I-64/High Rise Bridge Corridor Study Environmental Assessment: Vdot ITEM #9: I-64/HIGH RISE BRIDGE CORRIDOR STUDY ENVIRONMENTAL ASSESSMENT: VDOT In March 2013, the HRTPO 2034 Long-Range Transportation Plan was amended to include an environmental study for the improvement of the Interstate 64 (I-64) corridor from I-464 to I- 264/I-664 at Bowers Hill, including the High Rise Bridge. VDOT, in cooperation with the Federal itHighway was made Administration available for (FHWA) public review and the and U.S. comment Coast Guard, completed the Draft Environmental publicAssessment hearing (EA) for for the the project Interstate was held 64/High on November Rise Bridge 6, 2014. Corridor Study on October 6, 2014 and through November 21, 2014. A location the results of which analyzed potential environmental impacts associatedAt the November with any2014 alternatives HRTPO Board developed meeting, toVDOT address provided transportation a presentation capacity on needs and improvethe Draft roadway Environmental and bridge Assessment conditions (EA), throughout the corridor. - and two fixed-bridge options (95 feet and 135 feet): The draft EA includes the following No Build and Mainline Candidate Build Alternatives (CBAs) 1. No- 2. - – No Toll 3. Build- Alternative – High-Occupancy Vehicle (HOV) 4. CBA1 - Eight Lane Build Alternative – High-Occupancy Toll (HOT) 5. CBA2 - Eight Lane Build Managed Alternative – CBA2 Eight Lane Build Managed Alternative CBA2 Eight Lane Build Managed Alternative All Tolled accessedA VDOT brochure on the VDOT on the website study and at: a http://www.virginiadot.org/projects/hamptonroads/itable summarizing the Level of Service (LOS) of the various-64_- _high_rise_bridge_corridor_study.aspalternatives are attached. In addition,. the Draft EA and associated technical documents may be The Commonwealth Transportation Board (CTB) has expressed an interest in knowing the p Transportation Technical dvisory Creferred alternative members and bridge were heightrequested option to reviewselected the by available the HRTPO materials, and HRTACcoordinate prior with to theirmaking respective its decision HRTPO on those Board issues members, in April and 2015. make HRTPO a recommendation regarding a preferredA alternativeommittee (TTAC)and bridge height option. t recommended – , with a 95 foot bridge recommendation regarding HOV, HOT, orAt ttheolling March. 4, 2015 meeting, he TTAC CBA2 Eight Lane Build Managed Alternative height. The TTAC made no ect Manager, will brief the HRTPO Board on this item. Mr. Scott Smizik, VDOT Location Studies Proj AAttachment Resolution 9 for approval is included with Meeting Agenda Item #14. March 19, 2015 HRTPO Board Meeting │ │ Agenda Location Public Hearing Interstate 64 / High Rise Bridge Corridor Study Thursday, November 6, 2014 Tidewater Community College 120 Campus Drive www.VirginiaDOT.org Portsmouth, VA 23701 4:30 p.m. - 7:30 p.m. Welcome As part of the Interstate 64 / High Rise Bridge Corridor The purpose of this hearing is to provide a public Study, the Virginia Department of Transportation (VDOT), opportunity for any person, acting on his/her own behalf in cooperation with the Federal Highway Administration or representing a group or governing body, to offer (FHWA) as the lead federal agency, and the United States comments or submit written material concerning the Coast Guard as a cooperating agency, have evaluated proposed alternatives. We invite you to review the findings alternatives to improve transportation conditions along of the study and discuss the project with VDOT the Interstate 64 (I-64) corridor between the Interstate 464 representatives who are here to answer your questions. (I-464) interchange and the Interstate 664 (I-664) and To view the meeting materials, comment online, or for Interstate 264 (I-264) interchanges at Bowers Hill in the future updates, please visit the study website at: City of Chesapeake, Virginia. Pursuant to the National www.64highrise.org Environmental Policy Act of 1969, as amended, (NEPA) and in accordance with FHWA regulations, an Environmental Assessment (EA) has been prepared to analyze the potential social, economic, and environmental effects associated with the retained alternatives. Project Overview Purpose – Based on the existing and future transportation conditions, the purpose of the study is to develop alternatives to address transportation capacity and improve roadway and bridge conditions throughout the corridor. To meet this purpose, the following needs are being considered: • Improve capacity; • Enhance corridor safety; • Address the High Rise Bridge improvements; and, • Improve the ability of the corridor to function as a key emergency evacuation route. From: I-64/I-464 interchange To: I-64/I-264 interchange at Bowers Hill Total length: Approximately 8 miles State Project – 0064-131-783; UPC: 104366 