Sailing Instructions Three Bridges Race (Keelboats & Dinghies) Sunday 1St May 2016 in Contrast to the Three Islands Race, Th

Total Page:16

File Type:pdf, Size:1020Kb

Sailing Instructions Three Bridges Race (Keelboats & Dinghies) Sunday 1St May 2016 in Contrast to the Three Islands Race, Th Sailing Instructions Three Bridges Race (Keelboats & Dinghies) Sunday 1st May 2016 In contrast to the Three Islands Race, the Three Bridges Race heads west up the Parramatta River, where tight river sections, strong tides and the Mortlake Punt have always added to obstacles usually found on a race. From a start line at the Club, the course passes by the Iron Cove Bridge, under the Gladesville Bridge and up to within sight of the Ryde Bridge. From this point it’s turn-around-time and back to the Club following the reverse course. 1. Rules This race shall be governed by The Racing Rules of Sailing for 2013- 2016, the prescriptions of the YA, a nd these Sailing Instructions. This race is designated Category 7. By entering this race all skippers are certifying that they understand their responsibilities as covered in the YA Safety Regulations and Maritime Authority Safety Requirements and that all items required will remain on board their yacht for the duration of the race. 2. Race Entry Entrants shall complete a Race Entry at www.balmainsailingclub.com accompanied by the relevant entry fee no later than 9.00am on the Friday before the race. 3. Starting Line The start line will be the transit line defined by the triangular leading marks on the BSC clubhouse deck and building. The starting line extends from outside the line of moored boats to Cockatoo Island. 4. Course The course will be: Start_SB_PT_SB(P)_Finish Rounding marks: SB BSC buoy SE of Snapper Island PT Parramatta River transit (mainmast in transit with the 2 spires of the Thomas Walker Convalescent Home – to the east of Ryde Bridge) (P) Denotes port-hand rounding Unless otherwise specified all rounding marks are to be passed on starboard hand. 5. Short Course The courses will not be shortened. 6. Prohibited Water The area of water between swing moorings and the shoreline shall be considered as prohibited water. All navigation marks rank as obstructions and shall be passed on their designated side. Boats shall not sail within the area bounded by Cardinal Marks. The area of water bounded by Snapper Island, Spectacle Island, and the ammunition barges and their pylons shall be considered as prohibited water (a continuing obstruction). Infringements under Item 6 cannot be exonerated. Retirement is the sporting preference; the alternative is disqualification. 7. Starting and Finishing Times A handicap start will be used commencing at 1300hrs (1pm) Starting times, in minutes after 1pm will be posted on the club’s noticeboard and published on the club website before 12h00 on the day before the race. The first boat(s) to start will refer to the start sequence described below: Races will be started as follows. [This changes RRS rule 26]. Times shall be taken from the visual signals; the failure of a sound signal shall be disregarded. Unless otherwise stated, signals will be made from signal lights mounted on the clubhouse above the starting line. Warning Signal - Five minutes before the start of the race a blue light will be turned on and a sound signal made. Preparatory Signal - Four minutes before the start of the race a red light will be turned on, the blue light will be turned off, and a sound signal made. One-minute Signal - One minute before the start of the race an amber light will be turned on, the red light will be turned off, and a sound signal made. Starting Signal - At the start of the race a green light will be turned on, the amber light will be turned off, and a sound signal made. If the start is postponed each boat’s allocated a start time is to be calculated by adding their