Planning Committee 20/02/2019 Schedule Item 01

Total Page:16

File Type:pdf, Size:1020Kb

Planning Committee 20/02/2019 Schedule Item 01 Planning Committee 20/02/2019 Schedule Item 01 Ref : 183673OUT Address: MIDDLESEX BUSINESS CENTRE, BRIDGE ROAD, SOUTHALL, UB2 4AB Ward: NORWOOD GREEN Proposal: Outline Planning Application (with all matters reserved except access) for the demolition of existing buildings and structures; the retention, refurbishment and alteration of the Sunrise Radio Building and Maypole Margarine Factory façade; and the redevelopment of the site to include up to 2,083 residential units (use class C3), up to 7,199 sqm hotel floorspace (use class C1) (Gross Internal Area (GIA)), up to 2,688 sqm of flexible retail floorspace (use classes A1-A5) (GIA), and up to 10,076 sqm of flexible office and community floorspace (use classes B1, D1/D2) (GIA); any ancillary parking, amenity, plant, and services floorspace (including a new energy centre) and all other associated public, semi public and private realm, soft/hard landscaping, infrastructure and highway works, access and a new internal road network connecting with the existing road network Drawing numbers: Refer to relevant conditions Type of Application: Outline application Application Received: 27/07/2018 Revised: 19/12/2018 Report by: Chris Maltby Having taken into account all environmental information received by the Council under the Environmental Impact Assessment (EIA) process and giving full consideration to the environmental impacts of the proposed development, it is concluded that the proposed development is in accordance with the development plan taken as a whole and that there are no other material considerations that should outweigh the granting of planning permission and it is recommended that the Committee resolve to approve the proposed development subject to: 1) That the applicant and the other relevant persons having a requisite interest, be invited to complete the Section 106 Agreement in accordance with the detailed summary of the proposed terms of the planning obligations for this application in the ‘Legal Agreements and Community Infrastructure Levy’ section of this report, subject to: a. such reasonable amendments as may be approved by the Chief Planning Officer having due regard to any comments of the (Stage II referral to) Mayor of London and/or TfL and/or any other relevant comments on the Revised Section 106 Agreement; and, 1 of 73 Planning Committee 20/02/2019 Schedule Item 01 2) That upon completion of the Revised Section 106 agreement the Borough Planner be instructed to APPROVE the application ref: 183673OUT under delegated powers and grant planning permission subject to conditions substantially in the form contained in the subsequent recommendation (with such detailed amendments as the Chief Planning Officer may consider to be reasonable and necessary in the course of negotiating the final Revised Section 106 Agreement and having due regard to any comments of the Mayor and/or TfL and/or the Secretary of State and/or any other relevant comments on the Conditions). PROCEDURE FOR DETERMINING THE PLANNING APPLICATION This planning application for an Outline Planning Permission for the redevelopment of the Middlesex Business Centre was submitted on 27th July 2018 and supported by an Environmental Statement and other supporting documents. The Outline Application has undergone consultation for a period in excess of 16 weeks, including consultation in accordance with the Town and Country Planning (Environmental Impact Assessment) (England and Wales) Regulations 2017 (“the EIA Regulations 2017”). Approximately 23 site notices notifying of the planning application were erected within areas surrounding the application site. A summary of the consultation process and responses is contained in the ‘Statutory Consultation’ section of this report, below. The Greater London Authority has been notified, as the application is within the thresholds of potential strategic importance to London. The application has been referred under the following categories: (1A) new housing exceeding 150 units; (1B) mixed uses exceeding 15,000 sqm and (1C) new buildings over 30 metres high. The Mayor of London considered the proposal on 10th December 2018 and issued a letter of response containing the Mayor’s observations on the application. These comments are generally supportive of the application proposals and are reported in the consultation section of this report. The contents of this report have been considered by both the applicant and the Council and the Mayors comments have been properly addressed as far as is reasonably practicable through the planning conditions and obligations. Executive Summary: This application seeks outline planning permission for a mixed use redevelopment of this existing employment site. The site is designated as a development site SOU6 in the adopted local plan and it falls within an opportunity area identified by the Southall Opportunity Planning Framework. The application proposes outline permission with only access being determined at this stage with all other matters reserved for determination at a later stage. The proposals comprise of the demolition of all existing buildings and structures with the exception of the locally listed Margarine Works façade and the Sunrise Radio building which are retained. The redevelopment of the site will provide: • Up to 2,083 residential units (use class C3) • Up to 7,199 sqm of hotel floor space (180-bedrooms) (use class C1) • Up to 2,688 sqm of flexible retail floor space (use classes A1-A5) • Up to 10,076 sqm of flexible office and community floor space (use classes B1, D1/D2) The development comprises 7 development plots that will accommodate new buildings ranging in height from 11.5m (43.500m AOD, approx. 