RAIB Summary of Recommendation Status 2019

Total Page:16

File Type:pdf, Size:1020Kb

RAIB Summary of Recommendation Status 2019 RAIB summary of recommendation status 2019 Report Event Rec RAIB Investigation title Status of recommendation End implementer number date number concern Network Rail 1 ORR/OPB response awaited RSSB 2 ORR/OPB response awaited Hitachi STS Loss of safety critical signalling data on Network Rail 17/2019 20/10/17 3 ORR/OPB response awaited the Cambrian Coast line RSB Network Rail 4 ORR/OPB response awaited Hitachi STS 5 ORR/OPB response awaited 1 ORR/OPB response awaited Passenger injury at Ashton-under-Lyne 2 ORR/OPB response awaited 15/2019 12/03/19 Keolis Amey Metrolink (KAM) tram stop 3 ORR/OPB response awaited 4 ORR/OPB response awaited 1 ORR/OPB response awaited All TOCs Fatal accident involving a train 2 ORR/OPB response awaited All Heritage TOCs 14/2019 01/12/18 passenger at Twerton 3 ORR/OPB response awaited Great Western Railway 4 ORR/OPB response awaited RSSB Fatal accident at Tibberton No.8 footpath 13/2019 06/02/19 1 ORR/OPB response awaited Network Rail crossing Near miss with a track worker near 1 ORR/OPB response awaited Network Rail 12/2019 02/12/18 Gatwick Airport station 2 ORR/OPB response awaited BAM Nuttall Serious operational irregularity at Bagillt user worked crossing, Flintshire, 11/2019 17/09/19 1 ORR/OPB response awaited Network Rail involving an abnormally heavy road vehicle Key: Recommendations made prior to 2019 that remain open Recommendations made during 2019 Recommendations implemented during 2019 Recommendations where status changed during 2019 RAIB summary of recommendation status 2019 1 May 2020 Report Event Rec RAIB Investigation title Status of recommendation End implementer number date number concern All TOCs 1 ORR/OPB response awaited All FOCs Overspeed at Sandy South Junction, 2 ORR/OPB response awaited Rail Delivery Group 10/2019 19/10/18 Bedfordshire 3 ORR/OPB response awaited Network Rail 4 ORR/OPB response awaited LNER 5 ORR/OPB response awaited RSSB 1 Implemented Edinburgh Trams Limited Fatal collision between a tram and a 2 Implemented pedestrian, near Saughton tram stop, 09/2019 11/09/18 3 ORR/OPB response awaited Edinburgh LRSSB 4 Implemented Collision between two road-rail vehicles 1 ORR/OPB response awaited RSSB 08/2019 19/09/18 at Cholmondeston, Chesire 2 ORR/OPB response awaited Network Rail Track worker struck by a train at Stoats 1 ORR/OPB response awaited Network Rail 07/2019 06/11/19 Nest Junction, near Purley 2 ORR/OPB response awaited Vital Human Resources Ltd 1 ORR/OPB response awaited Train travelling with doors open on the 2 ORR/OPB response awaited 06/2019 01/09/18 London Underground LUL Jubilee line 3 ORR/OPB response awaited 4 ORR/OPB response awaited Collision between a train and utility 1 ORR/OPB response awaited vehicle at Dollands Moor freight yard, 05/2019 04/09/18 DB Cargo Kent 2 ORR/OPB response awaited 1 ORR/OPB response awaited 2 ORR/OPB response awaited Near miss between a train and a track 04/2019 20/07/18 3 ORR/OPB response awaited Network Rail worker at Peterborough 4 ORR/OPB response awaited 5 ORR/OPB response awaited 1 ORR/OPB response awaited Govia Thameslink Railway Train dispatch accident at Elstree & 03/2019 07/09/18 Rail Delivery Group Borehamwood station 2 ORR/OPB response awaited RSSB Key: Recommendations made prior to 2019 that remain open Recommendations made during 2019 Recommendations implemented during 2019 Recommendations where status changed during 2019 RAIB summary of recommendation status 2019 2 May 2020 Report Event Rec RAIB Investigation title Status of recommendation End implementer number date number concern Network Rail (South East route) 1 ORR/OPB response awaited Southeastern Network Rail (South East route) 2 ORR/OPB response awaited Southeastern RSSB Self-detrainment of passengers