start time to the actual start time. For example; If the race starts at 1pm as scheduled, the first boat to start ‘ Littleboat ’ starts at 1pm and the next boat Bitbigger starts at 1.02pm. If the race is postponed until 1.10pm, Littleboat , will start at 1.10pm. The next boat, ‘ Bitbigger ’ will start their stopwatch on the Start Signal and cross the Start line when the stopwatch indicates 2 minutes (1.12pm). The first boat over the finishing line will be the winner. Race entrants are expected to record their own finishing times, and also record the name of the boat ahead and behind (if any). Finishing times are to be declared at the Sailing Office after the race. Boats not returning to the club should phone in finishing times before 17h30 (9810-2086). Boats not notifying the club will be scored as D.N.F. (did not finish). 8. Recalls There will be no recalls, as the start line will not be manned. Entrants are expected to start on, or after their allocated starting time, and to restart if on the course side of the line prior to the scheduled starting time. 9. Extras This is a spinnaker race. Extras may be carried (spinnakers, bloopers, ringtails, tallboys, twin headsails, etc. allowed). Hiking aids including leg straps shall not be permitted to be used to assist crew members to hike outside of the gunnels of any boat unless these aids are permitted by the Class Rules for the particular keelboat or dinghy. This amends RRS 49.1. The use of trapezes is not permitted on any boat entered in the keelboat division. 10. Outriggers Retractable spinnaker poles and other outriggers are allowed when these are part of the design of the boat. This changes rule 50.3(a). 11. Stowage of Equipment Anchors shall not be carried off the bow or on the deck of any yacht taking part in any BSC race. Disqualification will be automatic. 12. Protests Protests must be lodged with the Sailing Office no later than 17h30. Protests must be in writing, on the YA-prescribed form available from the Sailing Office. Protests will be heard at the Club at the earliest opportunity following the race, as directed by the Protest Committee. Hearings will proceed whether or not all boats are represented. Protest mediation may be used prior to a formal protest hearing (see the explanation at the back of this book). A protested boat may elect to acknowledge breaking a rule and to accept the appropriate penalty. In such a case, the skipper should notify the protest committee chairperson to that effect and the hearing may be waived. This changes RRS rule 63.1. 13. Boats Retiring If a boat retires, the skipper shall notify the Sailing office before 17h30 by phoning the club on 9810-2086. 14. Finishing Line The Finish line will be the transit line defined in Item 3 above, crossed in the direction from the last rounding mark. 15. Keeping Clear at the Finishing Line A boat that has either retired or finished a race shall keep clear of the finishing line and boats still racing. 16. Time Limit The time limit for this race is 17h00. Boats failing to finish within 15 minutes after the first boat finishes or within the time limit, whichever is later, will be scored ‘Did Not Finish’. This changes rule 35. 17. Handicaps Performance Handicap System (PHS), applied as a nominated start time. Handicaps shall be determined by the Sailing Committee, and shall not be subject to protest or dispute. 18. Prizes & Trophies 18.1 Trophies A perpetual trophy will be awarded to the first place winner. 18.2 Awards Awards will be given for 1st, 2nd, and 3rd places. 19. Special Note It can be extremely dangerous to pass ahead of the Mortlake/Putney ferry whilst it is underway. It is cable-driven. There is a distinct possibility of a yacht or dinghy being caught in the cables. Competitors are expected to display prudent navigation and pass behind the ferry at a respectable distance if it is underway. .