3 storeys) and 92.125m (124.125m AOD, approx. 27 storeys). 2 of 73 Planning Committee 20/02/2019 Schedule Item 01 In addition, the development will include a new public park (Maypole Park), other public open spaces and public realm, parking for a maximum 330 vehicles including 65 disabled bays, cycle parking in accordance with draft London Plan policy, a new east-west road (Healum Avenue) and associated plant including an energy centre, soft and hard landscaping, infrastructure and highway work including a new internal road network. 35% of all residential units (by habitable room) will be affordable comprising a total of 671 units. Of these 370 units (55%) will be shared ownership, 201 units (30%) will be London Affordable Rent and 100 units (15%) will be discount market rent (discounted to 80% of market rent). 158 units (79%) of London Affordable Rent units and 525 (78%) of the total affordable housing offer will be delivered in the first three phases of development which it is estimated will be completed by 2022. The affordable housing offer has been scrutinised by independent viability consultants and the GLA and is supported. The application is supported by an Environmental Statement (ES) prepared in accordance with the EIA regulations. The ES has been independently assessed by expert consultants appointed by the Council. The ES has been thoroughly assessed and tested and clarifications sought and as a result it has been concluded that whilst some adverse effects are acknowledged to occur during the construction phases of the development these are only temporary in nature. The proposals will also lead to a number of significant positive effects that are considered to outweigh the temporary adverse effects. A number of mitigation measures are secured by relevant planning conditions to address any adverse impacts. The proposals follow on from a resolved planning application that was presented to this committee in February 2016 (ref. PP/2014/6440). At that time Members voted in favour of outline proposals which included up to 835 new homes, 6,750sqm of student accommodation, 5,200sqm hotel and 8,725sqm of commercial and retail floor space. Taking into account the current development and planning policy context, this application proposes a more ambitious approach in order to maximise the potential of the site including bringing forward significantly more new homes including a greater number of affordable homes and employment/community floor space. The proposals are the result of extensive pre-application consultation with officers of Ealing Council, the GLA and TfL. Minor revisions have been made during the course of the application’s consideration to address comments made in the GLA Stage 1 Report and by other statutory consultees. The proposals have also been subject to a review by an independent Design Review Panel. The reviewers commended the proposals and provided a number of useful suggestions to be taken through to the final detailed designs. These suggestions have been picked up by the applicant in the submitted Design Codes and are secured by way of relevant planning conditions. The proposed development is submitted on the basis of a series of Parameter Plans that set the physical framework including plot locations, the positions and max. heights of buildings, the location of different uses, the location of public open spaces and public realm and the network of routes through the site for vehicles, pedestrians and cyclists. The Parameter Plans are supplemented by a Design Codes document that provides a set of design objectives and principles that will provide guidance for the detailed designs in respect of appearance, layout, scale and landscaping. All subsequent reserved matters applications will be expected to demonstrate conformity with both the Parameter Plans, Design Code document and all relevant planning policies at the time of submission. 3 of 73 Planning Committee 20/02/2019 Schedule Item 01 The proposals set out a detailed framework for a comprehensive mixed-use development that will bring forward a large number of new homes significantly contributing to the Council’s and the GLA’s housing supply. A significant proportion of those new homes being affordable dwellings helping to address housing need in the Borough. The proposals also include a significant amount of employment generating floorspace in the form of retail, high quality office and creative workspaces and the hotel.
