Keele Station

Total Page:16

File Type:pdf, Size:1020Kb

Keele Station Keele Station 3435 Caledonia Station 3536 Dufferin Station 36 Oakwood Station 37 Eglinton West - Allen Station 38 Bathurst Station 39 Chaplin Station 40 Avenue Station 41 Eglinton - Yonge Station 42 Mount Pleasant Station 43 Bayview Station 44 Brentcliffe Station 45 Don Mills Stop – Option 1 (Surface) Option 1 - In this option, both the Eglinton Crosstown LRT Stop and the Don Mills LRT Stop are at the surface level. Bus terminal (5 Bus Bays) Tracks connecting Don Mills Northbound / southbound LRT and Eglinton Crosstown Don Mills LRT platform LRT may be required for trains to access Maintenance Eastbound / westbound and Storage Facilities. Eglinton LRT platform Eglinton LRT LEGEND These requirements will be LRT Platform determined once the Eglinton Maintenance and Storage Crosstown LRT (Surface) Facilities sites are selected. Don Mills LRT Don Mills LRT (Surface) Ontario Science Centre Drawing not to scale. 46 Don Mills Stop – Option 1 (Surface) – Re-routed Left Turns Left turns are proposed to be re-routed in Option1 in order to achieve efficient LRT operation at the intersection of Don Mills Road and Eglinton Avenue. Refer to Panels 17a and LEGEND 17b for more information New Route for Left Turns on why re-routed left turns North to West are being considered. South to East East to North West to South Existing Traffic Signal Proposed Traffic Signal 47 Don Mills Station – Option 2 (Surface and Underground) Option 2 - In this option, the Eglinton Crosstown LRT Station is underground and the Don Mills LRT Stop is at the surface level. Bus terminal (5 Bus Bays) Tunnel portal Tracks connecting Don Mills LRT and Eglinton Crosstown Northbound / southbound LRT may be required for Don Mills LRT platform trains to access Maintenance and Storage Facilities. LEGEND Eglinton LRT LRT Platform These requirements will be Eastbound / Eglinton westbound Eglinton Crosstown LRT determined once the LRT platform (Surface) Maintenance and Storage Eglinton Crosstown LRT Facilities sites are selected. (Underground) Don Mills LRT Don Mills LRT (Surface) Tunnel portal Tunnel Portal Ontario Science Centre Drawing not to scale. 48 Don Mills Station – Option 2 (Surface and Underground) – No Change in Left Turns Left turns will continue to be permitted at the intersection of Don Mills Road and Eglinton Avenue under Option 2. The Eglinton Crosstown LRT will not be affected by left turns at this location LEGEND because the LRT will be Route for Left Turns underground. Analysis has also shown that left turns North to West South to East will not seriously affect the East to North operation of the Don Mills West to South Existing Traffic Signal LRT. Proposed Traffic Signal 49 Wynford Stop – Option 1 (Current Alignment) Option 1 – Don Valley Parkway Don Valley Alignment of Wynford Drive stays in its current location. LEGEND LRT Platform Eglinton Crosstown LRT (Surface) Eastbound / westbound LRT platform Drawing not to scale. 50 Wynford Stop – Option 2 (Re-alignment) Option 2 – Wynford Drive is Don Valley Parkway Don Valley Proposed Wynford re-aligned and a Drive re-alignment new signalized intersection is created at Wynford Drive / Eglinton Proposed signalized intersection Avenue E. LEGEND LRT Platform Eglinton Crosstown LRT Eastbound / westbound (Surface) LRT platform Proposed Wynford Drive Re-alignment Drawing not to scale. 51 Victoria Park Stop 52 Pharmacy Stop 53 Warden Stop 54.
