Pedestrian Access

Pedestrian Access

What we’ve heard Master plan scope – The sense of green space on campus – The relationship between the natural and built environment MOUNT OUSLEY ROAD DALLAS STREET – Pedestrian access and way finding Mount Keira RING ROAD – World-class facilities and services Wollongong High School – Infrastructure for a range of weather TAFE Illawarra of the Performing Arts M1 PRINCES MOTORWAY Keira High School conditions NORTHFIELDS AVENUE Wollongong Tech Tahs Rugby Botanic Garden Union Footfall Club – Connection between the campus, ROBSONS ROAD IRVINE STREET UNIVER SITY AVE NU E Para Meadows School community and the CBD MURPHYS AVENUE NORTH WOLLONGONG STATION – Public transport and sustainability MEMORIAL DRIVE – The social and community character Keiraville Public School GIPPS ROAD – Teaching and learning 0 125 250 500m Key findings from consultations GOVERNANCE COMMUNITY AND PEDAGOGY Integrate the Campus as part Strengthen the role of the Collaborate with community Support extended-hour Build on cultural and Support student-centred of a University City Campus as part of the and government on aligned campus life historical identity pedagogy and digital learning Education Precinct regional projects BUILT FORM LANDSCAPE 250m Develop typically 4-5 storey Reinforce the objectives of Build on identity of faculty Maintain and enhance Strengthen the campus heart Upgrade Northfields Avenue academic buildings the student-focused campus precincts and manage landscape areas and regional by introducing a new plaza, to be the principal face of the by introducing new buildings growth in existing campus environmental connections central learning and teaching University and gateway to within convenient walking areas building and extended library the Keiraville and Gynneville distance of shared central neighbourhoods facilities ACCESS SUSTAINABILITY P P P P P P Introduce pedestrian- Introduce a series of Improve access to the Consolidate car parking on Support the introduction of a Continue key sustainability friendly gateways to provide pedestrian walks and improve Campus for cyclists and the periphery, providing easy new northern entrance to the initiatives to reduce the a welcoming entrance to the pedestrian safety throughout upgrade bike infrastructure access to the core campus Campus Campus’ energy and Campus that connects to the the Campus water consumption, waste neighbourhood production, and embodied energy use in materials Potential new northern entrance currently in planning by Roads and Maritime. Not funded for construction. For more information on this project please visit: www.rms.nsw.gov.au/MountOusleyInterchange University of Wollongong Wollongong Campus Draft Master Plan, June 2016, Concepts for Discussion CAMPUS WEST PRECINCT CW-P1 Multi-deck car park to service western campus SP-L1 SP-P2 SPORTS PRECINCT SP-L1 Potential new northern SPORTS entrance (Mount Ousley PRECINCT interchange) with cycle and pedestrian access SP-P2 Upgrade to hockey field and CW1 Oval 2 to an all-weather surface, with underground car park beneath CW-P1 sports fields CAMPUS WEST PRECINCT CAMPUS EAST CW2 PRECINCT CE-L2 Campus walks and shared CE4 roads WESTERN CH-L2 PRECINCT CH1 WP-P1 CE-L2 CE8 A welcoming entrance building for the University CAMPUS HEART PRECINCT CAMPUS EAST CH2 PRECINCT WP1 CH-L1 B73-75 CE8 CE-L6 WESTERN EASTERN PRECINCT PRECINCT B73-75 Building 73, 74 & 75 B120 Building 120 Student Student Accommodation Project, CH-L4 Accommodation Project Kooloobong Precinct EP2 EP5 B120 EASTERN PRECINCT CAMPUS HEART PRECINCT WP1 Future student CH1 Learning and teaching building CH2 Library extension CH-L1 Arrival Plaza CH-L2 University Square CH-L4 Northfields Avenue upgrade EP2 Future student accommodation accommodation 0 50 100m Learning and teaching building / At-grade car park central services Multi-deck car park Faculty building Underground car park Non-core University building Primary Pedestrian Network (PPN) Residential building Secondary Pedestrian Network (SPN) Existing building Shared street University Square Mount Ousley pedestrian / cycle access Bespoke space Pedestrian / cycle bridge extension Public realm upgrade Road network Potential new northern entrance currently in planning by Roads and Maritime. Not funded for construction. For more information on this project please visit: www.rms.nsw.gov.au/MountOusleyInterchange University of Wollongong Wollongong Campus Draft Master Plan, June 2016, Concepts for Discussion Artist impression of Wollongong Campus in 2036. Potential new northern entrance currently in planning by Roads and Maritime. Not funded for construction. For more information on this project please visit: www.rms.nsw.gov.au/MountOusleyInterchange.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    3 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us