Western Harbour Tunnel Initial Corridor Options Assessment

Total Page:16

File Type:pdf, Size:1020Kb

Western Harbour Tunnel Initial Corridor Options Assessment Fact sheet Spring 2017 Western Harbour Tunnel Initial corridor options assessment Selecting the concept design The Western Harbour Tunnel has been identified as a priority transport infrastructure project for New South Wales. Initial corridor options assessment Future Transport, released by the Four corridors were evaluated • Potential impacts on NSW Government in October (see map) to identify the most Goat Island 2017 includes Western Harbour acceptable corridor. Tunnel and Beaches Link. • Potential impacts to Key factors were: Sydney Harbour’s main Previously, the 2012 NSW Long shipping channel Term Transport Master Plan and • Likely geology, geotechnical stability and suitability for the 2014 State Infrastructure Orange option Strategy Update referenced tunnel construction the need for a new crossing • Tunnel depths, geometry and Similar to the red option, of Sydney Harbour. ability to achieve acceptable it connected with the Gore Hill Freeway near Artarmon and In 2015, Roads and Maritime road gradients not the Warringah Freeway Services started assessment work • Connectivity with the broader at North Sydney. on this new harbour crossing. road network Disadvantages included: The concept of a new bridge • Contructability • The need for a relatively across western Sydney Harbour • Minimise property disturbance was discontinued early because long tunnel • Minimise environmental impacts of the high visual, tourist and • Poor road connection heritage values of the Sydney compared with other options Harbour Bridge. Red option A tunnel under western Sydney Tunnels between Balmain, Goat Brown option Island and McMahons Point. Harbour provides similar Crossing of Sydney Harbour connectivity, capacity and Disadvantages include: further west – broadly design outcomes as a new bridge. • Steep gradients with adverse under Victoria Road and the It also avoids the impacts of a outcomes for traffic flow and Gladesville Bridge. bridge including environmental, tunnel air quality This option was discounted property and visual • North Sydney connections during initial assessment amenity issues. required long, circular access as it did not provide viable ramps with adverse impacts network connectivity. on traffic performance Selected option – Blue corridor The blue option was selected as the concept design option to be tested further, due to: • Good connectivity to North Sydney, Beaches Link and the Gore Hill Freeway • Flatter tunnel gradients • Avoids the Sydney Harbour National Park • Constructability • Minimising property impacts of the project • Reduces interface with Sydney Metro tunnels Fullers Middle Dehli Road Bridge Chatswood Cove Benefits: • Cut travel times y a Lane Cove Tunnel w Wi h g • Improve bus transport i l l Lane Cove o u c H i Willoughby g North f i h c b a y • Form a western bypass P Boronia R Northbridge o Park Go way a Lane Cove re H ill Free d of the Sydney CBD West Artarmon Lane Naremburn d • Support growth and a Cove d o a R o y Brook Street R a Gore economic development r B e Cammeray t s St Leonards a Hill n w r Blaxlands t u it Pacific Highway B Riverview Corner P Crows • Take pressure off River Road Nest Miller Linley Street Greenwich the Sydney Harbour Point Hunters y a Hill Longueville w Wollstonecraft e Bridge and Sydney e r F Neutral h Huntleys a Bay Harbour Tunnel g n Cove i Woolwich Road r Waverton r V a i Gladesville W ct • Streamline Australia’s or ia Road Bridge Woolwich Lavender Bay busiest and most Milsons complex road – the Point Sydney Harbour Warringah Freeway Victoria Road Chiswick Birchgrove Bridge Darling Lyons Road Street The Iron Cove Drummoyne Bridge Rocks Balmain Balmain Barangaroo East tor u b i r Wynyard Rodd Anzac t s Point Rozelle Bridge i Sydney n D r Pyrmont e t s Tow n Balmain Road e Hall Lilyfield W City West Link 0 2 km Indicative map of options assessed Key Blue option corridor Road network Brown option corridor Park Orange option corridor Water YouRed optioncan corridor have your say at any time Surface To findTunnel out more about the project, or to have your say: www.rms.nsw.gov.au/whtbl 1800 931 189 This document contains important information [email protected] about transport projects in your area. If you need an interpreter, please call the Translating and Interpreting Service on and ask them to call the Project Customer feedback 131 450 Team on 1800 931 189. The interpreter will then help Roads and Maritime Services you with translation. Locked Bag 928, North Sydney NSW 2059 Privacy Roads and Maritime Services (“RMS”) is subject to the Privacy and Personal Information Protection Act 1998 (“PPIP Act”) which requires that we comply with the Information Privacy Principles set out in the PPIP Act. All information in correspondence is collected for the sole purpose of assisting the assessment of this proposal. The information received, including names and addresses of respondents, may be published in subsequent documents unless a clear indication is given in the correspondence that all or part of that information is not to be published. Otherwise RMS will only disclose your personal information, without your consent, if authorised by the law. Your personal information will be held by RMS. You have the right to access and correct the information if you believe that it is incorrect. RMS 17.586.
