Creating Connections in Burlington
Total Page:16
File Type:pdf, Size:1020Kb
CREATING CONNECTIONS IN THE CITY OF BURLINGTON PETER ZUK, CHIEF CAPITAL OFFICER, METROLINX LESLIE WOO, CHIEF PLANNING OFFICER, METROLINX BURLINGTON CITY COUNCIL OCTOBER 30, 2017 CONGESTION COSTS OUR ECONOMY • The average commute in the GTHA is up to 60 minutes. That means the average commuter spends nearly an extra work day a week sitting in their car, stuck in traffic. Congestion is costing the GTHA between $6 BILLION - $11 BILLION A YEAR in lost economic activity. 2 METROLINX CAPITAL PROJECTS GROUP: FOCUS ON THE BUILD PLAN BUILD • Design • Environmental Assessment • Property Acquisition OPERATE • Procurement process • Contract Award • Construction 3 WHAT WE ARE BUILDING METROLINX PLANNED CAPITAL SPEND ASSETS TODAY OVER 10 YEAR PROGRAM $19.5 Billion* over $43 Billion** *March 2017, Audited **Metrolinx 17/18 Business Plan 4 Concrete Ties on the Stouffville Corridor, August 2017. AN INTEGRATED NETWORK 5 RER AND RT – NO SMALL TASK 6 GO RAIL EXPANSION 150 kilometers of new dedicated GO track will allow for more uninterrupted service New electric trains will travel faster for longer and reduce travel times Bridges and tunnels that eliminate intersections with rail and road traffic will provide more reliable GO train service New and improved stations will make your journey more comfortable, from start to finish New electrified rail infrastructure will allow Metrolinx to deliver faster, more frequent service 7 INFRASTRUCTURE 8 RER: NEW AND IMPROVED GO STATIONS As part of the RER Program, Metrolinx will modify and improve a large number of existing stations, build 12 new GO stations on the existing network, and 7 new stations on extensions. Amongst the new stations being constructed, 6 are identified Smart Track stations in the city of Toronto. There are three existing stations in the City of Burlington. Burlington Transit is key to these 3 stations - and critical to balancing mode split in future, and reducing our reliance on drive- and-park to access GO services. We are working closely to integrate services and provide connectivity. 9 BURLINGTON GO STATION Burlington connects with 16 Burlington Transit and 1 GO bus route, including connections with Niagara Region and Park-and-ride facility on the 407. Improvements substantially completed as of Sept. 2017: • enhanced south bus loop • improved accessibility. • south side ticket booth and east tunnel. • roof and zinc shell installed, minor corrections needed. • completed PRESTO work. • parking structure: snowmelt system on ramp has been repaired. 10 ALDERSHOT GO STATION AND PARKING EXPANSION Aldershot connects with 2 Burlington Transit, 1 Hamilton Street Railway and 2 GO bus routes including frequent connections with McMaster, downtown Hamilton and Brantford. • Station Project Scope: • Station building modifications and rehabilitation • Parking expansion (2 Phases) • New Kiss & Ride • Bus Shelter • Stormwater management • North bus loop modification • Adding a para-trans bus bay Parking Expansion: • Platform rehabilitation, including • 450-500 spaces proposed as close to the corridor as possible snowmelt system • Linear configuration from Masonry Court in the East to • Two new elevators Waterdown Road in the west • Removal of existing escalators (end of • Completing design work prior to tender life-cycle) • August 2017 received approval for enabling works • Requires large culvert under Waterdown Road and flood storage pond 11 DRURY LANE PEDESTRIAN BRIDGE • Working with City staff on replacing Drury Lane pedestrian bridge in order to protect for future electrification infrastructure. • Currently in the Environmental Assessment phase. INSERT FOOTER 12 ELECTRIFICATION • Metrolinx can only proceed with electrification on owned corridors unless the Railway authority permits it • Electrification requires traction power substations, switching stations, paralleling stations, overhead contact systems, and various safety modifications 13 BURLOAK DRIVE GRADE SEPARATION – STUDY AREA EA Milestone Timeline Notice of November 2017 Commencement Notice of January 2018 Completion EPR Public Review January-February 2018 Ministerial Review February-March 2018 Statement of March 2018 Completion 14 Facing Northeast Facing North Facing North Facing South 15 Burloak Grade Separation design subject to change during project delivery FIRST MILE, LAST MILE Customers travelling to GO stations (2016) Average Weekday Riders* and Mode Share 16 UNION STATION • One of the most important “places” in GTHA • Complex Stakeholder environment • Needs to be “done right” for 2025 GO Service and to protect future use • Being approached through collaboration across Metrolinx departments (Planning & Policy, Operations, Customer Experience & Marketing, and Capital Projects