INDIA Accessible and Sustainable Urban Mobility in Pune

Total Page:16

File Type:pdf, Size:1020Kb

INDIA Accessible and Sustainable Urban Mobility in Pune mahametro construction india INDIA Accessible and sustainable urban mobility in Pune ©MAHA-METRO/AFD AFD together with the European Investment Bank, supports the MAHA-METRO in the construction of a metro line that will lead to sustainable, long-term improvements to urban mobility in Pune. CONTEXT 01/01/2019 Located in the state of Maharashtra and called 'The Queen of Project start the Deccan' for its rich natural resources, Pune is one of the date most highly industrialised cities in Maharashtra and the second Pune, India largest in the state. While Pune is well-connected to state Location capital and surrounding headquarters through road and rail linkages, increasing private car ownership and the absence of Mobility and transport , a rail system is putting increased pressure on its roads. Infrastructure sector(s) Roads in Pune need to cater to mixed traffic conditions which include both slow and fast moving vehicles. Existing road Sovereign Concessional Loan transport in Pune can optimally carry 8.000 persons per hour financing tool(s) per direction (PHPDT). However when traffic density increases 245 000 000 EUR beyond this level, as it does during rush hour, the average Financing amount speed of vehicles comes down. This leads to longer journey times, increased air pollution and more inconvenienced 5 years commuters. Duration of funding Both the Government of India and the Government of ONGOING Maharashtra recognize the importance of sustainable urban Status development and urban public transport, particularly in the MAHA-METRO context of Pune being selected by the government to be one of Beneficiaries the 100 smart cities of the country as part of its Smart Cities Mission. DESCRIPTION The AFD will be providing support to MAHA-METRO to construct two mediumcapacity subway lines along the busiest thoroughfares of the city. The financing plan includes also the participation of the European Investment Bank. The overall goal of this project is to improve the mobility of the inhabitants while promoting sustainable development of the agglomeration. The construction of the Pune metro, therefore, looks to increasing access to lowcarbon transport, serving essential economic zones in the city and halting the increase in the number of private vehicles in Pune. The network is 33.234 km long and has 30 stations. When completed, the Pune metro is expected to carry 600.000 passengers per day. IMPACTS Economic development through strengthening and streamlining the link between the residential and employment areas Social well-being and reduction of social imbalances by enabling equitable access to essential goods and services Positive impact on the environment through reduction in traffic congestion, air and noise pollution, and fuel consumption.
Recommended publications
  • Request for Proposal for Selection of Contractor
    REQUEST FOR PROPOSAL FOR SELECTION OF CONTRACTOR FOR Procurement, Construction, and Maintenance of Baner Roads Package of 18m,24m,30m wide and total length 10.2Km road/ street/ footpath/junction/related utilities on Project Sites in Pune City under Pune Smart City Project Tender Number: PSCDCL/Road/03/2018 Dated: 20/02/2018 Issued By The Chief Executive Officer Pune Smart City Development Corporation Limited (“PSCDCL”) PMC Building, Near Mangla Theatre, Shivaji Nagar, Pune - 411 005, Maharashtra, India. Contents Disclaimer ....................................................................................................................... 10 Section 1. Introduction ................................................................................................................... 12 Section 2. Project Objective And Scope ....................................................................................... 15 Section 3. Instruction To Bidders ................................................................................................. 17 Section 4. Fraud And Corrupt Practices ...................................................................................... 47 Section 5. Miscellaneous Provisions ............................................................................................ 49 Section 6. Termination ................................................................................................................... 53 Section 7. Dispute Resolution ......................................................................................................