onto Network Rail (South East route) 02/2019 02/03/18 lines that were still open to traffic and 3 ORR/OPB response awaited Southeastern 4 ORR/OPB response awaited Network Rail (South East route) Southeastern 5 ORR/OPB response awaited Network Rail (South East route) 1 ORR/OPB response awaited Network Rail Runaway of a road-rail vehicle at 01/2019 08/06/18 2 ORR/OPB response awaited Bradford Interchange Readypower 3 ORR/OPB response awaited 1 ORR/OPB response awaited 2 ORR/OPB response awaited Near miss with track workers and 3 ORR/OPB response awaited 20/2018 11/03/18 Network Rail trolleys at South Hampstead, London 4 ORR/OPB response awaited 5 ORR/OPB response awaited 6 ORR/OPB response awaited 1 Impl. ongoing Network Rail Collision at London Waterloo 19/2018 15/08/18 2 Progressing OSL Rail Ltd 3 Progressing Mott Macdonald Ltd 1 Progressing Heritage Railway Association Runaway hand trolley at Ramsbottom, 18/2018 15/03/18 2 Impl. ongoing East Lancashire Railway East Lancashire Railway 3 Impl. ongoing Key: Recommendations made prior to 2019 that remain open Recommendations made during 2019 Recommendations implemented during 2019 Recommendations where status changed during 2019 RAIB summary of recommendation status 2019 3 May 2020 Report Event Rec RAIB Investigation title Status of recommendation End implementer number date number concern Touax Rail Extensive track damage between Ferryside and Llangennech, 17/2018 30/10/17 1 Implemented DB Cargo Maintenance Carmarthenshire Puma Energy Detrainment of passengers onto 1 Implemented Arriva Rail electically live track near Peckham Rye 16/2018 07/11/17 2 Implemented Network Rail (South East Route) station 3 Implemented Pushchair trapped in tram doors and 1 Progressing 15/2018 15/12/17 Nottingham Trams Ltd dragged, Nottingham 2 Progressing 1 Implemented 2 Implemented Δ White Passenger trapped and dragged at 14/2018 31/01/18 3 Implemented London Underground LUL Notting Hill Gate station 4 Implemented 5 Implemented 1 Implemented 2 Implemented Near miss with track workers at Pelaw 13/2018 21/02/18 3 Impl. ongoing Nexus Rail North Junction 4 Progressing 5 Implemented 1 Progressing Network Rail Collision at Frognal Farm User Worked 2 ORR/OPB response awaited Department for Transport 12/2018 23/10/17 Crossing 3 Progressing Network Rail 4 Progressing 1 Progressing Near miss with a group of track workers 11/2018 05/10/17 2 Progressing Network Rail at Egmanton level crossing 3 Impl. ongoing Landslip and derailment at Loch Eilt 10/2018 22/01/18 1 Progressing Network Rail Key: Recommendations made prior to 2019 that remain open Recommendations made during 2019 Recommendations implemented during 2019 Recommendations where status changed during 2019 RAIB summary of recommendation status 2019 4 May 2020 Report Event Rec RAIB Investigation title Status of recommendation End implementer number date number concern Freight train derailment at Ely West 09/2018 14/08/17 1 Implemented GB Railfreight Junction Collision at Stainforth Road level 1 Impl. ongoing 08/2018 11/01/18 Network Rail crossing 2 Progressing Fatal accident at Trenos footpath crossing near Llanharan, Rhondda 07/2018 01/06/17 1 Progressing Network Rail Wales Route Cynon Taf, South Wales 1 Implemented Passengers struck by a flying cable at 06/2018 28/07/17 2 Impl. ongoing Network Rail Abergavenny (Y Fenni) station 3 Impl. ongoing Explosion inside an underframe 05/2018 07/07/17 1 Progressing All TOCs equipment case at Guildford 1 Impl. ongoing 2 Impl. ongoing Network Rail Freight train derailment at Lewisham 04/2018 24/01/17 3 Impl. ongoing 4 Impl. ongoing 5 Progressing RSSB 1 Progressing Trailer runaway near Hope, Derbyshire 03/2018 28/05/17 2 Progressing Network Rail 3 Progressing Child nearly falling through a missing 02/2018 22/06/17 1 Impl. ongoing South Devon Railway toilet floor, South Devon Railway Runaway