35 CFR Ch. I (7–1–98 Edition)
Total Page:16
File Type:pdf, Size:1020Kb
§ 109.5 35 CFR Ch. I (7±1±98 Edition) (b) The number of Canal deckhands not less than 100 square inches (645 to be placed on board a transiting ves- square centimeters) in areaÐpreferred sel to assist her crew in handling tow- dimensions are 12 x 9 inches (305 x 229 ing wires in the locks. millimeters)Ðand shall be capable of withstanding a strain of 100,000 pounds § 109.5 Ship's gear to be ready during (43,331 kilograms) on a towing wire transit; test. from any direction. Before beginning transit of the (e) Chocks designated as double Canal, a vessel shall have hawsers, chocks shall have a throat opening of lines and fenders ready for passing not less than 140 square inches (903 through the locks, for warping, towing, square centimeters) in areaÐpreferred or mooring as the case may be; and dimensions are 14 x 10 inches (356 x 254 shall have both anchors ready for let- millimeters)Ðand shall be capable of ting go. The Master shall assure him- withstanding a strain of 140,000 pounds self, by actual test, of the readiness of (64,000 kilograms) on the towing wires his vessel's main engines, steering from any direction. gear, engine room telegraphs, whistle, (f) Use of roller chocks is permissible rudder-angle and engine-revolution in- provided they are not less than 14.94 dicators, and anchors. During the tran- meters (49 feet) above the waterline at sit, at all times while a vessel is under- the vessel's maximum Panama Canal way or moored against the lock walls, draft and provided they are in good her deck winches, capstans, and other condition, meet all of the requirements power equipment for handling lines, as for solid chocks as specified in para- well as her mooring bitts, chocks, graphs (a), (b), (c), and (d) of this sec- cleats, hawse pipes, etc., shall be ready tion, as the case may be, and are so for handling the vessel, to the exclu- fitted that transition from the rollers sion of all other work. to the chock body will prevent damage to towing wires. § 109.6 Construction, number, and lo- (g) Each single chock shall have an cation of chocks and bitts. accompanying bitt capable of with- (a) The Canal Operations Captain or standing a strain of 100,000 pounds designee is responsible for determining (45,331 kilograms). if vessels arriving for transit are prop- (h) Each double chock located at the erly equipped. That official is also re- stem and at the stern, in accordance sponsible for the approval of new con- with paragraph (h) of this section, shall struction requirements concerning have two pairs of heavy bitts with each chocks and bitts which are utilized for bitt of each pair capable of withstand- locomotives and tugs, relay operations, ing a strain of 100,000 pounds (45,331 tie-up operations, boarding facilities, kilograms). Other double chocks shall and wheelhouse design features, includ- have a pair of heavy bitts with each ing visibility factors. bitt capable of withstanding a strain of (b) All chocks for towing wires shall 100,000 pounds (45,331 kilograms). be of heavy closed construction and (i) All vessels, except a vessel not re- shall have a convex bearing surface quiring locomotives, shall be fitted with a radius of not less than seven with a double chock set athwartships inches (178 millimeters). The convex right in the stem and another double surface shall extend so that a wire chock set athwartships right in the from the bitt, or from the towing loco- stern, except that on vessels of less motive through the chock, shall be than 75 feet beam, two single chocks tangent to the seven-inch (178 millime- may be substituted for each double ter) radius at any angle up to 90 de- chock required by this subsection; on grees with respect to a straight line vessels of over 75 feet beam, two double through the chock. chocks may be substituted for each (c) No part of the vessel which may double chock required by this section. be contacted by the towing wires, at If such substitution is made, the any angle, shall have less than a seven- chocks shall be placed port and star- inch radius. board not more than eight feet abaft (d) Chocks designated as single the stem or 10 feet forward of the stern, chocks shall have a throat opening of provided that these chocks are not 92 VerDate 10<AUG>98 09:52 Aug 10, 1998 Jkt 179133 PO 00000 Frm 00086 Fmt 8010 Sfmt 8010 Y:\SGML\179133T.XXX pfrm02 PsN: 179133T Panama Canal Regulations § 109.6 more than 