Eglinton Crosstown Update: Eastern Works (Victoria

Total Page:16

File Type:pdf, Size:1020Kb

Eglinton Crosstown Update: Eastern Works (Victoria EGLINTON CROSSTOWN UPDATE: OPEN HOUSE MEETING EASTERN WORKS (VICTORIA PARK AVE. TO KENNEDY RD.) Metrolinx is building the Eglinton Crosstown, Toronto’s new 19-kilometre light rail transit (LRT) line that will run along Eglinton Avenue with a central 10 km underground section. The Crosstown will connect Mount Dennis in the west to Kennedy Road in the east, and the new service will be up to 60% faster than the bus service today. With 25 stations and stops and connections to 3 TTC subway stations, 54 local bus routes, 3 GO Transit lines and the UP Express, the Crosstown will improve travel times and change the way we move through the heart of the city. Join Metrolinx and its constructor, Crosslinx Transit Solutions (CTS), at the upcoming open house and learn about the progress at: Pharmacy Stop Hakimi Lebovic Stop Golden Mile Stop Birchmount Stop Ionview Stop Kennedy Station Join us to learn about: • current and upcoming construction in your neighbourhood; • construction impacts and who to contact if you have questions/concerns, and; • station progress, design and other informative pieces. When: Wednesday, November 21, 2018 6:30 p.m. to 8:00 p.m. Where: Eglinton Square Shopping Centre (Bay Corridor) 1 Eglinton Square Sign up at www.thecrosstown.ca/sign-up for construction updates and download the aCrosstown mobile app to get real-time traffic information for the Eglinton corridor. East Community Office Email: EGLINTON CROSSTOWN 660 Eglinton Avenue East [email protected] 416-482-7411 www.thecrosstown.ca facebook.com/thecrosstown twitter.com/crosstownTO.
Recommended publications
  • City of Toronto — Detached Homes Average Price by Percentage Increase: January to June 2016
    City of Toronto — Detached Homes Average price by percentage increase: January to June 2016 C06 – $1,282,135 C14 – $2,018,060 1,624,017 C15 698,807 $1,649,510 972,204 869,656 754,043 630,542 672,659 1,968,769 1,821,777 781,811 816,344 3,412,579 763,874 $691,205 668,229 1,758,205 $1,698,897 812,608 *C02 $2,122,558 1,229,047 $890,879 1,149,451 1,408,198 *C01 1,085,243 1,262,133 1,116,339 $1,423,843 E06 788,941 803,251 Less than 10% 10% - 19.9% 20% & Above * 1,716,792 * 2,869,584 * 1,775,091 *W01 13.0% *C01 17.9% E01 12.9% W02 13.1% *C02 15.2% E02 20.0% W03 18.7% C03 13.6% E03 15.2% W04 19.9% C04 13.8% E04 13.5% W05 18.3% C06 26.9% E05 18.7% W06 11.1% C07 29.2% E06 8.9% W07 18.0% *C08 29.2% E07 10.4% W08 10.9% *C09 11.4% E08 7.7% W09 6.1% *C10 25.9% E09 16.2% W10 18.2% *C11 7.9% E10 20.1% C12 18.2% E11 12.4% C13 36.4% C14 26.4% C15 31.8% Compared to January to June 2015 Source: RE/MAX Hallmark, Toronto Real Estate Board Market Watch *Districts that recorded less than 100 sales were discounted to prevent the reporting of statistical anomalies R City of Toronto — Neighbourhoods by TREB District WEST W01 High Park, South Parkdale, Swansea, Roncesvalles Village W02 Bloor West Village, Baby Point, The Junction, High Park North W05 W03 Keelesdale, Eglinton West, Rockcliffe-Smythe, Weston-Pellam Park, Corso Italia W10 W04 York, Glen Park, Amesbury (Brookhaven), Pelmo Park – Humberlea, Weston, Fairbank (Briar Hill-Belgravia), Maple Leaf, Mount Dennis W05 Downsview, Humber Summit, Humbermede (Emery), Jane and Finch W09 W04 (Black Creek/Glenfield-Jane
    [Show full text]
  • Connecting the Region
