTY 0T2321

AQC:A10S MULTI TPC : $0.6-$1.5 M TOTAL 4YR COST : 1.200 0.000 0.000 1.200 0.000

NYSDOT PAVEMENT MATERIALS & EQUIPMENT PURCHASE FOR MAINTENANCE NFA 2014 1.200 MISC 1.200 NASSAU AND SUFFOLK COUNTY 0T2322

AQC:A10S MULTI TPC : $0.6-$1.5 M TOTAL 4YR COST : 1.200 0.000 0.000 0.000 1.200 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 60 of 84 for REGION 10 4-YEAR PROGRAM (FFY) AGENCY PROJECT DESCRIPTION TOTAL Starting October 01, 2010 FUND SOURCES FFY 4-YEAR PHASE PIN PROGRAM FFY FFY FFY FFY in millions of dollars 2011 2012 2013 2014 AQ CODE COUNTY TOTAL PROJECT COST

NYSDOT REHABILITATE BRIDGES CARRYING I495 TO MAINTAIN STRUCTURAL IM 2013 0.991 DETLDES 0.991 INTEGRITY (LOCATIONS TO BE DETERMINED) IN NASSAU & SUFFOLK NFA 2013 0.110 DETLDES 0.110 0T2328 COUNTIES. AQC:A19P MULTI TPC : $12.5-$19 M TOTAL 4YR COST : 1.101 0.000 0.000 1.101 0.000

NYSDOT REHABILITATE BRIDGES CARRYING I495 TO MAINTAIN STRUCTURAL IM 2013 0.991 DETLDES 0.991 INTEGRITY (LOCATIONS TO BE DETERMINED) IN NASSAU & SUFFOLK NFA 2013 0.110 DETLDES 0.110 0T2329 COUNTIES. AQC:A19P MULTI TPC : $12.5-$19 M TOTAL 4YR COST : 1.101 0.000 0.000 1.101 0.000

NYSDOT SMART TRANSPORTATION INITIATIVE PROJECT TO IMPROVE PEDESTRIAN NFA 2014 0.931 DETLDES 0.931 AND BICYCLE SAFETY (LOCATIONS TO BE DETERMINED) ON VARIOUS 0T2330 STATE ROADS IN NASSAU & SUFFOLK COUNTIES. AQC:A7P MULTI TPC : $7.5-$12 M TOTAL 4YR COST : 0.931 0.000 0.000 0.000 0.931

LOCAL WOODBINE AVE REHAB BETWEEN 5TH AVE & BEACH AVE, VILLAGE OF HPP 2011 0.054 CONINSP 0.054 NORTHPORT. RECONSTRUCTION OF ROADWAY & SHOULDER SECTIONS, NFA 2011 0.013 CONINSP 0.013 0T2358 INSTALLATION OF RETAINING WALL & GUIDERAIL FOR PEDESTRIAN AND HPP 2011 0.451 CONST 0.451 TRAFFIC SAFETY.HPP#656 ,NY321 NFA 2011 0.113 CONST 0.113 HPP 2011 0.045 DETLDES 0.045 NFA 2011 0.011 DETLDES 0.011 AQC:A10 SUFFOLK TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.687 0.687 0.000 0.000 0.000

LOCAL INSTALLATION OF GUIDERAIL & RETAINING WALL ALONG WOODBINE HPP 2011 0.007 CONINSP 0.007 AVENUE AT INTERSECTION OF 5TH AVE,RECONSTRUCT DETERIORATED NFA 2011 0.002 CONINSP 0.002 0T2359 ROADWAY, SHOULDER SECTION INCLUDING CURBS AT WOODBINE &BEACH HPP 2011 0.056 CONST 0.056 AVENUE TO INCREASE SAFETY IN THE VILLAGE OF NORTHPORT.HPP#3232 NFA 2011 0.014 CONST 0.014 ,NY 576 HPP 2011 0.006 DETLDES 0.006 NFA 2011 0.001 DETLDES 0.001 AQC:C2 SUFFOLK TPC : < $0.75 M TOTAL 4YR COST : 0.086 0.086 0.000 0.000 0.000

SUFFOLK CO. CONSTRUCT THE OCKERS SURFACE WATER TRANSPORTATION CENTER ON STP ENHANCE 2011 0.000 CONINSP 0.000 THE LONG ISLAND MARITIME MUSEUM GROUNDS AT CHARLES DOMINY NFA 2011 0.046 CONINSP 0.046 0T2366 COUNTY PARK IN WEST SAYVILLE TO PROVIDE PUBLIC EDUCATION ON STP ENHANCE 2011 0.458 CONST 0.458 SURFACE WATER TRANSPORATION , MAINTAINED PROPERLY LANDMARK NFA 2011 0.115 CONST 0.115 VESSELS ON SITE. AQC:C13 SUFFOLK TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.619 0.619 0.000 0.000 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 61 of 84 for REGION 10 4-YEAR PROGRAM (FFY) AGENCY PROJECT DESCRIPTION TOTAL Starting October 01, 2010 FUND SOURCES FFY 4-YEAR PHASE PIN PROGRAM FFY FFY FFY FFY in millions of dollars 2011 2012 2013 2014 AQ CODE COUNTY TOTAL PROJECT COST

NASSAU CO. IMPROVE ACCESS ROAD & EXIT LANES FOR CENTER FOR ADVANCED HPP 2011 0.551 CONINSP 0.551 MEDICINE & NORTH SHORE-LONG ISLAND JEWISH HOSPITAL ON LAKEVILLE NFA 2011 0.138 CONINSP 0.138 0T2367 ROAD. THE PRIMARY ACCESS RD. TO THE FACILITY ON THE WESTSIDE OF HPP 2011 4.415 CONST 4.415 LAKEVILLE RD. WILL BE ENLARGED TO ACCOMODATE EXTRA TRAFFIC. NFA 2011 1.104 CONST 1.104 NY345,587 HPP 2011 0.512 DETLDES 0.512 NFA 2011 0.128 DETLDES 0.128 AQC:J1Z NASSAU TPC : $6-$9.4 M TOTAL 4YR COST : 6.848 6.848 0.000 0.000 0.000

NYSDOT REPLACE IN-NEED OR DAMAGED CULVERTS (LOCATIONS TO BE NFA 2012 0.756 DETLDES 0.756 DETERMINED) TO MAINTAIN STATE OF GOOD REPAIR ON VARIOUS STATE 0T2375 HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK COUNTIES. AQC:A6P MULTI TPC : $7.5-$12 M TOTAL 4YR COST : 0.756 0.000 0.756 0.000 0.000

NYSDOT IMPROVE SIDEWALK CURB RAMPS, CROSSWALKS AND PEDESTRIAN NFA 2012 1.035 DETLDES 1.035 CROSSING SIGNALS TO COMPLY WITH THE AMERICANS WITH DISABILITIES 0T2376 ACT (LOCATIONS TO-BE-DETERMINED) ON VARIOUS STATE ROADS IN NASSAU & SUFFOLK COUNTIES. AQC:C2P MULTI TPC : $6-$9.4 M TOTAL 4YR COST : 1.035 0.000 1.035 0.000 0.000

NYSDOT REHABILITATE OR REPLACE THE SOUND BARRIERS THAT ARE ALONG THE NFA 2013 3.184 PRELDES 3.184 I495 CORRIDOR WHICH ARE NEARING THE END OF THEIR USEFUL SERVICE 0T2377 LIFE TO MAINTAIN STATE OF GOOD REPAIR NASSAU AND SUFFOLK COUNTIES AQC:C13S MULTI TPC : $2-$4 M TOTAL 4YR COST : 3.184 0.000 0.000 3.184 0.000

NYSDOT IMPROVE SIDEWALK CURB RAMPS, CROSSWALKS AND PEDESTRIAN NFA 2014 0.874 DETLDES 0.874 CROSSING SIGNALS TO COMPLY WITH THE AMERICANS WITH DISABILITIES 0T2380 ACT (LOCATIONS TO-BE-DETERMINED) ON VARIOUS STATE ROADS IN NASSAU & SUFFOLK COUNTIES. AQC:C2ZW MULTI TPC : $6-$9.4 M TOTAL 4YR COST : 0.874 0.000 0.000 0.000 0.874

NYSDOT IMPROVE SIDEWALK CURB RAMPS, CROSSWALKS AND PEDESTRIAN NFA 2013 2.122 ROWACQU 2.122 CROSSING SIGNALS TO COMPLY WITH THE AMERICANS WITH DISABILITIES NFA 2014 1.592 DETLDES 1.592 0T2381 ACT (LOCATIONS TO-BE-DETERMINED) ON VARIOUS STATE ROADS IN NASSAU & SUFFOLK COUNTIES. AQC:C2P MULTI TPC : $7.5-$12 M TOTAL 4YR COST : 3.714 0.000 0.000 2.122 1.592 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 62 of 84 for REGION 10 4-YEAR PROGRAM (FFY) AGENCY PROJECT DESCRIPTION TOTAL Starting October 01, 2010 FUND SOURCES FFY 4-YEAR PHASE PIN PROGRAM FFY FFY FFY FFY in millions of dollars 2011 2012 2013 2014 AQ CODE COUNTY TOTAL PROJECT COST

LOCAL IMPROVE HOSPITAL ROAD BRIDGE BETWEEN CR 99 AND CR 101, HPP 2011 0.324 CONINSP 0.324 PATCHOGUE.DESIGN OF BRIDGE WIDENING & CONST.OF APPROACH ROADS NFA 2011 0.081 CONINSP 0.081 0T2384 TO ALLEVIATE TRAFFIC CONGESTION INCLUDING ADDING LEFT TURN HPP 2011 3.244 CONST 3.244 LANE,TRAFFIC SIGNAL,BIKE LANE,LANDSCAPING ETC.EARMARK# NFA 2011 0.811 CONST 0.811 1240,NY739 HPP 2011 0.560 DETLDES 0.560 NFA 2011 0.340 DETLDES 0.340 NFA 2011 0.500 PRELDES 0.500 AQC:D3 SUFFOLK TPC : $4.6-$7.5 M TOTAL 4YR COST : 5.860 5.860 0.000 0.000 0.000

SUFFOLK CO. REHABILITATION OF CR11, PULASKI ROAD FROM LARKFIELD ROAD TO STP LG URBAN 2011 0.780 CONINSP 0.780 NY25A (APPROXIMATELY 3.5 MILES). PROJECT WOULD RESURFACE NFA 2011 0.195 CONINSP 0.195 0T2392 ROADWAY AND IMPROVE DRAINAGE WHICH WILL IMPROVE USEFUL LIFE STP LG URBAN 2011 4.720 CONST 4.720 OF ROADWAY. NFA 2011 1.180 CONST 1.180 AQC:D2P SUFFOLK TPC : $6-$9.4 M TOTAL 4YR COST : 6.875 6.875 0.000 0.000 0.000

NYSDOT REMEDIATE HIGHWAY RUNOFF ON NASSAU EXPRESSWAY TO PREVENT NFA 2011 0.500 DETLDES 0.500 HIGHWAY FLOODING IN TOWN OF HEMPSTEAD, NASSAU COUNTY NFA 2013 0.523 CONINSP 0.523 0T2394 NFA 2013 5.228 CONST 5.228 AQC:A2P NASSAU TPC : $6-$9.4 M TOTAL 4YR COST : 6.251 0.500 0.000 5.751 0.000

NYSDOT INSTALL BRIDGE FENCING ALONG BRIDGE PARAPETS THAT HAVE NFA 2011 0.250 DETLDES 0.250 PEDESTRIAN ACCESS AS A SAFETY MEASURE ON VARIOUS STATE NFA 2012 0.418 CONINSP 0.418 0T2395 HIGHWAYS IN NASSAU AND SUFFOLK COUNTIES NFA 2012 4.183 CONST 4.183 AQC:A10P MULTI TPC : $4.6-$7.5 M TOTAL 4YR COST : 4.851 0.250 4.601 0.000 0.000