10 feet from the center line for correct positioning of assisting tugs of the vessel. or may be required to fit recessed tug (j) Vessels under 60.06 meters (200 bollards into the hull so the tugs can feet) in length and not exceeding 9.14 work without coming in contact with meters (30 feet) in beam shall have a the bow flare or having extra long lines double chock or two single chocks at and/or inefficient leads. the stem and stern. If the vessel is (o) A vessel not requiring loco- equipped with the two single chocks, motives shall have a chock arrange- they shall be placed, port and star- ment similar to that described in para- board, not more than eight feet abaft graph (i) of this section, except that the stem or 10 feet forward of the stern, the chocks need only be single chocks and not more than 10 feet off the center or, if approved by the Canal authori- line. ties, of lesser strength. (k) Vessels 60.96 to 121.92 meters (200 (p) Any vessel which fails to meet the to 400 feet) in length and not exceeding requirements of this section may be de- 22.86 meters (75 feet) in beam shall have nied transit. If the Marine Director or a double chock at the stem and at the his representative decides that such a stern or two single chocks at the bow vessel can be handled without undue and stern, port and starboard, not more danger to equipment or to personnel, than eight feet abaft the stem or 10 notwithstanding her failure to comply feet forward of the stern and not more with the requirements of this section, than 10 feet off the center line and and allows it to transit, such vessel shall have two additional single may do so only at its own risk and, to chocks, port and starboard, nine to 16 the extent and in proportion that such meters (30 to 50 feet) abaft the stem failure to meet the requirements of and nine to 16 meters (30 to 50 feet) for- this section proximately causes or con- ward of the stern. tributes to the casualty and resulting (l) Vessels 121.92 to 173.74 meters (400 damages, the Master of such vessel, on to 570 feet) long and not more than behalf of said vessel, her owners, opera- 22.86 meters (75 feet) in beam shall have tors, or any other persons having any a double chock at the stem and stern interest in her, and for himself, will be or two single chocks at the bow and considered to have released the Pan- stern, port and starboard, and in addi- ama Canal Commission and the United tion shall have a chock, port and star- States from, and to have indemnified board, 12 to 16 meters (40 to 50 feet) them against, any loss, damage, or li- abaft the stem, a single chock port and ability incurred by the Commission or starboard, 24 to 28 meters (80 to 90 feet) the United States under, or in respect abaft the stem, and a single chock, to: port and starboard, 12 to 16 meters (40 (1) Section 1411 through 1416, inclu- to 50 feet) forward of the stern. sive, of Pub. L. 96±70, 93 Stat. 485±87; (m) Vessels over 173.74 meters (570 (2) Property of Panama Canal Com- feet) long or 22.86 meters (75 feet) in mission or the United States; and beam or over shall have a double chock (3) Panama Canal Commission em- at the stem and stern; a double chock, ployees under the Federal Employees' port and starboard, 12 to 16 meters (40 Compensation Act, 5 U.S.C. 8101, et seq., to 50 feet) abaft the stem; a single or any other employee compensation chock, port and starboard, 24 to 28 me- system. ters (80 to 90 feet) abaft the stem; a The Master of the vessel that fails to double chock, port and starboard, 12 to meet the requirements of this section 16 meters (40 to 50 feet) forward of the may be required to execute, in the stern and a single chock, port and star- presence of a Commission official, a board, 24 to 28 meters (80 to 90 feet) for- form undertaking to release the Pan- ward of the stern. ama Canal Commission and the United (n) Vessels with large flared bows or States from liability in case of an acci- unusually high freeboard such as con- dent and to indemnify the Commission tainer vessels or vehicle carriers will and the United States for damages sus- be required to provide single closed tained. The failure of the Master of a chocks located further aft than those vessel to sign such a form, however, required in paragraph (l) of this section will not relieve the vessel, her owners, 93 VerDate 10<AUG>98 09:52 Aug 10, 1998 Jkt 179133 PO 00000 Frm 00087 Fmt 8010 Sfmt 8010 Y:\SGML\179133T.XXX pfrm02 PsN: 179133T § 109.7 35 CFR Ch.