DEPARTMENT OF WATER AFFAIRS

GERT SIBANDE DISTRICT MUNICIPALITY

REGIONAL BULK INFRASTRUCTURE GRANT PROGRAMME

CONTRACT Nº: 49/2010

EERSTEHOEK REGIONAL BULK WATER SCHEME

TECHNICAL REPORT

August 2012

Revision 7 Prepared by:

EMZANSI ENGINEERS (PTY) LTD P.O. Box: Post Net Suite Toll 57 Private Bag X9013 Ermelo 2350 Tel: +27 17 811 6422 Fax: +27 17 811 2919

Gert Sibande District Municipality Chief Albert Luthuli Municipality Cnr Joubert & Oosthuisen Streets 28 Kerk Street ERMELO CAROLINA 2350 1185

Tel: +27 17 801 7000 Tel: +27 17 843 4000 Fax: +27 17 811 1304 Fax: +27 17 843 4001

GERT SIBANDE DISTRICT MUNICIPALITY REGIONAL BULK INFRASTRUCTURE GRANT PROGRAMME EERSTEHOEK REGIONAL BULK WATER SCHEME

TECHNICAL REPORT

CONTENTS

Chapter Description Page

1 INTRODUCTION 4

1.1 Project Title 4

1.2 Project Name 5

1.3 Project Location 5 1.3.1 Project Coordinates 5 1.3.2 Settlements/Villages 5

1.4 Project Objectives 6

1.5 Purpose of Technical Report 6

1.6 Overview of Regional Planning/Studies 7

1.7 Other Water Schemes in the Area 7

2 NEEDS DETERMINATION 8

2.1 Demographics 8 2.1.1 Population 8 2.1.2 Growth projections 8

2.2 Demand/Needs Parameters 11 2.2.1 Service Levels (volumetric) 11 2.2.2 Design Criteria 13 2.2.3 Quality 13

2.3 Related Projects 13

3 ENGINEERING VIABILITY 15

3.1 Options Considered 15 3.1.1 Source 15 3.1.2 Water Quality 16

3.2 Engineering Considerations 16 3.2.1 Planning Norms and Design Parameters 16 3.2.2 Existing Infrastructure 16

3 735 18 3.2.3 Proposed Infrastructure 22

Eerstehoek Regional Bulk Water Scheme – Technical Report AUGUST 2012

3.2.4 Bill of Quantities 25

4 INSTITUTIONAL SUSTAINABILITY 30

4.1 Community Structures 30 4.1.1 Community Structures 30 4.1.2 Level of community awareness and development 30 4.1.3 Level of involvement of women 30 4.1.4 Community Involvement 31

4.2 Water Service Authority 31 4.2.1 Status and proficiency of Local Water Services Authority: 31

4.3 Water Service Provider 32 4.3.1 Section 78 Determination 32 4.3.2 Water Services Provider 33 4.3.3 Consumer/Customer Relation 33

4.4 Legal Requirements 33 4.4.1 Water Use Registration 33 4.4.2 Project Registration with Respect to NEMA 33

5 ECONOMIC/SOCIO ECONOMIC ANALYSIS 34

5.1 Infrastructure 34 5.1.1 Initial Capital Investment Cash Flow 34 5.1.2 Long Term Operational Costs 34 5.1.3 Replacement/Refurbishment Cycle Cost 34

5.2 Social and Socio Economic Opportunities 35

5.3 Training, Facilitation and Capacity Building Scope of Work 35 5.3.1 Community Participation 35 5.3.2 Sustainable Institutions 36 5.3.3 Sanitation Health and Hygiene Promotion 36 5.3.4 Entrepreneurial Development 36

5.4 Labour Based Construction 36

5.5 Permanent Staff Requirements 37

5.6 Cost Estimates 38

6 FINANCIAL VIABILITY 39

6.1 Funding Source 39 6.1.1 Capital Investments 39 6.1.2 Long Term Operation and Maintenance 39

6.2 Cash flow Forecast 41

6.3 Milestone Schedule 41

7 ENVIRONMENTAL ACCEPTABILITY 42

7.1 Natural Environment Impact Assessment 42

7.2 Social Environment 42

Eerstehoek Regional Bulk Water Scheme – Technical Report AUGUST 2012

7.2.1 Relocation Considerations 42 7.2.2 Socio Economic Opportunity Maximisation 42 7.2.3 Environmental Management Plan 42

8 CONCLUSION 43

8.1 Water Supply Requirements 43

8.2 Scope of Works Summary 43

8.3 Funding Summary 44

9 RECOMMENDATIONS 45

10 PROJECT APPROVAL 46

APPENDIXES

Annexure A: Locality Plan and Project Footprint Annexure B: Options Considered & Cost Breakdown Annexure C: GSDM Evaluation of Water Resources Report Annexure D: Cash flow (Tabular and Graphical) Annexure E: Detail of ISD Scope of Work Annexure F: Monthly Water Consumption and Possible Income and Expenditure on Completion Annexure G: Project Milestones Annexure H: Application Form for Authorisation in terms of Section 22 of the Environment Conservation Act and Letter of Appointment for EIA. Annexure J: Typical Water Quality Test Results Annexure K: Drawings

Eerstehoek Regional Bulk Water Scheme – Technical Report AUGUST 2012

EXECUTIVE SUMMARY

PROJECT OBJECTIVES

The primary objective of the project is to provide a safe and reliable source of potable water to the communities living in the project areas within Chief Albert Luthuli Municipality (CALM). The secondary objective is to develop institutional capacity within the community to create an awareness of the project and to promote health and hygiene awareness during the project and beyond. The project area covers communities residing in Nhlazatshe, , Avontuur, Mooiplaas, Arhemberg, Malahleka, Khuzuwandle and Elukwatini.

COMMUNITY NEEDS

The existing infrastructure is no longer adequate to cope with the current water demand in the project area. Gert Sibande District Municipality (GSDM) intends to Upgrade the infrastructure and simultaneously create a regional water scheme that will be able to provide the required demand projected up to year 2032. The scheme will be able to provide adequate water supplies to a population of between 70 010 (2012) and 96 527 (2032) people.

EXISTING INFRASTRUCTURE

Presently, the communities in the project area (for the infrastructure covered in this Technical Report) are supplied from the Eerstehoek Water Treatment Works. The plant in its current state is not sized to cope with the current demand. In addition, various components of the plant are in need of refurbishment and upgrading.

The bulk water distribution system in the form of existing pipelines, pumpstations and reservoirs is also not adequately sized to meet the current and future projected demands.

OPTIONS CONSIDERED

Presently, the communities in the project area are supplied from Eerstehoek Water Treatment Works. This Technical Report reviews three options, together with the Funding Plan. The three options considered are summarised as follows:

Option Description Scope of Works Estimated Total Project Cost(Incl. VAT) Option 1 Water Supply from Upgrade Eesterhoek WTW from a capacity Eerstehoek WTW of 13.4Ml/day to 26Ml/day to serve the (Ekulindeni WTW project area including bulk pipelines, R115 122 779.20 upgraded separately reservoirs and associated pumpstations up under a different BP) to Mooiplaas to the east Option 2 Water Supply from Upgrade Eerstehoek WTW from a capacity Eerstehoek WTW of 13.4Ml/day to 30 Ml/day to serve the R156 550 594.00 entire project area including bulk pipelines, reservoirs and associated pumpstations Option 3 Water Supply from Upgrade Ekulindeni WTW from a capacity of Ekulindeni WTW 4Ml/day to 30 Ml/day including bulk R281 349 500.00 pipelines, reservoirs and associated pumpstations

Eerstehoek Regional Bulk Water Scheme - Technical Report 1 AUGUST 2012

PROPOSED INFRASTRUCTURE

Option 1 has been recommended on the basis of the lower net present value cost of the total construction cost.

The proposed infrastructure for Option 1 comprises the following:

Upgrade Eesterhoek WTW from a capacity of 13.4Ml/day to 26Ml/day to serve the project area including bulk pipelines, reservoirs and associated pumpstations up to Mooiplaas to the east. This infrastructure will be subject to this Technical Report. (Upgrade of Ekulindeni WTW will be covered in a different BP).

Infrastructure Proposed in this Technical Report

The infrastructure thus proposed, in this Technical Report, is as follows:

 Refurbish and upgrade the existing Theespruit and Komati River Raw Water Abstraction civil works.

 Refurbish and upgrade the Komati Raw Water Booster Pumpstation to supply the additional demand up to the required 300l/s to the Eerstehoek WTW.

 Upgrade of Eerstehoek WTW from a capacity of 13.4Ml/day to 26Ml/day.

 Construction of the following pipelines: o 6.8km long x 450mm diameter uPVC rising main (class 16) from the Komati River Raw Water Pumpstation to Eerstehoek WTW.

 Upgrading / Equipping of the following pumpstations; o Elukwatini Pumpstation situated at the Eerstehoek WTW from the present 100l/s to 144l/s. o Komati River Raw Water Booster Pumpstation from 50 l/s to 200l/s. o Komati River Abstraction works from 100 l/s to 200 l/s.

 Construction of the following reservoirs: o A new 1Ml storage reservoir at the Eerstehoek Water Treatment Plant. o 2 No. x 6.5Ml reservoirs (to provide a total capacity of 13Ml) at Inhlazatshe. o A new 0.3Ml reservoir at Avontuur. o A new 0.3Ml reservoir at Malahleni. o A new 0.4Ml reservoir at Mooiplaas.

OWNERSHIP

CALM is the Water Services Authority (WSA) and Water Services Provider (WSP) in the project area. The project will be implemented by GSDM as the appointed Implementing Agent. On completion of the project the infrastructure shall be owned and maintained by the WSP.

Eerstehoek Regional Bulk Water Scheme - Technical Report 2 AUGUST 2012

COST PER CAPITA

The estimated present day total project cost is R115 122 779.20 including VAT and the allowances that have been made for contingencies. The breakdown of this cost is as detailed in the table below.

Construction and Related Costs Amount a. Refurbish and upgrade the existing Theespuit and Komati River Raw Water Abstraction Works R 2 736 000.00 b. Refurbish and upgrade the existing Komati River Raw Water Abstraction Works and Raw Water Booster Pumpstation supply the required 300l/s demand to eerstehoek WTW (pumpstation equipped with 2No. X 200l/s pumps) R 1 026 000.00 c. Construction of 6.8km long x 450mm diameter uPVC rising main (class 16) from the Komati River Raw Water Pumpstation to Eerstehoek WTW R 5 038 800.00 d. Mechanical and Electrical Works for pumpstation at Eerstehoek including remote monitoring equipment (2 No. pumps x 144l/s @ 400kW at 211m Head) R 1 026 000.00 e. Civil Construction of 13Ml reservoir at Inhlazatshe (2 x 6.5Ml reservoirs) R 15 321 600.00 f. Civil Construction of 0.3Ml reservoirs at Avontuur and Malahleni R 2 052 000.00 g. Civil Construction of 0.4Ml reservoir at Mooiplaas R 1 254 000.00 h. Refurbishment and upgrade of Eerstehoek WTW from 13.4Ml/day to 26 Ml/day (mechanical and civil works) R 57 456 000.00 i. Civil Construction of 1Ml reservoir at Eerstehoek WTW 1 710 000.00 j. Allowance for EIA, engineering survey, Power costs, Servitudes & Geotech investigations–1 R 1 265 000.00 k. Allowance for Social Consultant R 3 504 816.00 Sub Total R 92 390 216.00 Add : Allowance for Engineering Fees including disbursements R 8 691 016.00 Add : Allowance for Clerk of Works including travelling (assume 20 months) R 3 155 840.00 Add: Allowance for additional duties (arranging for servitudes, PTO’s and crop compensation) R 420 000.00 Sub Total: Non-Construction Costs R 12 266 856.00 TOTAL PROJECT COSTS (including VAT, excl Escalation & Contingencies) R 104 657 072.00 Add: Allowance for Escalation & Contingencies R 10 465 707.20

TOTAL PROJECT COSTS (incl VAT, Escalation & Contingencies) R 115 122 779.20

The 2032 population to be served by the water scheme is estimated at 96 527 people (20 984 households) (see Annexure B1). The resultant cost per capita for the project is R1 192.65.

The detailed breakdown of the capital cost for the project is provided in this Technical Report under Annexure B2.

Eerstehoek Regional Bulk Water Scheme - Technical Report 3 AUGUST 2012

1 INTRODUCTION

This Technical Report is for the Eerstehoek Regional Bulk Water Scheme, which includes the following bulk water infrastructure:

 Refurbish and upgrade the existing Theespruit and Komati River Raw Water Abstraction civil works.

 Refurbish and upgrade the Komati Raw Water Booster Pumpstation to supply the additional demand up to the required 300l/s to the Eerstehoek WTW.

 Upgrade of Eerstehoek WTW from a capacity of 13.4Ml/day to 26Ml/day.

 Construction of the following pipelines: o 6.8km long x 450mm diameter uPVC rising main (class 16) from the Komati River Raw Water Pumpstation to Eerstehoek WTW.

 Upgrading / Equipping of the following pumpstations; o Elukwatini Pumpstation situated at the Eerstehoek WTW from the present 100l/s to 144l/s. o Komati River Raw Water Booster Pumpstation from 50 l/s to 200l/s. o Komati River Abstraction works from 100 l/s to 200 l/s.

 Construction of the following reservoirs: o A new 1Ml storage reservoir at the Eerstehoek Water Treatment Plant. o 2 No. x 6.5Ml reservoirs (to provide a total capacity of 13Ml) at Inhlazatshe. o A new 0.3Ml reservoir at Avontuur. o A new 0.3Ml reservoir at Malahleni. o A new 0.4Ml reservoir at Mooiplaas.

In addition, the CALM is upgrading and refurbishing reticulation infrastructure. Implementation of a Water Conservation and Demand Management project to optimise the use of raw and treated water in the project area will be required in future. This will be subject to a separate business plan to be prepared by CALM.

Thus the project, under this Technical Report deals only with the bulk infrastructure from the abstraction points to appropriate storage infrastructure within the project area.

1.1 Project Title

This project is entitled: “Eerstehoek Regional Bulk Water Scheme”. This project will benefit the residents in the greater Elukwatini (Eerstehoek) and Mooiplaas areas of the Chief Albert Luthuli Municipality in the Gert Sibande District.

Eerstehoek Regional Bulk Water Scheme - Technical Report 4 AUGUST 2012

1.2 Project Name

The project name is as follows:

Project District and Local Budget Project Name Project Type Number Councils (including VAT) 49/2010 Eerstehoek Regional Gert Sibande District Regional Bulk Water R 115 122 779.20 Bulk Water Scheme Municipality (GSDM) & Chief Supply Albert Luthuli Municipality (CALM)

1.3 Project Location

A locality map of the area is attached to this report as Annexure A.

The project footprint includes the settlement areas of Nhlazatshe, Tjakastad, Avontuur, Mooiplaas, Arhemberg, Malahleka, and Elukwatini.

Eerstehoek (Elukwatini) is situated approximately midway between and the Oshoek Border Gate. The village is some 20 km from the Swaziland border in the far eastern corner of the CALM area. The region is drained by the Theespruit, a local tributary of the Komati River which it joins north of the village and upstream of the Songimvelo and Malolotja Nature Reserves situated on either side of the Republic of (RSA) Swaziland border. Access to the village is via the R541 main road.

1.3.1 Project Coordinates

The coordinates of the project, taken at Eesterhoek are as follows:

Nearest Town and Project NO Project Name distance to the Latitude Longitude Local Municipality village 49/2010 Eerstehoek Regional Bulk Ermelo - 131km 26º 02’ 54” 30º 51’ 38” Chief Albert Luthuli Water Scheme

1.3.2 Settlements/Villages

The project locality plan comprises of Villages / Communities including the following:

Villages / Communities Nearest Town and distance to the village Elukwatini Badplaas - ± 27 km Inhlazatshe Badplaas - ± 30 km Tjakastad Badplaas - ± 29 km Avontuur Badplaas - ± 35 km Mooiplaas Badplaas - ± 33 km Malahleka Badplaas - ± 35 km Arhemberg Badplaas - ± 31 km

A 1: 50,000 scale Locality Plan is attached as Annexure A to this Technical Report, to also serve as a footprint of the project area and/or area of supply.

Eerstehoek Regional Bulk Water Scheme - Technical Report 5 AUGUST 2012

1.4 Project Objectives

The primary objective of this project is to ensure the bulk infrastructure requirements of GSDM are met with a view to specifically focus on New or Consolidated Regional Bulk Infrastructure. This is as stated by the Mvula Trust Report dated May 2010.

“The new or consolidated Regional Bulk infrastructure must serve extensive areas over Municipal boundaries with the main aim to:

1. Eradicate Backlogs (access to basic infrastructure); 2. Serve housing and settlement programmes; 3. Support and stimulate economic growth and development; 4. Improve water service quality: - Drinking Water Quality (WTW) - Effluent quality (STW) - Eradicate high water losses - Consider O&M challenges (limited finances, ownership, lack of adequately skilled staff, lack of management, poor asset management. - Improve supply interruptions ( reliability of supply) 5. Provide benefit of scale; 6. Optimize costs / appropriate technology; 7. Support integrated resource planning and management; 8. Promote cooperation between authorities with regard to sharing of resources, responsibilities and risks; 9. Shared financial responsibilities; and 10. Increase sustainability”.