Attachment 9 Alternatives Retained for Detailed Study The alternatives retained for detailed analysis in the EA foot bridge to $2.30 billion for the 135 foot bridge. The include a No Build Alternative and two mainline build increased cost compared to the Eight Lane Build Alternative alternatives with two fixed bridge options. is based on the additional pavement necessary to separate No Build Alternative the managed and general purpose lanes. In accordance with the regulations implementing NEPA, the No Build Alternative has been retained for evaluation in the There have been no specific operational scenarios identified EA to serve as a benchmark for the comparison of future at this stage of the study. Accordingly, the following three conditions and impacts. The No Build Alternative would operational scenarios were developed to establish a sample retain the existing I-64 interstate, associated interchanges, range of travel demand conditions: High Occupancy Vehicle and the High Rise Bridge in their present configurations (HOV), High Occupancy Toll (HOT) and All Tolled. and allow for routine maintenance and safety upgrades. For the purpose of this study, potential impacts associated with the Eight Lane Build - Managed Alternative assume Eight Lane Build Alternative the same footprint as the Eight Lane Build Alternative. The The Eight Lane Build Alternative would include HOV and All Tolled lane scenarios would fit within the area construction of four additional lanes of capacity (two lanes of impact. If a specific managed lane scenario is identified in each direction) on I-64 within the study limits. Wherever as the Preferred Alternative, impact estimates could be possible, the additional lanes would be constructed towards updated in the Revised EA and associated technical reports. the existing median. The widening of I-64 to eight lanes also would require the reconstruction of ramps, bridges Bridge Options interchanges, and culverts along the retained alternative Two fixed-span bridge options, measuring 95 feet and corridor. Preliminary costs range from $1.86 billion for the 135 feet at mean high water, are under consideration. 95-foot bridge to $2.22 billion for the 135 foot bridge. Both options would include two new bridges, one built on existing alignment and one built south of the existing Eight Lane Build – Managed Alternative bridge alignment. These options include consideration of The Eight Lane Build – Managed Alternative would be widening the horizontal clearance from 125 feet to 135 similar to the Eight Lane Build Alternative; however, some feet. The Eight Lane Build Alternative planning level bridge I 64/High Rise orBridg eall of the travel lanes would be managed using tolls and/ cost is $405 million for the 95 foot bridgeState Projec tand Number: 00$63564-131-783, million P101; UPC: 104 366 Corridor Study Area* Federal Project Number: NH-IM-064-3(481) Water Bodiesor vehicle occupancy. Additionally, expandedFigure local/express 1 Study Areafor the 135 foot bridge. The Eight Lane Build - Managed N Great Dismal Swamp bus service or bus rapid transit couldInterstate be accommodated 64/High Rise Bridge AlternativeCorridor Stud yplanning level bridge cost is $425 million for the Environmental Assessment *The study area is a buffer around the road corridor that includes all natural, cultural and physical resources that must be analyzed in the NEPA documenwitht. It does no thist imply righ t-of-wayalternative take or construction impact. in the general purpose or the managed 95 foot bridge and $670 million for the 135 foot bridge. City of Chesapeake Miles Mapping Source: VDOT and Citylanes. of Chesapeake Preliminary costs range from $1.92 billion for the 95 0 0.25 0.5 1 1.5 Study Area D V L ) B E h N LI c IR A n a ¨¦§264 r ¤£558 B rn ¤£46460 J e O h L t L u IF o F R S D ( D r V e L 464 B v i ¨¦§ Bowers Hill ¤£117 E G R D I R Interchange h B t N I e D A V b B L Y B a Y 664 W z W § R i H ¨¦ H l Y E I N C E AR L O A T $ A T N ILI A V M $ G L A S IN D C H R ¤£46046 $ $ S A $ W ¤£113 $ E D $ $ G R R S $ $ D M O I $ E £131 A L ¤ I $ T G E AR $ T Y S $ HW E Y $ ILITARY HWY £46460 S M ¤ M O ¤£113 H ¤£113 «¬16166 ¤£46460 $ $ B A G I N R E B A R T $ B $ ID R ID G G E E $ B B $ $ L I-64 E (Westbound travel direction) L V $ V D $ $ D $ $ $ $ $ $ $ $ $ $ High Rise Bridge $ $ $ $ $ G $ 64 $ $ A $ ¨¦§ $ $ L B E $ R I-64 W (Eastbound travel direction) R Y R D «¬10410 O «168 L D ¤£117 I-64/High Rise Bridge Hampton M James River Chesapeake I D N L ¤£60 V Bay L Corridor StudyL Area* Newport R *The64 study area is a buffer around the road corridor that includes all natural, B 17 News ¨¦§ ¤£ D N Great Dismal IO IN Water BodiesM cultural and physical resourcesSwamp that must be analyzed in the NEPA document. It O D ¤£258 ¨¦§664 Isle of Wight Great Dismal Swamp does not¤£460 imply right-of-way take or construction impact.
