[Document Title]

Total Page:16

File Type:pdf, Size:1020Kb

[Document Title] [EHNUR WP 4] ADVANCED NUCLEAR POWER PLANT CONCEPTS AND TIMETABLES FOR THEIR COMMERCIAL DEPLOYMENT Steven C. Sholly1 VIENNA, June 2013 1 Institute of Safety/Security and Risk Sciences, University of Natural Resources and Life Sciences Copyright Vienna, June 2013 Media owner and editor: University of Natural Resources and Life Sciences Vienna, Department of Water, Atmosphere and Environment, Institute of Safety and Risk Sciences, Borkowskigasse 4, 1190 Wien, Austria URL: http://www.risk.boku.ac.at ReportWP4 – Advanced Nuclear Power Plant Concepts and Timetables EHNUR EXECUTIVE SUMMARY Most currently operating nuclear power plants are Generation II reactors (except for a few remaining Generation I units and a few Generation III units). Generation III and Generation III+ nuclear power plant concepts are widely recognized to be significant improvements over Generation II reactor designs. Both Generation III designs (standardized designs safer than Generation II) and Generation III+ designs (standardized designs safer than Generation II and with the expectation of greater economy of scale) are available for immediate deployment. The absolute minimum schedule for a Generation III or III+ nuclear power plant project is 10 years from feasibility study to completion of startup testing. Such a schedule is only achievable by: (a) an experienced utility, (b) with the reactor sited at an existing nuclear power plant site, and (c) with a design for which first-of-a-kind engineering (FOAKE) is complete. Under other circumstances (e.g. a utility new to nuclear generation, a greenfield site, a utility in a country without significant nuclear infrastructure, a nuclear power plant design where FOAKE has not yet been accomplished), the schedule would extend from fifteen to seventeen years and perhaps more. Within the 2030 time horizon of the ENHUR project, there are a number of advanced reactor designs available for immediate deployment that could be licensed, constructed, and placed in operation in time contribute to electricity generation by the year 2030. These designs are: • Eight advanced pressurized water reactors (PWRs) – AP1000, APR-1400, APWR, ATMEA1, EPR, VVER-1000 AES-91, VVER-1000 AES-92, and VVER-1200/491. As of June 2013, two units of VVER- 1000 AES 91 were in operation, and two units of VVER-1000 AES 92 were nearing operation. The first units of AP1000 and EPR were also nearing operation. Units of the AP1000, APR-1400, EPR, and VVER-1200/491 designs were under construction in June 2013. • Five boiling water reactors (BWRs) – GE-Hitachi ABWR, ESBWR, Toshiba EU-ABWR, KERENA, and Toshiba US-ABWR. As of June 2013, there were four ABWRs in operation, and two ABWRs were under construction. • Two pressurized heavy water reactors (PHWRs) – ACR-1000 and CANDU EC-6. There have been no orders as of June 2013 for either of these designs. • Three small modular reactors – CAREM-25, KLT-40S, and SMART, all PWRs. As of June 2013, there was one unit of CAREM-25 and two reactors (on one barge) of KLT-40S under construction. • One Generation IV Very High Temperature Reactor (HTR-PM). As of June 2013, there were two HTR-PM modules under construction. There are also five remaining Generation II reactor designs that were still (as of June 2013) under construction and for which plans exist to construct additional plants of these designs): BN-800 fast breeder reactor, the CNP-300 and CNP-600 PWRs, the CPR-1000 PWR, the PHWR-700, and the OPR- 1000 PWR. It is possible, although not very likely in view of the nominal duration of 17 years and the minimum to maximum range of 13-33 years for a nuclear power plant construction project (from