1.5 Purpose of Technical Report

The purpose of this project is to provide a sustainable long term upgrade to the standards of water supply thereby also alleviating current issues within the areas of Eerstehoek and to provide improved water quality to the inhabitants which will curtail any water related health risks.

This Technical Report aims to:

 Describe a strategic programme based approach to water service delivery, including area implications for the communities within the Eerstehoek area;  Provide a control document setting out the time, quality and cost details for the potential scope of work;  Give details of the programme and project layout and defining the area and its attributes for sustainability;  Describe how the project has been and will continue to be implemented and managed;  Demonstrate how the project will conform to RBIG requirements ;

In summary, the GSDM seeks that the Department of Water Affairs (DWA) recommends approval for the development of the Eerstehoek Regional Bulk Water

Eerstehoek Regional Bulk Water Scheme - Technical Report 6 AUGUST 2012

Scheme which will form the basis of securing Regional Bulk Infrastructure Grant (RBIG) funding.

1.6 Overview of Regional Planning/Studies

The GSDM utilizes the Integrated Development Plan (IDP) and the Water Services Development Plan (WSDP) to prioritise the critical areas in need of portable water. The Eerstehoek area has been prioritized for development in terms of this document.

In addition, other studies have been commissioned at various levels (DWA, CALM and GSDM) are relevant to this report. These include the following studies/reports:

 Report titled “Status Quo Report for the Development of Regional Bulk Infrastructure” dated May 2010 compiled for DWA by PD Naidoo & Associates (Pty) Ltd (PDNA). This report dealt with infrastructure for Albert Luthuli Local Municipality. PDNA had been appointed by Mvula Trust on behalf DWA.  Report titled “Comprehensive Assessments on Water and Sanitation Treatment Works in the Chief Albert Luthuli Municipality for Badplaas, Carolina, Ekulindeni, Elukwatini, eMpuluzi, Lusushwane and Oshoek”, dated June 2009. This report was prepared by SSI Engineers & Environmental Consultants (Pty) Ltd for Gert Sibande District Municipality.  Report entitled “Evaluation of the Water Resources of the Gert Sibande District Municipality, dated April 2010, prepared by IWR Water Resources. This report is attached to this Technical Report as Annexure C.

1.7 Other Water Schemes in the Area

The Ekulindeni Water Scheme is located approximately 18km due east from Mooiplas. Ekulindeni is situated in the far east of the Local Municipality on the border with Swaziland which is less than 10 km away. The village is on the strip between the Songimvelo and Malolotja nature reserves on either side of the RSA-Swaziland border. The Komati River is directly north of the village and the Oshoek Border Post directly south thereof. The areas supplied from this scheme include the following:

Villages / Communities Nearest Town and distance to the village Bosville Badplaas - ± 35 km Ekulindeni Badplaas - ± 55 km Ngoneni Badplaas - ± 57 km Nhlaba Badplaas - ± 42 km Kalwerskraal Badplaas - ± 55 km Vlakplaas Badplaas - ± 55 km Badplaas - ± 54 km

The Ekulindeni Water Scheme is considered as an option in this report in evaluating the viability of the Eerstehoek Bulk Regional scheme.

Eerstehoek Regional Bulk Water Scheme - Technical Report 7 AUGUST 2012

2 NEEDS DETERMINATION

2.1 Demographics

2.1.1 Population

Population figures shown are sourced from the following documents:

 GSDM Integrated Regional Water Services Development Plan (WSDP) dated September 2009 prepared by Messrs WorleyParsons RSA (former Kwezi V3) Engineers which provided population figures for year 2008.

 Chief Albert Luthuli Municipality (CALM) WSDP dated 21 October 2010 which provided population figures for year 2008.

 DWA Status Quo Report for the Development of Regional Bulk Infrastructure, Volume 1 and 2 dated May 2010 prepared by PD Naidoo and Associates which provided population figures escalated to 2010 at a growth rate of 1.5% based on DWA Macro Planning information.

The population demographics as provided by each document are as detailed in Table 2.1 below.

Table 2.1: Population Figures GSDM Integrated Regional Chief Albert Luthuli DWA Status Quo Report for Water Services Municipality (CALM) the Development of Development Plan (WSDP) WSDP Regional Bulk Infrastructure Village/ (Volume 1) Water Scheme Settlement (Year 2008) Year 2010 (Year 2008) N⁰ of Population N⁰ of Population N⁰ of Population Households Households Households Elukwatini 3 271 12 593 3271 12 593 3 200 12 692 Eerstehoek Inhlazatshea 6 971 32 066 6 971 32 066 6 820 32 320 Water Tjakastad 2 564 15 330 2 564 15 330 2 507 15 451 Scheme Avontuur 153 718 153 718 150 723 Mooiplaas 861 4 432 861 4 432 842 4 467 Malahleka 165 824 165 824 - - TOTAL 13 985 65 963 13 985 65 963 13 519 65 653

From the table above, it is clear that the GSDM Integrated Regional Water Services Development Plan (WSDP) and Chief Albert Luthuli Municipality (CALM) WSDP use the same current population figures. The population figures quoted are for year 2008. Applying an annual average growth rate of 1.5%, the 2012 population estimate is 70 010 people.

For purposes of this technical report, the population figures from the CALM Water Services Development Plan (WSDP) attached as Annexure B1 have been adopted. The average number of persons per household is 4.6.

2.1.2 Growth projections

DWA recommends that when estimating population growth trends, three growth scenarios are used as follows:

Eerstehoek Regional Bulk Water Scheme - Technical Report 8 AUGUST 2012

Growth Classification Recommended Annual % Growth Low Growth 0.5% Medium Growth 1.5% High Growth 2.5%

The following should be noted with regard to anticipated population growth trends in the project area:

 It is expected that a negative growth is possible due to the prevalence of HIV and AIDS and the rural to urban migration of mainly the youth seeking employment after completion of schooling.

 The area has tourism potential as a result of the Songimvelo Nature Reserve being located in the area. The road leading to the Songimvelo Nature Reserve and also joining the National R40 into Swaziland is currently being upgraded. This will result in an increase in the traffic volumes and visits to the project area.

 A number of RDP housing schemes with a service level 4 for water and sanitation services (i.e. individual house connections for water and sanitation services) are being provided and are at various stages of construction at Tjakastad and Nhlazatshe.

 In view of the foregoing, medium growth is expected in the project area and accordingly an annual growth rate of 1.5% and 1.85% will be used to determine future projections.

The population breakdown in terms of the areas supplied by the individual water treatment plants can be further broken down as detailed in Table 2.2. The present day (2012) deemed population for the areas supplied is 70 010 people. This assumption will be confirmed during detailed design.

Assuming a design horizon of 20 years and using the growth rates as reflected on Table 2.2 and Annexure B1, the projected total population by year 2032 is 96 527 people.

Eerstehoek Regional Bulk Water Scheme - Technical Report 9 AUGUST 2012

Table 2.2: Projected 20 Year Population Growth Breakdown Population Water Treatment No. of Village/Settlement Growth Rate Growth Rate Works Households 2010 2012 2022 2032 2012 - 2022 2022 - 2032

Elukwatini 3 271 12 974 13 366 1.85% 16 055 1.5% 18 632 Inhlazatshe 6 971 33 035 34 033 1.85% 40 880 1.5% 47 443 Eerstehoek Water Tjakastad 2 564 15 793 16 270 1.50% 18 882 1.5% 21 913 Treatment Works Avontuur 153 740 762 1.50% 884 1.5% 1 026 Mooiplaas 861 4 566 4 704 1.50% 5 459 1.5% 6 335 Malahleka 165 849 875 1.50% 1 015 1.5% 1 178 TOTAL 13 985 67 957 70 010 83 175 96 527

Eerstehoek Regional Bulk Water Scheme - Technical Report 10 AUGUST 2012

2.2 Demand/Needs Parameters

2.2.1 Service Levels (volumetric)

The communities in the project area can be classified as rural to peri-urban. Most of the households in the peri-urban areas have an upgraded level of service for water services to that of individual house connections. This has contributed to the increase in water demand in the area as this level of service results in increased water usage.

The basis of the needs parameters to be utilised in determining the demand is The Guidelines for Human Settlement, Planning and Design (The Red Book).

Despite the Regional Bulk Infrastructure Grant only covering demands of 150 l/c/d inclusive of losses, more realistic demand projections were adopted taking into account the development in the project area. The funding deficit will be covered by the GSDM counter funding as well as the Municipal Infrastructure Grant (MIG) allocation for CALM.

The demands arising from the areas supplied by Eerstehoek Water Treatment Works are determined as show in Table 2.3.

Eerstehoek Regional Bulk Water Scheme - Technical Report 11 AUGUST 2012

Table 2.3: Projected demand Figures

AADD GAADD SPD (l/c/d) (l/c/d) (l/c/d) (Ml/d) (Ml/d) (Ml/d) (Ml/d) (Ml/d) (Ml/d) (Ml/d) (Ml/d) (Ml/d) Losses(20%) 2012 2012 Population 2022 Population 2032 Population SummerPeak Factor Water Treatment works Village/SettlementName WaterDemand 2012 WaterDemand 2022 WaterDemand 2012 WaterDemand 2022 WaterDemand 2032 WaterDemand 2032 WaterDemand 2012 WaterDemand 2022 WaterDemand 2032 2012 2012 Per Capita WaterDemand 2022 Per Capita WaterDemand 2032 Per Capita WaterDemand Water Treatment &Conveyance

Elukwatini 13 366 130 16 055 180 18 632 180 1.738 2.890 3.354 20% 1.35 2.102 3.497 4.058 2.838 4.721 5.478 Inhlazatshe 34 033 130 40 880 180 47 443 180 4.424 7.358 8.540 20% 1.35 5.353 8.904 10.333 7.227 12.020 13.950 Tjakastad 16 270 130 18 882 130 21 913 130 2.115 2.455 2.849 20% 1.35 2.559 2.970 3.447 3.455 4.010 4.653

Avontuur 762 130 884 130 1 026 130 0.099 0.115 0.133 20% 1.35 0.120 0.139 0.161 0.162 0.188 0.218

Works Mooiplaas 4 704 130 5 459 130 6 335 130 0.612 0.710 0.824 20% 1.35 0.740 0.859 0.996 0.999 1.159 1.345 Malahleka 875 130 1 015 130 1 178 130 0.114 0.132 0.153 20% 1.35 0.138 0.160 0.185 0.186 0.216 0.250 TOTAL 70 010 83 175 96 527 9.101 13.660 15.852 11.013 16.528 19.181 14.867 22.313 25.895 EerstehoekWater Treatment

Eerstehoek Regional Bulk Water Scheme - Technical Report 12 AUGUST 2012

2.2.2 Design Criteria

The design criteria to be used in sizing the various water infrastructure elements is detailed in Table 2.4

Table 2.4: Design Criteria for Water Infrastructure Elements Description/ Water Demand Design Criteria Comments

Based on moderate levels of 130l/c/d Demand peri-urban areas consumption suitable for house connections in semi-developed areas RDP standard level of service for Demand rural areas ¹25 l/c/d standpipes Assume an average of 500 users per Demand for institutions 7.5 kl/d school at a consumption of 15 l/c/d. Agriculture and other users 0 Not included Allowance for water losses in water 10% treatment works Allowance for water losses in 10% This has to be supported by an conveyance (pipelines) effective Water Conservation and Demand Management Plan/Strategy Design Flows

Minimum bulk pipeline size 100 diameter Velocity of flow in pipelines 0.5 – 2.0 m/s Preliminary design is based on velocity of 1.5m/s Minimum residual pressure at 24m (2.4 bars) standpipes/connections Peak factor for bulk pipelines 3 Peak factor for water treatment 1.5 works

Storage

Storage capacity 48 hrs 48 hrs storage for Average Daily Demand Notes:

¹RDP guidelines specify a demand of 25 l/c/d. For design purposes and in order to be conservative, it is assumed that once water services are available, people will want to increase the level of service up to individual house connections. The design demand criteria to be used will be 130 l/c/d and 180 l/c/d for fast developing areas within the project area.

2.2.3 Quality

Water will be Class 0 as per SANS 241 specification and will be of that which is fit for human consumption.

2.3 Related Projects

CALM is currently implementing / have implemented the following related projects in the project area:

Eerstehoek Regional Bulk Water Scheme - Technical Report 13 AUGUST 2012

 Reticulation pipes replacement (AC pipes only) within the areas currently being served by Eerstehoek WTW to manage and curtail water loss through mains.

 Provision of a package water treatment plant at Mooiplaas and Avontuur. CALM anticipates this to be an immediate, short term solution to alleviate issues of water supply in this area.

 Replace the current bridge crossing along the pipeline between the Eerstehoek WTW and Mooiplaas.

 Refurbishment of Eerstehoek Water Treatment Works and elimination of bottlenecks in the system , for the WTW to operate at its design capacity of 13.4Ml/day

These projects being carried out by CALM under their Municipal Infrastructure Grant (MIG) programme. These projects seek to solve the current water issues and as such are short to medium term projects.

A Water Conservation and Demand Management project to reduce the “unaccounted for water” levels will be implemented by CALM once the regional water scheme has been completed.

Eerstehoek Regional Bulk Water Scheme - Technical Report 14 AUGUST 2012

3 ENGINEERING VIABILITY

3.1 Options Considered

3.1.1 Source

The potential sources and the characteristics for water sources for the Eerstehoek Bulk Water Regional Scheme are discussed in this section and under the following headings:

 Hydrological/Geohydrological Analyses  Water Balance  Medium /Long-term sustainability  Infrastructure

(a) Hydrological/Geohydrological Analyses

Surface Runoff

According to the report “Evaluation of the Water Resources of the Gert Sibande District Municipality” Water Resources Analyses were carried out using the Water Resources Modelling Platform (Mallory, et al)”. Where model setups were already available, then these were used, failing which new setups were created using WR2005 hydrology and water use upstream of abstraction point from WR2005 or the WARMS database. The report indicates the following:

 Surface water in the vicinity of Eerstehoek (Elukwatini) can be obtained from Theespruit River (a catchment of the Komati River) and the Komati River. Studies indicate that the yield of the two rivers (after taking into account upstream use is 25Mm3/annum., which equates to approximately 68,000m3/day.

Underground Water

The Water Services Development Plans (2003 and 2008/2009) indicate the following with respect to borehole sources:

 In the Eerstehoek (Elukwatini) Area, twelve boreholes situated in Mbekeka, Tjakastad, Elukwatini, Mooiplaas, Arnhemburg, Enkaba, Brandybal, exist. The average yield of all the boreholes is, reportedly, very low, and, thus, would not provide a sustainable source of water.

(b) Water Balance

Water Balance Statistics for the Eerstehoek (Elukwatini) Water Scheme is summarised in the Table below:

Item Description Eerstehoek (Elukwatini) 1 Potential surface water yield at abstraction point 25Mm3/year 2 Current abstraction 3.15Mm3/year 3 % Headroom on Current Abstraction 87.4%

Eerstehoek Regional Bulk Water Scheme - Technical Report 15 AUGUST 2012

4 Projected Demand/Abstraction (incl. for losses) 11Mm3/year 5 % Headroom 56%

(c) Medium/Long Term Sustainability

Based on the water balance, there are adequate water resource quantities to meet the medium and long term requirements of the project area.

3.1.2 Water Quality

The water quality from the river runoff will require the following processes to treat to the required SANS levels:

 Flocculation  Sedimentation/Clarification  Filtration and  Chlorination.

The water will be treated to comply with SANS 241

3.2 Engineering Considerations

3.2.1 Planning Norms and Design Parameters

Refer to Section 2.2.1 for Planning Norms and Design Parameters.

3.2.2 Existing Infrastructure

The project area is covered by Eerstehoek (Elukwatini) Water Scheme. The eastern areas adjacent to the project area up the border with Swaziland are serviced by the Ekulindeni Water Scheme. The two water schemes are briefly discussed under this section.

(a) Eersterhoek Water Scheme

Eerstehoek (Elukwatini) serves the project area that includes Avontuur, Tjakastad, Nhlazatshe, Eerstehoek (Elukwatini), Arnemburg and Mooiplaas. The schematic layout of the Eerstehoek (Elukwatini) Water Scheme is shown in Fig 1.

Eerstehoek Regional Bulk Water Scheme - Technical Report 16 AUGUST 2012

Fig 1: Schematic Layout of the Eerstehoek Water Supply Scheme

The existing bulk infrastructure is briefly discussed hereunder.

Eerstehoek Regional Bulk Water Scheme - Technical Report 17 AUGUST 2012

(i) Raw Water Abstraction

Raw water is abstracted from Theespruit and Komati Rivers as follows:

 Theespruit abstraction infrastructure comprises a pumpstation and pipework system capable of delivering 100l/s to the Eerstehoek WTW.

 Komati River abstraction infrastructure comprising of a pumpstation and pipework system capable of delivering 50l/s to the Eerstehoek WTW. The existing infrastructure, including the existing 250mm diameter uPVC rising main from the abstraction works to Eerstehoek WTW, is no longer adequate to cope with the current demand of 127 l/s and the projected demand of 300 l/s (refer to Table 2.3). The abstraction works is currently the subject of investigation, design and upgrade by Chief Albert Luthuli Municipality.

