Specification SAILS & RIGS

Total Page:16

File Type:pdf, Size:1020Kb

Specification SAILS & RIGS January 2014 Specification for SAILSetc International One Metre SAILS & RIGS prices valid for orders paid during 2014 SAILS No 1 £76.00 No 2 £80.25 No 3 £70.25 mainsail and headsail have the following features general features battens, tapered, self adhesive four panels in mainsails three panels in headsails (2 only in No 3) built in shaping at seams All sails NOT SEWN as standard luff shaping suitable for application eyelets, slides or small pocket luff finish on mainsails cloth suitable for application No 1 sails 50 micron film No 2 & No 3 sails 75 micron film headsail luff has a narrow pocket suitable for a 0.6 mm diameter forestay colour of tape light blue choose blue from black the grey list white pink red orange yellow corner reinforcements patches are self adhesive colour of reinforcement blue choose dark blue from black the grey list silver white pink dayglo red orange dayglo yellow dayglo SAILSetc cream options price slides for GROOVY mast (for No 1 mainsail) no charge eyelets for rings for round mast no charge non-standard cloth - other see note A non standard shaping see note A & B ‘finger’ patches £8.25 small pocket at luff for jackline £7.75 luff hooks for jackline £10.75 insignia & numbers added to each side of mainsail and headsail £14.50 national letters applied to each side of one mainsail £7.20 pair of tell tales on headsail £1.40 note A for one or more of the ‘non standard’ options please add per suit of sails £5.75 note B the shaping built into our sails has evolved over a long time and many generations of design F2 sails have our standard shaping F3 sails have 17% more camber F1 sails have 17% less camber sails with non-standard shaping are marked in the tack to show the difference so you will always know if the sails you see are of standard or non-standard shaping delivery sails are laid on thick paper then rolled and placed in a 90 or 100 mm diameter cardboard tube tube has end caps taped in place delivery by first class post in the UK delivery by letter post outside the United Kingdom delivery by other means on application sails for three suits of sails bought at same time there is a 5% discount on the total sail price SAILSetc RIG PACKS No 1 £88.00 No 2 £94.00 No 3 £94.00 sails are NOT included a pack contains spars, rigging and fittings sufficient to make one rig with the following features general features comprehensive plan and step by step instructions anodised mast material 11.0 mm diameter round section mast for No 1 rig 11.1 mm diameter GROOVY section mast for No 2 & No 3 rigs anodised and/or nickel plated fittings as appropriate No 2 & No 3 headsail booms and mainsail booms are SAILSetc section No 1 headsail boom is a lightweight tube headsail boom counterbalance weight gooseneck/kickingstrap unit is simple to fit to mast flexible 7 strand rigging wire for standing rigging Dyneema rigging cord for running rigging fastenings and terminations you will need the following materials to supplement the pack cyano glue, tape for limit marks (measurement bands) options price kicking strap variation necessary for FRAKTAL £2.00 rig kits without mast spar material – No 1 rig less £14.75 rig kits without mast spar material – No 2 & No 3 rigs less £18.50 GROOVY mast section (for No 1 rig kit) £3.50 ROUND tube mast (for No 2 or No 3 rig kits) less £6.00 different diameter mast tube no charge snap in/out rigging screws (needed for rigs on SAILSetc boats) £6.00 ball raced gooseneck/kicking strap unit £25.30 ball raced jib swivel for No 1 rig £12.25 ball raced jib swivel for No 2 or No 3 rig £13.75 mast supplied with pre-bend £4.00 mast supplied with holes drilled and sail limit marks applied £11.00 SAILSetc boom section for No 1 headsail boom no charge booms supplied in completed form – No 1 rig £14.50 booms supplied in completed form – No 2 & 3 rig £15.75 black anodised SAILSetc boom – per No 1 rig – when available£2.50 black anodised SAILSetc booms – per No 2/3 rig – when available £5.00 flat wire for rigging £1.00 mast heel fitting to fit 17.0 mm ID tube £0.60 delivery masts over 1.5 metres long have to go by carrier alternatively they can be cut and supplied with joint pieces for economy masts & booms will be packed in plastic tube fittings and rigging will be packed in another pack SAILSetc rig packs for three rigs bought at same time there is a 5% discount on the total rig pack price use The recommended wind speed range for each rig is as follows: Rig km/hour knots measured at 1 metre measured at 10 metres 1 0-15 0-13 2 13-25 11-21 3 20-40 17-33 