of a maintenance train near 1 Progressing 01/2018 17/10/17 Network Rail Markinch 2 Insufficient response Key: Recommendations made prior to 2019 that remain open Recommendations made during 2019 Recommendations implemented during 2019 Recommendations where status changed during 2019 RAIB summary of recommendation status 2019 5 May 2020 Report Event Rec RAIB Investigation title Status of recommendation End implementer number date number concern 1 Impl. ongoing Frieght train derailment at East 2 Impl. ongoing 19/2017 20/03/17 Network Rail Somerset Junction 3 Impl. ongoing 4 Implemented 1 Implemented 2 Impl. ongoing 3 Implemented 4 Impl. ongoing Δ Blue UK Tram Ltd 5 Implemented 6 Progressing 7 Impl. ongoing 8 Progressing 9 Implemented ORR Overturning of a tram at Sandilands Tram Operations Limited 18/2017 09/11/16 10 Implemented Junction, Croydon London Trams 11 Implemented 12 Implemented Tram Operations Limited 13 Implemented London Trams Transport for London London Trams 14 Implemented Tram Operations Limited London Trams 15 Implemented Tram Operations Limited Partial collapse of a wall onto open 1 Impl. ongoing 17/2017 28/02/17 Network Rail railway lines, Liverpool 2 Progressing 1 Impl. ongoing Track worker near miss incidents at 16/2017 28/02/17 2 Progressing Network Rail Camden Junction South, London Δ Blue 3 Progressing Key: Recommendations made prior to 2019 that remain open Recommendations made during 2019 Recommendations implemented during 2019 Recommendations where status changed during 2019 RAIB summary of recommendation status 2019 6 May 2020 Report Event Rec RAIB Investigation title Status of recommendation End implementer number date number concern 1 Progressing Serious irregularity at Cardiff East 15/2017 29/12/16 2 Implemented Network Rail Junction 3 Progressing Fatal accident at Alice Holt footpath 14/2017 05/10/16 1 Impl. ongoing Network Rail crossing Fatal collision between tram and 1 Implemented Stagecoach Supertram Ltd pedestrian at Woodbourn Road, 13/2017 22/12/16 All tram operators 2 Implemented Sheffield UK Tram Ltd Keolis Amey Docklands 1 Implemented Dangerous train door incident at Bank 12/2017 06/02/17 Docklands Light Railway Ltd station on the Docklands Light Railway 2 Implemented 3 Implemented Keolis Amey Docklands 1 Implemented Network Rail 2 Impl.
Recommended publications
  • Finding Your Way to Oxford: a Guide for New International Students
    Finding Your Way to Oxford: Arriving at Terminal 1, 2 or 3: follow the signs in the arrival hall to the Central Bus A Guide for New International Station, then take the lift up to the bus station Students and you will arrive in the ticket hall. Arriving at Terminal 4: follow the signs in the arrival hall to ‘the trains’ and take the free Welcome to the UK. We hope you will settle in Heathrow Connect train service to ‘Heathrow comfortably during your first few days here. There Central’; a three-minute train journey. Follow are good public transport links to Oxford, and you the signs to the Central Bus Station, take the will be able to use public transport to get here from lift up to the bus station and you will arrive in wherever you arrive in the UK—services the ticket hall. generally run throughout the day and night. Arriving at Terminal 5: the bus service to Oxford also departs from Terminal 5 next to Below are details on bus services operating from the arrival area (stop 10), so you do not need Heathrow, Gatwick and Stansted airports, and to go to the Central Bus Station. details about Eurostar if you plan to come via rail. Gatwick Airport A similar bus service operates from Gatwick to Oxford (see the website below) with buses departing every hour. The bus journey is longer than the journey from Heathrow: between 2 hours and 2 hours 30 minutes. Arriving at Gatwick North Terminal: the bus leaves from Lower Forecourt stands 4 and 5.