feasibility study to commercial operation), that a few additional reactor designs with near-term deployment possibilities (2015-2020) could be finished in time to contribute to electricity generation by the year 2030. Plants with such designs would have to be ordered by 2015 -2020 in order to be able to be completed and online by 2030 using the absolute minimum schedule constraints (experienced utility, 3/134 ReportWP4 – Advanced Nuclear Power Plant Concepts and Timetables EHNUR existing nuclear power plant site, standard design with FOAKE complete, and design certification by the regulatory authority). There are an increasing number of advanced reactor designs that may become available in time to generate electricity after 2030. Generation IV design concepts are still being studied, and except for a few prototype units, Generation IV reactors are not expected to begin operation until 2040 or thereafter. Nuclear fusion, although promising as a source of electricity, has no chance of producing electricity before 2030, and only a small chance of producing electricity on a commercial scale before 2050. 4/134 ReportWP4 – Advanced Nuclear Power Plant Concepts and Timetables EHNUR CONTENT METHODOLOGY 9 Limitations 9 1 BACKGROUND 10 1.1 Status of operating units and units under construction 10 1.2 Development of the nuclear industry over the past 40 years 17 1.3 The stages in the design of a nuclear power plant 20 1.4 How long does it take for a nuclear power plant to be constructed and placed in operation? 23 2 ADVANCED REACTORS AND ISSUES RELATED THERETO 28 2.1 What are advanced reactors? 28 2.2 To which generation of reactors do the following designs correctly belong? 30 2.3 Which advanced reactor designs appear to have been abandoned, and for what reasons? 34 2.4 Nuclear power plant efficiency 34 2.5 Deterministic safety assessment (safety analysis) and probabilistic safety assessment (psa) 35 2.6 Cautionary discussion regarding advanced reactor cost estimates (the difference between over-night and all-in estimates) 39 3 HOW DO ADVANCED REACTORS COMPARE WITH GENERATION II NUCLEAR POWER PLANT DESIGNS? 43 4 HOW DOES THE DURATION OF SITING, AND CONSTRUCTON AFFECT THE POTENTIAL OF ADVANCED REACTORS TO BE DEPLOYED IN TIME TO START PRODUCING ELECTRICITY BEFORE 2030? 48 5 WHAT ADVANCED REACTOR DESIGNS COULD BE DEPLOYED IN TIME IN ORDER TO PRODUCE ELECTRICITY BEFORE 2030 – SOURCES OF INFORMATION AND GENERAL CONSIDERATIONS 51 6 WHAT ADVANCED REACTOR DESIGNS ARE AVAILABLE FOR NEAR-TERM DEPLOYMENT (BEFORE 2020)? 56 7 BASED ON CURRENT (MID-2013) INFORMATION, WHAT ADVANCED REACTOR DESIGNS COULD BECOME AVAILABLE FOR DEPLOYMENT AFTER 2020 IN ORDER TO PRODUCE ELECTRICITY BEFORE 2050? 57 8 WHAT ARE THE POTENTIAL ADVANTAGES AND DETRIMENTS OF SMALL MODULAR REACTORS? 58 9 WHAT IS THE DEPLOYMENT HORIZON FOR GENERATION IV ADVANCED REACTOR DESIGN CONCEPTS, AND WHAT ARE THE POTENTIAL ADVANTAGES AND DETRIMENTS OF SUCH CONCEPTS?59 10 WHAT IS THE DEPLOYMENT HORIZON FOR NUCLEAR FUSION TECHNOLOGY ON A COMMERCIAL SCALE? 62 5/134 ReportWP4 – Advanced Nuclear Power Plant Concepts and Timetables EHNUR 11 SUMMARY, CONCLUSIONS, AND RECOMMENDATIONS 64 REFERENCES 66 ANNEX 1 – ACRONYMS AND INITIALISMS 96 ANNEX 2 – DEFINITIONS OF TERMS 103 ANNEX 3 – PSA RESULTS FOR GENERATION III & III+ ADVANCED REACTORS AND GENERATION II REACTORS 108 ANNEX 4 – TABLES 110 6/134 ReportWP4 – Advanced Nuclear Power Plant Concepts and Timetables EHNUR LIST OF FIGURES FIGURE 1: PWR REACTOR PRESSURE VESSEL. .......................................................................................................... 13 FIGURE 2: PRESSURIZED WATER REACTOR CONCEPT. ............................................................................................. 