Recommended publications
  • A Framework for Southall
    A Framework for April 2008 Tribal Urban Studio in association with Southall Michael Beaman Ltd London Borough of Ealing A Framework for April 2008 Tribal Urban Studio in association with Southall Michael Beaman Ltd London Borough of Ealing architec ture planning de sign Tribal Urban Studio in association with Michael Beaman Ltd Contents Contents List of Figures 1 Setting the Scene 1 Figure 1.1: Context Within London 2 1.1 Why a Framework for Southall? 1 Figure 1.2: Southall Context 3 1.2 The Process 1 Figure 1.3: Southall – Character and Place 4 1.3 Contextual Analysis 1 Figure 2.1: The Framework Plan 8 Figure 3.1: Southall Town Centre UDP Boundary 11 2 The Framework in Outline 7 Figure 3.2: Retail Centres in LB Ealing 12 2.1 Objectives for Southall as a Place 7 Figure 4.1: Major Transport Connections 19 2.2 The Framework in outline 7 Figure 5.1: Housing Character & Analysis Plan 28 Figure 7.1: The Community Hub concept - potential service provision 34 Figure 7.2: Potential Locations for the Community Hub 35 Figure 8.1: Areas for Change and Improvement 39 Part A: Planning for Change Figure 8.2: Town Centre Development Ideas 41 3 Retail and the Town Centre 11 Figure 8.3: Detailed Transport Development Ideas 43 Figure 8.4: Transport Development Ideas 45 3.1 The Current Position 11 Figure 8.5: Housing Opportunities 47 3.2 Planning for Change 12 Figure 8.6: Public Realm Proposals Plan 49 4 Transport 17 Figure 8.7: Employment Sites Identified for Change 51 4.1 The Current Position 17 4.2 Planning for Change 20 List of Tables 5 Housing, Public
    [Show full text]
  • Paddington Station Shepherd's Bush Oxford Circus King's Cross
    ickenham M40 wembley uxbridge greenford M25 transport links west hanwell Southall railway station is just a few minutes’ walk away, transporting you drayton stockley park to Paddington in under 20 minutesor west to Windsor, Reading and beyond. southall Travel by car, train or bus to London’s Heathrow Airport – a little over five M25 miles away – for national and international flights, or stay more local via connections to Kew, Ealing and Richmond. M4 M4 M4 by rail From Southall Station by road From The West Works by air From Heathrow Paddington Station 15 mins Heathrow Aiport 5 miles Amsterdam 1 hr 10 mins osterley Shepherd’s Bush 23 mins Brunel University 5 miles Dublin 1 hr 15 mins Oxford Circus 30 mins Richmond 7 miles Berlin 1 hr 50 mins terminal 5 terminals 2+3 King's Cross 37 mins Kew Gardens 7 miles Dubai 6 hrs 50 mins Waterloo 38 mins Windsor 13 miles New York 7 hrs 30 mins heathrow isleworth airport terminal 4 hounslow With The West Works specifically designed as a low car scheme, sustainable travel is encouraged through the use of the onsite car club exclusive for residents use. twickenham CGI is indicative only > Not representative of the final product crossrail connectivity developer vendor’s solicitors When Crossrail arrives in 2021, there’ll be a high-speed line just redrow london redrow legal team minutes from your door, cutting journey times across London in half. James Holmear, Graham Cope Sales & Marketing Director Redrow Homes Limited Telephone: 0208 358 8340 Redrow House Email: [email protected] St David’s Park, Ewloe Flintshire CH5 3RX local authority recommended Telephone: 01244 520 044 London Borough of Ealing Paddington Shepherd's Oxford King's Waterloo purchaser’s solicitors Email: [email protected] tenure Station Bush Circus Cross Riseam Sharples 15 minutes 23 minutes 30 minutes 37 minutes 38 minutes Mike Ellis recommended 999 years leashold 2 Tower Street, London WC2H 9NP letting agents Tel Office:+44(0)20 7836 9555 building insurance Sources: TfL, National Rail and Google Maps.