    EGLINTON CROSSTOWN CONSTRUCTION UPDATE EASTERN WORKS OPEN HOUSE | APRIL 9, 2020 WELCOME Our Eastern Works Open House will feature the following stations and stops: • Science Centre • Aga Khan Park & Museum, Wynford, Sloane, O’Connor • Pharmacy , Hakimi Lebovic, Golden Mile, Birchmount, Ionview • and Kennedy. 2 COVID-19 MANAGEMENT • Crosslinx Transit Solutions (CTS) has been exercising all safety protocols on-site including social distancing. • For more information on CTS’ COVID-19 Management, please visit their website: http://www.crosslinxtransit.ca/wp-content/uploads/CTS_COVID- 19_mobile_v2.png EGLINTON CROSSTOWN LRT PROJECT • A 19-kilometre route separated from regular traffic • 10-kilometres underground; 9-kilometres at surface in east • 15 underground stations and 10 surface stops • A maintenance and storage facility • Transit communications system • Links to 54 bus routes, 3 subway stations, GO Transit, UP Express station PROJECT PROGRESS Maintenance and Storage Facility complete 12 vehicles received 50% of track installed Mining complete at Laird and Oakwood stations Deep excavation underway or complete at all stations 2019 PROJECT HIGHLIGHTS FIRST LIGHT RAIL VEHICLE ON MAINLINE 8 9 10 SCIENCE CENTRE STATION RENDERINGS AERIAL VIEW MAIN ENTRANCE WEST PORTAL LOBBY BUS TERMINAL SCIENCE CENTRE STATION: WHAT TO EXPECT Year What to Expect • Completion of all structural concrete works 2019 Milestones • Completion of support of excavation • Completion of excavation • Interior works at Station Box • Interior and exterior finishes as Main Entrance • Track work and rail installation Remaining Work • Waterproofing and backfill for 2020 • Permanent road restoration • Substantial completion late 2020 SCIENCE CENTRE STATION PROGRESS PHOTOS WALL TILING AT THE MAIN ENTRANCE GLAZING AT THE BUS TERMINAL Aga Khan & Museum Stop to O’Connor Stop (Don Valley Parkway to Victoria Park Ave) Brentcliffe Portal AGA KHAN PARK & MUSEUM STOP RENDERINGS SIDEWALK PLATFORM AERIAL VIEW WYNFORD STOP RENDERINGS SIDEWALK PLATFORM .
    [Show full text]
  • CROSSTOWN LRT TOWN HALL April 2019 Agenda
    CROSSTOWN LRT TOWN HALL April 2019 Agenda 7:00 to 7:30 – View Deck 7:30 to 8:00 – Presentation 8:00 to 8:30 – Question & Answer 2 Eglinton Crosstown Overview • 19 km route separated from regular traffic • 10-kilometres underground; 9-kilometres at surface east of Laird • 15 underground stations and 10 surface stops • 20,000 m2 maintenance and storage facility to maintain and house 76 vehicles • Transit communications system • Links to 54 bus routes, 3 subway stations, GO Transit, UP Express station 3 Eglinton Avenue East - Final Configuration O’Connor Stop at Victoria Park and Eglinton Avenue 4 Eglinton Avenue East - At-Grade Construction • Major work will be occurring at intersection between Leslie and Ionview throughout 2019 • LRT guideway will be constructed in the middle of Eglinton and track will be installed • The work takes place in two stages – paving, followed by guideway construction and track installation 5 2019 Construction Schedule – Leslie to Ionview Road 6 Sunnybrook Park Stop – Leslie/Eglinton 7 July-August Traffic Restriction - Leslie/Eglinton • Crosslinx is seeking city permits for a temporary eight week restriction on vehicles travelling between Leslie Street & Eglinton Avenue East • Allows for LRT guideway construction & track installation. • Eglinton Avenue will remain open in both directions at all times. • Leslie Street will otherwise function normally. • Traffic lanes will open up & turn restrictions will be lifted at Bayview/Eglinton & Don Mills/Eglinton before the Leslie work starts. • Proposed timeline is during the lowest traffic volume months. 8 8 July-August Traffic Restriction - Leslie/Eglinton • Emergency services access to and from Eglinton Avenue will be maintained at all times.