These figures will vary depending on the stability of the boat and wave conditions. SAILSetc COMPLETED RIGS No 1 £274 No 2 £285 No 3 £275 sails are added to a completed rig pack sails as specified rig pack as specified mast tube has pre-bend added flat wire for rigging is used as standard rigging screw wires and shroud terminations are provided un- finished allowing you to adapt them to your boat/rigging arrangement mast tube is left over length at the lower end for you to cut off correctly mast tube is cut to length and shrouds/rigging screws are finished if we are completing a boat with rigs options are as for sails and rig packs and also as below options price kicking strap variation necessary for FRAKTAL £2.00 any of the options for sails and rig packs see above mast deck fittings, item 144e, supplied £2.40 fit rig to new SAILSetc boat £free fit rig to boat £POA sail bag (for three rigs) £33.25 we have stopped stocking rig box material, sorry - delivery packed in a sturdy box for delivery by carrier £POA alternatively collect the completed rigs - for three completed rigs bought at same time there is a 5% discount on the total rig pack price end SAILSetc Graham & Lorna Bantock 141 high street kelvedon essex england co5 9aa tel + 44 (0) 1376 570 583 fax + 44 (0) 1376 571 437 [email protected] www.sailsetc.com SAILSetc .
Recommended publications
  • ORC Rating Systems 2017 ORC International & ORC Club
    World Leader in Rating Technology OFFSHORE RACING CONGRESS ORC Rating Systems 2017 ORC International & ORC Club Copyright © 2017 Offshore Racing Congress. All rights reserved. Reproduction in whole or in part is only with the permission of the Offshore Racing Congress. Cover picture: ORC European Championship, Porto Carras, Greece 2016 by courtesy Fabio Taccola Margin bars denote rule changes from 2016 version Deleted rule from 2016 version: 205.3, 403.4 O R C World leader in Rating Technology ORC RATING SYSTEMS International ORC Club 2017 Offshore Racing Congress, Ltd. www.orc.org [email protected] CONTENTS Introduction ....................................................... 4 1. LIMITS AND DEFAULTS 100 General ……………………….......................... 6 101 Materials …….................................................... 7 102 Crew Weight ...................................................... 7 103 Hull ….……....................................................... 7 104 Appendages …………....................................... 8 105 Propeller ……………........................................ 8 106 Stability ……..................................................... 8 107 Righting Moment …………………………….. 8 108 Rig …………………………………………… 10 109 Mainsail …………………………….…...….... 10 110 Mizzen ………………………...………...…... 11 111 Headsail ………………………..…………..… 11 112 Mizzen Staysail ……………………...………. 12 113 Symmetric Spinnaker ………………………... 12 G SYSTEMS 114 Asymmetric Spinnaker ………………...……. 12 2. RULES APPLYING WHILE RACING 200 Crew weight …………………………………. 14 RATIN ORC 201 Ballast, Fixtures
    [Show full text]
  • Member Orientation Package Revised 2015
    SUS Member Orientation Package Revised 2015 We welcome you to Singles Under Sail, Inc. SUS members are required to meet certain education requirements. It is mandatory for all NEW members to have met the following requirements by their second membership renewal date: 1) To have completed the SUS Dockside Orientation Class (DOC), AND 2) To have passed either the U.S. Coast Guard Auxiliary's or the U.S. Power Squadron's Basic Boating Course (8 hours minimum), OR provide proof of having held a U.S. Coast Guard Captain’s license, AND 3) To attend an SUS Member Orientation Class (MOC). See the SUS Bylaws (attached) for additional information. In the Member Orientation Class (which lasts approximately 1-1/2 hours) we will review SUS policies, procedures and guidelines and give you an opportunity to ask questions about the Club. The Dockside Orientation Class is approximately 4 hours and given on a docked boat (usually one of the SUS Skipper’s boats). We encourage everyone to enhance SUS sailing activities with sailing and boating classes. We believe it is important for all members to become active, contributing, participants in SUS. In return you can enjoy great sailing, programs and social events with some of the best people you may ever meet. This booklet contains all the information you will need to become an active participant in SUS. BRING THIS BOOK WITH YOU TO THE MOC. http://www.singlesundersail.org VISIT THE SUS WEBSITE singlesundersail.org for additional information and updates. The site requires a user name and password to access members only material.