    [Show full text]
  • Highlights of APCCI Sustainability Report
    Sustainability Excellence Report 2018-19 LEADING INNOVATION FOR TECHNOLOGY DRIVEN AND SUSTAINABLE WASTE MANAGEMENT IN PUNE CITY GRI 100, 200, 300, 400 SDG 1, SDG 3, SDG 4, SDG 6, SDG 7, SDG 8, SDG 9, SDG 10, SDG 11, SDG 12, SDG 13, SDG 16, SDG 17 Highlights of APCCI Sustainability Report Clean City Bringing Dignity to Public Cleaning Jobs through Technology < 60% of the city population has benefitted < 1,044 waste chronic spots covered Waste warriors are our on-the-ground employees. We seek to make their work safe and hygienic, their lives healthy and dignified. < 1,300 fleet routes mapped optimally The waste warriors: < 227 low carbon and advanced fleet machines < have no physical contact with the garbage < 2,500 litter bins made available at strategic locations in Pune city < are continuously trained on-the-job training by OEMs Model of Public Private Partnership < are trained in safety, BOP, and security functions < receive Personal protection equipment (PPE) < Corporate joining hands with Government essential services Beyond these direct actions, the APCCI < INR 100 crore pledged by Mr Adar Poonawalla as part of < conducted 45 daily cleaning audits for all activities of on-road corporate social responsibility (CSR) machines fleets < generated 10 daily reports for better communication and further Citizens Engagement improvements < 10,322 downloads of MyAPCCI mobile app by citizens < followed all solid waste management (SWM2016) guidelines < 18,841 waste pickup concerns raised by citizens were resolved < assign 2 waste warriors per machine
    [Show full text]
  • Draft Development Plan for Pune City( Old Limit) 2007-2027
    Draft Development Plan For Pune City( Old Limit) 2007-2027 Executive Summary Executive summary for draft development plan for Pune City (old limit) Executive Summary Draft Development Plan For Pune City( Old Limit) 2007-2027 1.1. Introduction Pune City is the second largest metropolitan city in the State, is fast changing its character from an educational-administrative centre to an important Industrial (I.T.) City. The area under the jurisdiction of the Pune Municipal Corporation (old limit) is 147.53 sq.km. Vision Statement “An economically vibrant and sustainable city with diverse opportunities and rich culture; where all citizens enjoy a safe and liveable environment with good connectivity” 1.2. Need for revision of Development Plan Pune city, the second largest metropolitan city in the state, is fast changing its character from Pensioner’s city to Educational – Administrative Center and now to an important Industrial hub with reference to the IT Center. The character of the existing use of the land within the limit is of complex nature. The city is not developed in conventional manner, but it consists of such users which are of different nature than the normal corporation area. In 1987 DP, this multiple character of the city as metro city has been studied since 1965, when the city had started experiencing the influence of the Industrial development occurred around the city i.e in the neighbouring Pimpri- Chinchwad area, due to development of large Industrial Townships by M.I.D.C. and IT Industries in Hinjewadi . The overall scenario has resulted into higher population growth also due to migration, inadequacy of infrastructure, growth in vehicle thus causing congestion on city roads, parking problems and overall break down in traffic Pune Municipal Corporation 1 Executive summary for draft development plan for Pune City (old limit) system.
    [Show full text]
  • Integrated Traffic Study & Solution for Nagar Road
    || Volume 5 || Issue 9 || September 2020 || ISSN (Online) 2456-0774 INTERNATIONAL JOURNAL OF ADVANCE SCIENTIFIC RESEARCH AND ENGINEERING TRENDS INTEGRATED TRAFFIC STUDY & SOLUTION FOR NAGAR ROAD Amit Jadhav1, Suraj Jadhav2, Shubham Pawar3, Sanket Mohite4 Dr. Nagesh Shelke5 B.E. Student, Department of Civil Engineering, Dr. D.Y. Patil School of Engineering. And Technology, Lohegaon, Pune. 1,2,3,4 2 Associate Professor, HOD; Department of Civil Engineering, Dr. D.Y. Patil School of Engineering. And Technology, Lohegaon, Pune.5 --------------------------------------------------------------------------------------------------------------- Abstract: Traffic congestion is a severe problem in many modern cities around the world Traffic congestion has been causing many critical problems and challenges in the major and most populated cities. To travel to different places within the city is becoming more difficult for the travelers in traffic. Due to this congestion problems, people lose time, miss opportunities, and get frustrated. There are chances that people lose their lives in the ambulance itself, as it is stuck in a traffic jam. The fire brigade may not reach in time, thus leading in damage to life and property. The traffic congestion directly impacts the companies. Due to traffic congestions there is a loss in productivity from workers, trade opportunities are lost, delivery gets delayed, and there by the costs goes on increasing. To solve these congestion problems, we have to build new facilities and infrastructure but at the same time make it smart. The only disadvantage of making new roads on facilities is that it makes the surroundings more congested. So for that reason we need to change the system rather than making new infrastructure twice.