Recommended publications
  • Map of the Division of Reid
    REID S wa in Campbell es C Park re B e EA k 151°10'E C M ON HART OO D LA S AN M Lowanna F AR L O IE H D S VE O S OOLAROO Park Coolaroo P L A L C D S T E D N E T I R Park Chatswood FARRAN E ST D F T WILLOUGHBY Y E T Athletic S V R A D Park HA E W 151°9'E MPL K MOWBRAY RD W Y R LANE COVEMOWBRAY L AL RD W W T MA Lane RD DA H G S DA DRA LA T T LA N MINDARIE ST G D CA Cove N S NORTH OR R D MOW R E A BRAY O E C T ON T R P O L CR N P V S ES S R National I E L eek A NG T I r UNN C T L T RD rk N T A E A ba A y S M L W MURRAY S Park g O P D rin P R E St Upper A 151°8'E C A Batten T N E Lower ROSLYN CE I R I ST ON E T Stringybark C D Y S A G Y V re P Stringybark MURRA L A T ek MER SOURCESCreek Lower Stringybark V A N C R W O E E Creek S RD OX A R RT H D Reserve Creek E THIRD AVE O S D AT Stringybark K M T R CA Reserve Stringybark O T L RES O RF a A C Creek Reserve T K N N S E N T AVE r NB Reserve S E OR E A T l R N A P D T HA i ORIO C TON LL S n HNS RI RD N A P W OV JO Reserve H K E R S F Y W E T G E L s Batten T M T L O T L S I O A O E RR S N IZ N H L RD O S N A G W TU E I M AB T K G H Magdala RE E R E Creek N L P B AR D 151°7'E N A E D S R E A KL S R This map has been compiled Nby Spatial Vision from data supplied by the AustralianAND H L CLE T E L ST Park E A NUNDA U H L ER O D O AD S T D D S Tantallon O R Reserve P RD Z A S O Pryor D G T Y A W A I S G Y VE R R N N T T O P I V D T S R K A T Electoral Commission, Geoscience Australia, DepartmentL ofT the Environment, Water, HANCOTT ST R U R O K A T T IN Park E S D E S D F S S E B M D Park i E W V R P Wallumatta tt PAG S G R N U CL G L y E T ARA A U s ER LAND K C N F S Heritage andLD the Arts andB PitneyRD Bowes Business Insight.
    [Show full text]
  • Gladesville Bridge
    Gladesville Bridge – 50th Anniversary Ken Maxwell – Associate Technical Director, Bridges Hyder Consulting, Sydney Gladesville Bridge – Opened 2nd October 1964 Outline of Presentation • Old Gladesville Bridge. • Early concept design options for replacement bridge. • DMR tender design. • Accepted alternative design. • Arch falsework. • Arch design. • Arch construction. • Approach spans – design and construction. • Heritage recognition. • Opening ceremony. Gladesville Bridge – Parramatta River Old Gladesville Bridge • Constructed 1878 to 1881. • Wrought iron lattice girder spans. • Swing span for navigation purposes. Old Gladesville Bridge (approximate location) 1956 1881 Reasons for New Gladesville Bridge • New bridge originally intended to be part of Sydney’s North Western Expressway (road linking Sydney City to the northern suburbs and through to Newcastle). • Earlier bridge’s useful service life exceeded. • Only two-lane traffic capacity – ‘bottleneck’ to traffic flow. • Swing span – abrupt interference to traffic flow. • North Western Expressway project was abandoned in the 1970s due to protests about the freeway's projected route through inner city suburbs such as Glebe and Annandale. Early Concept Designs • Concept designs developed by DMR’s Bridge Section, headed by Design Engineer Cliff Robertson (one of John Bradfield’s senior assistants on Sydney Harbour Bridge). • Bridge Section of DMR included a number of other highly-respected bridge engineers during this period, namely Vladimir Karmalsky, Albert Fried and Brian Pearson. DMR Tender Design – Steel Cantilever Bridge Tender Process • 1957 – tenders invited by Department of Main Roads (DMR), based on steel cantilever bridge, but alternative designs permitted (tenders closed October 1957). • Four (4) companies tendered for the steel design. • Tenders ranged from £2.51 M to £3.87 M.
