Transport Vision Major Scheme Long List of Options

Total Page:16

File Type:pdf, Size:1020Kb

Transport Vision Major Scheme Long List of Options Transport Vision Major Scheme Long List of Options Scheme ID Scheme Name Scheme Information Transport Mode Status Timescale Indicative Cost Growth Area Development of a ‘Hertford Loop Metro’ on the Hertford Line from Moorgate to Hertford North through 18 Hertford Loop Metro service improvements (capacity, frequency and speed) facilitated by a new Stevenage turnback platform and Rail Improvements Proposed Medium term Medium A1(M) new stock. This scheme would support the development of Stevenage as a key transport / interchange hub. High Speed 2 (HS2) is a proposed high speed rail line from London to Birmingham and beyond, with Phase 2 proposed from the West Midlands to Leeds and Manchester. The additional capacity provided by Phase 2 will High Speed 2 Phase 2 – East Coast 19 release capacity on the East Coast Main Line, allowing more stopping services through Hertfordshire than Rail Improvements Concept Long term Very high A1(M) Main Line Opportunities operate at present. The opportunity is for additional long-distance stopping services at Stevenage and increased frequency and capacity for services from Welwyn Garden City and Hatfield. Concept level scheme to accommodate forecast levels of traffic on the A1(M) through Hertfordshire. Highways 22 A1(M) Widening Highway Improvements Concept Long term Very high A1(M) England forecasting to 2040 shows that the A1(M) will experience regular congestion. Sustainable Infrastructure 40 between Stevenage, Hitchin and Walking/cycling improvements between Stevenage, Hitchin and Letchworth. Sustainable Transport ImprovementsConcept Medium term Low A1(M) Letchworth Stevenage Station As part of ongoing masterplanning work for Stevenage station, there is potential to improve the capacity of 46 Rail Improvements Proposed Medium term Medium A1(M) Redevelopment Stevenage Station through its redevelopment. Stevenage Western Distributor 47 New road linking A602 - A505. Highway Improvements Proposed Long term Very High A1(M) Road Deliverable scheme with links to development around Stevenage - likely to be required even with A602 longer- 54 Hooks Cross Bypass Highway Improvements Proposed Medium term Medium A1(M) term strategy and role for route. 57 A1M J3 and J4 Upgrade Road upgrade building on work already undertaken. Highway Improvements Proposed Medium term Medium A1(M) A414 London Colney/A1081 58 Grade separated junction upgrade. Highway Improvements Proposed Medium term Medium A1(M) Upgrade 60 A414 Park St Roundabout Grade separated junction upgrade. Highway Improvements Proposed Medium term Medium A1(M) 73 A1(M) all lane running All lane running on A1(M) beyond the already committed junctions 6-8 Highway Improvements Concept Medium term Medium A1(M) A505-A602 Hitchin Southern 80 Highway bypass Highway Improvements Concept Medium term High A1(M) Bypass A1 South of M25 upgrade Provision of information technology on northbound and southbound carriageway including gantry signs and 83 New Technology Concept Medium term Medium A1(M) including technology variable speed limits combined with safety improvements. East-North bypass around Stevenage along Gresley Way alignment to connect Junction 8 to new development 100 Stevenage eastern bypass Highway Improvements Concept Long term High A1(M) in north of Stevenage and the hospital A120 Improvements (including A120 highway capacity improvements including the bypassing of Little Hadham to improve journey times 24 Highway Improvements Committed Short term Medium A10/M11 Little Hadham Bypass) between Bishop’s Stortford and the A10. Increased frequency of services in Increased frequency of local West Anglia Main Line services on the Lea Valley line to Stratford, delivering four 25 the Lea Valley on the West Anglia trains per hour in the peak instead of two trains per hour, through three-tracking sections of the line south of Rail Improvements Committed Short term High A10/M11 Main Line Hertfordshire towards Stratford. 