Eerstehoek Regional Bulk Water Scheme Technical

Total Page:16

File Type:pdf, Size:1020Kb

Eerstehoek Regional Bulk Water Scheme Technical DEPARTMENT OF WATER AFFAIRS GERT SIBANDE DISTRICT MUNICIPALITY REGIONAL BULK INFRASTRUCTURE GRANT PROGRAMME CONTRACT Nº: 49/2010 EERSTEHOEK REGIONAL BULK WATER SCHEME TECHNICAL REPORT August 2012 Revision 7 Prepared by: EMZANSI ENGINEERS (PTY) LTD P.O. Box: Post Net Suite Toll 57 Private Bag X9013 Ermelo 2350 Tel: +27 17 811 6422 Fax: +27 17 811 2919 Gert Sibande District Municipality Chief Albert Luthuli Municipality Cnr Joubert & Oosthuisen Streets 28 Kerk Street ERMELO CAROLINA 2350 1185 Tel: +27 17 801 7000 Tel: +27 17 843 4000 Fax: +27 17 811 1304 Fax: +27 17 843 4001 GERT SIBANDE DISTRICT MUNICIPALITY REGIONAL BULK INFRASTRUCTURE GRANT PROGRAMME EERSTEHOEK REGIONAL BULK WATER SCHEME TECHNICAL REPORT CONTENTS Chapter Description Page 1 INTRODUCTION 4 1.1 Project Title 4 1.2 Project Name 5 1.3 Project Location 5 1.3.1 Project Coordinates 5 1.3.2 Settlements/Villages 5 1.4 Project Objectives 6 1.5 Purpose of Technical Report 6 1.6 Overview of Regional Planning/Studies 7 1.7 Other Water Schemes in the Area 7 2 NEEDS DETERMINATION 8 2.1 Demographics 8 2.1.1 Population 8 2.1.2 Growth projections 8 2.2 Demand/Needs Parameters 11 2.2.1 Service Levels (volumetric) 11 2.2.2 Design Criteria 13 2.2.3 Quality 13 2.3 Related Projects 13 3 ENGINEERING VIABILITY 15 3.1 Options Considered 15 3.1.1 Source 15 3.1.2 Water Quality 16 3.2 Engineering Considerations 16 3.2.1 Planning Norms and Design Parameters 16 3.2.2 Existing Infrastructure 16 3 735 18 3.2.3 Proposed Infrastructure 22 Eerstehoek Regional Bulk Water Scheme – Technical Report AUGUST 2012 3.2.4 Bill of Quantities 25 4 INSTITUTIONAL SUSTAINABILITY 30 4.1 Community Structures 30 4.1.1 Community Structures 30 4.1.2 Level of community awareness and development 30 4.1.3 Level of involvement of women 30 4.1.4 Community Involvement 31 4.2 Water Service Authority 31 4.2.1 Status and proficiency of Local Water Services Authority: 31 4.3 Water Service Provider 32 4.3.1 Section 78 Determination 32 4.3.2 Water Services Provider 33 4.3.3 Consumer/Customer Relation 33 4.4 Legal Requirements 33 4.4.1 Water Use Registration 33 4.4.2 Project Registration with Respect to NEMA 33 5 ECONOMIC/SOCIO ECONOMIC ANALYSIS 34 5.1 Infrastructure 34 5.1.1 Initial Capital Investment Cash Flow 34 5.1.2 Long Term Operational Costs 34 5.1.3 Replacement/Refurbishment Cycle Cost 34 5.2 Social and Socio Economic Opportunities 35 5.3 Training, Facilitation and Capacity Building Scope of Work 35 5.3.1 Community Participation 35 5.3.2 Sustainable Institutions 36 5.3.3 Sanitation Health and Hygiene Promotion 36 5.3.4 Entrepreneurial Development 36 5.4 Labour Based Construction 36 5.5 Permanent Staff Requirements 37 5.6 Cost Estimates 38 6 FINANCIAL VIABILITY 39 6.1 Funding Source 39 6.1.1 Capital Investments 39 6.1.2 Long Term Operation and Maintenance 39 6.2 Cash flow Forecast 41 6.3 Milestone Schedule 41 7 ENVIRONMENTAL ACCEPTABILITY 42 7.1 Natural Environment Impact Assessment 42 7.2 Social Environment 42 Eerstehoek Regional Bulk Water Scheme – Technical Report AUGUST 2012 7.2.1 Relocation Considerations 42 7.2.2 Socio Economic Opportunity Maximisation 42 7.2.3 Environmental Management Plan 42 8 CONCLUSION 43 8.1 Water Supply Requirements 43 8.2 Scope of Works Summary 43 8.3 Funding Summary 44 9 RECOMMENDATIONS 45 10 PROJECT APPROVAL 46 APPENDIXES Annexure A: Locality Plan and Project Footprint Annexure B: Options Considered & Cost Breakdown Annexure C: GSDM Evaluation of Water Resources Report Annexure D: Cash flow (Tabular and Graphical) Annexure E: Detail of ISD Scope of Work Annexure F: Monthly Water Consumption and Possible Income and Expenditure on Completion Annexure G: Project Milestones Annexure H: Application Form for Authorisation in terms of Section 22 of the Environment Conservation Act and