    [Show full text]
  • Initial Project Submissions
    M4 Extension M4 PART 3: INITIAL PROJECT SUBMISSIONS M4 Extension NSW GOVERNMENT SUBMISSION TO INFRASTRUCTURE AUSTRALIA TEMPLATE FOR SUMMARIES OF FURTHER PRIORITY PROJECTS JULY 2010 Project Summary (2 pages, excluding attachments) Initiative Name: M4 Extension Location (State/Region(or City)/ Locality): Sydney, NSW Name of Proponent Entity: Roads and Traffic Authority of NSW Contact (Name, Position, phone/e-mail): Paul Goldsmith General Manager, Motorway Projects Phone: 8588 5710 or 0413 368 241 [email protected] Project Description: • Provide a description of the initiative and the capability it will provide. The description needs to provide a concise, but clear description of the initiative’s scope. (approx 3 paragraphs) A motorway connection, mainly in tunnel, from the eastern end of the Western Freeway (M4) at North Strathfield to the western outskirts of the Sydney CBD and the road network near Sydney Airport. It would link M4 to the eastern section of the Sydney Orbital via the Cross City Tunnel and Sydney Harbour Bridge. The eastern section of the M4 (east of Parramatta) would be widened/upgraded. A twin tube tunnel is proposed from North Strathfield to just south of Campbell Road at St Peters with connections to the City West Link at Lilyfield/Rozelle and Parramatta Road/Broadway at Glebe/ Chippendale. A bus only connection at Parramatta Road, Haberfield is also possible. A further tunnel is proposed to connect Victoria Road near Gladesville Bridge to the main tunnel in the Leichhardt area. There is a proposed surface motorway link from just south of Campbell Road to the road network around Sydney Airport probably connecting to Canal Road and Qantas Drive (the latter subject to M5 East Expansion planning and Sydney Airport Corp Ltd agreement) with a potential link to M5 at Arncliffe.
    [Show full text]
  • STATE SIGNIFICANT INFRASTRUCTURE ASSESSMENT: Westconnex Stage 3 – M4-M5 Link SSI 7485
    STATE SIGNIFICANT INFRASTRUCTURE ASSESSMENT: WestConnex Stage 3 – M4-M5 Link SSI 7485 Environmental Assessment Report under Section 5.18 of the Environmental Planning and Assessment Act 1979 March 2018 WestConnex Stage 3 – M4-M5 Link Environmental Assessment Report SSI 7485 Cover Photograph: Roadheader within an acoustic shed (Source: EIS) © Crown copyright 2018 Published March 2018 NSW Department of Planning & Environment www.planning.nsw.gov.au Disclaimer: While every reasonable effort has been made to ensure that this document is correct at the time of publication, the State of New South Wales, its agents and employees, disclaim any and all liability to any person in respect of anything or the consequences of anything done or omitted to be done in reliance upon the whole or any part of this document. NSW Government i Department of Planning & Environment WestConnex Stage 3 – M4-M5 Link Environmental Assessment Report SSI 7485 EXECUTIVE SUMMARY The Proposal Roads and Maritime Services (the Proponent), proposes to construct the M4-M5 Link proposal (the project), as part of the WestConnex program of works. WestConnex comprises a 33 kilometre motorway designed to improve connections between industrial, commercial and residential areas in Sydney’s west, east and south-west, by creating road network links between the Sydney Central Business District (CBD) and the Parramatta CBD. The M4-M5 Link is the third and final stage of WestConnex, forming the link between the M4 East at Haberfield and New M5 at St Peters. The component stages and projects
    [Show full text]
  • Patricia Palmer Lee PRG 1722 Special List POSTCARDS INDEX
    ___________________________________________________________ ______________________ Patricia Palmer Lee PRG 1722 Special List POSTCARDS INDEX 1993 to 2014 NO. DATE SUBJECT POSTMARK STAMPS A1 05.07.1993 Ramsgate Beach, Botany Bay Sydney Parma Wallaby A2 09.07.1993 Bondi Beach Surf Eastern Suburbs Ghost Bat A3 13.07.1993 Autumn Foliage, Blue Mountains Eastern Suburbs Tasmanian Herit Train A4 20.07.1993 Baha'i Temple, Ingleside Eastern Suburbs Silver City Comet A5 27.07.1993 Harbour Bridge from McMahon's Point Eastern Suburbs Kuranda Tourist Train A6 04.08.1993 Winter Sunset, Cooks River, Tempe Eastern Suburbs Long-tailed Dunnart A7 