FLOOD SITUATION SUMMARY PART - I: LEVEL FORECAST Numbers of S.No
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Government of Jharkhand State Transport Department Ranchi
GOVERNMENT OF JHARKHAND STATE TRANSPORT DEPARTMENT RANCHI From: Date :24-Feb-2020 District Transport Officer Bokaro To: JANKI MAHTO F/H : GOBARDHAN MAHTO NARAYANPUR BHANDRA NAWADIH BHANDRA NAWADIH Sub: Tax demand notice for motor vehicle no : JH09AG6689 It has been observed that due Tax/es along with penalty, if any, in terms of the provisions of the under section 5/7/21/23 of Jharkhand Motor Vehicles Taxation Act 2001 and under rule 4/5 of Jharkhand Motor Vehicles Taxation Rules 2001 has not been paid by you after 15-Oct-2018 against the aforementioned vehicle. You are, therefore, hereby directed to pay the Government dues forthwith, i. e. within a week of this notice date, failing which appropriate punitive measures will be initiated from this end. Please note that actual assessment of due tax/es may vary depending on the date of actual payment of such dues and subject to verification of relevant documents. In case if such tax/es payments have been made in the meantime against the concerned vehicle, then proof of such payment is to be submitted within the aforementioned period. This, however, does not apply to any vehicle, tax/es in respect of which is being paid or not being paid as a result of any decision /order of any Court of Law. Treat this as URGENT. District Transport Officer Bokaro NOTE: Computer generated notice therefore requires no signature. To Pay Your's Tax ,Please visit : https://vahan.parivahan.gov.in/vahanservice From: Date :24-Feb-2020 District Transport Officer Bokaro To: HIRA LAL MAHTO F/H : S/O GOBARDHAN MAHTO SUNDAY BAZAR BERMO BERMO Sub: Tax demand notice for motor vehicle no : JH09AM7971 It has been observed that due Tax/es along with penalty, if any, in terms of the provisions of the under section 5/7/21/23 of Jharkhand Motor Vehicles Taxation Act 2001 and under rule 4/5 of Jharkhand Motor Vehicles Taxation Rules 2001 has not been paid by you after 13-Feb-2019 against the aforementioned vehicle. -
Block) Mobile No RAKESH KUMAR (71036) JHARKHAND (Garhwa
Volunteer Name with Reg No State (District) (Block) Mobile no RAKESH KUMAR (71036) JHARKHAND (Garhwa) (Majhiaon) 7050869391 AMIT KUMAR YADAW (71788) JHARKHAND (Garhwa) (Nagar Untari) 0000000000 AMIRA KUMARI (70713) JHARKHAND (Garhwa) (Danda) 7061949712 JITENDRA KUMAR GUPTA (69517) JHARKHAND (Garhwa) (Sagma) 9546818206 HARI SHANKAR PAL (69516) JHARKHAND (Garhwa) (Ramna) 9905763896 RENU KUMARI (69513) JHARKHAND (Garhwa) (Dhurki) 8252081219 VANDANA DEVI (69510) JHARKHAND (Garhwa) (Meral) 840987061 PRIYANKA KUMARI (69509) JHARKHAND (Garhwa) (Bardiha) 8969061575 RAVIKANT PRASAD GUPTA (69496) JHARKHAND (Garhwa) (Chiniya) 9905448984 RAKESH TIWARI (71431) JHARKHAND (Garhwa) (Ramkanda) 9934009456 CHANDAN KUMAR RAM (72016) JHARKHAND (Garhwa) (Ramkanda) 6207157968 NEHA NISHE TIGGA (71038) JHARKHAND (Garhwa) (Bhandariya) 7061187175 SATENDRA KUMAR YADAV (71186) JHARKHAND (Garhwa) (Sadar) 8863853368 BHUSHBU KUMARI (69501) JHARKHAND (Garhwa) (Kandi) 9155478910 DURGA KUMARI (69499) JHARKHAND (Garhwa) (Dandai) 7070518032 CHATURGUN SINGH (69498) JHARKHAND (Garhwa) (Ranka) 7489917090 KUMARI SABITA SINGH (69766) JHARKHAND (Garhwa) (Chiniya) 8252202210 RAM AWATAR SHARMA (69497) JHARKHAND (Garhwa) (Kandi) 9939333182 RAHUL KUMAR PAL (69495) JHARKHAND (Garhwa) (Sadar) 9155182855 JIYA SHALIYA TIGGA (69502) JHARKHAND (Garhwa) (Bhandariya) 7323001422 CHANDAN KUMAR PAL (69569) JHARKHAND (Garhwa) (Ramna) 9608927730 MANAS KISHOR MEHTA (73595) JHARKHAND (Garhwa) (Majhiaon) 8002796352 OMPRAKASH YADAV (67380) JHARKHAND (Garhwa) (Bhavnathpur) 9504289861 NAGENDRA RAM (73338) -