Recommended publications
  • HAMPTON ROADS CLOSURES on WATER CROSSINGS, INTERSTATES and OTHER NOTABLE DETOURS for the Week of March 21-27
    RELEASE: IMMEDIATE March 19, 2021 CONTACT: Media Line: 757-956-3032 [email protected] HAMPTON ROADS CLOSURES ON WATER CROSSINGS, INTERSTATES AND OTHER NOTABLE DETOURS For the week of March 21-27 NOTE: This list covers full closures of interstates, ramps, bridges and primary roads, and lane closures at the bridge-tunnels and the Berkley, Coleman, High Rise and James River bridges. *Scheduled closures are subject to change based on weather conditions and other factors.* ​For information on the many other lane closures necessary for maintenance and construction throughout Hampton Roads, visit 511Virginia.org, download the 511VA smartphone app, or dial 511. Bridges & Tunnels: Hampton Roads Bridge-Tunnel, I-64: Single-lane closures westbound on: March 26 from 9 p.m. to 7 am. March 27 from 10 p.m. to 9 a.m. Monitor-Merrimac Memorial Bridge-Tunnel, I-664: Alternating, single-lane closures northbound on March 21-25 from as early as 8 p.m. to 5 a.m. Mobile, single-lane closures northbound on March 23 from 9 a.m. to 2 p.m. High Rise Bridge, I-64: Alternating, mobile, double-lane closures in both directions on March 22-25 from 9 p.m. to 5 a.m. Berkeley Bridge, I-264: Single-lane closure westbound on March 25 from 7 p.m. to midnight. James River Bridge, Route 17: Alternating, mobile, singe-lane closures in both directions on March 22 from 9 a.m. to 3 p.m. Alternating, mobile, singe-lane closures southbound March 23 from 9 a.m. to 3 p.m.
    [Show full text]
  • South Norfolk Jordan Bridge (“SNJB”) Is a 5,372 Ft Fixed Bridge That Connects the City of Chesapeake to the City of Portsmouth Over the Elizabeth River In
    TOLL REVENUE NEW BUILD / REPLACEMENT SOUTH NORFOLK PRIVATIZATION PRIVATE FINANCING UNSOLICITED BID JORDAN BRIDGE CHESAPEAKE, VA The South Norfolk Jordan Bridge (“SNJB”) is a 5,372 ft fixed bridge that connects the City of Chesapeake to the City of Portsmouth over the Elizabeth River in Virginia. The City of Chesapeake had decommissioned the original Jordan Bridge in November 2008. An unsolicited proposal submitted by United Bridge Partners (“UBP”) to replace the Jordan Bridge with a new, privately owned bridge was approved by the City of Chesapeake in January 20091 by executing an Acquisition and Development Agreement (“ADA”) between UBP and the City of Chesapeake. As part of the ADA, UBP assumed responsibility to demolish the existing Jordan Bridge, aquired the right of way and easments associated with the bridge, and the right to toll, design, construct, finance, operate and assume ownership of a new bridge and associated tolling facilities on the SNJB. The construction of the SNJB was reported to be privately financed. Project revenue on the SNJB comes from tolls, set by the private operator with no defined limit, which are collected electronically on the bridge2. Note: the facts of this case study were reviewed by UBP. We have provided Chesapeake footnotes to describe instances where UBP disputes information in the public domain. BACKGROUND + PROJECT DRIVERS The Elizabeth River Corridor between Midtown Tunnel and High Rise Bridge in southern eastern Virginia near the Chesapeake Bay serves approximately 250,000 Figure 1: Elizabeth River Crossings. vehicle trip crossings per weekday. It is a growing corridor that primarily serves Source: Pickard, A.
