Official Journal C 122 Volume 40 of the European Communities 19 April 1997

Total Page:16

File Type:pdf, Size:1020Kb

Official Journal C 122 Volume 40 of the European Communities 19 April 1997 ISSN 0378-6986 Official Journal C 122 Volume 40 of the European Communities 19 April 1997 English edition Information and Notices Notice No Contents page I Information Commission 97/C 122/01 Publication of main points of decisions to grant financial assistance under Regulation ( EC ) No 1164/94 establishing a Cohesion Fund 1 EN Price: ECU 25 19 . 4 . 97 EN Official Journal of the European Communities No C 122/1 I (Information) COMMISSION Publication of main points of decisions to grant financial assistance under Regulation ( EC ) No 1164/94 establishing a Cohesion Fund ( 97/C 122/01 ) LIST OF PROJECTS Page Page SPAIN 95/09/61 /005 80 96/11/61/007 2 96/09/61/085 81 96/11/61/009 4 96/11/61 /012 7 93/09/65/011 and 94/09/65/011 83 96/11/61 /015-017 10 96/11/61 /019-1 15 94/09/65/010 85 96/11/61 /019-2 17 94/09/65/0 12a and 012b 87 96/11 /61/020 19 94/09/65/012-c 89 96/11/61 /021 21 94/09/6 5/0 12-d 91 96/11/61 /023 24 94/09/65/0 12-e 92 96/11/61/024 26 94/09/65/0 12-f 94 96/11/61/026 30 94/09/65/0 13-a 95 96/11/61 /027 35 94/09/65/0 13-b 97 96/11 /61 /030-1 38 94/09/65/028-a 99 96/11 /61/030-2 41 94/09/65/028-b 100 96/ 11 /61 /036 45 94/09/65/028-c 102 96/11 /61/038 47 96/11 /61 /051 49 96/11/61/052 53 IRELAND 95/07/65/006 104 GREECE 93/09/61/023 57 93/09/61 /044 . 59 PORTUGAL 94/09/61 /015 60 93/10/61/014 and 96/10/61 /018 105 94/09/61/015-2a 62 94/09/61/019 63 95/10/61 /008 107 94/09/61/026-1 65 95/10/61/023 109 94/09/61 /042-1 66 95/10/61 /028 Ill 94/09/61 /046-1 68 94/09/61/055-4 69 96/10/61 /008 113 94/09/61/057 70 96/10/61/019 114 94/09/61/064-1 72 94/09/61 /074-1 73 95/10/65/003 116 94/09/61 /074-2 75 94/09/61/078 and 027-3 76 96/10/65/001 117 94/09/61 /079 78 96/10/65/002 119 No C 122/2 | EN Official Journal of the European Communities 19 . 4 . 97 PROJET No : 96/ 11 /61/007 1 . Name: — have six production lines , each with a capacity of 7 000 m 3/day, Water supply system : 'Bahia de Palma ( Calvía ) De-salination plant' — use porous fibre membranes . 2 . Body responsible for the application: 6 . Objectives: 2.1 . Name: Direccion General de The principal aims are to Planificación — supply 42 000 m /day of drinking water 2.2 . Address : Paseo de la Castellana , 162 to a population of 345 374 suffering from 28071 Madrid drought, 3 . Body responsible for the implementation: — construct an infrastructure of 25 000 m of piping and various pumping stations , reservoirs 3.1 . Name: Direccion General de Obras and other ancillary facilities necessary for the Hidraúlicas ( MOPT y MA ) supply of water to and the sustainable development of the town , 3.2 . Address: Paseo de la Castellana , 67 28071 Madrid — improve urban water supplies , — improve water quality, 4 . Location: — improve the hygiene and living conditions of 4.1 . Member State: Spain the communities concerned , 4.2 . Region : Balearic Islands — increase the availability of water by Municipality: Palma de Mallorca und Calvia economizing and coordinating its use , — improve the management and use of water 5 . Description: resources . It is planned to build a sea-water de-salination plant with an initial capacity of 42 000 m 3/day, 7 . Work schedule: later to be increased by a further 21 000 m3/day, to supply Bahía de Palma ( Palma y Calvía in the Category of work Commencement Completion Balearic Islands ). Main work 1 . 6 . 1996 30 . 6 . 1998 The work will involve : — sea-water supply , 8 . Economic and social cost-benefit analysis: — the de-salination unit itself ( construction work and installation of equipment ), A cost-benefit analysis has been carried out on the — electrical equipment and connections, basis of the following : — control systems and equipment, — investment and operating costs , — pumping system to carry de-salinated water to — guaranteed water supplies , the Pont D'Inca and Calvía reservoirs, — improved water quality , — a 30 000 m 3 capacity reservoir in Calvía . — reduction in over-exploitation of aquifers . The de-salination unit will be located in the Municipality of Palma de Mallorca and will : The internal rate of return is good at 20,8 % . — operate on external power, 9 . Environmental impact assessment: — de-salinate by reverse osmosis, • — produce 42 000 m 3/day during the first stage The project will significantly improve and an additional 21 000 m 3 during the second infrastructures in the area concerned and will , in stage , particular : — reduce salt content to a maximum of 200 — improve the well-being of the population ppm, which is suffering from water restrictions , 19 . 