Running Rigging Order Form

Total Page:16

File Type:pdf, Size:1020Kb

Running Rigging Order Form How to order: --------~----____, To receive a quote, or to place an order, you can: 1. Bring your existing rigging to a West Marine or E&B Marine store, or ship it to West Marine Rigging, 860 Marine Drive, Suite 581, Rock Hill, SC 29730 and let us duplicate it. Indicate any changes (diameter of rod, length, or type of terminals) that you'd like us to make. West Marine Rigging -OR- 2. Use this form and fill it out carefully. When completed, you can either return it to a store or fax it qitectIY to We?lM.arine Rigging at Running Rigging (803) 909-6290. If you need additional forms.phone.us.toll-tree at 1·888-447·RIGG. We have separate forms available for lifelines, Running Rigging, Standing Rigging, Rod Rigging, Anchor and Order Form Dock Lines, and Spinnaker Poles. SPLICING SERVICES ~ Please review the types of services and measuring instructions listed below before proceeding. Braided Eye Splices Whipped End Length of eye I:P~".\.(;":;)§S;7'\;)j".:?:'><;);;>7'\/j' Eye splices make it possible to Recommended for the "Bitter terminate a line to a piece of ~~»:~;;;:?,7 End' of any line, whipping will hardware with a compact eye ..•. -::J keep the line from unraveling . that will not come undone, and Waxed polyester thread is used. which retains the greatest ~ Any line we splice will include whipping on opposite end at no Charge amount of the breaking strength #579649 possible. A common application is a 'becket eye', which is about 1/2' across and designed to go over the Flemish Eyes becket on a block. While most large blocks have removable beckets C=&{';f~/F\"&I,',.,?<\/),..""j"~/ I allowing the line to be added at any time, other blocks have fixed beckets (Reeving Line) which require us to have the block at the time the splice is made. Flemish eyes are small diam- L- ~ J Double Braid #165456 eter, non-structural eyes which make it much easier to reeve halyards inside a mast. (A small piece of line Hi-tech #165431 can be tied to the eye so that the line can be fed without tangling inside the Regatta Braid #499657 mast.) They are made by doubling back the cover on a piece of braid, and Sta·Set "X" #165423 sewing it into an eye. SpecTwelve Eye #317703 #158164 .-- Wire to Rope Flemish Eye Wire to rope splices blend the stainless ·:,'::-:-'X;"0Y/":::":~".'_:'/"-\'!;·)\:·:'::'~;-:::'" />\'/:>~ .~.:-"~: ;~' and rope strands together, so much of the total strength is retained but the bulk ~ Length of exposed wire ~I"'~l----------- Length of rope , I is minimized. Wire to rope splices can be used in halyards, topping lifts, genoa sheets, Nominal Range of Standard and runner tails. Some racers are now using a very short length of wire Wire Size Rope Diameter Rope Diameter Bury (2-6') at the masthead to take abrasion, with Spectra, Kevlar, Technora or 3/32" 1/4" 1.5 It. Vectran line for the rest of the halyard. Wire sizes are generally slightly .. 1/8" 5/16" 1/4" ·318' 2 ft. less than half of the rope diameter, although each wire size has a range of 5/32' 3/8" 5/16" . 