Poplar Dutch Barn Latteridge BS37
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
M4 Junction 18A Link Study – Combined Modelled and Appraisal Report
M4 Junction 18a Link Study – Combined Modelled and Appraisal Report Prepared for South Gloucestershire Council and Highways England March 2018 Draft 1 The Square Temple Quay Bristol BS1 6DG Draft Document history M4 Junction 18a Link Study Combined Modelling and Appraisal Report This document has been issued and amended as follows: Version Date Description Created by Verified by Approved by 001 01.03.18 Working Draft JB HS HS Draft Contents Section Page Introduction ................................................................................................................................ 1‐1 1.1 Purpose of this Report ............................................................................................... 1‐1 1.2 Scheme Objectives ..................................................................................................... 1‐1 1.3 Scheme Description ................................................................................................... 1‐1 1.4 Previous Studies ......................................................................................................... 1‐3 Local Transport Situation ............................................................................................................ 2‐3 2.1 Existing Local Transport System ................................................................................ 2‐3 2.2 Key Travel Demands .................................................................................................. 2‐5 2.3 Transport Problems and Factors ............................................................................... -
Offices at Green Farm, Latteridge Green, Iron Acton, BS37 9TS
LATTERIDGE SOUTH GLOUCESTERSHIRE Offices at Green Farm, Latteridge Green, Iron Acton, BS37 9TS Attractive, Traditional Listed Farm Building converted to a high standard to give prestigious office accommodation with parking TO LET Either as a whole or in two units Unit 1 1063 ft² ( 98m²) Unit 2 1176 ft² (109m²) Ready for immediate occupation Knights Farm, Shepperdine Road, Shepperdine, Oldbury on Severn, Bristol, BS35 1RL Tel: 01454 269486 Fax: 01454 413320 www.voycepullin.co.uk OFFICES AT GREEN FARM, LATTERIDGE GREEN, IRON ACTON, SOUTH GLOUCESTERSHIRE, BS35 9TS LOCATION On the First Floor Latteridge is conveniently located on the B4059 between Thornbury and Yate and with easy access to Galleried Landing Area to two open-plan offices A38, Bristol and the M4/M5 interchange at Almondsbury. Parkway railway station is some 8 Office 1 20.53 m² (221 ft²) miles away. The offices offer the benefit of an Office 2 17.74 m² (191 ft²) attractive rural location within an area of excellent road and rail communication. All measurements are in accordance with the RICS Standard Code of Measuring Practice. Although DESCRIPTION every care has been taken measurements will be approximate only where rooms are not exactly The barn built principally of local stone under a square due to the nature of the building. tiled roof has been carefully converted and now offers character office accommodation with up to The offices benefit from date technology and facilities. Although approval exists for B1 office use the premises may have Oil-fired central heating to radiators potential for retail or other opportunities subject to • the necessary planning consents. -
EXCITING NEW CAFÉ OPPORTUNITY to LET Pinkers Country Store, Latteridge, Iron Acton
EXCITING NEW CAFÉ OPPORTUNITY TO LET Pinkers Country Store, Latteridge, Iron Acton UNIQUE OPPORTUNITY CAFÉ PREMISES IN RURAL LOCATION Pinkers Country Store Latteridge Lane Iron Acton BS37 9TY 1,159 sq ft (107.67sq m) GIA A3 planning consent Pinkers Country Store, Latteridge, Bristol, BS37 9TY Location Accommodation Business Rates Latteridge is a hamlet in South Gloucestershire, which Interested parties should make their own enquiries to lies on the B4059 north of Iron Acton, and south of Area Sq ft Sq m South Gloucestershire Council to ascertain the exact Rudgeway and Earthcott. Ground Floor 1,159 107.67 rates payable as a change in occupation may trigger an adjustment