EXPRESSION of INTEREST (Artist Proposal)

Total Page:16

File Type:pdf, Size:1020Kb

EXPRESSION of INTEREST (Artist Proposal) EXPRESSION OF INTEREST (Artist Proposal) Prepared for: City of Prince Albert Arts and Culture Call for Artist Concept 2nd Avenue Art Installation c/o City of Prince Albert, Purchasing Department Municipal Service Centre 11 – 38th Street East Prince Albert, SK S6W 1A5 E: [email protected] Prepared By: Joanne Churko 914 Broad Street North Regina, SK S4R 5Z1 P: 306-359-7886 Email: [email protected] [email protected] Thank you for creating this artistic creative design opportunity. I am excited to participate in the bid process for this competition. Please accept the following as an application/expression of interest for: City of Prince Albert Call For Artist Concept - 2nd Avenue Art Installation Prince Albert, SK as advertised. Deadline: Wednesday April 21, 2021 2:30p.m. 1 2 1.0 Expression of Interest 1.1 Project Description & Summary Public art has the ability to inspire, engage and connect people in extraordinary ways. The City of Prince Albert supports an Art and Culture program and policies that allow artists of all mediums, skill types and abilities to develop their crafts and create works that are truly inspiring. This particular opportunity is of interest because it aligns with my skillset as a multi-medium artist and combines my technical expertise as a multi-disciplined and creative designer and technical consultant of more than thirty years, into one single scope of work. This expression of interest proposes to design, develop, construct and install a collection of five (5) double-sided, open-faced, artistic fence panels (in duplicate), similar to the five concepts shown herein. The scenes are technically complex but simple in appearance, are aesthetically pleasing, and incorporate bright and bold color palettes and textures intended to stand out against the existing natural backdrop. For technical reasons, lighting is not considered at this time, but is open for discussion and can be revisited during the Detailed Design Phase. Each panel location is made up of two decorative interior panels, (one on each side of the fence), and a decorative outer face layer: a) The decorative outer face layer – consists of various trim pieces, including vertical panel end caps, a continuous top cap, and an adjustable skirt at the base (optional), if required. b) The decorative interior panels – will be made up of irregular shaped plywood cutouts of various sizes, shapes, layers and configurations to provide a three-dimensional effect. Layers may be adhered to each other or separated through the use of spacers to create texture and dimension. The interior panels may be block painted, artistically painted, or any combination thereof, as determined during the Detailed Design Phase (See Sec. 1.2 below). Each location will consist of two mirror- image panels so that the same design can be presented on both sides of the street. The five (5) concept collection, through its artistic composition and subject matter hopes to engage audiences and promote discussions about unique landscapes and interesting wildlife that can be found in the Prince Albert Region. 1.2 Technical Information & Execution The design and construction process will consist of three phases…a Detailed Design Phase, a Construction Phase and an Installation and Final Approval Phase. Should this proposal be accepted, these phases will be used to seek client feedback through engagement, consultation and approvals, as well as monitor progress, and determine key milestones for the purpose of gauging budget and schedule and establishing progress payments. These concepts have been designed in consideration of the following: a) artistic design specifications and/or parameters as listed in the Call for Artist Concept; b) maintenance, safety, visibility, longevity and structural integrity; c) suitability related to the location; d) complementary to the site, as a whole; e) appropriateness and relativity of subject matter; f) flexibility in the design, with some limitations, and; g) other creative design, artistic and technical parameters. 2.0 Budget and Schedule Budget: $25,000.00 CAD, plus applicable taxes (5-panel collection) $20,000.00 CAD, plus applicable taxes (4-panel collection, may include Panel 2) $15,000.00 CAD, plus applicable taxes (3-panel collection, does not include Panel 2) Schedule (timeline): 8 weeks, upon acceptance/approval to proceed Note: The development of one and two panel collections are not financially feasible under this proposal. This is because the work warrants a Detailed Design Phase to undertake client consultation, to acquire valued client feedback, to resolve design elements and technical details that must be reconciled prior to construction. This particular collection will have a higher than normal labor and material cost. Transport is also a budgetary factor. While some flexibility exists and concessions can be made in the design, the installation is an outdoor application that will be installed along an existing traffic median, and therefore, safety, durability and other 3 specific elements must also be considered in the design and construction details. Under this proposal, progress payments will be requested at key intervals. 