    [Show full text]
  • Jackline Update
    A P R I L 2 0 2 1 JACKLINE INSURANCE PROGRAM 2021 NEWS & UPDATES FEAR NO HORIZON - INSURANCE FOR GLOBAL CRUISERS & LIVING ABOARD The Jackline Insurance Program by Gowrie Group is a comprehensive insurance program designed to protect yachts and their owners cruising throughout the world. Our marine insurance experts understand the cruising lifestyle, and work with our clients to create customized insurance solutions to align with cruising plans and coverage needs. The Jackline Program includes key protection important to cruisers, such as world-wide navigation, approval for living aboard with a crew of two, personal property coverage, mechanical breakdown, ice damage, pollution liability, reef damage liability, loss of use, and more. The program is endorsed by Seven Seas Cruising Association (SSCA), underwritten by Markel Insurance, and managed by Gowrie Group, a Division of Risk Strategies. CONTENTS INSURANCE MARKET - UPDATE FOR CRUISERS The insurance marketplace has experienced unprecedented forces and undergone significant changes in the past few years. 2020 presented not only a global pandemic, but also delivered a Fear No Horizon continuation of the multi-year trend of extremely active, destructive, and costly Atlantic Hurricane Seasons. Many insurance companies have reacted to the multi-year catastrophic losses, by reevaluating their rates and in some cases, exiting the marine insurance market. These changes Insurance Market Update have left thousands of boat owners with a policy scheduled for non-renewal, and limited options for how to secure new coverage. Did You Know? The Jackline Insurance Program, underwritten by Markel and managed by Gowrie Group, is proud to confirm that we are committed to our cruising clients, and we have no plans to exit from the marine insurance market.
    [Show full text]
  • Mast Furling Installation Guide
    NORTH SAILS MAST FURLING INSTALLATION GUIDE Congratulations on purchasing your new North Mast Furling Mainsail. This guide is intended to help better understand the key construction elements, usage and installation of your sail. If you have any questions after reading this document and before installing your sail, please contact your North Sails representative. It is best to have two people installing the sail which can be accomplished in less than one hour. Your boat needs facing directly into the wind and ideally the wind speed should be less than 8 knots. Step 1 Unpack your Sail Begin by removing your North Sails Purchasers Pack including your Quality Control and Warranty information. Reserve for future reference. Locate and identify the battens (if any) and reserve for installation later. Step 2 Attach the Mainsail Tack Begin by unrolling your mainsail on the side deck from luff to leech. Lift the mainsail tack area and attach to your tack fitting. Your new Mast Furling mainsail incorporates a North Sails exclusive Rope Tack. This feature is designed to provide a soft and easily furled corner attachment. The sail has less patching the normal corner, but has the Spectra/Dyneema rope splayed and sewn into the sail to proved strength. Please ensure the tack rope is connected to a smooth hook or shackle to ensure durability and that no chafing occurs. NOTE: If your mainsail has a Crab Claw Cutaway and two webbing attachment points – Please read the Stowaway Mast Furling Mainsail installation guide. Step 2 www.northsails.com Step 3 Attach the Mainsail Clew Lift the mainsail clew to the end of the boom and run the outhaul line through the clew block.