    [Show full text]
  • 1609923228Cbfqp.Pdf
    the west works the opportunity discover so much more than simply a sense of place, discover a place with 04 05 this is more than luxury living, this is the west works southall • london a real sense of soul the west works the opportunity paddington wembley (6.5 miles) city of london osterley park southall park 11 9 1 06 07 3 4 southall high street 2 7 12 10 6 future regeneration of southall 8 1 The West Works 8 The Green southall station 2 New pedestrian bridge 9 Montreux 3 Redrow 10 WLMHT site 5 4 Galliard 11 Southall Village 5 Kings House 12 Arches 6 Southall Station 13 Southall Waterside 7 Sikh temple redevelopment heathrow (5 miles) 13 southall • london a real sense of soul the west works the development perfect place 08 to call home 09 Imagine a luxurious modern lifestyle, featuring beautifully finished, high specification apartments, in the lively, colourful and welcoming neighbourhood of Southall. A home that’s less than 5 minutes’ walk from Southall railway station, where connections are already great and will only improve following the arrival of Crossrail, bringing even faster links to central London, Canary Wharf and beyond. this could all be yours CGIs are indicative only > Not representative of the final product southall • london a real sense of soul the west works the development Outside space to enjoy 10 11 PLAY VIDEO The West Works benefits from its own communal landscape terrace, where you can soak up impressive views over London, and enjoy a piece of your own outdoor space.
    [Show full text]
  • Vebraalto.Com
    The West Works Southall • Middlesex • UB2 4AU Asking Price: £477,000 The West Works Southall • Middlesex • UB2 4AU Welcome to The West Works, a sensational collection of studios, 1, 2 and 3 bedroom apartments located in the vibrant and exciting neighbourhood of Southall, West London. Enjoy the quality you would expect from Redrow in a home that offers outstanding connections and a truly unique character. Imagine a luxurious modern lifestyle, featuring beautifully finished, high specification apartments, in the lively, colourful and welcoming neighbourhood of Southall. A home that’s less than 5 minutes’ walk from Southall railway station, where connections are already great and will only improve following the arrival of Crossrail in 2019, bringing even faster links to central London, Canary Wharf and beyond. • Brand New Apartments from Redrow Homes • Superior Specification • Approximately 18 Minutes to London paddington • Choice of 1,2 & 3 Bed Apartments • 999 Year Lease • Within Minutes of Southall Station • Communal Courtyard • Benefiting from Crossrail in 2019 • 10 Year Building Warranty • CGIs and Images shown are indicative only These particulars are intended as a guide and must not be relied upon as statements of fact. Your attention is drawn to the Important Notice on the last page. Directions From Southall train station turn left on South Road and at the mini roundabout take the first exit into Merrick Road, the development can be found just a short distance in front of you. Situation Conveniently close to the M4 and A4, and just a few minutes from the M25, your driving options are endless. Even more convenient is Southall Station, just a couple of minutes walk from the development, talking you directly to London Paddington in the heart of the city in around 18 minutes.
    [Show full text]
  • Southall Design Statement
    Southall Gas Works: Design Statement by URBED with Capita Symonds, WYG, Lovejoys, Jestico and Whiles and RPSDesign Statement 2 The Site Page 7 Southall Gas Works: Design Statement by URBED with Capita Symonds, WYG, Lovejoys, Jestico and Whiles and RPSDesign Statement 2:1. Site context The site Surrounding area The site The site is roughly triangular in shape The immediate surroundings to the site and runs from just to the west of include the following: Southall Railway Station for a mile Rich habitat along the main railway line from The gas holders: The retained Paddington to the South West. The site Transco area contains three gas boundary is marked on Figure 2.. holders. The largest of these is a The site has had a variety of ridged waterless holder, 90m high. industrial uses in the past including (equivalent to a 32 storey building). the manufacture and storage of The other gas holders are telescopic gas. All structures except the gas - the western holder rises to 65m infrastructure on the land retained by and the middle holder rises within a Transco have been demolished. This ridged frame to 35m. These holders has left a flat site that is subject to dominate the surrounding area and contamination in parts. There are also can be seen from miles around. a number of gas pipes crossing the The remainder of the Transco site. The majority of the site is used land is occupied by pipework and for surface parking including long- associated equipment. stay parking for Heathrow Airport as well as new car storage.