NYSDOT PIL & HSI SAFETY STUDIES.PIL & HSI SAFETY STUDIES-MULTIPLE HIGHWAY HSIP 2011 0.540 DETLDES 0.540 SAFETY INVESTIGATION (HSI) STUDIES IN NASSAU & SUFFOLK COUNTY.THE NFA 2011 0.060 DETLDES 0.060 0T2396 PROJECT DEVELOPMENT WILL OCCUR BASED OFF OF THE STRATEGIC HSIP 2012 0.540 DETLDES 0.540 HIGHWAY SAFETY PLAN WITH THE LOCATIONS TO BE DETERMINED. NFA 2012 0.060 DETLDES 0.060 HSIP 2013 0.540 DETLDES 0.540 NFA 2013 0.060 DETLDES 0.060 HSIP 2014 0.540 DETLDES 0.540 NFA 2014 0.060 DETLDES 0.060 AQC:A6P MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 2.400 0.600 0.600 0.600 0.600 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 63 of 84 for REGION 10 4-YEAR PROGRAM (FFY) AGENCY PROJECT DESCRIPTION TOTAL Starting October 01, 2010 FUND SOURCES FFY 4-YEAR PHASE PIN PROGRAM FFY FFY FFY FFY in millions of dollars 2011 2012 2013 2014 AQ CODE COUNTY TOTAL PROJECT COST

NYSDOT COLLECTION & WARRANT STUDY TASKS - PERFORM TRAFFIC DATA NFA 2011 0.350 DETLDES 0.350 COLLECTION, SAFETY STUDIES AND OTHER TRAFFIC AND SAFETY TASKS NFA 2012 0.350 DETLDES 0.350 0T2397 ON VARIOUS HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK COUNTIES. NFA 2013 0.350 DETLDES 0.350 LOCATIONS TO BE DETERMINED NFA 2014 0.350 DETLDES 0.350 AQC:A7P MULTI TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.400 0.350 0.350 0.350 0.350

NASSAU CO. OCEAN AVE. AT MERRICK ROAD INTERSECTION IMPROVEMENTS, NASSAU CMAQ 2012 2.400 CONST 2.400 COUNTY. INSTALLATION OF A DEDICATED LEFT TURN LANE TO ALLEVIATE NFA 2012 0.600 CONST 0.600 0T2403 TRAFFIC CONGESTION. AQC:D1P NASSAU TPC : $2-$4 M TOTAL 4YR COST : 3.000 0.000 3.000 0.000 0.000

SUFFOLK CO. PROCUREMENT OF INTELLIGENT TRANSPORTATION SYSTEMS (ITS) CMAQ 2012 1.200 DETLDES 1.200 EQUIPMENT FOR THE SUFFOLK COUNTY HIGHWAY SYSTEM (SCOPE TO BE NFA 2012 0.300 DETLDES 0.300 0T2404 DETERMINED). PROJECT IS INTENDED TO IDENTIFY ROADWAYS WITH CMAQ 2013 1.200 CONST 1.200 SIGNIFICANT INCIDENT RELATED CONGESTION & RECOMMEND ITS NFA 2013 0.300 CONST 0.300 IMPROVEMENT AQC:J1Z SUFFOLK TPC : $2-$4 M TOTAL 4YR COST : 3.000 0.000 1.500 1.500 0.000

SUFFOLK CO. CR46 (WILLIAM FLOYD PARKWAY) I-495 TO NEW MORICHES RD. PROJECT STP LG URBAN 2012 8.000 CONST 8.000 WILL RECONSTRUCT CR 46/NEW MORICHES INTERSECTION &REHABILITATE NFA 2012 2.000 CONST 2.000 0T2405 CR46/LIRR BRIDGE TO EXTEND LIFE, IN THE TOWN OF BROOKHAVEN. IT ALSO IMPROVE SAFTEY & CONGESTION AT INTERSECTION BIN 3300789 AQC:A10P SUFFOLK TPC : $7.5-$12 M TOTAL 4YR COST : 10.000 0.000 10.000 0.000 0.000

NASSAU CO. NASSAU COUNTY BRIDGE REHABILITATION; PAINTING AND MINOR HBRR 2014 4.000 CONST 4.000 REHABILITATION OF CHARLES LINDBERGH OVER THE MEADOWBROOK NFA 2014 1.000 CONST 1.000 0T2406 PARKWAY AND SANTINI BRIDGE OVER THE MEADOWBROOK PARKWAY AQC:A19P NASSAU TPC : $4.6-$7.5 M TOTAL 4YR COST : 5.000 0.000 0.000 0.000 5.000

SUFFOLK CO. SUFFOLK COUNTY 2012 PAVEMENT MAINTENANCE PROGRAM. PROJECT STP LG URBAN 2012 2.500 CONST 2.500 WILL PROVIDE FUNDING TO RESURFACE (IMPROVE RIDING SURFACE) AND NFA 2012 0.625 CONST 0.625 0T2407 REPAIR DAMAGED DRAINAGE STRUCTURES ON COUNTY ROADS. AQC:A10P SUFFOLK TPC : $2-$4 M TOTAL 4YR COST : 3.125 0.000 3.125 0.000 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 64 of 84 for REGION 10 4-YEAR PROGRAM (FFY) AGENCY PROJECT DESCRIPTION TOTAL Starting October 01, 2010 FUND SOURCES FFY 4-YEAR PHASE PIN PROGRAM FFY FFY FFY FFY in millions of dollars 2011 2012 2013 2014 AQ CODE COUNTY TOTAL PROJECT COST

NASSAU CO. NASSAU COUNTY SIGNAL COMMUNICATIONS EXPANSION PHASE 1. CMAQ 2013 1.200 CONST 1.200 PROVIDE OPERATION AND MAINTENANCE OF ANCILLARY EQUIPMENT NFA 2013 0.300 CONST 0.300 0T2409 RELATED TO THE SYSTEM AND SIGNAL CONTROL. AQC:J1Z NASSAU TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.500 0.000 0.000 1.500 0.000

NASSAU CO. NASSAU COUNTY SIGNAL EXPANSION PHASE 8.UPDATE EXISTING SIGNAL CMAQ 2014 5.000 OPER 5.000 AND CONSTRUCT NEW SIGNAL SYSTEMS AT VARIOUS LOCATIONS WITHIN NFA 2014 1.250 OPER 1.250 0T2414 NASSAU COUNTY AQC:NON NASSAU TPC : $6-$9.4 M TOTAL 4YR COST : 6.250 0.000 0.000 0.000 6.250

NASSAU CO. PURPOSE OF THIS PROJECT IS TO INSTALL VMS SIGNS AT VARIOUS CMAQ 2014 4.200 OPER 4.200 LOCATIONS IN NASSAU COUNTY TO INFORM MOTORISTS OF INFORMATION NFA 2014 1.050 OPER 1.050 0T2415 RELATED TO TRAFFIC CONGESTION AND/OR CLOSURES. AQC:J1Z NASSAU TPC : $4.6-$7.5 M TOTAL 4YR COST : 5.250 0.000 0.000 0.000 5.250

NASSAU CO. PURPOSE OF THIS PROJECT IS TO EXPAND THE COUNTY'S EXISTING FIBER CMAQ 2014 5.500 OPER 5.500 OPTIC NETWORK IN ORDER TO PROVIDE COMMUNICATIONS TO NFA 2014 1.375 OPER 1.375 0T2416 ADDITOINAL TRAFFIC SIGNALS, WHICH WILL ALLOW US TO OPTIMIZE SIGNAL TIMING AND REDUCE VEHICULAR CONGESTION. AQC:J1Z NASSAU TPC : $6-$9.4 M TOTAL 4YR COST : 6.875 0.000 0.000 0.000 6.875

SUFFOLK CO. PHASE II OF SUFFOLK COUNTY INTELLIGENT TRANSPORTATION SYSTEMS CMAQ 2014 1.800 OPER 1.800 (ITS) PROGRAM. THIS PROJECT WILL CONTINUE INSTALLMENT OF ITS NFA 2014 0.450 OPER 0.450 0T2417 EQUIPMENT TO ADDRESS CONGESTION ON COUNTY ROADWAYS FROM ROADWAY INCIDENTS. AQC:J1Z SUFFOLK TPC : $2-$4 M TOTAL 4YR COST : 2.250 0.000 0.000 0.000 2.250

SUFFOLK CO. CLOSED LOOP SIGNAL SYSTEM. UPDATE AND INTERCONNECT THE TRAFFIC CMAQ 2013 1.600 CONST 1.600 SIGNAL SYSTEM ON VARIOUS COUNTY ROADS SO THEY CAN BE NFA 2013 0.400 CONST 0.400 0T2418 CONTROLLED & OPTIMIZED BY THE COUNTYS COMPUTERIZED CONTROL SYSTEM (LOCATIONS TO BE DETERMINED). AQC:NON SUFFOLK TPC : $1.2-$2.5 M TOTAL 4YR COST : 2.000 0.000 0.000 2.000 0.000

SUFFOLK CO. CLOSED LOOP SIGNAL SYSTEM. UPDATE AND INTERCONNECT THE TRAFFIC CMAQ 2014 1.600 CONST 1.600 SIGNAL SYSTEM ON VARIOUS COUNTY ROADS SO THEY CAN BE NFA 2014 0.400 CONST 0.400 0T2419 CONTROLLED & OPTIMIZED BY THE COUNTYS COMPUTERIZED CONTROL SYSTEM. LOCATIONS TO BE DETERMINED. AQC:NON SUFFOLK TPC : $1.2-$2.5 M TOTAL 4YR COST : 2.000 0.000 0.000 0.000 2.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 65 of 84 for REGION 10 4-YEAR PROGRAM (FFY) AGENCY PROJECT DESCRIPTION TOTAL Starting October 01, 2010 FUND SOURCES FFY 4-YEAR PHASE PIN PROGRAM FFY FFY FFY FFY in millions of dollars 2011 2012 2013 2014 AQ CODE COUNTY TOTAL PROJECT COST

SUFFOLK CO. CR97 RECONSTRUCT (NICOLLS RD) BETWEEN I495 AND NY25, TO ADDRESS NFA 2011 1.000 PRELDES 1.000 SAFETY AND CONGESTION CONCERNS AROUND THE ENTRANCES OF NHS 2012 1.200 DETLDES 1.200 0T2425 SUFFOLK COUNTY COMMUNITY COLLEGE, TOWN OF BROOKHAVEN. NFA 2012 0.300 DETLDES 0.300 PROJECT SCOPING HAS NOT STARTED. (SCOPE TBD). AQC:J1Z SUFFOLK TPC : $12.5-$19 M TOTAL 4YR COST : 2.500 1.000 1.500 0.000 0.000

NASSAU CO. NASSAU COUNTY RESURFACING VARIOUS COUNTY ROADS. REHABILITATE STP LG URBAN 2013 4.200 CONST 4.200 EXISTING ROAD PAVEMENTS IN ORDER TO PROVIDE FOR BETTER AND NFA 2013 1.050 CONST 1.050 0T2428 SAFER SURFACES. AQC:A10P NASSAU TPC : $4.6-$7.5 M TOTAL 4YR COST : 5.250 0.000 0.000 5.250 0.000

NASSAU CO. PURPOSE OF THIS PROJECT IS TO REPLACE OLDER FADED OR MISSING STP LG URBAN 2013 0.800 CONST 0.800 ROADWAY PAVEMENT MARKINGS.LOCATIONS TO BE DETERMINED NFA 2013 0.200 CONST 0.200 0T2429

AQC:A10S NASSAU TPC : $0.6-$1.5 M TOTAL 4YR COST : 1.000 0.000 0.000 1.000 0.000

SUFFOLK CO. SAFETY AND DRAINAGE IMPROVEMENTS TO VARIOUS SUFFOLK COUNTY STP LG URBAN 2013 1.215 CONINSP 1.215 ROADS FOR THE PURPOSE OF IMPROVING ROADWAY DRAINAGE PROBLEMS NFA 2013 0.304 CONINSP 0.304 0T2431 AND OVERALL HIGHWAY SAFETY (SCOPE AND LOCATIONS TO BE STP LG URBAN 2013 10.935 CONST 10.935 DETERMINED) NFA 2013 2.734 CONST 2.734 AQC:A2P SUFFOLK TPC : $12.5-$19 M TOTAL 4YR COST : 15.188 0.000 0.000 15.188 0.000

NASSAU CO. NASSAU COUNTY RESURFACING VARIOUS COUNTY ROADS. REHABILITATE STP LG URBAN 2014 5.300 CONST 5.300 EXISTING ROAD PAVEMENTS IN ORDER TO PROVIDE FOR BETTER AND NFA 2014 1.325 CONST 1.325 0T2432 SAFER SURFACES. AQC:A10P NASSAU TPC : $6-$9.4 M TOTAL 4YR COST : 6.625 0.000 0.000 0.000 6.625

NASSAU CO. PURPOSE OF THIS PROJECT IS TO REPLACE OLDER FADED OR MISSING STP LG URBAN 2014 1.800 CONST 1.800 ROADWAY PAVEMENT MARKINGS.LOCATIONS TO BE DETERMINED) NFA 2014 0.450 CONST 0.450 0T2433

