Strategic Transport Projects Review Report 1 – Review of Current and Future Network Performance

Total Page:16

File Type:pdf, Size:1020Kb

Strategic Transport Projects Review Report 1 – Review of Current and Future Network Performance Transport Scotland Strategic Transport Projects Review Report 1 – Review of Current and Future Network Performance 5.3 Edinburgh 5.3.1 Setting the Context Edinburgh is Scotland’s capital city and plays a vital role in contributing to the economic well-being of the country. The city has a population of approximately 436,000190, and the SEStran area191, which largely correlates with the functioning of the Edinburgh labour market, has a population of approximately 1.5 million192. The city’s economy, which has been growing steadily in recent years, is dominated by the service sector with a strongly performing financial services sector and a significant number of public service employees. This growth has resulted in rising land and property prices and demand for further development in and around the city. Average house prices more than doubled between 1998 and 2006193. One of the consequences of this is the increase in the number of those working in Edinburgh but residing outside the city, increasing the levels of demand on radial routes into the city. Putting this into context, Edinburgh accounts for 45 per cent of the total employment in the SEStran area but only 30 per cent of the population. Figure 5.3.1 highlights the areas of particular relevance within Edinburgh. This shows the three key areas of economic activity within the city and the principal components of the transport network that support the city region. 190 General Register Office for Scotland Mid-2004 population estimates for town/city populations: http://www.gro- scotland.gov.uk/files1/stats/04mid-year-estimates-localities-table3.xls 191 SEStran includes City of Edinburgh Council, Clackmannanshire, East Lothian, Falkirk Council, Fife, Midlothian, Scottish Borders and West Lothian 192 General Register Office for Scotland Mid-2006 population estimates for administrative areas: http://www.gro- scotland.gov.uk/files1/stats/06mype-cahb-t2-revised.xls 193 Edinburgh City Council Capital Review www.capitalreview.co.uk 184 Transport Scotland Strategic Transport Projects Review Report 1 – Review of Current and Future Network Performance 185 Transport Scotland Strategic Transport Projects Review Report 1 – Review of Current and Future Network Performance Table 5.3.1 below summarises some relevant socio-economic characteristics for Edinburgh and provides a comparison against the regional and national context. Table 5.3.1: Summary of Socio Economic Characteristics Indicator Edinburgh “Region” Scotland UK (SEStran) Population (2005)194 436,000 1,437,000195 5,078,000 60,000,000 Population (2022)196 497,000 1,523,000 5,118,000 62,400,000 Population Change +14% + 6% +1% +4% (2005 – 2022)196 Employment (2005)196 298,300 668,100 2,330,900 27,900,000 Employment (2022)196 329,400 750,900 2,427,800 29,300,000 GVA per head £27,600 £17,390 £15,500 £16,200 (2005)197 Cars / capita (2005)198 0.35 0.40 0.39 0.42 Households with Car 60% 68% 67% 75% (2005)199 Figure 5.3.2 highlights the areas of particular growth in population and employment in future years within the city and its immediate environs. As the corridors serving Edinburgh are forecast to experience an increase in population in future years, there is expected to be a rising trend in commuting from the wider area to jobs located in Edinburgh. Inactivity rates are projected to decline in Edinburgh from 59,900 in 2005 to 50,700 in 2022196. Median gross weekly earnings in Edinburgh are £462, approximately 12 per cent higher than the national average for Scotland (£412)200. 194 General Register Office for Scotland Mid-2004 population estimates for town/city populations: http://www.gro- scotland.gov.uk/files1/stats/04mid-year-estimates-localities-table3.xls 195 General Register Office for Scotland Mid-2006 population estimates for administrative areas: http://www.gro- scotland.gov.uk/files1/stats/06mype-cahb-t2-revised.xls 196 TELMoS 197 Scottish Economic Statistics 2007 198 STS No.25 (2006) 199 Scotland’s Census 2001 www.scrol.gov.uk Table KS17 200 Scottish Economic Statistics 2006, table 4.20 186 Transport Scotland Strategic Transport Projects Review Report 1 – Review of Current and Future Network Performance 187 Transport Scotland Strategic Transport Projects Review Report 1 – Review of Current and Future Network Performance 5.3.2 Land Use Patterns Within Edinburgh, three areas of economic activity of national significance have been identified as being particularly relevant in terms of the STPR: • City centre (historic business and retail centre); • West Edinburgh (expanding business centre and established retail centre); and • South East Edinburgh (projected significant growth in business with nationally significant employers). Another key economic generator in Edinburgh is the international airport. The airport, located north of the A8, is one of the fastest growing airports in the UK having experienced an increase in passengers of approximately 160 per cent between 1995 and 2005. The changing land use patterns, particularly the projected growth in employment on the periphery of the city, will mean new challenges for the city’s transport network. The historical focus towards providing high quality public transport services to the city centre from the surrounding areas, whilst still important, will need to be augmented with improvements to peripheral economic locations, including the airport. These patterns have been in evidence in recent years with the increase in the level of orbital movements in Edinburgh to these areas of economic activity. This is forecast to continue in the years to come. This issue has been recognised in the SEStran Regional Transport Strategy201. 