Recommended publications
  • Map of the Division of Reid
    REID S wa in Campbell es C Park re B e EA k 151°10'E C M ON HART OO D LA S AN M Lowanna F AR L O IE H D S VE O S OOLAROO Park Coolaroo P L A L C D S T E D N E T I R Park Chatswood FARRAN E ST D F T WILLOUGHBY Y E T Athletic S V R A D Park HA E W 151°9'E MPL K MOWBRAY RD W Y R LANE COVEMOWBRAY L AL RD W W T MA Lane RD DA H G S DA DRA LA T T LA N MINDARIE ST G D CA Cove N S NORTH OR R D MOW R E A BRAY O E C T ON T R P O L CR N P V S ES S R National I E L eek A NG T I r UNN C T L T RD rk N T A E A ba A y S M L W MURRAY S Park g O P D rin P R E St Upper A 151°8'E C A Batten T N E Lower ROSLYN CE I R I ST ON E T Stringybark C D Y S A G Y V re P Stringybark MURRA L A T ek MER SOURCESCreek Lower Stringybark V A N C R W O E E Creek S RD OX A R RT H D Reserve Creek E THIRD AVE O S D AT Stringybark K M T R CA Reserve Stringybark O T L RES O RF a A C Creek Reserve T K N N S E N T AVE r NB Reserve S E OR E A T l R N A P D T HA i ORIO C TON LL S n HNS RI RD N A P W OV JO Reserve H K E R S F Y W E T G E L s Batten T M T L O T L S I O A O E RR S N IZ N H L RD O S N A G W TU E I M AB T K G H Magdala RE E R E Creek N L P B AR D 151°7'E N A E D S R E A KL S R This map has been compiled Nby Spatial Vision from data supplied by the AustralianAND H L CLE T E L ST Park E A NUNDA U H L ER O D O AD S T D D S Tantallon O R Reserve P RD Z A S O Pryor D G T Y A W A I S G Y VE R R N N T T O P I V D T S R K A T Electoral Commission, Geoscience Australia, DepartmentL ofT the Environment, Water, HANCOTT ST R U R O K A T T IN Park E S D E S D F S S E B M D Park i E W V R P Wallumatta tt PAG S G R N U CL G L y E T ARA A U s ER LAND K C N F S Heritage andLD the Arts andB PitneyRD Bowes Business Insight.
    [Show full text]
  • Gladesville Bridge
    Gladesville Bridge – 50th Anniversary Ken Maxwell – Associate Technical Director, Bridges Hyder Consulting, Sydney Gladesville Bridge – Opened 2nd October 1964 Outline of Presentation • Old Gladesville Bridge. • Early concept design options for replacement bridge. • DMR tender design. • Accepted alternative design. • Arch falsework. • Arch design. • Arch construction. • Approach spans – design and construction. • Heritage recognition. • Opening ceremony. Gladesville Bridge – Parramatta River Old Gladesville Bridge • Constructed 1878 to 1881. • Wrought iron lattice girder spans. • Swing span for navigation purposes. Old Gladesville Bridge (approximate location) 1956 1881 Reasons for New Gladesville Bridge • New bridge originally intended to be part of Sydney’s North Western Expressway (road linking Sydney City to the northern suburbs and through to Newcastle). • Earlier bridge’s useful service life exceeded. • Only two-lane traffic capacity – ‘bottleneck’ to traffic flow. • Swing span – abrupt interference to traffic flow. • North Western Expressway project was abandoned in the 1970s due to protests about the freeway's projected route through inner city suburbs such as Glebe and Annandale. Early Concept Designs • Concept designs developed by DMR’s Bridge Section, headed by Design Engineer Cliff Robertson (one of John Bradfield’s senior assistants on Sydney Harbour Bridge). • Bridge Section of DMR included a number of other highly-respected bridge engineers during this period, namely Vladimir Karmalsky, Albert Fried and Brian Pearson. DMR Tender Design – Steel Cantilever Bridge Tender Process • 1957 – tenders invited by Department of Main Roads (DMR), based on steel cantilever bridge, but alternative designs permitted (tenders closed October 1957). • Four (4) companies tendered for the steel design. • Tenders ranged from £2.51 M to £3.87 M.
