Mongolian Place Names and Stratigraphic Terms
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Cross-Border Trade and Transport Infrastructure Development In
CrossCross--borderborder tradetrade andand transporttransport infrastructureinfrastructure developmentdevelopment inin NEANEA By:By: Prof.Prof. GotovGotov Dugerjav,Dugerjav, Dr.ScDr.Sc ContentsContents — NEA and Mongolia cooperation — Mongolia’s Macroeconomic Review — Brief description of the Eastern Mongolia — Infrastructure capacity review — Future Development Potential (on- going/planned megaprojects, traffic forecasts) — Road and Rail Transport corridors — Conclusions and Recommendations Gotov Dugerjav 2 I. NEA and Mongolia cooperation Gotov Dugerjav 3 NEANEA cooperationcooperation Northeast Asia : • 3 of the world’s major powers, • 2 of the 5 permanent members of the UN Security Council, and • 2 of the largest economies of the world • 2 of the BRIC’s countries. It is also a home to one of the world’s hottest flash points. The situation in the sub-region remains fragile, although it is relatively stable. Gotov Dugerjav 4 BasisBasis ofof CooperationCooperation This area of the World includes countries with very diverse political and economic conditions. The basis of an international economic cooperation framework could be a combination of rich mineral resources of Mongolia and investment capital and advanced technology from South Korea and Japan, as well as a considerable pool of workforce from China (PRC) and North Korea. Gotov Dugerjav 5 MongoliaMongolia’’ss foreignforeign tradetrade withwith NEA,NEA, millionmillion USDUSD Export Import 2009 2010 2011 2009 2010 2011 Total 1888 385.1 2 908 502.2 4 780 350.5 2 137 673.5 3 200 053.3 6 526 882.4 NEA 1 414 023 2 499 662.6 4 449 328.7 794 553.8 1 355 282.5 2 851 436.7 DPRK - 25.5 - 47.1 798.5 740.0 ROK 15 458.1 30 519.9 1 896.1 155 102.2 181 781.9 350 648.5 PRC 1 393 906.7 2 466 265.5 4 400 735.7 538 582.6 970 976.0 2 007 572.2 Taiwan 94.0 182.0 10.0 3 768.4 5 238.1 8 966.5 Japan 4 564.2 2 669.7 10 694.6 97 053.5 196 488.0 483 509.5 Source: National Statistical Office, Mongolia Gotov Dugerjav 6 II. -
The Great Purge
First published in Twentieth Century Mongolia, Cambridge, White Horse Press, 1999 45 THE GREAT PURGE Baabar Chapter Twenty-One: The Great Purge ASS officially expressed its condolences on Demid’s death. In Ulaanbaatar, TChoibalsan mourned the decease of “his only close friend in the world” by taking an oath of allegiance. After the burial ceremony, on September 2, Choibalsan became Commander-in-Chief and Minister for Defense. The next day he issued Order No. 366, which stated: There are indications that among us are individuals and groups whose political conscious- ness has become so dull that they have fallen under the influence of Japanese spies and provocateurs and have become traitors of their native land.1 Creating an impression of the omnipresence of spies and traitors and producing justifications for future arrests was part of the final psychological preparation for the Great Purge. The technical preparations for the massacre were already complete. Many important things had happened in the few days between Demid’s death and the day Order No. 366 was signed by Choibalsan. On August 13, 1937, the Central Committee of the All- Union Communist (Bolshevik) Party chaired by Stalin decided to station the Red Army in Mongolia and to send a Bolshevik delegation there to implement the decision.2 On August 24, 1937, a large delegation of the Soviet government arrived in Ulaanbaatar unannounced. It included Smirnov, Deputy Minister for Defense, Frinovski, Deputy Minister for Soviet Internal Affairs, and Mironov, the newly assigned representative in Mongolia. Apparently the delegation had not intended to meet with Demid in Mongolia, who had just been called to Moscow for the second time, but rather to present to Prime Minister Amar Japan’s plan to take over Mongolia. -
Infrastructure Strategy Review Making Choices in Provision of Infrastructure Services
