Major Consultancy Agreements Awarded by Works Departments Under the Category a Items of Development Bureau and Transport and Housing Bureau (2018-19 Legco Session)

Total Page:16

File Type:pdf, Size:1020Kb

Major Consultancy Agreements Awarded by Works Departments Under the Category a Items of Development Bureau and Transport and Housing Bureau (2018-19 Legco Session) Annex Major Consultancy Agreements Awarded by Works Departments under the Category A Items of Development Bureau and Transport and Housing Bureau (2018-19 LegCo Session) Project Project Title Consultants Consultants’ Code fees1 ($ million) 4425DS Relocation of Sha Tin AECOM Asia Company Limited 21.7 Sewage Treatment Works to Mott MacDonald Hong Kong Limited caverns – site preparation and access tunnel construction 7822CL Kai Tak development - AECOM Asia Company Limited 23.8 infrastructure for Ramboll Hong Kong Limited developments at the former runway and south apron 7832CL Kai Tak Development - AECOM Asia Company Limited 16.2 stage 5B infrastructure Acuity Sustainability Consulting Limited works at the former north apron area 7747CL Advance site formation and AECOM Asia Company Limited 53.0 engineering infrastructure Mott MacDonald Hong Kong Limited works at Kwu Tung North new development area and Fanling North new development area 7759CL First stage of site formation AECOM Asia Company Limited 2.8 and engineering Mott MacDonald Hong Kong Limited infrastructure at Kwu Tung North new development area and Fanling North new development area Project Project Title Consultants Consultants’ Code fees1 ($ million) 7835CL Remaining phase of site Atkins China Limited 174.9 formation and engineering AECOM Asia Company Limited infrastructure works at Kwu Black & Veatch Hong Kong Limited Tung North new development area and Fanling North new development area - detailed design and site investigation 7793CL Site formation and AECOM Asia Company Limited 8.3 infrastructure works for Acuity Sustainability Consulting Limited Police facilities in Kong Nga Po 6863TH Widening of western Ove Arup & Partners Hong Kong 1.7 section of Lin Ma Hang Limited Road between Ping Yuen River and Ping Che Road Major Consultancy Agreements Awarded by Works Departments under the Category A Items of Development Bureau and Transport and Housing Bureau (2019-20 LegCo Session) Project Project Title Consultants Consultants’ Code fees1 ($ million) 7785TH Trunk Road T2 and Cha Kwo Ling Hyder-Meinhardt Joint Venture 15.1 Tunnel – Construction Ramboll Hong Kong Limited 7833CL Kai Tak development - remaining Hyder-Meinhardt Joint Venture 0.8 infrastructure works for developments at the former runway and south apron, phase 1 9357WF Design and construction for first Black & Veatch Hong Kong 74.0 stage of desalination plant at Tseung Limited Kwan O ANewR Consulting Limited 6188TB Footbridge near MTR Kowloon Bay WSP (Asia) Limited 1.6 Station Exit B 5051TF Reconstruction of Pak Kok Pier on Acuity Sustainability 0.2 Lamma Island Consulting Limited B780CL Site formation and infrastructure Ove Arup & Partners Hong 4.2 works for public housing Kong Limited development at Wang Chau, Yuen Long 4186CD Rehabilitation of underground Black & Veatch Hong Kong 1.6 stormwater drains stage 2 Limited 4171CD Revitalization of Tsui Ping River Atkins China Limited 5.4 3468RO Improvement of Lam Wah Street TLS & Associates Limited 0.7 Playground and adjacent area 7846CL Hung Shui Kiu/Ha Tsuen New Ove Arup & Partners Hong 37.5 Development Area stage 2 works - Kong Limited detailed design and site investigation Project Project Title Consultants Consultants’ Code fees1 ($ million) 7845CL Hung Shui Kiu/Ha Tsuen New Ove Arup & Partners Hong 31.6 Development Area advance works Kong Limited phases 1 & 2 - site formation and AECOM Asia Company engineering infrastructure and phase Limited 3 - detailed