    [Show full text]
  • Revised Recommendations: Eglinton Crosstown LRT Stations Naming
    STAFF REPORT To: Metrolinx Board of Directors From: Leslie Woo, Chief Planning Officer Date: January 14, 2016 Re: Revised Recommendations: Eglinton Crosstown LRT Stations and Stops Naming Executive Summary: Staff is seeking final approval of Eglinton Crosstown LRT station and stop names (Appendix A). The December 3, 2015 report of the Chief Planning Officer recommended Eglinton Crosstown LRT Station and Stop Names based on the Naming Principles and Protocols developed following a 12 month (between late 2014 and late 2015) long engagement process with GTHA local transit operators (Appendix B). The public was encouraged to provide feedback on proposed station and stop names online in October 2015. The Toronto Transit Commission also provided its own recommendations on the proposed names at its meeting of November 23, 2015. At the December 3, 2015 Board meeting, three recommended location names were questioned: Lebovic, Forest Hill and Fairbank and staff were to report back on the basis of this Board feedback. Since the December 3, 2015 meeting staff undertook: • a deeper analysis and exploration of possible alternative names for these three locations; and • sought additional feedback from local councillors and MPPs on the three locations. The revised recommendations are i) to use Hakimi in place of Lebovic; ii) no change be made to Forest Hill; and iii) no change be made to Fairbank. In addition, staff plan to use in-station way-finding to assist customers in navigating between stations and the surface street system. As well, Toronto Councillor Thompson raised the question on the naming of the “Golden Mile” station. No change is being proposed by staff.
    [Show full text]
  • The People of Scarborough
    ~THE SCARf>OROUGH PuBLIC LIBF{\RY I BOARP THE PEOPLE OF SCARBOROUGH Map of Scarborough ,.; .; .,; ::. .,; .,; .,; "'""- :;, -< "" -< "" "" 'ti "" "" S.teele~ Ave. V IV Finch Avenue III Sileppail.d Ave. 11 D St. REFERENCE POINTS 1. Thomson Park Z. Bluffer's Park J 3. civic Centre 4. Kennedy Subway 5. Metro Zoo Ikml 6. Guild Inn 1 mile! Map of Scarborough courtesy of Rick Schofield, Heritage Scarborough THE PEOPLE OF SCARBOROUGH The City of Scarborough Public Library Board Copyright© The City of Scarborough Public Library Board 1997 All rights reserved. No part of this publication may be reproduced, stored in a retrieval system or transmitted in any form or by any means, electronic, mechanical, by photocopying, recording or otherwise for purposes of resale. Published by The City of Scarborough Public Library Board Grenville Printing 25 Scarsdale Rd. Don Mills, Ontario M3B 2R2 Raku ceramic Bicentennial Collector Plate and cover photo by Tom McMaken, 1996. Courtesy of The City of Scarborough. Canadian Cataloguing in Publication Data Myrvold, Barbara The People of Scarborough: a history Includes index. ISBN 0-9683086-0-0 1. Scarborough (Ont.) - History. I. Fahey, Curtis, 1951- . II Scarborough Public Library Board. III. Title. FC3099.S33M97 1997 971.3'541 C97-932612-5 F1059.5.T686S35 1997 iv Greetings from the Mayor As Mayor of the City of Scarborough, and on behalf of Members of Council, I am pleased that The People of Scarborough: A History, has been produced. This book provides a chronological overview of the many diverse peoples and cultures that have contributed to the city's economic, cultural and social fabric.