5.3.3 Transport Network and Operations Infrastructure and Services A number of radial routes serve Edinburgh, as shown in Figure 5.3.1. The A720, Edinburgh City Bypass Trunk Road, which stretches from Gogar in the west to Old Craighall in the east, provides the link between these routes. At the western end, the City Bypass connects with the A8 (non-trunk) at Gogar and the M8 Motorway at Hermiston. The A720 is a dual carriageway road with grade separated junctions, except at Gogar and Sheriffhall. The radial routes are a combination of single and dual carriageway. To the north west of the city, the A90 carries traffic between the Forth Road Bridge and Edinburgh. This route is not directly connected to the A720, although there are indirect links via either the recently opened M9 Spur or the A902 (non-trunk) from Barnton to Gogar. 201 SEStran Regional Transport Strategy www.SEStran.gov.uk 188 Transport Scotland Strategic Transport Projects Review Report 1 – Review of Current and Future Network Performance Edinburgh Waverley railway station is the second busiest in Scotland and is located in the heart of the city, with Haymarket Station at the western edge of the city centre providing access to the rail network throughout Scotland and beyond. To the east of Waverley is the East Coast Main Line, which provides a link to London and northeast England. There are also branch lines off the East Coast Main Line which serve North Berwick and Newcraighall. To the west, three lines converge at Haymarket: the East Coast Main Line to the Forth Bridge, serving Fife, Perth, Dundee and Aberdeen; the Edinburgh - Glasgow line to the west serving Glasgow Queen Street, Stirling and Bathgate and intermediate stations; and another connection to the west serving Glasgow Central, Motherwell, Shotts and northwest England. Service patterns vary throughout the day and week but are generally: • Four services per hour between Edinburgh and Glasgow via Falkirk; • One service per hour between Edinburgh and Perth; • One service per hour between Edinburgh and Dundee; • One service per hour between Edinburgh and Glasgow via Shotts; • Two services per hour between Edinburgh and Bathgate; • One service per hour between Edinburgh and North Berwick; • Two services per hour between Edinburgh and Stirling / Dunblane; • One service per hour between Edinburgh and London (National Express East Coast); • One or two services per hour to other English destinations (Arriva Cross-Country); and • One overnight sleeper service to London. The main railway stations within the City of Edinburgh Council area currently cater for some 17.1 million passengers per annum (2005). In addition, 15.8 million passengers per annum (2005) pass through stations within Edinburgh city centre202. Edinburgh has an extensive network of bus services to and from the city centre. The main urban operator in the Edinburgh area is Lothian Buses which is a publicly owned company with over 700 buses and 50 routes. First Edinburgh operates a network of services to and from some of the towns in the Lothians and the Scottish Borders. Stagecoach also operates services into Fife. There are also a range of medium sized and smaller companies operating services. St Andrew Square Bus Station is the hub for an extensive network of long distance bus services. Citylink and Megabus run services to much of Scotland. Citylink also operate a high frequency service between Glasgow and Edinburgh. Megabus and National Express provide services from Edinburgh to the rest of the UK. 202 Rail industry LENNON data (Station Usage 2004/2005) 189 Transport Scotland Strategic Transport Projects Review Report 1 – Review of Current and Future Network Performance Service patterns are generally: • Four buses per hour between Edinburgh and Glasgow (Citylink); • One bus per hour between Edinburgh and Galashiels (First); • Three buses per hour between Edinburgh and Stirling (Citylink/First); • Three buses per hour between Edinburgh and Dundee (Citylink / Stagecoach); • One bus per hour between Edinburgh and St Andrews (Stagecoach); • Two buses per hour between Edinburgh and Dunfermline (Stagecoach); and • One bus per hour between Edinburgh and Aberdeen (Citylink). Integrated tickets in Edinburgh are available in the form of the PLUSBUS ticket and ‘One- Ticket’. PLUSBUS covers rail journeys into Edinburgh and provides the addition of unlimited bus travel within the urban network.