3.0 Other Considerations: 3.1 Phasing To ensure proper management of the budget and schedule, the work will be executed in phases. These phases will allow for periodic client reviews and consultations at appropriate intervals and for the purpose of establishing reasonable progress payments. The proposed execution phases are as follows: a) The Detailed Design Phase – Review, discuss and finalize artistic and technical design and execution details. Will require one pre-design site visit to review existing site conditions and collect asbuilt data and information. Will seek client consultation and client sign-off on the final designed artistic panels, prior to construction. The detailed design phase is expected to take 2 to 3 weeks to execute. b) The Construction Phase – Construction of the work as determined by the Detailed Design Phase. Requires client approval prior to shipping to the site. The construction phase is expected to take 3 to 4 weeks to execute. c) The installation and Final Approval Phase – Will require final client approval (through photos) prior to shipping to the site. Will also require acceptance of the work at the time that the installation is complete. 3.2 Support Local Where the work requires elements of the project to be sub-contracted consideration will be given to hire locally, where employing locally is competitive, and favourable to the management of the project budget and schedule, and both favourable and feasible to the success of the project, as a whole. Similarly, credits to the budget may be offered should the City of Prince Albert wish to install the finished panels independently. Credit values can be discussed and determined during the Detailed Design Phase. 3.3 Additional Information The details of this design including design details, feasibility and details related to budget and schedule, are open for discussion. Additional information may be available upon request. I am happy to answer any questions that you may have, in that regard. 4.0 Personal Resume/CV A Personal Resume/CV is submitted with this application in confidence, as a separate attachment. 5.0 Personal Portfolio (Personal Project Gallery) A Personal Project Gallery is also submitted in confidence, as a separate attachment to serve as an Artist Portfolio. 4 6.0 Visualization 6.1 Past Work City of Prince Albert Crosswalk Art Additional Past Work can be viewed in my Personal Project Gallery outlined in Sec. 5.0 above . 6.2 Concepts Time constraints dictated by the short bidding period did not allow for the development of all five concepts, given the complexity and enormity of this design concept and the level of detail required to successfully execute this proposal. However, five (5) themes have been determined and rough samples have been developed. Panel Themes are as follows: Panel 1 – Great Plains Bison Theme (rough sample shown below Panel 2 – Watershed Theme (ie: Pelicans, Loons, Beavers, Rabbits, Owl, Hawk) Panel 3 – Deer/Moose Forestry Theme Panel 4 – Bear/Fish River/Forest Theme Panel 5 – Wolf/Forest Theme (rough sample shown below) Two sample concepts have been provided below for the purpose of communicating the overall vision of the proposal and how it might actually appear on site. These samples may or may not reflect the final panel designs at the detailed design level. Should serious consideration be given to developing this proposal further, I would be happy to provide you with more detailed concepts, additional information, or engage in detailed discussions to help satisfy any questions or concerns that you might have regarding the proposal, as described throughout this EOI. These samples represent ROUGH CONCEPTS ONLY that were developed primarily for the purpose of determining colour schemes, layouts and scale specific to this proposal. These will be refined, detailed, finalized, resolved and reconciled during the Detailed Design Phase. As stated previously, client sign-off would be sought on each panel design prior to construction. 5 Sample Panel 1 – Great Plains Bison Theme (rough concept only) 6 Sample Panel 5 - Wolf/Forest Theme 7 8 CURRICULUM VITAE (CV) Joanne is an experienced multi-disciplined designer, technical consultant, project manager, draftsperson and artist. Her comprehensive technical knowledge in design, management and construction practices spans approximately thirty (30) years, contributing to the successful completion of more than 800 projects, in multiple disciplines, with varying subjects, scopes, budgets and degrees of complexity, through many forms of procurement and project delivery. She is the former owner of a successful small design and consulting firm of ten (10) years. She is currently operating as a sole proprietor on a contract, per-project basis. Joanne’s creative skills, technical diversity and applied work experience have allowed her to assume lead roles on many architectural, engineering and planning teams, as well as execute complex projects independently, from concept to completion.
