What we’ve heard Master plan scope

– The sense of green space on campus – The relationship between the natural and built environment MOUNT OUSLEY ROAD

DALLAS STREET

– Pedestrian access and way finding RING ROAD – World-class facilities and services High School – Infrastructure for a range of weather TAFE of the Performing Arts

M1 Keira High School conditions NORTHFIELDS AVENUE

Wollongong Tech Tahs Rugby Botanic Garden Union Footfall Club – Connection between the campus, ROBSONS ROAD

IRVINE STREET UNIVER SITY AVE NU E Para Meadows School community and the CBD MURPHYS AVENUE NORTH WOLLONGONG STATION – Public transport and sustainability MEMORIAL DRIVE – The social and community character Keiraville Public School GIPPS ROAD – Teaching and learning

0 125 250 500m

Key findings from consultations

GOVERNANCE COMMUNITY AND PEDAGOGY

Integrate the Campus as part Strengthen the role of the Collaborate with community Support extended-hour Build on cultural and Support student-centred of a University City Campus as part of the and government on aligned campus life historical identity pedagogy and digital learning Education Precinct regional projects

BUILT FORM LANDSCAPE

250m

Develop typically 4-5 storey Reinforce the objectives of Build on identity of faculty Maintain and enhance Strengthen the campus heart Upgrade Northfields Avenue academic buildings the student-focused campus precincts and manage landscape areas and regional by introducing a new plaza, to be the principal face of the by introducing new buildings growth in existing campus environmental connections central learning and teaching University and gateway to within convenient walking areas building and extended library the Keiraville and Gynneville distance of shared central neighbourhoods facilities

ACCESS SUSTAINABILITY

P

P P

P P

P

Introduce pedestrian- Introduce a series of Improve access to the Consolidate car parking on Support the introduction of a Continue key sustainability friendly gateways to provide pedestrian walks and improve Campus for cyclists and the periphery, providing easy new northern entrance to the initiatives to reduce the a welcoming entrance to the pedestrian safety throughout upgrade bike infrastructure access to the core campus Campus Campus’ energy and Campus that connects to the the Campus water consumption, waste neighbourhood production, and embodied energy use in materials

Potential new northern entrance currently in planning by Roads and Maritime. Not funded for construction. For more information on this project please visit: www.rms.nsw.gov.au/MountOusleyInterchange Wollongong Campus Draft Master Plan, June 2016, Concepts for Discussion

CAMPUS WEST PRECINCT

CW-P1 Multi-deck car park to service western campus

SP-L1

SP-P2 SPORTS PRECINCT

SP-L1 Potential new northern SPORTS entrance (Mount Ousley PRECINCT interchange) with cycle and pedestrian access

SP-P2 Upgrade to hockey field and CW1 Oval 2 to an all-weather surface, with underground car park beneath CW-P1 sports fields

CAMPUS WEST PRECINCT CAMPUS EAST CW2 PRECINCT

CE-L2 Campus walks and shared CE4 roads

WESTERN CH-L2 PRECINCT CH1

WP-P1 CE-L2 CE8 A welcoming entrance building for the University

CAMPUS HEART PRECINCT CAMPUS EAST CH2 PRECINCT

WP1 CH-L1 B73-75 CE8 CE-L6 WESTERN EASTERN PRECINCT PRECINCT

B73-75 Building 73, 74 & 75 B120 Building 120 Student Student Accommodation Project, CH-L4 Accommodation Project Kooloobong Precinct EP2 EP5 B120 EASTERN PRECINCT

CAMPUS HEART PRECINCT

WP1 Future student CH1 Learning and teaching building CH2 Library extension CH-L1 Arrival Plaza CH-L2 University Square CH-L4 Northfields Avenue upgrade EP2 Future student accommodation accommodation

0 50 100m

Learning and teaching building / At-grade car park central services Multi-deck car park Faculty building Underground car park Non-core University building Primary Pedestrian Network (PPN) Residential building Secondary Pedestrian Network (SPN) Existing building Shared street University Square Mount Ousley pedestrian / cycle access Bespoke space Pedestrian / cycle bridge extension Public realm upgrade Road network

Potential new northern entrance currently in planning by Roads and Maritime. Not funded for construction. For more information on this project please visit: www.rms.nsw.gov.au/MountOusleyInterchange University of Wollongong Wollongong Campus Draft Master Plan, June 2016, Concepts for Discussion

Artist impression of Wollongong Campus in 2036. Potential new northern entrance currently in planning by Roads and Maritime. Not funded for construction. For more information on this project please visit: www.rms.nsw.gov.au/MountOusleyInterchange