design and site investigation 7796CL Hung Shui Kiu/Ha Tsuen New Mott MacDonald Hong Kong 4.1 Development Area stage 1 works - Limited site formation and engineering infrastructure 7831CL West Kowloon Reclamation – main Mott MacDonald Consultants 5.4 works (remainder) – footbridge at (HK) Limited the junction of Sham Mong Road and Hing Wah Street West in Sham Shui Po B795CL Site formation and infrastructure Ove Arup & Partners Hong 11.0 works for public housing Kong Limited developments at Pok Fu Lam South 7666CL Formation, roads and drains in Area ANewR Consulting Limited 0.4 54, Tuen Mun – phase 1 stage 2 PYPUN Engineering Consultants Limited 7844CL Formation, roads and drains in Area ANewR Consulting Limited 2.0 54, Tuen Mun – phase 2, stage 4B PYPUN Engineering works Consultants Limited B812CL Site formation and infrastructure WSP (Asia) Limited 7.1 works for public housing developments at Pik Wan Road, Yau Tong 6875TH Noise enclosures at Gascoigne Road Mott MacDonald Hong Kong 1.0 Flyover Limited 6853TH Widening of Castle Peak Road - AECOM Consulting Services 4.1 Castle Peak Bay Limited Project Project Title Consultants Consultants’ Code fees1 ($ million) 9181WF In-situ reprovisioning of Sha Tin AECOM Asia Company 40.5 water treatment works (South Limited Works) – main works 9368WF Improvement to Dongjiang water Meinhardt Infrastructure and 4.3 mains P4 at Sheung Shui and Environment Limited Fanling 9369WF Uprating of Sheung Wong Yi Au Meinhardt Infrastructure and 4.3 fresh water supply system - stage Environment Limited 1 9196WC Implementation of Water Intelligent Black & Veatch Hong Kong 9.4 Network Limited Meinhardt (Hong Kong) Limited 6850TH New Wang Tong River Bridge ANewR Consulting Limited 0.3 7265RS Cycle tracks connecting North West Ho Tin & Associates 0.3 New Territories with North East Consulting Engineers Limited New Territories – Sam Mun Tsai extension 4185CD Drainage improvement works at Atkins China Limited 0.8 Yuen Long, stage 1 5052CG Greening master plans for Southwest ACLA Ltd. - Hyder Consulting 17.0 and Northeast New Territories – Ltd. Joint Venture priority greening works Mott MacDonald Hong Kong Limited Major Consultancy Agreements Awarded by Works Departments under the Category A Items of Development Bureau and Transport and Housing Bureau (2020-21 LegCo Session) Project Project Title Consultants Consultants’ Code fees1 ($ million) 3133KA Drainage Services Department C.S. Toh & Sons & Associates 11.9 Office Building at Cheung Sha Limited Wan Sewage Pumping Station 7765CL Development of Anderson Road AECOM Asia Company Limited 2.1 Quarry site - remaining pedestrian connectivity facilities works 3129KA Water Supplies Department Ronald Lu & Partners (Hong 36.7 Headquarters with Hong Kong Kong) Ltd and Islands Regional Office and Rider Levett Bucknall Limited Correctional Services Department Headquarters building in Chai Wan 7716CL Tseung Kwan O further AECOM Asia Company Limited 1.9 development - infrastructure works for Tseung Kwan O stage 1 landfill site 4445DS Relocation of Sha Tin Sewage AECOM Asia Company Limited 37.2 Treatment Works to caverns – main caverns construction and upstream sewerage works B857CL Site formation and infrastructure Black & Veatch Hong Kong 5.7 works for public housing Limited developments at Tuen Mun Central – Phase 1 7856CL Development of Lok Ma Chau AECOM Asia Company Limited 34.5 Loop – Main Works Package 1 – site formation and infrastructure works 4172CD Rehabilitation of underground Black & Veatch Hong Kong 2.4 stormwater drains - remaining Limited works Project Project Title Consultants Consultants’ Code fees1 ($ million) B858CL Site formation and infrastructure AECOM Asia Company Limited 8.7 works for public housing developments at Kam Tin South, Yuen Long - Phase 1 Note: 1. Consultants’ fees funded under respective Project. .