    [Show full text]
  • Revised Action Plan for Control of Air Pollution in Non-Attainment Cities of Maharashtra
    R-1 REVISED ACTION PLAN FOR CONTROL OF AIR POLLUTION IN NON-ATTAINMENT CITIES OF MAHARASHTRA PUNE Maharashtra pollution control board Kalpataru point, 3rd floor, Sion-Matunga scheme rd. no.8, Opp. Sion circle, Sion (east) Mumbai-400022 Pune : Draft Action Plan for Emission Control 1 | P a g e Revised Action Plan for Control of Air Pollution in Pune 1. Preamble The eighth largest metropolises in India, Pune is located in the state of Maharashtra. It is the second largest city in the state after Mumbai, and is an important city in terms of its economic and industrial growth. Once the hometown of Marathas and a center of power for the Maratha Empire, the presence of the numerous edifices in Pune links to its rich and glorious past. The city leads as the ‘veritable heartland’ of cultural Maharashtra. Pune also has made its mark as the educational epicenter winning itself the sobriquet, ‘The Oxford of the East’. Not just that, it has a growing industrial hinterland, with information technology, engineering and automotive companies sprouting. The city is known for cultural activities like classical music, spirituality, theatre, sports, and literature. Pune is a pleasant travel getaway destination to spend a quiet holiday. Pune district is located between 17 degrees 54′ and 10 degrees 24′ North latitude and 73 degrees19′ and 75 degrees 10′ East longitude. The district has geographical area of 15.642sq.km. Pune district is bound by Ahmadnagar district on north-east, Solapur district on the south-east, Satara district on south, Raigad district on the west and Thane district on the north-west.
    [Show full text]
  • Indira Management Review (IMR) (Bi-Annual International Research and Academic Journal)
    Indira Management Review (IMR) (Bi-annual International Research and Academic Journal) ISSN: 0974–3928 Volume: XI Issue: I July 2017 Editor-in-Chief Dr. Renu Bhargava Executive Editor Dr. Suvarna Deshpande Co-ordinating Editor Prof. Tanay Kurode Indira School of Business Studies Abhinavan, 89/2 A, New Pune–Mumbai Highway Tathawade, Pune–411033, India E-mail: [email protected] Cell: 020-66759428 First Impression: July 2017 © Indira School of Business Studies, Pune Indira Management Review (IMR) Vol. XI • Issue: I • July 2017 ISSN: 0974–3928 No part of this publication may be reproduced or transmitted in any form by any means, electronic or mechanical, including photocopy, recording, or any information storage and retrieval system, without permission in writing from the copyright owners. DISCLAIMER The authors are solely responsible for the contents of the papers compiled in this volume. The publishers or editors do not take any responsibility for the same in any manner. Errors, if any, are purely unintentional and readers are requested to communicate such errors to the editors or publishers to avoid discrepancies in future. Publishing Consultancy EXCEL INDIA PUBLISHERS 91 A, Ground Floor Pratik Market, Munirka, New Delhi-110067 Tel: +91-11-2671 1755/ 2755/ 3755/ 5755 Fax: +91-11-2671 6755 E-mail: [email protected] Web: www.groupexcelindia.com Typeset by Excel Prepress Services, New Delhi–110 067 E-mail: [email protected] Printed by Excel Printing Universe, New Delhi–110067 E-mail: [email protected] Indira Management Review (IMR) (Bi-annual International Research and Academic Journal) Advisory Board Dr. Tarita Shankar Chairperson, Indira Group of Institutes, Pune Prof.
    [Show full text]
  • Multi-Modal Urban Transport: Integrating Non-Motorized and Bus Transport
    Multi-modal Urban Transport: Integrating Non-Motorized and Bus Transport ADJEI, Eric March, 2010 Multi-modal Urban Transport: Integrating Non-Motorized and Bus Transport by ADJEI, Eric Thesis submitted to the International Institute for Geo-information Science and Earth Observation in partial fulfilment of the requirements for the degree of Master of Science in Geo-information Science and Earth Observation, Specialisation: (Urban Planning and Management) Thesis Assessment Board Chairman: Prof. Dr. Ir. M.F.A.M. van Maarseveen External Examiner : Ing. K.M. van Zuilekom First Supervisor : Ir. M.J.G. Brussel Second Supervisor : Dr. Ir. M.H.P. Zuidgeest Third Supervisor : Ms. Flavia Desouza INTERNATIONAL INSTITUTE FOR GEO-INFORMATION SCIENCE AND EARTH OBSERVATION ENSCHEDE, THE NETHERLANDS Disclaimer This document describes work undertaken as part of a programme of study at the International Institute for Geo-information Science and Earth Observation. All views and opinions expressed therein remain the sole responsibility of the author, and do not necessarily represent those of the institute. Abstract Public transport has been seen to be efficient in curbing increasing road congestions in many cities. It however does not provide door to door service needed to compete with private cars and to improve living conditions of the poor. A door to door service could mean extending bus routes to all parts of the city. Public transports has however been seen to work efficiently in high demand areas and extending routes to low demand areas would be inefficient. Using bicycles as feeder mode can be instrumental, increasing coverage of public bus to inaccessible areas. Providing bicycle infrastructures is important as it has the potential of inducing significant number of commuters who would not have chosen to make bicycle trips into doing so.
