South Tarawa Water Supply Project, Kiribati Report Prepared by: Summary The South Tarawa Water Supply Project funded by Asian Development Bank (leader), Green Climate Fund, World Bank and the Government of Kiribati is a USD 58 million project that aims to improve the water supply services by the construction of a desalination plant supported by solar photovoltaic cells connected to the grid that can generate the energy required for the operation of the plant. The project also includes awareness programs for the public an stakeholders in addition to technical and financial capacity building of Public Utilities Board and the relevant authorities of the Government of Kiribati, to ensure a sustainable system of high quality water supply to the entire population of South Tarawa at adequate amounts. After the completion of the preliminary works, the 6-year long project is to be officially initiated in the year 2019, and completed by the end of the year 2024. The implementing agency of the project is the Ministry of Infrastructure and Sustainable Energy (MISE). Various components of the project are already being completed. The most recent work that was initiated is the Project Design Advance of USD 2 million, the outcome of which will be the detailed design of the project and its bidding documents. Prepared by: Ms. Fathmath Shafa-Ath Ibrahim Nasih Student Assistant, Asian Institute of Technology, 58 Moo 9, Km. 42, Paholyothin Highway, Klongluang, Pathumthani 12120 Thailand Email:
[email protected] Disclaimer: This report was prepared for the NewTap project, which is funded by the Japan Water Research Center.