Annual Report 2 0 1 2 - 1 3
Annual Report 2 0 1 2 - 1 3 Ministry of Power Government of India Shram Shakti Bhawan, Rafi Marg, New Delhi-110 001 Website : www.powermin.nic.in Shri Pranab Mukherjee, Hon’ble President of India with Shri Jyotiraditya M. Scindia, Hon’ble Union Minister of State for Power (Independent Charge) at the National Energy Conservation Day function CONTENTS Sl. No. Chapter Page No. (s) 1. Performance Highlights 5 2. Organisational Set Up and Functions of the Ministry of Power 9 3. Capacity Addition Programme in the XIIth Plan 11 4. Generation & Power Supply Position 23 5. Status of Ultra Mega Power Projects 35 6. Transmission 37 7. Status of Power Sector Reforms 41 8. Rural Electrification Programme 43 9. Re-Structured Accelerated Power Development and Reforms Programme (R-APDRP) 45 10. Energy Conservation 49 11. Renovation and Modernisation of Thermal Power Stations 53 12. Private Sector Participation in Power Sector 57 13. International Cooperation 59 14. Power Development Activities in North-Eastern Region 67 15. Central Electricity Authority 75 16. Central Electricity Regulatory Commission (CERC) 79 17. Appellate Tribunal for Electricity (APTEL) 83 Public Sector Undertakings: 18 NTPC Limited 85 19. NHPC Limited 105 20. Power Grid Corporation of India Ltd. (PGCIL) 111 21. Power Finance Corporation Ltd. (PFC) 115 22. Rural Electrification Corporation Ltd. (REC) 125 23. North Eastern Electric Power Corporation Limited (NEEPCO) 133 Joint Venture Corporations : 24. SJVN Limited (SJVNL) 135 25. THDC India Limited (THDCIL) 139 Statutory Bodies : 26. Damodar Valley Corporation (DVC) 143 27. Bhakra Beas Management Board (BBMB) 149 28. Bureau of Energy Efficiency (BEE) 155 Autonomous Bodies : 29. -
Access Jharkhand-Obj07-04-2021-E-Book
Index 01. Jharkhand Special Branch Constable (Close 16. JSSC Assistant Competitive Examination Cadre) Competitive Exam 01-09-2019 28.06.2015. 02. J.S.S.C. - Jharkhand Excise Constable Exam 17. Jharkhand Forest Guard Appointment Com- 04-08-2019 petitive (Prelims) Exam - 24.05.2015. 03. SSC IS (CKHT)-2017, Intermediate Level (For 18. Jharkhand Staff Selection Commission the post of Hindi Typing Noncommittee in Com- organized Women Supervisor competitive puter Knowledge and Computer) Joint Competi- Exam - 2014. tive Exam 19. Fifth Combined Civil Service Prelims Compet- 04. JUVNL Office Assistent Exam 10-03-2017 itive Exam - 15.12.2013. 05. J.S.S.C. - Post Graduate Exam 19-02-2017 20. Jharkhand Joint Secretariat Assistant (Mains) 06. J.S.S.C Amin Civil Resional Investigator Exam Examination 16.12.2012. 08-01-2017 21. State High School Teacher Appointment 07. JPSC Prelims Paper II (18.12.2016) Examination 29.08.2012. 08. JPSC Prelims Paper-I (Jharkhand Related 22. Jharkhand Limited Departmental Exam- Questions Only on 18.12.2016) 2012. 