Recommended publications
  • The Hyperlinks of Merchant Websites Will Bring to You to Another Website on the Internet, Which Is Published and Operated by a Third Party
    The hyperlinks of merchant websites will bring to you to another website on the Internet, which is published and operated by a third party. Such links are only provided on our website for the convenience of the Client and Standard Chartered Bank does not control or endorse such websites, and is not responsible for their contents. The use of such websites is also subject to the terms of use and other terms and guidelines, if any, contained within each such website. In the event that any of the terms contained herein conflict with the terms of use or other terms and guidelines contained within any such websites, then the terms of use and other terms and guidelines for such website shall prevail. Offers are applicable for Standard Chartered Visa Credit Card Offers are applicable for Standard Chartered Mastercard Offers are applicable for Standard Chartered UnionPay Dual Currency Platinum Credit Card Offers are applicable for Standard Chartered WorldMiles Card Merchants Offers Details and Merchant's Additional Terms and Conditions Contact Details (852) 2833 0128 BEE CHENG HIANG SHOP NO.1 GROUND FLOOR, YING KONG MANSION, NO. 2-6 10% off on regular-priced meat products upon spending of HK$300 or above YEE WO STREET, CAUSEWAY BAY Promotion period is from 1 Jan to 31 Dec 2017. (852) 2730 8390 SHOP C, G/F, DAILY HOUSE, Merchant website: http://www.bch.hk NO.35-37 HAIPHONG ROAD, TSIM SHA TSUI (852) 2411 0808 SHOP NO.2 GROUND FLOOR,NO. 60 SAI YEUNG CHOI STREET SOUTH, MONGKOK (852) 3514 4018 SHOP NO.B02-36, LANGHAM PLACE,NO.8 ARGYLE STREET, MONGKOK (852) 2362 0823 SHOP NO.E5,HUNG HOM STATION,HUNG HOM (852) 2357 077 SHOP NO.KWT 20 ,KWUN TONG STATION, KWUN TONG (852) 2365 2228 Shop B12, Basement 1, Site 5,(Aeon Dept Store)Whampoa Garden, Hung Hom, Kowloon (852) 2698 8310 SHOP NO.
    [Show full text]
  • List of Recognized Villages Under the New Territories Small House Policy
    LIST OF RECOGNIZED VILLAGES UNDER THE NEW TERRITORIES SMALL HOUSE POLICY Islands North Sai Kung Sha Tin Tuen Mun Tai Po Tsuen Wan Kwai Tsing Yuen Long Village Improvement Section Lands Department September 2009 Edition 1 RECOGNIZED VILLAGES IN ISLANDS DISTRICT Village Name District 1 KO LONG LAMMA NORTH 2 LO TIK WAN LAMMA NORTH 3 PAK KOK KAU TSUEN LAMMA NORTH 4 PAK KOK SAN TSUEN LAMMA NORTH 5 SHA PO LAMMA NORTH 6 TAI PENG LAMMA NORTH 7 TAI WAN KAU TSUEN LAMMA NORTH 8 TAI WAN SAN TSUEN LAMMA NORTH 9 TAI YUEN LAMMA NORTH 10 WANG LONG LAMMA NORTH 11 YUNG SHUE LONG LAMMA NORTH 12 YUNG SHUE WAN LAMMA NORTH 13 LO SO SHING LAMMA SOUTH 14 LUK CHAU LAMMA SOUTH 15 MO TAT LAMMA SOUTH 16 MO TAT WAN LAMMA SOUTH 17 PO TOI LAMMA SOUTH 18 SOK KWU WAN LAMMA SOUTH 19 TUNG O LAMMA SOUTH 20 YUNG SHUE HA LAMMA SOUTH 21 CHUNG HAU MUI WO 2 22 LUK TEI TONG MUI WO 23 MAN KOK TSUI MUI WO 24 MANG TONG MUI WO 25 MUI WO KAU TSUEN MUI WO 26 NGAU KWU LONG MUI WO 27 PAK MONG MUI WO 28 PAK NGAN HEUNG MUI WO 29 TAI HO MUI WO 30 TAI TEI TONG MUI WO 31 TUNG WAN TAU MUI WO 32 WONG FUNG TIN MUI WO 33 CHEUNG SHA LOWER VILLAGE SOUTH LANTAU 34 CHEUNG SHA UPPER VILLAGE SOUTH LANTAU 35 HAM TIN SOUTH LANTAU 36 LO UK SOUTH LANTAU 37 MONG TUNG WAN SOUTH LANTAU 38 PUI O KAU TSUEN (LO WAI) SOUTH LANTAU 39 PUI O SAN TSUEN (SAN WAI) SOUTH LANTAU 40 SHAN SHEK WAN SOUTH LANTAU 41 SHAP LONG SOUTH LANTAU 42 SHUI HAU SOUTH LANTAU 43 SIU A CHAU SOUTH LANTAU 44 TAI A CHAU SOUTH LANTAU 3 45 TAI LONG SOUTH LANTAU 46 TONG FUK SOUTH LANTAU 47 FAN LAU TAI O 48 KEUNG SHAN, LOWER TAI O 49 KEUNG SHAN,