AQC:A10S NASSAU TPC : $2-$4 M TOTAL 4YR COST : 2.250 0.000 0.000 0.000 2.250

NASSAU CO. THIS PROJECT PROVIDES DAY-TO-DAY OPERATIONS OF THE COUNTY'S STP LG URBAN 2014 2.700 CONST 2.700 TRAFFIC MANAGEMEN CENTER IN WESTBURY AND INCLUDES MONITORING NFA 2014 0.675 CONST 0.675 0T2434 OF TRAFFIC VIDEO AND THE ADJUSTMENT OF SIGNAL TIMINGS AS NEEDED. AQC:A7P NASSAU TPC : $2-$4 M TOTAL 4YR COST : 3.375 0.000 0.000 0.000 3.375 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 66 of 84 for REGION 10 4-YEAR PROGRAM (FFY) AGENCY PROJECT DESCRIPTION TOTAL Starting October 01, 2010 FUND SOURCES FFY 4-YEAR PHASE PIN PROGRAM FFY FFY FFY FFY in millions of dollars 2011 2012 2013 2014 AQ CODE COUNTY TOTAL PROJECT COST

SUFFOLK CO. SUFFOLK COUNTY BRIDGE PAINTING PROGRAM. THIS PROJECT PROVIDES HBRR 2014 0.500 CONST 0.500 FUNDING FOR THE CYCLICAL CLEANING AND REPAINTING OF STEEL NFA 2014 0.125 CONST 0.125 0T2438 BRIDGES AND COMPONENTS TO EXTEND USEFUL (LOCATIONS TO BE DETERMINED). AQC:A19S SUFFOLK TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.625 0.000 0.000 0.000 0.625

LOCAL BAYSHORE FERRY TERMINAL BULKHEAD REHAB - REHAB 120 FEET OF FBD 2011 0.020 CONINSP 0.020 DETERIORATED BULKHEAD NFA 2011 0.010 CONINSP 0.010 0T2440 FBD 2011 0.240 CONST 0.240 NFA 2011 0.060 CONST 0.060 NFA 2011 0.010 MISC 0.010 AQC:A2P SUFFOLK TPC : < $0.75 M TOTAL 4YR COST : 0.340 0.340 0.000 0.000 0.000

NYSDOT Bridge rehabilitation #2 of Robert Moses Causeway over Fire Island Inlet in Islip Town, NFA 2011 0.406 DETLDES 0.406 Suffolk County 0T2444

AQC:A19P SUFFOLK TPC : < $0.75 M TOTAL 4YR COST : 0.406 0.406 0.000 0.000 0.000

SUFFOLK CO. CR16 (HORSEBLOCK RD) - PECONIC AVE TO I495 PAVEMENT STP LG URBAN 2014 0.880 CONINSP 0.880 REHABILITATION TO EXTEND THE ROADWAY'S USEFUL LIFE, TOWN OF NFA 2014 0.220 CONINSP 0.220 0T2446 BROOKHAVEN, SUFFOLK COUNTY .SCOPE TO BE DETERMINED. STP LG URBAN 2014 7.920 CONST 7.920 NFA 2014 1.980 CONST 1.980 AQC:J1Z SUFFOLK TPC : $9.5-15.5 M TOTAL 4YR COST : 11.000 0.000 0.000 0.000 11.000

LOCAL 2009 RECREATION TRAILS PROGRAM: DAVID OVERTON TRAIL IN CORAM, NY REC TRAILS 2011 0.320 CONST 0.320 (SUFFOLK COUNTY) FOR GRANT FUNDING FOR A NON-MOTORIZED PATH NFA 2011 0.080 CONST 0.080 0T2448 ALONG AN EXISTING UNUSED ROADWAY RIGHT-OF-WAY. AQC:C2P SUFFOLK TPC : < $0.75 M TOTAL 4YR COST : 0.400 0.400 0.000 0.000 0.000

NYSDOT DRAINAGE BASIN RECONSTRUCTION TO PREVENT HIGHWAY FLOODING ON NFA 2012 0.160 DETLDES 0.160 VARIOUS STATE HIGHWAYS IN NASSAU AND SUFFOLK COUNTIES. NHS 2013 0.373 CONINSP 0.373 0T2449 NFA 2013 0.093 CONINSP 0.093 NHS 2013 3.727 CONST 3.727 NFA 2013 0.932 CONST 0.932 AQC:A2Z MULTI TPC : $4.6-$7.5 M TOTAL 4YR COST : 5.285 0.000 0.160 5.125 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 67 of 84 for REGION 10 4-YEAR PROGRAM (FFY) AGENCY PROJECT DESCRIPTION TOTAL Starting October 01, 2010 FUND SOURCES FFY 4-YEAR PHASE PIN PROGRAM FFY FFY FFY FFY in millions of dollars 2011 2012 2013 2014 AQ CODE COUNTY TOTAL PROJECT COST

LOCAL ROAD REPAIR AND MAINTENANCE IN THE TOWN OF SOUTHAMPTON. HPP 2011 0.500 CONST 0.500 BRIDGE LANE-FUNCTIONALLY OBSOLETE BRIDGE RECONSTRUCTION AT NFA 2011 0.254 CONST 0.254 0T2451 SAGAPONACK POND.NY745 HPP#3636 NFA 2011 0.090 CONINSP 0.090 AQC:A19P SUFFOLK TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.844 0.844 0.000 0.000 0.000

SUFFOLK CO. INSTALL SPLIT BARRIER ON NY27 IN THE VICINITY OF THE NY27A NFA 2011 0.005 DETLDES 0.005 INTERSECTION IN OAKDALE TO ALLOW EGRESS SHOULD THE ROADWAY BE NHS 2011 0.020 CONINSP 0.020 0T2452 CLOSED DUE TO AN INCIDENT IN EITHER DIRECTION AND TO ALLOW FOR NFA 2011 0.005 CONINSP 0.005 EMERGENCY VEHICLES TO GET TO AND FROM THE INCIDENT. TOWN OF NHS 2011 0.180 CONST 0.180 ISLIP NFA 2011 0.145 CONST 0.145 AQC:A9P SUFFOLK TPC : < $0.75 M TOTAL 4YR COST : 0.355 0.355 0.000 0.000 0.000

LOCAL THE STRAIGHT PATH RECONFIGURATION STRETCHES FROM MOUNT STP FLEX 2013 0.112 CONINSP 0.112 AVENUE ON THE SOUTH TO NICOLLS ROAD ON THE NORTH FOR TRAFFIC NFA 2013 0.028 CONINSP 0.028 0T2453 CALMING & PEDESTRIAN ENHANCEMENT. A CENTRAL PLANTED MEDIAN STP FLEX 2013 0.374 CONST 0.374 INTERRUPTED FOR LEFT TURN LANES IN WYANDANCH, BABYLO NFA 2013 0.553 CONST 0.553 AQC:A6P SUFFOLK TPC : $0.6-$1.5 M TOTAL 4YR COST : 1.067 0.000 0.000 1.067 0.000

LOCAL ENHANCE TRAFFIC SAFETY AT VARIOUS INTERSECTION, HEMPSTEAD STP FLEX 2013 0.233 CONST 0.233 AVE,LAKEVIEW AVE,ATLANTIC AVE AND UNION AVE BY INSTALLING SPEED NFA 2013 0.058 CONST 0.058 0T2454 LIMIT SIGNS, VISAUL CROSSWALKS AND RESIDENTIAL SCALE ORNAMENTAL LIGHTING AND STREET TREES, VILLAGE OF LYNBROOK IN TOWM OF HEMPSTEAD AQC:A6P NASSAU TPC : < $0.75 M TOTAL 4YR COST : 0.291 0.000 0.000 0.291 0.000

NYSDOT VILLAGE OF SOUTHAMPTON PROPOSES IMPROVEMENTS IN SAFETY AND STP FLEX 2011 0.046 CONINSP 0.046 TRAFFIC CALMING BY PROVIDING LEFT TURN SIGNALS AT FIVE NFA 2011 0.011 CONINSP 0.011 0t2455 INTERSECTIONS AND BULB-OUT AT ONE INTERSECTION. DESIGNATED 3.3 STP FLEX 2011 0.392 CONST 0.392 MILES OF ROAD AS CLASS 3 BIKE ROUTE. NFA 2011 0.100 CONST 0.100 AQC:C2P SUFFOLK TPC : < $0.75 M TOTAL 4YR COST : 0.549 0.549 0.000 0.000 0.000

LOCAL THE PROJECT PROPOSES TO REDUCE THE TRAVEL SPEEDS TO PROVIDE NFA 2011 0.035 DETLDES 0.035 SAFER CONDITIONS FOR BICYCLISTS ON GRANNY RD BETWEEN NY112 AND STP FLEX 2011 0.016 CONINSP 0.016 0T2456 MILL RD IN THE TOWN OF BROOKHAVEN, SUFFOLK COUNTY NFA 2011 0.004 CONINSP 0.004 STP FLEX 2011 0.131 CONST 0.131 NFA 2011 0.033 CONST 0.033 AQC:C2Z SUFFOLK TPC : < $0.75 M TOTAL 4YR COST : 0.219 0.219 0.000 0.000 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 68 of 84 for REGION 10 4-YEAR PROGRAM (FFY) AGENCY PROJECT DESCRIPTION TOTAL Starting October 01, 2010 FUND SOURCES FFY 4-YEAR PHASE PIN PROGRAM FFY FFY FFY FFY in millions of dollars 2011 2012 2013 2014 AQ CODE COUNTY TOTAL PROJECT COST

LOCAL THE PROJECT PROPOSES TO REDUCE THE TRAVEL SPEEDS ON HOLBROOK NFA 2011 0.060 DETLDES 0.060 RD BETWEEN NY25 AND CR16 AND MAKE ADA COMPLIANT CONTINUOUS STP FLEX 2011 0.048 CONINSP 0.048 0T2457 SIDEWALKS AS WELL AS AN ON STREET BICYCLE LANE. TOWN OF NFA 2011 0.012 CONINSP 0.012 BROOKHAVEN, SUFFOLK COUNTY STP FLEX 2011 0.400 CONST 0.400 NFA 2011 0.100 CONST 0.100 AQC:C2Z SUFFOLK TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.620 0.620 0.000 0.000 0.000

LOCAL VILLAGE OF ROCKVILLE CENTER PROPOSED RESTORATION OF MAPLE AVE TCSP 2011 0.047 CONINSP 0.047 INCLUDES DRIVEWAY APRON, ROADWAY SURFACING, CURBING, HANDICAP NFA 2011 0.012 CONINSP 0.012 0T2458 RAMPS, DRAINAGE STRUCTURE, TREE PITS ETC... TCSP 2011 0.424 CONST 0.424 NFA 2011 0.106 CONST 0.106 AQC:A10Z NASSAU TPC : < $0.75 M TOTAL 4YR COST : 0.589 0.589 0.000 0.000 0.000

LOCAL CANAL ROAD TRAFFIC CALMING (ROSE LANE TO CR83) BY REDUCING NFA 2011 0.036 DETLDES 0.036 TRAFFIC SPEED BY REDUCE TRAVEL LANE.PROVIDE LEFT TURN LANES AT STP FLEX 2012 0.024 CONINSP 0.024 0T2459 VARIOUS INTERSECTION TO REDUCE LEFT TURN ACCIDENTS TO IMPROVE NFA 2012 0.006 CONINSP 0.006 MOTORIST SAFETY IN TOWN OF BROOKHAVEN STP FLEX 2012 0.224 CONST 0.224 NFA 2012 0.056 CONST 0.056 AQC:C2P SUFFOLK TPC : < $0.75 M TOTAL 4YR COST : 0.346 0.036 0.310 0.000 0.000

LIRR CONSTRUCTION: NEW TUNNELS BTWN SUNNYSIDE CMAQ 2011 2.300 MISC 2.300 YARD IN QUEENS & THE LOWER LEVEL OF THE EXISTING 63 ST TUNNEL NFA 2011 0.575 MISC 0.575 G609/01/AA UNDER EAST RIVER, NEW TUNNELS UNDER PARK AVE IN MANHATTAN TO FTA 5309 2011 246.863 MISC 246.863 ; ROLLING STOCK, REAL ESTATE AND PROFL NFA 2011 340.907 MISC 340.907 SERVICES CMAQ 2012 2.300 MISC 2.300 NFA 2012 0.575 MISC 0.575 FTA 5309 2012 430.000 MISC 430.000 NFA 2012 592.660 MISC 592.660 FTA 5309 2013 215.000 MISC 215.000 NFA 2013 296.905 MISC 296.905 FTA 5309 2014 215.000 MISC 215.000 NFA 2014 296.905 MISC 296.905 AQC:NON MULTI TPC : $4.3-9.2 B TOTAL 4YR COST : 2639.990 590.645 1025.535 511.905 511.905