Recommended publications
  • Connecting the Region
    EGLINTON CROSSTOWN CONSTRUCTION UPDATE EASTERN WORKS OPEN HOUSE | APRIL 9, 2020 WELCOME Our Eastern Works Open House will feature the following stations and stops: • Science Centre • Aga Khan Park & Museum, Wynford, Sloane, O’Connor • Pharmacy , Hakimi Lebovic, Golden Mile, Birchmount, Ionview • and Kennedy. 2 COVID-19 MANAGEMENT • Crosslinx Transit Solutions (CTS) has been exercising all safety protocols on-site including social distancing. • For more information on CTS’ COVID-19 Management, please visit their website: http://www.crosslinxtransit.ca/wp-content/uploads/CTS_COVID- 19_mobile_v2.png EGLINTON CROSSTOWN LRT PROJECT • A 19-kilometre route separated from regular traffic • 10-kilometres underground; 9-kilometres at surface in east • 15 underground stations and 10 surface stops • A maintenance and storage facility • Transit communications system • Links to 54 bus routes, 3 subway stations, GO Transit, UP Express station PROJECT PROGRESS Maintenance and Storage Facility complete 12 vehicles received 50% of track installed Mining complete at Laird and Oakwood stations Deep excavation underway or complete at all stations 2019 PROJECT HIGHLIGHTS FIRST LIGHT RAIL VEHICLE ON MAINLINE 8 9 10 SCIENCE CENTRE STATION RENDERINGS AERIAL VIEW MAIN ENTRANCE WEST PORTAL LOBBY BUS TERMINAL SCIENCE CENTRE STATION: WHAT TO EXPECT Year What to Expect • Completion of all structural concrete works 2019 Milestones • Completion of support of excavation • Completion of excavation • Interior works at Station Box • Interior and exterior finishes as Main Entrance • Track work and rail installation Remaining Work • Waterproofing and backfill for 2020 • Permanent road restoration • Substantial completion late 2020 SCIENCE CENTRE STATION PROGRESS PHOTOS WALL TILING AT THE MAIN ENTRANCE GLAZING AT THE BUS TERMINAL Aga Khan & Museum Stop to O’Connor Stop (Don Valley Parkway to Victoria Park Ave) Brentcliffe Portal AGA KHAN PARK & MUSEUM STOP RENDERINGS SIDEWALK PLATFORM AERIAL VIEW WYNFORD STOP RENDERINGS SIDEWALK PLATFORM .
    [Show full text]
  • Systems & Track: What to Expect
    IT’S HAPPENING, TODAY Forum Eglinton Crosstown LRT Metrolinx’s Core Business – Providing Better, Faster, Easier Service We have a strong connection with our Adding More Service Today Making It Easier for Our customers, and a Customers to Access Our great understanding Service of who they are and Building More to Improve Service where they are going. Planning for New Connections Investing in Our Future MISSION: VISION: WE CONNECT GETTING YOU THERE COMMUNITIES BETTER, FASTER, EASIER 3 WELCOME Our Central Open House will feature the following stations: • Forest Hill • Chaplin • Avenue (Eglinton Connects) • Eglinton • Mount Pleasant Station • Leaside PROJECT QUANTITIES 273.5 km 111 escalators 15.2 million job hours medium voltage/ 38 two-vehicle trains direct current cable 208 overhead 60 elevators 6000 tons of rail 5 new bridges catenary system poles 60 KM/H street level MODEL: Bombardier Flexity Freedom POWER SUPPLY: Overhead Catenary Read more about how Eglinton Crosstown will change Toronto’s cityscape here. Train Testing Video: Click Here Eglinton Crosstown PROJECT UPDATE • The Eglinton Crosstown project is now over 75% complete • Three stations – Mount Dennis, Keelesdale and Science Centre – are largely complete • Over 85% of track has been installed • 45 LRVs have arrived at the EMSF to date • Vehicle testing is now underway Eglinton Crosstown What to Expect: Systems & Track 2020 Progress to-date Remaining Work in 2020 Remaining Work for 2021 • Track installed between Mount Dennis Station • Track installation between Wynford Stop to
    [Show full text]
  • Systems & Track: What to Expect
    IT’S HAPPENING, TODAY Forum Eglinton Crosstown LRT Metrolinx’s Core Business – Providing Better, Faster, Easier Service We have a strong connection with our Adding More Service Today Making It Easier for Our customers, and a Customers to Access Our great understanding Service of who they are and Building More to Improve Service where they are going. Planning for New Connections Investing in Our Future MISSION: VISION: WE CONNECT GETTING YOU THERE COMMUNITIES BETTER, FASTER, EASIER 3 WELCOME Our Central East Open House will feature the following stations and stops: • Eglinton • Mt Pleasant • Leaside • Laird • Sunnybrook Park • Science Centre Read more about how Eglinton Crosstown will change Toronto’s cityscape here. Train Testing Video: Click Here Eglinton Crosstown PROJECT UPDATE • The Eglinton Crosstown project is now 70% complete • By the end of 2020, three stations – Mount Dennis, Keelesdale and Science Centre – will be largely complete • 69% of track has been installed • Vehicle testing is now underway Eglinton Crosstown What to Expect: Systems & Track 2020 Progress to-date Remaining Work in 2020 Remaining Work for 2021 • Track installed between Mount Dennis Station • Track installation between Wynford Stop to • Track installation between Fairbank Station to and Fairbank Station Sloane Stop track split and from Birchmount Laird Station, and Kennedy Station tail tracks • Track installed between East Portal Stop to Kennedy Station (excluding tail tracks) • Traction power cables installation from (Brentcliffe Rd) and Wynford Stop and