26 M25 J25 Improvement Upgrade of the M25 and the A10 junction at Cheshunt, providing greater capacity for traffic. Highway Improvements Committed Short term Medium A10/M11 Four-tracking of the West Anglia Main Line between Coppermill Junction and Broxbourne to improve access to Stansted Airport through the Upper Lea Valley. Key sections of the track would be expanded to four-track (from Four-tracking of the West Anglia 27 two or three), allowing faster services to overtake stopping services. This would provide additional timetabled Rail Improvements Planned Medium term Very high A10/M11 Main Line services to increase capacity and substantially reduce journey times from Bishop’s Stortford and Hertford East to London. Delivery of Crossrail 2 to Hertfordshire requires four-tracking of the West Anglia Main Line. New M11 junction to the north of Harlow to provide alternative access to the strategic network. Delivery of this 28 New Junction 7A on the M11 Highway Improvements Proposed Medium term Medium A10/M11 scheme would support the planned residential development north of Harlow. New south-west to north-east rail line to provide suburban and regional services between Hertfordshire and Crossrail 2 to Broxbourne (TfL 30 parts of Surrey and Middlesex, via a new central tunnel between Tottenham and Wimbledon. This route option Rail Improvements Concept Long term Very high A10/M11 scheme) includes services to Broxbourne, via the existing West Anglia Main Line, as consulted on by TfL (Autumn 2015). Building on the currently proposed Crossrail 2 route, these options look for Crossrail 2 to serve different parts Crossrail 2 extension options 31 of Hertfordshire. Options are currently being considered for inclusion in Hertfordshire’s response to the Rail Improvements Concept Long term Very high A10/M11 beyond Broxbourne current Crossrail 2 route consultation. 43 Hertford Bypass A414 Bypass at Hertford. Highway Improvements Concept Long term High A10/M11 North of Harlow PT/Highways 49 New PT/Highways link to new development north of Harlow, including a second Stort crossing. Sustainable Transport ImprovementsProposed Long term High A10/M11 Link Local A10 Improvements South of 51 Dualling and junction upgrades in southern section of the corridor. Highway Improvements Proposed Medium term High A10/M11 Buntingford 53 Standon Bypass New bypass around Standon. Also see no.50 'Continuation of A120 to Stevenage'. Highway Improvements Proposed Medium term Medium A10/M11 Link to Royston Growth & Transport Plan with south Cambridge and possibility of emerging through analysis of 55 Royston Bypass Highway Improvements Proposed Long term Medium A10/M11 future travel needs - local member has raised as a possibility. Linked to growth around north Harlow/Gilston and with wider J7a/A414 improvements from any possible 56 Sawbridgeworth Bypass Highway Improvements Proposed Long term Medium A10/M11 junction development with A1184. Bishops Stortford Southeast 67 Bypass to southeast of Bishops Stortford. Highway Improvements Proposed Long term High A10/M11 Bypass A120 (Bishops Stortford north) 68 Dualling bypass to north of Bishops Stortford. Highway Improvements Proposed Long term High A10/M11 bypass dualling Strategic intervention at M11 J8 bypassing the A120 east-west movement away from the junction (based 72 M11 J8 Improvements around the additional demand from growth around Harlow and increasing passenger numbers at Stansted) – Highway Improvements Proposed Medium term Medium A10/M11 this would be in addition to J7a development and J7 improvements. There are no direct rail services between Hertford and Harlow (this requires a change of train at Broxbourne). Hertford East-Harlow direct rail There is opportunity to attract mode shift from car on the A414 corridor. There is opportunity to provide direct 77 connection (plus onward direct Rail Improvements Concept Medium term High A10/M11 services to Bishop's Stortford and Stansted Airport, providing improved access to job opportunities at the services to Stansted) expanding airport. TBC - No obvious major scheme solution, and further studies are taking place to identify what may be A10 Broxbourne Package required/feasible to support proposed growth. Hertford East-Hertford North 78 Bus connection between the two stations. Sustainable Transport ImprovementsConcept Medium term High A10/M11 Public Transport connection Provision of improved cycle (and pedestrian) links between Bishop's Stortford and Stansted Airport, currently Bishop's Stortford - Stansted 88 not well linked other than by road. Links could be entirely separate from the existing road system, or via an Sustainable Transport ImprovementsConcept Medium term A10/M11 Airport cycle 'superhighway' upgraded M11 Junction 8 and other grade-separated