LIRR REDUNDANT ADA ELEVATOR FOR EAST SIDE ACCESS CONCOURSE (NYC) - FTA 5317 2011 2.240 MISC 2.240 CONSTRUCTION OF AN ADA ELEVATOR TO PROVIDE GREATER NFA 2011 0.560 MISC 0.560 G614/01/07 ACCESSIBILITY BETWEEN THE NEW LIRR CONCOURSE AND GTC AS PART OF MTA’S EAST SIDE ACCESS PROJECT. AQC:B8P NEW YORK TPC : $2-$4 M TOTAL 4YR COST : 2.800 2.800 0.000 0.000 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 69 of 84 for REGION 10 4-YEAR PROGRAM (FFY) AGENCY PROJECT DESCRIPTION TOTAL Starting October 01, 2010 FUND SOURCES FFY 4-YEAR PHASE PIN PROGRAM FFY FFY FFY FFY in millions of dollars 2011 2012 2013 2014 AQ CODE COUNTY TOTAL PROJECT COST

LIRR M-9 PROCUREMENT-84 CARS - PURCHASE 84 NEW M-9 ELECTRIC CARS TO NFA 2011 355.900 MISC 355.900 BEGIN THE REPLACEMENT OF THE AGING M-3 FLEET. THE NEW M-9 CARS L601/01/MA WILL BUILD UPON THE SUCCESS OF THE M-7 FLEET AND WILL BE OPERATED THROUGHOUT LIRR ELECTRIC TERRITORY. AQC:B10P SYSTEM-WIDE TPC : $300-$650 M TOTAL 4YR COST : 355.900 355.900 0.000 0.000 0.000

LIRR SPECIFICATION DEVELOPMENT-ALT DIESEL EQUIPMENT NEW DIESEL NFA 2011 2.800 MISC 2.800 POWERED ROLLING STOCK TO OPERATE EXCLUSIVELY IN L601/01/MB NON-ELECTRIFIED TERRITORY AND PROVIDE SCOOT SERVICE TO ELECTRIC TERMINAL STATIONS. THIS FLEET WOULD SUPPLEMENT THE EXISTING DIESEL FLEET. AQC:B10P SYSTEM-WIDE TPC : $2-$4 M TOTAL 4YR COST : 2.800 2.800 0.000 0.000 0.000

LIRR ALTERNATIVE DIESEL EQUIPMENT - PROCUREMENT OF NEW NFA 2013 78.000 MISC 78.000 DIESEL-POWERED ROLLING STOCK TO OPERATE EXCLUSIVELY IN L601/01/MD NON-ELECTRIFIED TERRITORY AND PROVIDE SCOOT SERVICE TO ELECTRIC TERMINAL STATIONS. THIS NEW FLEET WOULD SUPPLEMENT THE EXISTING DIESEL FLEET AQC:NON SYSTEM-WIDE TPC : $70-$130 M TOTAL 4YR COST : 78.000 0.000 0.000 78.000 0.000

LIRR REPLACE PLATFORM - REPLACEMENT OF FTA 5309 2013 14.640 MISC 14.640 PLATFORM WHICH DATES FROM 1953. REHABILITATION EFFORT WILL ALSO NFA 2013 3.660 MISC 3.660 L602/04/UB REPLACE ELEVATOR, ESCALATOR, PLATFORM WAITING ROOMS, LIGHTING, SIGNAGE, PLATFORM CANOPIES, AND OTHER ELEMENTS. AQC:B8P NASSAU TPC : $15-$25 M TOTAL 4YR COST : 18.300 0.000 0.000 18.300 0.000

LIRR REPLACE PLATFORM - REPLACEMENT OF PLATFORM FTA 5307 2012 15.280 MISC 15.280 WHICH DATES FROM 1968. REHABILITATION EFFORT WILL ALSO REPLACE NFA 2012 3.820 MISC 3.820 L602/04/UC ESCALATOR, PLATFORM WAITING ROOMS, LIGHTING, SIGNAGE, PLATFORM CANOPIES, NEW ELEVATOR, MAKING STATION WHEELCHAIR ACCESSIBLE. AQC:B8P NASSAU TPC : $15-$25 M TOTAL 4YR COST : 19.100 0.000 19.100 0.000 0.000

LIRR ESA/GCT SUPPORT - FUND ELEVATOR CONSTRUCTION AND OTHER STATION FTA 5307 2014 12.400 MISC 12.400 INFRASTRUCTURE REQUIRED FOR STATION OPERATIONS AT THE LIRR’S NFA 2014 3.100 MISC 3.100 L602/04/UE NEW STATION AT GRAND CENTRAL TERMINAL. AQC:B5P NEW YORK TPC : $12.5-$19 M TOTAL 4YR COST : 15.500 0.000 0.000 0.000 15.500 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 70 of 84 for REGION 10 4-YEAR PROGRAM (FFY) AGENCY PROJECT DESCRIPTION TOTAL Starting October 01, 2010 FUND SOURCES FFY 4-YEAR PHASE PIN PROGRAM FFY FFY FFY FFY in millions of dollars 2011 2012 2013 2014 AQ CODE COUNTY TOTAL PROJECT COST

LIRR METS/WILLETS PT STATION - TRACK & SIGNAL IMPROVEMENTS TO NFA 2013 1.000 MISC 1.000 FACILITATE OPERATIONS AT CENTER PLATFORM CURRENTLY NOT FTA 5309 2014 4.190 MISC 4.190 L602/04/UF UTILIZED, NEW ELEVATORS FOR WHEELCHAIR ACCESS, NEW NFA 2014 1.010 MISC 1.010 TACTILE-WARNING STRIPS, PLATFORM/CANOPY EXTENSIONS, NEW PLATFORM SHELTERS. AQC:B8P QUEENS TPC : $4.6-$7.5 M TOTAL 4YR COST : 6.200 0.000 0.000 1.000 5.200

LIRR ELEVATOR REPLACEMENT PROGRAM - REPLACES ONE ELEVATOR AT FTA 5307 2012 3.600 MISC 3.600 ROCKVILLE CENTRE AND ONE AT WOODSIDE. THE WOODSIDE ELEVATOR NFA 2012 0.900 MISC 0.900 L602/04/UH CONNECTS THE STREET LEVEL, THE LIRR AND THE NYCT AREAS OF THE STATION COMPLEX. AQC:B8P MULTI TPC : $4.6-$7.5 M TOTAL 4YR COST : 4.500 0.000 4.500 0.000 0.000

LIRR SMART CARD IMPROVEMENTS - PERFORM PILOT STUDIES AND ANALYSIS IN NFA 2011 2.000 MISC 2.000 PREPARATION FOR NEXT GENERATION OF MTA FARE MEDIA. FUTURE USE FTA 5309 2012 6.400 MISC 6.400 L602/04/UK OF CONTACTLESS CARDS EQUIPPED WITH SMART CHIPS CAN BE USED TO NFA 2012 1.600 MISC 1.600 PAY FOR VARIOUS LIRR & TRANSIT AQC:K2P SYSTEM-WIDE TPC : $7.5-$12 M TOTAL 4YR COST : 10.000 2.000 8.000 0.000 0.000

LIRR INTERMODAL FACILITY DEVELOPMENT - DESIGN AND CONSTRUCT A NEW NFA 2012 6.500 MISC 6.500 INTERMODAL FACILITY AT A SUBURBAN LOCATION IN ELECTRIC FTA 5309 2013 23.740 MISC 23.740 L602/05/U1 TERRITORY, WHOSE SITE IS YET TO BE IDENTIFIED. NFA 2013 19.760 MISC 19.760 AQC:NON SYSTEM-WIDE TPC : $40-$60 M TOTAL 4YR COST : 50.000 0.000 6.500 43.500 0.000

LIRR PENN STATION HVAC - REPLACING THE HVAC SYSTEM ENSURES RELIABLE NFA 2013 9.900 MISC 9.900 CLIMATE CONTROL FOR LIRR PORTION OF THE STATION L602/06/VL

AQC:B8P NEW YORK TPC : $9.5-15.5 M TOTAL 4YR COST : 9.900 0.000 0.000 9.900 0.000

LIRR 2010 ANNUAL TRACK PROGRAM PROVIDES FOR THE LIFE CYCLE FTA 5307 2011 21.450 MISC 21.450 REPLACEMENT OF TRACK COMPONENTS IN SELECTED SEGMENTS OF THE FTA 5309 2011 1.510 MISC 1.510 L603/01/TA RIGHT OF WAY AQC:B9P SYSTEM-WIDE TPC : $50-$85 M TOTAL 4YR COST : 22.960 22.960 0.000 0.000 0.000

LIRR 2011 ANNUAL TRACK PROGRAM PROVIDES FOR THE LIFE CYCLE FTA 5307 2011 14.560 MISC 14.560 REPLACEMENT OF TRACK COMPONENTS IN SELECTED SEGMENTS OF THE FTA 5309 2011 40.540 MISC 40.540 L603/01/TB RIGHT OF WAY AQC:B9P SYSTEM-WIDE TPC : $50-$85 M TOTAL 4YR COST : 55.100 55.100 0.000 0.000 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 71 of 84 for REGION 10 4-YEAR PROGRAM (FFY) AGENCY PROJECT DESCRIPTION TOTAL Starting October 01, 2010 FUND SOURCES FFY 4-YEAR PHASE PIN PROGRAM FFY FFY FFY FFY in millions of dollars 2011 2012 2013 2014 AQ CODE COUNTY TOTAL PROJECT COST

LIRR 2012 ANNUAL TRACK PROGRAM PROVIDES FOR THE LIFE CYCLE FTA 5309 2012 47.600 MISC 47.600 REPLACEMENT OF TRACK COMPONENTS IN SELECTED SEGMENTS OF THE NFA 2012 11.900 MISC 11.900 L603/01/TC RIGHT OF WAY AQC:B9P SYSTEM-WIDE TPC : $50-$85 M TOTAL 4YR COST : 59.500 0.000 59.500 0.000 0.000

LIRR 2013 ANNUAL TRACK PROGRAM PROVIDES FOR THE LIFE CYCLE FTA 5307 2013 7.600 MISC 7.600 REPLACEMENT OF TRACK COMPONENTS IN SELECTED SEGMENTS OF THE NFA 2013 1.900 MISC 1.900 L603/01/TD RIGHT OF WAY. FTA 5309 2013 40.000 MISC 40.000 NFA 2013 10.000 MISC 10.000 AQC:B9P SYSTEM-WIDE TPC : $50-$85 M TOTAL 4YR COST : 59.500 0.000 0.000 59.500 0.000

LIRR 2014 ANNUAL TRACK PROGRAM PROVIDES FOR THE LIFE CYCLE FTA 5307 2014 45.680 MISC 45.680 REPLACEMENT OF TRACK COMPONENTS IN SELECTED SEGMENTS OF THE NFA 2014 11.420 MISC 11.420 L603/01/TE RIGHT OF WAY AQC:B9P SYSTEM-WIDE TPC : $50-$85 M TOTAL 4YR COST : 57.100 0.000 0.000 0.000 57.100

LIRR THE TRACK CONSTRUCTION EQUIPMENT PROGRAM PROVIDES FOR THE FTA 5307 2011 4.800 MISC 4.800 TRACK CONSTRUCTION EQUIPMENT - REPLACES CONSTRUCTION FTA 5309 2012 1.360 MISC 1.360 L603/01/TF EQUIPMENT THAT HAS REACHED THE END OF ITS USEFUL LIFE AND NFA 2012 0.340 MISC 0.340 PURCHASE NEW EQUIPMENT TO EXPAND THE EQUIPMENT INVENTORY. FTA 5309 2013 0.400 MISC 0.400 NFA 2013 0.100 MISC 0.100 AQC:B9P SYSTEM-WIDE TPC : $6-$9.4 M TOTAL 4YR COST : 7.000 4.800 1.700 0.500 0.000

LIRR 1/2 TIES - REPLACES THE EXISTING WOOD HALF-TIES FTA 5307 2012 18.310 MISC 18.310 AND CONCRETE TRACK STRUCTURE IN THE TUNNEL BETWEEN EAST NEW NFA 2012 4.577 MISC 4.577 L603/01/TG YORK AND JAMAICA FTA 5309 2012 11.690 MISC 11.690 NFA 2012 2.922 MISC 2.922 AQC:B9P SYSTEM-WIDE TPC : $32-$50 M TOTAL 4YR COST : 37.499 0.000 37.499 0.000 0.000