    [Show full text]
  • Initial Project Submissions
    M4 Extension M4 PART 3: INITIAL PROJECT SUBMISSIONS M4 Extension NSW GOVERNMENT SUBMISSION TO INFRASTRUCTURE AUSTRALIA TEMPLATE FOR SUMMARIES OF FURTHER PRIORITY PROJECTS JULY 2010 Project Summary (2 pages, excluding attachments) Initiative Name: M4 Extension Location (State/Region(or City)/ Locality): Sydney, NSW Name of Proponent Entity: Roads and Traffic Authority of NSW Contact (Name, Position, phone/e-mail): Paul Goldsmith General Manager, Motorway Projects Phone: 8588 5710 or 0413 368 241 [email protected] Project Description: • Provide a description of the initiative and the capability it will provide. The description needs to provide a concise, but clear description of the initiative’s scope. (approx 3 paragraphs) A motorway connection, mainly in tunnel, from the eastern end of the Western Freeway (M4) at North Strathfield to the western outskirts of the Sydney CBD and the road network near Sydney Airport. It would link M4 to the eastern section of the Sydney Orbital via the Cross City Tunnel and Sydney Harbour Bridge. The eastern section of the M4 (east of Parramatta) would be widened/upgraded. A twin tube tunnel is proposed from North Strathfield to just south of Campbell Road at St Peters with connections to the City West Link at Lilyfield/Rozelle and Parramatta Road/Broadway at Glebe/ Chippendale. A bus only connection at Parramatta Road, Haberfield is also possible. A further tunnel is proposed to connect Victoria Road near Gladesville Bridge to the main tunnel in the Leichhardt area. There is a proposed surface motorway link from just south of Campbell Road to the road network around Sydney Airport probably connecting to Canal Road and Qantas Drive (the latter subject to M5 East Expansion planning and Sydney Airport Corp Ltd agreement) with a potential link to M5 at Arncliffe.
    [Show full text]
  • Temporary Construction Site: Victoria Road, Rozelle
    Community Update July 2018 Western Harbour Tunnel Temporary construction site: Victoria Road, Rozelle Western Harbour Tunnel is a The NSW Government has now major transport infrastructure A temporarily tunnelling site for Western Harbour Tunnel is released the proposed project project that makes it easier, proposed adjacent to Victoria reference design and there will faster and safer to get around Road, Rozelle. be extensive community and Sydney. This site is only needed stakeholder engagement over the temporarily and no major coming months. As Sydney continues to grow, our permanent facilities will be located transport challenge also increases We now want to hear what here. The site will be left clear for you think about the proposed and congestion impacts our future urban renewal. economy. reference design. Roads and Maritime recognises Your feedback will help us further While the NSW Government actively the importance of this site as refine the design before we seek manages Sydney’s daily traffic the home of the Balmain Tigers demands and major new public Leagues Club and will work with planning approval. transport initiatives are underway, it’s all parties concerned. There will be further extensive clear that even more must be done. community engagement once the Seaforth Spit Bridge Environmental Impact Statement Western Harbour Tunnel will provide is on public display. Northbridge a new motorway tunnel connection Balgowlah Heights Artarmon across Sydney Harbour between Seaforth Rozelle and the Warringah Freeway Spit Bridge near North Sydney. Northbridge Balgowlah Heights Artarmon It will form a new western bypass Lane Cove of the Sydney CBD, providing an Cammeray Ernest St alternative to the heavily congested St Leonards Mosman Falcon St Sydney Harbour Bridge, Western Lane Cove Crows Nest OFF Cremorne Distributor and Anzac Bridge.