    [Show full text]
  • CROSSTOWN LRT TOWN HALL April 2019 Agenda
    CROSSTOWN LRT TOWN HALL April 2019 Agenda 7:00 to 7:30 – View Deck 7:30 to 8:00 – Presentation 8:00 to 8:30 – Question & Answer 2 Eglinton Crosstown Overview • 19 km route separated from regular traffic • 10-kilometres underground; 9-kilometres at surface east of Laird • 15 underground stations and 10 surface stops • 20,000 m2 maintenance and storage facility to maintain and house 76 vehicles • Transit communications system • Links to 54 bus routes, 3 subway stations, GO Transit, UP Express station 3 Eglinton Avenue East - Final Configuration O’Connor Stop at Victoria Park and Eglinton Avenue 4 Eglinton Avenue East - At-Grade Construction • Major work will be occurring at intersection between Leslie and Ionview throughout 2019 • LRT guideway will be constructed in the middle of Eglinton and track will be installed • The work takes place in two stages – paving, followed by guideway construction and track installation 5 2019 Construction Schedule – Leslie to Ionview Road 6 Sunnybrook Park Stop – Leslie/Eglinton 7 July-August Traffic Restriction - Leslie/Eglinton • Crosslinx is seeking city permits for a temporary eight week restriction on vehicles travelling between Leslie Street & Eglinton Avenue East • Allows for LRT guideway construction & track installation. • Eglinton Avenue will remain open in both directions at all times. • Leslie Street will otherwise function normally. • Traffic lanes will open up & turn restrictions will be lifted at Bayview/Eglinton & Don Mills/Eglinton before the Leslie work starts. • Proposed timeline is during the lowest traffic volume months. 8 8 July-August Traffic Restriction - Leslie/Eglinton • Emergency services access to and from Eglinton Avenue will be maintained at all times.
    [Show full text]
  • Eglinton Crosstown Rapid Transit Benefits Case
    EGLINTON CROSSTOWN RAPID TRANSIT BENEFITS CASE April 2009 Eglinton Crosstown Rapid Transit Benefits Case Final Report 27 April 2009 Prepared for: Prepared by: Metrolinx Steer Davies Gleave 20 Bay Street, Suite 901 1000 - 355 Burrard Street Toronto ON M5J 2N8 Vancouver, BC V6C 2G8 In Association with: Economic Development Research Group Metropolitan Knowledge International Eglinton-Crosstown Rapid Transit Benefits Case CONTENTS EXECUTIVE SUMMARY............................................................................................. 1 PART A PROJECT RATIONALE ........................................................................... 7 Introduction ..................................................................................................................................................... 7 Purpose of Report ........................................................................................................................................ 7 Report Structure ........................................................................................................................................... 7 Project Rationale ............................................................................................................................................ 8 Context and Need ........................................................................................................................................ 8 Project Objectives ......................................................................................................................................
    [Show full text]
  • 300 Eglinton Avenue West Toronto | on Investment Highlights
    FOR SALE 300 EGLINTON AVENUE WEST TORONTO | ON INVESTMENT HIGHLIGHTS 300 Eglinton Avenue West is a 2,101 square foot mixed use retail property with a fully developed lower level adding approximately 1,000 square feet of useable space. The property has two tandem parking stalls accessible from a rear laneway allowing parking for up to four cars. Separate entrances for the main floor retail, second floor apartment and lower level flex space allow configuration options for end users and investors alike. The second level is a well appointed two bedroom, one bathroom apartment with month to month tenants. The lower level has been fully developed with a washroom, two offices, coffee area as well as a flex area with a fridge, kitchenette and washer and dryer. Current zoning permits a variety of retail and professional uses. The main floor and lower level are currently vacant making it an ideal end-user opportunity. INVESTMENT DETAILS OVERVIEW Location Just East of Avenue Road on Eglinton Avenue West. Click Here for Map Building Details Main Floor – 1240 SF Basement – 1000 SF 2nd Floor Apartment – 861 SF Lot Dimensions 20.16’ x 114’ Site Area 2,688 SF Taxes (2018) $15,782.87 PROPERTY Zoning CR SS2 (x2627) ASKING PRICE $2,100,000 300 EGLINTON AVENUE W | FOR SALE 1 Yonge Street Duplex Avenue Eglinton Park AREA Oriole Parkway 300 Eglinton Avenue W Avenue Road AVENUE STATION SURRONDING Eglinton Avenue West Avenue Eglinton Spadina Road CHAPLIN STATION 300 EGLINTON AVENUE W | FOR SALE 2 EGLINTON CROSSTOWN LRT The Eglinton Crosstown is the cornerstone of the $8.4 billion investment.