Recommended publications
  • A Railway to Regenerate Levenmouth
    A railway to regenerate Levenmouth This booklet shows the benefits of reinstating the mothballed Levenmouth railway and how this would transform the A project that ticks local community. all the boxes Scottish National Transport Policy LMRC High Level Promote economic growth √ Objectives Promote social inclusion √ Protect environment and improve health √ Improve safety of journeys √ Improve integration √ Key Strategic Improved journey times and connections √ Outcomes Reduced emissions √ Improved quality, accessibility and affordability √ CONTENTS Page 1. INTRODUCTION 1.1 Executive Summary 1 1.2 The Vision 2 1.3 The Proposal 3 2. BACKGROUND INFORMATION 2.1 The mothballed Leven line 4 2.2 Population 6 2.3 Previous studies 8 2.4 Potential rail freight 10 2.5 Support for Levenmouth rail link 11 3. BENEFITS 3.1 Personal stories 12 3.2 What makes a good rail reopening project? 14 3.3 Delivering Scottish Government policy 15 3.4 Freight 16 3.5 Land Value Capture 17 3.6 Tourism 18 3.7 Wider economic and regional benefits 20 3.8 The business case - Benefit to Cost ratio 21 4. RE-INSTATING THE RAILWAY 4.1 Construction costs - Comparing Levenmouth with Borders 22 4.2 Timetable issues 24 4.3 Other project issues 25 5. MOVING FORWARD 5.1 Conclusions 26 5.2 The final report? 26 6. LEVENMOUTH RAIL CAMPAIGN 6.1 About our campaign 27 6.2 Our Charter 28 6.3 More information 29 - 1 - 1. Introduction 1.1 Executive Summary This booklet has been produced by the Levenmouth Rail Campaign (LMRC) with the support of a group of railway professionals who wish to lend their expertise to the campaign.
    [Show full text]
  • Investing for the Future
    The new ScotRail franchise: good for passengers, staff and Scotland Improving your journey from door to door magazine Abellio ScotRail Investing for the future The Abellio Way Magazine – Abellio ScotRail special – Spring 2015 Travelling on the Forth Bridge and enjoying the wonderful view A northern gannet flying in front of Bass Rock SCOTRAIL SPECIAL - SPRING 2015 3 CONTENTS Ambitious plans and Abellio It is with enormous pleasure that I find myself writing 4 WE ARE ABELLIO the introduction to this special edition of The Abellio What can you expect from us? Way Magazine from my home in Edinburgh. When Abellio was granted the privilege of operating 6 JEFF HOOGESTEGER MEETS TRANSPORT Scotland’s rail services, I had no hesitation in making this my home. You may consider that a rather self- MINISTER DEREK MACKAY serving decision, after all who wouldn’t choose to live “This is an incredibly exciting period for transport in this beautiful country! However, as a Dutchman, it in Scotland” won’t surprise you that it was also a sensible business decision. 10 ABELLIO’S VISION FOR THE NEW The Scottish Government has ambitious plans to SCOTRAIL FRANCHISE transform its railways and I am grateful to them for Good for passengers, good for staff and choosing Abellio to assist in that purpose. We have many exciting and challenging plans for ScotRail, as good for Scotland you will read in this special edition, and it is my intention to work with the team wherever possible 13 WORKING TOGETHER FOR THE PASSENGER to deliver them. ScotRail and Network Rail Performance for passengers 14 BOOSTING TOURISM Living here, I will also be travelling by train most days to our new UK headquarters in Glasgow, and regularly Travel the Great Scenic Railways of Scotland using other parts of the ScotRail network.
