Islands District Council IDC Paper No

Total Page:16

File Type:pdf, Size:1020Kb

Islands District Council IDC Paper No Islands District Council IDC Paper No. 68/2009 Proposed Amendments to the Approved Chek Lap Kok Outline Zoning Plan No. S/I-CLK/10 1. Purpose The purpose of this paper is to brief Members on the amendments to the approved Chek Lap Kok Outline Zoning Plan (OZP) No. S/I-CLK/10. 2. Background 2.1 On 19 May 2006, the approved Chek Lap Kok OZP No. S/I-CLK/10 was exhibited for public inspection under section 9(5) of the Ordinance. 2.2 On 12 June 2009, the draft Chek Lap Kok OZP No. S/I-CLK/11, incorporating the transport infrastructures and land use proposals on the proposed reclamation areas for the Hong Kong-Zhuhai-Macao Bridge, the Hong Kong Boundary Crossing Facilities, the Hong Kong Link Road and the Southern Landfall of the Tuen Mun Chek Lap Kok Link, was exhibited for public inspection under section 5 of the Ordinance. 3. Proposed Amendments to the Approved Chek Lap Kok OZP 3.1 The draft Chek Lap Kok OZP No. S/I-CLK/11 incorporating the necessary amendments is at Appendix I for Members’ reference. 3.2 The amendments to the OZP are summarized in the Gazette Notice dated 12.6.2009 (Appendix II). 3.3 The revised Notes and Explanatory Statement of the OZP are at Appendices III and IV. 4. Consultation The amendments to the OZP have been agreed by the Rural and New Town Planning Committee (RNTPC) at its meeting on 5.6.2009. The RNTPC agreed that the Islands District Council should be consulted during the public inspection period. 5. Attachments Appendix I Gazette Notice dated 12.6.2009 Appendix II Draft Chek Lap Kok Outline Zoning Plan No. S/I-CLK/11 Appendix III Notes of the draft Chek Lap Kok Outline Zoning Plan No. S/I-CLK/11 Appendix IV Explanatory Statement of the draft Chek Lap Kok Outline Zoning Plan No. S/I-CLK/11 Sai Kung and Islands District Planning Office Planning Department June 2009 - 2 - Appendix I TOWN PLANNING ORDINANCE (Chapter 131) AMENDMENTS TO APPROVED CHEK LAP KOK OUTLINE ZONING PLANNO. S/I-CLK/10 In the exercise of the power conferred by section 12(1)(b)(ii) of the Town Planning Ordinance (the Ordinance), the Chief Executive in Council (CE in C) on 5 May 2009 referred the approved Chek Lap Kok Outline Zoning Plan No. S/I-CLK/10 to the Town Planning Board (the Board) for amendment. The Board has made amendments to the Plan. The amendments are set out in the Schedule of Amendments. The descriptions of the areas affected by the amendments in the Schedule of Amendments are for general reference only. The exact locations of the areas affected by the amendments are more specifically shown on the draft Chek Lap Kok Outline Zoning Plan No. S/I-CLK/11. The draft Chek Lap Kok Outline Zoning Plan No. S/I-CLK/11 showing the amendments is exhibited under section 5 of the Ordinance for public inspection for a period of two months from 12 June 2009 to 12 August 2009 during normal office hours at the following locations :- (i) the Secretariat of the Town Planning Board, 15th Floor, North Point Government Offices, 333 Java Road, North Point, Hong Kong; (ii) the Planning Enquiry Counter, 17th Floor, North Point Government Offices, 333 Java Road, North Point, Hong Kong; (iii) the Planning Enquiry Counter, 14th Floor, Sha Tin Government Offices, 1 Sheung Wo Che Road, Sha Tin, New Territories; (iv) the Sai Kung and Islands District Planning Office, 15th Floor, Sha Tin Government Offices, 1 Sheung Wo Che Road, Sha Tin, New Territories; (v) the Islands District Office, 20th Floor, Harbour Building, 38 Pier Road, Central, Hong Kong; (vi) the Islands District Office, Mui Wo Sub-office, Ground Floor, Mui Wo Government Offices, 2 Ngan Kwong Wan Road, Mui Wo, Lantau Island; and (vii) the Islands District Office, Tung Chung Sub-office, 1st Floor, Tung Chung Post Office Building, 6 Mei Tung Street, Tung Chung, Lantau Island. In accordance with section 6(1) of the Ordinance, any person may make representation to the Board in respect of any of the amendments. The representation should be made in writing to the Secretary, Town Planning Board, 15th Floor, North Point Government Offices, 333 Java Road, North Point, Hong Kong not later than 12 August 2009. In accordance with section 6(2) of the Ordinance, a representation shall indicate :- - 2 - (a) the particular matter in any of the amendments to which the representation relates; (b) the nature of and reasons for the representation; and (c) the amendments (if any) proposed to the draft plan. Any representation made to the Board will be available for public inspection under section 6(4) of the Ordinance until the CE in C has made a decision in respect of the draft plan in question under section 9. Any person who intends to make representation is advised to read the “Town Planning Board Guidelines on Submission and Publication of