4 . 97 EN Official Journal of the European Communities No C 122/3 overcome the limits and restrictions that the The project complies with the requirements for the shortage of water is placing on the growth and quality of surface water used for the production of development of various sectors of the drinking water laid down in Council Directive economy . 75/442/EEC . The individual measures making up this group of 10 . Cost and assistance: projects are included in the preliminary plans set out in the hydrological plan for the basin and the National Hydrological Plan , thus ensuring Total cost : ECU 41 256 871 coherence with the national hydrological strategy . They will also help improve the living conditions Eligible cost of the population, which is suffering from water ( after 2 April 1996 ): ECU 41 256 871 shortages , and help lay the bases for the sustainable development of the area in accordance Rate of assistance : with the guidelines set out in the Fifth Community 85% Programme of Policy and Action in relation to the Environment and Sustainable Development . Cohesion Fund grant : ECU 35 068 340 ANNEX FINANCING PLAN Project No : 96/11/61/007 (in ECU) Year Total Public expenditure Private sector Commu­ cost (') nity Total pub ic Cohesion N,itional authorities Other loans expenditui e Fund Total Central Other govern­ ment % % % % 1=2+11 2=4+6+10 3=2/ 1 4 5=4/2 6=8+9 7=6/2 8 9 10 11 12 = 11 / 1 13 1996 1 269 442 1 269 442 100 1 079 026 85 190 416 15 190416 1997 20 021 445 20 021 445 100 17 018 228 85 3 003 217 15 3 003 217 1998 19 965 984 19 965 984 100 16 971 086 85 2 994 898 15 2 994 898 Total 41 256 871 41 256 871 100 35 068 340 85 6 188 531 15 6 188 531 (') Total eligible cost of project . No C 122/4 EN Official Journal of the European Communities 19 . 4 . 97 PROJECT No : 96/11/61/009 1 . Name: 6 . Objectives: River-bed and environmental improvements : The general aims of the project include : PICHRA 96 — the reclamation , conservation and 2 . Body responsible for the application: improvement of hydrological conditions around continental rivers and lakes , 2.1 . Name: Ministerio de Economía y Hacienda — achieving a balance between hydrological and ecological factors in rivers . 2.2 . Address: Paseo de la Castellana , 162 28071 Madrid To that end, the following specific aims have been set : 3 . Body responsible for implementation: — to reduce the risks of flooding, 3.1 . Name: Direccion General de Obras Hidraulicas . — to improve beds and banks whilst preserving habitats, 3.2 . Address : Paseo de la Castellana , 67 28071 Madrid — to improve the compatibility between the exploitation of water resources and the 4 . Location: conservation of aquatic environments , — to promote social use . 4.1 . Member State: Spain 4.2 . Autonomous Andalusia , Aragón , Asturias, 7 . Work schedule: Communities: Cantabria , Castile-La Mancha , Castile-Leon, Catalonia , Extremadura , Galicia , Madrid, Category of work Commencement Completion Murcia . Main work 1 . 1 . 1996 31 . 12 . 1998 5 . Description: 8 . Economic and social cost-benefit analysis: The planned work forms part of the strategy laid down in the Integral Plans for the Environmental A cost-benefit analysis has been carried out to Restoration of Water Resources ( Pichra ) drawn up evaluate the environmental impact of the project . in 1994 and follows on from measures already completed or now being carried out, for some of Account was taken of the following benefits : which the Commission has already granted funding by Decisions C(94 ) 3755/ 1 and C(94 ) — reduction of losses caused by flooding, 3755/3 of 21 December 1994 . — reduction of losses caused by erosion , The aim of the Pichra project is to improve the — socio-economic benefits of re-afforestation . environmental conditions of continental rivers and lakes . The costs are those given in the investment plan . The measures are of two types : — restoration of water and forest resources, soil Over a period of 30 years , the internal rate of conservation and restoration of aquatic return will be 5,7% . environments, Account must also be taken of a series of — improvements to and cleaning of river beds , socio-economic benefits not included above rectification and protection of river banks and because of the difficulty in quantifying them , i.e : regulation of the use of rivers and reservoirs .