    [Show full text]
  • The Future of Island Line – Options Report”
    A Technical Response to the Report “The Future of Island Line – Options Report” By Mark Brinton MIET March 2016 Page 1 1. Executive Summary This Report should be read in conjunction with Chris Garnett’s Report “The Future of Island Line – Options Report”. I have set out to discuss the issues raised in the Garnett Report mainly from an engineering and technical point of view. My reports contains a detailed analysis of the various technical claims made the supporters of conversion of Island Line to a tramway and casts significant doubts as to the cost benefits claimed for the conversion of the existing railway into a tramway and the use of tram vehicles. I have also questioned the safety and legal aspects of the proposed method of operation of this tramway. I have also sought to address a number of myths and rumours surrounding some of the technical issues relating to Island Line. Unfortunately some of these have found their way into Christopher Garnett’s report and could be considered to be affecting its conclusions. The last part of my report describes a possible alternative to a tramway which should cost less to implement and reduce day-to-day operational costs whilst securing the operation of Island Line within the National Rail Network. 2. Introduction This document has been produced as a considered technical response to the statements and proposals put forward in the report “The Future of Island Line – Options Report” prepared by Christopher Garnett for the Isle of Wight Council in January 2016 [the Garnett Report]. As the author of this Report, I am a practicing railway engineer, with over forty years of experience mainly in traction and rolling stock engineering.
    [Show full text]
  • North West Region Cheshire and North Wales
    NATIONS, REGIONS & GROUPS NORTH WEST REGION LONDON REGION CHESHIRE AND NORTH WALES GROUPS HEATHROW GROUP Borderlands (Wrexham to Bidston) rail line Crossrail becomes Elizabeth Line full house greeted speaker John Goldsmith, Community A Relations Manager for Crossrail. Some 43km of new tunnelling is now complete under central London, and 65 million tonnes of material have been excavated. Building work on the whole line is now 87% complete. The first trains of the new Elizabeth Line are now in service between Liverpool Street and Shenfield where a new platform has been built for them, and the roof garden at the seven-storey Canary Wharf station has been open for some time. The 70 trains, built in Derby by Bombardier, are some 10–15% lighter than those now in use and will be in nine-car sets, 200m long, seating 450 passengers, with an estimated total capacity including standing passengers of 1,500 at peak times, most of The Borderlands line runs from Wrexham Central Station to Bidston Station whom are expected to be short-journey passengers. Seats will be sideways, forward facing and backward facing, giving plenty of his event was held in the strategic location of Chester, circulating space. The early trains now in service between T close to the border between England and Wales. The Liverpool Street and Shenfield are only seven cars long, because location chosen was apt, as the Borderlands line is a key the main line platforms at Liverpool Street will not accept nine-car strategic passenger route between North Wales and Merseyside. trains, but this is an interim measure until the lower level new John Allcock, Chairman, Wrexham–Bidston Rail Users’ Association station is operative.
    [Show full text]
  • London Heathrow Airport
    London Heathrow Airport Located 20 miles to the west of Central London. www.heathrowairport.com Heathrow Airport by Train The Heathrow Express is the fastest way to travel into Central London. Trains leave Heathrow Airport from approximately 5.12am until 11.40pm. For more information, and details of fares, visit the Heathrow Express website. Operating 150 services every day, Heathrow Express reaches Heathrow Central (Terminals 1 and 3) from Paddington in 15 minutes, with Terminal 5 a further four minutes. A free transfer service to Terminal 4 departs Heathrow Central every 15 minutes and takes four minutes. Heathrow Connect services run from London Paddington, calling at Ealing Broadway, West Ealing, Hanwell, Southall, Hayes & Harlington and Heathrow Central (Terminals 1 and 3). For Terminals 4 and 5, there's a free Heathrow Express tr ansfer service from Heathrow Central. Heathrow Connect journey time is about 25 minutes from Paddington to Heathrow Central. For more information, and details of fares, visit the Heathrow Connect website. Heathrow Airport by Tube The Piccadilly line connects Heathrow Airport to Central London and the rest of the Tube system. The Tube is cheaper than the Heathrow Express or Heathrow Connect but it takes a lot longer and is less comfortable. Tube services leave Heathrow every few minutes from approximately 5.10am (5.45am Sundays) to 11.35pm (11.25pm Sundays). Journey time to Piccadilly Circus is about 50 minutes. There are three Tube stations at Heathrow Airport, serving Terminals 1-3, Terminal 4 and Terminal 5. For more information, and details of fares, visit the Transport for London (TfL) website.