Letter of Appointment for EIA. Annexure J: Typical Water Quality Test Results Annexure K: Drawings Eerstehoek Regional Bulk Water Scheme – Technical Report AUGUST 2012 EXECUTIVE SUMMARY PROJECT OBJECTIVES The primary objective of the project is to provide a safe and reliable source of potable water to the communities living in the project areas within Chief Albert Luthuli Municipality (CALM). The secondary objective is to develop institutional capacity within the community to create an awareness of the project and to promote health and hygiene awareness during the project and beyond. The project area covers communities residing in Nhlazatshe, Tjakastad, Avontuur, Mooiplaas, Arhemberg, Malahleka, Khuzuwandle and Elukwatini. COMMUNITY NEEDS The existing infrastructure is no longer adequate to cope with the current water demand in the project area. Gert Sibande District Municipality (GSDM) intends to Upgrade the infrastructure and simultaneously create a regional water scheme that will be able to provide the required demand projected up to year 2032. The scheme will be able to provide adequate water supplies to a population of between 70 010 (2012) and 96 527 (2032) people. EXISTING INFRASTRUCTURE Presently, the communities in the project area (for the infrastructure covered in this Technical Report) are supplied from the Eerstehoek Water Treatment Works. The plant in its current state is not sized to cope with the current demand. In addition, various components of the plant are in need of refurbishment and upgrading. The bulk water distribution system in the form of existing pipelines, pumpstations and reservoirs is also not adequately sized to meet the current and future projected demands. OPTIONS CONSIDERED Presently, the communities in the project area are supplied from Eerstehoek Water Treatment Works. This Technical Report reviews three options, together with the Funding Plan. The three options considered are summarised as follows: Option Description Scope of Works Estimated Total Project Cost(Incl. VAT) Option 1 Water Supply from Upgrade Eesterhoek WTW from a capacity Eerstehoek WTW of 13.4Ml/day to 26Ml/day to serve the (Ekulindeni WTW project area including bulk pipelines, R115 122 779.20 upgraded separately reservoirs and associated pumpstations up under a different BP) to Mooiplaas to the east Option 2 Water Supply from Upgrade Eerstehoek WTW from a capacity Eerstehoek WTW of 13.4Ml/day to 30 Ml/day to serve the R156 550 594.00 entire project area including bulk pipelines, reservoirs and associated pumpstations Option 3 Water Supply from Upgrade Ekulindeni WTW from a capacity of Ekulindeni WTW 4Ml/day to 30 Ml/day including bulk R281 349 500.00 pipelines, reservoirs and associated pumpstations Eerstehoek Regional Bulk Water Scheme - Technical Report 1 AUGUST 2012 PROPOSED INFRASTRUCTURE Option 1 has been recommended on the basis of the lower net present value cost of the total construction cost. The proposed infrastructure for Option 1 comprises the following: Upgrade Eesterhoek WTW from a capacity of 13.4Ml/day to 26Ml/day to serve the project area including bulk pipelines, reservoirs and associated pumpstations up to Mooiplaas to the east. This infrastructure will be subject to this Technical Report. (Upgrade of Ekulindeni WTW will be covered in a different BP). Infrastructure Proposed in this Technical Report The infrastructure thus proposed, in this Technical Report, is as follows: Refurbish and upgrade the existing Theespruit and Komati River Raw Water Abstraction civil works. Refurbish and upgrade the Komati Raw Water Booster Pumpstation to supply the additional demand up to the required 300l/s to the Eerstehoek WTW. Upgrade of Eerstehoek WTW from a capacity of 13.4Ml/day to 26Ml/day. Construction of the following pipelines: o 6.8km long x 450mm diameter uPVC rising main (class 16) from the Komati River Raw Water Pumpstation to Eerstehoek