13 FIGURE 3: BOILING WATER REACTOR CONCEPT. ..................................................................................................... 14 FIGURE 4: GAS-COOLED REACTOR CONCEPTS. ........................................................................................................ 14 FIGURE 5: PHWR REACTOR CONCEPT. ..................................................................................................................... 15 FIGURE 6: VVER REACTOR CONCEPT– VVER PRIMARY SYSTEM. ................................................................................... 15 FIGURE 7: RBMK REACTOR CONCEPT. ..................................................................................................................... 16 FIGURE 8: FAST REACTOR CONCEPT. POOL & LOOP TYPE FBR. .................................................................................... 16 FIGURE 9: ILLUSTRATION OF NUCLEAR POWER - PLANT DESIGN GENERATIONS. ................................................... 29 FIGURE 10: ILLUSTRATION OF ADVERSE TURBINE ORIENTATION. ........................................................................... 45 FIGURE 11: ILLUSTRATION OF PARALLEL TURBINE HALLS. ...................................................................................... 46 FIGURE 12: GENERATION III+ EPR PWR (CUTAWAY VIEW). ............................................................................................. 53 FIGURE 13: GE-HITACHI ABWR (CUTAWAY VIEW). ........................................................................................................ 53 FIGURE 14: KLT-40S SMR (FLOATING NUCLEAR PLANT). ................................................................................................. 54 FIGURE 15: GENERATION II CPR-1000 PWR DESIGN (CUTAWAY VIEW). ............................................................................ 54 LIST OF TABLES TABLE 1: REACTOR DESIGNS AVAILABLE FOR IMMEDIATE DEPLOYMENT .............................................................................. 110 TABLE 2: GENERATION III AND III+ PRESSURIZED WATER REACTORS (PWRS) AVAILABLE FOR IMMEDIATE DEPLOYMENT............. 115 TABLE 3: GENERATION III
Recommended publications
  • Introduction to GE Hitachi
    Overview of ABWR Safety Features INPRO Dialogue Forum November 19-23, 2013 J. Alan Beard Principal Engineer Copyright 2013 GE Hitachi Nuclear Energy International, LLC - All rights reserved GE Hitachi nuclear alliance and businesses Wilmington, NC Tokyo, Japan Wilmington, NC Wilmington, NC Peterborough, ON USA USA Yokosuka, Japan Canada •Nuclear Power Plants: ABWR, •Uranium •Nuclear Fuel Fabrication ESBWR and PRISM Enrichment ….BWR and CANDU •Nuclear Services … Third •CANDU Services •Advanced Programs … Generation •Fuel Engineering and Support Recycling Technology Services •GENUSA European Fuel Joint Venture Copyright 2013 GE Hitachi Nuclear Energy International, LLC - All rights reserved 2 BWR legacy around the world Dodewaard - Netherlands KKM - Switzerland K6/K7 - Japan Dresden 1 – USA KRB - Germany Lungmen - Taiwan Santa María de Garoña - Spain Vallecitos – USA Garigliano - Italy Laguna Verde - Mexico Tarapur 1&2 – India Copyright 2013 GE Hitachi Nuclear Energy International, LLC - All rights reserved 3 Recent project experience Kashiwazaki-Kariwa 6/7 ABWR COD 1996/1997 Hamaoka-5 ABWR COD 2005 Shika-2 ABWR Continuously building for 58 years COD 2006 Images copyright TEPCO, Hokuriku Electric Power, Chugoku Electric Power, and J-Power; Provided by Hitachi GE Nuclear Energy Copyright 2013 GE Hitachi Nuclear Energy International, LLC - All rights reserved 4 Current project status Ohma ABWR Ohma 1 • 38% complete Shimane 3 • 94% complete Under Construction • Approaching fuel load Shimane-3 ABWR Lungmen 1&2 • 94% complete • Startup and Pre-Op