    [Show full text]
  • Transit City Update
    Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: JULY 14, 2010 SUBJECT: TRANSIT CITY UPDATE ACTION ITEM RECOMMENDATION It is recommended that the Commission receive this report noting that: • The Transit City Priority Projects Phase 1 consists of: o The Sheppard East LRT from Don Mills Station to Conlins Road to be completed in mid-2014. o The Eglinton Crosstown LRT from Kennedy Station to Jane Street to be started in 2011 and completed in 2020. o The Finch West LRT from Keele Street to Humber College to be started in 2015 and completed in 2019. o The Scarborough RT from Kennedy Station to Sheppard Avenue to be started in 2015 and completed in 2020. • All four Priority Projects have been approved by Toronto Council. The Minister of the Environment has issued the Notice to Proceed for the Sheppard East LRT, Eglinton Crosstown LRT and Finch West LRT. • The contract awarded by Metrolinx to Bombardier for the Transit City Light Rail Vehicles provides for all four Priority Projects Phase 1 to be completed by 2020. • The Transit City Construction Methodology intended to minimize construction time and disruption is on track for the Sheppard East LRT and Eglinton Crosstown LRT contracts. • Significant progress has been made on the design and engineering of the Sheppard East and Eglinton Crosstown LRTs. • Transit City Community Relations and Local Outreach initiatives are establishing constructive relationships with the community and are ensuring that the benefits of the Transit City Projects are understood across communities. • The Metrolinx Investment Strategy is to be proposed by June, 2013.
    [Show full text]
  • CROSSTOWN LRT November 14, 2017
    CROSSTOWN LRT Science Centre Station & West At-Grade Surface Stops November 14, 2017 WHO IS METROLINX? PLAN BUILD OPERATE 2 THE NEXT REGIONAL TRANSPORTATION PLAN Metrolinx is currently in the process of updating the Regional Transportation Plan (RTP). The Draft Plan (2041) outlines how governments and transit agencies can work together to continue building an integrated transportation system to support a high quality of life, a prosperous and competitive economy, and a protected environment in our region. As the provincial agency mandated with improving the coordination and integration of all modes of transportation in the GTHA, Metrolinx has developed the Draft Plan for review in consultation with partners, stakeholders and the public. The Next RTP LEARN MORE, GET INVOLVED Metrolinx has just released its Draft 2041 Regional Plan which outlines how people and goods will move across our great region. Curious about what’s in the Draft 2041 Plan? You can review and comment on the plan at metrolinx.com/theplan and join us for one of our roundtable discussions, where you can share your views on the future of regional mobility. Other ways to stay engaged: • Visit metrolinxengage.com • Read our blog, The Link • Follow us on social media Continuing TTC rollout in 2017 What Are We Building – a New Modern LRT • 15 underground stations and 10 surface stops – 9 km below ground and 10 km above ground • A maintenance and storage facility • A 19-kilometre route separated from regular traffic • Transit communications system • Links to 54 bus routes, three subway stations, GO Transit, and a new UP Express station 6 Safety First – Our #1 Priority We train and direct staff to: • Always have a site specific safety plan and site specific emergency plan.
    [Show full text]
  • Eglinton Crosstown Update: Eastern Works (Victoria
    EGLINTON CROSSTOWN UPDATE: OPEN HOUSE MEETING EASTERN WORKS (VICTORIA PARK AVE. TO KENNEDY RD.) Metrolinx is building the Eglinton Crosstown, Toronto’s new 19-kilometre light rail transit (LRT) line that will run along Eglinton Avenue with a central 10 km underground section. The Crosstown will connect Mount Dennis in the west to Kennedy Road in the east, and the new service will be up to 60% faster than the bus service today. With 25 stations and stops and connections to 3 TTC subway stations, 54 local bus routes, 3 GO Transit lines and the UP Express, the Crosstown will improve travel times and change the way we move through the heart of the city. Join Metrolinx and its constructor, Crosslinx Transit Solutions (CTS), at the upcoming open house and learn about the progress at: Pharmacy Stop Hakimi Lebovic Stop Golden Mile Stop Birchmount Stop Ionview Stop Kennedy Station Join us to learn about: • current and upcoming construction in your neighbourhood; • construction impacts and who to contact if you have questions/concerns, and; • station progress, design and other informative pieces. When: Wednesday, November 21, 2018 6:30 p.m. to 8:00 p.m. Where: Eglinton Square Shopping Centre (Bay Corridor) 1 Eglinton Square Sign up at www.thecrosstown.ca/sign-up for construction updates and download the aCrosstown mobile app to get real-time traffic information for the Eglinton corridor. East Community Office Email: EGLINTON CROSSTOWN 660 Eglinton Avenue East [email protected] 416-482-7411 www.thecrosstown.ca facebook.com/thecrosstown twitter.com/crosstownTO.