Recommended publications
  • Gazette Part I, March 29, 2018
    THIS ISSUE HAS NO PART III THE SASKATCHEWAN GAZETTE, 2 FÉVRIER 2018 609 (REGULATIONS)/CE NUMÉRO NE CONTIENT PAS DE PARTIE III (RÈGLEMENTS) The Saskatchewan Gazette PUBLISHED WEEKLY BY AUTHORITY OF THE QUEEN’S PRINTER/PUBLIÉE CHAQUE SEMAINE SOUS L’AUTORITÉ DE L’IMPRIMEUR DE LA REINE PART I/PARTIE I Volume 114 REGINA, THURSDAY, MARCH 29, 2018/REGINA, JEUDI 29 MARS 2018 No. 13/nº13 TABLE OF CONTENTS/TABLE DES MATIÈRES PART I/PARTIE I SPECIAL DAYS/JOURS SPÉCIAUX ................................................................................................................................................. 610 PROGRESS OF BILLS/RAPPORT SUR L’ÉTAT DES PROJETS DE LOI (Second Session, Twenty-Eighth Legislative Assembly/Deuxième session, 28e Assemblée législative) .......................................... 610 ACTS NOT YET PROCLAIMED/LOIS NON ENCORE PROCLAMÉES ..................................................................................... 612 ACTS IN FORCE ON ASSENT/LOIS ENTRANT EN VIGUEUR SUR SANCTION (Second Session, Twenty-Eighth Legislative Assembly/Deuxième session, 28e Assemblée législative) .......................................... 615 ACTS IN FORCE ON SPECIFIC EVENTS/LOIS ENTRANT EN VIGUEUR À DES OCCURRENCES PARTICULIÈRES..... 615 ACTS PROCLAIMED/LOIS PROCLAMÉES (2018) ........................................................................................................................ 616 CORPORATE REGISTRY NOTICES/AVIS DU REGISTRE DES SOCIÉTÉS .......................................................................... 616 The
    [Show full text]
  • Bylaw No. 3 – 08
    BYLAW NO. 3 – 08 A bylaw of The Urban Municipal Administrators’ Association of Saskatchewan to amend Bylaw No. 1-00 which provides authority for the operation of the Association under the authority of The Urban Municipal Administrators Act. The Association in open meeting at its Annual Convention enacts as follows: 1) Article V. Divisions Section 22 is amended to read as follows: Subsection (a) DIVISION ONE(1) Cities: Estevan, Moose Jaw, Regina and Weyburn Towns: Alameda, Arcola, Assiniboia, Balgonie, Bengough, Bienfait, Broadview, Carlyle, Carnduff, Coronach, Fleming, Francis, Grenfell, Indian Head, Kipling, Lampman, Midale, Milestone, Moosomin, Ogema, Oxbow, Pilot Butte, Qu’Appelle, Radville, Redvers, Rocanville, Rockglen, Rouleau, Sintaluta, Stoughton, Wapella, Wawota, White City, Whitewood, Willow Bunch, Wolseley, Yellow Grass. Villages: Alida, Antler, Avonlea, Belle Plaine, Briercrest, Carievale, Ceylon, Creelman, Drinkwater, Fairlight, Fillmore, Forget, Frobisher, Gainsborough, Gladmar, Glenavon, Glen Ewen, Goodwater, Grand Coulee, Halbrite, Heward, Kendal, Kennedy, Kenosee Lake, Kisbey, Lake Alma, Lang, McLean, McTaggart, Macoun, Manor, Maryfield, Minton, Montmarte, North Portal, Odessa, Osage, Pangman, Pense, Roch Percee, Sedley, South Lake, Storthoaks, Sun Valley, Torquay, Tribune, Vibank, Welwyn, Wilcox, Windthorst. DIVISION TWO(2) Cities: Swift Current Towns: Burstall, Cabri, Eastend, Gravelbourg, Gull Lake, Herbert, Kyle, Lafleche, Leader, Maple Creek, Morse, Mossbank, Ponteix, Shaunavon. Villages: Abbey, Aneroid, Bracken,
    [Show full text]
  • The Capacity Edition
    1 PARCS UPDATE #35 THE CAPACITY JUNE, 2013 EDITION 1. PROVINCE CLAMPING DOWN ON NEW COTTAGE COMMUNITIES The province is about to introduce changes to The Municipalities Act which will severely reduce, if not eliminate, the establishment of new Organized Hamlets or new Resort Villages in the Saskatchewan. The rationale for raising the bar for the establishment of new cottage In this issue communities is the assertion that many of our current communities do not have the CAPACITY to operate 1. Province clamping down . p. 1 effectively. 2. PARCS meets Ministry . p. 1 CAPACITY is the buzz word of the day. It refers to 3. What’s being proposed . p. 2 the ability of a community “to meet the 4. What’s your capacity? . p. 3 accountability, fiduciary and legislative requirements 5. More about PARCS lobby . P. 4 to operate independently and to generate sufficient More about PARCS survey . p. 4 revenue for services and administration”. 1 On page 3 of this issue, PARCS presents a summary of some of 6. Addendum - Villages the criteria the province uses to determine capacity. & resort villages today . p. 5, 6 2. PARCS DIRECTORS MEETS WITH MINISTRY OF GOVERNMENT AFFAIRS On May 28, a delegation from the PARCS Board of Directors met with officials from the Ministry of Government Relations to provide input into the proposed changes to the rules for forming new resort villages and new organized hamlets. 2 PARCS delegates acknowledged that many of our smaller resort villages are struggling due to lack of capacity to meet their obligations (see page 3).