    [Show full text]
  • Russia's Nuclear Security Policy
    Innovative approaches to peace and security from the Stanley Foundation POLICYANALYSISBRIEF THE STANLEY FOUNDATION | MAY 2015 Russia’s Nuclear Security Policy: Priorities and Potential Areas for Cooperation The crisis over Ukraine has led to a drastic reduction in regular official Russian-US contacts in most areas, including those where it is in the two countries’ mutual national security interests to work together. Bilateral cooperation on nuclear nonproliferation and nuclear security has been among the affected areas. The United States has suspended contacts with Russia in the framework of the G-8 and in the Russian-US Bilateral Presidential Commission’s Nuclear Energy and Nuclear Security Working Group. Implementation of the September 2013 agreement on Cooperation in Nuclear- and Energy- Related Scientific Research and Development (R&D Agreement), which Anton Khlopkov prioritizes joint efforts on nuclear nonproliferation and nuclear security, has also been put on hold, and exchanges between nuclear scientists of the two Author countries have been frozen. In turn, Russia has decided not to take part in Anton Khlopkov1 is director of the preparations for the 2016 Nuclear Security Summit. Moscow also notified Moscow-based Center for Energy and Washington that most of the joint nuclear security projects in Russia would Security Studies and editor in chief of the not be extended beyond December 31, 2014. journal Nuclear Club. He is a member of the Advisory Board under the Security This trend is a serious cause for concern, given that Russia and the United Council of the Russian Federation and States, which are depositaries of the Treaty on the Non-Proliferation of chairman of the Moscow Nonproliferation Nuclear Weapons (NPT), bear special responsibility for maintaining the Conference.
    [Show full text]
  • 小型飛翔体/海外 [Format 2] Technical Catalog Category
    小型飛翔体/海外 [Format 2] Technical Catalog Category Airborne contamination sensor Title Depth Evaluation of Entrained Products (DEEP) Proposed by Create Technologies Ltd & Costain Group PLC 1.DEEP is a sensor analysis software for analysing contamination. DEEP can distinguish between surface contamination and internal / absorbed contamination. The software measures contamination depth by analysing distortions in the gamma spectrum. The method can be applied to data gathered using any spectrometer. Because DEEP provides a means of discriminating surface contamination from other radiation sources, DEEP can be used to provide an estimate of surface contamination without physical sampling. DEEP is a real-time method which enables the user to generate a large number of rapid contamination assessments- this data is complementary to physical samples, providing a sound basis for extrapolation from point samples. It also helps identify anomalies enabling targeted sampling startegies. DEEP is compatible with small airborne spectrometer/ processor combinations, such as that proposed by the ARM-U project – please refer to the ARM-U proposal for more details of the air vehicle. Figure 1: DEEP system core components are small, light, low power and can be integrated via USB, serial or Ethernet interfaces. 小型飛翔体/海外 Figure 2: DEEP prototype software 2.Past experience (plants in Japan, overseas plant, applications in other industries, etc) Create technologies is a specialist R&D firm with a focus on imaging and sensing in the nuclear industry. Createc has developed and delivered several novel nuclear technologies, including the N-Visage gamma camera system. Costainis a leading UK construction and civil engineering firm with almost 150 years of history.