    [Show full text]
  • Toronto Transit Commission/City of Toronto TRANSIT PROJECT
    Toronto Transit Commission/City of Toronto EGLINTON CROSSTOWN LIGHT RAIL TRANSIT TRANSIT PROJECT ASSESSMENT Environmental Project Report northwest corner of Eglinton Avenue and Croham Road. Interface with Existing Transit A bus loop is proposed adjacent to Caledonia Station to provide a direct connection between the Eglinton Crosstown LRT with the existing Route 47B and Route 47C (Lansdowne) buses which currently travel in a north-south direction on Caledonia Road. The proposed bus loop is located at the northwest corner of Eglinton Avenue and Croham Road. Buses will travel counterclockwise through the loop, which will have one bus bay for passenger pickup/drop-off. To facilitate the proposed LRT/bus interface, the through bus services on Caledonia Road (47 Lansdowne) will be rerouted via Eglinton Avenue to a bus loop located east of the GO Rail line next to the main entrance. Northbound and southbound buses on Caledonia Road will turn west onto Eglinton Avenue, followed by a right turn north onto Croham Road then a left turn into the east end of the bus loop. After passing counterclockwise through the loop, buses will exit the bus loop by making an eastbound left turn onto Eglinton Avenue, and from there rejoin its regular route on Caledonia Road. In addition to the bus interface, there is potential for a future connection with GO Rail at Caledonia Station, which operates its Barrie service in the north-south rail corridor between Caledonia Station and the proposed bus loop. The potential future connection is shown in Exhibit 125 although exact connectivity will be subject to GO Rail alignment and platform configurations.
    [Show full text]
  • Mount Dennis Station
    IT’S HAPPENING, TODAY Forum Eglinton Crosstown LRT Metrolinx’s Core Business – Providing Better, Faster, Easier Service We have a strong connection with our Adding More Service Today Making It Easier for Our customers, and a Customers to Access Our great understanding Service of who they are and Building More to Improve Service where they are going. Planning for New Connections Investing in Our Future MISSION: VISION: WE CONNECT GETTING YOU THERE COMMUNITIES BETTER, FASTER, EASIER 3 Read more about how Eglinton Crosstown will change Toronto’s cityscape here. Train Testing Video: Click Here 11 Eglinton Crosstown PROJECT UPDATE • The Eglinton Crosstown project is now over 75% complete. • Most stations will be complete in 2021, beginning with Mount Dennis, Keelesdale and Science Centre stations in the first half of the year. • More than 85% of track has been installed – track installation between EMSF and Cedarvale Station is complete. • 45 LRVs have arrived at the EMSF to date. • Vehicle testing is underway. EGLINTON MAINTENANCE AND STORAGE FACILITY (EMSF) Eglinton Crosstown What to Expect: Systems & Track 2021 Progress to-date Remaining Work for 2021 • Track installed between EMSF and Cedarvale Station, and • Track installation between Avenue Station and Mount between Laird Station and Kennedy Station Pleasant Station • Traction power cables installed from Mount Dennis Station to • Traction power cable installation from Caledonia Caledonia Station, and from Science Centre Station to Station to Avenue Station and from Mount Pleasant Kennedy
    [Show full text]
  • Conservation and the Crosstown: Exploring the Intersection of Retail Heritage and Transportation Infrastructure in Toronto
    CONSERVATION AND THE CROSSTOWN: EXPLORING THE INTERSECTION OF RETAIL HERITAGE AND TRANSPORTATION INFRASTRUCTURE IN TORONTO By: Sophia Sousa Supervised By: Laura E. Taylor A Major Paper submitted to the Faculty of Environmental Studies in partial fulfillment of the requirements for the degree of Master in Environmental Studies York University, Toronto, Ontario, Canada November 29, 2018 CONTENTS CONTENTS LIST OF FIGURES .............................................................................................................................................. i ACKNOWLEDGEMENTS .................................................................................................................................. ii ABSTRACT ..................................................................................................................................................... iii FOREWORD ................................................................................................................................................... iv INTERSECTING THE PLAN OF STUDY .......................................................................................................... v INTRODUCTION .............................................................................................................................................. 1 METHODOLOGY ........................................................................................................................................ 6 CHAPTER 1 ...................................................................................................................................................
    [Show full text]