    [Show full text]
  • TRI00000076 0001 Borders Rail and I Have Also Served on the Transport Committee of the Cockburn Association
    Edinburgh Tram Inquiry Office Use Only Witness Name: Robert Alexander DRYSDALE Dated: THE EDINBURGH TRAM INQUIRY Witness Statement of Robert Alexander DRYSDALE Statement taken by Raymond Gray on 13 October 2016. My full name is Robert Alexander Drysdale. I am aged 61, my date of birth being . My contact details are known to the Inquiry. I am a retired Chartered Town Planning Consultant. Statement: 1. I am a recently retired planning consultant with 37 years' experience in this role. I worked within the planning department of Midlothian Council from 1979 until 1986. Between 1986 and 2016 I worked within the private sector as a planning consultant, initially for large property consultancy firms and then from 1996 in my own practice. During this time I provided advice to companies involved in major developments including Edinburgh Business Park. An important part of these projects was to advise on strategic objectives such as transport links to the sites. In respect of Edinburgh Business Park I recommended, as part of the designing of the business park in the early 1990s, that provision be made for possible future rapid transit access to the development, by way of a reserved north~south route through the business park. It is this route which is now used by the Edinburgh Tram. 2. I have a keen interest in transport infrastructure both on a personal and professional level. I am currently a committee member for the Campaign for Page 1 of7 TRI00000076 0001 Borders Rail and I have also served on the Transport Committee of the Cockburn Association. 3.
    [Show full text]
  • Campaigning for a Bigger Better Railway Railfuture Annual Review 2017 1
    Annual Review 2017 Campaigning for a bigger better railway Railfuture Annual Review 2017 1 www.railfuture.org.uk pushed into next year and beyond. Honorary Meanwhile, franchising is facing its most uncertain future since privatisation and there are doubts President’s whether the current model can survive. address It may seem that given all the travails of the railway, groups fighting for The coming year on the railways is full of both uncertainty and local improvements or reopenings opportunity. On the one hand, there may face an uphill task. Not is more money available for railway necessarily. The kind of ideas and investment than ever before, after an schemes that we are putting forward amazing settlement of the may well fit in with Network Rail’s Christian Wolmar investment plans which start in April wider plans. There is a new emphasis There may never be a better time to 2019. On the other hand, in the short term, the overspending during the on devolution, on listening to engage with the wider industry than current five year period means that ‘stakeholders’ and on finding quick during these rather troubled times. schemes have been reined back or wins. Go for it. which will stimulate economic Chair’s review growth. Campaigning for a bigger better Our key national campaigns for 2018 railway sounds simple, but what do are therefore: passengers first, fares we mean? and ticketing, route modernisation and a bigger railway. A better railway is one which puts the passenger first. Successful businesses Railfuture aims to put forward have excellent customer service realistic proposals to improve rail woven into their culture, gaining the services.
    [Show full text]
  • Appendix J Haddington Branch Line Survey
    Appendix J Haddington Branch Line Survey AllanRail East Lothian Access STAG Physical feasibility of re-opening the Haddington Rail Branch Line Background The reopening of the Haddington Railway branch line from the East Coast Main Line (ECML) at Longniddry to Haddington is one of the options that are required to be considered in the East Lothian Access STAG. This initial report informs the appraisal work of the feasibility of re-opening the railway, some of the issues and problems that would need to be resolved, choices that are available and suggests an order of magnitude cost. Because the rest of the railway is electrified it is assumed that the Haddington branch will also be