    [Show full text]
  • Equipment for Current Nuclear Plant Projects
    Ikata Nuclear Power Plant on the island of Shikoku, Japan. Owned and operated by the Shikoku Electric Power Company. This PWR has no cooling tower but cools by direct exchange with the ocean. Equipment for current nuclear plant projects The nuclear industry is undergoing a globalisation process. Companies like Westinghouse, GE, Areva and MHI are increasingly selling their expertise beyond their national borders; technology transfers and tie-ups are more frequent; plans are being laid to harness nuclear energy for desalinisation projects and - an industry first - for the manufacture of steel. Focus on Nuclear Power Generation surveys the scene, casting a particularly close eye on the role of suppliers in the slow but steady resurgence on the nuclear power industry. By James Chater he much talked about “nuclear still small. No wonder, then, that the 2007 the Finnish steel company announced renaissance” is happening, but progress is construction of nuclear power stations is put it had teamed up with Sweden's Boliden, Tslow. It takes time to choose a location, forward as a way of plugging the energy gap Rauman Energia, Katternoe and E.ON to ensure the investment funds are in place, seek - even though, if we are to believe critics of form Fennovoima, which aims to construct a the approvals, consult local communities and nuclear power, the new wave of power 1000-1800MW nuclear power plant in address the safety issues. And the market has stations being planned will not be built in Finland. Power generation requires steel, several options to choose from: APWRs from time to avert an energy shortage.
    [Show full text]
  • E-Mail: [email protected]
    ATOMENERGOMASH JSC Nuclear and Power Engineering Address: 28/3 Ozerkovsakaya nab., Moscow, 115184 Telephone: +7(495) 668-20-93 Fax: +7(495) 668-20-95 Website: http://www.aem-group.ru/en/ E-mail: [email protected] www.aem-group.ru/en/ 3 JSC Atomenergomash ABOUT US Аtomenergomash JSC (AEM, Сompany, Group) is a machine building division of ROSATOM State Atomic Energy Corporation. One of the leading Russian power engineering companies, a supplier of efficient integrated solutions for nuclear and thermal power plants, natural gas and petrochemical industry, shipbuilding, hydroelectricity, demineralization, water treatment, water purification and special steel market. FIGURES AND FACTS ATOMENERGOMASH • The key developer and equipment manu- • AEM was established in 2006 as part of facturer for the reactor facility of the ROSATOM State Atomic Energy Corporation. water-water energetic reactor (VVER). • The Holding includes about 20 • The key developer and equipement man- power engineering companies, R&D, ufacturer of fast nuclear reactors (FNR). manufacturing, construction and • Equipment manufacturer for the turbine construction companies located in Russia, island of NPP with VVER. Ukraine, the Czech Republic, and Hungary. • The only Russian manufacturer of steam • The Holding’s equipment is installed in generators and main circulation pumps more than 20 countries. for Russian-built NPPs. • 14% of global Nuclear Power Plants (NPP) • The key developer and manufacturer of and 40% of Thermal Power Plants (TPP) marine reactor plants for the Navy and in Russia and the former Soviet Union nuclear icebreakers. countries run our equipment. • One of the largest manufacturers of power plant boilers and Heat Recovery Steam Generator (HRSG) for medium and large Combined Cycle Gas Turbine (CCGT) units.