    [Show full text]
  • Appendix 1 Ealing Heritage Strategy Draft 2010
    Appendix 1 Ealing Heritage Strategy Draft 2010 - 2015 1 Contents 1. Introduction 2. Ealing’s Heritage 3. National and local context 4. Ealing’s Heritage: issues and opportunities 5. A new vision for Ealing’s Heritage, Objectives & Delivery Plan 2 1. Introduction 1.1 Ealing has a rich and deep built, natural and material heritage highly valued by residents. As with most councils responsibility for managing and promoting the borough’s heritage is divided amongst council departments. The Executive Director for Environment and Customer Services is responsible for the strategic lead for heritage development and is responsible for the management of important built, natural and material heritage assets. There are further responsibilities including planning, conservation, regeneration and ownership of some heritage assets which sit across the council. 1.2 The development of a sustainable future for key heritage assets has become a higher priority for the council over recent years and it is now necessary to adopt a strategic approach to this area of activity. The heritage strategy is intended to have the following benefits: a framework for maximising investment in Ealing’s heritage set a direction and define priorities within and between heritage initiatives and reconcile competing demands inform the management of the Council’s assets, detailed service plans and the work of individual officers, departments and other agencies encourage innovation and improved partnership working act as a lever and rationale for gaining funding from external agencies and partners demonstrate links with the long term vision for Ealing, central government agendas and with strategies of national and regional agencies 1.3 There are many definitions of heritage in the public domain including built, natural and material elements.
    [Show full text]
  • London Borough of Ealing
    2012 Air Quality Updating and Screening Assessment: London Borough of Ealing London Borough of Ealing_USA_2012 December 2012 Document Control Client London Borough of Ealing Principal Contact Dr John Freeman Job Number J1508 Report Prepared By: Austin Cogan, Suzanne Hodgson & Clare Beattie Document Status and Review Schedule Report No. Date Status Reviewed by 1508/1/F1 18 December 2012 Final Report Prof. Duncan Laxen This report has been prepared by Air Quality Consultants Ltd on behalf of the Client, taking into account the agreed scope of works. Unless otherwise agreed, this document and all other Intellectual Property Rights remain the property of Air Quality Consultants Ltd. In preparing this report, Air Quality Consultants Ltd has exercised all reasonable skill and care, taking into account the objectives and the agreed scope of works. Air Quality Consultants Ltd does not accept any liability in negligence for any matters arising outside of the agreed scope of works. The Company operates a formal Quality Management System, which is certified to ISO 9001:2008, and a formal Environmental Management System, certified to ISO 14001:2004. When issued in electronic format, Air Quality Consultants Ltd does not accept any responsibility for any unauthorised changes made by others. When printed by Air Quality Consultants Ltd, this report will be on Evolve Office, 100% Recycled paper. Air Quality Consultants Ltd 23 Coldharbour Road, Bristol BS6 7JT Tel: 0117 974 1086 12 Airedale Road, London SW12 8SF Tel: 0208 673 4313 [email protected] Registered Office: 12 St Oswalds Road, Bristol, BS6 7HT Companies House Registration No: 2814570 London Borough of Ealing_USA_2012 December 2012 Executive Summary This report fulfils the requirements of the Local Air Quality Management process as set out in Part IV of the Environment Act (1995), the Air Quality Strategy for England, Scotland, Wales and Northern Ireland 2007 and the relevant Policy and Technical Guidance documents.
    [Show full text]
  • Residential & Commercial Property Auction
    Residential & Commercial Property Auction Monday 9th December 2013 The Hilton Paddington Hotel, London W2 1EE Starting 12 noon CONTENTS Contents and Auctioneer’s Note .................................................................................................................................................................. 1 Guide to Auction ........................................................................................................................................................................................................... 2 Location ................................................................................................................................................................................................................................ 3 Lot Order and Guide Prices .............................................................................................................................................................................. 4 Lot Details and Advertising ................................................................................................................................................................................ 6 Auction Conditions ................................................................................................................................................................................................. 54 Index of Seller’s Solicitors ...............................................................................................................................................................................