WTW. Upgrading / Equipping of the following pumpstations; o Elukwatini Pumpstation situated at the Eerstehoek WTW from the present 100l/s to 144l/s. o Komati River Raw Water Booster Pumpstation from 50 l/s to 200l/s. o Komati River Abstraction works from 100 l/s to 200 l/s. Construction of the following reservoirs: o A new 1Ml storage reservoir at the Eerstehoek Water Treatment Plant. o 2 No. x 6.5Ml reservoirs (to provide a total capacity of 13Ml) at Inhlazatshe. o A new 0.3Ml reservoir at Avontuur. o A new 0.3Ml reservoir at Malahleni. o A new 0.4Ml reservoir at Mooiplaas. OWNERSHIP CALM is the Water Services Authority (WSA) and Water Services Provider (WSP) in the project area. The project will be implemented by GSDM as the appointed Implementing Agent. On completion of the project the infrastructure shall be owned and maintained by the WSP. Eerstehoek Regional Bulk Water Scheme - Technical Report 2 AUGUST 2012 COST PER CAPITA The estimated present day total project cost is R115 122 779.20 including VAT and the allowances that have been made for contingencies. The breakdown of this cost is as detailed in the table below. Construction and Related Costs Amount a. Refurbish and upgrade the existing Theespuit and Komati River Raw Water Abstraction Works R 2 736 000.00 b. Refurbish and upgrade the existing Komati River Raw Water Abstraction Works and Raw Water Booster Pumpstation supply the required 300l/s demand to eerstehoek WTW (pumpstation equipped with 2No. X 200l/s pumps) R 1 026 000.00 c. Construction of 6.8km long x 450mm diameter uPVC rising main (class 16) from the Komati River Raw Water Pumpstation to Eerstehoek WTW R 5 038 800.00 d. Mechanical and Electrical Works for pumpstation at Eerstehoek including remote monitoring equipment (2 No. pumps x 144l/s @ 400kW at 211m Head) R 1 026 000.00 e.
Recommended publications
  • PHARMACEUTICAL SERVICES Centre: Provincial Office, Nelspruit Salary: R1 185 879 – 1 355 916 P.A
    MPUMALANGA PROVINCE DEPARTMENT OF HEALTH “SIYANAKEKELA” SENIOR MANAGER: PHARMACEUTICAL SERVICES Centre: Provincial Office, Nelspruit Salary: R1 185 879 – 1 355 916 p.a. (OSD Requirements). All shortlisted candidates for SMS posts will be subjected to a technical exercise that intends to test relevant technical elements of the job. The recommended candidates will be subjected to a competency assessment. The successful candidate must sign a performance agreement. Reference No: MPDoH/July/17/01 Requirements: Diploma Pharm / BSC. Pharm / B. Pharm or NQF Level 7 qualification as recognized by SAQA. Current registration with SAPC. At least five (5) years of experience at a middle / senior managerial level. Good communication, interpersonal and computer skills (MS Word and Excel). Ability to work in a team. Good understanding of the National Drug Policy and good pharmacy practice guidelines. Sound knowledge of the Pharmacy Act and the related Substance Act. A valid code B driver’s license. Duties: Development of strategic and operational plan of Pharmaceutical services. Compile annual quarterly and monthly reports of Pharmaceutical services. Management of the pharmaceutical budget and monitor expenditure. Overall responsibility and accountability for medicine supply management processes. Manage warehousing of all pharmaceuticals. Manage the development and review of pharmaceutical policies. Manage Essential Medicine List Programme. Render technical and pharmaceutical support to all health programmes. Provide expert advice and training to other healthcare. Ensure the implementation of the down referral system. Implement the essential drug Programme. Supervise pharmaceutical care to Hospital patients by implementing monitoring of work procedures, policies and Guidelines. Overall responsibility and accountability for drug supply management to ensure the safe and reliable procurement, storage, control and distribution of quality pharmaceuticals.