links across key links and junctions Scheme to provide an extensive, county-wide electric vehicle charging network through the installation of Comprehensive Electric Vehicle electric vehicle charging points and new and emerging charging infrastructure. Up to date charging 32 New Technology Concept Short term Medium County Wide Charging Infrastructure infrastructure would be secured as part of new developments across the County and a central body would be tasked with addressing gaps and identifying opportunities for intensification of the network. Use of Social Media and Emerging Concept level scheme to provide better information about on-street parking options within Hertfordshire's 33 Technologies to Facilitate On- urban areas, reducing the time spent circulating looking for a space and total distance associated with New
Recommended publications
  • Responses to the Rail Strategy Consultation Page 1 West Anglia
    Responses to the Rail Strategy Consultation Appendix1 West Anglia Mainline Organisation Consultation Comments - WAML HCC Response Action for Rail Strategy Broxbourne 4-tracking & CR2 to be given higher profile - Include CR2 on page 14 but Borough Council e.g. on pages 4 & 32 & in figure 2.2 on page not on pages 4 & 32 as 14. Include Ambition Broxbourne's aspiration these figures list existing of Cheshunt as strategic hub with CR2, links services and lines. Include to Stratford, London & Stansted, and reference to Ambition significant development around the station Broxbourne's aspiration of associated with a potential redevelopment of Cheshunt as strategic hub, Delamare Road. Include lobbying for early and of lobbying for early safeguarding of regional CR2 route. CR2 safeguarding of regional route. Cambridgeshire Include addressing single track tunnel at Single track tunnel at None. County Council Stansted to improve journey times & capacity Stansted as constraint for all services, from the north & south. already included in Strategy. East Herts District Objects to wording on page 41 re - HCC not pursuing Hertford Council investigation into the implementation of East as CR2 terminus and development around Hertford East branch so text will be removed. stations. Serious constraints of implementing Amend text on page 40 re CR2 in East Herts should be recognised. Ware platform. There was never a second platform at Ware (page 40). Hertford Town Appropriate service mix with more semi-fasts - Include reference to semi- Council to London, and longer term to Liverpool St. fasts including to Liverpool St. Hertfordshire Lobby for Hertford East & Harlow as northern HCC not pursuing Hertford None.
    [Show full text]
  • Watford Character of Area Study
    Character Area 18 Period Generally 1930s. Includes 1900s – 1950s. Heights Predominantly two storeys. Some bungalows. Urban grain Intermediate form. Block size / structure Regular pattern of blocks varying in size (450m x 80m). Generally larger block sub-division than Victorian/Edwardian development. Plot sizes Typically 8m x 40m. Gaps between buildings of 4m- 5m. Streetscene Suburban streetscene. Wide carriageways (6-7m for total), with pavements of 2.5-3.5m widths – some of which feature street trees. Limited street furniture. Building lines Generally consistent building lines behind front gardens. Front boundaries Marked by hedges of varying heights, brick walls or timber fences. Many original hedges / walls are now open frontages to allow car access. Roof forms Generally hipped tile roofs, with brick chimneys. Windows Originally metal or timber framed windows. These have generally been replaced since with various types of uPVC windows. Projecting two storey bay windows are common. Materials Materials include variety of brick types, render and mock-Tudor style timbering. Tile roofs. Car parking Large proportion of houses have garages as later additions to the side. Majority of parking is accommodated in front drives. Some on-street parking. Landscaping Front gardens typically 6m deep. Rear gardens typically 15m-25m deep. Hedges are relatively common in rear gardens, but less so in front gardens. Street tree planting along some pavements. Limited green space outside of gardens and formal parkland/playing fields/allotments. No grass verges between carriageways and pavements 103 Character Area 18A 104 Area 18A Summary This residential character area is located on the eastern side of the Borough, at the border with Hertsmere.