of the ratings assessment. www.voa.gov.uk. The property is situated within the popular Pinkers TOTAL 1,159 107.67 Country Store on Latteridge Lane, just off the B4059. References/Rental Deposits Pinkers is a major supplier of Saddlery and Country The building has been measured in accordance with the Financial and accountancy references may be sought from Clothing and Game Farm Equipment. RICS code of Measuring Practice (6th Edition): any prospective tenant prior to agreement. All measurements are approximate Net Internal Areas. Prospective tenants may be required to provide a rental deposit subject to landlords’ discretion. Rent Energy Performance Certificate £15,000 per annum exclusive. The energy performance rating has been commissioned Lease and is and the full certificate and recommendations can The accommodation is available on a new full repairing be provided on request. and insuring lease for a term of years to be agreed. VAT Services Under the Finance Acts 1989 and 1997, VAT may be We are advised that all main services are connected to the levied on the Rent/Sale price. -
Lower Almondsbury.Pdf
Planning Statement Lower Almondsbury Green Ltd 0244 Contents Page 1.0 Introduction ...................................................................................... 2 2.0 Site Description and Location ............................................................. 3 3.0 Policy ............................................................................................... 4 4.0 Analysis ............................................................................................ 5 5.0 Conclusions .................................................................................... 11 Planning Statement Lower Almondsbury Green Ltd 0244 1.0 Introduction 1.1. The purpose of this document is to set out the planning policy case for the release of land at Lower Almondsbury from the Green Belt for housing development to assist the Council in meeting its specified housing needs. The Statement is structured as follows: • Section 2 Site Description and Location • Section 3 Policy • Section 4 Analysis • Section 5 Conclusion 1.2. In addition to the above, the Statement is supported by a number of supporting technical documents, which when combined with this document provide a robust evidence base for the site. This allows a decision to be made to allocate the site for housing development. These reports are as follows: • LDA Design Documents • Development Capacity Report • Ecological Appraisal • Heritage Appraisal • Landscape and Visual Appraisal • Corun Associates Documents • Transport Assessment 2 Planning Statement Lower Almondsbury Green Ltd 0244 2.0 Site Description and Location Site Description 2.1. The site is approximately 7.5 ha. It contains 5 fields of agricultural land used for grazing. A Conservation Area runs across the north of the site and a stream crosses through the site. Hedgerows, fences and stone walls contain the fields. The site is predominantly surrounded by a number of residential dwellings and their associated curtilage. Location 2.2. The site is found immediately outside of the development boundary of Almondsbury in South Gloucestershire. -
SUMMER 2016 a Great Place to Browse, Shop and Socialise
Iron Acton’s Magazine & Web Portal SUMMER 2016 A great place to browse, shop and socialise ... Your Local, Friendly, Garden Centre. DON’T MISS OUR MONTHLY OFFERS OPENING HOURS: Wo on Road, Iron Acton, South Glos. BS37 9XA MON-FRI 9am-6pm TEL: 01454 228764 SAT 9am-5.30pm www.ironactongardencentre.co.uk SUN 10.30am-4.30pm LETTER FROM THE EDITOR Local Poyntz team: - Jon Aries, Caroline Haselhan, Jessica Hatherell, Sarah Ridler, Amanda Scott, Jane Spare, John Wright, Marilyn Wright and myself, Pamela McCoy. DISTRIBUTION. Our thanks to all distributors MAGAZINE. Year 2 has begun with a large edition of 44 pages. This has been achieved even though some of our normal contributors have opted out, this time. ARTICLES – Thank you Eileen and Tim for writing more about the history of Iron Acton. We have an additional writer of history – Dorothy Denning, who has added an article about Brass Finial Pole Heads. Thank you Dorothy. If there’s anyone with more history, please contact me. YOUNG POYNTZ– Jessica Hatherell is doing a great job with the “Young Poyntz” section but would really like to receive some more articles from the young ones. Her e-mail address is on page 39. ADVERTISING – If anyone wishes to advertise please contact me. Email address below. WEBSITE If anyone would like to put something on the website please contact Jon Aries at [email protected]. FLYERS We are always willing to include any flyers, with the magazine. Price available on request. PHOTO’S I am always looking for photographs to put on the front page. -