    [Show full text]
  • Contract Leads Powered by EARLY PLANNING Projects in Planning up to Detailed Plans Submitted
    Contract Leads Powered by EARLY PLANNING Projects in planning up to detailed plans submitted. PLANS APPROVED Projects where the detailed plans have been approved but are still at pre-tender stage. TENDERS Projects that are at the tender stage CONTRACTS Approved projects at main contract awarded stage. Consultants, Nautilus House, 10 Central Plans Granted for 6 flats (conversion/ St Modwen Developments Ltd Agent: DBK Construction Ltd, 6 Bermuda Road, SOLIHULL £6M Agent: Ichthus, Norton, 81e High Street, CASTLEFORD £1.4M Avenue, St. Andrews Business Park, Norwich, extension) Client: Mr. Robin Murdoch Group, 321 Bradford Street, Birmingham, West Ransomes Europark, Ipswich, Suffolk, IP3 St. Catherine’s Court &, 29 Homer Road Norton, Stockton-On-Tees, Cleveland, TS20 Asda, Leeds Road Glasshoughton MIDLANDS/ Norfolk, NR7 0HR Tel: 01603 706706 Developer: Airvos Design Ltd, 43 Langtry Midlands, B5 6ET Tender return date: 9RU Tel: 01473 272222 Planning authority: Solihull Job: Detail 1AE Tel: Not Available Planning authority: Wakefield Job: Detail RUGBY £7.3M Grove, Nottingham, NG7 7AX Tel: 07941435994 Tenders invited. Tel: 0121 622 8520 KING’S LYNN £0.5M Plans Granted for supermarket Client: Opus HECKMONDWIKE £0.6M Plans Granted for supermarket (extension/ EAST ANGLIA Snellsdale Road Coton Park East PETERBOROUGH £0.3M WELLINGBOROUGH £0.75M King’’s Lynn Audi, Hamburg Way North Land Ltd Agent: AHR, Colmore Plaza, 20 The Brighton Hotel, 99 Brighton Street alterations) Client: Asda Stores Ltd Planning authority: Rugby Job: Approval Of Touthill Close, City Road Irchester Junior School, School Lane Lynn Industrial Estate Colmore Cricus, Queens Way, Edgbaston, Planning authority: Kirklees Job: Detailed Developer: WCEC Architects, South Building, Early Planning Reserved Matters for 110 residential units Planning authority: Peterborough Job: Irchester Planning authority: Kings Lynn & West Birmingham, West Midlands, B4 6AT Plans Submitted for 8 houses Client: Mr.
    [Show full text]
  • £1,600 Pcm 23, Norwood Close, Southall , Middlesex, UB2 5RF
    £1,600 pcm 23, Norwood Close, Southall , Middlesex, UB2 5RF b 3 a 1 Bedrooms Bathroom 183 Western Rd, Southall UB2 5HR, UK | [email protected] 02085746800 £1,600 pcm 23, Norwood Close, Southall , Middlesex, UB2 5RF 183 Western Rd, Southall UB2 5HR, UK | [email protected] 02085746800 Property Description Ashford Finance & Property Services are delighted to advertise another 3-bedroom property to let in Old Southall. Norwood Close, Southall, Middlesex, UB2 5RF. Off of Thorncliffe Road & overlooking Norwood Road. Situated on the second floor via two concrete sets of stairs. The property has a very large living room which is carpeted. The separate kitchen (as a popular feature) comes with all the White goods, Gas cooker with oven & has cupboards & matching drawers. The flat has 3 bedrooms which include two doubles & a single bedroom. The home benefits from double glazed windows throughout, central heating & has just recently been decorated. There are two separate balconies which is perfect for getting fresh air quickly into the home. There is parking on the road – no permits required. 2 minutes walking distance to local shops including convenient stores. Walking distance Kings Street where there are a number of shops and services. Walking distance/ bus ride away to Southall Railway Station. Walking distance to Southall Broadway. Easy access to Heston via Norwood Road. Frequent buses that stop near by include the 120 towards Hounslow Bus Garage via Heston, & Hounslow Central Tube service (Piccadilly Line/ Zone 4) or the opposite direction towards Northolt Tube Station(Central Line / Zone 5) via Southall Broadway, White Hart Roundabout and Northolt Library, 207, 607,427 bus stops are all nearby, with easy access to Uxbridge via Hillingdon or the opposite side towards White city Via Hanwell, Ealing, Acton and Shepherds Bush as well as bus stops to Hounslow, Heston and Northolt via 120 and H32.