LIRR MERRICK/BELLMORE DIRECT FIXATION - REPLACE THE TRACK TO FTA 5307 2012 28.640 MISC 28.640 VIADUCT FIXATION SYSTEM IN THE VICINITY OF MERRICK & BELLMORE NFA 2012 7.160 MISC 7.160 L603/01/TH STATIONS ON THE . AQC:B9P NASSAU TPC : $32-$50 M TOTAL 4YR COST : 35.800 0.000 35.800 0.000 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 72 of 84 for REGION 10 4-YEAR PROGRAM (FFY) AGENCY PROJECT DESCRIPTION TOTAL Starting October 01, 2010 FUND SOURCES FFY 4-YEAR PHASE PIN PROGRAM FFY FFY FFY FFY in millions of dollars 2011 2012 2013 2014 AQ CODE COUNTY TOTAL PROJECT COST

LIRR RIGHT OF WAY CULVERTS - REHABILITATE CULVERTS ADDRESSING NFA 2011 0.500 MISC 0.500 SIGNIFICANT DEFICIENCIES AND DETERIORATION NFA 2012 0.500 MISC 0.500 L603/01/TJ NFA 2013 0.500 MISC 0.500 NFA 2014 0.500 MISC 0.500 AQC:B9P SYSTEM-WIDE TPC : $2-$4 M TOTAL 4YR COST : 2.000 0.500 0.500 0.500 0.500

LIRR RIGHT OF WAY DRAINAGE CONTROL - IMPROVE RIGHT OF WAY AND TRACK NFA 2011 0.700 MISC 0.700 DRAINAGE IN AN EFFORT TO PREVENT TRACK DETERIORATION AND THE NFA 2012 0.700 MISC 0.700 L603/01/TK NEED FOR ASSOCIATED INCREASES IN MAINTENANCE NFA 2013 0.700 MISC 0.700 NFA 2014 0.700 MISC 0.700 AQC:B9P SYSTEM-WIDE TPC : $3.3-$5.6 M TOTAL 4YR COST : 2.800 0.700 0.700 0.700 0.700

LIRR SCOPE: INSTALL SECURITY FENCE ALONG THE RIGHT OF WAY. PURPOSE: FTA 5309 2011 3.200 MISC 3.200 TO ENHANCE SAFETY AND SECURITY AND PREVENT UNAUTHORIZED FTA 5307 2012 1.280 MISC 1.280 L603/01/TL ENTRY INTO THE RIGHT OF WAY.THIS IS PART OF ONGOING PROGRAM TO NFA 2012 0.320 MISC 0.320 FENCE ENTIRE SYSTEM FTA 5307 2013 1.280 MISC 1.280 NFA 2013 0.320 MISC 0.320 FTA 5307 2014 1.280 MISC 1.280 NFA 2014 0.320 MISC 0.320 AQC:B9P SYSTEM-WIDE TPC : $7.5-$12 M TOTAL 4YR COST : 8.000 3.200 1.600 1.600 1.600

LIRR ROW TRACK STABILITY/RETAINING WALLS WILL INCLUDE EXTENDING, NFA 2011 0.200 MISC 0.200 REPLACING/UPGRADING EXISTING RETAINING WALLS, REPLACING EXISTING NFA 2012 0.200 MISC 0.200 L603/01/TN DETERIORATED WOOD RAILROAD TIE WALLS, BACKFILLING STRUCTURES, NFA 2013 0.200 MISC 0.200 SURFACING EXISTING TRACK AND REPLACING TRACK SHOULDERS NFA 2014 0.200 MISC 0.200 AQC:B9P SYSTEM-WIDE TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.800 0.200 0.200 0.200 0.200

LIRR JAMAICA CAPACITY IMPROVEMENTS - PH I - DESIGN AND CONSTRUCT A NFA 2011 40.000 MISC 40.000 NEW PLATFORM AT AND ASSOCIATED TRACK, SWITCH & FTA 5307 2012 40.930 MISC 40.930 L603/04/TU SIGNAL INFRASTRUCTURE FOR FUTURE FLATBUSH-JAMAICA SCOOT NFA 2012 32.950 MISC 32.950 SERVICE FTA 5307 2013 51.100 MISC 51.100 NFA 2013 31.100 MISC 31.100 FTA 5307 2014 54.360 MISC 54.360 NFA 2014 27.402 MISC 27.402 FTA 5309 2014 89.390 MISC 89.390 NFA 2014 32.760 MISC 32.760 AQC:NON QUEENS TPC : $300-$650 M TOTAL 4YR COST : 399.992 40.000 73.880 82.200 203.912 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 73 of 84 for REGION 10 4-YEAR PROGRAM (FFY) AGENCY PROJECT DESCRIPTION TOTAL Starting October 01, 2010 FUND SOURCES FFY 4-YEAR PHASE PIN PROGRAM FFY FFY FFY FFY in millions of dollars 2011 2012 2013 2014 AQ CODE COUNTY TOTAL PROJECT COST

LIRR MASSAPEQUA POCKET TRACK - DESIGN AND CONSTRUCT A NEW CMAQ 2012 8.500 MISC 8.500 MASSAPEQUA POCKET TRACK, TO FACILITATE ADDITIONAL MID-BRANCH NFA 2012 2.600 MISC 2.600 L603/04/TV TRAIN STARTS ON THE BABYLON BRANCH CMAQ 2013 8.500 MISC 8.500 AQC:NON NASSAU TPC : $15-$25 M TOTAL 4YR COST : 19.600 0.000 11.100 8.500 0.000

LIRR GREAT NECK POCKET TRACK EXTENSION - EXTEND THE EXISTING GREAT NFA 2011 26.100 MISC 26.100 NECK POCKET TRACK LOCATED EAST OF ON THE L603/04/TW TO FACILITATE ADDITIONAL SERVICE TO GREAT NECK & QUEENS STATIONS AQC:NON NASSAU TPC : $21-$31 M TOTAL 4YR COST : 26.100 26.100 0.000 0.000 0.000

LIRR SECOND TRACK FARMINGDALE TO RONKONKOMA - PHASE 1 - DESIGN A NFA 2011 6.900 MISC 6.900 FULL-LENGTH DOUBLE TRACK FROM FARMINGDALE TO RONKONKOMA & FTA 5307 2013 10.770 MISC 10.770 L603/04/TX CONSTRUCT PHASE I - CENTRAL ISLIP TO RONKONKOMA NFA 2013 2.692 MISC 2.692 FTA 5309 2013 7.710 MISC 7.710 NFA 2013 1.927 MISC 1.927 AQC:NON SUFFOLK TPC : $26-$40 M TOTAL 4YR COST : 29.999 6.900 0.000 23.099 0.000

LIRR BRIDGE PROGRAM-REHABILITATE SELECTED BRIDGES & VIADUCTS FTA 5309 2012 8.000 MISC 8.000 IDENTIFIED AS PRIORITY FOR REHABILITATION NFA 2012 2.000 MISC 2.000 L604/01/BB FTA 5307 2013 6.400 MISC 6.400 NFA 2013 1.600 MISC 1.600 FTA 5307 2014 5.280 MISC 5.280 NFA 2014 1.320 MISC 1.320 AQC:B9P SYSTEM-WIDE TPC : $21-$31 M TOTAL 4YR COST : 24.600 0.000 10.000 8.000 6.600

LIRR REPLACE COLONIAL ROAD HIGHWAY BRIDGE - REPLACE THE COLONIAL NFA 2011 10.000 MISC 10.000 ROAD HIGHWAY BRIDGE IN GREAT NECK. THIS BRIDGE, CONSTRUCTED IN L604/01/BC 1897, HAS EXCEEDED ITS USEFUL LIFE AND IS IN NEED OF REPLACEMENT. AQC:B9P NASSAU TPC : $7.5-$12 M TOTAL 4YR COST : 10.000 10.000 0.000 0.000 0.000

LIRR CONSTRUCT 150TH ST-JAMAICA & BROADWAY/PW - REHABILITATE THE NFA 2012 29.700 MISC 29.700 150TH ST BRIDGE IN JAMAICA (MAIN LINE AND ATLANTIC BRANCH) AND L604/01/BD BROADWAY BRIDGE IN QUEENS (PORT WASHINGTON BRANCH), BRINGING THESE BRIDGES TO A STATE OF GOOD REPAIR. AQC:B9P QUEENS TPC : $26-$40 M TOTAL 4YR COST : 29.700 0.000 29.700 0.000 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 74 of 84 for REGION 10 4-YEAR PROGRAM (FFY) AGENCY PROJECT DESCRIPTION TOTAL Starting October 01, 2010 FUND SOURCES FFY 4-YEAR PHASE PIN PROGRAM FFY FFY FFY FFY in millions of dollars 2011 2012 2013 2014 AQ CODE COUNTY TOTAL PROJECT COST

LIRR CONSTRUCT 3 BRIDGES - REHABILITATE THE FTA 5307 2011 26.200 MISC 26.200 SHINNECOCK CANAL, MONTAUK HIGHWAY, AND NORTH HIGHWAY L604/01/BE BRIDGES TO BRING THESE BRIDGES TO A STATE OF GOOD REPAIR. AQC:B9P SUFFOLK TPC : $21-$31 M TOTAL 4YR COST : 26.200 26.200 0.000 0.000 0.000

LIRR BRIDGE PAINTING PROGRAM - PAINT VARIOUS BRIDGES AND VIADUCTS, FTA 5309 2011 2.000 MISC 2.000 BASED UPON PRIORITIZATION ESTABLISHED BY THE RAILROAD'S FTA 5307 2012 1.600 MISC 1.600 L604/01/BG ENGINEERING DEPARTMENT NFA 2012 0.400 MISC 0.400 NFA 2013 1.200 MISC 1.200 AQC:B9P SYSTEM-WIDE TPC : $4.6-$7.5 M TOTAL 4YR COST : 5.200 2.000 2.000 1.200 0.000

LIRR WOODHAVEN BOULEVARD BRIDGE - REHABILITATION TO EXTEND THE NFA 2011 10.200 MISC 10.200 SERVICE LIFE AND RESTORE ALL COMPONENTS TO A STATE OF GOOD L604/01/BH REPAIR AQC:B9P QUEENS TPC : $9.5-15.5 M TOTAL 4YR COST : 10.200 10.200 0.000 0.000 0.000

LIRR EAST RIVER TUNNEL FIRE & LIFE SAFETY - IMPROVE PHYSICAL NFA 2013 11.200 MISC 11.200 CONDITIONS, EGRESS OPPORTUNITIES AND VENTILATION IN THE TUNNELS L604/02/BP

AQC:B9P SYSTEM-WIDE TPC : $15-$25 M TOTAL 4YR COST : 11.200 0.000 0.000 11.200 0.000

LIRR FIBER OPTIC NETWORK - CONTINUE MULTI-PHASE BUILD OUT OF FIBER FTA 5309 2012 8.000 MISC 8.000 OPTIC NETWORK BY INSTALLING FIBER OPTIC CABLE AND EQUIPMENT AT NFA 2012 2.000 MISC 2.000 L605/01/L1 VARIOUS LOCATIONS THROUGHOUT THE LIRR AQC:B6P SYSTEM-WIDE TPC : $7.5-$12 M TOTAL 4YR COST : 10.000 0.000 10.000 0.000 0.000

LIRR PBX - WAYSIDE PHONE REPLACEMENT - PHASE I - WILL REPLACE NFA 2011 2.100 MISC 2.100 DETERIORATED OBSOLETE WAYSIDE PHONE SYSTEM & ACCESSORIES NFA 2012 2.100 MISC 2.100 L605/01/L2 PROVIDED IN SUBSTATIONS, YARDS, INTERLOCKINGS AND ALONG THE LIRR NFA 2013 2.100 MISC 2.100 RIGHT OF WAY WITH A MODERN COMMUNICATIONS SYSTEM NFA 2014 2.100 MISC 2.100 AQC:B6P SYSTEM-WIDE TPC : $9.5-15.5 M TOTAL 4YR COST : 8.400 2.100 2.100 2.100 2.100 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 75 of 84 for REGION 10 4-YEAR PROGRAM (FFY) AGENCY PROJECT DESCRIPTION TOTAL Starting October 01, 2010 FUND SOURCES FFY 4-YEAR PHASE PIN PROGRAM FFY FFY FFY FFY in millions of dollars 2011 2012 2013 2014 AQ CODE COUNTY TOTAL PROJECT COST