Infrastructure Delivery Plan (March 2014)
South Gloucestershire Infrastructure Delivery Plan March 2014 Infrastructure Delivery Statement – Supporting Explanation Planning for infrastructure to meet existing deficiencies and future growth is a high priority for the Council. It therefore continues to work closely with its development partners, the West of England Partnership (4UAs) and other statutory and non-statutory organisations to identify and bring forward new and improve existing infrastructure. The information shown in the following matrix reflects the current position at the time of writing [March 2014] based on information available to the Council. The IDP is thus subject to continual update and review as new information becomes available. It is proposed therefore that it is a 'living document'. The IDP matrix should be read in conjunction with the supporting Evidence Appendices. The following tables give a broad indication of the planned provision, cost and need for infrastructure in South Gloucestershire (to 2027). It sets out planned infrastructure to meet existing deficiencies where information is available, plus that required to meet growth as set out in the South Gloucestershire Local Plan 2006 & Core Strategy (Dec 2013). It thereby indicates requirements for additional infrastructure which would not have been necessary but for the implementation of the proposed development. Where available, items contained within existing S106 agreements for major development sites (or agreements in advanced states of negotiation) have been reflected. For clarity these major sites are Emersons Green Science Park, Charlton Hayes, Harry Stoke, Emersons Green East, Park Farm –Thornbury, North Yate New Neighbourhood & University of the West of England. These sites may from time to time, be subject to change due to negotiation and viability testing instigated by the respective developers. -
S150708 Large LNMS Evaluations Map.Ai
Large LNMS Evaluations LNMS schemes Motorway Trunk Road North East & Yorkshire A1 A64 / Top Lane Junction 2002 Improvement at Copmanthorpe A66 Sadberge Grade Separated Junction 2002 Newcastle M62 Junction 25 Eastbound Entry Slip 2002 upon Tyne 2002 A69 M62 Junction 27 Westbound Entry Slip A1(M) Durham Climbing Lanes 2004 (Bradbury To Bowburn) Carlisle M6 A19 A1 Rainton Crossroads 2004 A1(M) A66 Middlesbrough North West A19 Black Swan Bridge 2008 A595 A66 A174 A55 / A483 Junction Improvement Scheme 2003 A66 A63 Garrison Road Roundabout 2008 2003 A1 A596 / Calva Brow Junction Improvement A19 A64 Hopgrove Roundabouts 2009 A590 A596 Northside Junction Improvement 2003 A69 / A1 Denton Interchange Signalisation 2011 A168 A64 M6 Junction 40 Improvements 2006 A1(M) / M18 Junction M6 2011 A1(M) York Signalisation Scheme 2006 M62 Junction 10 Westbound Diverge M1 J34 Northern Roundabout Leeds Kingston 2011 A585 Signal Improvement M6 Junction 32 Southbound Widening 2009 upon Hull M65 A63 A1033 2012 M55 M62 M1 Junction 39 Traffic Signals M62 Junction 12 Eastbound Diverge 2011 A56 M62 M18 Junction 1 Traffic Signals 2012 M6 M61 M66 M6 to M62 Eastbound Merges 2012 M180 A180 M58 Manchester M1 M60 A628 M18 Liverpool M57 M60 A1(M) M62 M53 East Sheffield Lincoln M56 A1 A47 / A10 Hardwick Midlands M1 2003 A55 Roundabout A46 A45 Packington Crossroads 2001 A14 Jane Coston Bridge 2004 A38 A50 Derby A523 Leek to Hazel Grove 2002 A5 Dunstable Queue 2004 M6 A52 Relocation A453 A45 / A46 Stivichall Junction 2004 A5 A12 Stanway to Spring A38 A42 A1 -
Frampton Cotterell