7/16" 2.25 ft. rope that it will work with. See chart -->. 3/16" 7/16" 3/8" - 1/2' 2.5(\. 7/32' 7/16" '3/8' - 1/2" 3 ft. Wire to Polyester Braid #469577 1/4" 1/2" "3/8" . 1/2" 3.5 It. Wire to High Tech #477000 5/16" 9/16" . "7/16" - 5/8" 4 ft. 3/8" 5/8" '1/2"-3/4" 4.5 It. "While these splices are possible, we only recommend using hi-tech line for the tail. Oval Swage Sleeves Used to terminate 7x19 Halyard wire. Commonly has a thimble inserted. c >--- 1/16"· 3/8" #158198 ~1998 West Marine Rigging {Ol:11,'90) ~'.i8157 o Order o Quote Customer Name _ Date Phone _ Fax _ Special Order # _ Address _ Store Code _ City, State, Zip _ 1-888-447.RIGG Fax: 803.909·6290 Ship Method _ Boat Type _ EYE SPLICED LINES· ORDER FORM Calculations RopeLength Please fill out one for each line required. , Ix$ 1ft. = $ Hardware D HARDWARE EJ SPLICE ElROPE (Finished Length) C FLEMISH EYE I Ix$ Iftg. = $ Model Length __ ft. __ in. Length __ ft. __ in. Labor Model _ SpficeLabor lea. = $ I I Price Labor Model Rope Model IL.:P-,-n::::·c:::e-======::,..J I Ix $ .~ I Price Price I ft. ~ Flem. Eye Labor D l Length of eye f EJ . lea. = $ c I Ix$ '::J" Subtotal S o I(:L- .ri" ~;Vi <,"" ,/,',' Length::e:'II'"" . ,N"'" 'y.' •. Ii:~,~~:dorFI~:rsh~~ . x aty = TOTAL S ! ! RopeLength Itt, =$ I Ix $ : fD HARDWARE EJ SPLICE ElROPE (Finished Length) C FLEMISH EYE ,Hardware i Model Length __ ft. __ in. Length __ ft. __ in. Model _ Ix $ lfig. = $ SpficeLabor Ii L! -.Price:..:.:. Labor Model _ Rope Model _ Price , Ix lea, = $ ?: I . Price Price 1ft. S Spliced or Flem.EyeLabor eye I '/ Flemish eye 1 .~DC:'" El $ lea. = $ Ix ,y ~. ,? ..;'·\~:~'::·~:::_>_."'Y,'/\,y;·;··_5:7'··;_.://,>:.,,>_:>?_> -·..'/."·X: ..z.-::-.;.- ;'Y2!ZX~ . I o:l I~"' a Subtotal S Lengthoverall xQry =TOTALS! I ROPE TO WIRE ASSEMBLIES· ORDER FORM Wire Length /tt. = $ I Ix S RopeLength Please fill out one for each line required. , Ix $ /tt. = $ SpficeLabor D QVALSWAOES!.EEVE[ElTHlM"BLE El FLEMISH EYE , Ix $ lea. = $ Model ' __ "Model __ '-- _ Labor Model _ Flemish Eye Price _~ce ='==== Price lea, = $ I Id I ~D li Oval Steeve ..;\:'.-:,.z;,:,x: ..:,~>'.~-:~>/,,-,:- . <y;.-.- ';.·::'/'\',iSZ? lea. = S >=~ I Ix $ J j tl [iJ Hardware ~ ++ Length of exposed wire I•••••e---------- Length of rope c Ix $ lea. = $ '" 1 I <3 CHARDWARE El WIRE (Exposed) [!l ROPE Thimble lea. = $ Model Length __ ft. __ in. Length __ ft. __ In. I Ix $ Subtotal $ Price Model Model ~ x Qry Price 1ft. Price 1ft. = TOTALS I I ,WireLength Ix $ 1ft. =$ ,ROpeLength , OVAL SWAGE SLEEVE D EJTHIMBLE El FLEMISH EYE x $ Itt.=$ Model Model Labor Model ,SpficeLabor Price Price Price Ix $ lea. = $ ,FlemishEye ..~. //. ......•. / .\...-> / .., ....- ' ..;..•../ .Yo lea. = $ i ~Ei ••':> Ix $ r IlJ OvatSleeve .~ tl Length at excoseo wirer!\+l" .: +t lor( Length of rope lea. $ c I IxS = ':l" Hardware o C HARDWARE El WI!u;: (Expbsed) [f) ROPE Ix $ lea. = $ Model Length __ ft. __ in. Length __ I ft. -- in. Thimble Price Model Model I Ix $ lea. = $ Price I ft. Price I ft. Subtotal $ xaty = TOTAL SI I C1998 west Marine Rigging (01111198) Model148157.