10.08.1993 Henry Lawson Memorial, Domain Eastern Suburbs Little Pygmy-Possum A8 17.08.1993 Berry Island, Parramatta River Rushcutters Bay Ghost Bat A9 24.08.1993 Story Bridge, Brisbane River Eastern Suburbs Parma Wallaby A10 28.08.1993 Stradbroke Island, Moreton Bay Qld Cootamundra Long-tailed Dunnart A11 31.08.1993 Rainforest, Brisbane Botanical Gardens Yass Little Pygmy-Possum A12 05.09.1993 Dinosaur Exhibit, Brisbane Museum Eastern Suburbs Ghost Bat A13 10.09.1993 Wattle Festival Time, Cootamundra Eastern Suburbs Squirrel Glider A14 14.09.1993 Davidson Nat Park, Middle Harbour Eastern Suburbs Dusky Hopping-Mouse A15 17.09.1993 Cooma Cottage, Yass Eastern Suburbs Parma Wallaby A16 21.09.1993 Bicentennial Park, Homebush Bay Eastern Suburbs The Ghan A17 24.09.1993 Rainbow, North Coast NSW Eastern Suburbs Long-Tailed Dunnart A18 28.09.1993 Sphinx Monument, Kuring-gai Chase NP Canberra Little Pygmy-Possum A19 01.10.1993
    [Show full text]
  • 150 Years of Methodist / Uniting Church Worship in Five Dock 1864 - 2014
    150 Years of Methodist / Uniting Church Worship in Five Dock 1864 - 2014 Contents Foreword ............................................................................................ 2 Acknowledgements ............................................................................ 5 150 Years of Methodist/Uniting Church Worship in Five Dock ............ 7 The beginning of white settlement ...................................................... 7 The meaning of Methodism ................................................................ 7 The beginnings of Methodism in Australia .......................................... 7 The early history of Five Dock and surrounding areas........................ 9 Spread of the Gospel in NSW .......................................................... 12 Spread of the Gospel in Five Dock ................................................... 12 Spread of Methodism in Australia .................................................... 14 New growth in Drummoyne .............................................................. 15 Methodism comes to Drummoyne .................................................... 15 Times of Change .............................................................................. 16 Ministers appointed to Five Dock 1861-1968 ................................... 17 The First World War and Great Depression ..................................... 18 Ministers appointed to Drummoyne 1905-1968 ................................ 19 Plans at Five Dock church ..............................................................
    [Show full text]
  • Construction of the Gladesville Bridge Summary Report
    R T A Roads and Traffic Authority Oral History Program Construction of the Gladesville Bridge Summary Report Written and compiled by Martha Ansara from interviews by Frank Heimans and Martha Ansara August 2001 ISBN 0 7313 0130 7 Published Auf ust 2001 RTA/Pub 01.087 Prepared by. Martha Ansara and Cinetel Productions Pty Ltd (Frank Heimans) fir. RTA Environment and Community Policy Branch Level 6 RTA 260 Elizabeth St SURRY HILLS NSW 2010 Telephone (02)9218 6083 Fax (02)9218 6970 Roads and Traffic Authority Copyright® NSW Roads and Traffic Authority, 2001 www.rta.nsw.gov.au RTA V Some comments about Oral History,.. Oral history has been described as "a picture of the past in people's own words". It reveals what you often won't find in the files and the history books - the facts and the real reasons things happened. It is told by the people who were there - those who were involved, who made it happen, who were affected - in the colour, passion and inflection of their own voices. Oral history accounts can also tell about relationships, perceptions, social and political climates, all of which are part of life and influence our actions and those of others. It often reveals the unsung heroes, the names of those actually responsible for innovations and important changes. So, oral history provides a counterbalance to the formal written record by providing the personal, intimate, human and social account of events and why they happened. The RTA Environment and Community Policy Branch established an Oral History Program in 1997, to investigate various topics of historical interest.