Recommended publications
  • ISAE 2014.Pdf
    edited by: Inma Estevez, Xavier Manteca, Raul H. Marin and Xavier Averós Applied ethology 2014: Moving on ISAE2014 Proceedings of the 48th Congress of the International Society for Applied Ethology 29 July – 2 August 2014, Vitoria-Gasteiz, Spain Moving on edited by: Inma Estevez Xavier Manteca Raul H. Marin Xavier Averós Wageningen Academic Publishers Buy a print copy of this book at: www.WageningenAcademic.com/ISAE2014 This work is subject to copyright. All rights are reserved, whether the whole or part of the material is concerned. Nothing from this publication may be translated, reproduced, stored in a computerised system or published in any form or in any manner, including electronic, mechanical, reprographic or photographic, without prior written permission from the publisher: Wageningen Academic Publishers P.O. Box 220 EAN: 9789086862450 6700 AE Wageningen e-EAN: 9789086867974 The Netherlands ISBN: 978-90-8686-245-0 www.WageningenAcademic.com e-ISBN: 978-90-8686-797-4 [email protected] DOI: 10.3920/978-90-8686-797-4 The individual contributions in this publication and any liabilities arising from them remain First published, 2014 the responsibility of the authors. The publisher is not responsible for possible © Wageningen Academic Publishers damages, which could be a result of content The Netherlands, 2014 derived from this publication. Welcome to the 48th Congress of the ISAE What makes science most exciting is not how much you know, but how much you can still learn, widening the possibilities of exploring new horizons. In this learning process diversity of experiences, exposure to new ideas, concepts or methodologies enrich and expand our capacity for innovation.
    [Show full text]
  • International Society for Applied Ethology 2014
    Farrowing progress and cortisol level in sows housed in SWAP pens Pedersen, Janni Hales; Moustsen, Vivi Aarestrup; Nielsen, M.B.F.; Weber, Pernille Mixen; Hansen, Christian Fink Published in: Moving on DOI: 10.3920/978-90-8686-797-4 Publication date: 2014 Document version Publisher's PDF, also known as Version of record Citation for published version (APA): Pedersen, J. H., Moustsen, V. A., Nielsen, M. B. F., Weber, P. M., & Hansen, C. F. (2014). Farrowing progress and cortisol level in sows housed in SWAP pens. In I. Estevez, X. Manteca, R. H. Marin, & X. Averós (Eds.), Moving on: Proceedings of the 48th Congress of the International Society for Applied Ethology (pp. 149). Wageningen Academic Press. https://doi.org/10.3920/978-90-8686-797-4 Download date: 11. Oct. 2021 edited by: Inma Estevez, Xavier Manteca, Raul H. Marin and Xavier Averós Applied ethology 2014: Moving on ISAE2014 Proceedings of the 48th Congress of the International Society for Applied Ethology 29 July – 2 August 2014, Vitoria-Gasteiz, Spain Moving on edited by: Inma Estevez Xavier Manteca Raul H. Marin Xavier Averós Wageningen Academic Publishers Buy a print copy of this book at: www.WageningenAcademic.com/ISAE2014 This work is subject to copyright. All rights are reserved, whether the whole or part of the material is concerned. Nothing from this publication may be translated, reproduced, stored in a computerised system or published in any form or in any manner, including electronic, mechanical, reprographic or photographic, without prior written permission from the publisher: Wageningen Academic Publishers P.O. Box 220 EAN: 9789086862450 6700 AE Wageningen e-EAN: 9789086867974 The Netherlands ISBN: 978-90-8686-245-0 www.WageningenAcademic.com e-ISBN: 978-90-8686-797-4 [email protected] DOI: 10.3920/978-90-8686-797-4 The individual contributions in this publication and any liabilities arising from them remain First published, 2014 the responsibility of the authors.