    [Show full text]
  • Advanced Reactors
    © 2012 European Nuclear Society Rue Belliard 65 1040 Brussels, Belgium Phone + 32 2 505 30 54 Fax +32 2 502 39 02 E-mail [email protected] Internet www.euronuclear.org ISBN 978-92-95064-14-0 These transactions contain all contributions submitted by 7 December 2012. The content of contributions published in this book reflects solely the opinions of the authors concerned. The European Nuclear Society is not responsible for details published and the accuracy of data presented. 2 of 96 ENC2012-A0026 Development of a thermohydraulic model of the Lazaro Chueca, A. (1); Ammirabile, L. (1); European Sodium Fast Reactor (ESFR) using Martorell, S. (2) the system code TRACE. 1 - JRC-IET, Netherlands 2 - Universidad Politecnica de Valencia, Spain ENC2012-A0028 Generation IV Technology Status including Anderson, G. (1); Lillington, J. (1) recent R & D Activities in ANSWERS 1 - AMEC, United Kingdom ENC2012-A0053 Preliminary Design Assessment of the Molten Merle-Lucotte, E. (1); Allibert, M. (1); Salt Fast Reactor Brovchenko, M. (1); Ghetta, V. (1); Heuer, D. (1); Rubiolo, P. (1); Laureau, A. (1) 1 - LPSC-IN2P3-CNRS / UJF / Grenoble INP, France ENC2012-A0078 Development of materials to withstand the Shepherd, D. (1) extreme, irradiated environments in advanced 1 - National Nuclear Laboratory, United Kingdom nuclear fission reactors ENC2012-A0126 ARCHER:- Material and component challenges Buckthorpe, D. (1) for the Advanced High Temperature Reactor 1 - AMEC, United Kingdom ENC2012-A0258 Pressure Drop Analysis of a Pressure-Tube Type Peiman, W. (1); Saltanov, E. (1); Pioro, I. SuperCritical Water-Cooled Reactor (SCWR) (1); Gabriel, K. (1) 1 - University of Ontario Institute of Technology, Canada ENC2012-A0003 SPES3: THE INTEGRAL FACILITY FOR Ferri, R.
    [Show full text]
  • A Comparison of Advanced Nuclear Technologies
    A COMPARISON OF ADVANCED NUCLEAR TECHNOLOGIES Andrew C. Kadak, Ph.D MARCH 2017 B | CHAPTER NAME ABOUT THE CENTER ON GLOBAL ENERGY POLICY The Center on Global Energy Policy provides independent, balanced, data-driven analysis to help policymakers navigate the complex world of energy. We approach energy as an economic, security, and environmental concern. And we draw on the resources of a world-class institution, faculty with real-world experience, and a location in the world’s finance and media capital. Visit us at energypolicy.columbia.edu facebook.com/ColumbiaUEnergy twitter.com/ColumbiaUEnergy ABOUT THE SCHOOL OF INTERNATIONAL AND PUBLIC AFFAIRS SIPA’s mission is to empower people to serve the global public interest. Our goal is to foster economic growth, sustainable development, social progress, and democratic governance by educating public policy professionals, producing policy-related research, and conveying the results to the world. Based in New York City, with a student body that is 50 percent international and educational partners in cities around the world, SIPA is the most global of public policy schools. For more information, please visit www.sipa.columbia.edu A COMPARISON OF ADVANCED NUCLEAR TECHNOLOGIES Andrew C. Kadak, Ph.D* MARCH 2017 *Andrew C. Kadak is the former president of Yankee Atomic Electric Company and professor of the practice at the Massachusetts Institute of Technology. He continues to consult on nuclear operations, advanced nuclear power plants, and policy and regulatory matters in the United States. He also serves on senior nuclear safety oversight boards in China. He is a graduate of MIT from the Nuclear Science and Engineering Department.
    [Show full text]
  • Fast-Spectrum Reactors Technology Assessment
    Clean Power Quadrennial Technology Review 2015 Chapter 4: Advancing Clean Electric Power Technologies Technology Assessments Advanced Plant Technologies Biopower Clean Power Carbon Dioxide Capture and Storage Value- Added Options Carbon Dioxide Capture for Natural Gas and Industrial Applications Carbon Dioxide Capture Technologies Carbon Dioxide Storage Technologies Crosscutting Technologies in Carbon Dioxide Capture and Storage Fast-spectrum Reactors Geothermal Power High Temperature Reactors Hybrid Nuclear-Renewable Energy Systems Hydropower Light Water Reactors Marine and Hydrokinetic Power Nuclear Fuel Cycles Solar Power Stationary Fuel Cells U.S. DEPARTMENT OF Supercritical Carbon Dioxide Brayton Cycle ENERGY Wind Power Clean Power Quadrennial Technology Review 2015 Fast-spectrum Reactors Chapter 4: Technology Assessments Background and Current Status From the initial conception of nuclear energy, it was recognized that full realization of the energy content of uranium would require the development of fast reactors with associated nuclear fuel cycles.1 Thus, fast reactor technology was a key focus in early nuclear programs in the United States and abroad, with the first usable nuclear electricity generated by a fast reactor—Experimental Breeder Reactor I (EBR-I)—in 1951. Test and/or demonstration reactors were built and operated in the United States, France, Japan, United Kingdom, Russia, India, Germany, and China—totaling about 20 reactors with 400 operating years to date. These previous reactors and current projects are summarized in Table 4.H.1.2 Currently operating test reactors include BOR-60 (Russia), Fast Breeder Test Reactor (FBTR) (India), and China Experimental Fast Reactor (CEFR) (China). The Russian BN-600 demonstration reactor has been operating as a power reactor since 1980.