    [Show full text]
  • Transport with So Many Ways to Get to and Around London, Doing Business Here Has Never Been Easier
    Transport With so many ways to get to and around London, doing business here has never been easier First Capital Connect runs up to four trains an hour to Blackfriars/London Bridge. Fares from £8.90 single; journey time 35 mins. firstcapitalconnect.co.uk To London by coach There is an hourly coach service to Victoria Coach Station run by National Express Airport. Fares from £7.30 single; journey time 1 hour 20 mins. nationalexpress.com London Heathrow Airport T: +44 (0)844 335 1801 baa.com To London by Tube The Piccadilly line connects all five terminals with central London. Fares from £4 single (from £2.20 with an Oyster card); journey time about an hour. tfl.gov.uk/tube To London by rail The Heathrow Express runs four non- Greater London & airport locations stop trains an hour to and from London Paddington station. Fares from £16.50 single; journey time 15-20 mins. Transport for London (TfL) Travelcards are not valid This section details the various types Getting here on this service. of transport available in London, providing heathrowexpress.com information on how to get to the city On arrival from the airports, and how to get around Heathrow Connect runs between once in town. There are also listings for London City Airport Heathrow and Paddington via five stations transport companies, whether travelling T: +44 (0)20 7646 0088 in west London. Fares from £7.40 single. by road, rail, river, or even by bike or on londoncityairport.com Trains run every 30 mins; journey time foot. See the Transport & Sightseeing around 25 mins.
    [Show full text]
  • London's Rail & Tube Services
    A B C D E F G H Towards Towards Towards Towards Towards Hemel Hempstead Luton Airport Parkway Welwyn Garden City Hertford North Towards Stansted Airport Aylesbury Hertford East London’s Watford Junction ZONE ZONE Ware ZONE 9 ZONE 9 St Margarets 9 ZONE 8 Elstree & Borehamwood Hadley Wood Crews Hill ZONE Rye House Rail & Tube Amersham Chesham ZONE Watford High Street ZONE 6 8 Broxbourne 8 Bushey 7 ZONE ZONE Gordon Hill ZONE ZONE Cheshunt Epping New Barnet Cockfosters services ZONE Carpenders Park 7 8 7 6 Enfield Chase Watford ZONE High Barnet Theydon Bois 7 Theobalds Chalfont Oakwood Grove & Latimer 5 Grange Park Waltham Cross Debden ZONE ZONE ZONE ZONE Croxley Hatch End Totteridge & Whetstone Enfield Turkey Towards Southgate Town Street Loughton 6 7 8 9 1 Chorleywood Oakleigh Park Enfield Lock 1 High Winchmore Hill Southbury Towards Wycombe Rickmansworth Moor Park Woodside Park Arnos Grove Chelmsford Brimsdown Buckhurst Hill ZONE and Southend Headstone Lane Edgware Palmers Green Bush Hill Park Chingford Northwood ZONE Mill Hill Broadway West Ruislip Stanmore West Finchley Bounds 5 Green Ponders End Northwood New Southgate Shenfield Hillingdon Hills 4 Edmonton Green Roding Valley Chigwell Harrow & Wealdstone Canons Park Bowes Park Highams Park Ruislip Mill Hill East Angel Road Uxbridge Ickenham Burnt Oak Key to lines and symbols Pinner Silver Street Brentwood Ruislip Queensbury Woodford Manor Wood Green Grange Hill Finchley Central Alexandra Palace Wood Street ZONE North Harrow Kenton Colindale White Hart Lane Northumberland Bakerloo Eastcote
    [Show full text]
  • Aggregate Waiting Time Reduction on Public Transportation Networks
    Aggregate waiting time reduction on public transportation networks An application of multilayer networks Frederique A.E. Akse Linacre College University of Oxford A thesis submitted in partial fulfilment for the degree of MSc Mathematical Modelling and Scientific Computing 2013 - 2014 2 TO MY GRANDFATHER { whom I was never fortunate enough to meet anywhere else than the problem solving sessions in my dreams and in the sudden moments of clarity in times of need (read exams). Acknowledgements I first want to thank my supervisors Mason Porter and Mikko Kivel¨a. During the writing of this dissertation they have given me the freedom to explore and discover the field of networks while providing me with enough guidance to navigate myself through an ever expanding network of interesting papers and data sets. You have let me experience what it is like to do (real) research. I want to express my gratitude towards Riccardo Gallotti and Raghav Pant for their help during this project and to the Infrastructure Tran- sitions Research Consortium (ITRC) for supplying data on the British rail network. I also want to thank my parents with whom I first came to Oxford and who will luckily both be there to drive me back for their endless support. A big thank you also to my brother who spend countless hours of his vacation in the MMSC office just so we could have dinner together in the evening. I hope Atomic Burger was worth it. I want to express my gratitude to professor Jan Bouwe van den Berg from the Vrije Universiteit Amsterdam for his guidance and help during my undergraduate studies.
