Power Transformer, 116/21.9Kv

Total Page:16

File Type:pdf, Size:1020Kb

Power Transformer, 116/21.9Kv No. SS1405 TECHNICAL ToC Page 1 SPECIFICATION REV DATE: 07/17 10 CATEGORY TRANSFORMERS/ REGULATORS SUBJECT POWER TRANSFORMER, 116/12.47 kV TABLE OF CONTENTS 1. PURPOSE....................................................................................................................................................... 1 2. DEFINITIONS ................................................................................................................................................. 1 3. SCOPE ........................................................................................................................................................... 1 4. REFERENCES .................................................................................................................................................. 3 5. SERVICE CONDITIONS ................................................................................................................................... 7 6. CONSTRUCTION ............................................................................................................................................ 8 7. RATINGS ....................................................................................................................................................... 8 8. TRANSPORTATION & HANDLING REQUIREMENTS ........................................................................................ 9 9. STRUCTURAL DESIGN .................................................................................................................................. 10 10. SEISMIC REQUIREMENTS ............................................................................................................................ 11 11. ANCHORAGE APPENDAGES ......................................................................................................................... 11 12. DESIGN REVIEW .......................................................................................................................................... 12 13. TANK, BASE AND ACCESSORIES ................................................................................................................... 12 14. JACKING PADS AND LIFTING TRUNNIONS ................................................................................................... 13 15. TANK COVER ............................................................................................................................................... 15 16. FLANGES, GASKETS AND MANHOLES .......................................................................................................... 15 17. GROUNDING PADS ...................................................................................................................................... 16 18. TANK AND BASE MATERIALS ....................................................................................................................... 16 19. WELDING .................................................................................................................................................... 17 20. CONNECTION MATERIALS ........................................................................................................................... 18 21. PAINTING/COLOR ....................................................................................................................................... 19 22. FALL PROTECTION ....................................................................................................................................... 19 23. CORE AND COILS ......................................................................................................................................... 20 24. CURRENT TRANSFORMERS ......................................................................................................................... 24 25. BUSHINGS ................................................................................................................................................... 25 26. SURGE ARRESTERS ...................................................................................................................................... 27 27. LOAD TAP CHANGER (LTC) EQUIPMENT ...................................................................................................... 28 No. SS1405 TECHNICAL ToC Page 2 SPECIFICATION REV DATE: 07/17 10 CATEGORY TRANSFORMERS/ REGULATORS SUBJECT POWER TRANSFORMER, 116/12.47 kV 28. ACCESSORIES AND CONTROL DEVICES ........................................................................................................ 31 29. CONTROL POWER ....................................................................................................................................... 35 30. SMUD CABLES, WIRING AND LABELING ...................................................................................................... 36 31. COOLING SYSTEM ....................................................................................................................................... 37 32. OIL PRESERVATION SYSTEM ........................................................................................................................ 38 33. TRANSFORMER OIL ..................................................................................................................................... 42 34. SOUND LEVEL .............................................................................................................................................. 