    [Show full text]
  • 2021 Quality Assurance Standards Aggregate Report Apr. 1, 2021
    Quality Assurance Standard Report Residential Other Year Municipality Property Property Reporting Date Median ASR Median ASR 2021 RM 002 - MOUNT PLEASANT 1.00 0.99 2021-03-31 2021 RM 006 - CAMBRIA 1.00 0.99 2021-03-31 2021 RM 007 - SOURIS VALLEY 1.00 0.99 2021-03-31 2021 RM 017 - VAL MARIE 0.99 0.99 2021-03-31 2021 RM 032 - RECIPROCITY 1.00 0.99 2021-03-31 2021 RM 033 - MOOSE CREEK 1.00 0.99 2021-03-24 2021 RM 036 - CYMRI 1.00 1.00 2021-03-31 2021 RM 037 - LOMOND 1.00 0.99 2021-03-31 2021 RM 038 - LAURIER 1.00 0.99 2021-03-31 2021 RM 040 - BENGOUGH 1.00 0.99 2021-03-31 2021 RM 042 - WILLOW BUNCH 0.99 0.99 2021-03-31 2021 RM 044 - WAVERLY 0.99 0.99 2021-03-16 2021 RM 061 - ANTLER 1.00 0.99 2021-03-24 2021 RM 064 - BROCK 1.00 0.99 2021-03-31 2021 RM 068 - BROKENSHELL 1.00 0.99 2021-03-24 2021 RM 073 - STONEHENGE 1.00 0.99 2021-03-31 2021 RM 077 - WISE CREEK 0.99 0.99 2021-03-31 2021 RM 078 - GRASSY CREEK 0.99 0.99 2021-03-31 2021 RM 079 - ARLINGTON 0.99 0.99 2021-03-31 2021 RM 091 - MARYFIELD 1.00 0.99 2021-03-31 2021 RM 093 - WAWKEN 1.00 0.99 2021-03-31 2021 RM 094 - HAZELWOOD 1.00 0.99 2021-03-31 2021 RM 096 - FILLMORE 1.00 0.99 2021-03-31 2021 RM 098 - SCOTT 1.00 0.99 2021-03-10 2021 RM 099 - CALEDONIA 1.00 1.00 2021-03-16 2021 RM 104 - GRAVELBOURG 1.00 1.00 2021-03-10 2021 RM 105 - GLEN BAIN 0.99 0.99 2021-03-16 2021 RM 122 - MARTIN 0.99 0.96 2021-03-31 2021 RM 123 - SILVERWOOD 0.99 0.96 2021-03-24 2021 RM 125 - CHESTER 1.00 1.00 2021-03-24 2021 RM 130 - REDBURN 1.00 1.00 2021-03-24 Residential Other Year Municipality Property Property
    [Show full text]
  • Sask Gazette, Part I, Mar 24, 1995
    MARCH 24, 1995 277 THIS ISSUE HAS NO PART II (REVISED REGULATIONS) OR PART III (REGULATIONS) The Saskatchewan Gazette PUBLISHED WEEKLY BY AUTHORITY OF THE QUEEN’S PRINTER PART I Volume 91 REGINA, FRIDAY, MARCH 24, 1995 No. 12 TABLE OF CONTENTS PART I APPOINTMENT................................................................................................................... 278 PROGRESS OF BILLS ....................................................................................................... 278 ACTS PROCLAIMED.......................................................................................................... 278 MINISTER’S ORDERS ....................................................................................................... 279 The Oil and Gas Conservation Act ........................................................................................ 279 CORPORATIONS BRANCH NOTICES .......................................................................... 281 The Business Corporations Act .............................................................................................. 281 The Business Names Registration Act................................................................................... 283 The Non-profit Corporations Act ........................................................................................... 286 PUBLIC NOTICES .............................................................................................................. 286 The Agricultural Implements Act .........................................................................................