    [Show full text]
  • Table of Contents
    GERT SIBANDE DISTRICT MUNICIPALITY FINAL IDP 2011/12 TO 2013/14 A DISTRICT MUNICIPALITY STRIVING TO EXCEL IN GOOD GOVERNANCE AND QUALITY INFRASTRUCTURE Gert Sibande District Municipality i Foreword by the Executive Mayor It gives me great pleasure to present the Draft Integrated Development Plan for the 2011/12 to 2013/14 Financial Years, in the last year of this Current Term of Office. In reviewing our 2010/11 IDP and subsequently drafting our IDP and Budget respectively for 2011/12 to 2013/14 and beyond, we have consulted quite extensively with our communities in all our constituent Local Municipalities through their varying groupings using our IDP Representative Forum and other IGR structures institutionalised within our Municipality. Culminating from the state of the Nation and state of the Province Addresses respectively, and aforementioned consultation and engagements with varying stakeholders the following Key Development objectives were identified as pertinent in bringing about improved quality of life for our entire populace:- Facilitate creation of more jobs and descent work; Form strategic partnerships in fighting hunger and poverty; Advocate for access to quality education for all our citizens; Ensure proper health care for all our communities; Ensure sustainable development of all rural communities within our jurisdictional area; Harness the building of safer and secure communities To date resounding success has been realised in number of areas, where many of our people are living decent lives as a result of the services provided by the District in collaboration with its social partners. Whilst much has been achieved, there is still much that needs to be done to reverse and ultimately eradicate undesired consequences of underdevelopment, inequality, unemployment, HIV/AIDS and poverty.
    [Show full text]
  • Mpumalanga Presentation
    STATE OF THE PROVINCE: MPUMALANGA Briefing the Portfolio Committee on Home Affairs: 8 SEPTEMBER 2015 Presented by the Acting Provincial Manager: Ms ME Makatu TABLE OF CONTENT Provincial Overview 12 - 31 Capacity Information 32 - 38 Human Resources 39 - 49 Counter Corruption, Security Services and Labour Relations 50 -54 Finance and Budget 55 - 62 Operations 63 - 74 Ports of Entry 75 - 78 Challenges and Achievement 79 - 80 2 SOCIO-ECONOMIC REVIEW AND OUTLOOK OF MPUMALANGA - DECEMBER 2014 KEY FINDINGS • Mpumalanga’s percentage share of the national population of 54.0 million was 7.8 per cent, or 4.2 million, in 2014. • In total over the last year, Mpumalanga recorded 14 000 less jobs, however, the province registered an increase of 8 000 jobs in the third quarter of 2014. • Mpumalanga (29.3 per cent), recorded the fourth highest strict unemployment rate among the nine provinces. The expanded unemployment rate was 42.0 per cent in the third quarter of 2014. • The male unemployment rate was 25.7 per cent, the female unemployment was 33.6 per cent and the youth (15-34 years) unemployment rate was 41.8 per cent. • By 2013, 10.8 per cent of the people 20 years and older had not received any schooling. • In 2013, the Mpumalanga’s Grade 12 pass rate (77.6 per cent) was the fifth highest/lowest. • In 2012, the HIV prevalence rate of the female population aged 15–49 in Mpumalanga was 35.6 per cent – the second highest after KwaZulu-Natal. • In 2013, Mpumalanga recorded a HDI (The Human development index is a composite, relative index that attempts to quantify the extent of human development of a community.
