Annex Major Consultancy Agreements Awarded by Works Departments under the Category A Items of Development Bureau and Transport and Housing Bureau (2018-19 LegCo Session) Project Project Title Consultants Consultants’ Code fees1 ($ million) 4425DS Relocation of Sha Tin AECOM Asia Company Limited 21.7 Sewage Treatment Works to Mott MacDonald Hong Kong Limited caverns – site preparation and access tunnel construction 7822CL Kai Tak development - AECOM Asia Company Limited 23.8 infrastructure for Ramboll Hong Kong Limited developments at the former runway and south apron 7832CL Kai Tak Development - AECOM Asia Company Limited 16.2 stage 5B infrastructure Acuity Sustainability Consulting Limited works at the former north apron area 7747CL Advance site formation and AECOM Asia Company Limited 53.0 engineering infrastructure Mott MacDonald Hong Kong Limited works at Kwu Tung North new development area and Fanling North new development area 7759CL First stage of site formation AECOM Asia Company Limited 2.8 and engineering Mott MacDonald Hong Kong Limited infrastructure at Kwu Tung North new development area and Fanling North new development area Project Project Title Consultants Consultants’ Code fees1 ($ million) 7835CL Remaining phase of site Atkins China Limited 174.9 formation and engineering AECOM Asia Company Limited infrastructure works at Kwu Black & Veatch Hong Kong Limited Tung North new development area and Fanling North new development area - detailed design and site investigation 7793CL Site formation and AECOM Asia Company Limited 8.3 infrastructure works for Acuity Sustainability Consulting Limited Police facilities in Kong Nga Po 6863TH Widening of western Ove Arup & Partners Hong Kong 1.7 section of Lin Ma Hang Limited Road between Ping Yuen River and Ping Che Road Major Consultancy Agreements Awarded by Works Departments under the Category A Items of Development Bureau and Transport and Housing Bureau (2019-20 LegCo Session) Project Project Title Consultants Consultants’ Code fees1 ($ million) 7785TH Trunk Road T2 and Cha Kwo Ling Hyder-Meinhardt Joint Venture 15.1 Tunnel – Construction Ramboll Hong Kong Limited 7833CL Kai Tak development - remaining Hyder-Meinhardt Joint Venture 0.8 infrastructure works for developments at the former runway and south apron, phase 1 9357WF Design and construction for first Black & Veatch Hong Kong 74.0 stage of desalination plant at Tseung Limited Kwan O ANewR Consulting Limited 6188TB Footbridge near MTR Kowloon Bay WSP (Asia) Limited 1.6 Station Exit B 5051TF Reconstruction of Pak Kok Pier on Acuity Sustainability 0.2 Lamma Island Consulting Limited B780CL Site formation and infrastructure Ove Arup & Partners Hong 4.2 works for public housing Kong Limited development at Wang Chau, Yuen Long 4186CD Rehabilitation of underground Black & Veatch Hong Kong 1.6 stormwater drains stage 2 Limited 4171CD Revitalization of Tsui Ping River Atkins China Limited 5.4 3468RO Improvement of Lam Wah Street TLS & Associates Limited 0.7 Playground and adjacent area 7846CL Hung Shui Kiu/Ha Tsuen New Ove Arup & Partners Hong 37.5 Development Area stage 2 works - Kong Limited detailed design and site investigation Project Project Title Consultants Consultants’ Code fees1 ($ million) 7845CL Hung Shui Kiu/Ha Tsuen New Ove Arup & Partners Hong 31.6 Development Area advance works Kong Limited phases 1 & 2 - site formation and AECOM Asia Company engineering infrastructure and phase Limited 3 - detailed design and site investigation 7796CL Hung Shui Kiu/Ha Tsuen New Mott MacDonald Hong Kong 4.1 Development Area stage 1 works - Limited site formation and engineering infrastructure 7831CL West Kowloon Reclamation – main Mott