Group) • Work is ongoing and will be for years Aerial view of Union Station buildings and trainshed 17 OUTLOOK • Metrolinx continues to advance the Go Expansion Program (RER & Extensions) and the RT Program, important prerequisites to enable the vision of Metrolinx’s Regional Transportation Plan 18 PLANNING UPDATE 19 STATION ACCESS PLAN (2016) • Establishes hierarchy of access priority • Significant ridership growth anticipated by 2031 and with RER service • Cannot expand parking at same rate as ridership – MX and City need to work together to significantly change access mode to the station, encourage access by transit, cycling and walking 20 MOBILITY HUB STUDIES • City is leading an exemplary process with Mobility Hub Studies • Metrolinx is engaged with the City’s Mobility Hub team on planning around the GO station at Aldershot, Burlington and Appleby • Metrolinx is supportive of TOD around GO stations and the uses and densities being proposed through the Mobility Hub Studies 21 NEW STATIONS - PROCESS • The Metrolinx new stations analysis was a comprehensive, multi-year process • 12 new stations were recommended to the Metrolinx Board of Directors in June 2016 to proceed as part of the RER program • Walkers Line – Cumberland site was identified for an Initial Business Case, which is currently underway • Results of all business case analyses and updates will be shared when available 22 DRAFT 2041 REGIONAL TRANSPORTATION PLAN INSERT FOOTER 23 THE PROCESS Implementation Workplan 2018/2019 24 INFORMING THE PLAN – ENGAGEMENT • Since 2014, Metrolinx has been collaborating with our municipal partners, stakeholders and the public throughout the update process to ensure that the Draft Plan represents the GTHA Municipal Partners: • Partner municipalities have been engaged through Metrolinx-led forums, committees, senior level meetings and mid-level staff workshops. • Forums and Committees: • Municipal Planning Leaders Forum: This senior leader level forum, composed of Chief Planners/Commissioners from across the Region has provided strategic advice to Metrolinx throughout the review and update to the RTP. • Municipal Technical Advisory Committee: Composed of mid to senior level staff who provide support to Metrolinx in detailed analysis of inputs and draft products of the Regional Transportation Plan review. Public Engagement: • Resident’s Reference Panel • 36 member resident panel, representing all regions in the GTHA • Public Roundtables on the Draft 2041 Regional Transportation Plan • Halton Roundtable was hosted on October 16th • Online digital engagement via www.metrolinx.com/theplan 20 VISION THE GTHA URBAN REGION WILL HAVE A TRANSPORTATION SYSTEM THAT SUPPORTS COMPLETE COMMUNITIES BY FIRMLY ALIGNING THE TRANSPORTATION NETWORK WITH LAND USE. THE SYSTEM WILL PROVIDE TRAVELLERS WITH CONVENIENT AND RELIABLE CONNECTIONS AND SUPPORT A HIGH QUALITY OF LIFE, A PROSPEROUS AND COMPETITIVE ECONOMY AND A PROTECTED ENVIRONMENT. GOALS STRONG CONNECTIONS COMPLETE TRAVEL EXPERIENCES SUSTAINABLE COMMUNITIES STRATEGIES Strategy 1: Strategy 2: Strategy 3: Strategy 4: Complete connect more of Strategy 5: Optimize the Integrate Land Delivery of the Region with Prepare for an Transportation Use and Current Regional Frequent Rapid Uncertain Future System Transportation Transit Projects Transit 31 Priority Actions to Support the 5 Strategies* *full list of priority actions can be found in the appendix 27 PROJECTS IN BURLINGTON • Projects In Delivery (Map 3*) • Lakeshore West All-Day GO Service (Aldershot GO – Hamilton GO) • Lakeshore West 15-min GO Service (Union Station – Aldershot GO) • Projects in Development (Map 4*) • Dundas West BRT/Priority Bus (Kipling Stn. – Brant St) • Proposed Projects (Map 6*) • Lakeshore West 15-min GO Service Extension (Aldershot GO – Hamilton GO) • Brant Priority Bus (Lakeshore Rd – Dundas St) Proposed 2041 Frequent Rapid Transit Network • Harvester/Speers/Cornwall Priority Bus (Waterdown Rd – Port Credit GO) INSERT FOOTER 28 *all maps found in appendix MAKING IT HAPPEN REGIONAL DECISION-MAKING Formalize mechanisms for regional collaboration and integrated planning Align regional planning areas Monitor plan implementation and performance outcomes FUNDING THE PLAN Address capital and operations Use business case analysis and full lifecycle costing Align transportation funding to RTP *full list of priority actions can be found in the appendix 2 29 9 NEXT STEPS THE PLAN IS LIVE: www.metrolinx.com/theplan CONSULTATION AND ENGAGEMENT HAS STARTED: We need your input! Fall 2017 DRAFT FINAL PLAN: Board of Directors meeting December 2017 APPENDIX INSERT FOOTER 32 COMMUNITY ENGAGEMENT: PROJECT CYCLE • Introduce the project • Formal consultation to the community and period included in the ask for initial feedback Transit Project Assessment Process • Work with