    [Show full text]
  • Comprehensive Review of Special Structures
    COMPREHENSIVE REVIEW SPECIAL STRUCTURES Stephen C. Brich, P.E., Commissioner of Highways November 20th, 2019 Special Structures - Introduction 2018 Report to General Assembly Robert O. Norris Bridge 2019 Developed a Statewide, Systematic Long-Term Plan • Looks ahead 50 years and includes operations . Critical to ensuring mobility • Based on consistent classification and life-cycle approach • Based on several workshops (Districts/ Facility Managers/ Central Office) • Will be a living document that will be maintained and updated annually • Presented today to inform you of important economic and budget considerations Virginia Department of Transportation 3 Special Structures – Inventory • Risk/Complexity • Maintenance Cost Defined By: • Importance Long Detours, High Traffic, Economic Significance (Shipping and Vehicular), Access to Vital Facilities (Military and Ports) Virginia Department of Transportation 4 Special Structures – Original Build George P. Coleman Memorial Bridge Berkley Bridge Hampton Roads Bridge-Tunnel Virginia Department of Transportation 5 Special Structures – Current State Managed by Public Private Partnership . Pocahontas Parkway (Rt 895): through 2105 . Elizabeth River Tunnel (Midtown): through 2069 . Elizabeth River Tunnel (Downtown): through 2069 • Required funding not included in plan • VDOT responsible for the facility costs (e.g. maintenance, operations and replacement) once the concession agreement ends Hampton Roads Bridge-Tunnel Project . HRBT Approaches . I-64 over Willoughby • Existing tunnel - not included
    [Show full text]
  • I-64 Hampton Roads Bridge-Tunnel Expansion
    I‐64 Hampton Roads Bridge‐Tunnel Expansion Industry Forum | April 3, 2017 Aubrey L. Layne, Jr. Virginia Secretary of Transportation William D. Sessoms, Jr. Mayor, City of Virginia Beach Hampton Roads Transportation Accountability Commission Chair Welcome 2 Linda T. Johnson Mayor, City of Suffolk Hampton Roads Transportation Planning Organization Chair Hampton Roads Regional Project Support 3 Charles A. Kilpatrick Commissioner of Highways Virginia Department of Transportation Commonwealth of Virginia Project Support 4 John F. Malbon Commonwealth Transportation Board Member Hampton Roads Transportation Accountability Commission Member Regionally Significant Projects 5 Garrett W. Moore Chief Engineer Virginia Department of Transportation Project Delivery 6 James S. Utterback Hampton Roads District Administrator Virginia Department of Transportation District and Project Overview 7 Hampton Roads District Legend District Complex District Overview Interstate Maintenance • 9 Counties/12 Cities/2 Islands Residency Office • Over 830 positions Area Headquarters • Over 10,000 Total Lane Miles Bridge Crew Equipment Shops Tunnels/Facilities • I-64 Hampton Roads Bridge-Tunnel • I-664 Monitor Merrimac Memorial N Bridge-Tunnel • Jamestown-Scotland Ferry • Transportation Operations Center Major Bridges • James River Bridge • High Rise Bridge • Berkley Bridge • Coleman Bridge • Willoughby Bay Bridge Residencies • Accomac • Franklin • Williamsburg 8 8 Major Projects in Delivery I-64 Southside Widening & High Rise Bridge Phase 1 I-64/264 Interchange Phase
    [Show full text]
  • HAMPTON ROADS CLOSURES on WATER CROSSINGS, INTERSTATES and OTHER NOTABLE DETOURS for the Week of June 28 to July 4
    RELEASE: IMMEDIATE June 26, 2020 CONTACT: Media Line: 757-956-3032 [email protected] HAMPTON ROADS CLOSURES ON WATER CROSSINGS, INTERSTATES AND OTHER NOTABLE DETOURS For the week of June 28 to July 4 NOTE: This list covers full closures of interstates, ramps, bridges and primary roads, and lane closures at the bridge-tunnels and the Berkley, Coleman, High Rise and James River bridges. *Scheduled closures are subject to change based on weather conditions and other factors.* ​For information on the many other lane closures necessary for maintenance and construction throughout Hampton Roads, visit 511Virginia.org, download the 511VA smartphone app, or dial 511. Bridges & Tunnels: Hampton Roads Bridge-Tunnel, I-64: Alternating, single-lane closures westbound from June 29 to July 1 from 9 p.m. to 5 a.m. HRBT Expansion Project: For lane closures and project updates related to the HRBT Expansion Project, visit HRBTExpansion.org. Berkley Bridge, I-264: Alternating, mobile, single-lane closures in both directions on June 30 from 9:30 a.m. to noon. I-64 Widening Segment III Project, York County: Single-lane closures on I-64 east and west from Route 199 Lightfoot exit (exit 234) to Route 199/Humelsine Parkway (exit 242) June 28-July 2, starting as early as 7 p.m. to 5 a.m. A consecutive, long-term lane closure under traffic signal control on Colonial Parkway at the I-64 overpass continues. A consecutive, long-term full ramp closure on Route 143 Merrimac Trail north to I-64 west continues. Traffic will follow detour signage in place directing motorists to the Route 143 south on-ramp to I-64 west during the closure.