Frampton Cotterell & Coalpit Heath VVILLAGEILLAGE DDESIGNESIGN SSTATEMENTTATEMENT Frampton Cotterell Contacts Frampton Cotterell Parish Clerk & Coalpit 01454 865569 Heath www.framptoncott.co.uk Westerleigh Parish Clerk 01454 864433 Acknowledgements Frampton Cotterell & Westerleigh Parish VILLAGEVILLAGE Councils The Countryside DESIGN Commission DESIGN Village Design Statement (VDS) Facilitator STATEMENT Dave Dickson STATEMENT Di Western - Drawings All the local people and school children who contributed through the Village Conference, Roadshows and other VDS activities The VDS Team South Gloucestershire Council for assistance in publishing the VDS. Photographs Cover: Main view towards Frampton Cotterell from Frampton Court Top: Manor Hall Middle: Brockeridge Centre Bottom: Woodend Road Sketch left: St. Saviour’s Church Design by South Gloucestershire Council, Graphics & Mapping Unit, Kingswood 01454 86 3763 Frampton Cotterell & Coalpit Heath Village Design Statement ContentsContents 1 SUMMARY OF RECOMMENDATIONS PAGE 3 INTRODUCTION PAGE 4 2 LANDSCAPE & WILDLIFE PAGE 7 3 BUILT ENVIRONMENT & HERITAGE PAGE 11 4 SHOPS & SERVICES PAGE 25 5 TRANSPORT, HIGHWAYS & BYWAYS PAGE 28 INDEX PAGE 32 MAPS MAP 1 1880 HISTORIC MAP PAGE 14 MAP 2 VILLAGE DESIGN AREA PAGE 15 MAP 3 BUILT AREA PAGE 16 MAP 4 GEOLOGY PAGE 18 2 Landscape & Wildlife The present Green Belt should be maintained intact. Protection of existing green space on the village margins is a high priority. Developers should protect and create wildlife corridors and habitats. Water quality in the River Frome needs to be improved. Trees which form part of the villages’ character need to be safeguarded. Traditional hedge laying and maintenance is to be encouraged. More sites should be considered for the local nature conservation plan. -
Trafford Park Masterplan Baseline Assessment
Trafford Park Masterplan Baseline Assessment A Report for the Trafford Economic Alliance By EKOS, CBRE, URBED and WSP August 2008 EKOS Consulting (UK) Ltd 2 Mount Street Manchester M2 5WQ TABLE OF CONTENTS LIST OF FIGURES AND TABLES............................................................................................ 6 EXECUTIVE SUMMARY......................................................................................................... 12 2 INTRODUCTION AND STUDY CONTEXT ..................................................................... 23 INTRODUCTION ....................................................................................................................... 23 STUDY CONTEXT.................................................................................................................... 23 HISTORICAL CONTEXT ............................................................................................................ 24 STUDY CONTEXT AND MASTERPLAN OBJECTIVES .................................................................... 29 STUDY AREA.......................................................................................................................... 31 BASELINE REPORT OBJECTIVES AND STRUCTURE.................................................................... 31 3 REGENERATION AND PLANNING POLICY REVIEW.................................................. 33 INTRODUCTION ....................................................................................................................... 33 NATIONAL POLICY -
Iron Acton Latteridge
Drain ORDNANCE SURVEY Backfield House SHEET 1-1 Pond SHEET 1-21-1 Issues SCALE:Drain 1:2500 SCALE: 1:2500 Ponds Poplar Farm North Barn North Barn Cottage NOTES Drain Northmead House Sinks Pond 1. All dimensions are in metres unless noted otherwise. Bramble Cottage Bungalow Backfield Farm Poplar A8 to A4 Crossing Drain Farm Cottage 2. The road lighting installation is to comply with the South Gloucestershire Council Cottage Pond Rose Holding requirements in accordance with the previous Avon County Council Specification D8 to D13 to D8 Series 3100A document for Consultants, Developers and Contractors issued The Old Fouracre Plough Cottage A3 to A1 Pond Level CrossingLB March 1995. Two Pools A16 to A9 Farm D3 to D1 Little MS toD7 D4 Poplar Cottage 68.9m 3. The new lighting columns and their REC electrical supplies shall be installed in MS 52.7m Pond Seven Springs land dedicated for ownership to the Council by the Developer enabling continuity D15 Home D14 The Nook Farm of installation and maintenance access. Should property access require columns Cottage Pond Green Apple Cottage 63.1m to be repositioned the Developer shall notify the Council to obtain agreed Drain Home alternative position/s. Farm Track Ponds 4. All equipment and installation works shall comply with relevant British Standards. 