    [Show full text]
  • Speed Camera Locations
    April 2014 Current Speed Camera Locations Fixed Speed Camera Locations Suburb/Town Road Comment Alstonville Bruxner Highway, between Gap Road and Teven Road Major road works undertaken at site Camera Removed (Alstonville Bypass) Angledale Princes Highway, between Hergenhans Lane and Stony Creek Road safety works proposed. See Camera Removed RMS website for details. Auburn Parramatta Road, between Harbord Street and Duck Street Banora Point Pacific Highway, between Laura Street and Darlington Drive Major road works undertaken at site Camera Removed (Pacific Highway Upgrade) Bar Point F3 Freeway, between Jolls Bridge and Mt White Exit Ramp Bardwell Park / Arncliffe M5 Tunnel, between Bexley Road and Marsh Street Ben Lomond New England Highway, between Ross Road and Ben Lomond Road Berkshire Park Richmond Road, between Llandilo Road and Sanctuary Drive Berry Princes Highway, between Kangaroo Valley Road and Victoria Street Bexley North Bexley Road, between Kingsland Road North and Miller Avenue Blandford New England Highway, between Hayles Street and Mills Street Bomaderry Bolong Road, between Beinda Street and Coomea Street Bonnyrigg Elizabeth Drive, between Brown Road and Humphries Road Bonville Pacific Highway, between Bonville Creek and Bonville Station Road Brogo Princes Highway, between Pioneer Close and Brogo River Broughton Princes Highway, between Austral Park Road and Gembrook Road safety works proposed. See Auditor-General Deactivated Lane RMS website for details. Bulli Princes Highway, between Grevillea Park Road and Black Diamond Place Bundagen Pacific Highway, between Pine Creek and Perrys Road Major road works undertaken at site Camera Removed (Pacific Highway Upgrade) Burringbar Tweed Valley Way, between Blakeneys Road and Cooradilla Road Burwood Hume Highway, between Willee Street and Emu Street Road safety works proposed.
    [Show full text]
  • Contextual Analysis and Urban Design Objectives
    Rozelle Interchange Urban Design and Landscape Plan Contextual Analysis and Urban Design Objectives Artists impression: Pedestrian view along Victoria Road Caption(Landscape - Image shown description at full maturity and is indicative only). 03 White Bay Power Station Urban Design Objectives 3 Contextual analysis 3.1 Contextual analysis Local context WestConnex will extend from the M4 Motorway at The Rozelle Interchange will be a predominately Parramatta to Sydney Airport and the M5 underground motorway interchange with entry and Motorway, re-shaping the way people move exit points that connect to the wider transport through Sydney and generating urban renewal network at City West Link, Iron Cove and Anzac opportunities along the way. It will provide the Bridge. critical link between the M4 and M5, completing Sydney’s motorway network. Iron Cove and Rozelle Rail Yards sit on and are adjacent to disconnected urban environments. While the character varies along the route, the These conditions are the result of the historically WestConnex will be sensitively integrated into the typical approach to building large individual road built and natural environments to reconnect and systems which disconnect suburbs and greatly strengthen local communities and enhance the reduce the connectivity and amenity of sustainable form, function, character and liveability of Sydney. modes of transport such as cycling and walking. Rather than adding to the existing disconnection, An analysis of the Project corridor was undertaken the Project will provide increased
    [Show full text]
  • AN OVERVIEW of the CITY WEST CYCLE-LINK Prepared By: Ecotransit Sydney Date: 1 June 2010 Authorised by the Executive Committee O
    AN OVERVIEW OF THE CITY WEST CYCLE-LINK Prepared by: EcoTransit Sydney Date: 1 June 2010 Authorised by the Executive Committee of EcoTransit Sydney The submission (including covering letters) consists of: 14 pages Contact person for this submission: John Bignucolo 02 9713 6993 [email protected] Contact details for EcoTransit Sydney, Inc.: PO Box 630 Milsons Point NSW 1565 See our website at: www.ecotransit.org.au City West Cycle-Link 1 EcoTransit Sydney An Overview of the City West Cycle-Link Summary This document presents a proposal for the City West Cycle-Link, a new cycling facility that would: 1. Provide a cycling and walking tunnel running across and under the City West Link Road, from Darley Road in the west to Derbyshire Road in the east; 2. Offer a safe alternative to crossing the slip lane running from the City West Link Road onto Darley Road; 3. Closely integrate with the proposed Norton 2 (James St) light rail stop, increasing the flow of people in the vicinity of the stop, and thereby enhancing the sense of safety of light rail commuters; 4. Allow cyclists to bypass the climb up Lilyfield Road between the Hawthorne Canal and James Street; 5. Connect with and extend the cycling route along Darley Road proposed as part of the GreenWay project; 6. Provide a grade-separated alternative to Lilyfield Road by creating a comparatively flat and direct connection to the Anzac Bridge cycleway at White Bay via the Lilyfield rail cutting and the Rozelle rail lands. In order to determine its scope and feasibility, EcoTransit Sydney requests that the NSW government via the Department of Transport and Infrastructure (NSWTI) undertake an investigation of the proposal as it has the required technical skills and resources for the task.