(ii) Water Treatment Works

Eerstehoek WTW, capable of treating approximately 13.4Ml/day. The Treatment Plant is currently incapable of producing the designed 13.4 ML/d capacity. In addition, the WTW is no longer adequate to cope with the current demand as stated above. The WTW is subject to investigation, design and upgrade by GSDM as Implementing Agent for CALM. This is the subject of this Technical Report.

(iii) Bulk Pipelines

There are over 70km of bulk pipework (of size greater than 100mm diameter) distributing treated water to the consumers. Of this pipework, pertinent to this Technical Report are the following:

 The existing 250mm diameter uPVC rising main from the Komati Abstraction works to Eerstehoek WTW is no longer adequate to meet the demand in the project area and requires to be upgraded. This upgrade work is included in this technical report.

 The distribution pipework network is varied state/condition resulting in “unaccounted for water” levels of reportedly up to 40%. The CALM is currently investigating, designing and upgrading distribution infrastructure through another project. In addition, a water conservation and demand management intervention has been initiated through a separate project.

A summary of the details of existing bulk pipelines is provided in the table below referenced to Fig 1 above for identification.

ID From To Material Length Diameter Gravity/ (m) (mm) Pump PL06 Komati Raw Eerstehoek uPVC 5783 250 Pump Water P/S WTW PL07 Theespruit Raw Eerstehoek Steel 200 300 Pump Water P/S WTW PL08 Eerstehoek Elukwatini Low Steel 3 735 300 WTW Level Pump AC 2 719 300 Reservoir PL09 Elukwatini Industrial area AC 360 150 Hospital Gravity AC 200 125 Reservoir PL10 Rising main Elukwatini BPT AC 1 111 250 Gravity (PL08) PL11 Elukwatini Elukwatini AC 2 255 300 Pump Booster P/S High Level

Eerstehoek Regional Bulk Water Scheme - Technical Report 18 AUGUST 2012

ID From To Material Length Diameter Gravity/ (m) (mm) Pump Reservoir PL12 Elukwatini High PL13 & PL14 AC 250 Gravity Level Reservoir PL13 PL12 via Nhlazatshea AC 1 588 300 Elukwatini High Restant AC 1 272 250 Gravity Level Reservoir Reticulation AC 890 200 PL14 PL12& PL 13 Nhlazatshea Restant uPVC 140 250 Gravity booster P/S sump PL15 Nhlazatshea Nhlazatshea Restant booster Restant uPVC 90 250 Pump P/S sump booster P/S PL16 Nhlazatshea Nhlazatshea Restant booster Restant uPVC 1 650 200 Pump P/S Reservoir PL17 Eerstehoek Tjakastad 1 Steel 1 390 273 Pump WTW reservoir FC 2 225 250 PL18 Tjakastad 1 Tjakastad 2 FC 2 675 300 Gravity Reservoir Reservoir PL19 Tjakastad 2 Avontuur BPT FC 1 600 225 Gravity Reservoir PL20 Eesterhoek Nhlazatshea Steel 3 225 324 Pump WTW Reservoir uPVC 1 236 315 PL21 Nhlazatshea Nhlazatshea uPVC 1 035 250 Gravity reservoir reticulation PL22 Nhlazatshea Nhlazatshea uPVC 1 570 250 Gravity Reservoir reticulation PL23 Mooiplaas clear Mooiplaas Steel 550 240 water P/S Reservoir uPVC 3 400 200 Pump uPVC 5 250 160 PL24 Mooiplaas rising Arhemburg uPVC 80 75 Pump main Reservoir PL25 Arhemburg Arhemburg uPVC 2 400 75 Gravity Reservoir reticulation Notes: Source: Water Services Business Definition – Mswati & Mlondozi Regions

(iv) Pumpstations

There are six pumpstations that pump clear water to the various supply areas and two raw water pumpstations pumping water to Eerstehoek WTW. The clear water pumpstations and the Theespruit Raw Water Pumpstation are all currently upgraded and in good working condition. Upgrading of the Komati Raw Water Booster Pumpstation is the subject of this technical report. The details of the pumpstations are summarised in the table below referenced to Fig 1 above for identification.

ID Name Pump Type Motor Type kW Capacity Standby Power Rating (l/s) Capacity Source (l/s) PS04 Komati KSB – KRTK KSB River raw 100-315/234 Siemens 150 50 50 Electricity water P/S KSB – ETA TEFC 125-50/2 PS05 Theespruit raw water Orbit 300-8-7 100 100 Electricity P/S PS06 Mooiplaas 2x KSB WKIn clear water 90 16 15.5 Electricity 65/4 P/S PS07 Elukwatini Elmac clear water GA fluid 400 100 100 Electricity Siemens P/S

Eerstehoek Regional Bulk Water Scheme - Technical Report 19 AUGUST 2012

ID Name Pump Type Motor Type kW Capacity Standby Power Rating (l/s) Capacity Source (l/s) PS08 Nhlazatshe a clear 51 51 Electricity water P/S PS09 Tjakastad KSB WL clear water GEC 400 100 100 Electricity 200/5 P/S PS10 Elukwatini Sigmund Booster Siemens 250 100 100 Electricity Pulsometer P/S PS11 Nhlazatshe a Restant 2x KSB WKIn 150 28 28 Electricity Booster 100/7 P/S Notes: Source: Mpulanga Water Services Business Definition – Mswati & Mlondozi Regions

(v) Reservoirs

The existing reservoirs have no structural defects except that steel works such as ladders and level controls need refurbishment or replacement. The available storage facilities are detailed in the table below.

ID Name Capacity Material Control Floor FSL (Ml) Mechanism Level R02 Elukwatini BPT - Concrete Manual 1 040 - R0301 Elikwatini Hospital 3 Concrete Manual 1 020 1 027 Reservoir R0302 Elukwatini Hospital 1 Concrete Manual 1 020 1 027 Elevated Tower R04 Elukwatini Low 5 Concrete Manual 1 100 1 107 Level Reservoir R05 Elukwatini High 5 Concrete Manual 1 277 1 284 Level Reservoir R06 Nhlazatshea Restant Booster 0.032 Steel Manual 1 120 1 141 P/S Sump R07 Nhlazatshea 1.35 Concrete Manual 1 300 1 303 restant Reservoir R0801 Tjakastad 1 5 Concrete Manual 1 020 1 027 Reservoir R0802 Tjakastad 1 5 Concrete Manual 1 020 1 027 Reservoir R09021 Tjakastad 2 0.145 Concrete Manual 1 008 1 012 Reservoir R0902 Tjakastad 2 0.145 Concrete Manual 1 008 1 012 Reservoir R0903 Tjakastad 2 0.145 Concrete Manual 1 008 1 012 Reservoir R10 Avontuur BPT - Concrete Manual 880 - R11 Nhlazatshea 2.9 Concrete Level 1066 1073 Reservoir R12 Arnhemburg 0.032 Steel Manual 980 981 Reservoir R12 Mooiplaas 1.3 Concrete Manual 920 922 Reservoir TOTAL CAPACITY (excluding 26.017 hospital & BPTs) Notes: 1. Source: Mpulanga Water Services Business Definition – Mswati & Mlondozi Regions 2. BPTs and pumpstation sumps are not considered as available storage capacity

Eerstehoek Regional Bulk Water Scheme - Technical Report 20 AUGUST 2012

The bulk storage facilities have a combined capacity of 26.017 Ml excluding the 4 Ml storage which is dedicated to the Eerstehoek Hospital and the Break Pressure Tanks (BPTs). Recommended storage capacity is 48 hrs of Annual Average Daily Demand. The total present day storage requirement for the project area is 18.203 Ml (Table 2.3, 2012 AADD). The projected 2032 storage requirements is 31.704Ml meaning that an additional 5.688Ml is required.

The storage requirements can be further broken down into the individual supply areas as detailed in the table below.

2012 2032 Village or Available Available 2012 48 hr 2032 48 hr Settlement Capacity Shortfall Capacity Shortfall AADD Storage AADD Storage (Ml) (Ml)

Elukwatini 1.738 3.475 10 -6.525 3.354 6.708 10 -3.292 Inhlazatshe 4.424 8.849 4.25 4.599 8.540 17.079 4.25 12.829 Tjakastad 2.115 4.230 10.435 -6.205 2.849 5.697 10.435 -4.738 Avontuur 0.099 0.198 0 0.198 0.133 0.267 0 0.267 Mooiplaas 0.612 1.223 1.3 -0.077 0.824 1.647 1.3 0.347 Malahleka 0.114 0.228 0.032 0.196 0.153 0.306 0.032 0.274 TOTAL 9.101 18.203 26.017 -7.814 15.852 31.705 26.017 5.688

From the table above, it is clear that presently (2012), there is a shortfall in storage capacity at Inhlazatshe, Avontuur and Malahleka. For the projected 20 year demand (2032), additional storage capacity will be required for all the settlements except for Elukwatini and Tjakastad. The provision of the required additional storage is included in this technical report.

(b) Ekulindeni Water Scheme

Ekulindeni serves eastern areas of the project area that include Bosville, Ebutsini, Ekulindeni, Kalwerskraal, Moddergat, Ngoneni, Nhlaba/Maanhaar, Steynsdorp and Vlakplaas. The bulk infrastructure comprises the following:

 River abstraction from the Komati River with abstraction infrastructure comprising a single submersible pump and pipework system. No structure is provided in the river for the submersible pump. The submersible pump feeds centrifugal pumps located in a dilapidated building on the banks of the Komati River. The abstraction works is currently the subject of investigation and refurbishment by the Chief Albert Luthuli Municipality.

 Ekulindeni WTW, capable of treating approximately 4Ml/day. Due to the current inefficient state of the works, it is no longer able to supply the current demand of 3.8 Ml/day. The WTW is subject to investigation by GSDM as Implementing Agent for CALM with a view to integrating it into a long-term water supply regionalisation plan.

 Over 20km of bulk pipework (of size greater than 100mm diameter) distributing treated water to the consumers. The distribution pipework network is varied state/condition resulting in “unaccounted for water” levels of up to 40%.The CALM is currently investigating, designing and refurbishing distribution infrastructure through another project. In addition, a water conservation and demand management intervention has been initiated through another project.

Eerstehoek Regional Bulk Water Scheme - Technical Report 21 AUGUST 2012

 Bulk storage facilities with a combined capacity of 2.3 Ml. The capacity of these storage facilities is not adequate to meet the current demand of 3.4 Ml/day and the projected demand of 5 Ml/day. CALM is assessing the adequacy of existing facilities and proposals for additional facilities under a separate project.

3.2.3 Proposed Infrastructure

Two potential sources of water exist in the form of surface runoff from the Theespruit River and Komati River in the vicinity of Eerstehoek WTW and the Komati River in the vicinity of Ekulindeni WTW. At all abstraction points, the sources have yields far in excess of the demands of the project footprint. Thus the following options for development are considered:

(a) Option 1 – Upgrade and Operate Eerstehoek Water Scheme (Ekulindeni Water Scheme upgraded separately under a different BP)

This option will involve the upgrading of Eerstehoek WTWs to a capacity of 26Ml/day Ml/day to serve the project area. In addition bulk pipelines and associated pumpstations will be required to serve the areas.

The infrastructure is thus summarised as follows:

Upgrade infrastructure to provide adequate water supplies up to Mooiplas in the east as follows:

 Refurbish and upgrade the existing Theespruit and Komati River Raw Water Abstraction civil works.

 Refurbish and upgrade the Komati Raw Water Booster Pumpstation to supply the additional demand up to the required 300l/s to the Eerstehoek WTW.

 Upgrade of Eerstehoek WTW from a capacity of 13.4Ml/day to 26Ml/day.

 Construction of the following pipelines: o 6.8km long x 450mm diameter uPVC rising main (class 16) from the Komati River Raw Water Pumpstation to Eerstehoek WTW.

 Upgrading / Equipping of the following pumpstations; o Elukwatini Pumpstation situated at the Eerstehoek WTW from the present 100l/s to 144l/s. o Komati River Raw Water Booster Pumpstation from 50 l/s to 200l/s. o Komati River Abstraction works from 100 l/s to 200 l/s.

 Construction of the following reservoirs: o A new 1Ml storage reservoir at the Eerstehoek Water Treatment Plant. o 2 No. x 6.5Ml reservoirs (to provide a total capacity of 13Ml) at Inhlazatshe. o A new 0.3Ml reservoir at Avontuur. o A new 0.3Ml reservoir at Malahleni. o A new 0.4Ml reservoir at Mooiplaas.

The present day construction cost estimate of this option is R115 122 779.20 (including VAT). Refer to Annexure B2 for breakdown of costs.

Note: The upgrading of Ekulindeni WTW will be undertaken CALM under a separate business plan and funding source.

Eerstehoek Regional Bulk Water Scheme - Technical Report 22 AUGUST 2012

(b) Option 2 – Upgrade Eerstehoek WTW only to Supply Eerstehoek and Ekulindeni

The option will involve the upgrade of Eerstehoek WTW from a capacity of 13.4Ml/day to 30 Ml/day. Pipelines and associated pumpstations will be required to convey water from Eerstehoek (Elukwatini) to Ekulindeni and en route serve the areas of Mooiplaas, Bosville, Vlakplaas and Steyndorp.

The infrastructure is thus summarised as follows:

 Upgrade WTWs; o Eerstehoek to be upgraded from a capacity of 13Ml/day to 30Ml/day o Theespruit and Komati River Abstraction civil and mechanical works upgrade to meet the WTW design capacity of 30Ml/day.

 Construction of the following pipelines: o 6.8km long x 450mm diameter uPVC rising main (class 16) from the Komati River Raw Water Pumpstation to Eerstehoek WTW. o 8.5km x 350mm diameter uPVC gravity main from Elukwatini to Mooiplaas reservoir. o 5.5km x 350mm diameter uPVC rising main from Mooiplaas to Ekulindeni Command Reservoir. o 9.0km x 350mm diameter uPVC gravity main from Ekulindeni Command Reservoir to Ekulindeni o 2.0km long x 160mm diameter gravity main from Ekulindeni Command Reservoir to Bosville.

 Construction and Equipping of the following pumpstations; o Elukwatini Pumpstation situated at the Eerstehoek WTW (upgrade works) o Ekulindeni Pumpstation situated at Mooiplaas

 Construction of the following reservoirs: o A new 2Ml storage reservoir at the Eerstehoek Water Treatment Plant. o 2 No. x 6.5Ml reservoirs (to provide a total capacity of 13Ml) at Inhlazatshe. o A new 0.3Ml reservoir at Avontuur. o A new 0.3Ml reservoir at Malahleni. o A new 0.4Ml reservoir at Mooiplaas. o A new 1.0Ml Ekulindeni Command Reservoir located at the top of the hill between Ekulindeni and Mooiplass.

This option will require one Operation and Maintenance team at Eerstehoek WTW.

The present day construction cost estimate of this option is R156 550 594.00 (including VAT). Refer to Annexure B2 for breakdown of costs.

(c) Option 3 – Upgrade Ekulindeni WTW only to Supply Eerstehoek and Ekulindeni

This option will involve the upgrade of Ekulindeni WTW from a capacity of 4Ml/day to 30 Ml/day. Pipelines and associated pumpstations will be required to convey water from Ekulindeni to Eerstehoek (Elukwatini) and en route serve the areas of Mooiplaas, Bosville, Vlakplaas and Steyndorp.

The infrastructure is thus summarised as follows:

 Upgrade WTWs;

Eerstehoek Regional Bulk Water Scheme - Technical Report 23 AUGUST 2012

o Ekulindeni WTW to be upgraded from 4Ml/day to 30Ml/day including river abstraction facilities.

 Construction of the following pipelines: o 14.5km long x 500mm diameter steel rising main from Ekulindeni WTW to a 1 Ml command reservoir located at the top of the hill between Ekulindeni and Mooiplass. o 2.5km long x 500mm diameter steel gravity pipeline from the 1 Ml command reservoir to Elukwatini (near hospital). o 2.0km long x 160mm diameter gravity main from 1Ml command reservoir to Bosville.

 Construction and Equipping of the following pumpstations; o Elukwatini Pumpstation situated at Ekulindeni WTW

 Construction of the following reservoirs: o A new 1.0Ml Ekulindeni Command Reservoir located at the top of the hill between Ekulindeni and Mooiplass. o 2 No. x 6.5Ml reservoirs (to provide a total capacity of 13Ml) at Inhlazatshe. o A new 0.3Ml reservoir at Avontuur. o A new 0.3Ml reservoir at Malahleni. o A new 0.4Ml reservoir at Mooiplaas.

This option will require one Operation and Maintenance team at the Ekulindeni WTW.

The present day construction cost estimate of this option is R281 349 500.00 (including VAT). Refer to Annexure B2 for breakdown of costs.

(d) Summary of Options

The options considered are summarised in the Table 3.1 below.