    [Show full text]
  • South West Herts Economy Study
    South West Hertfordshire Economic Study A Final Report by Regeneris Consulting and GL Hearn South West Hertfordshire Councils South West Hertfordshire Economic Study February 2016 Regeneris Consulting Ltd www.regeneris.co.uk South West Hertfordshire Economic Study Contents Page Executive Summary i Purpose of the Study and Approach i Functional Economic Market Area (FEMA) i Policy Context ii Economic Baseline ii Market Assessment iii Growth Scenarios iv 1. Introduction and Purpose of Study 1 2. Defining the Functional Economic Area 4 Housing Market Area 6 Local Enterprise Partnership Geographies 9 Flow of Goods, Services and Information 13 Service Market for Consumers 16 Cultural and Social Well-Being Catchments 19 Transport Network 21 Future Considerations 22 The FEMA of South West Herts 24 3. Policy Context 27 4. The South West Herts Economy: An Overview 37 Size of the South West Herts Economy 37 Geography of the South-West Hertfordshire Economy 39 Recent Economic Performance 41 Labour Market 44 Broad Sectoral Composition 46 Sector Strengths 49 Structure of Business Base 57 Enterprise 60 5. Commercial Property Market Assessment 63 South West Hertfordshire Economic Study National Economic Conditions 63 Office Market Review 63 Industrial Sector Review 71 Commercial Agents Consultations 76 Summary 78 6. Future Growth Scenarios 80 Higher Growth Scenario 102 Conclusions on Preferred Scenario 108 7. Relationship with London 111 Introduction 111 Migration 112 8. Supply of Employment Land 120 Introduction 120 Site Assessment Methodology 120 Sites in Dacorum 122 Sites in Hertsmere 124 Sites in St Albans 141 Sites in Three Rivers 145 Sites in Watford 151 Conclusion 158 9.
    [Show full text]
  • Submissions to the Call for Evidence from Organisations
    Submissions to the call for evidence from organisations Ref Organisation RD - 1 Abbey Flyer Users Group (ABFLY) RD - 2 ASLEF RD - 3 C2c RD - 4 Chiltern Railways RD - 5 Clapham Transport Users Group RD - 6 London Borough of Ealing RD - 7 East Surrey Transport Committee RD – 8a East Sussex RD – 8b East Sussex Appendix RD - 9 London Borough of Enfield RD - 10 England’s Economic Heartland RD – 11a Enterprise M3 LEP RD – 11b Enterprise M3 LEP RD - 12 First Great Western RD – 13a Govia Thameslink Railway RD – 13b Govia Thameslink Railway (second submission) RD - 14 Hertfordshire County Council RD - 15 Institute for Public Policy Research RD - 16 Kent County Council RD - 17 London Councils RD - 18 London Travelwatch RD – 19a Mayor and TfL RD – 19b Mayor and TfL RD - 20 Mill Hill Neighbourhood Forum RD - 21 Network Rail RD – 22a Passenger Transport Executive Group (PTEG) RD – 22b Passenger Transport Executive Group (PTEG) – Annex RD - 23 London Borough of Redbridge RD - 24 Reigate, Redhill and District Rail Users Association RD - 25 RMT RD - 26 Sevenoaks Rail Travellers Association RD - 27 South London Partnership RD - 28 Southeastern RD - 29 Surrey County Council RD - 30 The Railway Consultancy RD - 31 Tonbridge Line Commuters RD - 32 Transport Focus RD - 33 West Midlands ITA RD – 34a West Sussex County Council RD – 34b West Sussex County Council Appendix RD - 1 Dear Mr Berry In responding to your consultation exercise at https://www.london.gov.uk/mayor-assembly/london- assembly/investigations/how-would-you-run-your-own-railway, I must firstly apologise for slightly missing the 1st July deadline, but nonetheless I hope that these views can still be taken into consideration by the Transport Committee.