    [Show full text]
  • Transportation
    Transportation Goals The City will: • Achieve a safe, efficient, economical and multi-modal transportation system, including non-motor vehicle modes and public transportation, while recognizing that pressures for increased motor vehicle travel will continue. • Balance the priorities of motor vehicles with those of bicycles and pedestrians in the design of roadways and land use patterns so that most residents have the General Overview choice to walk and bicycle The City’s transportation system and level of conveniently to shopping, schools and recreation. accessibility has a major influence on economic development and on the basic function and form of • Coordinate land use and the City. It also has the potential to generate public facilities development adverse impacts on the community if not carefully with the transportation integrated into its fabric. Thus, long-range system in order to ensure transportation planning is a key element in safety, efficiency and organizing and directing the future growth of the City convenience. of Chesapeake. In the context of comprehensive planning, land use and transportation must be • Provide adequate transportation facilities and recognized as complementary components of the services that meet the City’s City’s overall planning process. adopted service standards. Master Transportation Plan • Provide adequate Chesapeake’s transportation system is composed of transportation access to the roadways, public transit, trails, waterways, railways, City’s waterways. trucking, and airports. Each mode of transportation • Coordinate the City’s and all elements within each perform a specific role transportation system with in the system, and should be appropriately the regional transportation coordinated to provide various levels of accessibility network to promote to areas and sites within the City.
    [Show full text]
  • City of Portsmouth Traffic Alerts
    City of Portsmouth Traffic Alerts The Department of Engineering announces the following road closures: - REMINDER-- Cedar Lane Northbound will be closed for two weeks from today between West Norfolk Road and Western Freeway (VA-164). The detour is signed via West Norfolk Road and Western Freeway. Southbound traffic will not be impacted during this two-week northbound closure for emergency sewer force main work. - Cypress Road will be closed at Willow Street on Monday, April 27th, from 9 a.m. until 3 p.m. Flaggers will direct traffic during work for Columbia Gas. - Both eastbound lanes of Turnpike Road between Phillips Avenue and Gothic Street will be closed from 7 a.m. on Monday, April 27th, until Thursday, April 30th, at 5 p.m. Two-way traffic will be maintained during this 24-hour closure for sewer and water installation work. - Deep Creek Boulevard will be closed between Columbus Avenue and Chicago Avenue from 7 a.m. on Monday, May 4th, until Friday, May 8th, at 5 p.m. A signed detour will be in place for this 24-hour closure during sewer connection work at Lexington Development. For more information, please call 393-8592. DriveERT WEEKLY LANE CLOSURE SCHEDULE From Friday, April 24 to Friday, May 1 Below is a list of significant tunnel/lane closures for the Elizabeth River Crossings (ERC) facilities. All work is dependent upon weather conditions and closure dates are subject to change. For updates, follow us on Twitter @DriveERT. US 58 East Midtown Tunnel: Full tunnel closure in the Midtown Tunnel eastbound on Sunday, April 26 from midnight until to 2 a.m.