MONGOLIA Infrastructure Strategy Review Making Choices in Provision of Infrastructure Services S. Rivera East Asia & Pacific The World Bank Government of Mongolia: Working Group Technical Donors Meeting October, 2006. 1 Mongolia: Infrastructure Strategy The Process and Outputs Factors Shaping Infrastructure Strategy Demand Key Choices to discuss this morning 2 Process and Outcome The Process – An interactive process, bringing together international practices: Meeting in Washington, March 2005. Field work in the late 2005. Preparation of about 12 background notes in sector and themes, discussed in Washington on June 2006. Submission of final draft report in November, 2006 Launching of Infrastructure Strategy report in a two day meeting in early 2007. Outcome A live document that can shape and form policy discussions on PIP, National Development Plan, and Regional Development Strategy….it has been difficult for the team to assess choices as well. 3 Factors Shaping the IS • Urban led Size and Growth of Ulaanbaatar and Selected Aimag (Pillar) Centers Size of the Circle=Total Population ('000) Infrastructure 6% 5% 869.9 Investments ) l 4% ua nn 3% a Ulaanbaatar (%, 2% h t Darkhan w Erdenet o 1% r G n 0% o i -10 0 10 20 30 40 50 60 70 80 at l -1% Choibalsan Kharkhorin opu Ondorkhaan P -2% Khovd Uliastai -3% Zuunmod -4% Share of Total Urban Population (%) 4 Factors Shaping the IS: Connectivity, with the World and in Mongolia Khankh Khandgait Ulaanbaishint Ereentsav Khatgal Altanbulag ULAANGOM Nogoonnuur UVS KHUVSGUL Tsagaannuur ÒýñTes -
Land Use and Land Tenure in Mongolia: a Brief History and Current Issues Maria E
Land Use and Land Tenure in Mongolia: A Brief History and Current Issues Maria E. Fernandez-Gimenez Maria E. Fernandez-Gimenez is an Assistant Professor in the Department of Forest, Rangeland, and Watershed Stewardship at Colorado State University. She received her PhD at the University of California, Berkeley in 1997 and has conducted research in Mongolia since 1993. Her current areas of research include pastoral development policy; community-based natural resource management; traditional and local ecological knowledge; and monitoring and adaptive management in rangeland ecosystems. strategies have not changed greatly; mobile and flexible grazing Abstract—This essay argues that an awareness of the historical relation- ships among land use, land tenure, and the political economy of Mongolia strategies adapted to cope with harsh and variable production is essential to understanding current pastoral land use patterns and policies conditions remain the cornerstone of Mongolian pastoralism. in Mongolia. Although pastoral land use patterns have altered over time in Similarly, although land tenure regimes have evolved towards response to the changing political economy, mobility and flexibility remain increasingly individuated tenure over pastoral resources, hallmarks of sustainable grazing in this harsh and variable climate, as do the communal use and management of pasturelands. Recent changes in Mongolia’s pasturelands continue to be held and managed as common political economy threaten the continued sustainability of Mongolian pastoral property resources in most locations, although these institutions systems due to increasing poverty and declining mobility among herders and have been greatly weakened in the past half century. The most the weakening of both formal and customary pasture management institu- recent changes in Mongolia’s political economy threaten the tions. -
MONGOLIA CONSTRAINTS ANALYSIS a Diagnostic Study of the Most Binding Constraints to Economic Growth in Mongolia
The production of this constraints analysis was led by the partner governments, and was used in the development of a Millennium Challenge Compact or threshold program. Although the preparation of the constraints analysis is a collaborative process, posting of the constraints analysis on this website does not constitute an endorsement by MCC of the content presented therein. 2014-001-1569-02 MONGOLIA CONSTRAINTS ANALYSIS A diagnostic study of the most binding constraints to economic growth in Mongolia August 18, 2016 Produced by National Secretariat for the Second Compact Agreement between the Government of Mongolia and the Millennium Challenge Corporation of the USA With technical assistance from the Millennium Challenge Corporation i Table of Contents Contents Table of Contents ............................................................................................................................................... i List of Figures ............................................................................................................................................... iv List of Tables ................................................................................................................................................ vi Glossary of Terms .......................................................................................................................................... viii 1. Executive Summary ................................................................................................................................. -