    [Show full text]
  • INFR Oct 2019 COMET LP4 SADC Analysis V4 Final
    Hertfordshire COMET: 2036 Local Plan Run 4. St Albans District Council Output Analysis FINAL DRAFT Project number: 60588905 October 2019 Hertfordshire COMET: Local Plan Forecasting Report Project number: 60555331 Quality information Prepared by Checked by Approved by CW, PGN, TTS CW SK Revision History Revision Revision date Approved by v1 – Draft for client comment 10 April 2019 In draft V2 – Draft with extra journey time analysis 24 April 2019 In draft V3 – Final with client comments addressed 14 October 2019 CW FINAL DRAFT 2 AECOM Hertfordshire COMET: Local Plan Forecasting Report Project number: 60555331 Prepared for: Hertfordshire County Council Prepared by: AECOM Limited AECOM House 63-77 Victoria Street St Albans Hertfordshire AL1 3ER United Kingdom T: +44(0)1727 535000 aecom.com FINAL DRAFT © 2018 AECOM Limited. All Rights Reserved. This document has been prepared by AECOM Limited (“AECOM”) for sole use of our client (the “Client”) in accordance with generally accepted consultancy principles, the budget for fees and the terms of reference agreed between AECOM and the Client. Any information provided by third parties and referred to herein has not been checked or verified by AECOM, unless otherwise expressly stated in the document. No third party may rely upon this document without the prior and express written agreement of AECOM. 3 AECOM Hertfordshire COMET: Local Plan Forecasting Report Project number: 60555331 Table of Contents 1. Introduction ....................................................................................................
    [Show full text]
  • Character of Area Study
    Watford Character of Area Study Adopted December 2011 0B1.0 Introduction The Borough of Watford is a well established urban centre in West Hertfordshire that contains a diverse patchwork of areas reflecting different types of built form. These character areas provide the spatial framework for local neighbourhoods and reflect the multifunctional nature of the town as a location for employment, leisure, study and residential provision. Although these areas provide a network of urban form, rich in “place identity”, they remain at risk of degradation from the pressures of new development. There is therefore a need to identify the Borough’s existing character areas and to provide a reference for guiding contextually responsive development that reinforces local character. 2.0 Urban Conservation Strategy 2.1 The need for a comprehensive study identifying character areas within the Borough was set out in the Council’s Urban Conservation Strategy, as detailed in the Watford District Plan 2000 (adopted 2003). The Urban Conservation Strategy sets out to deliver a package of different documents covering the various heritage assets within the town, including: conservation areas, Statutory Listed Buildings, Locally Listed Buildings and archaeology. The Character of the Area Study provides an overarching resource on urban form for the whole Borough and not just areas or buildings that are designated as heritage assets and referred to in the District Plan and the Urban Conservation Strategy. 2.2 The Watford District Plan 2000 and the related Supplementary Planning Guidance Note 28 (adopted 2003) includes information on Historic Environment Character Zones in Watford. This map based resource provides general information on the historical character zones that exist within the Borough and their archaeological potential.
    [Show full text]
  • Local Plan Emerging Strategy for Growth 2020-2038
    DELIVERY STRATEGIES Dacorum Emerging Strategy for Growth (2020 - 2038) 23 Delivery Strategies Introduction 23.1 We have prepared Delivery Strategies for each of the Borough’s towns and large villages and wider countryside. The role of these strategies is to set out how growth and development will be managed in each area. 23.2 Each strategy discusses key delivery requirements under a number of headings before going on to set out a series of policies for each of the Growth Areas. Associated site allocations within the Growth Areas can be found in the 'Proposal and Sites' chapter of the Plan. It is important that the Delivery Strategies are read alongside the policies contained in the Guiding Development section of the Plan, any Supplementary Planning Documents, the site specific requirements in the Proposals and Sites section of the Plan and the infrastructure requirements set out in the Draft Infrastructure Delivery Plan. Supporting Growth in the Delivery Strategies 23.3 Work on identifying the type and level of future infrastructure requirements to support the Delivery Strategies is ongoing. These requirements will be refined in the next stages of the Local Plan process. What is identified in the Emerging Strategy for Growth reflects our current understanding and we hope that publishing a draft Infrastructure Delivery Plan and Sustainable Transport Plans alongside this Plan will inform discussion on the Local Plan. 23.4 Our intention is to incorporate infrastructure requirements into the relevant Growth Areas either as standalone allocations or to be incorporated into specific Site Allocations as required when we publish the next stage of the Plan.