43 35. TESTING ...................................................................................................................................................... 43 36. PHOTOGRAPHS ........................................................................................................................................... 52 37. LOSS EVALUATION ...................................................................................................................................... 52 38. BID SUBMITTAL ........................................................................................................................................... 53 39. CONTRACT SUBMITTALS ............................................................................................................................. 55 40. INSTRUCTION BOOK REQUIREMENTS ......................................................................................................... 58 41. QUALITY ASSURANCE.................................................................................................................................. 59 42. INSPECTION AND HOLD POINTS .................................................................................................................. 60 43. PREPARATION FOR SHIPMENT .................................................................................................................... 60 44. SHIPMENT AND DELIVERY ........................................................................................................................... 61 45. FIELD SERVICES ........................................................................................................................................... 63 46. ATTACHMENTS ........................................................................................................................................... 64 REV PAGE TECHNICAL POWER TRANSFORMER, 116/12.47 kV SPECIFICATION 10 1 of 64 № SS1405 1. PURPOSE 1.1 This specification has been developed to procure 116/12.47 kV, oil-filled, power transformers. The specification provides detailed requirements for the power transformer including design, documentation, furnishing, manufacturing, transporting, delivery, off-loading, on-site assembly, oil processing and testing. 1.2 This specification and all attachments are intended to inform the Contractor of technical requirements, design parameters, documentation requirements and evaluation criteria that must be incorporated into the design, manufacturing, performance, documentation, delivery, assembly and testing of the transformers. 2. DEFINITIONS 2.1 SMUD (Sacramento Municipal Utility District) - The purchaser and end user of the power transformers. 2.2 Contractor – The provider/bidder/manufacturer of the power transformers. 3. SCOPE 3.1 The transformer shall consist of three-phase, step-down power transformer with automatic load tap changer designed to supply a three-phase, four wire, grounded wye distribution system. 3.2 This Contractor shall be responsible for all shipping, drayage, and placing each transformer on SMUD’s designated foundation pad located in Sacramento County, California. 3.3 The Contractor shall also be responsible for onsite assembly, oil processing & filling, and testing the transformer after delivery. 3.4 The power transformer shall be complete with all accessories for installation, connection and immediate service. 3.5 All brackets, adapters, threaded fasteners, and other hardware necessary for complete field assembly of the transformer and accessory equipment shall be supplied. 3.6 All supplied materials shall be itemized on a complete bill of material. 3.7 The successful Contractor shall be responsible for providing a comprehensive structural engineering report for the transformer. The report shall include detailed REV PAGE TECHNICAL POWER TRANSFORMER, 116/12.47 kV SPECIFICATION 10 2 of 64 № SS1405 design calculations, drawings, material information, quality control documentation, fabrication/assembly procedures
Recommended publications
  • The Capacitor: Posi- Tive on One Side, Negative on the Other
    TESLA COIL by George Trinkaus Third edition, originally ©1989 by George Trinkaus (ISBN 0-9709618-0-4) published by High Voltage Press in paper format High Voltage Press PO Box 1525 Portland, OR 97207 Content copyright ©2003 George Trinkaus Layout, design, and e-book creation are copyright ©2003 Good Idea Creative Services Published by Wheelock Mountain Publications, an imprint of Good Idea Creative Services Good Idea Creative Services 324 Minister Hill Road Wheelock VT 05851 www.tesla-ebooks.com i How To Use This Book Text links Click on red colored text to go to a link within the e-book. Click on blue colored text to go to an external link on the internet. The link will automatically open your browser. You must be connected to the internet to view the externally linked pages. Buttons The TOC button will take you to the table of contents. The left facing arrow will take you to the previous page. The right facing arrow will take you to the next page. ii Table Of Contents Preface . iv Tesla Free Energy . 1 How It Works. 5 How to Build It . 9 Tesla Lighting . 54 Magnifying Transmitter . 60 Tuning Notes. 66 For More Information. 69 Click on the red text or red page number to go to the page. iii Preface Invented by Nikola Tesla back in 1891, the tesla coil can boost power from a wall socket or battery to millions of high frequency volts. In this booklet, the only systematic treatment of the tesla coil for the electrical nonexpert, you’ll find a wealth of information on one of the best-kept secrets of electric technology, plus all the facts you need to build a tesla coil on any scale.