    [Show full text]
  • Glossary of Nautical Terms: English – Japanese
    Glossary of Nautical Terms: English – Japanese 2 Approved and Released by: Dal Bailey, DIR-IdC United States Coast Guard Auxiliary Interpreter Corps http://icdept.cgaux.org/ 6/29/2012 3 Index Glossary of Nautical Terms: English ‐ Japanese A…………………………………………………………………………………………………………………………………...…..pages 4 ‐ 6 B……………………………………………………………………………………………………………………………….……. pages 7 ‐ 18 C………………………………………………………………………………………………………………………….………...pages 19 ‐ 26 D……………………………………………………………………………………………..……………………………………..pages 27 ‐ 32 E……………………………………………………………………………………………….……………………….…………. pages 33 ‐ 35 F……………………………………………………………………………………………………….…………….………..……pages 36 ‐ 41 G……………………………………………………………………………………………….………………………...…………pages 42 ‐ 43 H……………………………………………………………………………………………………………….….………………..pages 49 ‐ 48 I…………………………………………………………………………………………..……………………….……….……... pages 49 ‐ 50 J…………………………….……..…………………………………………………………………………………………….………... page 51 K…………………………………………………………………………………………………….….…………..………………………page 52 L…………………………………………………………………………………………………..………………………….……..pages 53 ‐ 58 M…………………………………………………………………………………………….……………………………....….. pages 59 ‐ 62 N……………….........................................................................…………………………………..…….. pages 63 ‐ 64 O……………………………………..........................................................................…………….…….. pages 65 ‐ 67 P……………………….............................................................................................................. pages 68 ‐ 74 Q………………………………………………………………………………………………………..…………………….……...…… page 75 R………………………………………………………………………………………………..…………………….…………..
    [Show full text]
  • Mainsail Trim Pointers, Reefing and Sail Care for the Beneteau Oceanis Series
    Neil Pryde Sails International 1681 Barnum Avenue Stratford, CT 06614 203-375-2626 [email protected] INTERNATIONAL DESIGN AND TECHNICAL OFFICE Mainsail Trim Pointers, Reefing and Sail Care for the Beneteau Oceanis Series The following points on mainsail trim apply both to the Furling and Classic mainsails we produce for Beneteau USA and the Oceanis Line of boats. In sailing the boats we can offer these general ideas and observations that will apply to the 311’s through to the newest B49. Mainsail trim falls into two categories, upwind and downwind. MAINSAIL TRIM: The following points on mainsail trim apply both to the Furling and Classic mainsail, as the concepts are the same. Mainsail trim falls into two categories, upwind and downwind. Upwind 1. Upwind in up to about 8 knots true wind the traveler can be brought to weather of centerline. This ensures that the boom will be close centerline and the leech of the sail in a powerful upwind mode. 2. The outhaul should be eased 2” / 50mm at the stopper, easing the foot of the mainsail away from the boom about 8”/200mm 3. Mainsheet tension should be tight enough to have the uppermost tell tail on the leech streaming aft about 50% of the time in the 7- 12 true wind range. For those with furling mainsails the action of furling and unfurling the sail can play havoc with keeping the telltales on the sail and you may need to replace them from time to time. Mainsail outhaul eased for light air upwind trim You will find that the upper tell tail will stall and fold over to the weather side of the sail about 50% of the time in 7-12 knots.
    [Show full text]
  • Sail Measurement Form
    Sail Measurement Form Sailrite has en extensive database of standard boat rig specifications and, in most cases, no further information is required to prepare a sail. However, if you have a custom or modified rig, please fill out this sail measurement form completely and return to us. A proper fitting sail is only as good as the measurements used to cut the fabric. We recommend keeping a copy of this form and accurate measurements of your sails to reference the next time a sail quote is needed. 1. GENERAL RIG SPECIFICATIONS I ______ Height of foretriangle. Measured from deck level along the forward edge of the mast to the intersection of the forestay and mast. Prior to the IOR rule, this was defined as ‘P2’. J ______ Base of the foretriangle. Measured from the front of the mast horizontally to the intersection of the forestay and deck. P ______ Longest reach of the mainsail along the mast. Measured from the top of the boom to the black band at the masthead or P2 P I2 I highest point of the halyard. E ______ Longest reach of the mainsail along boom. An outer band is used to limit stretch for rating purposes. Prior to the IOR, this measurement was designated ‘B’. I2 ______ Height of foretriangle to the inner forestay. Measured from the deck. J2 ______ Base of the foretriangle to the inner stay. P2 ______ Longest reach of the mizzen along its mast. E2 ______ Longest reach of the mizzen along its boom. J E2 E J2 HOISTED MEASUREMENTS Use a tape rule hoisted on the jib halyard.