    [Show full text]
  • Technical Paper 1 Traffic Report
    Technical Paper 1 Traffic report 1 WestConnex Updated Strategic Business Case Contents List of Tables ..................................................................................................................................................... 3 List of Figures .................................................................................................................................................... 4 Preface .............................................................................................................................................................. 6 Terminology ....................................................................................................................................................... 7 1 Executive summary .................................................................................................................................... 8 1.1 Background to this report ................................................................................................................... 8 1.2 Traffic methodology ........................................................................................................................... 9 1.3 Road network performance without WestConnex ........................................................................... 10 1.4 Traffic effects of WestConnex.......................................................................................................... 12 1.5 Traffic operations and influence on WestConnex design ...............................................................
    [Show full text]
  • STATE SIGNIFICANT INFRASTRUCTURE ASSESSMENT: Westconnex Stage 3 – M4-M5 Link SSI 7485
    STATE SIGNIFICANT INFRASTRUCTURE ASSESSMENT: WestConnex Stage 3 – M4-M5 Link SSI 7485 Environmental Assessment Report under Section 5.18 of the Environmental Planning and Assessment Act 1979 March 2018 WestConnex Stage 3 – M4-M5 Link Environmental Assessment Report SSI 7485 Cover Photograph: Roadheader within an acoustic shed (Source: EIS) © Crown copyright 2018 Published March 2018 NSW Department of Planning & Environment www.planning.nsw.gov.au Disclaimer: While every reasonable effort has been made to ensure that this document is correct at the time of publication, the State of New South Wales, its agents and employees, disclaim any and all liability to any person in respect of anything or the consequences of anything done or omitted to be done in reliance upon the whole or any part of this document. NSW Government i Department of Planning & Environment WestConnex Stage 3 – M4-M5 Link Environmental Assessment Report SSI 7485 EXECUTIVE SUMMARY The Proposal Roads and Maritime Services (the Proponent), proposes to construct the M4-M5 Link proposal (the project), as part of the WestConnex program of works. WestConnex comprises a 33 kilometre motorway designed to improve connections between industrial, commercial and residential areas in Sydney’s west, east and south-west, by creating road network links between the Sydney Central Business District (CBD) and the Parramatta CBD. The M4-M5 Link is the third and final stage of WestConnex, forming the link between the M4 East at Haberfield and New M5 at St Peters. The component stages and projects
    [Show full text]
  • Sailing Instructions Three Bridges Race (Keelboats & Dinghies) Sunday 1St May 2016 in Contrast to the Three Islands Race, Th
    Sailing Instructions Three Bridges Race (Keelboats & Dinghies) Sunday 1st May 2016 In contrast to the Three Islands Race, the Three Bridges Race heads west up the Parramatta River, where tight river sections, strong tides and the Mortlake Punt have always added to obstacles usually found on a race. From a start line at the Club, the course passes by the Iron Cove Bridge, under the Gladesville Bridge and up to within sight of the Ryde Bridge. From this point it’s turn-around-time and back to the Club following the reverse course. 1. Rules This race shall be governed by The Racing Rules of Sailing for 2013- 2016, the prescriptions of the YA, a nd these Sailing Instructions. This race is designated Category 7. By entering this race all skippers are certifying that they understand their responsibilities as covered in the YA Safety Regulations and Maritime Authority Safety Requirements and that all items required will remain on board their yacht for the duration of the race. 2. Race Entry Entrants shall complete a Race Entry at www.balmainsailingclub.com accompanied by the relevant entry fee no later than 9.00am on the Friday before the race. 3. Starting Line The start line will be the transit line defined by the triangular leading marks on the BSC clubhouse deck and building. The starting line extends from outside the line of moored boats to Cockatoo Island. 4. Course The course will be: Start_SB_PT_SB(P)_Finish Rounding marks: SB BSC buoy SE of Snapper Island PT Parramatta River transit (mainmast in transit with the 2 spires of the Thomas Walker Convalescent Home – to the east of Ryde Bridge) (P) Denotes port-hand rounding Unless otherwise specified all rounding marks are to be passed on starboard hand.