    [Show full text]
  • List of Doctors / Clinics Enrolled in COVID-19 Vaccination Programme Under the Vaccination Subsidy Scheme
    List of Doctors / Clinics Enrolled in COVID-19 Vaccination Programme under the Vaccination Subsidy Scheme Yuen Long District Name of Doctor Name of Clinic Address Enquiry Phone No. Podium M14, Shek Ping House, Long Ping Estate, YUEN LONG, NEW CHAK, CHI WAH Dr Chak Chi Wah's Clinic 24758988 TERRITORIES Shop G, 1/F, Phase 2, Kingswood Richly Plaza, Kingswood Villas, TIN SHUI CHAN, CHI WAI NIXON Grace Medical Clinic 31522170 WAI, NEW TERRITORIES CHAN, HUNG WAI Dr Chan Hung Wai Patrick Flat E15, Town Centre, Fairview Park, YUEN LONG, NEW TERRITORIES 24719580 PATRICK Shop NG16, G/F, T Town North, Tin Yuet Estate, 33 and 39 Tin Wah Road, Tin CHAN, KUNG YAT Dr Chan Kung Yat 22530543 Shui Wai, YUEN LONG, NEW TERRITORIES Shop 5, G/F, Chestwood Court, Kingswood Villas, 8 Tin Shui Road, TIN SHUI CHAN, LAM FUNG Heavenly Joy Family Clinic 26169898 WAI, NEW TERRITORIES Shop 7, G/F, Kwong Wah Plaza, 11 Tai Tong Road, YUEN LONG, NEW CHAN, NAI YIN Dr. Chan Nai Yin 24422120 TERRITORIES CHAN, TSE PUI Dr Chan Tse Pui G/F, Fu Shing Building, 8 Sai Ching Street, YUEN LONG, NEW TERRITORIES 24792716 Shop C2C & C3A, 1/F , Kingswood Richly Plaza, Kingswood Villas, TIN SHUI CHAN, TSZ KIN ANTHONY Tsz Kin Medical Centre 26170508 WAI, NEW TERRITORIES CHAN, WAI CHUNG Jockey Club Tin Shui Wai Community Health Unit 103, 1/F, Tin Ching Amenity & Community Building, Tin Ching Estate, Tin 31569000 VIRGINIA Centre Kwai Road, TIN SHUI WAI, NEW TERRITORIES Shop F1, 1/F, Phase 2, Kingswood Richly Plaza, Kingswood Villas, TIN SHUI CHEUNG, HON YUEN Town Health-PHC Medical Centre 21461119 WAI, NEW TERRITORIES 1 List of Doctors / Clinics Enrolled in COVID-19 Vaccination Programme under the Vaccination Subsidy Scheme Yuen Long District Name of Doctor Name of Clinic Address Enquiry Phone No.
    [Show full text]
  • M / Sp / 14 / 168 Fairview Park Road West flk“
    BAUHINIA ROAD NORTH flK“ NULLAH A»f DRIVE CYPRESS LYCHEE ROAD NORTH A§j fl LYCHEE ROAD SOUTH FAIRVIEW PARK ROAD NORTH 40 構 20 Yau Mei 20 LYCHEE RD E San Tsuen “¸ƒ ¨» SAN TIN HIGHWAY `²WÆ s•—¥§⁄ł§¤‚˛†p›ˇ M / SP / 14 / 168 FAIRVIEW PARK ROAD WEST flK“ C«s⁄‰⁄‚ SEE PLAN REF. No. M / SP / 14 / 168 YAU POK ROAD GOLDEN BAMBOO ROAD NORTH KAM POK ROAD FOR SAN TIN VILLAGE CLUSTER BOUNDARIES GINKGO RD A§j NULLAH ‰« ‰« A§ ı‹ Mong Tseng Tsuen Mong Tseng Wai Ï¥ ROSE WOOD RD BAUHINIA ROAD WEST Fairview Park 20 LUT CHAU s·Ð¥ ¨» õ® ˦é Tai Yuen Chuk Yuen Tsuen FAIRVIEW PARK RD EAST LOTUS ROAD DEEP BAY ROAD ˦ñ Q“ fl'” Hang Fook A§j Gardens CASTLE PEAK ROAD - TAM MI W¤Ë s•—¥§⁄ł§¤‚˛†p›ˇ Sheung Chuk Yuen 40 M / SP / 14 / 168 SEE PLAN REF. No. M / SP / 14 / 168 FOR SAN TIN VILLAGE CLUSTER BOUNDARIES A§Æ“ s• fiA San Wai Tsuen Villa Camellia