    [Show full text]
  • Transformer Protection
    Power System Elements Relay Applications PJM State & Member Training Dept. PJM©2018 6/05/2018 Objectives • At the end of this presentation the Learner will be able to: • Describe the purpose of protective relays, their characteristics and components • Identify the characteristics of the various protection schemes used for transmission lines • Given a simulated fault on a transmission line, identify the expected relay actions • Identify the characteristics of the various protection schemes used for transformers and buses • Identify the characteristics of the various protection schemes used for generators • Describe the purpose and functionality of Special Protection/Remedial Action Schemes associated with the BES • Identify operator considerations and actions to be taken during relay testing and following a relay operation PJM©2018 2 6/05/2018 Basic Concepts in Protection PJM©2018 3 6/05/2018 Purpose of Protective Relaying • Detect and isolate equipment failures ‒ Transmission equipment and generator fault protection • Improve system stability • Protect against overloads • Protect against abnormal conditions ‒ Voltage, frequency, current, etc. • Protect public PJM©2018 4 6/05/2018 Purpose of Protective Relaying • Intelligence in a Protective Scheme ‒ Monitor system “inputs” ‒ Operate when the monitored quantity exceeds a predefined limit • Current exceeds preset value • Oil level below required spec • Temperature above required spec ‒ Will initiate a desirable system event that will aid in maintaining system reliability (i.e. trip a circuit
    [Show full text]
  • The Impulse Design of Transformer Oil-Cellulose Structures
    IEEE Transactions on Dielectrics and Electrical Insulation Vol. 13, No. 3; June 2006 477 The Impulse Design of Transformer Oil-Cellulose Structures J.K. Nelson and C. Shaw Rensselaer Polytechnic Institute. Dept. of Electrical, Computer and Systems Engineering Troy, NY 12180-3590, USA ABSTRACT Transformer oil/cellulose structures are often designed based on a cumulative stress criterion derived from experimental tests at power frequency. However, such structures must also meet stringent impulse requirements defined by a Basic Insulation Level (BIL). The industry has tried to establish an equivalence factor to permit power frequency cumulative stress methods to be used to estimate impulse withstand strength. Since the mechanisms of failure differ substantially under surge conditions, there would seem no good reason to suppose that a universal equivalence factor is appropriate. Tests are reported using a 2.3 MV generator to document impulse failure of a number of bulk, creep and hybrid structures to establish the nature of this relationship through statistical comparisons with the established 50/60 Hz methods. Factors varied from 1.94 to 3.34, depending on the configuration. The methodology is described and the results discussed in the context of the design of oil-cellulose structures, having regard to complicating factors such as waveshape and electrode covering. The study permits some speculation about impulse design under hybrid situations (i.e. failure paths involving both creep and bulk liquid). Index Terms — Insulation design, oil/cellulose structures, cumulative stress, impulse withstand. 1 BACKGROUND paths may be categorized as either “bulk” through oil volumes, “creep” along cellulose surfaces (paper or THE “cumulative stress” method is in industrial use for the pressboard) or some combination of the two.
    [Show full text]
  • Designed for Service in All Parts O F the World
    AUTOMATIC including T runk Main Rural designed for service Unit Private in all parts o f the world Private Branch DY dose attention to technical detail MANUAL EXCHANGES of all types the Company has maintained Its position in the forefront of Telecom­ CARRIER TRANSMISSION EQUIPMENT munication Engineers throughout its long experience. Its products enjoy TELEPHONE INSTRUMENTS of all types a world-wide reputation for sound TELEPHONE SWITCHING EQUIPMENT • design and technical excellence. PROTECTIVE DEVICES The Company undertakes the supply and installation of complete Auto- RELAYS matlcandManualTelephoneExchanges for Public and Private service, Auto­ TELEPHONE CABLES, WIRES & CORDS matic and Manual Trunk Exchanges, all types of Telephone Cables for LOADING COILS Trunk and Local Service, C arrier Transmission Equipment and Cables, MARINE RADIO EQUIPMENT Radio Equipments for Ships. SHIPS’ TELEGRAPHS & TELEPHONES CELLS & BATTERIES Dry, Fluid & Inert SIEMENS BROTHERS & CO., LIMITED ISTAtusHEPms WOOLWICH. LONDON. S.E.I8 TELEPHONE : WOOLWICH 2020 30 MAY 1947 SIXPENCE mm: «»». H k 3*ï RM »a BJS&» ¥ L*: b u i L ELECTROFLUX ‘ MAGNETIC CRACK DETECTION APPARATUS The Electroflux Universal Crack Detector will locate cracks in all directions. It is ideal for the rapid inspection of mass produced articles. Semi-automatic operation. TRAFFORD PARK ••• MANCHESTER 17. N/C70I THE ELECTRICIAN 30 M A Y 1947 1409 The Factory Manager gets asato hot w ater ! •VO'S e»V Yiot > %<>» to r i i0 o0.t& Ca° e?3 so in rfíXf tef ... • • 19 5OO VÖ1 fe<4o.Vr® •yec t o O-®” tn° î f lor VS° r&° ti» 6- / * # ie* - J / provÍ ct,at:¡A ^adj^L^ter 1,0 i.°°Ô !£* The model illustrated is just one from the w ide range o f G .E.C.