Representations, Comments on Representations and Further Representations under the Town Planning Ordinance” for details. The Guidelines and the sample submission form are available at locations (i) to (iii) above and the Board’s website (http://www.info.gov.hk/tpb/). Copies of the draft Chek Lap Kok Outline Zoning Plan No. S/I-CLK/11 incorporating the amendments are available on payment of a fee at the Survey and Mapping Office, Map Publications Centre (Hong Kong), 23rd Floor, North Point Government Offices, 333 Java Road, North Point, Hong Kong, and the Survey and Mapping Office, Map Publications Centre (Kowloon), Ground Floor, 382 Nathan Road, Kowloon. The electronic version of the plan can be viewed at the Board’s website. Statement on Personal Data The personal data submitted to the Board in any representation will be used by the Secretary of the Board and Government departments for the following purposes :- (a) the processing of the representation which includes making available the name of the person making the representation (hereafter known as “representer”) for public inspection when making available the representation for public inspection; and (b) facilitating communication between the “representer” and the Secretary of the Board/Government departments in accordance with the provisions of the Ordinance and the relevant Town Planning Board Guidelines. - 3 - SCHEDULE OF AMENDMENTS TO THE APPROVED CHEK LAP KOK OUTLINE ZONING PLAN NO. S/I-CLK/10 MADE BY THE TOWN PLANNING BOARD UNDER THE TOWN PLANNING ORDINANCE (Chapter 131) I. Amendments to Matters shown on the Plan Item A1 – Designating part of the extension area at the northeastern water of Hong Kong International Airport as “Other Specified Uses” (“OU”) annotated “Boundary Crossing Facilities” and stipulating building height restrictions for this zone. Item A2 – Designating the extension area to the northeast of AsiaWorld-Expo as “OU” annotated “Sea Rescue Station” and stipulating building height restriction for this zone. Item A3 – Designating part of the extension area to the south of CNAC Tower as “OU” annotated “Highways Maintenance Area” and stipulating building height restriction for this zone. Item A4 – Designating part of the extension area to the north-east of the proposed Boundary Crossing Facilities as “OU” annotated “Ventilation Building” and stipulating building height restriction for this zone. Item A5 – Designating part of the extension area to the east of the proposed Boundary Crossing Facilities as “OU” annotated “Satellite Control Building” and stipulating building height restriction for this zone. Item A6 – Designating two strips of extension area near Dragonair Tower as “OU” annotated “Amenity Area”. Item A7 – Designating two strips of extension area along the eastern shore of Hong Kong International Airport as areas shown as ‘Road’. Item A8 – Designating part of the extension area abutting the eastern boundary of the proposed Boundary Crossing Facilities as an area shown as ‘Road’. Item B1 – Rezoning a strip of land to the south of CNAC Tower at the eastern shore of Hong Kong International Airport from “Coastal Protection Area” (“CPA”) to “OU” annotated “Highways Maintenance Area” and stipulating building height restriction for this zone. Item B2 – Rezoning three strips of land to the south and north-east of CNAC Tower and Dragonair Tower at the eastern shore of Hong Kong International Airport from “CPA” to “OU” annotated “Amenity Area”. Item B3 – Rezoning three strips of land at the eastern shore of Hong Kong International Airport from “CPA” to area shown as ‘Road’. - 4 - Item C – Rezoning an area at the eastern shore of Hong Kong International Airport from “Commercial” to an area shown as ‘Road’. II. Amendments to the Notes of the Plan (a) Incorporation of a new set of Notes for the “OU” annotated “Boundary Crossing Facilities”. (b) Incorporation of a new set of Notes for the “OU” annotated “Highways Maintenance Area”. (c) Incorporation of a new set of Notes for the “OU” annotated “Amenity Area”. (d) Incorporation of a new set of Notes for the “OU” annotated “Ventilation Building”. (e) Incorporation of a new set of Notes for the “OU” annotated “Satellite Control Building”. (f) Incorporation of a new set of Notes for the “OU” annotated “Sea Rescue Station”. (g) Deletion of the set of Notes for the “CPA” zone. (h) Revision to the covering Notes to reflect the deletion of the “CPA” zone. Town Planning Board 12 June 2009 Appendix III DRAFT CHEK LAP KOK OUTLINE ZONING PLAN NO. S/I-CLK/11 (Being a Draft Plan for the Purposes of the Town Planning Ordinance) NOTES (N.B. These form part of the Plan) (1) These Notes show the uses or developments on land falling within the boundaries of the Plan which are always permitted and which may be permitted by the Town Planning Board, with or without conditions, on application.