    [Show full text]
  • Low Other* Dwelling Density Availability of Destinations
    21 24 116 130 2 35 36 50 49 48 27 131 22 34 37 117 129 3 25 51 52 47 46 4 132 26 38 53 118 1 5 33 40 128 135 134 23 39 45 6 29 113 28 32 105 133 31 41 42 119 126 137 7 8 30 103 127 136 115 112 108 102 43 125 100 138 140 11 10 110 109 101 99 44 9 111 107 104 56 55 139 106 124 Dwelling Availability of 91 92 97 54 120 density destinations 13 90 94 96 58 123 15 89 98 57 High - High 12 114 93 59 60 14 88 95 67 61 121 83 74 66 High - Low 87 80 79 71 68 69 62 16 75 64 122 86 84 81 78 76 65 Low - High 7372 63 85 70 Low - Low 20 17 82 77 Other* 18 19 0 2.5 5 km * Indicates DB belonged to the middle quintile of Neighbourhoods dwelling density and/or availability of destinations 1 West Humber-Clairville 25 Glenfield-Jane Heights 49 Bayview Woods-Steeles 73 Moss Park 96 Casa Loma 121 Oakridge 2 Mount Olive-Silverstone- 26 Downsview-Roding-CFB 50 Newtonbrook East 74 North St. James Town 97 Yonge-St.Clair 122 Birchcliffe-Cliffside Jamestown 27 York University Heights 51 Willowdale East 75 Church-Yonge Corridor 98 Rosedale-Moore Park 123 Cliffcrest 3 Thistletown-Beaumond Heights 28 Rustic 52 Bayview Village 76 Bay Street Corridor 99 Mount Pleasant East 124 Kennedy Park 4 Rexdale-Kipling 29 Maple Leaf 53 Henry Farm 77 Waterfront Communities- 100 Yonge-Eglinton 125 Ionview 5 Elms-Old Rexdale 30 Brookhaven-Amesbury 54 O'Connor-Parkview The Island 101 Forest Hill South 126 Dorset Park 6 Kingsview Village-The Westway 31 Yorkdale-Glen Park 55 Thorncliffe Park 78 Kensington-Chinatown 102 Forest Hill North 127 Bendale 7 Willowridge-Martingrove-Richview 32 Englemount-Lawrence
    [Show full text]
  • CROSSTOWN LRT November 14, 2017
    CROSSTOWN LRT Science Centre Station & West At-Grade Surface Stops November 14, 2017 WHO IS METROLINX? PLAN BUILD OPERATE 2 THE NEXT REGIONAL TRANSPORTATION PLAN Metrolinx is currently in the process of updating the Regional Transportation Plan (RTP). The Draft Plan (2041) outlines how governments and transit agencies can work together to continue building an integrated transportation system to support a high quality of life, a prosperous and competitive economy, and a protected environment in our region. As the provincial agency mandated with improving the coordination and integration of all modes of transportation in the GTHA, Metrolinx has developed the Draft Plan for review in consultation with partners, stakeholders and the public. The Next RTP LEARN MORE, GET INVOLVED Metrolinx has just released its Draft 2041 Regional Plan which outlines how people and goods will move across our great region. Curious about what’s in the Draft 2041 Plan? You can review and comment on the plan at metrolinx.com/theplan and join us for one of our roundtable discussions, where you can share your views on the future of regional mobility. Other ways to stay engaged: • Visit metrolinxengage.com • Read our blog, The Link • Follow us on social media Continuing TTC rollout in 2017 What Are We Building – a New Modern LRT • 15 underground stations and 10 surface stops – 9 km below ground and 10 km above ground • A maintenance and storage facility • A 19-kilometre route separated from regular traffic • Transit communications system • Links to 54 bus routes, three subway stations, GO Transit, and a new UP Express station 6 Safety First – Our #1 Priority We train and direct staff to: • Always have a site specific safety plan and site specific emergency plan.