    [Show full text]
  • Estudos De História Empresarial De Portugal O Setor Ferroviário
    Série Documentos de Trabalho Working Papers Series Estudos de História Empresarial de Portugal O setor ferroviário Ana Tomás Nuno Valério DT/WP nº 68 (GHES –CSG–ISEG –ULisboa) ISSN 2183-1785 Instituto Superior de Economia e Gestão Universidade de Lisboa Estudos de História Empresarial de Portugal O setor ferroviário Ana Tomás Nuno Valério (GHES – CSG – ISEG – ULisboa) Resumo Este documento de trabalho pretende ser o primeiro de um conjunto a preparar e publicar nos próximos anos, tendo como objetivo final elaborar uma História Empresarial de Portugal. Nele é sintetizada a evolução do setor dos caminhos-de-ferro em Portugal, quer sob a ótica da disponibilidade de serviços ferroviários, quer sob a ótica das empresas que construíram as infraestruturas ou prestaram esse serviço. Abstract This working paper aims to be the first one of a set to be prepared and published along the next years, with the final purpose of preparing a Business History of Portugal. It summarizes the evolution of the railroad sector in Portugal, both from the perspective of the availability of the railway service, and from the perspective of the firms that built the infrastructure or provided that service. Palavras-chave Portugal, caminhos-de-ferro, empresas ferroviárias. Keywords Portugal, railroads, railway firms. Classificação JEL / JEL classification L92 – caminhos-de-ferro e outros transportes de superfície / railroads and other surface transports 1 Plano Apresentação geral O setor ferroviário 1 – Projeto na década de 40 do século XIX 2 – A construção da rede
    [Show full text]
  • Research Report
    MARVILA/BEATO RESEARCH REPORT João Carlos Martins João Mourato Institute of Social Sciences University of Lisbon Document produced for the Horizon 2020 project ‘ROCK’. Year: 2018. Status: Final. Disseminaon Level: Public. 1 Contents Figures Graphics Tables Introduction 1 Intervention Area 1.1 ROCK integration on Lisbon: 1998-2018. Between planning and the constructed city. Territorial Management, Strategic Plans. From late 1990’s to contemporary practices. Eastern Waterfront of Lisbon 1.2 ROCK Space, Internal borders, urban frontiers and mobilities 1.2.1 Zone 1: Marvila’s Library and Alfinetes Palace. PRODAC, Quinta do Chale, Cooperative Housing and Palace, Alfinetes and Marques de Abrantes Areas 1.2.2 Zone: 2: Island. Marvila and Beato Island Areas 1.2.3 Zone 3: Harbour. Marvila and Beato Harbour Areas 2 Socioeconomic Outline 2.1 Demographic features: people and families 2.2 Old and New Economic profiles 3. Built Space, Green Spaces and Voids 3.1 Housing Stock: Private and Public Funded Initiatives 3.2 Heritage and Culture related Spaces 3.3 Local Agriculture and Lisbon´s Green Belt. Urban Voids, empty spaces and future perspectives 4. Political and Institutional Outline 4.1 Elected governments and other political groups in Marvila and Beato 4.2 Local based groups. Public Funded initiatives and projects References 2 Figures Figure 1 Soil uses of Chelas Masterplan. Font: Gabinete Técnico da Habitação, CML Figure 2 ROCK Zones and Areas Figure 3: Zone 1 Library and Palace Figure 4: Bairro Chines Graffiti Figure 5: Collective Toilet on Bairro do Chines in the 1960’s. Figure 6: Library and Alfinetes Area Figure 7 Bairro Chines on the 1960’s Figure 8: Bairro Chines today.