60.7m Track For this development the equipment detailed in section equipment specific shall Latteridge Pond be installed. Prior to any installation road lighting works commencing on site Pond alternative equipment will be considered for approval by the Council subject to Latteridge Slurry Pit Green Farm Path (um) agreement for suitability, design, lighting performance and operational costs. -
Map 2 F R a M P T O N C O T T E R E L L & C O a L P It H E a T H V Il L a G E D E S Ig
Map 2 frampton cotterell & coalpit heath village design area 15 River Fr L ome a d d e n B Turnpike r o Cottage o k Corporation Wood A432 Frog Lane Pit Badminton Road North Old Withy Church Road Woods Bed Windsurfing Lake B4427 Shepherds Wood Old Gloucester Road Burn Wood B4058 Rockwell Bristol Road Wood Key N Ram e Blackberry m Hill Pit Boundary of Village Design Statement o Brake r F r Ramhill Frampton Cotterell Parish Boundary e Wood v i Principal Road R Railway Bridleway Lake Hotwater Brake Disused Coal Shaft River Bitterwell Lake View Point Woodland 65 Height (m) Green Belt 01.00.5 kilometres Reproduced from the Ordnance Survey mapping with the permission of the Controller of Her Majesty's Stationery Office Crown Copyright. Unauthorised reproduction infringes Crown copyright and may lead to prosecution or civil proceedings. South Gloucestershire Council Licence No 100023410,2004 Map 3 built area of frampton cotterell & coalpit heath Hovers Lane R i v e r F r o m e Frampton Cotterell Parish B4058 Old Iron Workings Bristol Road Bristol Centenary Field A st. peters P PH Church Bridge e b e l G PH PH Parsonage Bridge Frampton Cotterell C of E School Crossbow BeesmoorBe Rd House PlayingPl Field PH Pavilion The Park Frampton Court Nightingales Bridge N Key Parish Boundary Frome Valley Walkway Principal Road Dramway Railway P Post Office Rockwell Wood PH Public House Bridleway R i v e r River Listed Building F r o m e 65 Height (m) Community Building Woodland Church Green Belt A Allotments Recreation Area Bridge 0 0.5 kilometres 16 65 65 Westerleigh A432 PH Parish Highcroft School PH Church Road 75 PH Brockeridge School Badminton Road Brockeridge Centre zion Coalpit Heath Village Hall P Beesmooreesmoor Rd Playinglaying Field st. -
Grassedandplantedareas by Motorways
GRASSEDANDPLANTEDAREAS BY MOTORWAYS A REPORT BASED ON INFORMATION GIVEN IN 1974175 BY THE DEPARTMENT OF THE ENVIRONMENT AND COUNTY COUNCIL HIGHWAY DEPARTMENTS, WITH ADDITIONAL DATA FROM OTHER SOURCES J. M. WAY T.D.. M.Sc., Ph.D. 1976 THE INSTITUTE OF TERRESTRIAL ECOLOGY I MONKS WOOD EXPERIMENTAL STATION .ARROTS. - - - . - .RIPTON .. - . HUNTINGDON PE 17 2LS I CAMBRIDGESHIRE INDEX Page Chapter 1 Introduction. 1 Chapter 2 Distribution and mileage of motorways, with estimates of acreage of grassed and planted areas. Chapter 3 Geology and land use. Chapter 4 Grass and herbaceous plants. Chapter 5 Planting and maintenance of trees and shrubs. Chapter 6 Analysis of reasons for managing grassed areas and attitudes towards their management. Chapter 7 Management of grassed areas on motorway banks and verges in 1974. Chapter 8 Ditches, Drains, Fences and Hedges. Chapter 9 Central Reservations. Chapter 10 Pollution and litter. Chapter 11 Costs of grass management in 1974. Summary and Conclusions Aclolowledgements Bibliography Appendix Figures Appendix Tables iii INDEX Page TEXT TABLES Table 1 Occurrences of different land uses by motorways. Monks Wood field data. Table 2 Occurrences of different land uses by motorways. Data from maps. Table 3 Special grass mixtures used by motorways. Table 4 Annual totals of trees and shrubs planted by motorways 1963-1974. Table 5 Numbers of individual species of trees and shrubs planted by motorways in the three seasons 1971/72 to 1973/74- APPENDIX FIGURES Figure 1 General distribution of motorways in England and Wales, 1974. Figure 2 The M1, M10, M18, M45, M606 and M621. Southern and midland parts of the Al(M).