    [Show full text]
  • Dissolved Gas Analysis in Transformer Oil Using Transformer Oil Gas Analyzer
    APPLICATION NOTE Gas Chromatography Authors: Tracy Dini Manny Farag PerkinElmer, Inc. Shelton, CT Dissolved Gas Analysis in Transformer Oil Using Introduction Nearly 90% of the world’s population does not Transformer Oil Gas Analyzer know life without the ubiquity of electricity. It is a luxury that gets taken for granted by most people and TurboMatrix HS Sampler every day. Panic often ensues when the electricity supply is interrupted, as witnessed in Manhattan during the July 13, 2019 blackout that left over 73,000 people without electricity for several hours. While no injuries or fatalities were reported in this case, history offers many accounts of chaos and safety risks following blackouts of this magnitude, especially in a major metropolitan city. To prevent such interruptions in electrical power, transformers must be properly maintained and monitored. An effective means of conducting routine monitoring towards this goal of reduced blackouts includes the analysis of oil insulting the transformers. Acting as both an insulator and coolant, insulating oil in electrical transformers is expected to meet demanding chemical, electrical, and physical properties to ensure proper functioning of the transformer and its internal components. The American Society for Testing and Materials (ASTM) offers reference test methods as guidance for performing required routine analysis on the oil. As the insulating oil is subjected to high intensity thermal and electrical conditions, decomposition occurs over time and forms gases that dissolve into the oil. ASTM D3612 Method C is a standard test method using a headspace sampler to extract these dissolved gases for GC analysis. Dissolved gas analysis (DGA) is performed on the oil to identify the gases and their concentrations.
    [Show full text]
  • Electrical Engineering Diploma Based 73 Important Mcq Pdf
    WWW.ALLEXAMREVIEW.COM ELECTRICAL ENGINEERING DIPLOMA BASED 73 IMPORTANT MCQ PDF 1.The temperature, under thermal and electrical system analogy, is considered analogous to (a) voltage (b) current (c) capacitance (d) charge (e) none of the above Ans: a 2.In electrical-pneumatic system analogy the current is considered analogous to (a) velocity (b) pressure (c) air flow (d) air flow rate Ans: d 3.In liquid level and electrical system analogy, voltage is considered analogous to (a) head (b) liquid flow (c) liquid flow rate (d) none of the above Ans: a 4.The viscous friction co-efficient, in force-voltage analogy, is analogous to (a) charge (b) resistance (c) reciprocal of inductance (d) reciprocal of conductance (e) none of the above Ans: b 5.In force-voltage analogy, velocity is analogous to (a) current (b) charge (c) inductance (d) capacitance Ans: a 6.In thermal-electrical analogy charge is considered analogous to WWW.ALLEXAMREVIEW.COM (a) heat flow (b) reciprocal of heat flow (c) reciprocal of temperature (d) temperature (e) none of the above Ans: d 7.Mass, in force-voltage analogy, is analogous to (a) charge (b) current (c) inductance (d) resistance Ans: c 8.In a stable control system backlash can cause which of the following ? (a) Underdamping (b) Overdamping (c) Poor stability at reduced values of open loop gain (d) Low-level oscillations Ans: d 9.In an automatic control system which of the following elements is not used ? (a) Error detector (b) Final control element (c) Sensor (d) Oscillator Ans: d 10.In a control system the output
    [Show full text]
  • Tesla Coil Works
    Matt Behrend http://home.earthlink.net/~electronxlc/ How a Tesla Coil works On this page, I will explain the basic theory of how a Tesla coil works. Below is the Table of Contents for this page. z Description of Components z How the Components Operate z LC Circuits z Voltage Gain z Resonant Rise z Oscillation and Tuning z Quarter Wavelength Frequency Description of Components A Tesla coil is a high-voltage air-core resonant transformer. A Tesla coil has 6 basic components. The first is the primary transformer, which is a high-voltage iron-core transformer. The second is the tank capacitor, which is a high-voltage capacitor that is usually homemade, but can be purchased for a high price from commercial suppliers. The third is the spark gap, basically two wires separated by a small gap of air. The fourth is the primary coil consisting of about 10 to 15 turns of thick heavy gauge wire wound around the base of the secondary coil. The fifth is the secondary coil, and it consists of many hundreds of turns of relatively thin, small gauge enameled wire. The primary and secondary coils make up an air-core transformer. That means that there is no iron core inside of the coils. The sixth basic component is the toroid. It is usually an aluminum doughnut-shaped object, and placed on top of the secondary coil. The high-voltage sparks radiate in all directions from the toroid out into the air. How the Components Operate The primary transformer converts the AC line voltage (120/240 volts AC) to over 10,000 volts.