equipped with standard 25Kv overhead electrification equipment. The report is based on a physical site walk-over on 21 February 2019, carried out by David Prescott of AllanRail who has considerable experience in the initial development of re-opened railways in Scotland including walk-overs on the Stirling – Alloa – Kincardine, Airdrie- Bathgate and Borders Railway routes in the inception and pre-construction stages. This is not an engineering assessment, but an initial view based on observation and experience. The route is considered in the Longniddry to Haddington direction and the report is broken down into key route sections. Connecting to the ECML The ideal connection to the main line has several desirable operating and engineering requirements: · It should be on the Edinburgh side of Longniddry to minimise the occupation of the ECML; · It should provide as
    [Show full text]
  • Muirhouse • Pilton • Ferry Road • Leith • Bridges • Prestonfield • Greendykes
    service 14 at a glance... frequency During the day During the day During the day During the Mon-Fri Saturday Sunday evening every every every every 12 15 20 30 mins mins mins mins City Centre bus stops Omni Centre See previous page for City Centre bus stops Whilst we’ve taken every effort in the preparation of this guide, Lothian Buses Ltd cannot accept any liability arising from inaccuracies, amendments or changes. The routes and times shown are for guidance – we would advise customers to check details by calling 0131 555 6363 before travelling. On occasion due to circumstances beyond our control and during special events, our services can be delayed by traffic congestion and diversion. 14 Muirhouse • Pilton • Ferry Road • Leith • Bridges • Prestonfield • Greendykes Muirhouse, Pennywell Place — — — 0552 — — 0617 — — 0637 0649 0700 0713 0724 0735 0747 0759 0811 0823 Pilton, Granton Primary — — — 0558 — — 0623 — — 0643 0655 0706 0719 0731 0742 0754 0806 0818 0830 Goldenacre — — — 0603 — — 0628 — — 0649 0701 0712 0726 0738 0749 0803 0815 0827 0839 Leith Walk (foot) — — — 0610 — — 0635 — — 0658 0710 0721 0738 0750 0802 0816 0828 0840 0852 Elm Row 0518 0538 0558 0615 0626 0634 0640 0654 0701 0705 0717 0728 0745 0757 0809 0823 0835 0847 0859 North Bridge 0522 0542 0602 0619 0630 0638 0644 0658 0705 0709 0721 0733 0751 0803 0815 0829 0841 0853 0905 Friday to Monday Prestonfield Avenue, East End 0531 0551 0611 0628 0639 0648 0654 0708 0715 0719 0734 0746 0806 0818 0830 0844 0856 0908 0920 Greendykes Terminus 0538 0558 0618 0635 0647 0656 0702
    [Show full text]
  • Rail for All Report
    RAIL FOR ALL Delivering a modern, zero-carbon rail network in Scotland Green GroupofMSPs Policy Briefing SUMMARY Photo: Times, CC BY-SA 2.5 BY-SA Times, CC Photo: The Scottish Greens are proposing the Rail for All investment programme: a 20 year, £22bn investment in Scotland’s railways to build a modern, zero-carbon network that is affordable and accessible to all and that makes rail the natural choice for commuters, business and leisure travellers. This investment should be a central component of Scotland’s green recovery from Covid, creating thousands of jobs whilst delivering infrastructure that is essential to tackle the climate emergency, that supports our long-term economic prosperity, and that will be enjoyed by generations to come. CONTENTS CHAPTER PAGE 1 Creating the delivery infrastructure 4 i. Steamline decision-making processes and rebalance 4 them in favour of rail ii. Create one publicly-owned operator 4 iii. Make a strategic decision to deliver a modern, 5 zero-carbon rail network and align behind this iv. Establish a task force to plan and steer the expansion 5 and improvement of the rail network 2 Inter-city services 6 3 Regional services 9 4 Rural routes and rolling stock replacement 10 5 TramTrains for commuters and urban connectivity 12 6 New passenger stations 13 7 Reopening passenger services on freight lines 14 8 Shifting freight on to rail 15 9 Zero-carbon rail 16 10 Rail for All costs 17 11 A green recovery from Covid 18 This briefing is based on the report Rail for All – developing a vision for railway investment in Scotland by Deltix Transport Consulting that was prepared for John Finnie MSP.