    [Show full text]
  • CONTACT INFORMATION AREA COURT MANAGERS CLUSTER NAME TELEPHONE FAX NUMBER E-MAIL ADDRESSES CELL NUMBER SPEED DIAL Barberton
    CONTACT INFORMATION AREA COURT MANAGERS CLUSTER NAME TELEPHONE FAX NUMBER E-MAIL ADDRESSES CELL NUMBER SPEED DIAL Barberton Ms. Cathy Venter (013) 712 2104 086 6150972 [email protected] 082 334 2937 16503 Eerstehoek Vacant (017) 883 0090 16510 Evander Ms Thembela (017) 632 2204 086 6292907 [email protected] 073 158 7502 16512 Mcetywa Mdutjana Mr. William Baloyi (013) 947 2363 086 4018346 [email protected] 083 4304 485 16517 Middelburg Mr. William Nyathi (013) 262 2033 086 6293960 [email protected] 083 5355 283 16521 Nelspruit Mr. Titus Letlape (013) 753 6200 086 6292684 [email protected] 084 8388 663 16504 Nsikazi Mr. A Thabethe (013) 793 0567 086 6446010 [email protected] 082 933 3228 16527 Witbank Vacant (013) 656 2221 16534 Prov Man Mr IR (013) 283 7501 [email protected] 082 9568 663 16551 Mohlamonyane COURT MANAGERS OFFICE NAME TELEPHONE FAX NUMBER E MAIL ADDRESS CELL NUMBER SPEED NAME DIAL Nelspruit Ms N Ndlovu (013) 753 6299 013 7554077 [email protected] 076 271 2920 16525 Belfast Ms LP Thaha (Act) (013) 253 1138 013 2530035 [email protected] 16504 Waterval Ms LP Thaha (013) 257 0004 013 2570004 [email protected] 072 833 8983 16533 Boven Lydenburg Mr Chiloane (013) 235 2325 086 5070998 [email protected] 082 256 4722 16518 Eerstehoek Ms LT Mtuta (017) 883 0090 086 6046420 [email protected] 082 359 8096 16510 Carolina Mr DA Gule (017) 843 1033 086 5699732 [email protected] 082 844 5008 16507 Morgenzon Mr B Mahlambi (017) 793 3013 086 6446329 [email protected]
    [Show full text]
  • Chief-Albert-Luthuli
    Chief Albert Luthuli Municipality Integrated Development Plan 2020-2021 The transparent, innovative and developmental municipality that improves the quality of life of its people 6/4/2020 INDEX ACCRONYMS AND ABREVIATIONS ABET Adult Based Education and Training AIDS Acquired Immune Deficiency Syndrome ASGISA Accelerated Shared Growth Initiative South Africa CBO’s Community Based Organizations CETA Construction Education and Training Authority CHBC Community Home Base Care CIP Comprehensive Infrastructure Plan CFO Chief Financial Officer CMIP Consolidated Municipal Infrastructure Programme CM Community Services DAC District Aids Council DBSA Development Bank of South Africa DALA Department of Agriculture and Land Administration DARDLA Department of Development and Land Administration DCOGTA Department of Corporative Government and Traditional Affairs DHS Department of Human Settlements DLA Department of Land Affairs DM District Municipality DME Department of Minerals and Energy DPWR&T Department of Public Works, Roads and Transport DRDLR Department of Rural Development and Land Reform ECA Environmental Conservation Act EPWP Expanded Public Works Programme EIA Environmental Impact Assessment EIP Environmental Implementation Plan EPWP Expanded Public Works Programme EIA Environmental Impact Assessment EIP Environmental Implementation Plan EPWP Expanded Public Works Programme FBS Free basic Services FBE Free Basic Electricity GIS Geographic Information System GSDM Gert Sibande District Municipality HoD Head of Department HDI Human Development
    [Show full text]
  • Study of Knowledge, Attitudes, Perceptions and Beliefs Regarding HIV and AIDS (KAPB)
    DOCUMENT RESUME ED 407 373 SP 037 287 AUTHOR Du Plessis, G. E.; And Others TITLE Study of Knowledge, Attitudes, Perceptions and Beliefs Regarding HIV and AIDS (KAPB). Memorandum Presented to the Directorate Primary Health Care of the Department of National Health and Population Development. INSTITUTION Human Sciences Research Council, Pretoria (South Africa). PUB DATE 93 NOTE 204p PUB TYPE Reports Research (143) EDRS PRICE MF01/PC09 Plus Postage. DESCRIPTORS *Acquired Immune Deficiency Syndrome; Adults; *Behavior Change; *Communicable Diseases; Elementary Secondary Education; Foreign Countries; Health Promotion; *Knowledge Level; *Public Opinion; Students; Surveys IDENTIFIERS Health Behavior; *Sexually Transmitted Diseases; *South Africa ABSTRACT This document reports on a study that assessed levels of knowledge, types of attitudes, perceptions, and beliefs (KAPB) of the general South African public regarding Human Immunodeficiency Virus (HIV) infection and Acquired Immune Deficiency Syndrome (AIDS). Interviews were conducted with 5,360 participants; survey data are summarized in 49 tables. After describing the theoretical background and methodology used in the study, findings are grouped according to differences by gender, age group, language, geographic area, educational level, population group, occupation, and differential access to sources of information about AIDS. Study results indicated: knowledge of sexually transmitted diseases (STDs) was not very high, especially regarding prevention; and many believed that contraceptives also provided protection against STDs and HIV. Overall, awareness of AIDS seemed to be high, but with a mixture of appropriate and inappropriate knowledge about HIV/AIDS in terms of transmission, nature of the disease, seriousness, prevention, and cure. Conclusions and recommendations are grouped by knowledge about HIV/AIDS, perceptions of seriousness, condom use, support for behavioral change, self-efficacy in health, perceptions of social distance, the role of communication media, and further research needs.