    [Show full text]
  • Saskatchewan Municipal Board Assessment Appeals Committee
    Saskatchewan Municipal Board Assessment Appeals Committee Appeal: 2008-0100 RESPONDENT: Resort Village of Chorney Beach In the matter of an appeal to the Assessment Appeals Committee, Saskatchewan Municipal Board, by: Milton and Susan Derry 218 Flavelle Crescent Saskatoon, Saskatchewan S7L 6L2 respecting the assessment of: Lot 16, Block 06, Plan 68H06717 57 Lakeshore Drive Alternate Number: 504504250-01 for the year 2008; BEFORE: David Wilkin, Chairman Jenny Lai Yu, Member Robert L. Edwards, Member Cynthia J. Schwindt, Secretary APPEARED FOR THE APPELLANT: Milton Derry, Susan Derry APPEARED FOR THE RESPONDENT: No one appeared APPEARED FOR THE SASKATCHEWAN ASSESSMENT MANAGEMENT AGENCY: Michael W. R. Caskey, John Smysniuk This appeal was heard in Room 10.1, Sturdy Stone Centre, 122 – 3rd Avenue, in Saskatoon, Saskatchewan, on November 12, 2008. APPEAL 2008-0100 [Page 2] This appeal is against the decision of the Board of Revision (the Board) for the Resort Village of Chorney Beach, pursuant to section 246 of The Municipalities Act (the Act). ISSUE: Did the Board err in its decision by failing to adjust the value of the property due to flooding? FACTS: (1) This is a 5,900 square foot parcel improved with a 1,024 square foot two storey summer cottage and decks of 125 and 718 square feet respectively. The improvements are all wood frame, residential type construction built in 2004 and 2005 . The cottage is of average quality (class B) and the decks are of economical quality (class D). The Saskatchewan Assessment Management Agency (SAMA) assigned a 15% unfinished allowance to the summer cottage. A functional obsolescence of 33% has been applied to all improvements.
    [Show full text]
  • SK COMMUNITY WATER USE RECORDS 1996 to 2010
    SASKATCHEWAN COMMUNITY WATER USE RECORDS 1996 to 2010 REPORT NO. 24 PREPARED AND SUBMITTED BY: SASKATCHEWAN WATERSHED AUTHORITY INTEGRATED WATER SERVICES DIVISION 111 FAIRFORD STREET EAST MOOSE JAW SASKATCHEWAN S6H 7X9 October 2011 Disclaimer Notice The data presented is provided by the various communities listed in this report. While every effort is made to ensure that the content of this report is accurate, the report is provided “as is” and Saskatchewan Watershed Authority makes no representations or warranties in relation to the accuracy or completeness of the information found on it. Nothing in this report should be taken to constitute professional advice or a formal recommendation and we exclude all representations and warranties relating to the content and use of this report. In no event will Saskatchewan Watershed Authority be liable for any direct or incidental, indirect, consequential or special damages of any kind, or any damages whatsoever, including, without limitation, those resulting from loss of profit, loss of contracts, goodwill, data, information, income, anticipated savings or business relationships, whether or not advised of the possibility of such damage, arising out of or in connection with the use of this report. Please check Disclaimer Notice on Title Page (first page of report) INTRODUCTION This document reflects water consumption data for the majority of Saskatchewan municipalities from 1996 to 2010. The information contains Saskatchewan Ministry of Health population statistics, monthly, yearly, average day, peak day and per capita water consumption as well as peak day factors. For 2010, the Saskatchewan Watershed Authority obtained water consumption records from approximately 604 communities including 33 Provincial and Regional Parks and campgrounds and 74 First Nations.