    [Show full text]
  • Driveert Traffic Alerts & Closures
    DriveERT WEEKLY LANE CLOSURE SCHEDULE From Friday, December 4 to Friday, December 11 Below is a list of significant tunnel/lane closures for the Elizabeth River Crossings (ERC) facilities. All work is dependent upon weather conditions and closure dates are subject to change. For updates, follow us on Twitter @DriveERT. US 58 East Midtown Tunnel: Alternating lane closures in the Midtown Tunnel eastbound on Sunday, December 6 from 6 a.m. to 10 a.m. US 58 West Midtown Tunnel: Alternating lane closures in the Midtown Tunnel westbound on Sunday, December 6 from 6 a.m. to 10 a.m. I-264 East Downtown Tunnel: Alternating lane closures in the Downtown Tunnel eastbound on Sunday, December 6 from 6 a.m. to 10 a.m. I-264 West Downtown Tunnel: Alternating lane closures in the Downtown Tunnel westbound on Sunday, December 6 from 6 a.m. to 10 a.m. I-264 West Downtown Tunnel: Left lane closure in the Downtown Tunnel westbound on Sunday, December 6; Monday, December 7; Tuesday, December 8; Wednesday, December 9 and Thursday, December 10 from 8 p.m. to 5 a.m. the following morning. I-264 East: Left lane closure on I-264 East between Frederick Blvd. and Effingham St. on Sunday, December 6 from 10 a.m. to 2 p.m. I-264 West: Left lane closure on I-264 West between Effingham St. and Frederick Blvd. on Sunday, December 6 from 10 a.m. to 2 p.m. US 58 East: Left lane closure on US 58 East from London Blvd.
    [Show full text]
  • Media Advisory
    For Immediate Release Contact: Kevin Crum May 14, 2019 #757/537-1027 cell [email protected] MEDIA ADVISORY WHAT: Temporary overnight closure planned for new sign installation The region’s tallest bridge is getting a brand new welcome sign! In order to provide a safe work and travel environment, all vehicle lanes will be temporarily closed to traffic during the overnight installation. The Pedestrian Walkway, which is normally closed from dusk to dawn, is not affected. WHEN: 7 pm on Saturday, May 18, 2019 – 5 am on Sunday, May 19, 2019 All work will be conducted outside of primary weekday travel hours to minimize impact on vehicle traffic. WHERE: South Norfolk Jordan Bridge Drivers who need to cross the Elizabeth River during the closure may choose the Downtown Tunnel, Midtown Tunnel, Gilmerton Bridge or High Rise Bridge as an alternate route. About the South Norfolk Jordan Bridge The 5,375’ long South Norfolk Jordan Bridge is two-lane, fixed span, high-rise toll bridge over the Southern Branch of the Elizabeth River. On the west side of the river, the bridge ties into the Elm Avenue and Victory Boulevard intersection near NNSY’s Gate 36. On the east side, it connects to Poindexter Street and provides seamless access to I-464. The privately-funded bridge features two 12’ wide traffic lanes, two 8’ wide shoulders and a pedestrian sidewalk separated from traffic by a concrete barrier. A fully-electronic video capture system uses E-ZPass to maximize convenience for users, but is not required for travel. ### South Norfolk Jordan Bridge 3815 Bainbridge Boulevard, Chesapeake, VA 23324 757.545.3444 phone www.SNJB.net .