    [Show full text]
  • A Study of Health Workers' Knowledge and Practices Regarding Leprosy Care and Control at Primary Care Clinics in the Eerstehoe
    Original Research A study of health workers’ knowledge and practices regarding leprosy care and control at primary care clinics in the Eerstehoek area of Gert Sibande district in Mpumalanga Province, South Africa Ukpe IS, MBBCh, DTM&H, MMed (FamMed), FACTM Senior Specialist - Family Medicine, University of Pretoria / Mpumalanga Province, South Africa. Correspondence: E-mail: [email protected] Abstract Background Leprosy is now a rare disease in South Africa. It does still occur, however, and it is an important cause of preventable disability. The target of eliminating leprosy as a public health problem has long been reached in the country in terms of the World Health Organization (WHO) definition of less than one case of leprosy per 10 000 population. However, there is still a commitment to the eradication of the disease in the country.1 Also, as leprosy is a chronic communicable disease with an extraordinary long incubation period, it is expected that even in areas where the elimination target has been reached, a proportion of the population infected several years ago will show clinical disease, resulting in the occurrence of new cases for many years to come. There is, therefore, a continuing need for vigilance regarding leprosy in South Africa. The low prevalence of leprosy in South Africa is found mostly in the eastern coastal areas and the south-eastern Highveld region, comprising mostly the provinces of Eastern Cape, KwaZulu-Natal and Mpumalanga. The strategy of leprosy care and control programmes in the country is currently that of decentralisation and integration into the general health care services at the primary health care (PHC) level in accordance with the WHO recommendations.
    [Show full text]
  • MDE All Public Schools - Address List 2003
    MDE all public schools - address list 2003 REGION GERT SIBANDE CIRCUIT 07 BALFOUR EMIS Postal address Physical address TEL. / FAX 000232 AMUKELANI PRIMARY SCHOOL P O BOX 238 BRAKFONTEIN FARM 017-7703588 BALFOUR 2410 BALFOUR - 000489 BALFOUR PRIMARY SCHOOL P O BOX 144 CHEF STREET, 017-773 0101 BALFOUR 2410 BALFOUR 017-773 0101 000810 BEERLAAGTE PRIMARY SCHOOL P O BOX 213 ELDORADO FARM 01777-9 0328 GROOTVLEI 2420 - 001172 BLOEKOMLAAN PRIMARY SCHOOL P O BOX 993 RIETFONTEIN FARM - BALFOUR 2410 - 001487 BONUKUKHANYA PRIMARY SCHOOL P O BOX 91 2678 MONARENG STREET 017-773 0299 BALFOUR 2410 SIYATHEMBA - 001628 BOTJHABELA PRIMARY SCHOOL P O BOX 290 LINDEN FARM, 017-7798257 GROOTVLEI 2420 GROOTVLEI - 003731 ENHLALAKAHLE PRIMARY SCHOOL P O BOX 53 RIETFONTEIN FARM - BALFOUR 2410 - 004465 GEKOMBINEERDE SKOOL BALFOUR POSBUS 42 MINNAARSTRAAT, 110 017-773 0256 BALFOUR 2410 BALFOUR 017-773 0068 004853 GROOTVLEI PRIMARY SCHOOL P O BOX 57 LEEUSPRUIT FARM - GROOTVLEI 2420 - 005603 I M MANCHU SECONDARY SCHOOL P O BOX 885 CNR VOORTREKKER, & 017-773 0989 FRANK, STR BALFOUR 2410 BALFOUR 017-7730989 006718 ISIFISOSETHU SECONDARY SCHOOL P O BOX 534 3803 017-773 0488 BALFOUR 2410 LEFOKOTSANE STR - 006767 ISIPHESIHLE PRIMARY SCHOOL P O BOX 218 RUSTFONTEIN FARM, 017-778 0241 BALFOUR 2410 BALFOUR NORTH - 006825 ITHUTENG PRIMARY SCHOOL P O BOX 10 LEEUWFONTEIN FARM 0839505499 GROOTVLEI 2420 - 008029 KLEINSKUUR PRIMARY SCHOOL P O BOX 84 KLEINSKUUR AF 7 017-773 1080 BALFOUR 2410 RIETBULT FARM - 009175 LAERSKOOL GREYLINGSTAD POSBUS 37 HV BEZUIDENHOUD & 017-7780410 DREYERSTRAAT
    [Show full text]
  • Constitution of the Republic of South Africa: Rationalisation of Magisterial Districts for Limpopo and Mpumalanga