    [Show full text]
  • ABFLY/Abbey Line CRP/Acorp Abbey Line Passing Loop Feasibility
    ABFLY/Abbey Line CRP/ACoRP Abbey Line Passing Loop Feasibility Final Report by The Railway Consultancy and others April 2019 The Railway Consultancy Ltd 1st Floor, South Tower Crystal Palace Station London SE19 2AZ Tel 020 8676 0395 1 Forewords Introduction from Abfly ABFLY is pleased to introduce this study, which is the culmination of several year's campaigning for improvements and a more frequent service on the Abbey line. This study, the first part of which was financed by our group with a crowd funding campaign along with support from local councillors from their locality budgets, provides a workable and cost-effective solution which would enable an enhanced half-hourly frequency train service to be operated on the line. The Abbey line fulfils an important link between St Albans and Watford and is currently an underused asset; the chronic road traffic congestion in the area for much of the day demands that solutions be found sooner rather than later, and this study is key to meeting that. The study provides details of the costs, operational and revenue implications of the increased train service, highlighting the potential of how it might be funded by third-parties such as developers, and also suggests some economical ways of operating the service on the line without affecting the passenger experience to help sustainability. The relatively-simple infrastructure intervention recommended for the line would transform the current service provision, and make the service much more attractive to both current and potential users at a fraction of the cost of road based improvements, plus would also be environmentally better.
    [Show full text]
  • Abbey Line Report 060615
    Hertfordshire County Council Abbey Line Passenger Survey FINAL REPORT June 2006 The Railway Consultancy Ltd 1st Floor, South Tower Crystal Palace Station London SE19 2AZ Tel. 020-8676 0395 Fax. 020-8778 7439 1 Executive Summary E1 The Abbey Line between Watford Junction and St Albans Abbey is a single-track Community Rail Partnership (CRP) line. Although currently operated by Silverlink, the line is to be part of the new West Midlands franchise, due to commence on 11 November 2007. The Community Rail Partnership is seeking to increase the frequency of services on the route, to a half-hourly level, thus requiring a second trainset and passing loop to be installed. The CRP therefore commissioned The Railway Consultancy to undertake a series of passenger counts and surveys of passenger travel patterns, in order to provide a basis on which business planning might be undertaken. E2 Analysis of passenger usage on the line was based upon surveying all weekday and weekend services once during May 2006. This encompassed the counting and alighting of boarders at every Abbey Line station and a series of on-train counts. In addition, a questionnaire was distributed to passengers. A total of 1300 forms were distributed; by the closing date of 9 th June 2006, a total of 496 survey forms were returned completed, representing a response rate of 38%. E3 Count data across the survey period revealed that passenger numbers on the line were somewhat disappointing. The total number of boarders (i.e. across both directions) for weekdays, Saturdays and Sundays were respectively around 1300, 1000 and 450 per day.
    [Show full text]
  • History of Local Rail Links
    History of local rail links The Watford branch of the Metropolitan line has never served Watford town centre. While this was the intention when the line was rst proposed in the early 1900s, constraints dictated that the route would terminate to the South of Cassiobury Park, located on the outskirts of Watford. The Croxley Green National Rail branch line was lightly used for most of its life, resulting in increasingly limited train services. The route was nally severed by the construction of the Ascot Road dual carriageway in 1996. Closure Notice for the branch line was authorised by the Secretary of State for Transport on 6th November 2002. The Secretary of State supported the retention of the branch line for future rail infrastructure as it was aware of Hertfordshire County Council’s aspirations to link this route with the Metropolitan line. History of the project The Croxley Rail Link Scheme has been an aspiration since the early 1990s and has been developed over the years by a number of dierent promoters. The outline scheme has been consulted upon during a number of studies. This development process included various iterations of engineering design however the overall scheme concept of diverting the Metropolitan line along the disused Croxley Green National Rail branch line to terminate at the Watford Junction Station remained unchanged. Alternatives A number of alternatives to the current proposals have been assessed including: Retention of existing Watford Met line station and running a split service to Watford Junction Reopening the Croxley Green Branch Line and not connecting to the Metropolitan line Conversion of the Croxley Green Branch Line to a segregated bus way Improvements to the existing local bus network Connecting the rail link to the St Albans Abbey Line and the Amersham branch of the Metropolitan line HISTORY Construction of a Watford relief road Tunnelling under Cassiobury Park The preferred scheme continues to oer the greatest benets whilst remaining nancially and operationally viable.