    [Show full text]
  • DISTRIBUTION TRANSFORMERS SPECIFICATION #1212.01 12.47Kv Grd Wye Padmount & Polemount
    DISTRIBUTION TRANSFORMERS SPECIFICATION #1212.01 12.47kV Grd Wye Padmount & Polemount June 7, 2019 Page 1 of 17 Material Specification 1212.01 Distribution Transformers – Padmount & Polemount TABLE OF CONTENTS 1 SCOPE ............................................................................................................................................. 3 2 STANDARDS .................................................................................................................................. 3 3 EVALUATION AND AWARD ..................................................................................................... 3 4 INFORMATION TO BE FURNISHED WITH BID ................................................................... 4 5 POLEMOUNT TRANSFORMERS .............................................................................................. 6 6 PAD MOUNT TRANSFORMER – SINGLE PHASE ................................................................ 8 7 PAD-MOUNTED TRANSFORMERS – THREE PHASE ....................................................... 11 8 TRANSFORMER OIL ................................................................................................................. 15 9 NOISE ............................................................................................................................................ 15 10 PAINT FINISH ............................................................................................................................. 15 11 INSPECTION ...............................................................................................................................
    [Show full text]
  • Single Phase Oil Immersed Distribution Transformers (Outdoor Type)
    TS for 1 Phase DT 1 Single Phase Oil Immersed Distribution Transformers (Outdoor Type) 1 SCOPE: 1.1 This specification covers design, engineering, manufacture, assembly, stage testing, inspection and testing before supply and delivery at site of oil immersed naturally cooled 11 kV/240 V, 11/√3 kV/240 V single phase distribution transformers for outdoor use. 1.2 The equipment shall conform in all respects to high standards of engineering, design and workmanship and shall be capable of performing in continuous commercial operation in a manner acceptable to the purchaser, who will interpret the meanings of drawings and specification and shall have the power to reject any work or material which, in his judgment is not in accordance therewith. The offered equipment shall be complete with all components necessary for their effective and trouble free operation. Such components shall be deemed to be within the scope of bidder’s supply irrespective of whether those are specifically brought out in this specification and/or the commercial order or not. 1.3 The transformer and accessories shall be designed to facilitate operation, inspection, maintenance and repairs. The design shall incorporate every precaution and provision for the safety of equipment as well as staff engaged in the operation and maintenance of equipment. 1.4 All outdoor apparatus, including bushing insulators with their mountings, shall be designed so as to avoid any accumulation of water. 1.5 STANDARD RATINGS 1.5.1 Standard ratings of single phase transformers shall be 5, 10, 16 and 25 kVA. 2 STANDARDS: 2.1 The materials shall conform in all respects to the relevant Indian Standard, with latest amendments thereof unless otherwise specified herein; some of them are listed below.
    [Show full text]
  • Transformer Oil Testing
    OIL CONDITION MONITORING TRANSFORMER OIL TESTING Providing total confidence in the quality and reliability of transformers with Intertek’s TransoilCHECKTM programme. TransoilCHECKTM -Total Quality Assurance for Transformers TransoilCHECKTM monitors the condition and change in transformer oil quality, helping to identify potential transformer oil related failures before they occur, reducing disruptions, keeping unscheduled maintenance to an absolute minimum and therefore reducing the risk of potentially expensive downtime. TRANSFORMER OIL TESTING Intertek’s TransoilCHECKTM expertise helps to prevent transformer failure which is vital to the safe and reliable operation of any electrical network. Preventing Transformer Failures reports provide trending information Preventing transformer failure is vital to the and fully interpreted results, with easy-to- safe and reliable operation of any electrical understand summaries and recommendations. network. With a single point of Transformer breakdowns usually cause power contact, Intertek provides convenient access outages and interruptions. To compound the to a full range of expert global testing, damage, unforeseen repair and maintenance consultancy, and problem costs are incurred, and new unexpected solving capabilities, including mode-of-failure equipment investment is required. and forensic analysis. Testing the condition and quality of Quality Analysis & Reporting transformer insulating oil provides data TransoilCHECKTM is a key monitoring tool to showing the actual condition of the maximise the reliability and availability of your transformer, and its remaining lifetime. transformers. As a fully integrated solution, Information from oil analysis can help TransoilCHECKTM supports all aspects of anticipate potential failures, and guide your transfomers’ oil systems, and gives you precisely targeted maintenance and simple, easy access to Intertek’s full range of replacement plans.