09. Combined Graduation Standard Competitive 23. Jharkhand Joint Secretariat Assistant Exam- (Prelims) Examinations 21.08.2016 2012. 10. Kakshpal appointment (mains) Competitive 24. Fourth Combined Civil Service (Prelims) Examination 10.07.2016. Competitive Examination - 2010. 11. Jharkhand Forest guard appointment (mains) 25. Government High School Teacher Appoint- Competitive Examination 16.05.2016. ment Exam - 2009. 12. JSSC Kakshpal Competitive (Prelims) Exam - 26. Primary Teacher Appointment Exam - 2008. 20.03.2016. 27. Third Combined Civil Service Prelims 13. Jharkhand Police Competitive Examination Competitive Exam - 2008. 30.01.2016. 28. JPSC Subsidiary Examination - 2007. -
JHARKHAND - NOTIFIED PROTECTION OFFICERS (W.E.F
JHARKHAND - NOTIFIED PROTECTION OFFICERS (w.e.f. 11.06.2007) 1. Ms. Hema Choudhary, CDPO, Integrated Child Development Services, Lapung, P.O. Lapung, Ranchi - 835244, Jharkhand. Ph. 9934172154 2. Smt. Abha Choudhary, CDPO, Integrated Child Development Services, Ranchi Sadar, Kanke Road, Apar Shivpuri, Ranchi - 834008, Jhharkhand. Ph. 9431578415 3. Ms. Pushpa Tigga, CDPO, Integrated Child Development Services, Angara, P.O. Angara, Ranchi – 835103, Jharkhand. Ph. 9431118906 4. Ms. Renu Ravi, CDPO, Integrated Child Development Services, Chanho, P.O. Chanho, Ranchi - 835239, Jharkhand. Ph. 9431701597 5. Ms. Jyoti Kumari Prasad CDPO, Integrated Child Development Services Mandar, P.O. Mandar, Ranchi - 835214. Jharkhand Ph. 9130147188 6. Ms. Neeta Kumari Chouhan, ICDPO, Integrated Child Development Services, Khijari, P.O. Namkum, Ranchi – 834010, Jharkhand. Ph. 9431465643 7. Ms. Sudha Sinha, CDPO, Integrated Child Development Services, Bero, P.O. Berro, Ranchi – 835202, Jharkhand. Ph. 9431386449 8. Ms. Nirupama Shankar, CDPO, Integrated Child Development Services, Ratu, P.O. Ratu, Ranchi - 835222, Jharkhand. 9. CDPO, Integrated Child Development Services, Bundu, P.O. Bundu, Ranchi - 835204, Jhharkhand. 10. Ms. Uma Sinha, CDPO, Integrated Child Development Services, Tamar, P.O. Tamar, Ranchi – 835225, Jhharkhand. Ph. 9431312338 11. Ms. Surbhi Singh, CDPO, Integrated Child Development Services, Ormanjhi, P.O. Ormanjhi, Ranchi - 835219, Jharkhand. Ph. 9431165293 12. CDPO, Integrated Child Development Services, Budmu, P.O. Budmu, Ranchi – 835214, Jharkhand. 13. Ms. Pooja Kumari, CDPO, Integrated Child Development Services, Kanke, P.O. Kanke, Ranchi - 834006. Jharkhand Ph. 9431772461 14. Ms. Kanak Kumari Tirki, CDPO, Integrated Child Development Services, Silli, P.O. Silli, Ranchi - 835103, Jharkhand. Ph. 9431325767 15. Ms. Lilavati Singh, CDPO, Integrated Child Development Services, Sonahatu, Post – Sonahatu, Ranchi - 835243, Jharkhand. -
Model School Approved in 2011-12 Sl.No. District Block 1 Latehar Manika
Model School Approved in 2011-12 Sl.No. District Block 1 Latehar Manika(Palamou Distict in MDM List) 2 Chatra Kunda 3 Chatra Lawlaung 4 Hazaribagh Barkatha 5 Hazaribagh Chauparan 6 Giridih Tisri 7 Giridih Gawan 8 Giridih Bagodar 9 Giridih Gandey 10 Giridih Birni 11 Giridih Dewri 12 Giridih Dhanwar 13 Giridih Giridih (Sadar) 14 Giridih Bengabad 15 Giridih Dumri (Balthariya) 16 Giridih Pirtanr 17 Sahebganj Borio 18 Sahebganj Barhet 19 Sahebganj Mandro 20 Sahebganj Taljhari 21 Pakur Littipara 22 Pakur Pakur 23 Dumka Jarmundi 24 Dumka Raneshwar 25 Dumka Shikaripara 26 Dumka Masaliya 27 