    [Show full text]
  • Brochure PDF 00.Pdf
    Salisbury Gardens; a contemporary [Inside cover] home in a charismatic area Tucked away in a tranquil residential area of Southall and surrounded by green spaces, Salisbury Development image to come Gardens offers you a rare chance to live in a brand new home of quality in this vibrant part of London. With a rich and colourful history, Southall is one of the most popular and cosmopolitan areas of the city, yet several parks and the Grand Union Canal mean peace and quiet is always near at hand. There are excellent travel links to Heathrow Airport and central London, with Paddington just over 10 miles away. Computer generated image shown. Previous Barratt London interior shown A dynamic community with a range of choices Located just moments away from the Grand Union Canal, Salisbury Gardens offers you a fantastic selection of different homes. Choose from a range of stylish 1, 2, 3 and 4 bedroom apartments in two distinctive, contemporary buildings. The buildings’ external finishes include warm, red brick complemented by rich blue detailing, while many apartments come complete with their own balconies, terraces, patios or gardens. There’s more outdoor space surrounding the development including beautiful landscaped gardens and a children’s play area. Many apartments also have below-ground private parking. Computer generated images shown. Contemporary interiors, designed for modern living Whichever sort of apartment you choose at Salisbury Gardens, you’re guaranteed a stylish, contemporary space to call home. Living areas are light and airy, designed and built to make the most of the natural light and the perfect blank canvas for your own personal touches.
    [Show full text]
  • Catalogue 14/09/2016
    LOCAL EXPERTISE | NATIONAL COVERAGE PROPERTY AUCTION CATALOGUE RDS WINN WA ER A 2 A 0 V 1 A 5 N WEDNESDAY 14 SEPTEMBER 2016 at 2:00 pm • P • R R A O GROSVENOR HOUSE HOTEL, 86-90 PARK LANE, E P Y E LONDON W1K 7TN R E T H Y T F AU O C E TION HOUS www.networkauctions.co.uk NA_Cover_SEPT 16.indd 3 18/08/2016 09:25 VENUE LOCATION GROSVENOR HOUSE HOTEL 86-90 PARK LANE. LONDON W1K 7TN Grosvenor House Hotel is located in Central London’s elegant Mayfair district, on world-famous Park Lane overlooking Heathrow Express Hyde Park. at Paddington Station 3/4 mile This 5-star hotel was first opened in 1929. It was meticulously restored to the highest standard before reopening as a JW Marriott hotel in 2008, and retains many historic touches, EDGW including the original Lutyens wrought-iron gates that lead into A R E R O A D our elegant forecourt. N E W B O N D S T R E E T Directions The hotel is approximately Midway between Marble Arch & Hyde Park Corner. The main entrance, however is on Park Street (between upper Grosvenor Street and Mount Street) G R E E N S T which runs parallel to Park Lane in a one way direction W O O D S M E W S towards Oxford Street. UPPER BROOK ST Nearest tube station: C U L R O S S S T Marble Arch UPPER GROSVENORPARK STREET ST www.marriott.co.uk T 020 7871 0420 | E [email protected] www.networkauctions.co.uk INTRODUCING THE AUCTION TEAM Toby Limbrick Stuart Tullah Guy Charrison Stuart Elliott Emma Brooks [email protected] [email protected] [email protected] [email protected] [email protected]
    [Show full text]