    [Show full text]
  • Western Harbour Tunnel Initial Corridor Options Assessment
    Fact sheet Spring 2017 Western Harbour Tunnel Initial corridor options assessment Selecting the concept design The Western Harbour Tunnel has been identified as a priority transport infrastructure project for New South Wales. Initial corridor options assessment Future Transport, released by the Four corridors were evaluated • Potential impacts on NSW Government in October (see map) to identify the most Goat Island 2017 includes Western Harbour acceptable corridor. Tunnel and Beaches Link. • Potential impacts to Key factors were: Sydney Harbour’s main Previously, the 2012 NSW Long shipping channel Term Transport Master Plan and • Likely geology, geotechnical stability and suitability for the 2014 State Infrastructure Orange option Strategy Update referenced tunnel construction the need for a new crossing • Tunnel depths, geometry and Similar to the red option, of Sydney Harbour. ability to achieve acceptable it connected with the Gore Hill Freeway near Artarmon and In 2015, Roads and Maritime road gradients not the Warringah Freeway Services started assessment work • Connectivity with the broader at North Sydney. on this new harbour crossing. road network Disadvantages included: The concept of a new bridge • Contructability • The need for a relatively across western Sydney Harbour • Minimise property disturbance was discontinued early because long tunnel • Minimise environmental impacts of the high visual, tourist and • Poor road connection heritage values of the Sydney compared with other options Harbour Bridge. Red option A tunnel under western Sydney Tunnels between Balmain, Goat Brown option Island and McMahons Point. Harbour provides similar Crossing of Sydney Harbour connectivity, capacity and Disadvantages include: further west – broadly design outcomes as a new bridge. • Steep gradients with adverse under Victoria Road and the It also avoids the impacts of a outcomes for traffic flow and Gladesville Bridge.
    [Show full text]
  • Gladesville Bridge, Acl~>> River Connecting Drurnmoyne and Gladesville and the Original Across the Parramatta River in the Locality Was by Ferry
    I Denis Gojak f PO Box457 Newtown NSW 2042 i HER ROYAL HIGHNESS DUCHESS OF KENT r ORDER OF PROCEEDINGb The Honourable P. D. Hills, M.L.A., Minister for Highways 1 will open proceedings New Bridge over the Parramatta River Minister for Industrial Development between Gladesville and Drummoyne, and Decentralisation Sydney I will speak Friday, 2nd October, 1964, Her Royal Highness, Princess Marina, Duchess of Kent, at I 1.00 a.m. will reply I BY Her Royal Highness, Princess Marina, Duchess of Kent A Duchess of Kent . " Advance Australia Fair " A LENGTH 1,901 feet 6 inches including a four-ribbed concrete arch with a clear span of 1,000 feet and, on each side of the arch, four pre-stressed concrete girder spans, each loo feet long. WIDTH The roadway is 72 feet between kerbs. CLEARANCE The underside of the arch is more than 120 feet above high water level for a width of zoo feet in the middle of the arch, the maximum clearance being 134 feet. GRADE The roadway rises on a grade of 6 feet in each loo feet from either side and the grades are connected by a vertical curve 300 feet long over the centre of the structure. FOOTWAYS There is a footway, 6 feet wide on each side of the roadway. Inner and outer protective barriers flank each footway. The inner protective barriers divide the footways from the vehicular roadway, providing complete safety for pedestrians and preventing splashing from vehicles in wet weather. b'-ogf/m crkdipw, LIGHTING Steel standards set in the line of the outer protective barriers carry lanterns ,$"-, CD-M with 400-watt lights over the roadway.
    [Show full text]
  • Questions About the Sydney Harbour Bridge Waterproofing and Resurfacing in January 2012
    Questions about the Sydney Harbour Bridge waterproofing and resurfacing in January 2012 1. Why is the bridge being closed some weekends in January? 12. What if there is an emergency and an ambulance or fire engine The Sydney Harbour Bridge will be closed to motorists as we need to use the bridge? waterproof and resurface lanes 1 to 6 across the bridge. Emergency vehicles will have access across the bridge. Traffic management plans are in place for emergency situations. 2. What will the bridge work achieve? It’s important to rejuvenate the bridge which will be 80 years old 13. Is there a problem with the bridge? on 19 March 2012. Waterproofing and resurfacing will: No. It has been more than 20 years since the last major resurface - Reduce the need for reactive maintenance. of the bridge and the first time in the bridge’s 80 year history that - Improve road quality by providing a smoother and more durable we will strip back the road surface to the original concrete deck road surface. to carry out essential waterproofing work. This work will ensure longevity of the surface of the road. - Reduce road noise as the new surface will be smoother and quieter. - Reduce the risk of corrosion and structural damage on the deck. 14. Will the look or structure of the bridge change? 3. When will the bridge be closed to motorists? No. The bridge structure and appearance will remain the same. Up to three consecutive weekends in January 2012 (13-16, 20-23 15. Will the work be noisy for nearby residents, hotels and 27-30) from 10pm Friday to 5am Monday.