Recommended publications
  • Abbreviations
    ABBREVIATIONS AA Airport Authority Hong Kong ACC Apron Control Centre ACP Airport Core Programme ACS Access Control System ADSCOM Airport Development Steering Committee AIP Aeronautical Information Programme AMD/AA Airport Management Director / Airport Authority Hong Kong AOCC Airport Operation Control Centre AOD Airport Opening Date AODB Airport Operational Datebase AOR Airport Operational Readiness APM Automated People Mover AR Airport Railway ARA Airport Restricted Area ASP Airport Security Programme AVSECO Aviation Security Company Limited BAR Board of Airline Representatives in Hong Kong BHS Baggage Handling System BSM Baggage Source Message BSS Box Storage System CAD Civil Aviation Department - Page 1 of 6 - CC(CLK) Chief Co-ordinator (Chek Lap Kok) CCTV Closed Circuit Television CE Chief Executive CEO/AA Chief Executive Officer / Airport Authority Hong Kong Chairman/ Chairman / Airport Development Steering Committee ADSCOM Chairman/AA Chairman / Airport Authority Hong Kong CHS Cargo Handling System CLK Chek Lap Kok COSAC Community System for Air Cargo CPCS Cathy Pacific Catering Services (HK) Limited CPM/NAPCO Consultant Project Manager / New Airport Projects Co- ordination Office CROW CLK Ramp Operations Working Group CS Chief Secretary for Administration CSE Centre for Software Engineering Limited CSS Container Storage System CUTE Common User Terminal Equipment D/NAPCO Director / New Airport Projects Co-ordination Office DAC Door Access Control DCA Director of Civil Aviation DCEO/AA Deputy Chief Executive Officer / Airport Authority
    [Show full text]
  • A New Airport for London
    November 2011 A new airport for London Part 2 – The economic benefits of a new hub airport Greater London Authority November 2011 Published by Greater London Authority City Hall The Queen’s Walk More London London SE1 2AA www.london.gov.uk enquiries 020 7983 4100 minicom 020 7983 4458 Cover photograph © BAA Limited Contents 3 Mayor’s foreword 4 Executive summary 6 Introduction 20 1: The London economy 22 2: The benefits of aviation 26 3: The implications for airport capacity requirements 48 4: Requirements of an efficient national hub airport 64 5: The limitations of Heathrow 68 6: Future hub airport demand 78 7: Hub airport benefits 92 8: Meeting the Government’s growth agenda 98 9: Key findings 101 Appendices A: ‘Hubbing’ at Heathrow 105 B: Forecasting methodology 113 C: Other cities’ strategies 115 Footnotes and references 125 4 Mayor’s foreword Next summer, the eyes of the world will be on London as the setting for a contest on an epic scale. In many ways, London is involved in a less well known but nonetheless epic contest of its own – one for connectivity with the rest of the world. We cannot afford to lose. A host of up-and-coming competitors want to beat London at the things we have until now done best. By emulating and then leap-frogging London in terms of its aviation links, they hope to usurp us in terms of all the things aviation has enabled: a dynamic economy, a vibrant, international population and the cornucopia of cultural riches this brings with it, and much more besides.