    4 No. 39365 GOVERNMENT GAZETTE, 5 NOVEMBER 2015 GOVERNMENT NOTICES • GOEWERMENTSKENNISGEWINGS Justice and Constitutional Development, Department of/ Justisie en Staatkundige Ontwikkeling, Departement van DEPARTMENT OF JUSTICE AND CONSTITUTIONAL DEVELOPMENT NO. 1059 05 NOVEMBER 2015 1059 The Constitution of the Republic of South Africa, 1996: Invitation to submit comments on the Proposed Rationalisation of Magisterial Districts for the Limpopo and Mpumalanga Provinces 39365 INVITATION TO SUBMIT COMMENTS ON THE PROPOSED RATIONALISATION OF MAGISTERIAL DISTRICTS FOR THE LIMPOPO AND MPUMALANGA PROVINCES The Constitution of the Republic of South Africa, 1996 enjoins the Minister of Justice and Correctional Services to manage the rationalisation of all courts with a view to establishing a court system suited to the requirements of the Constitution (Item 16 (6) to the Constitution). The rationalisation of magisterial districts is part of this exercise. In accordance with this constitutional imperative, the Minister of Justice and Correctional Services, Adv. Michael Masutha, intends to rationalise magisterial districts in the Republic in order to align the territorial jurisdictions of all courts with the Constitution, thereby correcting the legacy of the old districts which are based on the defunct independent, self-governing states and Old RSA territories. The rationalisation process is undertaken gradually and commenced with Gauteng and North West provinces which were implemented with effect from 1 December 2014 followed by the Limpopo and Mpumalanga provinces. Comments are invited on the proposed changes to the magisterial districts indicated in the Schedule below with regard to the Provinces of Limpopo and Mpumalanga. (Proposed changes to the magisterial districts in respect the outstanding Provinces will be published at a later stage).
    [Show full text]
  • Department of Labour Satellite Mpumalanga 2014.Pdf
    Satellite Offices - Mpumalanga Contact or visit your nearest Labour Centres for ... Claiming UIF Benefits Labour complaints Enquiries Contact Details Amersfort Telephone Number(s): (017) 753 1801 Fax Number(s): Street Address: Hannes Rothmann Building Room 5 Sheiding Street Amersfort Postal Address: Private Bag X34 Amersfort 2380 Badplaas Telephone Number(s): (017) 844 1403 Fax Number(s): Street Address: Corner Wallach & Goodman Streets Badplaas Postal Address: Private Bag X718 Carolina 1185 Balfour Telephone Number(s): (017) 773 0410 Fax Number(s): Street Address: Shop 7 Villa Centre 106 Jan Van Riebeeck Street Balfour Postal Address: Private Bag X2001 Standerton 2430 Belfast Telephone Number(s): (013) 253 1276 Fax Number(s): Street Address: 20 Scheepers Street Belfast Postal Address: Private Bag X718 Carolina 1185 Breyten Telephone Number(s): (017) 861 3028 Fax Number(s): Street Address: Old Railway Hostel Ous Grobler Street Breyten Postal Address: Private Bag X9054 Ermelo 2350 Delmas Telephone Number(s): (013) 665 2259 Fax Number(s): Street Address: Monaco Building 26 Third Street Delmas Postal Address: Private Bag X7291 Emalahleni 1035 Ekangala Telephone Number(s): (013) 934 4249 Fax Number(s): Street Address: Magistrate Office Ekangala Postal Address: Private Bag X4016 KwaMhlanga 1022 Eerstehoek Telephone Number(s): (013) 883 2414 Fax Number(s): (013) 883 1253 Street Address: Mkhwanazi building 4-way stop cross road Eerstehoek Postal Address: Private Bag X1013 Elukwatini 1192 Graskop Telephone Number(s): (013) 767 1070 Fax Number(s):
    [Show full text]
  • February 2018