Dumka Sariyahat 28 Dumka Ramgarh 29 Dhanbad Tundi 30 Ranchi Bero 31 Khunti Erki (Tamar II) 32 Khunti Karra 33 Khunti Khunti 34 Lohardaga Kisko 35 Lohardaga Bhandra 36 Simdega Jaldega 37 W. Singhbhum Manoharpur 38 Saraikela Ichagarh 39 Saraikela Nimdih (West Singhbhum Dist. in MDM List) 40 E. Singhbhum Dumaria Model School Approved in 2013-14 Sl.No. District Block 1 Dhanbad Govindpur 2 E. Singhbhum Ghatsila 3 E. Singhbhum Dhalbhumgarh 4 E. Singhbhum Chakuliya 5 E. Singhbhum Bahragora 6 E. Singhbhum Patmada 7 Godda Poreyahat 8 Godda Godda 9 Godda Sundarpahari 10 Godda Boarijore 11 Gumla Bishunpur 12 Gumla Ghaghra 13 Gumla Bharno 14 Gumla Kamdara 15 Gumla Basia 16 Gumla Gumla 17 Gumla Raidih 18 Gumla Palkot 19 Hazaribagh Ichak 20 Hazaribagh Barhi 21 Hazaribagh Bishnugarh 22 Koderma Markaccho 23 Koderma Jainagar 24 Koderma Koderma 25 Latehar Balumath 26 Latehar Barwadih 27 Pakur Amdapada 28 Ranchi Burhmu (Murma) 29 Ranchi Kanke (Sukurhutu) 30 Ranchi Namkum (Hudidag) 31 Ranchi Lapung (Garai) 32 Ranchi Angara (Bedwari) 33 Ranchi Mandar (Gudgudjari) 34 Ranchi Chanho (Soparam) 35 Sahebganj Patna 36 Sahebganj Raj Mahal 37 Sahebganj Udwha 38 Saraikela Kharsawan Seraikela (Paschimi singhbhum dist in MDM EBB list) 39 Saraikela Kharsawan Kharsawan (Paschimi singhbhum dist in MDM EBB list) 40 Saraikela Kharsawan Kuchai (Paschimi singhbhum dist in MDM EBB list) 41 Sim dega Simdega 42 Simdega Kurdeg 43 Simdega Kolebira 44 Simdega Bano 45 W. -
World Bank Document
PROCUREMENT PLAN (Textual Part) Project information: India- PMGSY Additional financing (P124639) Project Implementation agency: NRIDA and SRRDAs Public Disclosure Authorized Date of the Procurement Plan: 15th May 2018 Period covered by this Procurement Plan: ist 18 months Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. Public Disclosure Authorized This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Public Disclosure Authorized Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in NCP conditions, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. List only the applicable conditions required to ensure consistency with paragraph 5.4 of the Procurement Regulations. -
Block Level Forecast
METEOROLOGICAL CENTRE, RANCHI INDIA METEOROLOGICAL DEPARTMENT BLOCK LEVEL WEATHER FORECAST VALID TILL 0830 IST OF NEXT 5 DAYS AMFU, Ranchi : Districts of Central and North Eastern Plateau Zone FORECAST DISTRICTS BLOCK PARAMETERS DAY-1 DAY-2 DAY-3 DAY-4 DAY-5 17.04.21 18.04.21 19.04.21 20.04.21 21.04.21 BOKARO BOKARO Rainfall (mm) 2 0 0 0 0 Max Temperature ( deg C) 36 38 38 39 40 Min Temperature ( deg C) 25 25 23 22 24 Total cloud cover (octa) 4 3 2 0 0 Max Relative Humidity (%) 36 28 20 15 31 Min Relative Humidity (%) 9 12 11 6 6 Wind speed (kmph) 14 9 11 7 8 Wind direction (deg) 222 256 307 228 240 BOKARO BERMO Rainfall (mm) 2 0 0 0 0 Max Temperature ( deg C) 37 38 38 39 40 Min Temperature ( deg C) 25 25 23 22 24 Total cloud cover (octa) 4 3 2 0 0 Max Relative Humidity (%) 36 30 22 19 31 Min Relative Humidity (%) 9 12 11 6 6 Wind speed (kmph) 15 9 10 7 8 Wind direction (deg) 220 254 298 230 229 BOKARO CHANDANKIYARI Rainfall (mm) 2 0 0 0 0 Max Temperature ( deg C) 36 37 37 38 39 Min Temperature ( deg C) 25 24 21 22 24 Total cloud cover (octa) 3 3 2 0 0 Max Relative Humidity (%) 37 26 21 14 23 Min Relative Humidity (%) 10 12 11 7 7 Wind speed (kmph) 18 10 10 6 7 Wind direction (deg) 220 271 294 228 226 BOKARO CHANDRAPURA Rainfall (mm) 2 0 0 0 0 Max Temperature ( deg C) 36 38 38 39 40 Min Temperature ( deg C) 25 25 23 22 24 Total cloud cover (octa) 4 3 2 0 0 Max Relative Humidity (%) 36 28 20 15 31 Min Relative Humidity (%) 9 12 11 6 6 Wind speed (kmph) 14 9 11 7 8 Wind direction (deg) 222 255 306 228 239 BOKARO CHAS Rainfall (mm) 2 0 0 -