    [Show full text]
  • Expenditure and Claims Relating to the Airport Core Programme Projects
    For information Legislative Council Panel on Planning, Lands and Works Expenditure and claims relating to the Airport Core Programme projects Purpose This paper is to inform Members of the present position on the expenditure of the Airport Core Programme (ACP) projects and settlement of claims against ACP construction contracts. ACP expenditures 2. The Finance Committee had up to 15 June 2001 approved a total of $49,527 million for government ACP projects on a net basis. The expenditure is $47,562 million or 96% of the approved total. A summary of the expenditure situation is shown in Table 1. 3. The Finance Committee has approved an equity commitment of $36,648 million for the new airport. As at 15 June 2001, the Airport Authority (AA) had expended $49,040 million. Expenditure in excess of the approved equity commitment is funded by the AA’s borrowing programme. 4. The Finance Committee has approved an equity commitment of $23,700 million for the Mass Transit Railway Corporation (MTRC) (now MTR Corporation Limited) to construct the Airport Railway. As at 15 June 2001, the MTRC had expended $34,563 million. Expenditure in excess of the approved equity commitment is funded by the MTRC’s borrowing programme. Claims against ACP construction contracts 5. The government, the AA and the MTRC have received a total of 26 948 claims against ACP construction contracts. Of these, 24 694 claims at a cost of $9,860 million had been resolved against an original claim amount of $31,335 million. For the 2 254 unresolved claims, the estimated contingent liability is $596 million against a claim amount of $3,614 million.
    [Show full text]
  • Development of Tung Chung New Town in Hong Kong H. Wang, W
    Transactions on the Built Environment vol 33, © 1998 WIT Press, www.witpress.com, ISSN 1743-3509 Development of Tung Chung New Town in Hong Kong H. Wang, W. Wong Department of Civil and Structural Engineering, The Hong Kong Polytechnic University, Hung Horn, Kowloon, Hong Kong Email: [email protected] Email: [email protected]. hk Abstract Hong Kong's new airport at Chek Lap Kok is scheduled to open on July 6, 1998. At present, construction of all major projects is either at the last stage or in completion. Tung Chung New Town, one of the Airport Core Programme (ACP), has been initially set up for housing 216,000 people by 2006 and providing living area for servicing staff of the new airport. Based on the case study on the development of Tung Chung New Town, this paper illustrates the relationship between transport system and land use development. In the paper, referring to many survey data and research results, the development of Tung Chung New Town is shown to be essential due to the relocation of the Hong Kong Airport. On the other hand, comparing with other new towns in Hong Kong, Tung Chung New Town is provided with better transport system links that minimize the travel time and improve the comfort and accessibility to other parts of the territory. This makes Tung Chung New Town a more attractive new town for people to reside. 1 Introduction In the past twenty years, the Hong Kong International Airport at Kai Tak has commenced a series of improvement to cater for the continuous growth in passengers and cargo.
    [Show full text]
  • Dispute Resolution Boards and the Hong Kong Airport: an Exciting Example of Commercial Dispute Resolution in Action
    Dispute Resolution Boards and the Hong Kong Airport: An Exciting Example of Commercial Dispute Resolution in Action By Robert K. Wrede, JD, LLM Historical Setting Since the British returned Hong Kong to Chinese sovereignty in July 1997, Hong Kong has been a Special Administrative Region of the Peoples' Republic of China. Despite its return to Chinese sovereignty, Hong Kong remains, distinctly British in tone, but Asian in temperament, and its fiercely independent inhabitants continue to vigorously defend Hong Kong's autonomy under the characteristically ambiguous Chinese policy slogan: "One country, two systems." This vibrant, mountainous, densely populated former British colony is but one third the area of Rhode Island. Despite its diminutive size, however, Hong Kong has long been one of Asia's greatest trading, shipping and banking centers. Under its century-and-a-half of British rule, Hong Kong functioned, and now continues to function, both as a major trade conduit between China and the rest of the world, and as a source of its own products and economic resources. Hong Kong's British-dominated recent history, cramped geographical confines, prime coastal location, mountainous terrain, vibrant economy, proximity to mainland China and large, energetic, multicultural population have combined to create both exceptional challenges and exceptional opportunities for Hong Kong's economic, political and social development, and its role in the new global economy and strong economic and political influence on the Peoples' Republic. Among the many results of Hong Kong's growth and thriving economy has been a burgeoning construction industry, involving both numerous large-scale private projects, and many major publicly funded housing, transportation, cultural and other infrastructure projects.