    [Show full text]
  • The Economics of Nuclear Power: Analysis of Recent Studies
    Public Services International Research Unit (PSIRU) www.psiru.org The economics of nuclear power: analysis of recent studies by Steve Thomas July 2005 PSIRU University of Greenwich www.psiru.org 1. INTRODUCTION.................................................................................................................................................... 3 2. THE WORLD MARKET FOR NUCLEAR PLANTS: EXISTING ORDERS AND PROSPECTS................ 4 3. OPERATING NUCLEAR POWER PLANTS IN THE UK ................................................................................ 7 4. CURRENT DESIGNS ............................................................................................................................................. 9 4.1. PWRS ................................................................................................................................................................ 9 4.1.1. EPR........................................................................................................................................................... 9 4.1.2. AP-1000.................................................................................................................................................. 10 4.1.3. System 80+/APR-1400............................................................................................................................ 10 4.1.4. APWR ..................................................................................................................................................... 10
    [Show full text]
  • Core Design and Optimization of the High Conversion Small Modular Reactor
    Technische Universität München Fakultät für Maschinenwesen Lehrstuhl für Nukleartechnik Core Design and Optimization of the High Conversion Small Modular Reactor Denis Janin Vollständiger Abdruck der von der Fakultät für Maschinenwesen der Technischen Universität München zur Erlangung des akademischen Grades eines Doktor-Ingenieurs (Dr.-Ing.) genehmigten Dissertation. Vorsitzender: Prof. Phaedon-Stelios Koutsourelakis, PhD Prüfer der Dissertation: 1. Prof. Rafael Macián-Juan, PhD 2. Prof. Dr. Jean-Baptiste Thomas Die Dissertation wurde am 08.05.2018 bei der Technischen Universität München eingereicht und durch die Fakultät für Maschinenwesen am 01.11.2018 angenommen. ABSTRACT This research work investigates the design and optimization of the high conversion small modular reactor (HCSMR) core. The HCSMR has a thermal output of 600 MW for 200 MW electrical. It is an integrated PWR with a tightened fuel assembly lattice. The rod-to-rod pitch is 1.15 cm in a hexagonal fuel assembly geometry. As a result the moderation ratio (1.0) is reduced compared to large PWRs (around 2.0) and the HCSMR has an improved ability to convert 238U into 239Pu and use plutonium isotopes more efficiently. The core is loaded with MOX fuel. The HCSMR concept finds its roots both in large high conversion light water reactors and small modular reactor (SMR) concepts. The reduced core size results in an increased neutron leakage rate compared to large cores. This intrinsically supports the core behavior in voided situations. The necessity to introduce fertile fuel materials in the core to keep negative void coefficients is reduced, contributing to the HCSMR safety and limited core heterogeneity.