LIRR REPLACE COMMUNICATION POLE/COPPER PLANT:PURPOSE: THESE POLES FTA 5309 2011 7.000 MISC 7.000 CARRY THE CABLE LINES PROVIDING SERVICE TO THE LONG ISLAND RAIL L605/01/L3 ROAD COMMUNICATION SYSTEM AND FIBER OPTIC CABLE. LOCATIONS: OYSTER BAY, CENTRAL AND PORT WASHINGTON BRANCHES AND MAIN LINE. AQC:B6P SYSTEM-WIDE TPC : $6-$9.4 M TOTAL 4YR COST : 7.000 7.000 0.000 0.000 0.000

LIRR IMPROVED RADIO COVERAGE INITIATIVE - PURCHASE AND INSTALL NEW NFA 2011 2.000 MISC 2.000 RADIO INFRASTRUCTURE TO MIGRATE THE LIRR'S RADIO NFA 2012 2.000 MISC 2.000 L605/01/L4 COMMUNICATIONS SYSTEM FROM CURRENT ANALOG TO MODERN RADIOS NFA 2013 2.900 MISC 2.900 USING LESS BANDWITH TO PROVIDE GREATER CHANNEL CAPACITY AND NFA 2014 2.900 MISC 2.900 AVAILABILITY AQC:B6P SYSTEM-WIDE TPC : $9.5-15.5 M TOTAL 4YR COST : 9.800 2.000 2.000 2.900 2.900

LIRR PENN STATION RADIO RETROFIT/ERT ANTENNA - UPGRADE/REPLACE NFA 2011 5.200 MISC 5.200 EXISTING DETERIORATED RADIO INFRASTURE IN PENN STATION AND THE L605/01/L6 EAST RIVER TUNNELS, IN ORDER TO IMPROVE COMMUNICATIONS AQC:B6P NEW YORK TPC : $6-$9.4 M TOTAL 4YR COST : 5.200 5.200 0.000 0.000 0.000

LIRR ATLANTIC AVE TUNNEL CABLE REPLACEMENT - REPLACE THE FTA 5307 2011 1.700 MISC 1.700 DETERIORATED COPPER AND COAXIAL RADIO CABLE WHICH SUPPORTS FTA 5309 2012 1.360 MISC 1.360 L605/01/L7 NUMEROUS COMMUNICATIONS SYSTEMS IN ATLANTIC AVENUE TUNNEL NFA 2012 0.340 MISC 0.340 FTA 5309 2013 1.360 MISC 1.360 NFA 2013 0.340 MISC 0.340 AQC:B6P SYSTEM-WIDE TPC : $4.6-$7.5 M TOTAL 4YR COST : 5.100 1.700 1.700 1.700 0.000

LIRR POSITIVE TRAIN CONTROL:SCOPE: A SYSTEM TO PROVIDE ENFORCEMENT NFA 2011 22.300 MISC 22.300 OF CIVIL SPEED A& TEMPORARY SPEED RESTRICTIONS, POSITIVE STOP AT NFA 2012 155.700 MISC 155.700 L605/02/LA INTERLOCKINGS AND PROTECTION OVER IMPROPERLY ALIGNED SWITCHES, NFA 2013 77.200 MISC 77.200 AS WELL AS PROTECTION OF ROADWAY WORKERS. LOCATION: VARIOUS AQC:B6P SYSTEM-WIDE TPC : $175-$385 M TOTAL 4YR COST : 255.200 22.300 155.700 77.200 0.000

LIRR SIGNAL NORMAL REPLACEMENT PROGRAM INCLUDES SWITH,BATTERIES FTA 5307 2011 7.500 MISC 7.500 ETC.SCOPE: REPLACE VARIOUS SIGNAL SYSTEM COMPONENTS THAT HAVE FTA 5309 2011 7.500 MISC 7.500 L605/02/LB REACHED AND/OR EXCEEDED THEIR USEFUL LIFE AT LONG BEACH, PORT JEFFERSON, OYSTER BAY, CENTRAL, MONTAUK AND MAIN LINE BRANCHES. AQC:B6P SYSTEM-WIDE TPC : $12.5-$19 M TOTAL 4YR COST : 15.000 15.000 0.000 0.000 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 76 of 84 for REGION 10 4-YEAR PROGRAM (FFY) AGENCY PROJECT DESCRIPTION TOTAL Starting October 01, 2010 FUND SOURCES FFY 4-YEAR PHASE PIN PROGRAM FFY FFY FFY FFY in millions of dollars 2011 2012 2013 2014 AQ CODE COUNTY TOTAL PROJECT COST

LIRR SPEONK - MONTAUK SIGNALIZATION - SIGNALIZE DARK TERRITORY FTA 5307 2011 10.000 MISC 10.000 (UN-SIGNALIZED) ON THE MONTAUK BRANCH BETWEEN SPEONK AND NFA 2011 2.500 MISC 2.500 L605/02/LC MONTAUK. FTA 5309 2011 10.000 MISC 10.000 NFA 2011 27.400 MISC 27.400 AQC:B6P SUFFOLK TPC : $40-$60 M TOTAL 4YR COST : 49.900 49.900 0.000 0.000 0.000

LIRR BABYLON INTERLOCKING RENEWAL - RENEW AND UPGRADE THE SIGNAL NFA 2011 7.700 MISC 7.700 COMPONENTS IN BABYLON INTERLOCKING WHICH HAVE REACHED AND/OR NFA 2012 14.700 MISC 14.700 L605/02/LD EXCEEDED THEIR USEFUL LIVES FTA 5307 2013 43.280 MISC 43.280 NFA 2013 10.820 MISC 10.820 AQC:B6P SUFFOLK TPC : $70-$130 M TOTAL 4YR COST : 76.500 7.700 14.700 54.100 0.000

LIRR SUPERVISORY CONTROL + REMOTE TERMINAL UNITS (RTU) - RENEW AND NFA 2011 1.900 MISC 1.900 UPGRADE EXISTING SUPERVISORY CONTROL SYSTEMS AND ASSOCIATED NFA 2012 1.900 MISC 1.900 L605/02/LE REMOTE TERMINAL UNITS (RTUS) AT DIVIDE TOWER IN HICKSVILLE, WHICH NFA 2013 1.800 MISC 1.800 DISPTACHES TRAINS ON THE MAIN LINE AND NFA 2014 1.800 MISC 1.800 AQC:B6P MULTI TPC : $7.5-$12 M TOTAL 4YR COST : 7.400 1.900 1.900 1.800 1.800

LIRR CENTRALIZED TRAIN CONTROL - ALLOW LIRR TO BEGIN MIGRATION FROM NFA 2011 10.000 MISC 10.000 THE CURRENT SYSTEM OF TERRITORY-BASED CONTROL TOWERS TO A NFA 2012 10.000 MISC 10.000 L605/02/LF CENTRALIZED SYSTEM WHERE TRAIN DISPATCHING AND TRAIN NFA 2013 10.000 MISC 10.000 SUPERVISION IS DONE FROM A SINGLE LOCATION AQC:B6P SYSTEM-WIDE TPC : $26-$40 M TOTAL 4YR COST : 30.000 10.000 10.000 10.000 0.000

LIRR HILLSIDE FACILITY BLDG REHAB (ROOF) - REPLACE SELECTED ROOFS AND NFA 2013 6.000 MISC 6.000 ROOF COMPONENTS AT THE HILLSIDE FACILITY IN HOLLIS, QUEENS L606/01/YB

AQC:B8P QUEENS TPC : $4.6-$7.5 M TOTAL 4YR COST : 6.000 0.000 0.000 6.000 0.000

LIRR HILLSIDE MAINTENANCE FACILITY - ADDRESS VARIOUS BUILDING SYSTEMS NFA 2011 2.500 MISC 2.500 AND REPLACE COMPONENTS WHICH HAVE REACHED THE END OF THEIR L606/01/YC USEFUL LIVES AT THE HILLSIDE FACILITY IN HOLLIS, QUEENS. AQC:B8P QUEENS TPC : $2-$4 M TOTAL 4YR COST : 2.500 2.500 0.000 0.000 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 77 of 84 for REGION 10 4-YEAR PROGRAM (FFY) AGENCY PROJECT DESCRIPTION TOTAL Starting October 01, 2010 FUND SOURCES FFY 4-YEAR PHASE PIN PROGRAM FFY FFY FFY FFY in millions of dollars 2011 2012 2013 2014 AQ CODE COUNTY TOTAL PROJECT COST

LIRR DIESEL LOCOMOTIVE SHOP UPGRADE - UNDERTAKE FACILITY NFA 2012 5.000 MISC 5.000 IMPROVEMENTS AND MODERNIZATION AT MORRIS PARK, LOCATED IN L606/01/YE RICHMOND HILL, QUEENS, WHICH IS USED TO MAINTAIN DIESEL LOCOMOTIVES AQC:B8P QUEENS TPC : $4.6-$7.5 M TOTAL 4YR COST : 5.000 0.000 5.000 0.000 0.000

LIRR MONTAUK YARD IMPROVEMENTS - IMPROVEMENTS TO THE FIVE TRACK NFA 2011 0.800 MISC 0.800 MONTAUK YARD, USED FOR THE STORAGE, MAINTENANCE AND REPAIR OF FTA 5309 2013 3.000 MISC 3.000 L606/01/YK DIESEL EQUIPMENT INCLUDES LIGHTING, SOUND WALL, WAYSIDE POWER NFA 2013 4.600 MISC 4.600 AND OTHER IMPROVEMENTS. AQC:B8P SUFFOLK TPC : $7.5-$12 M TOTAL 4YR COST : 8.400 0.800 0.000 7.600 0.000

LIRR EXPAND THE TRAIN STORAGE CAPACITY OF PORT WASHINGTON ELECTRIC NFA 2011 3.000 MISC 3.000 STORAGE YARD IN ORDER TO OPERATE THE EAST SIDE ACCESS SERVICE FTA 5307 2012 7.280 MISC 7.280 L606/01/YL NFA 2012 1.820 MISC 1.820 AQC:NON NASSAU TPC : $9.5-15.5 M TOTAL 4YR COST : 12.100 3.000 9.100 0.000 0.000

LIRR NEW MID SUFFOLK ELECTRIC YARD - DESIGN AND CONSTRUCT A NEW NFA 2011 56.200 MISC 56.200 ELECTRIC STORAGE YARD ON THE MAIN LINE IN SUFFOLK COUNTY NFA 2012 23.000 MISC 23.000 L606/01/YN

AQC:NON SUFFOLK TPC : $70-$130 M TOTAL 4YR COST : 79.200 56.200 23.000 0.000 0.000

LIRR REHABILITATION OF EMPLOYEE FACILITIES - REHABILITATE/REPLACE NFA 2011 2.500 MISC 2.500 SELECTED BUILDING COMPONENTS AT LIRR EMPLOYEE FACILITIES NFA 2012 2.500 MISC 2.500 L606/04/YT SYTEMWIDE, IN AN EFFORT TO MAINTAIN THESE FACILITIES IN A STATE OF NFA 2013 2.500 MISC 2.500 GOOD REPAIR NFA 2014 2.500 MISC 2.500 AQC:B8P SYSTEM-WIDE TPC : $7.5-$12 M TOTAL 4YR COST : 10.000 2.500 2.500 2.500 2.500

LIRR SUBSTATION REPLACEMENTS - REPLACE 6 SUBSTATIONS IN QUEENS AND FTA 5307 2011 22.500 MISC 22.500 NASSAU COUNTIES. THESE TRACTION POWER FACILITIES, SOME OF WHICH NFA 2012 27.500 MISC 27.500 L607/01/AA DATE FROM THE 1940S, HAVE REACHED THE END OF THEIR USEFUL LIFE AND REQUIRE REPLACEMENT. AQC:B6P MULTI TPC : $50-$85 M TOTAL 4YR COST : 50.000 22.500 27.500 0.000 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 78 of 84 for REGION 10 4-YEAR PROGRAM (FFY) AGENCY PROJECT DESCRIPTION TOTAL Starting October 01, 2010 FUND SOURCES FFY 4-YEAR PHASE PIN PROGRAM FFY FFY FFY FFY in millions of dollars 2011 2012 2013 2014 AQ CODE COUNTY TOTAL PROJECT COST

LIRR SUBSTATION BATTERY REPLACEMENT INCLUDES BATTERIES,CHARGER FTA 5309 2011 0.800 MISC 0.800 AND APPLICABLE HARDWARES PART OF NORMAL REPLACEMENT L607/01/AB CYCLE.GREENLAWN, JAMAICA, MAIN LINE, MINEOLA, PORT JEFFERSON, SMITHTOWN, WOODSIDE, WANTAGH, RONKONKOMA, SYOSSET, HUNTINGTON, ETC. AQC:B6P SYSTEM-WIDE TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.800 0.800 0.000 0.000 0.000