Table 3.1: Summary of Costs of Options Considered Option Description Scope of Works Estimated Total Project Cost Option Water Supply from Upgrade Eesterhoek WTW from a capacity 1 Eerstehoek and of 13.4Ml/day to 26Ml/day to serve the Ekulindeni WTW project area including bulk pipelines, R115 122 779.20 Separately reservoirs and associated pumpstations up to Mooiplaas to the east

Option Water Supply from Upgrade Eerstehoek WTW from a capacity 2 Eerstehoek WTW of 13.4Ml/day to 30 Ml/day to serve the R156 550 594.00 entire project area including bulk pipelines, reservoirs and associated pumpstations Option Water Supply from Upgrade Ekulindeni WTW from a capacity of 3 Ekulindeni WTW 4Ml/day to 30 Ml/day including bulk R281 349 500.00 pipelines, reservoirs and associated pumpstations

The three options considered are further compared side by side with the estimated Operation and Maintenance costs on completion of the project.

Eerstehoek Regional Bulk Water Scheme - Technical Report 24 AUGUST 2012

Table 3.2: Cost Estimates for Options Considered Description Option 1 Option 2 Option 3 Infrastructure Cost 87 620 400.00 120 919 800.00 223 599 600.00 Contingencies 10 465 707.20 12 091 980.00 22 359 960.00 Planning, design and supervision P & G’s 12 266 856.00 16 928 772.00 24 595 956.00 Institutional and socio-economic costs 3 504 816.00 4 836 792.00 8 943 984.00 Environmental Costs 100 000.00 200 000.00 650 000.00 Power Supply, Survey & Geotechnical Investigations 1 165 000.00 1 573 250.00 1 200 000.00 TOTAL CAPITAL COST R115 122 779.20 R156 550 594.00 R281 349 500.00 Annual Recurring Cost R9 466 865.00 R15 286 188.00 R25 611 565.00 (O & M)

Option 1 has been selected as a result of the lower present day and overall long term costs.

3.2.4 Bill of Quantities

Detailed construction cost estimates have been prepared using industry norms, previous experience and current rates on awarded contracts for scope of works of a similar nature. Based on the overall capital and Operation and Maintenance Costs, the most favourable option is Option 1. This option involves the upgrade of the Eerstehoek WTW to become a source for a regional scheme serving the project area up to Mooiplaas. The areas from Ekulindeni up to Bosville will be supplied from Ekulindeni WTW. This scheme will be referred to as the “Eerstehoek Regional Bulk Water Scheme”.

The project will be implemented with funding from the RBIG, GSDM and MIG allocation on the basis of the proposal in this Technical Report. The capital cost for the project is R115 122 779.20 (including VAT).

(a) Implementation Plan

The project is to be implemented in manageable work packages that will be aimed at achieving the overall target completion date for the project. The breakdown of the costs and respective work packages is detailed in Tables 3.3, 3.4, and 3.5.

Eerstehoek Regional Bulk Water Scheme - Technical Report 25 AUGUST 2012

WORK PACKAGE 1 – Raw Water Infrastructure Upgrade and Storage Facilities

Work package 1 will focus the upgrading of raw water abstraction infrastructure at Theespruit and Komati Rivers and the construction of pipelines and reservoirs.

Table 3.3: Cost Estimate for Work Package 1 Construction and Related Costs Amount % of Total a. Refurbish and upgrade the existing Theespuit and Komati River Raw Water Abstraction Civil Works R 2 736 000.00 7.2% b. Refurbish and upgrade the existing Komati River Raw Water Abstraction Works and Raw Water Booster Pumpstation supply the required 300l/s demand to Eerstehoek WTW (pumpstation equiped with 2No. X 200l/s pumps) R 1 026 000.00 2.7% c. Construction of 6.8km long x 450mm diameter uPVC (class 16) rising main from the Komati River Raw Water Pumpstation to Eerstehoek WTW R 5 038 800.00 13.2% d. Mechanical and Electrical Works for pumpstation at Eerstehoek including remote monitoring equipment (2 No. pumps x 144l/s @ 400kW at 211m Head) R 1 026 000.00 2.7% e. Civil Construction of 13Ml reservoir at Inhlazatshe (2 x 6.5Ml reservoirs) R 15 321 600.00 40.1% f. Civil Construction of 0.3Ml reservoirs at Avontuur and Malahleni R 2 052 000.00 5.4% g. Civil Construction of 0.4Ml reservoir at Mooiplaas 1 254 000.00 3.3% h. Allowance for EIA, engineering survey, Power costs, Servitudes & Geotech investigations–1 R 1 130 000.00 3.0% i. Allowance for Social Consultant –1 R 1 138 176.00 3.0% Sub Total R 30 722 576.00 80.5% Add : Allowance for Engineering Fees including disbursements –1 R 2 941 016.00 7.7% Add : Allowance for Clerk of Works including travelling (assume 10 months) –1 R 892 600.00 2.3% Add: Allowance for additional duties (arranging for servitudes, PTO’s and crop compensation) –1 R 150 000.00 0.4% Sub Total: Non-Construction Costs R 3 983 616.00 10.4% TOTAL PROJECT COSTS (including VAT, excl Escalation & Contingencies) R 34 706 192.00 90.9% Add: Allowance for Escalation & Contingencies R 3 470 619.20 9.1% TOTAL PROJECT COSTS (incl VAT, Escalation & Contingencies) R 38 176 811.20 100.0%

-1 For details of these costs refer to Annexure B2.

Eerstehoek Regional Bulk Water Scheme - Technical Report 26 AUGUST 2012

WORK PACKAGE 2 – Eerstehoek WTW Upgrade

Work package 2 will focus on the upgrade of Eerstehoek WTW as detailed in Table 3.4.

Table 3.4: Cost Estimate for Work Package 2 Item Amount % Of Total Construction and related costs a. Refurbishment and upgrade of Eerstehoek WTW from 13.4Ml/day to 20 Ml/day (mechanical and civil works) R 30 096 000.00 76.8% b. Allowance for EIA, engineering survey, servitudes boundary extensions and Geotechnical investigations –1 costs, etc R 90 000.00 0.2% c. Allowance for ISD Costs & disbursements –1 R 1 203 840.00 3.2% Sub Total R 31 389 840.00 80.2% Add : Allowance for Engineering Fees including disbursements –1 R 2 680 000.00 6.8% Add : Allowance for Clerk of Works including travelling (assume 10 months) –1 R 1 233 440.00 3.1% Add: Allowance for additional duties (arranging for –1 servitudes, PTO’s and crop compensation) R 300 000.00 0.8% Sub Total: Non-Construction Costs R 4 213 440.00 10.7% TOTAL PROJECT COSTS (including VAT & excluding Escalation & Contingencies) R 35 603 280.00 90.9% Add: Allowance for Escalation & Contingencies R 3 560 328.00 9.1% TOTAL PROJECT COSTS (incl. VAT, Escalation & Contingencies) R 39 163 608.00 100.0% -1 For details of these costs refer to Annexure B2

Eerstehoek Regional Bulk Water Scheme - Technical Report 27 AUGUST 2012

WORK PACKAGE 3 – Eerstehoek WTW Upgrade

Work package 3 will also focus on the upgrade of Eerstehoek WTW as detailed in Table 3.5.

Table 3.5: Cost Estimate for Work Package 3 Item Amount % Of Total Construction and related costs a. Refurbishment and upgrade of Eerstehoek WTW from 20Ml/day to 26Ml/day (mechanical and civil works) R 27 360 000.00 72.4% b. Civil Construction of 1Ml reservoir at Eerstehoek WTW R 1 710 000.00 4.5% c. Allowance for EIA, engineering survey, servitudes boundary extensions and Geotechnical investigations –1 costs, etc R 45 000.00 0.1% d. Allowance for ISD Costs & disbursements –1 R 1 162 800.00 3.1% Sub Total R 30 277 800.00 80.1% Add : Allowance for Engineering Fees including disbursements –1 R 2 920 000.00 7.7% Add : Allowance for Clerk of Works including travelling (assume 10 months) –1 R 1 029 800.00 2.7% Add: Allowance for additional duties (arranging for –1 servitudes, PTO’s and crop compensation) R 120 000.00 0.4% Sub Total: Non-Construction Costs R 4 069 800.00 80.8% TOTAL PROJECT COSTS (including VAT & excluding Escalation & Contingencies) R 34 347 600.00 90.9% Add: Allowance for Escalation & Contingencies R 3 434 760.00 9.1% TOTAL PROJECT COSTS (incl. VAT, Escalation & Contingencies) R 37 782 360.00 100.0% -1 For details of these costs refer to Annexure B2

(b) Social Consultant’s costs

Community awareness, social issues and general liaison with community for Permission To Occupy (PTO’s), etc will be undertaken by a Social Consultant to be appointed at implementation stage. The bulk of the Social Consultant’s efforts are geared towards the smooth running of construction work (i.e. labour recruitment, task determination, etc.). The fees for the Social Consultant have been estimated at 4% of Construction cost in this Technical Report.

(c) Implementation Agent

All services as per the agreement between CALM/DWA and IA (GSDM) including mentorship, training and co-ordination of monitoring and evaluation.

Eerstehoek Regional Bulk Water Scheme - Technical Report 28 AUGUST 2012

(d) Consulting Engineer

On behalf of the IA, preparation of Feasibility Study and Technical Report, design and invitation of tenders for construction work, supervision during construction (site staff) and additional duties such as application for power supplies, arranging way leaves and servitudes from Telkom, Eskom and Department of Transport (DoT), arranging for registration of servitudes on private land and arranging for PTO from rural land to construct the proposed infrastructure.

(e) Construction Cost

The construction costs include for the construction of the various components of the works, payment of compensation for crop damage and land acquisition. The cost estimates are based on current rates for work of similar scope as per this technical report. The costs include escalation and contingencies during the construction period.

Eerstehoek Regional Bulk Water Scheme - Technical Report 29 AUGUST 2012

4 INSTITUTIONAL SUSTAINABILITY

4.1 Community Structures

4.1.1 Community Structures

The project area covers the following municipality wards:

Area Ward Elukwatini 9,10,13,14,16,18,19,20

All wards have ward committees that steer projects and disseminate information to the residents.

The project components in the rural areas will be subject to acceptance by the tribal structures.

4.1.2 Level of community awareness and development

During the development of the project, the GSDM will ensure that there is a high level of awareness amongst members of the community regarding developments in their area. This will be done by the following:

 Involvement of the key stakeholders in the project steering committee  Providing regular project updates to the councillors of CALM and GSDM  Appointment of a Community Liaison Officer (CLO) at the appropriate stages of the project  Dissemination of project information through public notices and meetings.

4.1.3 Level of involvement of women

The participation of women in this particular project will be continuously promoted. Ensuring women participation is one of the critical areas of the PSC. The women have generally expressed a willingness to be involved in all aspects of the water project. Their male counterparts have come to understand and accept that government stipulates 50 % representation in all development programmes and projects.

(a) Income level and sources of income of the community

The GSDM WSDP provides information on the Annual Household Incomes in the area as shown below:

Income Range (R) Population (%) Below R2,400 0.5% R2,400 to R12,000 13.1% R12,000 to R18,000 12.9% > R18,000 73.5%

Eerstehoek Regional Bulk Water Scheme - Technical Report 30 AUGUST 2012

On the basis of the above, about 26.5% of the population can be classified as predominantly poor. However, the remainder can be expected to have the ability to pay modest amounts for the water service.

4.1.4 Community Involvement

Community involvement is at various stages/levels of the project as follows:

 Identification and prioritisation through the IDP process.  Project steering by representation in the Project Steering Committees.  Facilitation by granting access to contractors and CALM to construct. Infrastructure on their property subject to agreement.  Labour provision by use of local labour on the project.  Supply of materials/services by local enterprises.  Operation of infrastructure by use of local personnel.  Supply of personnel for the operation and maintenance of infrastructure during its use.

The community involvement will be promoted through meetings, training and the GSDM/CALM’s procurement policies.

4.2 Water Service Authority

4.2.1 Status and proficiency of Local Water Services Authority:

Chief Albert Luthuli Municipality (CALM) is the Water Service Authority for this region as per local government Municipal Structures Act 117 0f 1998, as contemplated in the Water Service Act 108 0f 1998. The CALM is a competent WSA and has the capacity to perform the role of a Water Services Authority. The development of this scheme is by GSDM as the Implementing Agent. However, it will be owned by CALM as the WSA. It is therefore considered that the WSA has adequate capacity to manage its operation and maintenance.

The Overall Management Organogram for the project showing the relationships between the various stakeholders is depicted in Figure 1

Eerstehoek Regional Bulk Water Scheme - Technical Report 31 AUGUST 2012

RBIG National Provincial Manager

RBIG Provincial Programme Manager

GSDM PSC WSA (IA) Technical Management Committee

GSDM

Technical Consultant Social Consultant Community

Contractor

Superior - Subordinate Relationship

Colleague (same level of responsibility) Relationship

Fig 2: Overall Management Organogram

4.3 Water Service Provider

4.3.1 Section 78 Determination

The CALM undertook a Section 78(1) Assessment in May 2007. The following pertinent findings were made:

 The CALM provided effective service in some parts of the municipal area.  Water balancing and metering needed some attention.  Upgrading of WTW was required.  Cost recovery was poor in areas previously run by DWA.  It was possible for the CALM to provide the service internally with experienced top management and suitably qualified and experienced middle management, superintendents and operators.

Eerstehoek Regional Bulk Water Scheme - Technical Report 32 AUGUST 2012

4.3.2 Water Services Provider

The CALM is the Water Services Provider in the project area. As per the Section 78) (1) Assessment, the CALM is capable of undertaking the WSP function. However, it is considered prudent for the CALM to regularly assess the viability of external mechanisms for service delivery.

4.3.3 Consumer/Customer Relation

The Municipality is responsible for the billing or meter readings for the existing water supply schemes. All households, including each private connected user are guaranteed 6 kilolitres, free of charge, anything above is then charged.

4.4 Legal Requirements

4.4.1 Water Use Registration

According to the report “Comprehensive Assessments on Water and Sanitation Treatment Works in the Chief Albert Luthuli Municipality for Badplaas, Carolina, Ekulindeni, Elukwatini, eMpuluzi, Lusushwane and Oshoek” prepared by Messrs SSI Engineers and Environmental Consultants, no abstraction permit exists for the proposed water source (Komati and Theespruit Rivers at Eerstehoek). Through this project the CALM will apply for the permit.

4.4.2 Project Registration with Respect to NEMA

As the project infrastructure comprises elements that are listed in terms of the National Environmental Management Act (NEMA), the project will require environmental approval through a “Basic Assessment”. A basic assessment involves the identification and analysis of environmental risks/ threats that may be caused by the implementation of the project. Once identified, possible solutions or mitigation against environmental damage is suggested, analysed and recommended. The deliverables from this analysis is a Basic Assessment Report which is submitted to Department of Agriculture and Environmental Affairs and Rural Development (DAEARD) for approval.

Environmental authorisation to proceed with the project is granted when the basic assessment report is approved by DAEARD. When implementation of the project commences an Environmental Management Plan (EMP) is prepared which details how construction works are to be carried out to prevent environmental damage. The EMP is included in the tender documentation for the works so that tenderers can price to comply with environmental requirements.

The preparation of the basic Assessment Report and the EMP is specialised work that will be undertaken by an Environmental Practitioner to be appointed at project implementation stage.

Eerstehoek Regional Bulk Water Scheme - Technical Report 33 AUGUST 2012

5 ECONOMIC/SOCIO ECONOMIC ANALYSIS

5.1 Infrastructure

5.1.1 Initial Capital Investment Cash Flow

The estimated capital cost of the project is R115 122 779.20 (including VAT) made up of the following components:

Table 5.1: Project Implementation Work Packages Work Description Estimated Cost Package 0 Technical Report R Included 1 Refurbishment & upgrade of Raw Water Abstraction and construction of pipelines and reservoirs R 38 176 811.20 2 Upgrade of existing Eerstehoek WTW from a 13.4ML/d capacity to a 26ML/d capacity R 39 163 608.00 3 Upgrade of existing Eerstehoek WTW from a 13.4ML/d capacity to a 26ML/d capacity R 37 782 360.00

TOTAL R 115 122 779.20

The cash flow projections for the project are included as Annexure D.

5.1.2 Long Term Operational Costs

The long term estimated operation and maintenance costs for a period of 5 years after completion of the project is as detailed in the table below.

Table 5.2: Operation & Maintenance Costs Year Operational Maintenance Total 1 8 533 493 1 505 911 10 039 404 2 9 100 685 1 606 003 10 706 688 3 9 705 779 1 712 785 11 418 564 4 10 351 337 1 826 707 12 178 044 5 11 040 072 1 948 248 12 988 320

5.1.3 Replacement/Refurbishment Cycle Cost

Infrastructure will be sized for a design period of 20 years. It is envisaged that the infrastructure will require to be upgraded thereafter. Refurbishment is expected to occur every 5 years due to component wear and tear. This has been taken into account in the O & M costs in Table 5.2 above.

Eerstehoek Regional Bulk Water Scheme - Technical Report 34 AUGUST 2012

5.2 Social and Socio Economic Opportunities

The Project is expected to create employment opportunities during the construction phases. It also envisaged that permanent work opportunities may be created at the Eerstehoek WTW for operation and monitoring of the waterworks.