MacDonald Consultants 5.4 works (remainder) – footbridge at (HK) Limited the junction of Sham Mong Road and Hing Wah Street West in Sham Shui Po B795CL Site formation and infrastructure Ove Arup & Partners Hong 11.0 works for public housing Kong Limited developments at Pok Fu Lam South 7666CL Formation, roads and drains in Area ANewR Consulting Limited 0.4 54, Tuen Mun – phase 1 stage 2 PYPUN Engineering Consultants Limited 7844CL Formation, roads and drains in Area ANewR Consulting Limited 2.0 54, Tuen Mun – phase 2, stage 4B PYPUN Engineering works Consultants Limited B812CL Site formation and infrastructure WSP (Asia) Limited 7.1 works for public housing developments at Pik Wan Road, Yau Tong 6875TH Noise enclosures at Gascoigne Road Mott MacDonald Hong Kong 1.0 Flyover Limited 6853TH Widening of Castle Peak Road - AECOM Consulting Services 4.1 Castle Peak Bay Limited Project Project Title Consultants Consultants’ Code fees1 ($ million) 9181WF In-situ reprovisioning of Sha Tin AECOM Asia Company 40.5 water treatment works (South Limited Works) – main works 9368WF Improvement to Dongjiang water Meinhardt Infrastructure and 4.3 mains P4 at Sheung Shui and Environment Limited Fanling 9369WF Uprating of Sheung Wong Yi Au Meinhardt Infrastructure and 4.3 fresh water supply system - stage Environment Limited 1 9196WC Implementation of Water Intelligent Black & Veatch Hong Kong 9.4 Network Limited Meinhardt (Hong Kong) Limited 6850TH New Wang Tong River Bridge ANewR Consulting Limited 0.3 7265RS Cycle tracks connecting North West Ho Tin & Associates 0.3 New Territories with North East Consulting Engineers Limited New Territories – Sam Mun Tsai extension 4185CD Drainage improvement works at Atkins China Limited 0.8 Yuen Long, stage 1 5052CG Greening master plans for Southwest ACLA Ltd. - Hyder Consulting 17.0 and Northeast New Territories – Ltd. Joint Venture priority greening works Mott MacDonald Hong Kong Limited Major Consultancy Agreements Awarded by Works Departments under the Category A Items of Development Bureau and Transport and Housing Bureau (2020-21 LegCo Session) Project Project Title Consultants Consultants’ Code fees1 ($ million) 3133KA Drainage Services Department C.S. Toh & Sons & Associates 11.9 Office Building at Cheung Sha Limited Wan Sewage Pumping Station 7765CL Development of Anderson Road AECOM Asia Company Limited 2.1 Quarry site - remaining pedestrian connectivity facilities works 3129KA Water Supplies Department Ronald Lu & Partners (Hong 36.7 Headquarters with Hong Kong Kong) Ltd and Islands Regional Office and Rider Levett Bucknall Limited Correctional Services Department Headquarters building in Chai Wan 7716CL Tseung Kwan O further AECOM Asia Company Limited 1.9 development - infrastructure works for Tseung Kwan O stage 1 landfill site 4445DS Relocation of Sha Tin Sewage AECOM Asia Company Limited 37.2 Treatment Works to caverns – main caverns construction and upstream sewerage works B857CL Site formation and infrastructure Black & Veatch Hong Kong 5.7 works for public housing Limited developments at Tuen Mun Central – Phase 1 7856CL Development of Lok Ma Chau AECOM Asia Company Limited 34.5 Loop – Main Works Package 1 – site formation and infrastructure works 4172CD Rehabilitation of underground Black & Veatch Hong Kong 2.4 stormwater drains - remaining Limited works Project Project Title Consultants Consultants’ Code fees1 ($ million) B858CL Site formation and infrastructure AECOM Asia Company Limited 8.7 works for public housing developments at Kam Tin South, Yuen Long - Phase 1 Note: 1. Consultants’ fees funded under respective Project. .
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages7 Page
-
File Size-