    [Show full text]
  • TRI00000076 0001 Borders Rail and I Have Also Served on the Transport Committee of the Cockburn Association
    Edinburgh Tram Inquiry Office Use Only Witness Name: Robert Alexander DRYSDALE Dated: THE EDINBURGH TRAM INQUIRY Witness Statement of Robert Alexander DRYSDALE Statement taken by Raymond Gray on 13 October 2016. My full name is Robert Alexander Drysdale. I am aged 61, my date of birth being . My contact details are known to the Inquiry. I am a retired Chartered Town Planning Consultant. Statement: 1. I am a recently retired planning consultant with 37 years' experience in this role. I worked within the planning department of Midlothian Council from 1979 until 1986. Between 1986 and 2016 I worked within the private sector as a planning consultant, initially for large property consultancy firms and then from 1996 in my own practice. During this time I provided advice to companies involved in major developments including Edinburgh Business Park. An important part of these projects was to advise on strategic objectives such as transport links to the sites. In respect of Edinburgh Business Park I recommended, as part of the designing of the business park in the early 1990s, that provision be made for possible future rapid transit access to the development, by way of a reserved north~south route through the business park. It is this route which is now used by the Edinburgh Tram. 2. I have a keen interest in transport infrastructure both on a personal and professional level. I am currently a committee member for the Campaign for Page 1 of7 TRI00000076 0001 Borders Rail and I have also served on the Transport Committee of the Cockburn Association. 3.
    [Show full text]
  • Campaigning for a Bigger Better Railway Railfuture Annual Review 2017 1
    Annual Review 2017 Campaigning for a bigger better railway Railfuture Annual Review 2017 1 www.railfuture.org.uk pushed into next year and beyond. Honorary Meanwhile, franchising is facing its most uncertain future since privatisation and there are doubts President’s whether the current model can survive. address It may seem that given all the travails of the railway, groups fighting for The coming year on the railways is full of both uncertainty and local improvements or reopenings opportunity. On the one hand, there may face an uphill task. Not is more money available for railway necessarily. The kind of ideas and investment than ever before, after an schemes that we are putting forward amazing settlement of the may well fit in with Network Rail’s Christian Wolmar investment plans which start in April wider plans. There is a new emphasis There may never be a better time to 2019. On the other hand, in the short term, the overspending during the on devolution, on listening to engage with the wider industry than current five year period means that ‘stakeholders’ and on finding quick during these rather troubled times. schemes have been reined back or wins. Go for it. which will stimulate economic Chair’s review growth. Campaigning for a bigger better Our key national campaigns for 2018 railway sounds simple, but what do are therefore: passengers first, fares we mean? and ticketing, route modernisation and a bigger railway. A better railway is one which puts the passenger first. Successful businesses Railfuture aims to put forward have excellent customer service realistic proposals to improve rail woven into their culture, gaining the services.