    [Show full text]
  • Informen En Tiempo Real a Los Ciudadanos De Qué Está Sucediendo En Sus Entornos
    Esta publicación es resultado de las jornadas técnicas del 2 Foro Urbano de Paisaje “Ciudades + Verdes”, celebradas en Vitoria – Gasteiz durante los días 4, 5 y 6 de Julio de 2007. This publication is a result of the technical conference of the 2nd Landscape Urban Forum “Cities + Green”, which took place in Vitoria – Gasteiz during the 4th, 5th and 6th of July, 2007. Argitalpen hau Vitoria-Gasteizen 2007ko uztailaren 4, 5 eta 6an egin zen Paisaiaren 2. Hiri Foroaren baitan antolatutako “Hiri berdeagoak” jardunaldi teknikoen emaitza da. © 2009, AYUNTAMIENTO DE VITORIA-GASTEIZ CENTRO DE ESTUDIOS AMBIENTALES EDITA: CENTRO DE ESTUDIOS AMBIENTALES DISEÑO: 2ADOS FOTOGRAFÍAS: ARCHIVO CEA Y QUINTAS FOTÓGRAFOS IMPRESIÓN: MCC GRAPHICS - EVAGRAF DEPÓSITO LEGAL: VI-XXX-08 ISBN: XXXXXXX EL FORO URBANO DE PAISAJE THE LANDSCAPE URBAN FORUM PAISAIAREN HIRI FOROA Nació en 2005 en la ciudad de Vitoria-Gasteiz, con la finalidad de favorecer el debate y la reflexión en torno al amplio concepto de paisaje y, concretamente, en torno al rol de la arquitectura del paisaje en la planificación de la ciudad y del territorio. Se celebra cada dos años con la participación de expertos internacionales, profesionales, estudiantes, gestores, políticos y ciudadanos interesados en compartir su sabiduría, experiencias e inquietudes en torno a este campo del conocimiento. Comprende distintos eventos que favorecen la generación y transferencia de ideas y conocimientos como jornadas técnicas, concursos de ideas, premios, exposiciones, talleres, etc. En 2005, bajo el título PERIFERIAS: HACIA DENTRO, HACIA FUERA, el Foro abordó la problemática de las zonas de transición entre las ciudades y el territorio circundante y las relaciones entre estas zonas periféricas y los centros urbanos.
    [Show full text]
  • Impacto Da Construção Ferroviária Sobre a Cidade De Lisboa
    Impacto da construção ferroviária sobre a cidade de Lisboa Magda Pinheiro- CEHCP-ISCTE Em 1856, quando o primeiro troço de caminho de ferro é inaugurado em Portugal, do plano de construção de estradas de 1842/1843 apenas algumas centenas de quilómetros estavam concluídas. No entanto Lisboa estava situada na foz do maior rio navegável do País e, como mais importante porto nacional, estava ligada por barco a vapor à sua segunda maior cidade, o Porto. Ao Norte Viana do Castelo, no centro Figueira Foz, ao Sul Setúbal e os vários portos do Algarve punham a capital em contacto com o litoral e com as zonas servidas por transportes fluviais. Estas circunstâncias geográficas explicam em parte que os primeiros projectos de construção ferroviária tivessem por objectivo uma ligação com a fronteira de Espanha. Ao analisar a rede ferroviária portuguesa é-se inevitavelmente levado a concluir que a sua construção contribuiu, a partir dos anos sessenta do século XIX, para aumentar o fosso entre a velocidade de crescimento demográfico do País e a da sua capital1. A rede ferroviária, construída após 1853, tem o seu ponto de partida em Lisboa e em menor medida no Porto, desenvolvendo-se por ramificação. Esta forma arborescente facilita as trocas entre Lisboa e os diversos pontos do interior ao mesmo tempo que mantém as dificuldades de comunicação entre as diversas zonas situadas longe da plataforma costeira. Em termos de crescimento económico poder-se-à ainda considerar relevante o facto de, em 1897, o preço da condução das mercadorias e passageiros desde as sedes de concelho até às estações ferroviárias ser ainda muito elevado, exprimindo a baixa densidade de caminhos de ferro e a permanência de um défice na construção de estradas2 .