    [Show full text]
  • Hampton Roads Transportation Accountability Commission
    HAMPTON ROADS TRANSPORTATION ACCOUNTABILITY COMMISSION Economic Vitality and Quality of Life Unlocking Hampton Roads HRTAC Overview Kevin B. Page 9/27/2019 Executive Director CONGESTION/FUTURE CONNECTIVITY 2040 Population 2040 Employment The Stage is set for Regional Transportation Solution Consensus Building 2 Unlocking Hampton Roads 3 • For two decades the Region has identified these projects MOVING THE REGION FORWARD HRTAC/HRTF Overview • Hampton Roads Transportation Fund created 2013 Acts of Assembly HB2313 • HRTAC created 2014 Acts of Assembly HB1253 – Hired Executive Director August 2015 • Empowered to procure, finance, build and operate highway, bridge, tunnel, rail and transit projects in Hampton Roads • Authorized to use HRTF monies (and tolls for new construction projects on new or existing highways, bridges and tunnels and to issue bonds using revenues to support Unlocking Hampton Roads bond debt • Regional Collaboration ‐ Works closely with the Hampton 4 Roads Transportation Planning Organization (HRTPO) who determines Project Prioritization for the region HRTAC Membership 19 Voting members 10 Cities 4 Counties Chesapeake Isle of Wight Franklin James City Hampton Southampton Newport News York Norfolk Poquoson 5 VA General Assembly Members Portsmouth Two Members of the Senate Suffolk Three Members of the House of Virginia Beach Delegates Williamsburg 4 Non‐Voting Ex‐officio members Commonwealth Transportation Board Member Virginia Department of Transportation Unlocking Hampton Roads Virginia Department of Rail and Public Transportation
    [Show full text]
  • Coody Presentation In
    Hampton Roads Lane Closure Management Ken Coody Regional Traffic Operations Manager September 13, 2016 District Administrator Guidance • As a matter of District Policy, VDOT will not close or restrict travel at two major competing water crossings at the same time for scheduled work. • In the case of an emergency maintenance issue and there is an existing lane closure at the opposing water crossing, the emergency is dealt with appropriately. • Notification to the TOC and DDO is made immediately. • In the case of an urgent maintenance issue and there is an existing lane closure at the competing water crossing • Deputy District Administrator must approve the work, in writing. 2 District Administrator Guidance • Competing Water Crossings: • Hampton Roads Bridge Tunnel and Monitor Merrimac Memorial Bridge Tunnel • Downtown Tunnel and Midtown Tunnel • James River Bridge and Monitor Merrimac Memorial Bridge Tunnel • Berkley Bridge and High Rise Bridge • High Rise Bridge and Downtown Tunnel • High Rise Bridge and Gilmerton Bridge NOTE: Work within 2 miles of a facility is considered part of the facility. 3 District Administrator Guidance • Traffic Engineering will review traffic counts and complete a traffic analysis prior to approval of a complete closure • Requires 2-4 weeks advance notice • VDOT will coordinate with localities to ensure pending road work does not conflict with a major harbor crossing closure. • Example: Coordination with City of Chesapeake to ensure the Gilmerton Bridge is available during High Rise Bridge closures. • Managers need to ensure closures do not impact major holidays or local events such as Harborfest, Neptune Festival, or graduations amongst other events. • Regional Closures are shared via: [email protected] 4 District Administrator Guidance • Early coordination is the key to ensuring conflicts are resolved.
    [Show full text]
  • Hampton Roads Congestion Management System
    HAMPTON ROADS CONGESTION MANAGEMENT SYSTEM Part II–- Bridge and Tunnel Analysis Presented by: Dwight L. Farmer, PE Deputy Executive Director, Transportation January 19, 2005 CMSCMS OutlineOutline • Part I - State of Transportation (December 2004) • Part II – – Bridge & Tunnel analysis (Today) – Comprehensive congestion analysis (March 2005) • Part III – – Identification of most congested corridors – Congestion management strategies RegionalRegional BridgesBridges andand TunnelsTunnels Coleman Bridge Hampton Roads Bridge-Tunnel James River Bridge Chesapeake Bay Bridge-Tunnel Monitor-Merrimac Mem. Bridge-Tunnel Midtown Tunnel Downtown Tunnel High Rise Bridge AnnualAnnual AverageAverage DailyDaily TrafficTraffic Annual Average Daily Traffic at Regional Bridges and Tunnels, 1990 - 2003 100,000 Average Annual Growth Rates, 1990 – 2003 90,000 Monitor-Merrimac BT* 6.8% Downtown Tunnel High Rise Bridge 3.8% 80,000 Downtown Tunnel 2.8% Hampton Roads BT Chesapeake Bay BT 2.3% 70,000 Coleman Bridge 1.7% Hampton Roads BT 1.3% High Rise Bridge Midtown Tunnel 0.3% 60,000 James River Bridge 0.1% 50,000 * - Monitor-Merrimac BT growth rates Monitor-Merrimac BT are for 1992-2003. 40,000 Midtown Tunnel 30,000 Coleman Bridge Annual Average Daily Traffic (AADT) James River Bridge 20,000 10,000 Chesapeake Bay BT 0 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 Data Sources: HRPDC Economic Outlook, VDOT. Some data is VDOT estimates. Downtown and Midtown Tunnel data excludes Sept. and Oct. 2003 due to Midtown Tunnel closure. James River Bridge data excludes 9/15/03 – 10/3/03 due to equipment failure. AnnualAnnual AverageAverage DailyDaily TrafficTraffic • The amount of traffic crossing the HR harbor increased 64% between 1990 - 2003.
    [Show full text]