    [Show full text]
  • Infrastructure Delivery Plan 2011
    Strategic and Detailed Local Plan Technical Report Infrastructure Delivery Plan June 2016 Contents 1.0 Introduction 2 2.0 Policy Background 3 3.0 Methodology 4 4.0 Limitations 5 5.0 St Albans in Context 5 6.0 Strategy for Growth 6 7.0 Strategic Planning and Partnerships 7 8.0 Assessment of Infrastructure Capacity 10 9.0 Social & Community Infrastructure 11 Health Infrastructure 11 Health and Community Services 17 Education Infrastructure 20 Primary Schools 22 Secondary Education 26 Further Education - Oaklands College 28 Early Education and Child Care Provision 29 Emergency Services 33 Leisure and Cultural Facilities 36 Libraries 42 Cemeteries 44 Youth Provision 45 10.0 Green Infrastructure 48 Strategic Green Infrastructure 48 Local Green Infrastructure 54 11.0 Physical Infrastructure 61 Transport 61 Road Network 63 Public Transport 69 Walking and Cycling Infrastructure 76 12.0 Utilities Infrastructure 80 Water Infrastructure 80 Energy Distribution 84 Digital Infrastructure 87 Waste Infrastructure 90 References 94 Appendices 95 1 1.0 Introduction 1.1. The purpose of the Infrastructure Delivery Plan (IDP) is to provide a detailed understanding of the future infrastructure needs of the District to support planned growth up to the 2031. The National Planning Policy Framework (NPPF) requires the council to plan for future infrastructure needs as part of the Local Plan preparation process. The IDP provides information on the position of current infrastructure, drawing together collaborative research to set out the existing issues and consider the additional provision required to support the growth set out in the Strategic Local Plan (SLP). 1.2. The IDP draws together collaborative research and modelling in cooperation with a wide range of service providers including Hertfordshire County Council (HCC) and District Council services and the public / private infrastructure providers outside of local government.
    [Show full text]
  • Abbey Line Trail
    General information Notes & symbols Holiday Periods Transport Focus London Travelwatch ) PLUSBUS through ticketing available We will be running amended timetables over web: transportfocus.org.uk web: londontravelwatch.org.uk Christmas, Easter and May Bank Holidays. Details email: [email protected] email: [email protected] SN operated by Southern will be available on our website and station posters. tel: 0300 123 2350 tel: 020 3176 2999 post: Freepost (RTEH-XAGE-BYKZ), Post: 169 Union Street, London, SE1 0LL Transport Focus, PO Box 5594, Bring your bike Southend-on-Sea, SS1 9PZ Bikes (except tandems) are welcome on board our Community Rail Partnership trains but please be extra careful when it’s busy. On Rail User Groups The Community Rail Partnership brings together weekdays, only folding bikes are allowed on trains If you’d like to be more involved with the the local community, businesses, local government arriving at London Euston between 0700 –1000, development of rail services, why not join your and the railway to secure the long term future and departing between 1600 –1900. local rail user group. of the Abbey line. For more information about how you can get involved please contact the Abbey Flyer Users Group Community Rail Partnership Offi cer. Getting assistance at the station Dave Horton Call us on 0800 092 4260 if you need some email: info@abfl y.org.uk Abbey Line Community Rail Partnership help getting on or off the trains and we’ll make tel: 07739 023 316 Edna Woname the necessary arrangements. Please give at least web: abbeyline.org.uk 24 hours notice if possible.
    [Show full text]