    [Show full text]
  • Attachment 2: Draft Zoning By-Law Amendments to All Applicable General Zoning By-Laws Permit Short-Term Rentals
    Attachment 2 Attachment 2: Draft Zoning By-law Amendments to all Applicable General Zoning By-laws Permit Short-term Rentals Authority: Planning and Growth Management Committee Item PGXX.X, as adopted by City of Toronto Council on Month Date, 2017. CITY OF TORONTO Bill No. BY-LAW No. XXXX-2017 To amend Zoning By-laws City of Toronto 569-2013; former City of Toronto by-law 438- 86; Harbourfront by-law 289-93; Railway Lands East Area 'A' by-law 168-93; Railway lands West by-law 1994-0805; Railway Lands Central by-law 1994-0806; former City of York 1-83; former City of North York by-law 6752; former town of Leaside by-law 1916; former Town of East York by-law 7625; former City of Etobicoke Zoning Code; former City of Scarborough Employment Districts by-law 2482; former City of Scarborough, Agincourt Community, by-law 10076; former City of Scarborough, Agincourt North Community, by-law 12797; former City of Scarborough, Bendale Community by-law 9530; former City of Scarborough, Birchcliff Community by-law 8786; former City of Scarborough, Birchmount Park by-law 9174; former City of Scarborough, Centennial Community by-law 12077; former City of Scarborough, Clairlea Community by-law 8978; former City of Scarborough, Cliffcrest Community by-law 9396; former City of Scarborough, Cliffside Community by-law 9364; former City of Scarborough, Dorset Park Community by-law 9508; former City of Scarborough, Eglinton Community by-law 10048; former City of Scarborough, Guildwood Community by-law 9676; former City of Scarborough, Highland Creek Community by-law 10827; former City of Scarborough, Ionview Community by-law 9089; former City of Scarborough, Kennedy Park Community by-law 9276; former City of Scarborough, L'Amoreaux Community by-law 12466; former City of Scarborough, Malvern Community by-law 14402; former City of Scarborough, Malvern West Community by-law 12181; former City of Scarborough, Midland-St.
    [Show full text]
  • Train Testing Video: Click Here
    IT’S HAPPENING, TODAY Forum Eglinton Crosstown LRT Metrolinx’s Core Business – Providing Better, Faster, Easier Service We have a strong connection with our Adding More Service Today Making It Easier for Our customers, and a Customers to Access Our great understanding Service of who they are and Building More to Improve Service where they are going. Planning for New Connections Investing in Our Future MISSION: VISION: WE CONNECT GETTING YOU THERE COMMUNITIES BETTER, FASTER, EASIER 3 Train Testing Video: Click Here 6 Eglinton Crosstown Supports for Community • The Eglinton Crosstown LRT Project contractually requires the constructor, Crosslinx Transit Solutions Constructors (CTSC), to embed community benefits in their work, including ensuring that local communities and historically disadvantaged groups benefit directly from the province’s $5.3 billion investment. • We are committed to making the pathway to professional, administrative and technical (PAT) roles in the construction industry more accessible to people facing barriers to employment. • CTS has hired 209 people in PAT roles to date, as well as 185 apprentices and journey persons from historically disadvantaged and equity seeking groups. • We are committed to supporting small and medium sized businesses along the Eglinton corridor, businesses impacted by our construction, and social enterprises that create employment and training opportunities for people who face systemic barriers to employment. • CTS has spent more than $800,000 on social enterprises and more than $7 million at local businesses. EGLINTON CROSSTOWN Eglinton Crosstown COVID-19 Construction Safety • With construction remaining classified as an essential industry, work on the Eglinton Crosstown LRT continues through the COVID-19 pandemic.