    [Show full text]
  • Driving Services Section
    DRIVING SERVICES SECTION Taxi Written Test - Part B (Location Question Booklet) Note: This pamphlet is for reference only and has no legal authority. The Driving Services Section of Transport Department may amend any part of its contents at any time as required without giving any notice. Location (Que stion) Place (Answer) Location (Question) Place (Answer) 1. Aberdeen Centre Nam Ning Street 19. Dah Sing Financial Wan Chai Centre 2. Allied Kajima Building Wan Chai 20. Duke of Windsor Social Wan Chai Service Building 3. Argyle Centre Nathan Road 21. East Ocean Centre Tsim Sha Tsui 4. Houston Centre Mody Road 22. Eastern Harbour Centre Quarry Bay 5. Cable TV Tower Tsuen Wan 23. Energy Plaza Tsim Sha Tsui 6. Caroline Centre Ca useway Bay 24. Entertainment Building Central 7. C.C. Wu Building Wan Chai 25. Eton Tower Causeway Bay 8. Central Building Pedder Street 26. Fo Tan Railway House Lok King Street 9. Cheung Kong Center Central 27. Fortress Tower King's Road 10. China Hong Kong City Tsim Sha Tsui 28. Ginza Square Yau Ma Tei 11. China Overseas Wan Chai 29. Grand Millennium Plaza Sheung Wan Building 12. Chinachem Exchange Quarry Bay 30. Hilton Plaza Sha Tin Square 13. Chow Tai Fook Centre Mong Kok 31. HKPC Buil ding Kowloon Tong 14. Prince ’s Building Chater Road 32. i Square Tsim Sha Tsui 15. Clothing Industry Lai King Hill Road 33. Kowloonbay Trademart Drive Training Authority Lai International Trade & King Training Centre Exhibition Centre 16. CNT Tower Wan Chai 34. Hong Kong Plaza Sai Wan 17. Concordia Plaza Tsim Sha Tsui 35.
    [Show full text]
  • Designing Victoria Harbour: Integrating, Improving, and Facilitating Marine Activities
    Designing Victoria Harbour: Integrating, Improving, and Facilitating Marine Activities By: Brian Berard, Jarrad Fallon, Santiago Lora, Alexander Muir, Eric Rosendahl, Lucas Scotta, Alexander Wong, Becky Yang CXP-1006 Designing Victoria Harbour: Integrating, Improving, and Facilitating Marine Activities An Interactive Qualifying Project Report Submitted to the Faculty of WORCESTER POLYTECHNIC INSTITUTE in partial fulfilment of the requirements for the Degree of Bachelor of Science In cooperation with Designing Hong Kong, Ltd., Hong Kong Submitted on March 5, 2010 Sponsoring Agencies: Designing Hong Kong, Ltd. Harbour Business Forum On-Site Liaison: Paul Zimmerman, Convener of Designing Hong Kong Harbour District Submitted by: Brian Berard Eric Rosendahl Jarrad Fallon Lucas Scotta Santiago Lora Alexander Wong Alexander Muir Becky Yang Submitted to: Project Advisor: Creighton Peet, WPI Professor Project Co-advisor: Andrew Klein, WPI Assistant Professor Project Co-advisor: Kent Rissmiller, WPI Professor Abstract Victoria Harbour is one of Hong Kong‟s greatest assets; however, the balance between recreational and commercial uses of the harbour favours commercial uses. Our report, prepared for Designing Hong Kong Ltd., examines this imbalance from the marine perspective. We audited the 50km of waterfront twice and conducted interviews with major stakeholders to assess necessary improvements to land/water interfaces and to provide recommendations on improvements to the land/water interfaces with the goal of making Victoria Harbour a truly “living” harbour. ii Acknowledgements Our team would like to thank the many people that helped us over the course of this project. First, we would like to thank our sponsor, Paul Zimmerman, for his help and dedication throughout our project and for providing all of the resources and contacts that we required.