    [Show full text]
  • Download/14265/13245>
    ENGLISH VERSIONS SCIENZE DEL TERRITORIO. ISSN 2284-242X. no. 3 REBUILDING THE CITY, pp. 356-358. © 2015 Firenze University Press Editorial Editorial. Territorial forms and dimensions of a new urbanity demand - Full English version1 Alberto Magnaghi In the face of a global process of urbanisation which appears hardly containable or revers- ible (MAGNAGHI 2013, 48-51), we experience today a general fall of the urban in which the “mort de la ville” foreshadowed in 1994 by Françoise Choay seems to come true. Such a “kingdom of the post-urban” (and the post-rural) arose with the breakdown of the co-evolu- tion relationships among human settlement, nature and work that, for better or worse, char- acterised the previous civilisations. The one-way path of de-territorialisation, started with the enclosure of commons, goes in hand with the gradual commodification of common goods, be they natural (the Earth first of all, and then water, air, natural energy sources, glaciers, for- ests and so on) or territorial (the city and its historical infrastructure, agro-forestry systems, landscapes, water works, factories, power plants, down to the electronic networks). Within this double loop, de-territorialisation and commodification of common goods, a path is being accomplished, leading to a condition of global urbanisation (but not of urbanity) as the exclusive destiny of humanity on the planet on the one hand, on the other, ‘extra muros’, to the abandonment and reversion to a wild state of so many open areas, made unsuitable for human life by degradation, desertification, chemicalization, floods and other not entire- ly ‘natural’ disasters related to the commercial use of environmental assets.
    [Show full text]
  • Contrato 2005
    CONTRATO DE CONCESSÃO PARA A EXPLORAÇÃO DO SERVIÇO DE TRANSPORTE SUBURBANO DE PASSAGEIR0S NO FIXO FERR0vIÁRI0 NORTE-SUL 2 tNDICE CONSIDERANDOS PARTE 1- OBjEcro E ÂMBITO DA CONCESSÃO 1.0 — Definições 2.’ — Objecto da Concessão 3•a — Outras actividades integradas no objecto do contrato 4.’ — Prazo da Concessão 5a — Prestações de serviço público 6.’ — Regime do risco 7•0 — Reposição do equilíbrio financeiro 8.0 — Tarifário — Responsabilidade do Concessionário perante terceiros 10.0 — Exclusividade lia — Estabelecimento da Concessão 12.0 — Contratos Acessórios PARTE II- DISPOSIÇÕES ESPECIAIS SOBRE A EXPLORAÇÃO CAPÍTULO 1- INFRA-ESTIUJTURAS 13.’ — Utilização da infra-estrutura 14í — Tarifa pela utilização da Infra-estrutura e outros pagamentos 15.’— Utilização e gestão das estações, interfaces, parques e silos de estacionamento 16.’ — Canal Horário e Horário Técnico CAPÍTuLo II- MATERIAL CIRCULANTE 3 17i— Manutenção do Material Circulante 3•a — Implementação de estrutura de locação 19.— Aquisição de Material Circulante CAPÍTULO III - PRINcÍPIOS E OBRIGAÇÕES DE EXPLORAÇÃO 20Y — Princípios da exploração — Sistemas e manuais 22) — Regulamentos e normativos de segurança 23.a — Indicadores da qualidade da oferta 24.a — Estatísticas e indicadores — Relacionamento com os passageiros PARTE III - OBRIGAÇÕES ACESSÓRIAS DO CONCESSIONÁRIO 26.a — Informação contabilística e financeira 27!’ — Seguros 28!’ — Acordos com entidades de protecção civil PARTE IV - OBRIGAÇÕES RESPEITANTES À SOCIEDADE CONCESSIONÁRIA — Estrutura da Sociedade Concessionária 30!’ — Obtenção de licenças e outras certificações PARTE V - FISCALIZAÇÃO E MONITORIZAÇÃO 31!’ — Fiscalização e monitorização 32!’a — Obrigações de informação 33 — Intervenção directa do Concedente PARTE VI - RESGATE E FORÇA MAIOR 34!’ — Resgate 4 35” — Força maior PARTE VII- INCUMPRIMENTO DO CONTRATO E SUAS CONSEQUÊNCIAS 36.”—.