FAIRVIEW PARK BOULEVARD 81 20 y¬B fiA łfi 20 Royal Camellia s±A Greenery 75 ⁄ ⁄b Garden 39 º­ 38 Man Yuen Meister j¤Í Chuen WETLAND PARK ROAD House Tai Sang Wai TIN YING ROAD Tin Heng Estate KAM POK ROAD NULLAH 20 40 ñ§P fi »›·ª Long Ha T«» Hong Kong Wetland Park · AP Jetties Grandeur Terrace ⁄v 37 ˆƒ⁄B 30 n«Í¥ Sewage Treatment YAU POK ROAD Works ⁄A y¬B 29 1 Tin Chak 31 Lau Fau Shan Estate 62 ªaƒ‰ 35 ⁄h y¬B KAM POK ROAD ®®I´ SHAN PUI RIVER Merry Garden LAU FAU SHAN Tin Yat Estate ⁄ z¼º Vianni Cove s·y TIN SAU ROAD 32 San Hing 36 »§Q Pé LAU FAU SHAN ROAD ⁄~ Pok Wai Tsuen TIN YIP ROAD `²WÆ »§ |§f ⁄q 33 C«s⁄‰⁄‚ Hang Hau Tsuen · d§Î Ng Uk Tsuen AP Ngau Hom ⁄I SAN TIN HIGHWAY 7 F¨¿ Tin Fu Court NULLAH TIN KWAI ROAD Sha Kong Wai 34 FUK SH 25 26 UN TIN SHUI ROAD S Tin Ching Estate T ûºé¶ R E Vienna Villa E ⁄‚ T ⁄ƒ ⁄fi Tin Yuet Estate ”¶ 27 3 Tin Yan Estate 28 j¤« WANG LEE STREET ⁄“ Tai Tseng Wai WANG LOK STREET NAM SANG WAI ROAD ñ§P F¨¿¦ ±²Î ”Y Sha Kong Shing Uk Tsuen n«Í y¬B¯ Wai Tsai ⁄ »›·˝¥O TIN WAH ROAD NULLAH San Miguel Brewery NAM SANG WAI a” ‹ Hong Kong Ltd.
    [Show full text]
  • Information, Communications & Building Technologies
    INFORMATION, COMMUNICATIONS & BUILDING TECHNOLOGIES Driving Innovation for Smart Cities ICBT CONTENTS INFORMATION COMMUNICATIONS 01 - 02 ABOUT ICBT BUILDING TECHNOLOGIES 03 - 18 ICBT SOLUTIONS 03 IoT Solutions 05 ICT Solutions 07 Energy Optimisation Solutions 09 Intelligent Control & Automation Solutions 11 Security & ELV Solutions 13 Air Conditioning Solutions 15 Architectural Lighting & LED Solutions 17 Renewable Energy Solutions 19 Electrical & Mechanical Equipment for Environmental Solutions 21 - 34 SIGNATURE PROJECTS 21 e-Channels 23 Hong Kong-Zhuhai-Macao Bridge Boundary Crossing Facilities 25 Hong Kong Convention and Exhibition Centre (HKCEC) 27 Hong Kong Science Park (HKSTP) 29 Two International Finance Centre (Two ifc) 31 One Taikoo Place 33 Victoria Dockside 35 - 40 PROVEN TRACK RECORDS 35 Commercial & Office Premises 35 - 36 Education 36 Government Buildings 36 - 37 Healthcare, Laboratories & Clean Rooms 37 - 38 Hospitality & Serviced Apartments 38 Industrial Buildings 38 - 39 Infrastructure & Utilities 39 - 40 Residential Buildings 40 Retail 01 About ICBT 02 OUR R&D CAPABILITIES Information, Communications In-house R&D team: and Building Technologies (ICBT) - Scholars ATAL Information, Communications and Building Technologies - IT Specialists (ICBT) is one of the business segments of ATAL Engineering Group. - Green Building Specialists We offer design, installation and servicing of information and - Mathematics Specialists communication technologies, intelligent systems and green building solutions. By incorporating big data analytics into practices, we help you realise your data's true potential and achieve optimal operation. With our in-house R&D capabilities, all solutions can be tailor-made 2019 Hong Kong ICT Awards Winner - Silver in accordance with your specifications, catering for any applications. 2015 Hong Kong ICT Awards Winner - Bronze Our deep insights into different industry sectors also enable us to provide customers with guidance on every step of the process, ensuring smooth and successful implementation.