    [Show full text]
  • Saskatchewan Official Road
    PRINCE ALBERT MELFORT MEADOW LAKE Population MEADOW LAKE PROVINCIAL PARK Population 35,926 Population 40 km 5,992 5,344 Prince Albert Visitor Information Centre Visitor Information 4 3700 - 2nd Avenue West Prince Albert National Park / Waskesieu Nipawin 142 km Northern Lights Palace Meadow Lake Tourist Information Centre Phone: 306-682-0094 La Ronge 88 km Choiceland and Hanson Lake Road Open seasonally 110 Mcleod Avenue W 79 km Hwy 4 and 9th Ave W GREEN LAKE 239 km 55 Phone: 306-752-7200 Phone: 306-236-4447 ve E 49 km Flin Flon t A Chamber of Commerce 6 RCMP 1s 425 km Open year-round 2nd Ave W 3700 - 2nd Avenue West t r S P.O. Phone: 306-764-6222 3 e iv M e R 5th Ave W r e Prince Albert . t Open year-round e l e n c f E v o W ru e t p 95 km r A 7th Ave W t S C S t y S d Airport 3 Km 9th Ave W H a 5 r w 3 Little Red 55 d ? R North Battleford T River Park a Meadow Lake C CANAM o Radio Stations: r HIGHWAY Lions Regional Park 208 km 15th St. N.W. 15th St. N.E. Veteran’s Way B McDonald Ave. C CJNS-Q98-FM e RCMP v 3 Mall r 55 . A e 3 e Meadow Lake h h v RCMP ek t St. t 5 km Northern 5 A Golf Club 8 AN P W Lights H ark . E Airport e e H Ave.
    [Show full text]
  • THE SASKATCHEWAN GAZETTE, March 22, 2013 565 (REGULATIONS)/CE NUMÉRO NE CONTIENT PAS DE PARTIE III (RÈGLEMENTS)
    THIS ISSUE HAS NO PART III THE SASKATCHEWAN GAZETTE, MARCH 22, 2013 565 (REGULATIONS)/CE NUMÉRO NE CONTIENT PAS DE PARTIE III (RÈGLEMENTS) The Saskatchewan Gazette PUBLISHED WEEKLY BY AUTHORITY OF THE QUEEN’S PRINTER/PUBLIÉE CHAQUE SEMAINE SOUS L’AUTORITÉ DE L’ImPRIMEUR DE LA REINE PART I/PARTIE I Volume 109 REGINA, FRiday, MARCH 22, 2013/REGINA, VENDREDI, 22 MARS 2013 No. 12/nº 12 TABLE OF CONTENTS/TABLE DES MATIÈRES PART I/PARTIE I APPOINTMENT/NOMINATION ........................................................................................................................................................ 566 PROGRESS OF BILLS/RAPPORT SUR L’éTAT DES PROJETS DE LOI (Second Session, Twenty-Seventh Legislative Assembly/Deuxième session, 27e Assemblée législative) ........................................ 566 ACTS NOT YET PROCLAIMED/LOIS NON ENCORE PROCLAMÉES ..................................................................................... 567 ACTS IN FORCE ON ASSENT/LOIS ENTRANT EN VIGUEUR SUR SANCTION (Second Session, Twenty-Seventh Legislative Assembly/Deuxième session, 27e Assemblée législative) ........................................ 570 ACTS IN FORCE ON SPECIFIC EVENTS/LOIS ENTRANT EN VIGUEUR À DES OCCURRENCES PARTICULIÈRES..... 571 ACTS PROCLAIMED/LOIS PROCLAMÉES (2013) ........................................................................................................................ 571 CORPORATE REGISTRY NOTICES/AVIS DU REGISTRE DES SOCIÉTÉS .......................................................................... 572
    [Show full text]
  • RPT 21-250 That the Community Services Advisory Committee
    RPT 21-250 TITLE: Beautification of City Entrance Ways DATE: May 13, 2021 TO: Community Services Advisory Committee PUBLIC: X INCAMERA: RECOMMENDATION: That the Community Services Advisory Committee approve the 2021 Focus Areas for Beautification identified by the Community Services Department and forward the recommendation to Council for consideration. TOPIC AND PURPOSE To provide background on the beautification process, the accomplishments in 2019 & 2020, and the suggested plan moving into 2021 related to the topic of beautification of the City Entrance Ways. BACKGROUND The following resolution was approved during the 2021 Budget Committee Regular meeting. “That the total 2021 Operating Budget for the City Beautification Functional Area be approved at a cost of $75,800, as presented.” PROPOSED APPROACH AND RATIONALE: Beginning with the 2019 Season, Community Services has been tasked with looking at implementing various beautification initiatives including how to best use the funds allocated in the annual budget to plan the beautification process. Preliminary discussions have taken place around the Development of a Comprehensive Plan involving various City Departments as it relates to general maintenance, signage, landscaping and promotion. Community RPT 21-250 Page 2 of 10 beautification should be considered a high priority, specifically highway entrances, as they are the first contact that residents and visitors have, creating that first impression of the City. When we talk about beautification, the immediate thought was to look at the addition of landscaping which would include flowerbeds to brighten the entryways. Suggestions were brought forth to look at designing options to communicate to the public providing an opportunity for input into a Comprehensive Plan.