All stakeholders will be informed of the project and will form part of the Project Steering Committee. This will ensure that their respective interests/ concerns with regard to the project are addressed. The Project Committee will review all the projects being implemented within the CALM and the GSDM so that it can be informed of the development taking place within the respective areas of jurisdiction thereby linking the developmental initiatives within the municipalities.

5.3 Training, Facilitation and Capacity Building Scope of Work

The training and capacity building that will be overseen by the ISD consultant will focus on four key areas being community participation, creation of sustainable institutions, sanitation, health and Hygiene Promotion and Entrepreneurial Development. The account below details the relevant objectives, actions, methodologies and outcomes of the training ad capacity building initiatives.

5.3.1 Community Participation

This aspect will target the following key areas:

 Communication systems development - the target groups for this exercise are the PSC and the community. The objective of the exercise is to improve communication between the community and the WSA and WSP. This will be done via project and public meetings. The requisite skills training should focus on communication strategies, barriers to effective communication, and methods of improving communication. At the end of the exercise there should be convergence of minds amongst all role players. The possible methodologies than can be employed include lectures, discussions, Question and Answer sessions and Role Playing.  Awareness Creation – the objective of this exercise is to enlighten the community and the PSC on the processes that will be followed to deliver the water project. Project meetings, public meetings, banners and posters will be used to reach out to the target groups. Methodologies to be employed include lectures, discussions and question and answer sessions. Skills training are required to form an outstanding of the nature of the project, the size of the project, the various stages of the project and the payment options. Awareness will be achieved when the average citizen in the project area has gained knowledge of the project and the various phases of the scheme.  Community Responsibility – the key objective of this exercise will be to make the community take ownership of the project from inception and during the life of the scheme. The target group for this exercise is the community at large. This will be achieved via public meetings, project meeting and banners and posters. The topics to be covered will include safeguarding assets, the benefits of looking after the project and the consequences of failing to do so, water conservation and demand management and health and hygiene issues. Success indicators will include ownership and sustainability of the project. Methodology to include lectures, discussions and question and answer sessions.

Eerstehoek Regional Bulk Water Scheme - Technical Report 35 AUGUST 2012

5.3.2 Sustainable Institutions

CALM is an established institution and will not require additional training under this project.

5.3.3 Sanitation Health and Hygiene Promotion

The social consultant will, whilst discussing the water project, provide general information and discuss sanitation, health and hygiene in general with the PSC and the community.

5.3.4 Entrepreneurial Development

GSDM has adopted the policy of Preferential Procurement Policy Framework Act, 2000(Act No.5 of 2000.). The District Municipality gives preference to HDIs, local contractors and SMMEs. Tender documents are compiled such that the targeted contractors are able to tender for manageable size contracts. Further tender briefing will be arranged and conducted by the Engineer for emerging contractors after site inspections to explain the contents of tender documents to them.

Annexure E is attached detailing the scope of works to be undertaken by the ISD Consultant.

5.4 Labour Based Construction

Where conditions permit, the contract documents for the infrastructure and pipelines construction will specify hand excavation and other labour intensive work as a means of creating jobs for the local communities. The contract documents will also specify that 100% of the contractors’ unskilled labour force is to be sourced from the local communities.

The PSC will form a labour sub-committee which will be responsible for identifying and recommending suitable candidates for employment as labourers, pipe-layers, etc. The Labour Sub-Committee will ensure that the above employment policy is adhered to each time employment opportunities arise. The Sub-Committee will also assist in dispute resolution and payment of labourers and builders.

It is estimated that approximately 140 community jobs will be created during construction. This will include builders for block-work, labour for excavation of trenches and movement of materials from store yards to the construction site, pipe layers and artisans and transporters. The breakdown of anticipated job opportunities is provided in Table 5.3.

Eerstehoek Regional Bulk Water Scheme - Technical Report 36 AUGUST 2012

Table 5.3: Breakdown of Estimated Job Opportunities Number of Total Adult Youth Disabled Persons planned Number to be employed of Women Men Female Male Female Male persons Number of persons planned to be 35 10 10 5 8 1 1 employed (A) Average length of employment (days) 400 400 400 400 400 400 400 (B) Number of planned person days C=A x 14 000 4 000 4 000 2 000 3 200 400 400 B Please note: -  The definition of youth is any person under the age of 35 years. (18-35 Years)  Each person may only be counted once. If a person falls into more than one category, disabled persons take preference, then youth, and then adult. Must include all occupational categories (Clerical, Labourer, Managerial, Semi skilled, Skilled and Supervisor). Permanent Employment after Construction Total number of permanent employees to be appointed after the completion 9 of the project Local Labourers Average wage rate (per day): a R100.00 Number of labourers planned to be employed (Person Days) (Total of C): b 14 000 Total Value to local Community: c R 1 400 000.00 Note: Calculation / Formula c= a x b

5.5 Permanent Staff Requirements

Upon completion of the upgrade works, Eerstehoek WTW will have a capacity of 26Ml/day. The plant will be classified in accordance with Section 26 of the Water Act as a Class B water treatment works. Staffing requirements for such a class of plant is as depicted in the table below.

Number Required Description Class Per Shift For 3 shifts a Day Trainee 1 1 Operator Class I 2 6 Class II 1 3 Class III 1 3 Supervisor Class IV 1 3 Inspector Class V (weekly) 1 1 TOTAL 7 17

According to the Comprehensive Assessment of Water and Sanitation Treatment Works in the Chief Albert Luthuli Municipality prepared by Messrs SSI Engineers and Environmental Consultants (June 2009), 8 people operate the plant. Accordingly, it is estimated that an additional 9 permanent employment opportunities could be created at Eerstehoek WTW.

The breakdown of employment of employment to be created in detailed in Table 5.3 above.

Eerstehoek Regional Bulk Water Scheme - Technical Report 37 AUGUST 2012

5.6 Cost Estimates

The breakdown of the cost estimates for the proposed infrastructure is summarised in Table 5.4.

Table 5.4: Cost Estimate Breakdown for Option 1 Construction and Related Costs Amount a. Refurbish and upgrade the existing Theespuit and Komati River Raw Water Abstraction Civil Works R 2 736 000.00 b. Refurbish and upgrade the existing Komati River Raw Water Abstraction Works and Raw Water Booster Pumpstation supply the required 300l/s demand to eerstehoek WTW (pumpstation equipped with 2No. X 200l/s pumps) R 1 026 000.00 c. Construction of 6.8km long x 450mm diameter uPVC rising main (class 16) from the Komati River Raw Water Pumpstation to Eerstehoek WTW R 5 038 800.00 d. Mechanical and Electrical Works for pumpstation at Eerstehoek including remote monitoring equipment (2 No. pumps x 144l/s @ 400kW at 211m Head) R 1 026 000.00 e. Civil Construction of 13Ml reservoir at Inhlazatshe (2 x 6.5Ml reservoirs) R 15 321 600.00 f. Civil Construction of 0.3Ml reservoirs at Avontuur and Malahleni R 2 052 000.00 g. Civil Construction of 0.4Ml reservoir at Mooiplaas R 1 254 000.00 h. Refurbishment and upgrade of Eerstehoek WTW from 13.4Ml/day to 26 Ml/day (mechanical and civil works) R 57 456 000.00 i. Civil Construction of 1Ml reservoir at Eerstehoek WTW 1 710 000.00 j. Allowance for EIA, engineering survey, Power costs, Servitudes & Geotech investigations R 1 265 000.00 k. Allowance for Social Consultant R 3 504 816.00 Sub Total R 92 390 216.00 Add : Allowance for Engineering Fees including disbursements R 8 691 016.00 Add : Allowance for Clerk of Works including travelling (assume 20 months) R 3 155 840.00 Add: Allowance for additional duties (arranging for servitudes, PTO’s and crop compensation) R 420 000.00 Sub Total: Non-Construction Costs R 12 266 856.00 TOTAL PROJECT COSTS (including VAT, excl Escalation & Contingencies) R 104 657 072.00

Add: Allowance for Escalation & Contingencies R 10 465 707.20

TOTAL PROJECT COSTS (incl VAT, Escalation & Contingencies) R 115 122 779.20

Eerstehoek Regional Bulk Water Scheme - Technical Report 38 AUGUST 2012

6 FINANCIAL VIABILITY

6.1 Funding Source

6.1.1 Capital Investments

Funding for the project will be from the Regional Bulk Infrastructure Grant (RBIG), GSDM and MIG broken down as detailed in Table 6.1.

Table 6.1: Funding Breakdown Basic Level of Higher Level Funding Source Services of Service Conditional Government Grant / Subsidy (RBIG 56%) R 64 468 756.35 N/A GSDM Budget (14%) R 16 117 189.09 R 0.00 MIG Funding (30%) R 34 536 833.76 R 0.00 TOTAL R 115 122 779.20 R 0.00

6.1.2 Long Term Operation and Maintenance

(a) Cost Recovery

The Water Services Authority and Water Services Provider for the bulk and reticulation infrastructure will be CALM. The cost recovery strategy has been developed by the WSA and WSP.

Free Basic Water

The free basic water policy of CALM will apply to the project area. Each household will thus be entitled to 6 kilolitres of free water per month. All water from communal standpipes will be delivered free of charge in line with “free basic water” principles.

Indigent Policy

CALM has an Indigent Policy in place which has been implemented since 2008.

High Level of Individual Household Services

It is anticipated that once water services are available, the community will require improving the level of service to that of private individual connection. The cost recovery strategy has been developed by the WSA and WSP (bulk and reticulation), together with input from their Finance Division. The WSP will take legal action and upgrade other schemes to ensure better cost recovery in line with the requirements of the Water Services Act, Act 107 of 1997.

Institutional Service Delivery

The Water Services Authority is CALM. For this project, GSDM is the Implementing Agent. CALM will be the bulk and reticulation Water Services Provider, who will be responsible for maintaining and operating all aspects of the water infrastructure (i.e. bulk and reticulation). Selling of water via standpipes (optional) and private connections will be by CALM Finance

Eerstehoek Regional Bulk Water Scheme - Technical Report 39 AUGUST 2012

Division. No other options for WSP (bulk or reticulation) have been considered. The functions and responsibilities of the WSP (reticulation and bulk) are detailed in Table 6.2.

Table 6.2: Functions and Responsibilities of the WSP Indicate who will perform the individual Functions functions Contracted out to: (If the function is to be Water Services contracted out, (Detail the functions under Provider: (bulk indicate which sector the following categories) and reticulation) the function will be contracted out to, e.g. private, NGO, Water Board, etc) Governance: CALM – WSA Administration: CALM – Finance Finance: CALM – Finance Planning: CALM – WSA Private – if required Project: CALM – WSP Private – if required Consumer relations (liaison): CALM – WSP Private – if required CALM – Finance CALM – WSA Private – if required Operations: CALM – WSP Maintenance: CALM – WSP

(b) Organogram (relationship between WSA, WSP and customers)

Water Services Authority (CALM)

Water Services Provider (bulk and reticulation) (CALM Technical Department & CALM Finance)

Customers

Represents a formal contract

Represents assistance and support function

Eerstehoek Regional Bulk Water Scheme - Technical Report 40 AUGUST 2012

(c) Deficit Funding

Anticipated Operation and maintenance costs and cost recovery are compared in Table 6.3. The WSP already has in place a cost recovery strategy that will be utilized to recover costs through billing for water usage where individual households have private connections. Billing of private consumers will be done monthly upon taking of monthly meter readings. Record-keeping, bookkeeping and banking arrangements will be carried out by WSP as part of its normal duties.

Table 6.3: Operation and Maintenance Costs Operation & Rand per Annum Maintenance Year 1 Year 2 Year 3 Year 4 Year 5 Cost Estimated O & M Cost 10 039 404.00 10 706 688.00 11 418 564.00 12 178 044.00 12 988 320.00 Anticipated Cost Recovery 9 377 520.00 10 855 656.00 12 147 888.00 13 593 936.00 15 212 124.00 Annual Deficit/profit -661 884.00 148 968.00 729 324.00 1 415 892.00 2 223 804.00

6.2 Cash flow Forecast

The cash flow for the project is shown in Annexure D in tabular and graphical format. The cash flow has been based on the funding plan.

6.3 Milestone Schedule

Milestones for implementation of the project are detailed in the programme included in Annexure G.

Eerstehoek Regional Bulk Water Scheme - Technical Report 41 AUGUST 2012

7 ENVIRONMENTAL ACCEPTABILITY

7.1 Natural Environment Impact Assessment

In terms of the new regulations the elements of this project will require the following level of assessment for environmental approval:

 Registration with the Department of Environmental Affairs  Preparation of an Environmental Management Plan  And/or Compilation of Basic Assessment

Annexure I includes a copy of the application form that will be submitted to the Department of Agriculture and Environmental Affairs for environmental approvals. All requirements with regard to the preparation of an Environmental Impact Assessment or scoping report will be complied with. An Environmental Practitioner will be appointed for this work.

7.2 Social Environment

7.2.1 Relocation Considerations

The infrastructure proposed in this Technical Report will be located in such a manner that it does not result in relocation of existing households. Where proposed pipelines run through private properties, PTOs will be signed between the Implementing Agent and the landowner.

The existing Eerstehoek Waterworks site has adequate space for the proposed upgraded infrastructure.

7.2.2 Socio Economic Opportunity Maximisation

The project is in line with the GSDM WSDP and IDP which aims at providing a regional scheme for the project area.

7.2.3 Environmental Management Plan

An environmental management plan will be prepared and included in tender documentation for the proposed infrastructure. This will enable contractors to price for compliance with the plan. During construction, compliance issues will be assessed through environmental audits undertaken on a monthly basis.

Eerstehoek Regional Bulk Water Scheme - Technical Report 42 AUGUST 2012

8 CONCLUSION

8.1 Water Supply Requirements

The Eerstehoek Regional Bulk Water Scheme is aimed at providing the communities of Nhlazatshe, Tjakastad, Avontuur, Mooiplaas, Elukwatini, Malahleka and Arhemberg with a safe, adequate and reliable potable water supply. Water supply requirements in the project area have been determined using the following design criteria:

Demand 130l/c/d Institutions Demand 7.5 Kl/d Agriculture and other users Nil Water Source Komati and Theespruit Rivers Raw Water Storage Available storage is 100 Kl to be increased to 500 kl Treatment Conventional flocculation, sedimentation, clarification, filtration and chlorination in that order to be adopted Dispensing  Standpipes  Private house connections where consumers can afford and are willing to pay for the service

8.2 Scope of Works Summary

The water supply requirements for the project area will be met through the upgrading of Eerstehoek Water Treatment Works into a regional water treatment works supplying the entire project area. The envisaged scope of works includes the following:

 Refurbish and upgrade the existing Theespruit and Komati River Raw Water Abstraction civil works.

 Refurbish and upgrade the Komati Raw Water Booster Pumpstation to supply the additional demand up to the required 300l/s to the Eerstehoek WTW.

 Upgrade of Eerstehoek WTW from a capacity of 13.4Ml/day to 26Ml/day.

 Construction of the following pipelines: o 6.8km long x 450mm diameter uPVC rising main (class 16) from the Komati River Raw Water Pumpstation to Eerstehoek WTW.

 Upgrading / Equipping of the following pumpstations; o Elukwatini Pumpstation situated at the Eerstehoek WTW from the present 100l/s to 144l/s. o Komati River Raw Water Booster Pumpstation from 50 l/s to 200l/s. o Komati River abstraction works from 100 l/s to 200 l/s.

 Construction of the following reservoirs: o A new 1Ml storage reservoir at the Eerstehoek Water Treatment Plant. o 2 No. x 6.5Ml reservoirs (to provide a total capacity of 13Ml) at Inhlazatshe. o A new 0.3Ml reservoir at Avontuur. o A new 0.3Ml reservoir at Malahleni. o A new 0.4Ml reservoir at Mooiplaas.

Eerstehoek Regional Bulk Water Scheme - Technical Report 43 AUGUST 2012

8.3 Funding Summary

It is anticipated that funding for the project will be provided from the following sources:

Funding Source Contribution Amount Conditional Government Grant (RBIG) 56% R 64 468 756.35

GSDM Budget 14% R 16 117 189.09 MIG Funding 30% R 34 536 833.76 TOTAL 100% R 115 122 779.20

Eerstehoek Regional Bulk Water Scheme - Technical Report 44 AUGUST 2012

9 RECOMMENDATIONS

In view of the foregoing, the following is recommended:

1. DWA approves the proposed Eerstehoek Regional Bulk Water Scheme for supply of potable water to the communities of Nhlazatshe, Tjakastad, Avontuur, Mooiplaas, Elukwatini, Malahleka and Arhemberg.

2. That DWA approves Option 1 in this technical report for a regional scheme supplying the areas as detailed in Item 1 above in the total amount of R115 122 779.20. This amount equates to a cost per capita of R1 192.65 (2032).

The infrastructure to be constructed includes the following:

 Refurbish and upgrade the existing Theespruit and Komati River Raw Water Abstraction civil works.

 Refurbish and upgrade the Komati Raw Water Booster Pumpstation to supply the additional demand up to the required 300l/s to the Eerstehoek WTW.

 Upgrade of Eerstehoek WTW from a capacity of 13.4Ml/day to 26Ml/day.