    [Show full text]
  • Construction Pune Metro Dr
    A Study of Key Project Features of the Under- Construction Pune Metro Dr. Nagarjuna Pilaka Associate Professor National Institute of Construction Management and Research, Pune Abstract Pune is a large metropolitan city in India which has a high level of population and the traffic and transportation problems are rising over the past several years. As the existing transportation modes – buses and trains – are already saturated, there is a need for developing Mass Rapid Transit Systems (MRTS). Recognizing this, the Pune Metro Rail Project (PMRP) popularly known as “Maha Metro” was planned to be developed as a Public- Private Partnership (PPP) model a decade ago. The Pune Metro Rail Corporation Limited (PMRCL) project suffered from several challenges and yet it is on the verge of completion in terms of execution on the ground. This paper discusses the salient technical features of the PMRP which is believed to address future traffic and transportation problems of the Pune city. The technical analysis covers the details of metro rail route alignment, horizontal, vertical and technology involved in construction of underground route, design of the project finance structures, construction costs, metro route alignment etc. These features make the PMRCL as perhaps one of the well designed and developed project that is being executed with perfection. Keywords: Mass Transportation; PRTS; Pune Metro Rail; Maha Metro and Key Project features 1. Introduction Pune is popularly known as the „Queen of Deccan‟ due to its rich natural beauty and resources. Pune is the second largest city of the Maharashtra after Mumbai. It is the ninth most populated city in the India with a population of 6.772 million in 2018.
    [Show full text]
  • PMC-Nanded City Monorail to Make Pune SMARTER
    IOSR Journal of Mechanical and Civil Engineering (IOSR-JMCE) e-ISSN : 2278-1684, p-ISSN : 2320–334X PP 90-94 www.iosrjournals.org PMC-Nanded city Monorail to make Pune SMARTER S. G. Ban1, Dr. S. S. Shahpure2 (Assist. Prof & HOD .Civil Engineering Department. G.H. Raisoni Institute of Engineering & Technology, Wagholi, Pune.) (Professor, Civil Engineering RSCOE, Tathwade, Pune.) Abstract: All the developed cities face transportation as a major problem along with municipal solid waste and sewage disposal. The level of pollution is also a serious matter. While becoming a smart city Pune cannot go by a single solution to such problem and there is a need to have integrated and environment friendly system that will make us (PUNE) unique in the world. In this paper an effort is made to push forward a monorail system on one corridor Nanded city to PMC. As the system like METRO and BRT are not feasible on routes on which turns and gradients are stiff. In Pune there is a possibility to run a monorail along ‘MULA’ and ‘MUTHA’ rivers considerable length and it can help connect all the other corridors of the city. Its economically, cost effectiveness, technical feasibility is discussed in the paper to come to a conclusion that MONORAIL can be an effective augmentation to other transportation systems on this particular corridor. I. Introduction: Monorail is one of the best alternative systems for urban transportation. There are many opportunities for us to introduce monorail systems the world over; not just in India, but also in China, South-east Asian countries, etc..