    [Show full text]
  • 1171 20180510 AM Final Draft-Clean
    Minutes of 1171st Meeting of the Town Planning Board held on 10.5.2018 Present Permanent Secretary for Development Chairperson (Planning and Lands) Ms Bernadette H.H. Linn Professor S.C. Wong Vice-Chairperson Mr Ivan C.S. Fu Mr Sunny L.K. Ho Mr Stephen H.B. Yau Mr David Y.T. Lui Dr Frankie W.C. Yeung Mr Peter K.T. Yuen Dr Lawrence W.C. Poon Mr Wilson Y.W. Fung Mr Thomas O.S. Ho Mr Alex T.H. Lai Professor T.S. Liu Ms Sandy H.Y. Wong Mr Franklin Yu Mr L.T. Kwok - 2 - Mr Daniel K.S. Lau Mr K.W. Leung Professor John C.Y. Ng Professor Jonathan W.C. Wong Assistant Director (Environmental Assessment) Environmental Protection Department Mr C.F. Wong Assistant Director (Regional 1) Lands Department Mr Simon S.W. Wang Chief Engineer (Works) Home Affairs Department Mr Martin W.C. Kwan Chief Traffic Engineer (New Territories East) Transport Department Mr Ricky W.K. Ho Deputy Director of Planning/District Secretary Ms Jacinta K.C. Woo Absent with Apologies Mr Lincoln L.H. Huang Mr H.W. Cheung Dr F.C. Chan Mr Philip S.L. Kan Mr K.K. Cheung Dr C.H. Hau Dr Lawrence K.C. Li Mr Stephen L.H. Liu Miss Winnie W.M. Ng - 3 - Mr Stanley T.S. Choi Ms Lilian S.K. Law Dr Jeanne C.Y. Ng Mr Ricky W.Y. Yu Director of Planning Mr Raymond K.W. Lee In Attendance Assistant Director of Planning/Board Ms April K.Y.
    [Show full text]
  • Palaeozoic Rocks of the San Tin Group Classification and Distribution
    PalaeozoicRocks of the San Tin Group Classification and Distribution The sedimenmryrocks of this Palaeozoicbasin (the San Tin Group) occupy a northeasterly,curving, faulted, irregular belt at least 25 km long and up to a maximum of 4 km in width. This fault-bounded basinextends northwards into Shenzhenand Guangdong,and south throughTuen Mun. Bennett (1984c) outlined the basic structureof the areaas a narrow grabenbetween the CastlePeak and the Sung Kong granites,and noted the presenceof metasedimenmryrocks of the Repulse Bay Formation and the Lok Ma ChauFormation. The San Tin Group is divided into two formations; a lower, largely calcareousYuen Long Formation, and an upper, mostly arenaceous/argillaceousLok Ma ChauFormation (Langford et ai, 1989)(Figure5). Yuen Long Formation The Yuen Long Fonnation was named by Lee (1985) to distinguish the concealed marbles and limestonesof the Yuen Long area from the better known clastic rocks belonging to the establishedand exposed Lok Ma Chau Fonnation (Bennett, 1984b). The distinctive carbonate lithologies were originally recognised by Ha et al (1981), who suggested that they probably belonged to the CarboniferousPeriod. General supportfor a Carboniferousage was provided by the strike of the rocks which could be traced northeastwardsinto Shenzhen,where unpublished1:50 000 geologicalmapping of the Shenzhen,Special Economic Zone apparently showed similar lithologies classified as Lower Carboniferous(Visean) (Lai & Mui, 1985). The Yuen Long Fonnation is overlain by the Lok Ma Chau Fonnation. The boundary betweenthe two fonnations is in places gradationalbut in others sharp and probably unconfonnable.The presenceof beds of marble intercalatedwith the lowest metasiltstonesin someboreholes is interpretedby Langford et al (1989) to be a gradual passagefrom a dominantly calcareoussequence to one of largely clastic material.