    [Show full text]
  • Centro De Estudos Interculturais Klçzxcvbnmqwertyuiopasdfghjklçzxc Repositório De Conteúdos Dos Periódicos Vbnmqwertyuiopasdfghjklçzxcvbnmq Fevereiro De 2017
    Qwertyuiopasdfghjklçzxcvbnmqwert yuiopasdfghjklçzxcvbnmqwertyuiopa sdfghjklçzxcvbnmqwertyuiopasdfghj Centro de Estudos Interculturais klçzxcvbnmqwertyuiopasdfghjklçzxc Repositório de Conteúdos dos Periódicos vbnmqwertyuiopasdfghjklçzxcvbnmq Fevereiro de 2017 (página em construção) wertyuiopasdfghjklçzxcvbnmqwerty Instituto Superior de Contabilidade e Administração do Porto uiopasdfghjklçzxcvbnmqwertyuiopas dfghjklçzxcvbnm qwertyuiopasdfghjklçzxcvbnmqwert yuiopasdfghjklçzxcvbnmqwertyuiopa sdfghjklçzxcvbnmqwertyuiopasdfghj klçzxcvbnmqwertyuiopasdfghjklçzxc vbnmqwertyuiopasdfghjklçzxcvbnmq wertyuiopasdfghjklçzxcvbnmqwerty Conteúdo Análise Social – Revista do Instituto de Ciências Sociais da Universidade de Lisboa Nº 107 Vol. XXV Ano 1990 ........................................................................... 17 Análise Social – Revista do Instituto de Ciências Sociais da Universidade de Lisboa Nº 111 Vol. XXVI Ano 1991 .......................................................................... 18 Análise Social – Revista do Instituto de Ciências Sociais da Universidade de Lisboa Nº 112 e 113 Vol. XXVI Ano 1991 .............................................................. 19 Análise Social – Revista do Instituto de Ciências Sociais da Universidade de Lisboa Nº 114 Vol. XXVII Ano 1991 ........................................................................ 21 Análise Social – Revista do Instituto de Ciências Sociais da Universidade de Lisboa Nº 121 Vol. XXVIII Ano 1993 ......................................................................
    [Show full text]
  • Relatório Técnico De Avaliação Do Programa De Investimentos Pni 2030 – Ferrovia
    2020 RELATÓRIO TÉCNICO DE AVALIAÇÃO DO PROGRAMA DE INVESTIMENTOS PNI 2030 – FERROVIA APOIO DE CONSULTORIA AO CSOP ACÚRCIO MENDES DOS SANTOS ERNESTO J. S. MARTINS DE BRITO Abril 2020 NOTA DE CONJUNTURA O violento surto pandémico mundial designado por Covid19 e que se propaga desde o início do corrente ano de forma avassaladora obrigou a excepcionais medidas de emergência em matéria de saúde publica ao nível do globo o que produziu um violentíssimo efeito na economia mundial por efeito dos súbitos choques, tanto na oferta como na procura. Esta realidade, até agora nunca vivida pelas sociedades e fruto das intensas interações resultantes da globalização, vem trazer um exigentíssimo duplo desafio a todos nós: o de conter e inverter o colapso da saúde publica e, ao mesmo tempo, recuperar e revitalizar as economias. O que começa a ser uma evidencia é que haverá muitos aspectos da sociedade e da economia que vão sofrer mudanças profundas apontando-se já para o lado positivo desta circunstância, focado na oportunidade de aceleração da transformação para toda uma nova economia de baixo carbono, centrada na emergência climática e nas energias renováveis. Assim, parece claro que a iniciativa da UE de uma Estratégia da Mobilidade Hipocarbónica, anunciada em 2017 com o objectivo de estabelecer as “guide lines” de um novo paradigma de mobilidade não poluente e mais competitiva, irá sofrer um impulso significativo com os respectivos planos de acção e de investimento a anteciparem a sua execução e operacionalidade. Por outro lado, o profundo choque económico por cessação de muitas e diversificadas actividades irá gerar uma séria crise de desemprego, pese embora todos os esforços e medidas em curso adoptadas pelos governos para manterem uma base mínima do estado de prontidão das estruturas produtivas com “layoffs” generalizados, com vista ao seu arranque nos pós Covid 19.