    [Show full text]
  • Saskatchewan Tire Collection Zones
    Legend Saskatchewan 0255075 Tire Zones First Nation Reserve Highway Kilometres Tire Collection Zones Urban Municipality Park R.M. Water Creation Date 01/13/2018 Version 1.0 Mahigan UV165 Oskikebuk Lake MISTIK 184 106 Lake 203 UV Map 1 of 1 WASKWAYNIKAPIK Lake Vance 228 Wildfong Annabel 919 Dore Lake Bryans Lake UV Casat 911 Lake UVViney Lake Lake Lake Lake NAKISKATOWANEEK 227 Neagle FLIN FLON 165 Lake UV CREIGHTON Flotten UV903 Sarginson MCKAY IM Lake Lake 209 PISIWIMINIWAT Hanson Smoothstone 207 Lake Lake Deschambault NARE BEACH DORE 106 DE Waterhen LAK 912 MUSKWAMINIWATIM Lake UV E UV Chisholm Spectral 924 Limestone Shuttleworth UV 225 Lake UV2 Lake Lake Lake McNally Lake W ATERHEN UV969 AMISK Lake Hollingdale 130 Stringer LAKE M Beaupre 916 Lake EADOW UV Lake 184 BI LA Lake Molanosa Cobb Kerr G KE GREIG L 167 IS AKE UV 21 LAND PROVINCIA UV155 Lake Lake Hobbs Lake Amisk UV G L SO OO UT PIE DSOIL H Sled Clarke Lake Lake Nepe RCELA PAR WATERH GLADUE Edgelow ND K EN Lake Lake Oatway Balsam Lake LAKE LAKE Lake Meeyomoot Shallow Renown Lake Lake Maraiche 105 SLED Lake UV55 Nipekamew Lake Lake Lake DORIN L Lake Saskoba 622 TOSH AKE Lake WEYAKWIN Big Sandy Harrington AMISKOSAKAHIKAN Wanner Lake Narrow Herman Lake 210 Lake Lake Goulden Lake Lake UV924 East Trout Saunders GRE Lake Lake Suggi Windy EN Montre 26 4 al 927 UV106 Lake Lake UV UV LAK Lake UV Little Bear E Lake Leonard STURGEON WEIR Marquis Lake 184 Lake Red Bobs T 55 CLARENCE-STEEPBANK Waterfall HUNDERCHILD FLYING DUST UV Lake O'Leary Lake 115 UV55 105 LAKES PROVINCIAL PARK Lake Namew
    [Show full text]
  • Saskatchewan Population Report 2016 Census of Canada
    Saskatchewan Population Report 2016 Census of Canada 2016 CENSUS POPULATION Saskatchewan’s Census population for 2016 Villages and Resort Villages accounted for was 1,098,352, according to Statistics Canada. This represents an increase of 64,971 persons 47,308 persons in 2016. This is an increase of 228 persons (0.5 percent) from the 2011 village (6.3 percent) from the 2011 Census population of 1,033,381. and resort village population of 47,080. These people live in a total of 21,159 dwellings. Table 1 shows the Census population counts Indian Reserves also decreased in population and growth rates for Saskatchewan for the past between 2011 and 2016. Reserve population 55 years. fell by 172 persons (0.3 percent) to 56,050 in 2016 from 56,222 in 2011. These people live in Table 1: Census Population, 1961 - 2016 a total of 13,995 dwellings. Saskatchewan Rural Municipality population increased by Date Census Population Growth Rate 1,934 to 176,535 persons in 2016 from 174,601 1961 925,181 5.1% persons in 2011. This represents an increase of 1966 955,344 3.3% 1.1 percent. These people live in a total of 1971 926,242 -3.0% 65,770 dwellings. 1976 921,323 -0.5% 1981 968,313 5.1% Northern Villages, Hamlets, Crown Colonies, 1986 1,009,613 4.3% Unorganized and other populations fell 1,201 1991 988,928 -2.0% persons between 2011 and 2016 from 14,630 1996 990,237 0.1% persons to 13,429 persons. These people live in 2001 978,933 -1.1% a total of 4,183 dwellings.
    [Show full text]