 Construction of the following pipelines: o 6.8km long x 450mm diameter uPVC rising main (class 16) from the Komati River Raw Water Pumpstation to Eerstehoek WTW.

 Upgrading / Equipping of the following pumpstations; o Elukwatini Pumpstation situated at the Eerstehoek WTW from the present 100l/s to 144l/s. o Komati River Raw Water Booster Pumpstation from 50 l/s to 200l/s. o Komati River Abstraction works from 100 l/s to 200 l/s.

 Construction of the following reservoirs: o A new 1Ml storage reservoir at the Eerstehoek Water Treatment Plant. o 2 No. x 6.5Ml reservoirs (to provide a total capacity of 13Ml) at Inhlazatshe. o A new 0.3Ml reservoir at Avontuur. o A new 0.3Ml reservoir at Malahleni. o A new 0.4Ml reservoir at Mooiplaas.

3. That RBIG approves funding for the project in the amount of R64 468 756.35 (including VAT) for the implementation of the water scheme with the balance of funding sourced from GSDM Budget and MIG as detailed in the report. The funding breakdown is as follows:

Funding Source Amount Contribution Equivalent Ml/day (RBIG) R 64 468 756.35 56% 14.56

GSDM Budget R 16 117 189.09 14% 3.64 MIG Funding R 34 536 833.76 30% 7.80 TOTAL R 115 122 779.20 100% 26.00

4. That RBIG provides funding in the 2012/2013 and 2013/2014 financial years to be aligned to the cash flows as detailed in Annexure G.

Eerstehoek Regional Bulk Water Scheme - Technical Report 45 AUGUST 2012

10 PROJECT APPROVAL

The Regional Bulk Infrastructure Grant project comprising the Eerstehoek Regional Bulk Water Scheme as contained in this Technical Report was approved by the Full Council of the Gert Sibande District Municipality at its meeting held on 20th January 2011, by way of Resolution taken on Item C06/01/2011.

Eerstehoek Regional Bulk Water Scheme - Technical Report 46 AUGUST 2012

ANNEXURE A

Locality Map & Project Foot Print

ANNEXURE B1

Population Figures

2. Conveyancelossesof10%asrecommendedbyDWA 1. Waterdemandassumedtobe130l/c/dbasedonTable9.11Guidelines forHumanSettlementandPlanningDevelopment(RedBook) Notes:

Eerstehoek Water Water Treatment Treatment Works works Inhlazatshe Elukwatini TOTAL Malahleka Mooiplaas Avontuur Tjakastad

Village/Settlement Name 620101 8 3 193102152452891%1%13 .5 .7 .4 .5 .1 4.653 4.010 13.950 5.478 12.020 3.455 4.721 7.227 3.447 2.838 10.333 2.970 4.058 8.904 2.559 3.497 5.353 1.35 2.102 1.35 1.35 10% 10% 10% 10% 10% 10% 2.849 8.540 2.455 3.354 7.358 2.890 2.115 4.424 1.738 130 180 21913 180 47443 130 18632 180 70 010 18882 180 40880 130 16055 130 16 270 130 34 033 13 366 0 3 5 3 3 3 .1 .1 .2 0 0 .50700890960991191.345 1.159 0.999 0.996 0.859 0.740 1.35 10% 10% 0.824 0.710 0.612 130 6335 130 5459 130 4 704 7 3 1 3 7 3 .1 .3 .5 0 0 .50180100150160260.250 0.218 0.216 0.188 0.186 0.162 0.185 0.161 0.160 0.139 0.138 0.120 1.35 1.35 10% 10% 10% 10% 0.153 0.133 0.132 0.115 0.114 0.099 130 130 1178 1026 130 130 1015 884 130 130 875 762 2012 Population

2012 Per Capita Water Demand (l/c/d) 83 175

2022 Population

2022 Per Capita Water Demand (l/c/d) 96 527

2032 Population

2032 Per Capita

Water Demand EERSTEHOEK REGIONALBULKWATERSCHEME (l/c/d) GERT SIBANDEDISTRICTMUNICIPALITY WATER DEMANDCALCULATION .0 36015.852 13.660 9.101 Water Demand 2012 (Ml/d)

Water AADD Demand 2022 (Ml/d)

Water Demand 2032 (Ml/d)

Water Treatment Losses (10%)

Conveyance Losses (10%)

Summer Peak Factor

1031.2 9111.6 23325.895 22.313 14.867 19.181 16.528 11.013 Water Demand 2012 (Ml/d)

Water GAADD Demand 2022 (Ml/d)

Water Demand 2032 (Ml/d)

Water Demand 2012 (Ml/d)

Water SPD Demand 2022 (Ml/d) ANNEXURE B1

Water Demand 2032 (Ml/d) ANNEXURE B1 GERT SIBANDE DISTRICT MUNICIPALITY EERSTEHOEK REGIONAL BULK WATER SCHEME POPULATION FIGURES

Population No. of Water Treatment Works Village/Settlement Growth Rate Growth Rate Households 2010 2012 2022 2032 2012 - 2022 2022 - 2032

Elukwatini 3 271 12 974 13 366 1.85% 16 055 1.5% 18 632 Inhlazatshe 6 971 33 035 34 033 1.85% 40 880 1.5% 47 443 Eerstehoek Water Tjakastad 2 564 15 793 16 270 1.50% 18 882 1.5% 21 913 Treatment Works Avontuur 153 740 762 1.50% 884 1.5% 1 026 Mooiplaas 861 4 566 4 704 1.50% 5 459 1.5% 6 335 Malahleka 165 849 875 1.50% 1 015 1.5% 1 178 TOTAL 13 985 67 957 70 010 83 175 96 527

Notes: 1. Project Design Horizon is 20 years. 2. Medium growth population rate is estimated at 1.5% per annum 3. Average population per household is 4.6 persons.

ANNEXURE B2

Cost Breakdown

EERSTEHOEK REGIONAL BULK WATER SCHEME OPTION 1: SUPPLY FROM EERSTEHOEK WATER TREATMENT WORKS (EKULINDENI SUPPLIED SEPARATELY)

1 SUPPLY FROM EERSTEHOEK WTW

WORK PACKAGE 1 Cost (Inclusive of Item Description Unit Quantity Rate Cost VAT)

1 Refurbish and upgrade the existing Theespuit and Komati River Raw Water Abstraction Civil Works sum 1 2 400 000.00 2 400 000.00 2 736 000.00 2 Refurbish and upgrade the existing Komati River Raw Water Abstraction Works and Raw Water Booster Pumpstation supply the required 300l/s demand to eerstehoek WTW (pumpstation equiped with 2No. X 200l/s pumps) sum 1 900 000.00 900 000.00 1 026 000.00 3 Construction of 6.8km long x 450mm diameter uPVC (class 16) rising main from the Komati River Raw Water Pumpstation to Eerstehoek WTW m 6800 650.00 4 420 000.00 5 038 800.00 4 Mechanical and Electrical Works for pumpstation at Eerstehoek including remote monitoring equipment (2 No. pumps x 144l/s @ 400kW at 211m Head) Nº 1 900 000.00 900 000.00 1 026 000.00 5 Civil Construction of 13Ml reservoir at Inhlazatshe (2 x 6.5Ml reservoirs) Nº 1 13 440 000.00 13 440 000.00 15 321 600.00 6 Civil Construction of 0.3Ml reservoirs at Avontuur and Malahleni Nº 2 900 000.00 1 800 000.00 2 052 000.00 7 Civil Construction of 0.4Ml reservoir at Mooiplaas Nº 1 1 100 000.00 1 100 000.00 1 254 000.00 8 EIA, Survey and Power sum 1 130 000.00 9 Institutional and socio-economic costs (training etc.) sum 1 138 176.00 Subtotal 30 722 576.00 Planning, design and supervision costs sum 2 941 016.00 Site Supervision sum 892 600.00 Additional Duties sum 150 000.00 Subtotal 3 983 616.00 TOTAL PROJECT COST 34 706 192.00 Contingencies & escalation sum 3 470 619.20 TOTAL PROJECT PHASE COST (VAT inclusive) 38 176 811.20

WORK PACKAGE 2 Cost (Inclusive of Item Description Unit Quantity Rate Cost VAT) 1 Refurbishment and upgrade of Eerstehoek WTW from 13.4Ml/day to 20 Ml/day (mechanical and civil works) - Phase 1 sum 1 26 400 000.00 26 400 000.00 30 096 000.00

EIA, Survey and Power sum 90 000.00 Institutional and socio-economic costs (training etc.) sum 1 203 840.00 Subtotal 31 389 840.00 Planning, design and supervision costs sum 2 830 000.00 Site Supervision sum 1 233 440.00 Additional Duties sum 150 000.00 Subtotal 4 213 440.00 TOTAL PROJECT COST 35 603 280.00 Contingencies & escalation sum 3 560 328.00 TOTAL PROJECT PHASE COST (VAT inclusive) 39 163 608.00

WORK PACKAGE 3 Cost (Inclusive of Item Description Unit Quantity Rate Cost VAT)

Refurbishment and upgrade of Eerstehoek WTW from 1 20Ml/day to 26 Ml/day (mechanical and civil works) - Phase 2 sum 1 24 000 000.00 24 000 000.00 27 360 000.00 2 Civil Construction of 1Ml reservoir at Eerstehoek WTW Nº 1 1 500 000.00 1 500 000.00 1 710 000.00 EIA, Survey and Power sum 45 000.00 Institutional and socio-economic costs (training etc.) sum 1 162 800.00 Subtotal 30 277 800.00 Planning, design and supervision costs sum 2 920 000.00 Site Supervision sum 1 029 800.00 Additional Duties sum 120 000.00 Subtotal 4 069 800.00 TOTAL PROJECT COST 34 347 600.00 Contingencies & escalation sum 3 434 760.00 TOTAL PROJECT PHASE COST (VAT inclusive) 37 782 360.00

TOTAL PROJECT COST (VAT inclusive) 115 122 779.20 ANNEXURE B2

EERSTEHOEK REGIONAL BULK WATER SCHEME OPTION 2: SUPPLY ENTIRE PROJECT AREA FROM EERSTEHOEK WATER TREATMENT WORKS

SUPPLY FROM EERSTEHOEK WTW

PHASE 1 Cost (Inclusive of Item Description Unit Quantity Rate Cost VAT) 1 Refurbish and upgrade the existing Theespuit and Komati River Raw Water Abstraction Works and Raw Water Booster Pumpstations to supply the required 353l/s demand to the Eerstehoek WTW - Civil Works Nº 2 2 400 000.00 4 800 000.00 5 472 000.00 2 Refurbish and upgrade the existing Komati River Raw Water Abstraction Works and Raw Water Booster Pumpstations to supply the required 353l/s demand to the Eerstehoek WTW - Mechanical Electrical sum 1 990 000.00 990 000.00 1 128 600.00 3 Construction of 6.8km long x 450mm diameter uPVC rising main from the Komati River Raw Water Pumpstation to Eerstehoek WTW m 6 800 650.00 4 420 000.00 5 038 800.00 4 Civil Construction of 2ML reservoir at Eerstehoek WTW Nº 1 3 000 000.00 3 000 000.00 3 420 000.00 5 Mechanical and Electrical Works for pumpstation at Eerstekoek including remote monitoring equipment Nº 1 1 200 000.00 1 200 000.00 1 368 000.00 6 Civil Construction of 13Ml reservoir at Inhlazatshe (2 x 6.5Ml reservoirs) Nº 1 13 440 000.00 13 440 000.00 15 321 600.00 7 Civil Construction of 0.3Ml reservoirs at Avontuur and Malahleni Nº 2 900 000.00 1 800 000.00 2 052 000.00 8 Civil Construction of 0.4Ml reservoir at Mooiplaas Nº 1 1 100 000.00 1 100 000.00 1 254 000.00

Subtotal 35 055 000.00 Contingencies & escalation 3 505 500.00 Planning, design and supervision P & G's 4 907 700.00 Institutional and socio-economic costs (training etc.) 1 402 200.00 Environmental Management Plan (mitigation, relocations, etc.) 100 000.00 Survey costs 123 250.00 Power Supply 50 000.00 TOTAL PROJECT PHASE COST (VAT inclusive) 45 143 650.00

PHASE 2 Cost (Inclusive of Item Description Unit Quantity Rate Cost VAT) 1 Refurbishment and upgrade of Eerstehoek WTW from 13.4Ml/day to 30 Ml/day (mechanical and civil works) sum 1 53 120 000.00 53 120 000.00 60 556 800.00 3 Construction of 8.5km x 350mm diameter uPVC gravity main from Elukwatini to Mooiplaas Reservoir m 8 500 800.00 6 800 000.00 7 752 000.00

Subtotal 68 308 800.00 Contingencies & escalation 6 830 880.00 Planning, design and supervision P & G's 9 563 232.00 Institutional and socio-economic costs (training etc.) 2 732 352.00 Environmental Costs (mitigation, relocation, etc.) 50 000.00 Survey costs 60 000.00 Power Supply 1 000 000.00

TOTAL PROJECT PHASE COST (VAT inclusive) 88 545 264.00

PHASE 3 Cost (Inclusive of Item Description Unit Quantity Rate Cost VAT) 1 Construction of 5.5km x 350mm diameter uPVC rising main from Mooiplaas to Ekulindeni Command Reservoir m 5500 800.00 4 400 000.00 5 016 000.00 2 Construction of 250kl breakpressure at Ekulindeni Command Reservoir Nº 1 900 000.00 900 000.00 1 026 000.00 3 Construction of Ekulindeni pumpstation building situated at Mooiplaas and installation/commission Mechanical & Electrical Equipment Nº 1 1 600 000.00 1 600 000.00 1 824 000.00 4 Construction of 9km x 350mm diameter gravity main from Ekulindeni Command Reservoir to Ekulindeni Nº 9000 800.00 7 200 000.00 8 208 000.00 5 160mm dia gravity main from Bosville Reservoir to Bosville m 2 000 650.00 1 300 000.00 1 482 000.00

Subtotal 17 556 000.00 Contingencies & escalation 1 755 600.00 Planning, design and supervision P & G's 2 457 840.00 Institutional and socio-economic costs (training etc.) 702 240.00 Environmental Costs (mitigation, relocation, etc.) 50 000.00 Survey costs 140 000.00 Power Supply 200 000.00

TOTAL PROJECT PHASE COST (VAT inclusive) 22 861 680.00

TOTAL PROJECT COST (Including VAT) 156 550 594.00 ANNEXURE B

EERSTEHOEK REGIONAL BULK WATER SCHEME OPTION 3: SUPPLY ENTIRE PROJECT AREA FROM EKULINDENI WTW

Cost (Inclusive of Item Description Unit Quantity Rate Cost VAT) 1 Upgrading of Ekulindeni WTW from 4ML/day to 30 ML/day - Civil and Mechanical electrical works sum 1 104 000 000.00 104 000 000.00 118 560 000.00 2 Pumpstation at Ekulindeni WTW (civil and M & E) Nº 1 1 600 000.00 1 600 000.00 1 824 000.00 3 500mm dia steel rising main from Ekulindeni WTW to 1ML Command Reservoir m 14 500 4 200.00 60 900 000.00 69 426 000.00 4 500mm dia steel gravity main from 1ML command Res to 500KL res at Elukwatini (Near Hospital) m 2 500 4 200.00 10 500 000.00 11 970 000.00 5 1 ML clear water command reservoir at top of hill between Ekulindeni and Mooiplaas Nº 1 1 500 000.00 1 500 000.00 1 710 000.00 6 160mm dia gravity main to Bosville m 2000 650.00 1 300 000.00 1 482 000.00 7 Civil Construction of 13Ml reservoir at Inhlazatshe (2 x 6.5Ml reservoirs) Nº 1 13 440 000.00 13 440 000.00 15 321 600.00 8 Civil Construction of 0.3Ml reservoirs at Avontuur and Malahleni Nº 2 900 000.00 1 800 000.00 2 052 000.00 9 Civil Construction of 0.4Ml reservoir at Mooiplaas Nº 1 1 100 000.00 1 100 000.00 1 254 000.00

Subtotal 223 599 600.00 Contingencies & escalation 22 359 960.00 Planning, design and supervision P & G's 24 595 956.00 Institutional and socio-economic costs (training etc.) 8 943 984.00 Environmental Costs (mitigation, relocation, etc.) 650 000.00 Survey costs 200 000.00 Power Supply 1 000 000.00

TOTAL PROJECT COST (VAT inclusive) 281 349 500.00

ANNEXURE C

GSDM Water Resources Evaluation Report

ANNEXURE D

Cash Flow (Tabular and Graphical)

Eerstehoek Regional Bulk Water Scheme Cashflows - Bar Chart Format 7 000 000.00

6 000 000.00

5 000 000.00

4 000 000.00 Amount(R) 3 000 000.00

2 000 000.00

1 000 000.00

0.00

Month Monthly Expenditure EERSTEHOEK REGIONAL BULK WATER SUPPLY SCHEME Cashflow Graphical Format (note : the cash flow figures include VAT and retention)