Recommended publications
  • N*Ff L/R/ Ihf L' Th"
    n*ff l/r/ Ihf l' Th" t rff, .o.. J, A( th in at c( Al al rh +l br he searchtirr the perf'ectcruising boat, especiallyfbr f al I couples.cun be a long,frustlating one. Eachhas their S( priorities "rnake own setof and or breakissues." Finding t\ a boatthat satisflesenough priorities of both parties o without any leal "break"issues is, well...difficult. For Jakeand Jackie Adarrs, the searchtook a coupleof years, V but the outconre,Hokulc'u. a Liberty458, is one they are p both thlilled with. Jakehad been cruising betbre. which greatly influencedhis prioritiesfbr the nextcruising boat. In his early30s, he and two friendswent into partnershipon a I Sr Tayana37, Far Niente,and setsail for Mexico and the SouthPacific. He was satisfledwith the boatexcept for Jakehad tried to talk Jackieinto going on the cruisc, its windwardperfbnnance. The nextboat would needto but shewas contentto help the guys with all the prep performwell on all pointsof sail. and then visit sornewherealong the way. That ended up being Tonga,and Jackiegot a good tasteof what cruisingwas reallyall about. Shewas readyand willing to give the lil-estylea try. Fastforward a few years... Jakeand friends finished their grandadventure, sailed back horne, sold Fur Niertte and went backto their respectivecareers. Jake and Jackie got rrrarried,bought a Hunter Passage42 narnedHokLrlatti and movedaboard. The plan was to live aboardand cruiselocally fbr a few years,and if all went well, start lookingfor their ultirnatecruising boat to takethem on a circumnavigation.Needless to say,all went very well. The searchwas on. Jackie'srnain priority was a strongbluewater boat with a greatlayout fbr living aboard.She was spoiledwith the liveabilityo1'the Passage 42.
    [Show full text]
  • Masts & Rigging
    Masts & Rigging By Ralf Morgan Standing Rigging Careful inspection and preparation of the spars and rigging is essential prior to any voyage offshore. Embarking on the Pacific Cup is an undertaking that is likely to be the equivalent of many years of use for the average boat. To put this into perspective, sailing the Pacific Cup is the equivalent distance as sailing from the Blackhaller Buoy to the Blossom Rock Buoy 679.8 times. Many Bay sailors have not done that in a lifetime. Now, if you decide you are going to sail back too……. Many aspects of inspection and preparation are common to all sailboat rigs regardless of construction or type. If the owner/skipper has not taken the opportunity to do a careful inspection of the rig in the past three years, it makes a lot of sense to pull the rig and go over it very carefully. There are areas of the rig that can really only be inspected and serviced when it is not under tension. There are other items that are just easier to do on the ground. While the rig is down, become intimately familiar with it. Take some digital photos of key components. Remember that two in the morning during a driving squall, is not the optimal time to gain familiarity with your rig! 1) Starting at the bottom and working up: the first thing to inspect is the actual mast base. This includes both the mast tube and the mast step. On aluminum spars you should be most concerned about corrosion and electrolysis.
    [Show full text]
  • Sailing Course Materials Overview
    SAILING COURSE MATERIALS OVERVIEW INTRODUCTION The NCSC has an unusual ownership arrangement -- almost unique in the USA. You sail a boat jointly owned by all members of the club. The club thus has an interest in how you sail. We don't want you to crack up our boats. The club is also concerned about your safety. We have a good reputation as competent, safe sailors. We don't want you to spoil that record. Before we started this training course we had many incidents. Some examples: Ran aground in New Jersey. Stuck in the mud. Another grounding; broke the tiller. Two boats collided under the bridge. One demasted. Boats often stalled in foul current, and had to be towed in. Since we started the course the number of incidents has been significantly reduced. SAILING COURSE ARRANGEMENT This is only an elementary course in sailing. There is much to learn. We give you enough so that you can sail safely near New Castle. Sailing instruction is also provided during the sailing season on Saturdays and Sundays without appointment and in the week by appointment. This instruction is done by skippers who have agreed to be available at these times to instruct any unkeyed member who desires instruction. CHECK-OUT PROCEDURE When you "check-out" we give you a key to the sail house, and you are then free to sail at any time. No reservation is needed. But you must know how to sail before you get that key. We start with a written examination, open book, that you take at home.