    [Show full text]
  • 300 Airport • Gyle • Sighthill • Chesser • Fountainbridge • Surgeons’ Hall • Newington • Cameron Toll
    Services X12 & Skylink 400 also serve RBS Gogarburn - see separate timetable leaflets for details. Whilst we’ve taken every effort in the preparation of this guide, Lothian Buses Ltd cannot accept any liability arising from inaccuracies, amendments or changes. The routes and times shown are for guidance – we would advise customers to check details by calling 0131 555 6363 before travelling. On occasion due to circumstances beyond our control and during special events, our services can be delayed by traffic congestion and diversion. 300 Airport • Gyle • Sighthill • Chesser • Fountainbridge • Surgeons’ Hall • Newington • Cameron Toll Edinburgh Airport — — — — 0550 — 0620 — 0650 — 0725 0750 0810 — 0837 0857 0920 0940 1000 Ingliston Park & Ride — — — — 0554 — 0624 — 0655 — 0730 0755 0815 0835 0842 0902 0925 0945 1005 RBS Gogarburn — — — — 0558 — 0628 — 0659 — 0735 0800 0820 0840 0847 0907 0929 0949 1009 Gyle Centre — — — — 0602 — 0632 — 0704 — 0740 0806 0826 0846 0853 0913 0934 0954 1014 Edinburgh Park, Redheughs Ave — — — — 0604 — 0634 — 0707 — 0744 0810 0830 0850 0857 0917 0937 0957 1017 Friday to Monday Sighthill, Napier Uni G G G G 0609 G 0639 0655 0713 0731 0751 0817 0837 0857 0904 0924 0944 1004 1024 Saughton Mains 0419 0449 0519 0549 0612 0627 0642 0659 0717 0736 0756 0822 0842 L 0909 0929 0949 1009 1029 Slateford Station 0423 0453 0523 0553 0617 0632 0647 0704 0722 0743 0803 0830 0850 — 0916 0936 0956 1016 1036 Fountainbridge, Semple St 0431 0501 0531 0601 0625 0640 0656 0716 0735 0801 0821 0848 0908 — 0929 0949 1009 1029 1049 Surgeons’
    [Show full text]
  • Building Better Transport
    Building Better Transport CEC02083844_0001 Building Better Transport Ministerial Foreword When I was appointed Tr ansport Minister last spring, Scotland's Transport: Delivering Improvements was not long published. That document identified key priorities for transport that have underpinned our work over the last year. It also promised that we would issue a report on progress. We have taken huge steps forward since then. The key to progress was our decision last year to allocate unprecedented sums to transport over the next three years. Spending on transport will rise by over 50% over three years, with almost £1 billion per annum being spent by 2006. Spending on public transport - which is now top of our priorities - will rise by over 70% in three years. That decision made an enormous impact. There is now money to fund major new infrastructure projects. The sense of momentum is building. People are beginning to believe. Transport improvements that once seemed a pipe dream stand a genuine chance of becoming reality. The new communications links that businesses have been crying out for are just around the corner, and the economy will thrive on them. Resources are not unlimited, but we can be certain that the transformation of Scotland's transport infrastructure will be well under way by the end of the decade. We have been criticised in the past for not committing the funds needed to enable major projects to proceed. That has now changed. All schemes will still have to continue to demonstrate value for money and stand up to rigorous economic and environmental scrutiny. But the security of a £1 billion per annum budget has enabled us over the year to make firm funding commitments, including the MS and M80 motorway upgrades in west central Scotland; the reinstatement of the Airdrie-Bathgate railway line; a new bypass, the Western Peripheral Route, for Aberdeen; and has allowed us to make further progress with rail links to Glasgow and Edinburgh airports.
    [Show full text]
  • Borders Railway Business Guide You’Re on the Right Tracks to Develop Your Business
    BORDERS RAILWAY BUSINESS GUIDE You’re on the right traCKS TO DEVELOP YOUR BUSINESS You’re on the right traCKS TO DEVELOP YOUR BUSINESS 1 2 BORDERS RAILWAY BUSINESS GUIDE CONTENTS Introduction 3 All On Track 4 Midlothian & Borders: Great Destinations to Visit 5 Opportunities for Business 7 Be Inspired: Case Studies 11 Next Steps: Making the Most of the Opportunities 14 Support and Resources 15 INTRODUCTION Tourism is key to the economic development of Midlothian and the Scottish Borders Tourism is central to to the Midlothian and Scottish Borders’ economies and the opening of the Borders Railway offers an exciting opportunity for tourism businesses to benefit. The investment in the Borders Railway supports the ambitions for growth and will be a catalyst for attracting visitors with the promise of compelling experiences and immersion in Borders’ and Midlothian’s history, heritage, culture and landscape. How can you make the most of the Borders Railway and use it to benefit your business? This guide has been created to help you find out. It is packed with ideas and tips that will give you a competitive edge. It will also help you identify opportunities to drive new custom and enhance the quality of your visitors’ experience. “We are very excited about the Borders Railway. For commuters and tourists alike, the line will provide opportunities to enjoy the beautiful scenery and many attractions on offer between Edinburgh and the Borders.” Gillian Rankin, Marketing & Events Officer National Mining Museum Scotland “The opening of the Borders Railway in 2015 presents exciting opportunities for the Borders region and for Abbotsford.