Series1

140 000 000.00

120 000 000.00

100 000 000.00

80 000 000.00 Amount Amount Amount (R)(R) 60 000 000.00

40 000 000.00

20 000 000.00

0.00 13 14 14 14 14 14 15 12 12 13 13 13 13 14 14 14 14 14 14 12 12 13 13 13 13 13 13 14 13 ------Jul Jul Oct Apr Oct Apr Oct Jan Jun Jan Jun Jan Feb Mar Feb Mar Sep Nov Dec Aug Sep Nov Dec Aug Sep Nov Dec May May Cash Flow Period Annexure D

GERT SIBANDE DISTRICT MUNICIPALITY EERSTEHOEK REGIONAL BULK WATER SUPPLY SCHEME

CASH FLOW (Rands) (note : the cashflow figures include VAT and retention)

Grand Total Month - Year Social Consultant Implementing Agent Consulting Engineer Construction Total (per Phase)

EIA, Geotech, Power & Monthly Accumulative Monthly Accumulative % Fee & Disb. Add Duties Site Staff Tech Report Survey Monthly Accumulative Monthly Accumulative Monthly Accumulative Accumulative

Sep-12 500 000.00 500 000.00 500 000.00 0.00 500 000.00 500 000.00 500 000.00 Oct-12 600 000.00 600 000.00 1 100 000.00 0.00 600 000.00 1 100 000.00 1 100 000.00 Nov-12 0.00 0.00 0.00 1 100 000.00 0.00 0.00 1 100 000.00 1 100 000.00 Dec-12 0.00 0.00 0.00 300 000.00 300 000.00 1 400 000.00 0.00 300 000.00 1 400 000.00 1 400 000.00 Jan-13 200 000.00 200 000.00 600 000.00 50 000.00 200 000.00 850 000.00 2 250 000.00 0.00 1 050 000.00 2 450 000.00 2 450 000.00 Feb-13 0.00 200 000.00 300 000.00 15 000.00 125 000.00 250 000.00 690 000.00 2 940 000.00 2 500 000.00 2 500 000.00 3 190 000.00 5 640 000.00 5 640 000.00 Mar-13 200 000.00 400 000.00 300 000.00 15 000.00 125 000.00 50 000.00 490 000.00 3 430 000.00 3 000 000.00 5 500 000.00 3 690 000.00 9 330 000.00 9 330 000.00 Apr-13 145 000.00 545 000.00 300 000.00 15 000.00 125 000.00 440 000.00 3 870 000.00 3 500 000.00 9 000 000.00 4 085 000.00 13 415 000.00 13 415 000.00 May-13 145 000.00 690 000.00 300 000.00 15 000.00 125 000.00 440 000.00 4 310 000.00 4 000 000.00 13 000 000.00 4 585 000.00 18 000 000.00 18 000 000.00 Jun-13 145 000.00 835 000.00 300 000.00 15 000.00 125 000.00 440 000.00 4 750 000.00 4 000 000.00 17 000 000.00 4 585 000.00 22 585 000.00 22 585 000.00 Jul-13 145 000.00 980 000.00 300 000.00 15 000.00 125 000.00 440 000.00 5 190 000.00 4 000 000.00 21 000 000.00 4 585 000.00 27 170 000.00 27 170 000.00 Aug-13 145 000.00 1 125 000.00 300 000.00 15 000.00 125 000.00 500 000.00 940 000.00 6 130 000.00 4 000 000.00 25 000 000.00 5 085 000.00 32 255 000.00 32 255 000.00 Sep-13 145 000.00 1 270 000.00 300 000.00 15 000.00 125 000.00 440 000.00 6 570 000.00 4 000 000.00 29 000 000.00 4 585 000.00 36 840 000.00 36 840 000.00 Oct-13 145 000.00 1 415 000.00 300 000.00 15 000.00 125 000.00 440 000.00 7 010 000.00 4 000 000.00 33 000 000.00 4 585 000.00 41 425 000.00 41 425 000.00 Nov-13 145 000.00 1 560 000.00 300 000.00 15 000.00 125 000.00 440 000.00 7 450 000.00 4 000 000.00 37 000 000.00 4 585 000.00 46 010 000.00 46 010 000.00 Dec-13 145 000.00 1 705 000.00 300 000.00 15 000.00 125 000.00 440 000.00 7 890 000.00 4 500 000.00 41 500 000.00 5 085 000.00 51 095 000.00 51 095 000.00 Jan-14 145 000.00 1 850 000.00 300 000.00 15 000.00 125 000.00 440 000.00 8 330 000.00 5 000 000.00 46 500 000.00 5 585 000.00 56 680 000.00 56 680 000.00 Feb-14 145 000.00 1 995 000.00 500 000.00 20 000.00 125 000.00 645 000.00 8 975 000.00 5 000 000.00 51 500 000.00 5 790 000.00 62 470 000.00 62 470 000.00 Mar-14 145 000.00 2 140 000.00 300 000.00 15 000.00 125 000.00 440 000.00 9 415 000.00 5 000 000.00 56 500 000.00 5 585 000.00 68 055 000.00 68 055 000.00 Apr-14 145 000.00 2 285 000.00 300 000.00 15 000.00 125 000.00 165 000.00 605 000.00 10 020 000.00 5 000 000.00 61 500 000.00 5 750 000.00 73 805 000.00 73 805 000.00 May-14 145 000.00 2 430 000.00 500 000.00 15 000.00 125 000.00 640 000.00 10 660 000.00 5 000 000.00 66 500 000.00 5 785 000.00 79 590 000.00 79 590 000.00 Jun-14 145 000.00 2 575 000.00 300 000.00 15 000.00 125 000.00 440 000.00 11 100 000.00 5 000 000.00 71 500 000.00 5 585 000.00 85 175 000.00 85 175 000.00 Jul-14 145 000.00 2 720 000.00 300 000.00 15 000.00 125 000.00 440 000.00 11 540 000.00 4 500 000.00 76 000 000.00 5 085 000.00 90 260 000.00 90 260 000.00 Aug-14 145 000.00 2 865 000.00 300 000.00 15 000.00 125 000.00 440 000.00 11 980 000.00 4 500 000.00 80 500 000.00 5 085 000.00 95 345 000.00 95 345 000.00 Sep-14 145 000.00 3 010 000.00 300 000.00 15 000.00 125 000.00 440 000.00 12 420 000.00 4 200 000.00 84 700 000.00 4 785 000.00 100 130 000.00 100 130 000.00

ENTIRE PROJECT ENTIRE Oct-14 145 000.00 3 155 000.00 300 000.00 15 000.00 125 000.00 440 000.00 12 860 000.00 4 000 000.00 88 700 000.00 4 585 000.00 104 715 000.00 104 715 000.00 Nov-14 145 000.00 3 300 000.00 150 000.00 15 000.00 125 000.00 290 000.00 13 150 000.00 3 500 000.00 92 200 000.00 3 935 000.00 108 650 000.00 108 650 000.00 Dec-14 145 000.00 3 445 000.00 100 000.00 20 000.00 115 000.00 235 000.00 13 385 000.00 3 000 000.00 95 200 000.00 3 380 000.00 112 030 000.00 112 030 000.00 Jan-15 59 816.00 3 504 816.00 41 016.00 15 000.00 90 840.00 146 856.00 13 531 856.00 2 886 107.20 98 086 107.20 3 092 779.20 115 122 779.20 115 122 779.20

GRAND TOTAL 3 504 816.00 0.00 8 191 016.00 420 000.00 3 155 840.00 500 000.00 1 265 000.00 13 531 856.00 98 086 107.20 115 122 779.20 Note: 1. Social Consultant's costs include costs for reimbursement of PSC members for attending meetings. 2. Consulting Engineer's % fee includes disbursements. 3. Site staff costs includes costs for travelling. 4. Construction costs includes escalation and contingencies allowances.

W:Admin\Business Plan\Nosita\Annexure_D_-Cash_Flow_-_All_Phases

ANNEXURE E

Scope of Works for ISD Consultant

Annexure E - ISD Framework (Duties for Social Consultant)

CAPACITY BUILDING AND TRAINING - FRAMEWORK (ISD SCOPE OF WORK) Supply Area A ANNEXURE E

1 COMMUNITY FACILITATION - DURING CONSTRUCTION QTY ISD REP's Hours Rate Cost VAT Total Accumulative Total

1.1 Mass meetings (PSC Reps - LOS) Community Explain LOS to community Get Community support for LOS 2 2 10 175.44 7017.60 982.46 8000.06 R 8 000.06 Explain water tariff and payment for 1.2 Mass Meetings (Payment for water) Community / ISD Cons services to community (Staff, office costs Get community support for tariff & payment 2 1 100 175.44 35088.00 4912.32 40000.30 R 48 000.36 etc) procedures Explain connection procedures & 1.3 Mass Meetings (Connection procedures) Community / ISD Cons consumer agreement to community * Encourage project ownership 2 1 40 175.44 14035.20 1964.93 16000.12 R 64 000.48 Community contributions

1.4 General Facilitation not catered for in this budget ISD Cons. / PSC Unforeseen activities Problem solving 2 1 40 175.44 14035.20 1964.93 16000.13 R 80 000.61

SUB TOTAL 8 5 190 701.76 70176.00 9824.64 R 80 000.61 R 80 000.61

2 GENERAL FACILITATION DURING CONSTRUCTION PHASE QTY ISD REP's Hours Rate Cost VAT Total Accumulative Total

2.1 Task Setting & Payments PSC and labour desk Train labour desk on task setting & tools Labour Desk understand procedures 0.00 0.00 0.00 R 80 000.61

Ensure employment activities are correct 2.3 Hands-on Field Monitoring PSC Correct employment quantities 0.00 0.00 0.00 R 80 000.61 & labour quantities balance with SE

Monitor payment of labour / wages on 2.4 Monthly payroll supervising PSC / ISD Cons Check all timesheets & wage claims 1 2 40 175.44 14035.09 1964.91 16000.00 R 96 000.61 fortnightly basis

ISD Consultant Unplanned Facilitation 1 2 20 175.44 7017.54 982.46 8000.00 R 104 000.61 2.5 Meeting with engineer on site facilitation Resolve social issues that may accur

2.6 Installation materials ISD Consultant Assist with obtaining quotations & 0.00 0.00 0.00 R 104 000.61 ordering of connection materials Materials delivered to respective water offices SUB TOTAL 2.00 4.00 60.00 350.88 21052.63 2947.37 24000.00 R 104 000.61

3 WSP TRAINING MODULE Cost VAT Total Accumulative Total

Train the WSP members re the Water WSP members act in accordance to the 3.1 Water Act / Function of WSP WSP 0.00 0.00 0.00 R 104 000.61 Act and the function they must carry out Water Act

3.2 Constitution WSP WSP to be trained on Constitution Signed Constitution 0.00 0.00 0.00 R 104 000.61 Train Secretary re compilation of agendas 3.3 Effective Meetings WSP Effective meeting procedures 0.00 0.00 0.00 R 104 000.61 & recording of minutes Each household to pay a community 3.4 Community Contributions WSP System in place for receiving community funds 0.00 0.00 0.00 R 104 000.61 contribution

Explain payment procedures for 3.5 Household Connection procedures WSP household connections and how Community acceptance of connection costs 0.00 0.00 0.00 R 104 000.61 connection costs are determined

Explain contents of consumer agreement Community accepts the consumer agreement 3.6 Consumer Agreement WSP and the responsibility of the consumer 0.00 0.00 0.00 R 104 000.61 and signs on application of connection and WSP in terms of the water act

Determine terms of reference / job 3.7 Staff Employment Procedures WSP descriptions for respective staff members, Compile staff compliment with tor and salaries 0.00 0.00 0.00 R 104 000.61 supervision of staff and reporting systems

Advertise for staff internally and assist Each staff member to be appointed with a 3.8 Advertise for staff in community WSP WSP with the interviewing & appointing 0.00 0.00 0.00 R 104 000.61 detailed job description process Combined workshop to determine what 3.9 Identify Staff Requirements WSP Detailed employee profile 0.00 0.00 0.00 R 104 000.61 staffing would be required Introduce staff to role-players and 3.10 Staff Induction WSP Field trip and introduction workshop 0.00 0.00 0.00 R 104 000.61 physical component of project

Monthly financial statements to be 3.11 Bank recon & Age analysis WSP prepared and financial reports to be Effective financial reporting 0.00 0.00 0.00 R 104 000.61 submitted to IA & Water Authority

Sub Total 0 0 0 0.00 0.00 0.00 R 104 000.61

Page 1 Annexure E - ISD Framework (Duties for Social Consultant)

ANNEXURE E

4 MEETINGS Rate Cost VAT Total Accumulative Total

Monitor progress & obtain community approval 4.1 Community / Project PSC ISD Consultant Monthly project meeting 1 2 20 175.44 7017.54 982.46 8000.00 R 112 000.61 for management policies

Meet with Contractor when required to discuss technical progress & community Facilitate communication between Contractor 4.2 Contractor ISD Consultant 2 1 20 175.44 7017.54 982.46 8000.00 R 120 000.61 requirements including crop & other participating parties compensation issues

Ensure participating community understands Monthly site meeting with technical team 4.3 Site Meetings ISD Consultant scope of work and performs according to the 5 1 40 175.44 35087.72 4912.28 40000.00 R 160 000.61 & labour desk SE's requirements

Sub Total 8 4 80 49122.81 6877.19 56000.00 R 160 000.61

5 TRAINING OF MAINTENANCE STAFF TOWARDS OPERATION AND MAINTENANCE Sessions Rate Cost VAT Total Acc Sum

Maintenance Officers to learn how to calculate a quotation for a water 5.1 Consulting potential consumers & preparing quotations Maintenance Staff Correct quotation procedures 0.00 0.00 0.00 R 160 000.61 connection and what materials are required Maintenance staff to do required A checklist to be compiled for Maintenance to 5.2 Preventative maintenance of ret. pipeline Maintenance Staff preventative maintenance / emergency 0.00 0.00 0.00 R 160 000.61 carry out each week/month repairs Maintenance staff to know what materials List of suppliers with pricelists and ordering 5.3 Ordering of materials (Physical) Maintenance Staff are required for respective sections of 0.00 0.00 0.00 R 160 000.61 procedures in place infrastructure Maintenance & Administration staff to Ensure deliveries are checked, storage of 5.4 Delivery and receiving materials (Physical) Maintenance Staff ensure correct delivery checks and record 0.00 0.00 0.00 R 160 000.61 materials and records are kept keeping are done 5.5 Stock Control - Workshop Maintenance Staff Implement stock control system Effective Stock control system 0.00 0.00 0.00 R 160 000.61 To ensure itemised control of each fitting / 5.6 Store facility & numbering of items Staff (Clerk & M/Officer) Effective stock control 0.00 0.00 0.00 R 160 000.61 materials Monthly reading of each metered Meter readers to record correct readings from 5.7 Meter reading & Billing process Meter Readers connection and delivering of water 0.00 0.00 0.00 R 160 000.61 consumer's meters on route list accounts Ensure staff know what function to carry 5.8 Follow-up ISD Consultant Effective supervision 0.00 0.00 0.00 R 160 000.61 out Sub Total 0 0 0 0.00 0.00 0.00 0.00 R 160 000.61

6 CLERKS - ADMINISTRATION TRAINING DAYS Rate Cost VAT Total Accumulative Total

6.1 Financial Training Clerks & treasurers Pettycash " Banking Procedures " Reconciliations Hands on training (Able to perform basic " Cash handling 0.00 0.00 0.00 R 160 000.61 financial control procedures in water office) " Payroll " Asset Management " Analysis Book 6.2 Computer literacy Clerks & treasurers MS Windows basic Course Understand PC principles 0.00 0.00 0.00 R 160 000.61 6.3 Administration Training Clerks VAT PAYE, UIF, WCA Hands-on supervision in offices after course 0.00 0.00 0.00 R 160 000.61 Insurances Inventory Control

Able to submit correct payments to ROR etc 6.4 Guarantee Trust Clerks & Admin staff Admin Course 0.00 0.00 0.00 R 160 000.61 6.5 Consumer details & community participation Committees Institutional Reports Submit accurate reports 0.00 0.00 0.00 R 160 000.61 6.6 ISD Consultant Office staff Financial Reports Accurate control reports 0.00 0.00 0.00 R 160 000.61 Sub Total 0 0 0 0.00 0.00 0.00 R 160 000.61

7 SUB CONSULTANTS Rate Cost VAT Total Accumulative Total

7.1 Report Writing & Administration (ISD Consultant) ISD Consultant Produce monthly reports 1 1 10 175.44 1754.39 245.61 2000.00 R 162 000.61 7.2 Contract Agreements (WSP - WSA) WSP Understand agreements Signed Contract agreements 0.00 0.00 0.00 R 162 000.61 Sub Total 1754.39 245.61 2000.00 R 162 000.61

8 TRAVELLING Distance Rate Quantity Months Sub Total VAT Total Accumulative Total

8.3 ISD Consultant Project area (5 month period) 5000 2.50 1 1 12500.00 1750.00 14250.00 R 176 250.61 8.4 ISD Consultant Disbursements 1 1 39780.17 5569.22 45349.39 R 221 600.00 Sub Total 39780.17 5569.22 59599.39 R 221 600.00

Page 2

ANNEXURE F

Monthly Water Consumption and Possible Income and Expenditure on Completion

ANNEXURE F

EERSTEHOEK REGIONAL BULK WATER SUPPLY SCHEME

MONTHLY WATER CONSUMPTION & POSSIBLE INCOME AND EXPENDITURE FOR VARIOUS YEARS

(consumption rate of 130 l /person/day increasing by 5 l/person/day/year )