    [Show full text]
  • Sunfish Sailboat Rigging Instructions
    Sunfish Sailboat Rigging Instructions Serb and equitable Bryn always vamp pragmatically and cop his archlute. Ripened Owen shuttling disorderly. Phil is enormously pubic after barbaric Dale hocks his cordwains rapturously. 2014 Sunfish Retail Price List Sunfish Sail 33500 Bag of 30 Sail Clips 2000 Halyard 4100 Daggerboard 24000. The tomb of Hull Speed How to card the Sailing Speed Limit. 3 Parts kit which includes Sail rings 2 Buruti hooks Baiky Shook Knots Mainshoat. SUNFISH & SAILING. Small traveller block and exerts less damage to be able to set pump jack poles is too big block near land or. A jibe can be dangerous in a fore-and-aft rigged boat then the sails are always completely filled by wind pool the maneuver. As nouns the difference between downhaul and cunningham is that downhaul is nautical any rope used to haul down to sail or spar while cunningham is nautical a downhaul located at horse tack with a sail used for tightening the luff. Aca saIl American Canoe Association. Post replys if not be rigged first to create a couple of these instructions before making the hole on the boom; illegal equipment or. They make mainsail handling safer by allowing you relief raise his lower a sail with. Rigging Manual Dinghy Sailing at sailboatscouk. Get rigged sunfish rigging instructions, rigs generally do not covered under very high wind conditions require a suggested to optimize sail tie off white cleat that. Sunfish Sailboat Rigging Diagram elevation hull and rigging. The sailboat rigspecs here are attached. 650 views Quick instructions for raising your Sunfish sail and female the.
    [Show full text]
  • Running Rigging 43
    6 – Running Rigging 43 Section 6 Running Rigging Bitter End. The inboard end of a line, chain, or cable. Line Stopper (Rope Clutch). A clamp-type device that The end made fast to the vessel, as opposed to the contains a cam for securing a line. It can be released “working end,” which may be attached to an anchor, quickly. cleat, or other vessel. Tackle. An arrangement of line and blocks used to provide Boom Vang. A tackle, usually running between the boom increased mechanical advantage. and the base of the mast, which removes twist from the sail by downward pull on the boom. Traveller. A sail-positioning system composed of an athwartships track on which slides a car attached to blocks Cleat. Fitting, usually with two projecting horns, to which to permit positioning the main boom under load. lines are made fast. Turning Block. A block used to change the direction of Downhaul. A line or tackle used to exert a downward pull a line (such as a sheet or halyard) to make hauling more on a sail or spar. convenient. ® 1 The lines used to hoist and trim sails comprise the run- 5 Spinnaker halyards are almost always Dacron because ning rigging. This section discusses these lines and fit- it can take the loads created by the wind in the spinnaker tings and the layout of the fittings on the deck. while keeping weight aloft to a minimum. 6 In use, one end of the halyard is attached to the head Halyards 2 A halyard is a line used to hoist and lower a sail or flag.
    [Show full text]
  • HUNTER 38 FURL STANDING RIGGING ITEM QTY WIRE SIZE FITTINGS OVERALL LENGTH 1 D3 2 5/16" 8 Mm T-TERMINAL 308-326 15Ft
    HUNTER 38 CONVENTIONAL RUNNING RIGGING SPECIFICATIONS Selden Mast #: RRIG-0056S OPT/STD ITEM QTY Line Size Line Type Color End 1 Length End 2 1 STD MAIN HALYARD 1 12mm (1/2") 32/3 pl BLUE 307-047 SHACKLE /KNOT 39 m 128 ft BARE 2 STD JIB HALYARD 1 12mm (1/2") 32/3 pl RED 307-021 SHACKLE /KNOT 37 m 121 ft BARE 3 STD MAIN TRAVELER LINE 2 10mm (5/16") 16/16 pl WHITE SMALL EYE 7.9 m 26 ft BARE 4 STD MAINSHEET 1 12mm (1/2") 16/16 pl BLUE SMALL EYE 26 m 85 ft BARE 5 STD REEFING LINE #1 1 12mm (1/2") 16/16 pl GREEN BARE 25.9 m 85 ft BARE 6 STD REEFING LINE #2 1 12mm (1/2") 16/16 pl RED BARE 33.5 m 110 ft BARE 7 STD JIB SHEET 2 12mm (1/2") 16/16 pl RED BARE 14.5 m 48 ft BARE 8 OPT CRUISING SPINN. SHEET 2 10mm (3/8") 32/3 pl WHITE BARE 24 m 79 ft BARE 9 OPT SPINNAKER HALYARD 1 12mm (1/2") 16/16 pl RED 307-338 SHACKLE /KNOT 36 m 121ft BARE 10 OPT RODKICKER TACKLE 1 12mm (1/2") 16/16 pl WHITE SMALL EYE 9 m 30 ft BARE PLASTIC 307-015 SHACKLE Thimble Block 11 STD LAZY JACK WIRE 2 4 MM (5/32) WHITE 5.5 m 18 ft COATED 7X7 12 STD FIXED LAZY JACK LINE 2 10mm (3/8) 16/16 pl WHITE BARE 6 m 20 ft.