    [Show full text]
  • Mainsail Implementation Overview
    Stanford Computer Systems Laboratory March 1980 Memo CSL-TR-167 Computer Science Department Report No. STAN-CS-80-792 MAINSAIL IMPLEMENTATION OVERVIEW bY Clark R. Wilcox Mary L. Dageforde and Gregory A. Jirak Research sponsored by National Institutes of Health COMPUTER SCIENCE DEPARTMENT Stanford University Stanford Department of Computer Science March 1980 Report No. STAN-CS-80-792 Stanford Computer Systems Laboratory Report No. CSL TR-167 MAINSAIL IMPLEMENTATION OVERVIEW bY Clark R. Wilcox Mary L. Dageforde Gregory A. Jirak DEPARTMENT OF L COMPUTER SCIENCE School of Humanities and Science Stanford University This work was supported by the Biotechnology Resources Program of the National Institutes of Health under grant RR-00785. Stanford Department of Computer Science March 1980 Report No. STAN-CS-80-792 ’ Stanford Computer Systems Laboratory Report No. CSL TR-167 MAINSAIL IMPLEMENTATION OVERVIEW bY Clark R. Wilcox Mary L. Dagcforde Gregory A. Jirak Abstract i ----..------ The MAINSAIL programming language and the supporting implementations have been developed over the past five years as an integrated approach to a viable machine-independent system suitable L for the dcvelopmcnt of large, portable programs. Particular emphasis has been placed on minimizing the effort involved in moving the system to a new machine and/or operating system. For this reason, almost all of the compiler and runtimc support is written in MAINSAIL, and is utilized in L each implementation without alteration. This use of a high-level language to support its own implementation has proved to be a significant advantage in terms of documentation and maintenance, without unduly affecting the cxccution speed.
    [Show full text]
  • Crewmember Overboard Training Summary (ASA101 & 103 Courses)
    The Maryland School of Sailing and Seamanship P.O. Box 609 • Rock Hall, MD 21661 • 410-639-7030 • www.mdschool.com April 22, 2013 Crewmember Overboard Training Summary (ASA101 & 103 Courses) Dockside Discussion (Overview; 10-15 minutes) • Risks & recovery difficulties • Loss of life potential • Staying onboard is best solution o Jacklines per Figure (1) o Harness & tether o Deck safety procedures • Overboard Survival Equipment o Personal Flotation Device (PFD) • Overboard Rescue Equipment o Horseshoe-Pole rig per Figure (2) o Lifesling per Figure (3) o Throw Rope per Figure (4) • Rescue Procedures o Figure Eight under sail per ASA Sailing Made Easy or Quick Stop under sail per ASA Cruising Made Easy. o Lifesling maneuver under power per ASA Cruising Made Easy. o Motor-sailing maneuvers per Figures (5) & (6) • Bringing victim aboard o Midship preferred o Lift with mainsail halyard Dockside Demos (Show and Tell; 15-20 minutes) • Rig jacklines on side decks per Figure (1) • Donning Harness & Tether • Clipping to Jackline and going forward • Throw rope • Halyard lift with Lifesling Figure (1) Jacklines are run the full length of boat from bow to stern. This allows clipping to jackline before exiting cockpit to go forward along side deck or coach roof. Jacklines may be secured to bow pulpit and stern pulpit stanchions to leave mooring cleats clear. Figure (2) Horseshoe & Pole rig is deployed during the recovery process 2 Figure (3) Lifesling is used to encircle victim in the water with a tether line and harness. It is kept in a stowage box on stern rail ready for quick deployment.