VARIOUS YEARS OF THE PROJECT 1 2 3 4 5 WATER CONSUMPTION DATA Estimated population who will have access to water(see note #1) 70 010 71 060 72 126 73 208 74 306 Expected nett consumption (kl/month) 273 039 277 135 281 292 285 511 289 794 Estimated losses in system (say 20 %) 54 608 55 427 56 258 57 102 57 959 Expected gross water consumption (kl/month) 327 647 332 562 337 550 342 613 347 752 Bulk water purification cost (Rands) 1.50 1.58 1.65 1.74 1.82 Bulk water pumping cost (Rands) 1.00 1.05 1.10 1.16 1.22

No of standpipes 5 027 5 278 5 357 5 438 5 519 Consumption per standpipe (kl) 26 23 22 20 19 Standpipe water tariff (Rands/kl) 0.00 0.00 0.00 0.00 0.00 No of private connections) 11 729 12 316 12 500 12 688 12 878 Consumption per private connection (kl/month) 12 13 13 14 15 Private connection water tariff (Rands/kl) 5.58 5.86 6.15 6.46 6.78

INCOME PER MONTH (RANDS)

Standpipe water sales 0.00 0.00 0.00 0.00 0.00 Private connection water sales 781 460.00 904 638.00 1 012 324.00 1 132 828.00 1 267 677.00 TOTAL INCOME PER MONTH (RANDS) 781 460.00 904 638.00 1 012 324.00 1 132 828.00 1 267 677.00

EXPENDITURE PER MONTH (RANDS) FIXED COSTS : Plumber's salary + his labour (part-costs) 6 000.00 6 600.00 7 260.00 7 986.00 8 784.60 Spare parts and repairs 5 500.00 6 050.00 6 655.00 7 320.50 8 052.55 Transport ( plumber) 6 000.00 6 600.00 7 260.00 7 986.00 8 784.60 VARIABLE COSTS : Purification Costs 491 470.00 523 784.00 558 223.00 594 926.00 634 043.00 Bulk water pumping cost (Rands) 327 647.00 349 190.00 372 149.00 396 618.00 422 695.00 TOTAL EXPENDITURE PER MONTH (RANDS) 836 617.00 892 224.00 951 547.00 1 014 837.00 1 082 360.00 NETT MONTHLY PROFIT/DEFICIT (RANDS) -55 157.00 12 414.00 60 777.00 117 991.00 185 317.00 NETT ANNUAL PROFIT/DEFICIT (RANDS) -661 884.00 148 968.00 729 324.00 1 415 892.00 2 223 804.00 Notes :

#1 - this figure assumes that 95% of the total estimated present day population will use the scheme on completion of Phase 2 at the end of January 2013 ( a 1.5 % increase in population has been used).

ANNEXURE G

Project Milestones

ANNEXURE G EERSTEHOEK REGIONAL BULK WATER SCHEME PROJECT MILESTONES

STAGE DESCRIPTION OF ACTIVITY DATE

Technical Report Appointment of Consultant Completed

Technical Report completed (7th Revision) Completed

Technical Report approved by Gert Sibande 08 August 2012 District Municipality Technical Report approved by DWA for 15 August 2012 recommendation for RBIG funding

RBIG Approval of Technical Report 30 August 2012

EIA application (Basic Assessment Report) 21 September 2012 Contracts submitted to DAEARD

WULA application submitted to DWA 14 September 2012

Geotechnical investigations completed 21 September 2012

Survey completed 14 September 2012

Design report, draft tender document and 12 October 2012 drawings submitted to GSDM

Designs approved by GSDM 26 October 2012

WULA approved by DWA 26 October 2012

EIA approved by DAEARD 21 December 2012

Refine tender documentation for submission to 04 January 2013 Bid Spec Committee Designs and draft tender documents approved 18 January 2013 by GSDM

Tender Advert 24 & 25 January 2013

Tenders close 15 February 2013

Tender evaluation report submitted to GSDM 08 March 2013

Contract Award 05 April 2013

Commence Construction 22 April 2013

STAGE DESCRIPTION OF ACTIVITY DATE

28 February 2014 Complete Construction (assume 10 months)

Tests & Commissioning 7 March 2014

Handover 7 March 2014

Project Close Out Report 28 March 2014

ANNEXURE H

Application Form for Authorisation in terms of Section 22 of the Environment Conservation Act and Letter of Appointment for Environmental Impact Assessment

KZN Agriculture and Environmental Affairs Mnyango: eZolimo neZemvelo SIFUNDAZWE SAKWAZULU-NATALI

______Application for authorization in terms of the National Environmental Management Act, 1998 (Act No. 107 of 1998), (as amended) and the Environmental Impact Assessment Regulations, 2006

(For official use only) Application No: Date Received: Office: Designated officer:

Kindly note that: 1. It is the responsibility of the environmental assessment practitioner (EAP) to ascertain whether subsequent versions of this form have been published or produced by this department. 2. The application may be typed within the spaces provided in the form. The sizes of the spaces provided are not necessarily indicative of the amount of information to be provided. 3. Where appropriate, indicate applicable boxes in the form with a cross. 4. Incomplete applications may be returned to the applicant for revision. 5. The use of “not applicable” in the form must be done with circumspection. If used in respect of material information that is required by this department for assessing the application, it may result in the rejection of the application. If “not applicable” is used, an explanation must be provided. 6. The application must be completed by an independent environmental assessment practitioner. 7. Unless protected by law, all information filled in on this application will become public information on receipt by this department. Any interested and affected party should be provided with the information contained in this application on request, during any stage of the application process. 8. No faxed or e-mailed applications will be accepted.

Department of Agriculture EIA Application Form Page 1 of 7 & Environmental Affairs, Version 5: March 2007 KwaZulu-Natal

9. This application must be handed in or posted to the appropriate Regional Office of the KwaZulu-Natal Department of Agriculture and Environmental Affairs at one of the following addresses:

 FOR APPLICATIONS IN NORTHERN KWAZULU-NATAL (Amajuba, Umkhanyakude, Uthungulu, Umzinyathi and Zululand District Municipalities)

Environment: North Region KwaZulu Natal Department of Agriculture and Environmental Affairs Private Bag X1048 RICHARDS BAY 3900

4th Floor ABSA Building Lakeview Terrace RICHARDS BAY

Contact Person: Ms Zama Mbanjwa Telephone No.: (035) 780 6706

 FOR APPLICATIONS IN SOUTHERN KWAZULU-NATAL (Ethekwini Metro, Ilembe, Sisonke, Ugu, Umgungundlovu and Uthukela District Municipalities):

Environment: South Region KwaZulu-Natal Department of Agriculture and Environmental Affairs Private Bag X6005 HILTON 3245

A Block 4 Pin Oak Avenue HILTON

Contact Person: Ms Mavis Padayachee Telephone No.: (033) 343 8428

Department of Agriculture EIA Application Form Page 2 of 7 & Environmental Affairs, Version 5: March 2007 KwaZulu-Natal

1. BACKGROUND INFORMATION

Project applicant: Trading name (if any): Contact person: Physical address: Postal address: Postal code: Cell: Telephone: Fax: E-mail:

Environmental assessment practitioner: (name of business) Contact person: Postal address: Postal code: Cell: Telephone: Fax: E-mail: Professional affiliation(s) (if any)

Landowner: Contact person: Postal address: Postal code: Cell: Telephone: Fax: E-mail: In instances where there is more than one landowner, please attach a list of landowners with their contact details to this application. District municipality: Local municipality in whose jurisdiction the proposed activity will fall: Contact person in environment/ planning department: Postal address: Postal code: Cell: Telephone: Fax: E-mail: In instances where there is more than one local authority involved, please attach a list of local authorities with their contact details to this application.

Project title:

Project description: (provide comprehensive details of the project with thresholds for activities as applicable)

Property description: (Farm name, portion etc.) Where a large number of properties are involved (e.g. linear activities), please attach a full list to this application. Town(s) or district(s): Physical (street) address of project: Directions to the physical address

In instances where there is more than one town or district involved, please attach a list of towns or districts to this application.

Department of Agriculture EIA Application Form Page 3 of 7 & Environmental Affairs, Version 5: March 2007 KwaZulu-Natal

Current land-use zoning:

In instances where there is more than one current land-use zoning, please attach to this application a list of current land use zonings that also indicates which portions each use pertains to.

Is a change of land-use or a consent use application required? YES NO Must a building plan be submitted to the local authority? YES NO Is permission from a traditional authority required? YES NO Is a lease with the Ingonyama Trust required? YES NO

Locality map: A locality map must be attached to the back of this document, as Appendix A. The scale of the locality map must be at least 1:50 000. The scale must be indicated on the map. The map must indicate the following: • an accurate indication of the project site position as well as the positions of the alternative sites, if any; • road access from all major roads in the area; • road names or numbers of all major roads as well as the roads that provide access to the site(s); and • all roads within a 1km radius of the site or alternative sites; and a north arrow.

• Site identification

Please indicate all the Surveyor-General 21 digit site (erf/farm/portion) reference numbers for all sites (including portions of sites) that are included in this application.

(For more than three reference numbers please attach a list of the additional numbers)

Please provide the geographical coordinates for the site

Latitude /Longitude Degrees Minutes Seconds South East

• Landowner’s and Traditional Authority’s consent

Landowner’s and • In accordance with the requirements of the EIA regulations, letters of Traditional Authority’s consent from all landowners or a detailed explanation by the applicant consent: explaining why consent is not possible must be attached to this document as Appendix B. • If appropriate consent of the Traditional Authority must be attached to this document as Appendix B.

Department of Agriculture EIA Application Form Page 4 of 7 & Environmental Affairs, Version 5: March 2007 KwaZulu-Natal

2. ACTIVITIES APPLIED FOR

An application may be made for more than one listed or specified activity that, together, make up one development proposal. All the listed activities that make up this application must be listed.

Indicate the number Activity No (s) (in Describe each listed activity as in the relevant Government and date of the terms of the relevant Notice: relevant Government Government Notice): Notice:

Please note that any authorisation that may result out of this application will only cover activities applied for. Omissions may render any authorisation that is based on incomplete information to be nul and void.

3. TYPE OF APPLICATION

3.1 Application for Basic Assessment

Is this an application that is subject to basic assessment process (as YES NO defined in the regulations)? If, YES please ensure that a basic assessment report is attached.

3.2 Application for Scoping and Environmental Impact Assessment (EIA)

If this is an application that is subject to Scoping and EIA (as defined in YES NO the regulations), is a Scoping Report and Plan of Study for EIA attached? If, NO, please indicate when the Scoping Report and Plan of Study for EIA will be submitted:

4. APPLICATION FOR EXEMPTION

Will an application for exemption from the provisions of the EIA YES NO Regulations, 2006, be submitted to the Department?

If yes, please indicate for which regulations exemption will be applied for:

An application for exemption from the requirements of the EIA Regulations must be submitted to the KwaZulu-Natal Department of Agriculture and Environmental Affairs on the form obtainable from its offices.

Department of Agriculture EIA Application Form Page 5 of 7 & Environmental Affairs, Version 5: March 2007 KwaZulu-Natal

5. DECLARATIONS

5.1 The independent environmental assessment practitioner

I, , decl,declare under oath that I:

• act as the independent environmental practitioner in this application ; • do not have and will not have any financial interest in the undertaking of the activity, other than remuneration for work performed in terms of the Environmental Impact Assessment Regulations, 2006; • have and will have no vested interest in the proposed activity proceeding; • have no, and will not engage in, conflicting interests in the undertaking of the activity; • undertake to disclose, to the KwaZulu-Natal Department of Agriculture & Environmental Affairs, any material information that have or may have the potential to influence its decision or the objectivity of any report, plan or document required in terms of the Environmental Impact Assessment Regulations, 2006; • will ensure that information containing all relevant facts in respect of the application is distributed or made available to interested and affected parties and the public and that participation by interested and affected parties is facilitated in such a manner that all interested and affected parties will be provided with a reasonable opportunity to participate and to provide comments on documents that are produced to support the application; • will ensure that the comments of all interested and affected parties are considered and recorded in reports that are submitted to the KwaZulu-Natal Department of Agriculture & Environmental Affairs in respect of the application, provided that comments that are made by interested and affected parties in respect of a final report that will be submitted to the KwaZulu-Natal Department of Agriculture & Environmental Affairs may be attached to the report without further amendment to the report; • will keep a register of all interested and affected parties that participated in a public participation process; and • will provide the KwaZulu-Natal Department of Agriculture & Environmental Affairs with access to all information at my disposal regarding the application, whether such information is favourable to the applicant or not.

Signature of the environmental practitioner

Name of company

Date

Before me:

Signature of the Commissioner of Oaths

Date

Designation

Official stamp (below)

Department of Agriculture EIA Application Form Page 6 of 7 & Environmental Affairs, Version 5: March 2007 KwaZulu-Natal

5.2 The applicant

I, ,declare under oath that I:-

• Am, or represent, the applicant in this application; • appointed the environmental assessment practitioner as indicated under point 5.1 above to act as the independent environmental assessment practitioner for this application; • will provide the environmental assessment practitioner and the KwaZulu-Natal Department of Agriculture & Environmental Affairs with access to all information at my disposal that is relevant to the application; • will be responsible for the costs incurred in complying with the Environmental Impact Assessment Regulations, 2006, including but not limited to –  costs incurred in connection with the appointment of the environmental assessment practitioner or any person contracted by the environmental assessment practitioner;  costs incurred in respect of the undertaking of any process required in terms of the regulations;  costs in respect of any fee prescribed by the Minister or MEC in respect of the regulations;  costs in respect of specialist reviews, if the KwaZulu-Natal Department of Agriculture & Environmental Affairs decides to recover costs; and  the provision of security to ensure compliance with conditions attached to an environmental authorisation, should it be required by the KwaZulu-Natal Department of Agriculture & Environmental Affairs; • will ensure that the environmental assessment practitioner is competent to comply with the requirements of these regulations; • am responsible for complying with the conditions of any environmental authorisation issued by the KwaZulu-Natal Department of Agriculture & Environmental Affairs; • hereby indemnify, the government of the Republic, the competent authority and all its officers, agents and employees, from any liability arising out of the content of any report, any procedure or any action for which the applicant or environmental assessment practitioner is responsible in terms of these regulations; and • will not hold the KwaZulu-Natal Department of Agriculture & Environmental Affairs responsible for any costs that may be incurred by the applicant in proceeding with an activity prior to an appeal being decided in terms of these regulations.

Signature of the applicant or applicant’s representative

Name of company (if applicable)

Date

Before me:

Signature of the Commissioner of Oaths

Date

Designation

Official stamp (below)

Department of Agriculture EIA Application Form Page 7 of 7 & Environmental Affairs, Version 5: March 2007 KwaZulu-Natal

ANNEXURE J

Typical Water Quality Test Results

ANNEXURE J

EERSTEHOEK AND EKULINDENI REGIONAL BULK WATER SCHEME TYPICAL WATER QUALITY RESULTS AT MOOIPLAS

ALBERT LUTHULI WATER SAMPLES MICRO RESULTS PHYSICAL RESULTS CHEMICAL RESULTS Town Date Sample point HPC TC FC E Coli Conductivity pH Turbidity Alkalinity (TOTAL) CaCO3 Aluminum AL Calcium Ca Chloride CI Fluoride Iron Fe Magnesium Mg Manganese Mn Nitrate Potassium K Sodium Na Sulphate SO4 Total dissolved solids Total Hardness 3 CaCO Badplaas 09/12/10 Municipal office 924 2000 40 18 11 8.04 4.6 Carolina 09/12/10 Silobela 914 0 0 0 227.72 1.6 Carolina 09/12/10 AGS Church 227 11 7 2 23 815 Tjakastad 09/12/10 Stand 540 328 200 30 15 11 8.28 0.6 Elukwatini 09/12/10 Municipal office 272 0 0 0 117.94 0.6 Mooiplaas 09/12/10 Community center 605 145 138 130 17 8.19 23 80 0.1 10 5 0.4 0.55 8.8 0.01 0.1 0.12 16 9.4 108 60 Fernie A 09/12/10 Thusong center 262 101 30 9 4 6.97 10 09/12/10 Tribal authority 495 200 120 66 4 7.31 8 Ekulindeni 09/12/10 Municipal office 489 8 6 2 16 8.15 0.3 Mayflower 09/12/10 Glenmore FET No sample 7 6.78 21 Mayflower 09/12/10 Municipal office 1150 21 9 3 7.15 8 32 Mayflower 09/12/10 Dun Donald 814 200 10 3 51 6.23 3.7 Lochiel 09/12/10 Betties goed No sample 6.6 7.54 21 Badplaas 09/12/10 Forever Resort 85 0 0 0 77.612.2

Standard Class 1 0 0 <1505-9.5 <1 <0.3 <150 <200 <1 <0.2 <70 <0.1 <10 <50 <200 <400 <1000 Standard Class 2 0 0 <3704-10 <5 <0.5 <300 <600 <1.5 <2 <100 <1 <20 <100 <400 <600 <2400

ANNEXURE K

Drawings