    [Show full text]
  • Issue 4 Past Present
    PAST PRESENT FUTURE ISSUE 4 PAST PRESENT Every business can be defined by where they’ve come from, However, with our history and reputation comes how they conduct themselves and where they plan to be. responsibility and we are committed to maintaining the So it is at Marlow, where these thoughts define everything quality and service that our customers have come to expect. FUTUREwe do. As to the future, we strive for innovation and growth, We are extremely proud of our heritage – not only as a constantly looking at ways to improve and develop – not brand recognised around the world for quality, performance only our range of world beating products, but our service and innovation, but as a business with ties to the local and availability to every sailor around the globe. community going back over 200 years. 2 3 COMPANY PROFILE 5 MARLOW SECTORS 5 CONTENTSGRAND PRIX SERIES 6 GRAND PRIX PROJECTS 7 CORE TECHNICAL REFERENCE 8 GRAND PRIX CORES 11 GRAND PRIX COVER TECHNOLOGY 12 GRAND PRIX COVERS 13 ACCESSORIES & CUSTOMISATIONS 14 SUPER YACHT SERIES 16 PROJECTS & TECHNOLOGY 17 RUNNING RIGGING 19 MOORING 21 OCEANUS 21 CLASSIC SERIES 22 CLASSIC PROJECTS 23 HIGH TECH CLASSICS 24 TRADITIONAL CLASSICS 25 CRUISER & RACER SERIES 26 RUNNING RIGGING DEFINITIONS 27 CRUISER RACER PRODUCTS 29 EXCEL DINGHY SERIES 32 SPONSORED SAILORS / TEAMS 33 RUNNING RIGGING DEFINITIONS 34 EXCEL DINGHY PRODUCTS 35 EXTREME SPORTS 41 MOORING 42 ACCESSORIES 46 SPLICING TOOLS 47 WEBBING & CORDS 48 RACKING 49 MAST CLIMBING 50 USEFUL INFORMATION 52 LINE SELECTION GUIDE 53 CARE AND STORAGE 54 4 COMPANY PROFILE QUALITY, INNOVATION, TECHNICAL EXCELLENCE In 1807 Thomas Burfield opened his rope factory in Hailsham, strength to strength, further asserting its dominance in the yachting From stock levels, which gives us enviable On Time In Full delivery East Sussex and, over 200 years later, Marlow Ropes continue to industry with innovation and marketing.