Mongolia Country Report 2018
Toxic Site Identification Program in Mongolia Award: DCI-ENV/2015/371157 Prepared by: Erdenesaikhan Naidansuren Prepared for: UNIDO Date: October 2018 Pure Earth 475 Riverside Drive, Suite 860 New York, NY, USA +1 212 647 8330 www.pureearth.org Acknowledgements ................................................................................................................. 3 Organizational Background .................................................................................................... 3 Toxic Site Identification Program (TSIP) ............................................................................... 3 Project Background ................................................................................................................. 5 Country Background ............................................................................................................... 5 Implimentation Strategy .......................................................................................................... 6 Coordinating with the Government ........................................................................................ 6 Sharing TSIP Information ....................................................................................................... 7 Current Work .......................................................................................................................... 8 TSIP Training in Mongolia ....................................................................................................... 9 Sites -
Strategic Development Outline for Economic Cooperation Between the People's Republic of China and Mongolia
STRATEGIC DEVELOPMENT OUTLINE FOR ECONOMIC COOPERATION BETWEEN THE PEOPLE’S REPUBLIC OF CHINA AND MONGOLIA (PROJECT AREA: XINGANMENG PREFECTURE IN THE INNER MONGOLIA AUTONOMOUS REGION OF THE PRC AND THE PROVINCES OF DORNOD, HENTIY, SUHBAATAR OF MONGOLIA ) i This publication was prepared by Asian Development Bank consultants under the guidance of Bank staff. The findings, interpre- tations, and conclusions expressed in it do not necessarily represent the views of the Bank or those of its member countries. The Asian Development Bank does not guarantee the accuracy of the data in- cluded in this publication and accepts no responsibility whatsoever for any consequences of their use. @ Asian Development Bank 2002 ISBN No. 971-561-412-4 Stock No. 110501 Published by the Asian Development Bank P.O. Box. 789, 0980 Manila, Philippines For more information on ADB, visit http:\\www.adb.org ii STRATEGIC DEVELOPMENT OUTLINE FOR ECONOMIC COOPERATION BETWEEN THE PEOPLE’S REPUBLIC OF CHINA AND MONGOLIA (PROJECT AREA: XINGANMENG PREFECTURE IN THE INNER MONGOLIA AUTONOMOUS REGION OF THE PRC AND THE PROVINCES OF DORNOD, HENTIY, SUHBAATAR OF MONGOLIA ) iii Message from the People’s Republic of China n line with the open door policy, the Government of options for economic cooperation in a specific project the People’s Republic of China regards promotion area covering Xinganmeng Prefecture of Inner Mongolia Iof economic cooperation with neighboring coun- Autonomous Region and the three eastern provinces in tries as a special means to accelerate growth and eco- Mongolia. As revealed by the strategic study, the two nomic development of the local economy in the provinces countries have good opportunity to cooperate in the and autonomous regions that share border with other project area in the sectors of agriculture, mining, tour- countries. -
Implications for Predatory Dinosaur Macroecology and Ontogeny in Later Late Cretaceous Asiamerica