    [Show full text]
  • 400 Airport • Ingliston P&R • Gyle • Wester Hailes • Fairmilehead • Moredun • Royal Infirmary • Fort Kinnaird
    Real time information Get real-time departures from your local bus stop: TfEapp.com Live service updates are also available online at www.lothianbuses.co.uk 400 Airport • Ingliston P&R • Gyle • Wester Hailes • Fairmilehead • Moredun • Royal Infirmary • Fort Kinnaird Edinburgh Airport — — — — 0540 0610 0640 0718 0748 0818 0853 0923 0953 1453 1523 1553 1623 1650 Ingliston Park & Ride — — — — 0544 0614 0644 0723 0753 0823 0858 0928 0958 1458 1528 1558 1628 1655 RBS Gogarburn — — — — 0548 0618 0648 0727 0758 0828 0903 0932 1002 1502 1532 1603 1633 1700 Gyle Centre — — — — 0552 0622 0653 0732 0805 0835 0909 0937 1007 1507 1537 1609 1639 1706 then Edinburgh Park, Redheughs Ave G G G G 0554 0624 0655 0734 0807 0837 0911 0939 1009 1509 1539 1612 1642 1709 every Westside Plaza 0428 0458 0523 0543 0605 0635 0707 0748 0821 0851 0924 0951 1021 1521 1554 1632 1702 1729 Friday to Monday Clovenstone 0432 0502 0527 0547 0609 0639 0712 0753 0826 0856 0928 0955 1025 30 1525 1558 1636 1706 1733 Oxgangs Bank 0443 0513 0538 0558 0620 0651 0725 0808 0840 0910 0941 1008 1038 1538 1613 1651 1721 1748 mins Kaimes Crossroads 0450 0520 0545 0605 0627 0700 0734 0818 0849 0919 0949 1016 1046 until 1546 1623 1701 1731 1758 Hyvots Bank 0454 0524 0549 0609 0631 0705 0741 0825 0855 0925 0955 1022 1052 1553 1630 1708 1738 1805 Royal Infirmary 0503 0533 0558 0618 0640 0715 0752 0836 0906 0936 1005 1032 1102 1604 1641 1719 1749 1816 Hay Drive 0509 0539 0604 0624 0646 0721 0758 0842 0912 0942 1011 1038 1108 1611 1648 1726 1756 1823 Fort Kinnaird (west) 0512 0542 0607 0627
    [Show full text]
  • Final Report Transport Scotland Strategic Transport Projects Review
    Strategic Transport Projects Review Edinburgh – Glasgow Rail Improvements October 2007 Final Report Transport Scotland Strategic Transport Projects Review Authorisation Jacobs UK Ltd in association with Tribal Consulting has great pleasure in presenting this document. Copyright Jacobs U.K. Limited. All rights reserved. No part of this report may be copied or reproduced by any means without prior written permission from Jacobs U.K. Limited. If you have received this report in error, please destroy all copies in your possession or control and notify Jacobs U.K. Limited. This report has been prepared for the exclusive use of the commissioning party and unless otherwise agreed in writing by Jacobs U.K. Limited, no other party may use, make use of or rely on the contents of this report. No liability is accepted by Jacobs U.K. Limited for any use of this report, other than for the purposes for which it was originally prepared and provided. Opinions and information provided in the report are on the basis of Jacobs U.K. Limited using due skill, care and diligence in the preparation of the same and no warranty is provided as to their accuracy. It should be noted and it is expressly stated that no independent verification of any of the documents or information supplied to Jacobs U.K. Limited has been made. It should be noted that all timetables are indicative and require detailed work to prove that they can be planned and operated robustly. Authorisation & Preparation Prepared by: KMcK/GKD/ET Reviewed by: JM/GKD Approved by: JM / GKD Version History Version No.
    [Show full text]