    [Show full text]
  • Skycity Golf Course PP V4.Doc Development of March 2005 Skycity Golf Course
    for Excel Engineering & Technology (International) Limited in association with Urbis Limited Philip So & Associated Limited Prudent Design Limited Development of SkyCity Golf Course Airport Management Services Project Profile 29 March 2005 Limited Development of March 2005 SkyCity Golf Course CONTENTS 1. BASIC INFORMATION 1 1.1 Project Title 1 1.2 Purpose and Nature of the Project 1 1.3 Name of Project Proponent 1 1.4 Location and Scale of Project and History of Site 1 1.5 Number and Type of Designated Project to be Covered by the Project Profile 2 1.6 Name and Telephone Number of Contact Person 2 1.7 Summary of Key Environmental Protection Features of SkyCity Golf Course 2 2. OUTLINE PLANNNING AND IMPLEMENTATION PROGRAMME 11 3. POSSIBLE IMPACT ON THE ENVIRONMENT 13 3.1 Summary 13 3.2 Air Quality Impact 13 3.3 Noise Impact 13 3.4 Water Quality Impact 13 3.5 Waste Impact 13 3.6 Ecological Impact 13 3.7 Fisheries Impact 13 3.8 Landscape and Visual Impact 13 3.9 Cultural Heritage Impact 13 4. MAJOR ELEMENTS OF THE SURROUNDING ENVIRONMENT 13 5. ENVIRONMENTAL PROTECTION MEASURES 13 5.1 Summary 13 5.2 Air Quality 13 5.3 Noise 13 5.4 Water Quality 13 5.5 Waste Management 13 5.6 Ecology and Fisheries 13 5.7 Landscape and Visual 13 5.8 Cultural Heritage 13 6. ENVIRONMENTAL MONITORING AND AUDIT 13 6.1 Need for EM&A 13 6.2 Baseline Water Quality Monitoring 13 6.3 Construction Impact Water Quality Monitoring & Audit 13 6.4 Operation Impact Water Quality Monitoring & Audit 13 7.
    [Show full text]
  • Information Paper on Expenditure Relating to Airport Core Programme
    LC Paper No. CB(1)1980/01-02 For information Legislative Council Panel on Planning, Lands and Works Expenditure relating to Airport Core Programme projects Purpose This paper informs Members of the present position on the expenditure of the Airport Core Programme (ACP) projects in response to the concerns raised by PWSC Members when they considered paper PWSC(2002- 03)11 on 354CL “West Kowloon Reclamation – consultants’ fees and site investigation” at its meeting on 17 April 2002. ACP expenditure 2. The Finance Committee had up to 10 May 2002 approved a total of $49,644 million for government ACP projects on a net basis. The expenditure is $47,732 million or 96% of the approved total. A summary of the expenditure situation is shown in Table 1. The latest change to the approved funding occurred on 10 May 2002 when the Finance Committee approved an increase in funding for item 354CL from $250 million by $37 million to $287 million in money-of-the-day prices. According to information now available, we do not see the need to seek additional funding for any other government ACP projects. 3. The Finance Committee has approved an equity commitment of $36,648 million for the new airport. As at 10 May 2002, the Airport Authority (AA) had expended $49,345 million. Expenditure in excess of the approved equity commitment is funded by the AA’s borrowing programme. 4. The Finance Committee has approved an equity commitment of $23,700 million for the Mass Transit Railway Corporation (MTRC) (now MTR Corporation Limited) to construct the Airport Railway.
    [Show full text]
  • Landac First Term Work Report
    First-term Work Report Lantau Development Advisory Committee January 2016 Lantau Development Advisory Committee First-term Work Report Foreword Lantau in Evolution 1 Chapter 1 Brief Report on the Work of LanDAC 3 Chapter 2 Vision, Strategic Positioning and Planning Principles 5 2.1 Vision 2.2 Strategic Positioning 2.3 Major Planning Principles Chapter 3 Major Proposals 8 3.1 Spatial Planning and Land Use 3.2 Conservation 3.3 Strategic Traffic and Transport Infrastructure 3.4 Recreation and Tourism 3.5 Social Development Chapter 4 Short-term Work 26 Chapter 5 Looking Ahead 28 Appendix 30 Foreword Lantau in Evolution Lantau is the largest island in Hong Kong with a long history: existing important heritage includes the Stone Circle at Fan Lau and the Rock Carving at Shek Pik; rich antiquities unearthed in village settlements; forts and obelisks in north and south Lantau, etc. Before the 20th century, Lantau residents were mainly engaged in fishery, farming and salt-panning industries. Older generations of Hong Kong people may still remember the reliance on ferry to get to Mui Wo, Tung Chung, Sha Lo Wan and Tai O before the completion of bridges and expressways to the Chek Lap Kok Airport. Mui Wo was the then main gateway to Lantau, busy and crowded during holidays. Places in south Lantau, including Pui O, Cheung Sha and Tong Fuk, were also popular attractions, and the Po Lin Monastery in Ngong Ping always attracted a huge crowd. The selection of Chek Lap Kok as the site for the airport was an epoch-making decision, and the subsequent implementation of the Airport Core Programme in north Lantau in the early 1990s was a watershed in the evolution of Lantau.