Canadian Journal of Earth Sciences Theropod Guild Structure and the Tyrannosaurid Niche Assimilation Hypothesis: Implications for Predatory Dinosaur Macroecology and Ontogeny in later Late Cretaceous Asiamerica Journal: Canadian Journal of Earth Sciences Manuscript ID cjes-2020-0174.R1 Manuscript Type: Article Date Submitted by the 04-Jan-2021 Author: Complete List of Authors: Holtz, Thomas; University of Maryland at College Park, Department of Geology; NationalDraft Museum of Natural History, Department of Geology Keyword: Dinosaur, Ontogeny, Theropod, Paleocology, Mesozoic, Tyrannosauridae Is the invited manuscript for consideration in a Special Tribute to Dale Russell Issue? : © The Author(s) or their Institution(s) Page 1 of 91 Canadian Journal of Earth Sciences 1 Theropod Guild Structure and the Tyrannosaurid Niche Assimilation Hypothesis: 2 Implications for Predatory Dinosaur Macroecology and Ontogeny in later Late Cretaceous 3 Asiamerica 4 5 6 Thomas R. Holtz, Jr. 7 8 Department of Geology, University of Maryland, College Park, MD 20742 USA 9 Department of Paleobiology, National Museum of Natural History, Washington, DC 20013 USA 10 Email address: [email protected] 11 ORCID: 0000-0002-2906-4900 Draft 12 13 Thomas R. Holtz, Jr. 14 Department of Geology 15 8000 Regents Drive 16 University of Maryland 17 College Park, MD 20742 18 USA 19 Phone: 1-301-405-4084 20 Fax: 1-301-314-9661 21 Email address: [email protected] 22 23 1 © The Author(s) or their Institution(s) Canadian Journal of Earth Sciences Page 2 of 91 24 ABSTRACT 25 Well-sampled dinosaur communities from the Jurassic through the early Late Cretaceous show 26 greater taxonomic diversity among larger (>50kg) theropod taxa than communities of the 27 Campano-Maastrichtian, particularly to those of eastern/central Asia and Laramidia. -
Introduction on Dry Ports in Mongolia
Introduction on Dry Ports in Mongolia 2017.11.14 Dry Ports Significance for Introduction Land‐Locked Countries Mongolia is an ideal environment for the development of Dry Ports. With fast growing local industries and volumes of cargo exchanged with our world, with no access to a sea but with a relatively good connection to neighboring ports of Russia and China calls for an erection and development of respective hubs, even with reflection of the vast territory of the country and a minor‐but‐growing intensity of settlement. Dry Ports Significance for Dry Ports Significance for Land‐Locked Land‐Locked Countries Countries as Mongolia • Mongolia ratified the Intergovernmental Agreement on Dry Ports on 23 April 2016. • The Agreement identifies a number of existing and potential dry port locations that are to be the basis of a coordinated effort to creates modes along an international integrated intermodal transport and logistics system. Dry Ports Significance for Dry Ports in Mongolia Land‐Locked Countries o Altanbulag (border with Russian Federation) o Ulaanbaatar o Sainshand o Zamyn-Uud (border with People`s republic of China) o Choibalsan (potential dry port) Dry Ports Significance for Dry Ports in Mongolia Land‐Locked Countries Dry Ports Significance for Dry Ports in Mongolia – Access to the Sea Land‐Locked Countries Dry Ports Significance for Dry Ports in PRC&RF - Significance for Mongolia Land‐Locked Countries CHINA • Erenhot South International Logistics Center, Erenhot • Manzhouli New International Freight Yard, Manzhouli • (altogether 17 ports, the above 2 have a direct connection with Mongolia). Dry Ports Significance for Dry Ports Significance for Land‐Locked Land‐Locked Countries Countries Nominated as Dry Ports /inland ports/ in Mongolia ALTANBULAG and ZAMYN-UUD are respectfully key parts of a wider Altanbulag and Zamyn-Uud Special Economic Zones. -
Land Acquisition and Resettlement Plan Progress Report MON
Land Acquisition and Resettlement Plan Progress Report Annual Report December 2020 MON: Southeast Gobi Urban and Border Town Development Project–Additional Financing Prepared by Project Management Unit for the Ministry of Construction and Urban Development of Mongolia and the Asian Development Bank. This land acquisition and resettlement plan progress report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. L3388-MON: Southeast Gobi Urban and Border Town Development Project-Additional Financing Land Acquisition and Resettlement Plan Progress Report Project Management Unit December 2020 TABLE OF CONTENTS I. INTRODUCTION AND PROJECT BACKGROUND II. SCOPE OF THIS REPORT . III. PROJECT DESCRIPTION . 