    [Show full text]
  • Preparatory Survey on the Urban Railway Project in Pune City
    PUNE MUNICIPAL CORPORATION PUNE, MAHARASHTRA, INDIA PREPARATORY SURVEY ON THE URBAN RAILWAY PROJECT IN PUNE CITY FINAL REPORT JUNE 2013 JAPAN INTERNATIONAL COOPERATION AGENCY ORIENTAL CONSULTANTS CO., LTD. OS TOSHIBA CORPORATION JR(先) INTERNATIONAL DEVELOPMENT CENTER OF JAPAN INC. 13-067 PUNE MUNICIPAL CORPORATION PUNE, MAHARASHTRA, INDIA PREPARATORY SURVEY ON THE URBAN RAILWAY PROJECT IN PUNE CITY FINAL REPORT JUNE 2013 JAPAN INTERNATIONAL COOPERATION AGENCY ORIENTAL CONSULTANTS CO., LTD. TOSHIBA CORPORATION INTERNATIONAL DEVELOPMENT CENTER OF JAPAN INC. Preparatory Survey on the Urban Railway Project in Pune City Final Report TABLE OF CONTENTS List of Abbreviations Page Chapter 1 Implementation Policy 1.1 Basic Policy of the Study ...................................................................................................... 1-1 1.1.1 Background of the Study............................................................................................... 1-1 1.1.2 Purpose of this Study..................................................................................................... 1-2 1.1.3 Approach to Conducting the Study ............................................................................... 1-2 1.1.4 Study Methodology ....................................................................................................... 1-7 1.1.5 Selection of Study Team Members and Schedule ......................................................... 1-9 1.2 Target Area of this Study ...................................................................................................
    [Show full text]
  • Detailed Project Report for Financial Assistance Under Moud Scheme
    Detailed Project Report for Financial Assistance under MoUD Scheme for Purchase of Buses PUNE [Total Project Cost: (in Rs 40747 Lakhs)] [Central Financial Assistance Required: (in Rs 17870 Lakhs)] TABLE OF CONTENTS CHAPTER 1: CITY PROFILE ........................................................................................................................... 8 1.1 BACKGROUND ........................................................................................................................................... 8 1.2 SPATIAL GROWTH AND REGIONAL SETTING ...................................................................................................... 8 1.3 CLIMATE ................................................................................................................................................. 10 1.4 LINKAGES & CONNECTIVITY ........................................................................................................................ 10 1.5 DEMOGRAPHIC PROFILES ........................................................................................................................... 11 1.5.1 Population ....................................................................................................................................... 11 1.5.2 Population growth rate ................................................................................................................... 11 1.5.3 Population density .........................................................................................................................
    [Show full text]
  • 1 Minutes of the Ordinary Board Meeting Held on 29.02
    1 MINUTES OF THE ORDINARY BOARD MEETING HELD ON 29.02.2016 AT 1100 HOURS IN THE OFFICE OF THE CANTONMENT BOARD, GOLIBAR MAIDAN, PUNE MEMBERS PRESENT Brig. A K Tyagi President Smt. Kiran Tushar Mantri Vice President Shri. Sanjeev Kumar Member-Secretary Brig. V Rastogi, SEMO Ex-Officio Member Col. Nilesh Dahiya Nominated Member Lt. Col. Ravinder Singh Nominated Member Smt. Roopali Shailendra Bidkar Elected Member Shri. Ashok Dnyaneshwar Pawar Elected Member Shri. Dilip Madhukar Giramkar Elected Member Shri. Atul Vinayak Gaikwad Elected Member Shri. Vivek Mahadev Yadav Elected Member Shri. Vinod M Mathurawala Elected Member Smt. Priyanka Rajesh Shrigiri Elected Member MEMBERS ABSENT Col. C K Rajesh, YSM SM** Nominated Member Shri. Neeraj, GE (N) Ex-Officio Member SPECIAL INVITEES ABSENT Shri. Anil Shirole, Hon’ble M.P. (Lok Sabha) Smt. Vandana Chavhan, Hon’ble M.P. (Rajya Sabha) Shri. Sanjay D Kakade, Hon’ble M.P. (Rajya Sabha) Shri. Dilip Kamble, Hon’ble M.L.A. & Minister of State, Government of Maharashtra At the outset Brig. V Rastogi, SEMO, took oath of office as Ex-Officio Member of the Board. 01. CIRCULAR AGENDA – CONSTRUCTION OF A BUILDING FOR WORKING WOMEN’S HOSTEL IN PUNE CANTONMENT To note Circular Agenda dated 23.02.2016 approving the plans and estimates amounting to Rs. 5,18,44,947/- for construction of a building & services and Rs. 7,20,000/- for provision of furniture for working women’s hostel in Pune Cantonment at site bearing GLR Sy. No. 390/945 admeasuring an area of 0.45 acres, which is classified as Class ‘C’ land under the management of this Board.
    [Show full text]