    [Show full text]
  • EP) Provision of Compensatory Marine Park for Integrated Waste Management Facilities at an Artificial Island Near Shek Kwu Chau – Investigation”(The Study
    Agreement No. CE 14/2012 (EP) Provision of Compensatory Marine Park for Integrated Waste Management Facilities at an Artificial Island near Shek Kwu Chau – Investigation Executive Summary 07 November 2019 Environmental Resources Management 2507, 25/F, One Habrourfront 18 Tak Fung Street Hunghom, Kowloon Hong Kong Telephone 2271 3000 Facsimile 2723 5660 www.erm.com Environmental Resources Agreement No. CE 14/2012 (EP Management Provision of Compensatory Marine 2507, 25/F, Park for Integrated Waste One Habrourfront 18 Tak Fung Street Management Facilities at an Hunghom, Kowloon Artificial Island near Shek Kwu Hong Kong Telephone: (852) 2271 3000 Chau – Investigation Facsimile: (852) 2723 5660 E-mail: [email protected] http://www.erm.com Executive Summary Document Code: 0302663_Executive Summary_v4.docx Client: Project No: Environmental Protection Department (EPD) 0302663 Summary: Date: 07 November 2019 Approved by: This document presents the Executive Summary for the EPD consultancy (Agreement No. CE 14/2012(EP)) Provision of Compensatory Marine Park for Integrated Waste Management Facilities at an Artificial Island near Shek Kwu Chau – Investigation. Craig A Reid Partner 4 Executive Summary Var JT CAR 7/11/19 3 Executive Summary Var JT CAR 16/10/19 2 Executive Summary Var JT CAR 3/7/19 1 Executive Summary Var JT CAR 6/5/19 0 Executive Summary (Draft) CY JT CAR 1/2/19 Revision Description By Checked Approved Date Distribution Internal Government Confidential CONTENTS 1 INTRODUCTION 1 1.1 BACKGROUND TO THE STUDY 1 1.2 OBJECTIVES OF THE STUDY
    [Show full text]
  • Property Investment 2011 Highlights
    Review of Operations – Business in Hong Kong Property Investment 2011 Highlights • Including attributable contributions from associates and jointly controlled entities, the Group’s gross rental income increased by 11% year-on-year to HK$4,889 million, setting a new record • 9.2 million square feet in attributable gross floor area of completed investment properties • Quality portfolio with core properties attaining 97% occupancy at 31 December 2011 Property Investment Leasing performance was impressive innovative marketing activities, including during the year with gross rental income organizing shopping tours for mainlanders setting a new record. The Group’s and an increased adoption of multi-media At 31 December 2011, the Group held attributable gross rental incomeNote in Hong promotional channels, to draw more a total attributable gross floor area of Kong for the year ended 31 December shoppers to its shopping malls and boost approximately 9.2 million square feet in 2011 increased by 11% to HK$4,889 tenants’ business. These marketing efforts completed investment properties in Hong million, whilst pre-tax net rental incomeNote coupled with the advantageous locations Kong, comprising 4.5 million square feet was HK$3,585 million, representing a near MTR stations make these shopping of commercial or retail space, 3.4 million growth of 15% over the previous year. At malls the preferred choice for many square feet of office space, 0.9 million 31 December 2011, the leasing rate for the discerning retailers. For instance, Inditex, square feet of industrial/office space and Group’s core rental properties rose to 97%. a global fashion group, has committed to a 0.4 million square feet of residential and (Note: this figure includes that derived from the total gross floor area of 62,000 square feet at apartment space.
    [Show full text]
  • Office Address of the Labour Relations Division
    If you wish to make enquiries or complaints or lodge claims on matters related to the Employment Ordinance, the Minimum Wage Ordinance or contracts of employment with the Labour Department, please approach, according to your place of work, the nearby branch office of the Labour Relations Division for assistance. Office address Areas covered Labour Relations Division (Hong Kong East) (Eastern side of Arsenal Street), HK Arts Centre, Wan Chai, Causeway Bay, 12/F, 14 Taikoo Wan Road, Taikoo Shing, Happy Valley, Tin Hau, Fortress Hill, North Point, Taikoo Place, Quarry Bay, Hong Kong. Shau Ki Wan, Chai Wan, Tai Tam, Stanley, Repulse Bay, Chung Hum Kok, South Bay, Deep Water Bay (east), Shek O and Po Toi Island. Labour Relations Division (Hong Kong West) (Western side of Arsenal Street including Police Headquarters), HK Academy 3/F, Western Magistracy Building, of Performing Arts, Fenwick Pier, Admiralty, Central District, Sheung Wan, 2A Pok Fu Lam Road, The Peak, Sai Ying Pun, Kennedy Town, Cyberport, Residence Bel-air, Hong Kong. Aberdeen, Wong Chuk Hang, Deep Water Bay (west), Peng Chau, Cheung Chau, Lamma Island, Shek Kwu Chau, Hei Ling Chau, Siu A Chau, Tai A Chau, Tung Lung Chau, Discovery Bay and Mui Wo of Lantau Island. Labour Relations Division (Kowloon East) To Kwa Wan, Ma Tau Wai, Hung Hom, Ho Man Tin, Kowloon City, UGF, Trade and Industry Tower, Kowloon Tong (eastern side of Waterloo Road), Wang Tau Hom, San Po 3 Concorde Road, Kowloon. Kong, Wong Tai Sin, Tsz Wan Shan, Diamond Hill, Choi Hung Estate, Ngau Chi Wan and Kowloon Bay (including Telford Gardens and Richland Gardens).