    [Show full text]
  • Directorate Posts Created for the Airport Core Programme and Directorate Posts Created Or Planned to Be Created for the 10 Major Infrastructure Projects
    Legislative Council Secretariat FS20/08-09 FACT SHEET Directorate posts created for the Airport Core Programme and directorate posts created or planned to be created for the 10 Major Infrastructure Projects 1. Introduction 1.1 At the request of the Panel on Transport at its meeting on 19 December 2008, this fact sheet provides information on the directorate posts created for the implementation of the Airport Core Programme (ACP) projects in the 1990s and the directorate posts created or planned to be created for the implementation of the 10 Major Infrastructure Projects that were announced in the 2007-2008 Policy Address. 1.2 The Government introduced the Port and Airport Development Strategy (PADS) in 1989 to meet the future port and airport infrastructure requirements of Hong Kong. Projects related to PADS were grouped into the port-related projects and the ACP projects. The latter group covered the following 10 interlinked projects: (a) Chek Lap Kok Airport; (b) Airport Railway; (c) North Lantau Expressway; (d) Lantau Link; (e) Route 3; (f) Tung Chung Development; (g) West Kowloon Reclamation; (h) West Kowloon Expressway; (i) Western Harbour Crossing; and (j) Central Reclamation. Research and Library Services Division page 1 Legislative Council Secretariat FS20/08-09 1.3 In the 2007-2008 Policy Address, the Chief Executive announced that the Government would undertake the 10 Major Infrastructure Projects to improve the transportation system and enhance the economic development of Hong Kong. The 10 Major Infrastructure Projects consist
    [Show full text]
  • L'agrandissement De La Métropole Par L'infrastructure, L'aéroport XXL De
    L’agrandissement de la métropole par l’infrastructure, l’aéroport XXL de Hong Kong Nathalie Roseau To cite this version: Nathalie Roseau. L’agrandissement de la métropole par l’infrastructure, l’aéroport XXL de Hong Kong. Kostantinos Chatzis, Gilles Jeannot, Valérie November, Pascal Ughetto. Les métamorphoses de l’infrastructure, entre béton et numérique, Peter Lang International, pp.71-98, 2017. hal-01672368 HAL Id: hal-01672368 https://hal.archives-ouvertes.fr/hal-01672368 Submitted on 12 Feb 2018 HAL is a multi-disciplinary open access L’archive ouverte pluridisciplinaire HAL, est archive for the deposit and dissemination of sci- destinée au dépôt et à la diffusion de documents entific research documents, whether they are pub- scientifiques de niveau recherche, publiés ou non, lished or not. The documents may come from émanant des établissements d’enseignement et de teaching and research institutions in France or recherche français ou étrangers, des laboratoires abroad, or from public or private research centers. publics ou privés. Publié dans Konstantinos Chatzis, Gilles Jeannot, Valérie November, Pascal Ughetto (Eds), Les metamorphoses des infrastructures, Entre béton et numérique, P.I.E. Peter Lang, Bruxelles, pp.67-94. L’AGRANDISSEMENT DE LA MÉTROPOLE PAR L’INFRASTRUCTURE L’aéroport XXL de Hong Kong Nathalie ROSEAU Vilipendée comme lieu critique des failles de nos sociétés urbaines, l’infrastructure est aussi brandie comme rempart d’un urbanisme volontaire. Elle occupe un rôle prégnant dans les projets contemporains d’agrandissement métropolitain comme en témoigne l’actualité du Grand Paris mais aussi celle de nombre de métropoles XXL (Lorrain, 2011 ; Roseau, 2012). Comment concrétise-t-elle ce processus ? Et que dit ce mouvement de sa nature propre ? Pour comprendre ce méta-objet, sa construction et sa mutation, nous nous intéresserons au tournant qu’a connu à partir des années 90, l’infrastructure aéroportuaire de Hong Kong dans le contexte d’une transformation profonde de la cité- État du sud-est du delta de la Rivière des Perles.
    [Show full text]