LIRR SIGNAL POWER MOTOR GENERATOR REPLACEMENT - REPLACE SIGNAL FTA 5307 2011 1.800 MISC 1.800 POWER MOTOR GENERATORS AND ASSOCIATED EQUIPMENT AT L607/01/AC SUBSTATIONS WHERE THE EQUIPMENT HAS EXCEEDED ITS USEFUL LIFE. AQC:B6P SYSTEM-WIDE TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.800 1.800 0.000 0.000 0.000

LIRR SUBSTATION PILOT WIRE AND RELAY REPLACEMENT - REPLACE THE FTA 5309 2011 2.000 MISC 2.000 EXISTING DC BREAKER PROTECTION AND AUTO RE-CLOSE FOR DC L607/01/AD BREAKERS AT VARIOUS TRACTION POWER SUBSTATION LOCATIONS AQC:B6P SYSTEM-WIDE TPC : $1.2-$2.5 M TOTAL 4YR COST : 2.000 2.000 0.000 0.000 0.000

LIRR REPLACE & UPGRADE THE DETERIORATED, AGED THE CABLE & FTA 5309 2011 2.500 MISC 2.500 INADEQUATE 2000 MCM DC FEEDER AND JUMPER CABLES AT ATLANTIC L607/01/AE BRANCH-E AST NEW YORK .PURPOSE: TO ENSURE AN ADEQUATE & DEPENDABLE SUPPLY OF TRACTION POWER TO MEET POWER DEMANDS AQC:B6P SYSTEM-WIDE TPC : $2-$4 M TOTAL 4YR COST : 2.500 2.500 0.000 0.000 0.000

LIRR THIRD RAIL SYSTEM - DISCONNECT SWITCHES - REPLACE AND/OR UPGRADE FTA 5307 2011 1.000 MISC 1.000 DETERIORATED, AGED AND INADEQUATE DC FEEDER DISCONNECT L607/01/AF SWITCHES SYSTEM-WIDE AQC:B6P SYSTEM-WIDE TPC : $0.6-$1.5 M TOTAL 4YR COST : 1.000 1.000 0.000 0.000 0.000

LIRR THIRD RAIL SYSTEM - PROTECTION BOARD - REPLACE AND UPGRADE FTA 5309 2011 9.200 MISC 9.200 DETERIORATED, AGED, AND INADEQUATE PROTECTION BOARD SYSTEM L607/01/AG WIDE AQC:B6P SYSTEM-WIDE TPC : $7.5-$12 M TOTAL 4YR COST : 9.200 9.200 0.000 0.000 0.000

LIRR THIRD RAIL SYSTEM-ALUMINUM RAIL - REPLACE AND/OR UPGRADE WORN, FTA 5309 2011 5.600 MISC 5.600 AGED, AND INADEQUATE CONDUCTOR THIRD RAIL SYSTEMWIDE. NFA 2012 5.300 MISC 5.300 L607/01/AH

AQC:B6P SYSTEM-WIDE TPC : $9.5-15.5 M TOTAL 4YR COST : 10.900 5.600 5.300 0.000 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 79 of 84 for REGION 10 4-YEAR PROGRAM (FFY) AGENCY PROJECT DESCRIPTION TOTAL Starting October 01, 2010 FUND SOURCES FFY 4-YEAR PHASE PIN PROGRAM FFY FFY FFY FFY in millions of dollars 2011 2012 2013 2014 AQ CODE COUNTY TOTAL PROJECT COST

LIRR ATLANTIC AVENUE TUNNEL LIGHTING - REPLACE AND UPGRADE NFA 2012 0.700 MISC 0.700 DETERIORATED AND INADEQUATE LIGHTING IN THE LIRRS ATLANTIC FTA 5307 2014 5.040 MISC 5.040 L607/01/AJ AVENUE TUNNEL BETWEEN EAST NEW YORK AND FLATBUSH AVENUE NFA 2014 1.260 MISC 1.260 AQC:B9P KINGS TPC : $6-$9.4 M TOTAL 4YR COST : 7.000 0.000 0.700 0.000 6.300

LIRR SIGNAL POWER LINE REPLACEMENT REPLACE IN-KIND THE DETERIORATED FTA 5309 2011 3.000 MISC 3.000 5KV POWER LINES FOR THE SIGNAL POWER SYSTEM AND ASSOCIATED LINE L607/01/AK HARDWARE AT VARIOUS LOCATIONS SYSTEMWIDE ALONG THE RAILROAD RIGHT OF WAY AQC:B6P SYSTEM-WIDE TPC : $2-$4 M TOTAL 4YR COST : 3.000 3.000 0.000 0.000 0.000

LIRR POWER POLE LINE REPLACEMENT REPLACE DETERIORATED POWER LINE FTA 5307 2011 3.000 MISC 3.000 POLES AND APPLICABLE HARDWARE AT VARIOUS LOCATIONS SYSTEMWIDE L607/01/AL ALONG THE RAILROAD RIGHT OF WAY AQC:B6P SYSTEM-WIDE TPC : $2-$4 M TOTAL 4YR COST : 3.000 3.000 0.000 0.000 0.000

LIRR NEW SUBSTATIONS - DESIGN TWO NEW SUBSTATIONS AND CONSTRUCT NFA 2012 5.000 MISC 5.000 ONE NEW SUBSTATION ON THE MAIN LINE IN QUEENS, WEST OF JAMAICA. NFA 2013 17.100 MISC 17.100 L607/01/AM

AQC:B6P QUEENS TPC : $21-$31 M TOTAL 4YR COST : 22.100 0.000 5.000 17.100 0.000

LIRR THIRD RAIL FEEDER CABLE UPGRADE- REPLACE AND UPGRADE THIRD RAIL FTA 5307 2011 2.500 MISC 2.500 FEEDER CABLE IN AREAS WHERE IT IS BEYOND ITS USEFUL LIFE AND IS L607/01/AN UNDERSIZED TO PROPERLY SUPPORT ELECTRIC FLEET OPERATIONS AQC:B6P SYSTEM-WIDE TPC : $2-$4 M TOTAL 4YR COST : 2.500 2.500 0.000 0.000 0.000

LIRR NEGATIVE REACTOR UPGRADE - REPLACE AND UPGRADE THIRD RAIL FTA 5309 2011 4.000 MISC 4.000 NEGATIVE REACTORS WHICH ARE BEYOND THEIR USEFUL LIVES AND ARE L607/01/AP UNDERSIZED TO PROPERLY SUPPORT THE ELECTRIC FLEET AQC:B6P SYSTEM-WIDE TPC : $3.3-$5.6 M TOTAL 4YR COST : 4.000 4.000 0.000 0.000 0.000

LIRR CHLORDANE REMEDIATION - 20 SUBSTATIONS - ADDRESS CHLORDANE NFA 2012 0.800 MISC 0.800 CONTAMINATION WHICH EXISTS IN SOIL SURROUNDING SELECTED LIRR NFA 2013 7.700 MISC 7.700 L609/04/N3 SUBSTATIONS AQC:A2P SYSTEM-WIDE TPC : $7.5-$12 M TOTAL 4YR COST : 8.500 0.000 0.800 7.700 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 80 of 84 for REGION 10 4-YEAR PROGRAM (FFY) AGENCY PROJECT DESCRIPTION TOTAL Starting October 01, 2010 FUND SOURCES FFY 4-YEAR PHASE PIN PROGRAM FFY FFY FFY FFY in millions of dollars 2011 2012 2013 2014 AQ CODE COUNTY TOTAL PROJECT COST

LIRR YAPHANK LANDFILL ENVIRONMENTAL - REMEDIATION AT SITE INCLUDES NFA 2011 8.200 MISC 8.200 INSTALLATION OF AN IMPERMEABLE BARRIER AND ANCILLARY ITEMS L609/04/N4 (GRADING, SEEDING, ETC.) AQC:A2P SUFFOLK TPC : $7.5-$12 M TOTAL 4YR COST : 8.200 8.200 0.000 0.000 0.000

LIRR SMITHTOWN VIADUCT REMEDIATION & DRAINAGE - REMEDIATE ELEVATED NFA 2012 0.300 MISC 0.300 LEAD LEVELS IN THE SOIL NEAR THE SMITHTOWN VIADUCT NFA 2013 2.900 MISC 2.900 L609/04/N6

AQC:A2P SUFFOLK TPC : $2-$4 M TOTAL 4YR COST : 3.200 0.000 0.300 2.900 0.000

LIRR PROGRAM ADMINSTRATION - LIRR COSTS ASSOCIATED WITH THE SUPPORT, NFA 2011 26.100 MISC 26.100 ADMINISTRATION AND MANAGEMENT OF THE 2010-2014 CAPITAL PROGRAM FTA 5309 2012 3.800 MISC 3.800 L609/04/NA NFA 2012 23.100 MISC 23.100 NFA 2013 28.000 MISC 28.000 NFA 2014 28.000 MISC 28.000 AQC:B1P SYSTEM-WIDE TPC : $100-$225 M TOTAL 4YR COST : 109.000 26.100 26.900 28.000 28.000

LIRR PROGRAM DEVELOPMENT PROVIDES FUNDS FOR THE LONG ISLAND RAIL NFA 2012 5.500 MISC 5.500 ROAD TO PREPARE PROJECT SCOPES, EXAMINE SYSTEM ASSET NEEDS, AND NFA 2013 1.400 MISC 1.400 L609/04/NB TO STUDY CAPITAL NEEDS IN ORDER TO PREPARE FOR THE NEXT CAPITAL NFA 2014 1.400 MISC 1.400 PROGRAM AQC:B1P SYSTEM-WIDE TPC : $7.5-$12 M TOTAL 4YR COST : 8.300 0.000 5.500 1.400 1.400

LIRR INSURANCE FOR ALL WORK ASSOCIATED WITH THE LIRR CAPITAL NFA 2011 0.200 MISC 0.200 PROGRAM NFA 2012 0.200 MISC 0.200 L609/04/NC NFA 2013 0.200 MISC 0.200 NFA 2014 0.200 MISC 0.200 AQC:B1P SYSTEM-WIDE TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.800 0.200 0.200 0.200 0.200

LIRR INDEPENDENT ENGINEER FUNDS INDEPENDENT ENGINEERING WORK FOR NFA 2011 0.900 MISC 0.900 PROJECTS THROUGHOUT THE CAPITAL PROGRAM NFA 2012 0.900 MISC 0.900 L609/04/ND NFA 2013 0.800 MISC 0.800 NFA 2014 0.800 MISC 0.800 AQC:B1P SYSTEM-WIDE TPC : $3.3-$5.6 M TOTAL 4YR COST : 3.400 0.900 0.900 0.800 0.800 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 81 of 84 for REGION 10 4-YEAR PROGRAM (FFY) AGENCY PROJECT DESCRIPTION TOTAL Starting October 01, 2010 FUND SOURCES FFY 4-YEAR PHASE PIN PROGRAM FFY FFY FFY FFY in millions of dollars 2011 2012 2013 2014 AQ CODE COUNTY TOTAL PROJECT COST

LIRR MENTORING PROGRAM ADMINISTRATION - WILL PROGRESS SELECTED NFA 2011 0.300 MISC 0.300 CAPITAL PROGRAM ELEMENTS FOR INCLUSION IN MTA-WIDE MENTORING NFA 2012 0.300 MISC 0.300 L609/04/NE PROGRAM - INITIATIVE WHICH LOOKS TO EXPAND PARTICIPATION BY NFA 2013 0.300 MISC 0.300 SMALL BUSINESSES SERVING AS CONTRACTORS AND CONSULTANTS FOR NFA 2014 0.300 MISC 0.300 MTA. AQC:C3P SYSTEM-WIDE TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.200 0.300 0.300 0.300 0.300

NYSDOT ELDERLY AND HANDICAPPED VEHICLES - SECTION 5310 VEHICLES FOR FTA 5310 2011 1.030 MISC 1.030 ELDERLY AND HANDICAPPED TRANSPORTATION BY PRIVATE NFA 2011 0.257 MISC 0.257 NS5310 NOT-FOR-PROFIT AGENCIES. AQC:B10P SUFFOLK TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.287 1.287 0.000 0.000 0.000

NYSDOT NYSDOT NHS BLOCK TO COVER COST SUCH AS ORDER ON CONTRACT FOR NHS 2013 5.221 MISC 5.221 IDENTIFIED PROJECTS NFA 2013 1.305 MISC 1.305 NSBLOCK