    [Show full text]
  • Executive Summary
    Rozelle Interchange Urban Design and Landscape Plan Executive summary Artist’s impression: Aerial View over Iron Cove Link 1—i (Landscape shown at full maturity and is indicative only). 01 The project acknowledges the Traditional Custodians of the land, the Gadigal and Wangal peoples of the Eora nation. We pay our respects to their Elders past, present and emerging. The area through which the project would traverse has been home to the Gadigal and Wangal peoples for thousands of years, and they maintain an ongoing connection to country. 1 Executive Summary DRUMMOYNE Rozelle Interchange The WestConnex Rozelle Interchange and Iron Cove Link will provide a new underground motorway interchange with connections to the New BALMAIN M4, New M5, future Western Harbour Tunnel, ANZAC Bridge and Iron Cove Bridge. The Project will also provide over nine hectares of new public open space and new and improved connectivity for pedestrians and cyclists. ROZELLE The Rozelle Interchange Project is being designed and constructed by the John Holland CPB Western Harbour Tunnel Contractors Joint Venture (JHCPB). Rozelle * & Beaches Link Interchange^ Opening 2023 GR EAT WE STE RN HIGH WAY RHODES D A O R T R E PA E R T E R A A R M T A W S T TA R Rozelle H R E C O V A L R D I U S H Interchange^ D C GRANVILLE A O R L VE L I I R Opening 2023 H SYDNEY V Western Harbour Tunnel D I C LILYFIELD OLYMPIC PARK Y T * A O B R & Beaches Link I H New M4 Tunnels A S AUBURN U R O B D E A M A D SYDNEY HARBOUR BRIDGE H O O New M4 R Six lanes D DRUMMOYNE R CONCORD O BALMAIN SYDNEY
    [Show full text]
  • Patricia Palmer Lee PRG 1722 Special List POSTCARDS INDEX
    ___________________________________________________________ ______________________ Patricia Palmer Lee PRG 1722 Special List POSTCARDS INDEX 1993 to 2014 NO. DATE SUBJECT POSTMARK STAMPS A1 05.07.1993 Ramsgate Beach, Botany Bay Sydney Parma Wallaby A2 09.07.1993 Bondi Beach Surf Eastern Suburbs Ghost Bat A3 13.07.1993 Autumn Foliage, Blue Mountains Eastern Suburbs Tasmanian Herit Train A4 20.07.1993 Baha'i Temple, Ingleside Eastern Suburbs Silver City Comet A5 27.07.1993 Harbour Bridge from McMahon's Point Eastern Suburbs Kuranda Tourist Train A6 04.08.1993 Winter Sunset, Cooks River, Tempe Eastern Suburbs Long-tailed Dunnart A7 10.08.1993 Henry Lawson Memorial, Domain Eastern Suburbs Little Pygmy-Possum A8 17.08.1993 Berry Island, Parramatta River Rushcutters Bay Ghost Bat A9 24.08.1993 Story Bridge, Brisbane River Eastern Suburbs Parma Wallaby A10 28.08.1993 Stradbroke Island, Moreton Bay Qld Cootamundra Long-tailed Dunnart A11 31.08.1993 Rainforest, Brisbane Botanical Gardens Yass Little Pygmy-Possum A12 05.09.1993 Dinosaur Exhibit, Brisbane Museum Eastern Suburbs Ghost Bat A13 10.09.1993 Wattle Festival Time, Cootamundra Eastern Suburbs Squirrel Glider A14 14.09.1993 Davidson Nat Park, Middle Harbour Eastern Suburbs Dusky Hopping-Mouse A15 17.09.1993 Cooma Cottage, Yass Eastern Suburbs Parma Wallaby A16 21.09.1993 Bicentennial Park, Homebush Bay Eastern Suburbs The Ghan A17 24.09.1993 Rainbow, North Coast NSW Eastern Suburbs Long-Tailed Dunnart A18 28.09.1993 Sphinx Monument, Kuring-gai Chase NP Canberra Little Pygmy-Possum A19 01.10.1993
    [Show full text]