    [Show full text]
  • ECLRT Environmental Report Cover.Ai
    Transit City Eglinton Crosstown Light Rail Transit EGLINTON CROSSTOWN LRT Transit Project Assessment Study Eglinton Crosstown An agency of the Government of Ontario TCG Transit City Group ENVIRONMENTAL PROJECT REPORT March 2010 N T A R I O E O L A K Toronto Transit Commission/City of Toronto EGLINTON CROSSTOWN LIGHT RAIL TRANSIT TRANSIT PROJECT ASSESSMENT ENVIRONMENTAL PROJECT REPORT ENVIRONMENTAL PROJECT REPORT MARCH 2010 Toronto Transit Commission/City of Toronto EGLINTON CROSSTOWN LIGHT RAIL TRANSIT TRANSIT PROJECT ASSESSMENT Environmental Project Report 2.2 Feasibility Studies ............................................................................................................... 17 TABLE OF CONTENT 2.2.1 Renforth to Kennedy Station ............................................................................................... 17 1. INTRODUCTION .................................................................................................................................. 1 2.2.2 Airport Link Pearson International Airport to Martin Grove ................................................... 17 1.1 Study Purpose ...................................................................................................................... 1 2.2.3 Key Challenges and Constraints ......................................................................................... 18 1.2 Study Scope ......................................................................................................................... 1 2.2.4 Options ..............................................................................................................................
    [Show full text]
  • The Hidden Epidemic: a Report on Child and Family Poverty in Toronto
    DIVIDED CITY: Life in Canada’s Child Poverty Capital 2016 Toronto Child and Family Poverty Report Card DIVIDED CITY: Life in Canada’s Child Poverty Capital 2016 Toronto Child and Family Poverty Report Card November 2016 1 DIVIDED CITY: Life in Canada’s Child Poverty Capital 2016 Toronto Child and Family Poverty Report Card Acknowledgements This report was researched and written by a working group that included: Michael Polanyi Community Development and Prevention Program, Children’s Aid Society of Toronto Jessica Mustachi Family Service Toronto (Ontario Campaign 2000) michael kerr Colour of Poverty – Colour of Change Sean Meagher Social Planning Toronto Research and data analysis support provided by the City of Toronto is gratefully acknowledged. Financial support was provided by the Children’s Aid Society of Toronto and the Children’s Aid Foundation. Design support was provided by Peter Grecco. We thank Ann Fitzpatrick, Said Dirie, Sharon Parsaud and Beth Wilson for their assistance with, and review of, the report. Data and mapping support for the transit section of the report from Steve Farber and Jeff Allen, Department of Human Geography, University of Toronto, Scarborough, is gratefully acknowledged. Data support for housing provided by Scott Leon, Wellesley Institute. 2 DIVIDED CITY: Life in Canada’s Child Poverty Capital 2016 Toronto Child and Family Poverty Report Card Contents Executive Summary 4 1. Introduction 6 2. Unequal Child and Family Incomes 8 3. Unequal Educational and Recreational Opportunities 14 4. Unequal Access to
    [Show full text]
  • EXECUTIVE SUMMARY Amendment
    Toronto Transit Commission/City of Toronto EGLINTON CROSSTOWN LIGHT RAIL TRANSIT TRANSIT PROJECT ASSESSMENT Environmental Project Report and buses. The connection of the Eglinton Crosstown LRT to Kennedy Station will be the subject of an EA EXECUTIVE SUMMARY amendment. E.1. INTRODUCTION The connection of the Eglinton Crosstown LRT with the Airport Terminal lands will be determined following completion of Metrolinx‟s Airport Precinct Study and the Greater Toronto Airports Authority Transportation The Toronto Transit Commission (TTC) and City of Toronto have undertaken a Transit Project Assessment Master Plan. Subsequently, TTC and the City will comply with applicable environmental assessment for the 33 kilometre long Eglinton Crosstown Light Rail Transit (Eglinton Crosstown LRT) corridor that regulations for the finalization of the alignment on the federally-owned airport lands. would link the Pearson International Airport with the Kennedy Station. The Eglinton Crosstown LRT will connect with the Spadina Subway Line, the Yonge Subway Line, the Scarborough RT and the planned The preferred connection of the Eglinton Crosstown LRT with the TTC Maintenance and Storage Facility at Jane Street LRT, Don Mills Road LRT, Scarborough-Malvern LRT, and Mississauga BRT. This study Black Creek Drive is reflected in this Transit Project Assessment, although the TTC Maintenance and recommends that bus services along Eglinton Avenue be replaced by Light Rail Transit (LRT) with Storage Facility itself is undergoing a separate environmental assessment. electrically
    [Show full text]