    [Show full text]
  • Implications of Current Research on Social Innovation in the Basque Country
    Implications of Current Research on Social Innovation in the Basque Country EDITED BY Ander Gurrutxaga Abad and Antonio Rivera Center for Basque Studies UPV/EHU University of Nevada, Reno Center for Basque Studies Current Research Series, No. 4 Implications of Current Research on Social Innovation in the Basque Country Edited by Ander Gurrutxaga Abad and Antonio Rivera Current Research Series No. 4 Center for Basque Studies University of Nevada, Reno Published in conjunction with the University of the Basque Country UPV/EHU // Center for I -:;_ Basque Studies Universidad Euskal Herriko 0 .. UNIVERSITY OF NEVADA, RENO ■ del Pais Vasco Unibertsitatea Current Research Selections of the ongoing work done by the faculty of the University of the Basque Country (UPV/EHU), www.ehu.es/ Editorial Committee Amaia Maseda (Chair, UPV/EHU), Arantza Azpiroz (UPV/EHU), Javier Echeverría (Ikerbasque), Jon Landeta (UPV/EHU), Sandra Ott (UNR), Joseba Zulaika (UNR), Santos Zunzunegui (UPV/EHU) Current Research Series, No. 4 Center for Basque Studies University of Nevada, Reno Reno, Nevada 89557 http://basque.unr.edu Copyright © 2011 by the Center for Basque Studies All rights reserved. Printed in the United States of America. Cover and series design © 2011 by Jose Luis Agote. Cover design based on engravings by Eduardo Chillida and Jorge Oteiza. Library of Congress Cataloging-in-Publication Data Implications of current research on social innovation in the Basque Country / edited by Ander Gurrutxaga Abad and Antonio Rivera. p. cm. -- (Current research series ; no. 2) Includes bibliographical references and index. Summary: “Collection of articles on social innovation in the Basque Country”--Provided by publisher.
    [Show full text]
  • PUA - OUTRA SOLUÇÃO É POSSIVEL! (Excertos Do Documento De 12 Páginas Entregue Á CML
    PUA - OUTRA SOLUÇÃO É POSSIVEL! (Excertos do documento de 12 páginas entregue á CML. Foi também enviado ao governo, a todos os vereadores e aos parti- dos políticos com assento no Parlamento e na Assembleia Municipal de Lisboa) Nas 3 sessões realizadas sobre o PUA ficou evidente que as condicionantes da proposta da REFER tiveram uma incidência negativa na elaboração do PUA apresentado pela CML, não só porque a pro- posta da REFER - em pleno leito de cheia e zona sísmica de máxima gravidade - quer construir uma estação subterrânea entre a Rua de Cascais e a Rua João Miguéns, e mais um viaduto sobre a Avenida de Ceuta, com um plano de execução de obra que atinge sete anos; como também pelas propostas do sistema de transportes do PUA que apresenta num total, mais um túnel e três viadutos rodoviários (um dos quais em plena Rua de Cascais e Rua João Miguens), uma passagem superior de peões, prolonga- mentos das Linhas de Metropolitano Amarela e Vermelha, um funicular, mais duas rotundas, uma delas desnivelada, um alargamento da Avenida 24 de Julho no seu troço final e um conjunto de novos arrua- mentos, como o prolongamento da Rua Luis de Camões à Avenida da Índia, passando pelo interior das instalações da Carris, baseadas numa engenharia de tráfego rodoviário (?) mas, sem qualquer enqua- dramento estratégico de desenvolvimento durável e de mobi- lidade sustentável do sistema de transportes e, muito menos, sem qualquer conceito de cidade sustentável. Durante estas sessões, foi possível contestar esta proposta de PUA e da REFER e apresentar
    [Show full text]