AQC:J1Z MULTI TPC : $26-$40 M TOTAL 4YR COST : 6.526 0.000 0.000 6.526 0.000

SUFFOLK CO. COUNTYWIDE STRENGTHENING AND IMPROVING COUNTY ROADS ASPHALT NFA 2011 6.000 CONST 6.000 REHABILITATION AND RESURFACING AT VARIOUS LOCATIONS NFA 2012 6.000 CONST 6.000 SC5014 NFA 2013 6.000 CONST 6.000 AQC:A10P SUFFOLK TPC : $15-$25 M TOTAL 4YR COST : 18.000 6.000 6.000 6.000 0.000

SUFFOLK CO. COUNTYWIDE RECONSTRUCTION OF DRAINAGE SYSTEMS ON VARIOUS NFA 2011 0.525 CONST 0.525 COUNTY ROADS. PROJECT IS INTENDED TO PROVIDE FUNDS TO MAINTAIN NFA 2012 0.525 CONST 0.525 SC5024 AND IMPROVE HIGHWAY DRAINAGE SYSTEMS. NFA 2013 0.550 CONST 0.550 AQC:A2Z SUFFOLK TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.600 0.525 0.525 0.550 0.000

SUFFOLK CO. CONSTRUCTION AND REHABILITATION OF HIGHWAY MAINTENANCE NFA 2011 0.363 CONST 0.363 FACILITIES SALT STORAGE BUILDINGS. THIS PROJECT FUNDS THE NFA 2013 0.708 CONST 0.708 SC5048 CONSTRUCTION AND REHABILITATION OF ENVIRONMENTALLY NFA 2014 0.690 CONST 0.690 ACCEPTABLE STORAGE FOR SALT USED FOR ICE AND SNOW CONTROL. LOCATIONS TO BE DETERMINED. AQC:C14Z SUFFOLK TPC : $2-$4 M TOTAL 4YR COST : 1.761 0.363 0.000 0.708 0.690 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 82 of 84 for REGION 10 4-YEAR PROGRAM (FFY) AGENCY PROJECT DESCRIPTION TOTAL Starting October 01, 2010 FUND SOURCES FFY 4-YEAR PHASE PIN PROGRAM FFY FFY FFY FFY in millions of dollars 2011 2012 2013 2014 AQ CODE COUNTY TOTAL PROJECT COST

SUFFOLK CO. RECONSTRUCTION OF CR11, PULASKI ROAD FROM OLD BRIDGE ROAD TO NFA 2011 1.600 CONINSP 1.600 LONG ISLAND RAILROAD TRACKS, TOWN OF HUNTINGTON. PROJECT NFA 2011 0.400 CONST 0.400 SC5095 WOULD IMPROVE SAFETY AND ROADWAY ALIGNMENT AS WELL AS IMPROVE DRAINAGE AND PAVEMENT SURFACE. AQC:D2P SUFFOLK TPC : $2-$4 M TOTAL 4YR COST : 2.000 2.000 0.000 0.000 0.000

SUFFOLK CO. CR17 WHEELER ROAD /CR67 MOTOR PKWY. INTERSECTION IMPROVEMENT NFA 2012 0.750 CONINSP 0.750 BY ADDING TURN LANES TO ALLEVIATE THE CONGESTION. RECONSTRUCT NFA 2014 2.000 CONST 2.000 sc5097 THE SIDE WALKS FOR PEDESTRIAN MOBILITY. AQC:D1P SUFFOLK TPC : $2-$4 M TOTAL 4YR COST : 2.750 0.000 0.750 0.000 2.000

SUFFOLK CO. CR46 WILLAIM FLOYD PKWY.DRAINAGE AND SHOULDER IMPROVEMENTS NFA 2014 2.300 CONST 2.300 TO CORRECT SAFETY AND DRAINAGE ISSUES FROM VICINITY OF OSTEND SC5116 CIRCLE TO SMITH POINT BRIDGE IN TOWN OF BROOKHAVEN AQC:D3P SUFFOLK TPC : $2-$4 M TOTAL 4YR COST : 2.300 0.000 0.000 0.000 2.300

SUFFOLK CO. INTERSECTION IMPROVEMENTS ON COUNTY ROAD 83, NORTH OCEAN AVE NFA 2013 0.500 CONST 0.500 IN THE VICINITY OF MOUNT SINAI-CORAM ROAD BY ADDING ADDTIONAL SC5126 RIGHT LANES AND EXTENDING EXISTING LEFT TURN LANES. AQC:D1Z SUFFOLK TPC : < $0.75 M TOTAL 4YR COST : 0.500 0.000 0.000 0.500 0.000

SUFFOLK CO. RECONSTRUCTION OF CR11/DEPOT ROAD/FAIRGROUND AVE INTERSECTION, NFA 2012 0.250 ROWACQU 0.250 TOWN OF HUNTINGTON. PROJECT WOULD RECONSTRUCT INTERSECTION NFA 2014 1.200 CONST 1.200 SC5168 TO IMPROVE SAFETY AND CONGESTION. AQC:A10Z SUFFOLK TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.450 0.000 0.250 0.000 1.200

SUFFOLK CO. SUFFOLK COUNTY SIGN MANAGEMENT PROGRAM. PROJECT WILL BRING NFA 2011 0.450 CONST 0.450 SUFFOLK COUNTY HIGHWAY ROADWAY SIGNAGE INTO CONFORMANCE NFA 2012 1.000 CONST 1.000 SC5196 WITH FHWA MUTCD REQUIREMENTS. THIS PROJECT WOULD IMPLEMENT NFA 2013 1.000 CONST 1.000 AN ASSESSMENT AND MANAGEMENT SYSTEM DESIGNED TO MAINTAIN NFA 2014 1.000 CONST 1.000 TRAFFIC SIGN REFLECTIVITY, REVIEW SIGN PLACEMENT COMPLIANCE AND ESTABLISH AN INVENTORY OF ANY ROADSIDE APPRURTENANCES REQUIRING MAINTENANCE. AQC:A6Z SUFFOLK TPC : $3.3-$5.6 M TOTAL 4YR COST : 3.450 0.450 1.000 1.000 1.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 83 of 84 for REGION 10 4-YEAR PROGRAM (FFY) AGENCY PROJECT DESCRIPTION TOTAL Starting October 01, 2010 FUND SOURCES FFY 4-YEAR PHASE PIN PROGRAM FFY FFY FFY FFY in millions of dollars 2011 2012 2013 2014 AQ CODE COUNTY TOTAL PROJECT COST

SUFFOLK CO. RECONSTRUCTION OF CULVERTS REPAIR AND MAINTENANCE IN SUFFOLK NFA 2011 0.900 CONST 0.900 COUNTY. THIS PROJECT PROVIDES FUNDING FOR ON-GOING REAPIR AND NFA 2012 0.900 CONST 0.900 SC5371 MAINTENANCE OF COUNTY OWNED CULVERTS WHICH ARE IN A STATE OF NFA 2013 1.030 CONST 1.030 DISREPAIR. NFA 2014 1.850 CONST 1.850 AQC:A10Z SUFFOLK TPC : $4.6-$7.5 M TOTAL 4YR COST : 4.680 0.900 0.900 1.030 1.850

SUFFOLK CO. PHASE I - CR97 INTERSECTIONS IMPROVEMENTS @HAMMOND ROAD,MARK NFA 2011 0.400 DETLDES 0.400 TREE ROAD.HAWKINS AVE, WIRELESS RD/POND RD, TOWN OF NFA 2013 4.100 CONST 4.100 SC5512 BROOKHAVEN. NFA 2014 4.100 CONST 4.100 PHASE II -CR97/NY27 INTERSECTION IMPROVEMENT PROJECT WILL IMPROVE SAFETY & EASE CONGESTION WITH NEW TURN LANE. TOWN OF BROOKHAVEN AQC:A10Z SUFFOLK TPC : $7.5-$12 M TOTAL 4YR COST : 8.600 0.400 0.000 4.100 4.100

SUFFOLK CO. PH I RECONSTRUCTION OF CR48 FROM HORTON AVENUE TO MAIN STREET, NFA 2012 5.000 CONST 5.000 TOWN OF SOUTHOLD. PROJECT WOULD REHABILITATE CR48 IMPROVING NFA 2014 0.750 ROWACQU 0.750 SC5526 PAVING SURFACE, DRAINAGE AND ALIGNMENT. NO NEW CAPACITY. AQC:A10P SUFFOLK TPC : $9.5-15.5 M TOTAL 4YR COST : 5.750 0.000 5.000 0.000 0.750

SUFFOLK CO. CR83 INTERSECTION IMPROVEMENTS AT CR16 AND NY 25. ADD TURN NFA 2012 1.500 ROWACQU 1.500 LANES TO IMPROVE TRAFFIC CONGESTION, TOWN OF BROOKHAVEN. SC5548

AQC:D1P SUFFOLK TPC : $3.3-$5.6 M TOTAL 4YR COST : 1.500 0.000 1.500 0.000 0.000

SUFFOLK CO. REHABILITATION OF CR59, LONG LANE FROM VICINITY OF THE EAST NFA 2012 2.200 CONST 2.200 HAMPTON VILLAGE LINE TO THE VICINITY OF STEPHENS HANDS PATH, SC5561 TOWN OF EAST HAMPTON. PROJECT WILL IMPROVE RIDING SURFACE AND SAFETY. AQC:A3P SUFFOLK TPC : $2-$4 M TOTAL 4YR COST : 2.200 0.000 2.200 0.000 0.000

SUFFOLK CO. SAGTIKOS CORRIDOR- INTERIM BY-PASS CORRIDOR. STUDY TRAFFIC NFA 2011 1.300 SCOPING 1.300 PATTERN ON COMMACK ROAD AND SAGTIKOS PARKWAY, TOWN OF ISLIP SC5565 ( SCOPE TO BE DETERMINED). AQC:J1Z SUFFOLK TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.300 1.300 0.000 0.000 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 84 of 84 for REGION 10 4-YEAR PROGRAM (FFY) AGENCY PROJECT DESCRIPTION TOTAL Starting October 01, 2010 FUND SOURCES FFY 4-YEAR PHASE PIN PROGRAM FFY FFY FFY FFY in millions of dollars 2011 2012 2013 2014 AQ CODE COUNTY TOTAL PROJECT COST

SUFFOLK CO. ASSESSMENT OF STRUCTRUAL,ELECTRICAL AND MECHANICAL NFA 2011 2.300 CONST 2.300 COMPONETS OF MOVEABLE BRIDGES IN SUFFOLK COUTY FOR THE NFA 2011 0.750 DETLDES 0.750 SC5806 PURPOSE OF MAINTAINING COUNTY BRIDGES IN GOOD WORKING ORDER. NFA 2012 3.500 CONST 3.500 AQC:A19Z SUFFOLK TPC : $6-$9.4 M TOTAL 4YR COST : 6.550 3.050 3.500 0.000 0.000

SUFFOLK CO. CLEANING AND REPAINTING VARIOUS STEEL BRIDGES IN SUFFOLK NFA 2011 1.350 CONST 1.350 COUNTY. NFA 2012 0.750 CONST 0.750 SC5815 NFA 2014 1.840 CONST 1.840 AQC:A19Z SUFFOLK TPC : $3.3-$5.6 M TOTAL 4YR COST : 3.940 1.350 0.750 0.000 1.840

NYSDOT NEW YORK STATE DEPARTMENT OF TRANSPORTATION OZONE ACTION CMAQ 2011 0.264 OPER 0.264 DAYS: NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL NFA 2011 0.066 OPER 0.066 SOAD01 CONSERVATION MONITORS OZONE LEVELS AND FORECASTS AMOUNTS. CMAQ 2012 0.264 OPER 0.264 NFA 2012 0.066 OPER 0.066 CMAQ 2013 0.264 OPER 0.264 NFA 2013 0.066 OPER 0.066 CMAQ 2014 0.264 OPER 0.264 NFA 2014 0.066 OPER 0.066 AQC:NON MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 1.320 0.330 0.330 0.330 0.330

LIRR TRANSIT TECHNICAL ASSISTANCE PROGRAM (FORMERLY TRANTECH) CMAQ 2011 0.320 MISC 0.320 NFA 2011 0.080 MISC 0.080 TRANTECH CMAQ 2012 0.320 MISC 0.320 NFA 2012 0.080 MISC 0.080 CMAQ 2013 0.320 MISC 0.320 NFA 2013 0.075 MISC 0.075 CMAQ 2014 0.320 MISC 0.320 NFA 2014 0.080 MISC 0.080 AQC:C1P NASSAU TPC : $2-$4 M TOTAL 4YR COST : 1.595 0.400 0.400 0.395 0.400