Chapter-Vii Other Non-Tax Receipts
CHAPTER-VII OTHER NON-TAX RECEIPTS EXECUTIVE SUMMARY Marginal increase In 2010-11, the collection of forest receipts increased by 33.33 in tax collection per cent over the previous year which was attributed by the Department to recovery of dues and other receipts from seized forest produce and imposition of penalties. Internal audit not The internal audit wing in the Department has not been set up conducted and no internal audit was conducted by the Finance Department during 2010-11. Results of audits In 2010-11, we test checked the records of 17 units relating to conducted by us in forest receipts and 10 units of irrigation receipts solely for the 2010-11 purpose of review. We found cases of non/short raising of demand/ non-disposal of forest produce/non-achievement of target of irrigation and other deficiencies of ` 601.27 crore in 826 cases. The Department accepted non/short raising of demand/ non-disposal of forest produce and other deficiencies of ` 524.03 crore in 619 cases pointed out by us during 2010-11. What we have In this Chapter we present a review on “Receipts from Major highlighted in this and Medium Irrigation Projects” conducted during test check of Chapter records where we found cases of non-achievement of target in irrigation, non-preparation of Sudkar, non-raising of demand, usage of water for industrial purposes without any agreement, etc., having financial implication of ` 519.15 crore. We have also highlighted illustrative cases of ` 17.44 lakh selected from observations noticed during our test check of records relating to forest receipts, where we found that the provisions of the Acts/ Rules were not observed. -
Brief Summary of the Project
Brief Summary of the Project 1. Introduction Bokaro Steel Plant (BSL) was set up and commissioned in the year 1972-73 for production of 1.7 Mtpa of flat rolled products. Subsequently, the plant was further expanded to 4.0 Mtpa for which EC was obtained in 1991. BSL had obtained EC for expansion of crude steel production from 4 MTPA to 7 MTPA vide F.No. J-11011/99/2007-IA-II(I) dated 16.10.2008. However, BSL had amended the same for change in expansion capacity from 7.0 MTPA to 4.606 MTPA vide F.No. J-11011/99/2007-IA- II(I) dated 28.11.2014. BSL is currently producing 4.606 MTPA crude steel. As part of modernization of the existing plant, Addition of a 2.0 Mtpa Pellet plant and 7m tall top charged Coke oven battery of 0.768 MTPA production capacity were also proposed within the same plant premises without increasing the approved production capacity of the existing plant. EC application for the same has been submitted to MoEFCC. The required raw water for BSL plant operations and township is being drawn from Tenughat Dam which is built on upstream of Damodar River at a distance of about 35 Km from Plant site. The maximum limit for drawal of water from Tenughat Dam is 23140 m3/hr. At present, the raw water drawal by BSL is about 17500 m3/hr. Water is supplied through a Gravity Canal which is controlled by WRD, Govt. of Jharkhand (Tenu canal which is about 35 km long from the dam). -