    [Show full text]
  • Program Jądrowy W Federacji Rosyjskiej 10
    Program jądrowy w Federacji Rosyjskiej PROGRAM POLSKIEJ ENERGETYKI JĄDROWEJ ANALIZY I OPRACOWANIA 10 materiał informacyjny opracowany przez Departament Energii Jądrowej Ministerstwa Energii JAMAŁ Rosyjski 150-metrowy lodołamacz wyposażony w dwa reaktory jądrowe. Jest jednym z niewielu statków, którym udało się dopłynąć do bieguna północne- go, i jedynym, któremu ta sztuka udała się kilkadziesiąt razy. Jednostka jest również statkiem wycieczkowym posiadającym 50 kabin i apartamentów. Opracowanie uwzględnia dane według stanu na maj 2016. Program jądrowy w Federacji Rosyjskiej Energia jądrowa pozostaje strategicznym priorytetem dla Rosji. Utrzy- muje się stały wzrost jej udziału w bilansie energetycznym kraju zarówno poprzez budowę nowych bloków jądrowych, jak i dzięki znacznej poprawie wydajności istniejących instalacji. Obecnie FR eksploatuje 35 reaktorów energetycznych o całkowitej mocy 26,1 GWe, które dostarczają ok. 18% krajowej produkcji energii elektrycznej, a w budowie znajduje się kolejnych 8 reaktorów. Do roku 2030 planowane jest uruchomienie 15 nowych reaktorów i zwiększenie udziału energii jądrowej w bilansie energetycznym do 25-30%. Kraj ten opanował pełny cykl paliwowy, w tym wzbogacanie uranu oraz przerób wypalonego paliwa i jest samowystarczalny pod względem zaopa- trzenia w paliwo jądrowe oraz postępowania z odpadami promieniotwór- czymi. Eksport urządzeń i usług jądrowych stanowi jeden z głównych celów politycznych i ekonomicznych państwa. Firmy rosyjskie oferują kom- pleksową dostawę technologii (budowa elektrowni, dostarczanie paliwa, demontaż) a państwo zapewnia wsparcie finansowe tych inwestycji. Rosja jest także światowym liderem w technologii reaktorów prędkich. 1 1. Bilans energetyczny Krajowa produkcja energii elek- na krajowe cele energetyczne. reaktora energetycznego. trycznej w 2012 r. wyniosła 1071 W 2015 r. całkowita zainstalo- W dalszej perspektywie strategia TWh, z czego 525 TWh wyprodu- wana moc elektrowni jądrowych rosyjska zakłada, że ograniczone kowano w elektrowniach gazowych wynosiła 26,1 GWe.
    [Show full text]
  • Status of Small and Medium Sized Reactor Designs
    STATUS OF SMALL AND MEDIUM SIZED REACTOR DESIGNS A Supplement to the IAEA Advanced Reactors Information System (ARIS) http://aris.iaea.org @ September 2012 STATUS OF SMALL AND MEDIUM SIZED REACTOR DESIGNS A Supplement to the IAEA Advanced Reactors Information System (ARIS) http://aris.iaea.org FOREWORD There is renewed interest in Member States grids and lower rates of increase in demand. in the development and application of small They are designed with modular technology, and medium sized reactors (SMRs) having an pursuing economies of series production, factory equivalent electric power of less than 700 MW(e) fabrication and short construction times. The or even less than 300 MW(e). At present, most projected timelines of readiness for deployment new nuclear power plants under construction of SMR designs generally range from the present or in operation are large, evolutionary designs to 2025–2030. with power levels of up to 1700 MW(e), The objective of this booklet is to provide building on proven systems while incorporating Member States, including those considering technological advances. The considerable initiating a nuclear power programme and those development work on small to medium sized already having practical experience in nuclear designs generally aims to provide increased power, with a brief introduction to the IAEA benefits in the areas of safety and security, non- Advanced Reactors Information System (ARIS) proliferation, waste management, and resource by presenting a balanced and objective overview utilization and economy, as well as to offer a of the status of SMR designs. variety of energy products and flexibility in This report is intended as a supplementary design, siting and fuel cycle options.
    [Show full text]