    [Show full text]
  • Bridging Sydney Education Resource Kit
    Bridging Sydney Education Resource Kit HISTORIC HOUSES TRUST Bridging Sydney Education Resource Kit SydnEy HaRbouR BridgE – SitE Study MaterialS (SEcondaRy) Suitable for using with Stage 4, “Investigating History” and Stage 5, “Australia between the Wars”. These documents provide information and student tasks for a site study on the Sydney Harbour Bridge. contents 1 Curriculum overview and introduction 2 Student task 3 Student activities Activity 1 Reasons for construction of the Bridge Activity 2 John Bradfield – Chief Engineer of the Bridge construction Activity 3 Opening the Bridge Activity 4 Impacts Activity 5 Since the opening – work for a visit to the Bridge Bridging Sydney 16 December 2006 – 29 April 2007 MUSEUM OF SYDNEYon the site of first Government House cnr Bridge & Phillip Streets, Sydney | open daily 9.30am – 5pm t 02 9251 5988 | www.hht.net.au Principal sponsor Partner An initiative of the Historic Houses Trust presented in association with the Roads and Traffic Authority and State Records New South Wales Cover: Arch in the sky (detail), Harold Cazneaux, 1930, silver gelatin photograph. Courtesy the Cazneaux family and the National Library of Australia curriculuM overviEw and intRoduction The Stage 5 History Syllabus, Topic 3, “Australia between the Wars”, requires that students study one event from either the 1920s or the 1930s. One event that can be chosen is the opening of the Sydney Harbour Bridge. Students must also complete a site study as part of their study in Stage 5 History. A site study is an inquiry-based examination of an historically or culturally significant location. A site study allows students to examine the contemporary issues (management, conservation, etc.) associated with an historical study.
    [Show full text]
  • City of Canada Bay LGA
    Parramatta River Estuary Processes Study AECOM City of Canada Bay LGA 163 Parramatta River Estuary Processes Study – LGA Management Summaries October 2010 Parramatta River Estuary Processes Study AECOM 9.4 City of Canada Bay 9.4.1 General Description The City of Canada Bay LGA contains over 35km of shoreline which is one of the largest foreshore area that any one local government authority is responsible for. Land use is primarily low and medium density residential with significant areas dedicated to public recreation (parks along drainage reserves, golf course, wharves, and foreshore reserves) and special use (infrastructure) areas (e.g. Rivendell Child Adolescent & Family Unit, Concord Repatriation Hospital and “Yaralla House” Dame Eadith Walker Hospital) The LGA contributes a catchment area of approximately 1,847.6 ha to the estuary study area, its tributaries and embayments, excluding land draining to Homebush Bay and Iron Cove Bay catchments (refer Section 3.0), include the following: x Iron Cove Bay, downstream to Iron Cove Bridge (28.8 ha); x River South, Iron Cove Bridge to Five Dock Point (77.9 ha); x Five Dock Bay (206.1 ha); x Abbotsford Bay (47.9 ha); x Hen and Chicken Bay (849.5 ha). x Kendall Bay, including foreshore land upstream to Breakfast Point, and downstream to Cabarita Point (74.8 ha); x Majors Bay (215.5 ha); x Yaralla Bay (76.9ha); x Brays Bay, including foreshore land west to John Whitton Bridge (85.4 ha); and x Homebush Bay (75.2 ha) 9.4.2 Stormwater Management and GPTs The City of Canada Bay Council has installed a number of GPTs in various catchments within the LGA.
    [Show full text]