    [Show full text]
  • Sunfish Sailboat Rigging Instructions
    Sunfish Sailboat Rigging Instructions Serb and equitable Bryn always vamp pragmatically and cop his archlute. Ripened Owen shuttling disorderly. Phil is enormously pubic after barbaric Dale hocks his cordwains rapturously. 2014 Sunfish Retail Price List Sunfish Sail 33500 Bag of 30 Sail Clips 2000 Halyard 4100 Daggerboard 24000. The tomb of Hull Speed How to card the Sailing Speed Limit. 3 Parts kit which includes Sail rings 2 Buruti hooks Baiky Shook Knots Mainshoat. SUNFISH & SAILING. Small traveller block and exerts less damage to be able to set pump jack poles is too big block near land or. A jibe can be dangerous in a fore-and-aft rigged boat then the sails are always completely filled by wind pool the maneuver. As nouns the difference between downhaul and cunningham is that downhaul is nautical any rope used to haul down to sail or spar while cunningham is nautical a downhaul located at horse tack with a sail used for tightening the luff. Aca saIl American Canoe Association. Post replys if not be rigged first to create a couple of these instructions before making the hole on the boom; illegal equipment or. They make mainsail handling safer by allowing you relief raise his lower a sail with. Rigging Manual Dinghy Sailing at sailboatscouk. Get rigged sunfish rigging instructions, rigs generally do not covered under very high wind conditions require a suggested to optimize sail tie off white cleat that. Sunfish Sailboat Rigging Diagram elevation hull and rigging. The sailboat rigspecs here are attached. 650 views Quick instructions for raising your Sunfish sail and female the.
    [Show full text]
  • Cruising Sails: Mainsails by Carol Hasse (A Shorter Version of This Article Originally Appeared in Cruising World Magazine.)
    Cruising Mainsails 1 Cruising Sails: Mainsails By Carol Hasse (A shorter version of this article originally appeared in Cruising World magazine.) We were night sailing through the coral strewn Bahamas, broad reaching at hull speed in uncomfortably rising seas and winds. Our course was set for tropical warmth and the adventures only sailors can experience. Somewhere between the exquisite Berry Islands and Nassau Harbor (though we may just as well have been somewhere between hell and high water with all the visuals of a coal bin), it was time to jibe. It had to be a controlled jibe of course; the 616 square foot mainsail of our 50’ gaff schooner was, indeed, a force to be reckoned with. Carefully easing the preventer that was secured to the aft end of our 500-pound 30-foot boom, we bore off downwind. Predictably and powerfully, the not much lighter (or shorter) gaff arced across the sky from windward to leeward. In the “split second” before the boom jibed over to join the gaff on our new tack, the mainsail ripped from leech to luff just above the clew reinforcing patch. With dispatch born of necessity, we tucked in a belated reef, neatly hiding the offending seam in the bunt of the sail. It wasn’t long before another jibe was called for, and despite the impeccable timing of our well-orchestrated crew, the mainsail was ripped again from leech to luff, this time along the seam above the reef clew reinforcing patch. It is with much embarrassment that I admit we committed this act a third time, ripping our mainsail above its second (and final) reef clew’s reinforcing patch—once more from leech to luff.
    [Show full text]
  • Sultana's Sails
    Sultana’s Sails Each Sail Performs a Different Function When Sultana is Underway MAIN FORE TOPSAIL TOPSAIL STAY SAIL M A JIB I N M F MAIN A O S R T E M SAIL FORE A ST SAIL ultana is powered by six sails. The main sail is the vessel’s largest sail and is S attached to the main mast. The fore sail is the schooner’s second largest sail and is attached to the fore mast. These two sails provide the majority of the power when Sultana is underway. Near the bow, or front of the ship, are two smaller sails known as the stay sail and the jib. These sails provide Sultana with additional speed and give the captain greater control of the bow when the ship is turning into the wind. At the top of Sultana’s sailing rig are the main topsail and the fore topsail. These sails are most effective when the wind is directly behind the ship. They are also very useful in light wind conditions. In colonial times, Sultana’s commander used as many as fifteen sails! Adding more sails was important for increasing the ship’s speed, particularly when the schooner was chasing down colonial ships to enforce the tea taxes. Today Sultana’s maximum speed using all six of her sails is about twelve miles an hour. Rendering of Sultana by Darby Hewes Sultana’s Sails NAME: ____________________________________________ DATE: ____________ DIRECTIONS: Use information from the diagram on the previous page to label each of Sultana’s six sails. At the bottom of the page, briefly describe the function of each sail.
    [Show full text]