    A PHASE 1 ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT: DEVELOPMENT OF TWO TENTED CAMPS AT SONGIMVELO NATURE RESERVE, EERSTEHOEK, ON THE FARMS LAAGGENOEG 158IT & ONVERWACHT 733IT MPUMALANGA PROVINCE REPORT COMPILED FOR UMSINSI ENVIRONMENTAL SPECIALISTS Ms. RIA WILKEN P.O. Box 8163, SONPARK NELSPRUIT, 1206 Tel: 082 3386 934 / Fax: 086 6304 313 / e-mail: [email protected] FEBRUARY 2018 ADANSONIA HERITAGE CONSULTANTS ASSOCIATION OF SOUTHERN AFRICAN PROFESSIONAL ARCHAEOLOGISTS C. VAN WYK ROWE E-MAIL: [email protected] Tel: 0828719553 / Fax: 0867151639 P.O. BOX 75, PILGRIM'S REST, 1290 1 EXECUTIVE SUMMARY A Phase 1 Heritage Impact Assessment (AIA & HIA) was conducted on the Songimvelo Nature Reserve for two new Tented camp developments. Songimvelo is situated on several farms (Josefsdal, Mendon, Noisy, Schoonoord, Goedehoop, Sedan, Vooruitsicht and Duurstede), but the Tented Camp developments are proposed on the farms Laaggenoeg 158IT and Onverwacht 733IT. Songimvelo is approximately 32 km from the town of Badplaas. The Nature Reserve borders YORK’s Taurus Plantation to the north, Swaziland directly to the east and Tjakastad in the west. The study area is situated on topographical maps 1:50 000, 2530DD (NELSHOOGTE), & 2630BB (LOCHIEL), which are in the Mpumalanga Province. This area falls within the Badplaas region under the jurisdictions of the Gert Sibande District Municipality, and Albert Luthuli Local Municipality. The National Heritage Resources Act, no 25 (1999)(NHRA), protects all heritage resources, which are classified as national estate. The NHRA stipulates that any person who intends to undertake a development, is subjected to the provisions of the Act. The aims of this study were to do a surface investigation for possible graves, archaeological and / or historical remains on the two locations which were identified for Tented Camp developments, and to recommend mitigation measures if necessary.
    [Show full text]
  • Free/Gratis the Municipality Is Working Hard to Issue Title Deeds To
    Free/Gratis Tel: 017 811 2221/55 Fax: 017 811 2277 Web: www.highvelder.co.za Vrydag 8 Junie 2018 Local economy must thrive, says Mayor Amanda Mthembu indigent register to target households that receive an income less than R2 500 per The State of the Municipality Address and month. budget speech were delivered at the Ella De Mr Mkhaliphi went on to note that the Bruin Hall in the Civic Centre on Thursday, municipality has over the past six years 31 May. implemented strategic infrastructure projects Members of the Msukaligwa political to improve water supply and to ensure sphere, the public and the media converged storage capacity to meet consumption in the hall to hear the executive mayor of demands resulting from increases in the Msukaligwa, Mr Joseph Mkhaliphi, deliver population size, particularly in Wesselton his address. and Ermelo. According to the ¿ rst citizen, the State of In the ¿ nancial year 2017/18, the the Municipality Address and budget speech municipality has installed internal water provide the municipality with an opportunity reticulation to address water challenges in to provide a detailed account of their the various wards. performance over the past ¿ nancial year Regarding the issue of potholes in roads, and to highlight key service delivery issues Mr Mkhaliphi acknowledged that it is a in terms of the budget and the integrated serious cause for concern and through development plan (IDP). limited resources, the municipality has Mr Mkhaliphi began his much awaited managed to ¿ x numerous roads though much must still be done. The mayor went on to address the The municipality is working hard electricity issue, saying Msukaligwa has upgraded the 11kV switching station and the to issue title deeds to low income 11kV main sub-station in Wesselton.
    [Show full text]