    [Show full text]
  • (Site B19) Yuen Long
    Yuen Long (Site B19) Area (Plan B19) : “OU(B) ” Zone 2009 2014^ Difference (in ha) (about) 11.63 6.94 -4.69@ No. of Private Industrial Buildings : 2009 2014^ Difference Occupied 24 17 -7@ Wholly vacant - - - Under renovation - - - Tot al 24 17 -7 Other Building(s)/Site(s) : 2009 2014^ Difference Private Nil Government Petrol filling station 1 1 - Bus depot 1 1 - ^ Survey undertaken in March 2014. @ Involving an area with seven industrial buildings rezoned to “R(E)1” in March 2011 based on the recommendations of the 2009 Area Assessments. Details of Private Industrial Buildings Total No. of Private Industrial Buildings : 17 Total No. of Units Involved : 786 Total GFA* Involved (about) : 207,733m2 No. of Sample Units Surveyed : 701 (89.1%) * 2 Total GFA Involved (about) : 194,356m (93.6%) No. of Buildings Wholly Under Occupied Tot al vacant renovation No. of Storeys 1 - 7 storeys 9 - - 9 8 - 19 storeys 8 - - 8 20 storeys or above - - - - Land Ownership (as at end June 2014) Single 8 - - 8 Multiple 9 - - 9 Building Age (as at end March 2014) < 15 years - - - - 15 – 29 years 16 - - 16 30 years or above 1 - - 1 Building Condition Good 1 - - 1 Fair 16 - - 16 Poor - - - - * Conversion factor from internal floor area to gross floor area is 1.3333. Yuen Long “OU(B)” Area 1 Surrounding Land Uses : Residential developments, villages, industrial buildings in nearby “R(E)” zone, government, institution and community uses, open spaces, open car parks, nullah and West Rail Long Ping Station. Vacancy Rate (based on GFA*) PlanD’s Area Assessments “OU(B)” Zone 2009 Area Assessments Survey in 2013-14 Territorial 8.4% 6.0% Northwest New Territories 4.7% 3.0% Yuen Long 4.7% 0.8%# # Survey undertaken in March 2014.
    [Show full text]
  • Installation Locations of Internet Protocol Cameras
    Annex Installation Locations of Internet Protocol Cameras District Installation Locations Central / 1. Outside Bowen Road Refuse Collection Point Western 2. Recyclable Collection Bin at Elgin Street (near Mid-Levels Escalator) 3. Rear Lane of Hau Wo Street, Sai Wan 4. At the junction of Elgin Street and Staunton Street 5. At the junction of Castle Steps and Robinson Place, No. 70 Robinson Road, Mid-Levels 6. Sands Street (near Lift) 7. Wo On Lane 8. Near Shek Tong Tsui Whitty Street Children's Playground 9. Pavement of Davis Street (section between Forbes Street and Belcher's Street) 10. Recyclable Collection Bin at Mosque Street (near Mid-Levels Escalator) 11. At the junction of Sataunton Street and Shelly Street Wanchai 12. Cannon Street 13. At the junction of Bowrington Road and Wan Chai Road 14. Pavement outside Methadone Clinic, No. 2 O'Brien Road 15. At the junction of Hennessy Road and Johnston Road (near Methodist House) 16. Tin Hau Station near Lau Sin Street Temporary Sitting-out Area 17. At the junction of Leighton Road and Wong Nai Chung Road(near Craigengower Cricket Club) 18. No. 4 Tin Hau Temple Road 19. At the junction of Cross Lane and Wood Road 20. At the junction of Canal Road West and Wan Chai Road 21. At the junction of Spring Garden Lane and Sam Pan Street (outside Spring Garden Lane Sitting-out Area) Eastern 22. At the junction of Shing On Street and Tai Shek Street, Sai Wan Ho 23. At the junction of North Point Road and Chun Yeung Street/Java Road 24.
    [Show full text]