1. A1.1 Arkhangai WWTP and ancillary services 2. A1.4 Uvurkhangai WWTP and ancillary services 3. A1.1 Umnugovi WWTP and ancillary services 4. A1.1 Dornogovi WWTP and ancillary services 5. A1.1 Khujirt soum, Uvurkhangai WWTP and ancillary services IV. GRIEVANCE REDRESSAL MECHANISM V. CONCLUSION Attachment: Photos ABBREVIATIONS ADB Asian Development Bank AP Affected Person / People PMU Project Management Unit LAR Land Acquisition and Resettlement LARP Land Acquisition and Resettlement Plan LACUDD Land Affairs, Construction and Urban Development Division PUSO Public Utilities Service Organization WWTP Wastewater Treatment Plant GRM Grievance Redressal Mechanism I. -
Overview of Civil Aviation Sector in Mongolia
A38-WP/324 International Civil Aviation Organization EC/37, TE/142 12/9/13 (Information paper) WORKING PAPER English only ASSEMBLY — 38TH SESSION ECONOMIC COMMISSION TECHNICAL COMMISSION Agenda Item 38: Other issues to be considered by the Technical Commission Agenda Item 43: Aviation Data — Monitoring and Analysis OVERVIEW OF CIVIL AVIATION SECTOR IN MONGOLIA (Presented by Mongolia) EXECUTIVE SUMMARY This information paper outlines the aviation sector activity of Mongolia by presenting the major developments and accomplishments in the sector and related actions taken by the Civil Aviation Authority (CAA) of Mongolia in addressing the challenges during the past triennium. Strategic This working paper relates to the Safety, and Environmental Protection and Sustainable Objectives: Development of Air Transport Strategic Objectives. Financial Not applicable. implications: References: 1. INTRODUCTION 1.1 This information paper outlines the aviation sector activity of Mongolia by presenting the major developments and accomplishments in the sector and related actions taken by the Civil Aviation Authority (CAA) of Mongolia in addressing the challenges during the past triennium. 1.2 The adoption of the State Policy on Civil Aviation in Mongolia up to the year 2020 for the first time was a major milestone for the civil aviation sector of Mongolia. The State Policy has outlined major objectives for the development of Mongolia civil aviation. 1.3 Mongolia remains committed to the strategic objectives of ICAO with respect to its goal of enhancing the global aviation safety and security, improving efficiency of aviation operations, minimizing adverse environmental impacts from air transport and strengthening the laws governing civil aviation. A38-WP/324 - 2 - EC/37, TE/142 2. -
Lyons SCIENCE 2021 the Influence of Juvenile Dinosaurs SUPPL.Pdf
science.sciencemag.org/content/371/6532/941/suppl/DC1 Supplementary Materials for The influence of juvenile dinosaurs on community structure and diversity Katlin Schroeder*, S. Kathleen Lyons, Felisa A. Smith *Corresponding author. Email: [email protected] Published 26 February 2021, Science 371, 941 (2021) DOI: 10.1126/science.abd9220 This PDF file includes: Materials and Methods Supplementary Text Figs. S1 and S2 Tables S1 to S7 References Other Supplementary Material for this manuscript includes the following: (available at science.sciencemag.org/content/371/6532/941/suppl/DC1) MDAR Reproducibility Checklist (PDF) Materials and Methods Data Dinosaur assemblages were identified by downloading all vertebrate occurrences known to species or genus level between 200Ma and 65MA from the Paleobiology Database (PaleoDB 30 https://paleobiodb.org/#/ download 6 August, 2018). Using associated depositional environment and taxonomic information, the vertebrate database was limited to only terrestrial organisms, excluding amphibians, pseudosuchians, champsosaurs and ichnotaxa. Taxa present in formations were confirmed against the most recent available literature, as of November, 2020. Synonymous taxa or otherwise duplicated taxa were removed. Taxa that could not be identified to genus level 35 were included as “Taxon X”. GPS locality data for all formations between 200MA and 65MA was downloaded from PaleoDB to create a minimally convex polygon for each possible formation. Any attempt to recreate local assemblages must include all potentially interacting species, while excluding those that would have been separated by either space or time. We argue it is 40 acceptable to substitute formation for home range in the case of non-avian dinosaurs, as range increases with body size.