    [Show full text]
  • Competitive Tendering of Rail Services EUROPEAN CONFERENCE of MINISTERS of TRANSPORT (ECMT)
    Competitive EUROPEAN CONFERENCE OF MINISTERS OF TRANSPORT Tendering of Rail Competitive tendering Services provides a way to introduce Competitive competition to railways whilst preserving an integrated network of services. It has been used for freight Tendering railways in some countries but is particularly attractive for passenger networks when subsidised services make competition of Rail between trains serving the same routes difficult or impossible to organise. Services Governments promote competition in railways to Competitive Tendering reduce costs, not least to the tax payer, and to improve levels of service to customers. Concessions are also designed to bring much needed private capital into the rail industry. The success of competitive tendering in achieving these outcomes depends critically on the way risks are assigned between the government and private train operators. It also depends on the transparency and durability of the regulatory framework established to protect both the public interest and the interests of concession holders, and on the incentives created by franchise agreements. This report examines experience to date from around the world in competitively tendering rail services. It seeks to draw lessons for effective design of concessions and regulation from both of the successful and less successful cases examined. The work RailServices is based on detailed examinations by leading experts of the experience of passenger rail concessions in the United Kingdom, Australia, Germany, Sweden and the Netherlands. It also
    [Show full text]
  • The International Light Rail Magazine
    THE INTERNATIONAL LIGHT RAIL MAGAZINE www.lrta.org www.tautonline.com JUNE 2017 NO. 954 BLACKPOOL GOES FROM STRENGTH TO STRENGTH Sacramento: New lines and new life for San Jose cars US Congress rejects transit cutbacks Siemens and Bombardier to merge? Strasbourg opens cross-border link The art of track Saving Gent 06> £4.40 Challenges of design The impact and and maintenance legacy of the PCCs 9 771460 832050 Phil Long “A great event, really well organised and the dinner, reception and exhibition space made for great networking time.” Andy Byford – CEO, Toronto Transit Commission MANCHESTER “Once again your team have proved your outstanding capabilities. The content was excellent and the feedback from participants was great.” 18-19 July 2017 Simcha Ohrenstein – CTO, Jerusalem LRT Topics and themes for 2017 include: > Rewriting the business case for light rail investment > Cyber security – Responsibilities and safeguards > Models for procurement and resourcing strategies > Safety and security: Anti-vandalism measures > Putting light rail at the heart of the community > Digitisation and real-time monitoring > Street-running safety challenges > Managing obsolescence > Next-generation driver aids > Wire-free solutions > Are we delivering the best passenger environments? > Composite & materials technologies > From smartcard to smartphone ticketing > Rail and trackform innovation > Traction energy optimisation and efficiency > Major project updates Confirmed speakers include: SUPPORTED BY > Geoff Inskip – Chairman, UKTram > Danny Vaughan – Head
    [Show full text]
  • News Update July 2017
    Council of Tramway Museums of Australasia Inc. www.cotma.org.au News Update July 2017 From the Chairman Welcome to our third COTMA News Update for 2017. In this issue we report on the recent FEDECRAIL conference held in Antwerp, Belgium and attended by Warren Doubleday, and the NZ FRONZ conference in Dunedin which I attended. As I write this I am preparing to travel to Melbourne for the COTMA AGM on Tuesday (25 July) and an Executive meeting which will follow. At the Executive meeting we have a number of important issues to discuss, including spare parts - note the references further below to Wellington (trolley bus closure), and PC5 equipment, as well as getting an update on Melbourne W’s and equipment. All member museums will have received an invitation to the AGM and should by now have indicated whether they will be attending. The annual conference of the Federation of Rail Organisations of NZ (FRONZ) was well attended by both railway and tramway groups from around N.Z. and included rail trips on the Taieri Gorge line and on the main line to Oamaru as well as visits to the local Gasworks Museum, the Ocean Beach Railway and Toitu Otago Settlers Museum which includes in its collection former Maryhill Cable car No. 106, Roslyn Electric tram No. 1 (restored at Ferrymead) and Dunedin Trolley bus No 10. The Settlers Museum was the venue for an informative talk about the Dunedin Cable car systems and proposals to set up an operating cable car museum using restored cable cars from Ferrymead.
    [Show full text]