    [Show full text]
  • Transformer Oil Testing
    Transformer Oil Testing By Robert Turcotte, Manager, Electrical Loss Control The Hartford Steam Boiler Inspection and Insurance Company The Value Of Transformer Oil Testing Transformer Oil Testing is a proven loss prevention technique which should be a part of any condition- based predictive maintenance program. This early warning system can allow maintenance management to identify maintenance priorities, plan work assignment schedules, arrange for outside service, and order necessary parts and materials. Hartford Steam Boiler uses test results in its Transformer Oil Gas Analyst (TOGA ) program, for instance, to diagnose transformer problems. The transformer’s fluid not only serves as a heat transfer medium, it also is part of the transformer's insulation system. It is therefore prudent to periodically perform tests on the oil to determine whether it is capable of fulfilling its role as an insulant. Some of the most common tests for transformer oil are: Dissolved Gas In Oil Analysis, screen tests, water content, metals-in-oil, and polychlorinated biphenyl (PCB) content. In this article, we will examine the value and benefits of each test. Dissolved Gas-In-Oil Analysis The most important test that can be done on the liquid insulation of a transformer is an annual Dissolved Gas Analysis (DGA). This test can give an early indication of abnormal behavior of the transformer. As the name implies, this test analyzes the type and quantity of gases that are dissolved in the transformer oil. ©1996-2011 The Hartford Steam Boiler Inspection and Insurance Company. All rights reserved. 1 | P a g e http://www.hsb.com/Thelocomotive Disclaimer statement: All recommendations are general guidelines and are not intended to be exhaustive or complete, nor are they designed to replace information or instructions from the manufacturer of your equipment.
    [Show full text]
  • Central Electricity Authority Notification
    CENTRAL ELECTRICITY AUTHORITY WHEREAS the Government of India has published a Regulation with amendments on different dates the following, namely: (Technical Standards for Construction of Electrical Plants and Electric Lines) Regulations, 2010 (Notification No.: CEA/TETD/MP/R/01/2010, Dated: 20.08.2010) A. (Technical Standards for Construction of Electrical Plants and Electric Lines) Regulations, 2010, (First Amendment), 2015, (Notification No.: 502/11/DP&D/2015, Dated: 06.04.2015) Inserted/ Replaced matter is shown as [ ]A at appropriate place; wordings inserted/ replaced shown within square brackets; In both of above cases; -A ; superscript A implies that change is caused by Amendment ‗1‘. NOTIFICATION New Delhi, the 20th August, 2010 No. CEA/TETD/MP/R/01/2010.—In exercise of the powers conferred by sub-section (2) of Section 177 of the Electricity Act, 2003, the Central Electricity Authority hereby makes the following regulations namely:— 1. Short Title and Commencement.—(1) These regulations may be called the Central Electricity Authority (Technical Standards for Construction of Electrical Plants and Electric Lines) Regulations, 2010. (2) They shall come into force on the date of their publication in the Official Gazette. 2. Definitions.—(1) In these regulations, unless the context otherwise requires,— (a) "Act" means the Electricity Act, 2003; (b) "Authority" means the Central Electricity Authority established under sub-section (2) of Section 70 of the Act; (c) "Base load Operation" means operation at maximum continuous rating (MCR) or its high fraction; (d) "Basic Insulation Level (BIL)" means reference voltage level expressed in peak (crest) voltage with standard 1.2/50 us lightning impulse wave.
    [Show full text]