Directory Establishment
DIRECTORY ESTABLISHMENT SECTOR :RURAL STATE : JHARKHAND DISTRICT : Bokaro Year of start of Employment Sl No Name of Establishment Address / Telephone / Fax / E-mail Operation Class (1) (2) (3) (4) (5) NIC 2004 : 1010-Mining and agglomeration of hard coal 1 PROJECT OFFICE POST OFFICE DISTRICT BOKARO, JHARKHAND , PIN CODE: 829144, STD CODE: NA , TEL NO: NA , FAX 1975 51 - 100 MAKOLI NO: NA, E-MAIL : N.A. 2 CENTRAL COAL FIELD LIMITED AMLO BERMO BOKARO , PIN CODE: 829104, STD CODE: NA , TEL NO: NA , FAX NO: NA, 1972 101 - 500 E-MAIL : N.A. 3 PROJECT OFFICER KHASMAHAL PROJECT VILL. KURPANIA POST SUNDAY BAZAR DISTRICT BOKARO PIN 1972 101 - 500 CODE: 829127, STD CODE: NA , TEL NO: NA , FAX NO: NA, E-MAIL : N.A. 4 SRI I. D. PANDEY A T KARGAL POST . BERMO DISTRICT BOKARO STATE JHARKHAND , PIN CODE: NA , STD CODE: 06549, TEL NO: 1960 > 500 221580, FAX NO: NA, E-MAIL : N.A. 5 SRI S K. BALTHARE AT TARMI DAH DISTRICT BOKARO STATE - JHARKHAND , PIN CODE: NA , STD CODE: NA , TEL NO: NA 1973 > 500 P.O.BHANDARI , FAX NO: NA, E-MAIL : N.A. 6 PROJECT OFFICER CCL MAKOLI POST CE MAKOLI DISTRICT BOKARO STATE JAHARKHAND PIN CODE: 829144, STD CODE: NA , TEL 1975 > 500 OFFFI NO: NA , FAX NO: NA, E-MAIL : N.A. NIC 2004 : 1410-Quarrying of stone, sand and clay 7 SANJAY SINGH VILL KHUTR PO ANTR PS JARIDIH DIST BOKARO JHARKHANDI PIN CODE: 829138, STD CODE: 1989 10 - 50 NA , TEL NO: NA , FAX NO: NA, E-MAIL : N.A. -
Mcp Khasmahal Ocp 0 6
MINE CLOSURE REPORT FOR KHASMAHAL OPEN CAST PROJECT (0.60 MTY) (CENTRAL COALFIELDS LIMITED) JULY 2012 Regional Institute – III Central Mine Planning & Design Institute Ltd. (A Subsidiary of Coal India Ltd.) Gondwana Place, Kanke Road Ranchi-834008, Jharkhand 1 INTRODUCTION 1.1 About the Mine Khasmahal OCP is located in East Bokaro Coalfields of Jharkhand State. It is a part of B&K Area of Central Coalfields Limited. The Khasmahal OCP is a running project, which is working in the north of Konar block. The Khasmahal OCP (0.60 Mty) was approved and put in operation since April 1990. CCL further increased the quarry area measuring 400 m x 1650 m after boundary adjustment with property of Konar OCP located in dip side of Khasmahal OCP. The mining plan was prepared considering the area extended in dip direction. The date of start of production is 1993-94. Details of Mine The mining plan was prepared for rated capacity of 0.60 Mty for the purpose of coal production from opencast method of mining, spread over two quarries, using heavy earth moving machineries. Both the quarries are under one mine, Khasmahal opencast mine. The life of the mine at the time of preparation of PR was estimated as 35 years. As per existing status of the mine, the estimated remaining life of this mine is 31 years. 1.1.1 Name of mine owner / company Project--------- Khasmahal OCP Area------------ B & K Area Company------Central Coalfields Limited Mine Owner---Director (Technical)(Operation), CCL 1.1.2 Address for Communication Project-------- Khasmahal OCP Nearest Railway station ----- The block is well connected by rail and road.