    [Show full text]
  • Running Rigging Plans Sheet 1 of 12 Dh-04-17 View Looking Fwd Under Sheet Winch Pedestal
    MAINTAMER BOOM ILLUSTRATED, SELDEN BOOM SIMILAR BAILS BY SELDEN GOOSENECK BY SELDEN HARKEN 6058 FAIRLEADS ON MAINTAMER BLOCKS (5) OR SELDEN BOOM TURNING BLOCK SHACKLES TO GOOSENECK BAIL MAINSHEET USES 115' (35M) 1/2" (12mm) BRAID, EYE SPLICE ONE END HARKEN CARS & TRACK ASSY. SEE DH-04-18, HARDTOP FITOUT SHEET DESCENDS THROUGH UP TO SHEET STARBOARD FAIRLEAD IN MAST CLUTCH & WINCH MOUNTING PLATE TO MAST BASE ORGANIZERS, SEE DH-04-15 FROM MAST BASE ORGANIZERS MAIN SHEET TACKLE HARKEN 6058 75MM ANTARES 44 DECK HARDWARE BLOCK AT SHEET PEDESTAL TURNING BRACKET RUNNING RIGGING PLANS SHEET 1 OF 12 DH-04-17 VIEW LOOKING FWD UNDER SHEET WINCH PEDESTAL FIRST ISSUE NOV.6 2003 T. C. FIRST USED VESSEL 4408 HARKEN 6058 BLOCK AT JIB CLEW HARKEN OVER THE TOP BLOCK 3002, MOUNTS ON MAST PLATE SELF-TACKING JIB SHEET IS 108' (33M) X 3/8" (10mm) DYNEMA HARKEN 6058 BLOCKS ON CARS AND PORT PADEYE HARKEN PADEYE 688, P&S HARKEN 1617 3m TRACK, COMPOUND BEND AS PER DH-04-20 HARKEN CAR ASSEMBLY 2 OF 1624 CAR 1 OF 1614 COUPLER 2 OF 1561 TOGGLE SHEET DESCENDS THROUGH HARKEN PIN STOPS STARBOARD FAIRLEAD IN MAST 1624, P&S MOUNTING PLATE TO MAST BASE HARKEN END STOPS ORGANIZERS, SEE DH-04-15 1522 P&S UP TO SHEET CLUTCH & WINCH SELF TACKING JIB SHEET TACKLE FROM MAST BASE ORGANIZERS ANTARES 44 DECK HARDWARE RUNNING RIGGING PLANS HARKEN 6058 75MM BLOCK AT SHEET PEDESTAL TURNING SHEET 2 OF 12 BRACKET DH-04-17 VIEW LOOKING FWD T. C. UNDER SHEET WINCH PEDESTAL LINE ENTERS AND EXITS FURLING LINE IS AS CHAIN LOCKER THROUGH TWO HARKEN 134NP BULLET ORIGINAL SUPPLIED WITH FURLEX.
    [Show full text]
  • The Dynarig: Efficient, Safe and High-Performance Sailing System for Tomorrow’S Sailing Superyachts
    THE DYNARIG: EFFICIENT, SAFE AND HIGH-PERFORMANCE SAILING SYSTEM FOR TOMORROW’S SAILING SUPERYACHTS innovative solutions in composites to meet a complex array of design challenges UNIQUE CHALLENGES: ENGINEERED Magma Structures is a global leader in composite technology, providing world-class structural engineering expertise and flexible manufacturing resources and processes to deliver high-performance solutions for unique and challenging requirements. PAGE 2 PAGE 3 UNIQUE CHALLENGES: ENGINEERED UNIQUE CHALLENGES: ENGINEERED INTRODUCING THE DYNARIG A safe, high-performance sailing system, delivering ease of handling, reliability and efficiency, even when sailing at 18 knots. The DyanRig addresses key challenges from escalated loads and unprecedented scale, making it especially Private sailing yachts are increasing in size year by year. Crew numbers should be minimal and the crew must be The Maltese Falcon, suitable for two and three masted performance cruising Today’s sailing superyachts are approaching, and in some able to perform all sailing manoeuvres with ease and cases surpassing, the size of the major sailing vessels of at short notice. Large loads, flogging sails and moving launched in 2006, has yachts from 60m to 110m in length. the late 18th and early 19th century; huge vessels that deck lines should be avoided. The pleasure of a sailing carried rigs developed over years that distributed the sail vessel underway, powered up in a seaway, should not be proved that the DynaRig area into reasonable portions enabling them to be sailed tempered by any concerns of safety and ease of handling efficiently by relatively small crews. by the crew or guests on board. is a highly efficient, Today, many of the large yachts recently built or currently The DynaRig meets all of these requirements; its sails can reliable, practical, in build have rigs based on scaling up sailing rigs that be deployed and furled away with considerable ease, the owe their origin to dinghies and small sailing vessels.
    [Show full text]
  • Pleasure Marine Catalog 2017
    PLEASURE MARINE 1 2 CONTENTS CONTENTS ■ Grand Prix Racing 4 Competition and Regatta Tested ■ Peformance Racing 10 For the Competitive Sailor, Club Racer, or Performance Cruiser ■ Dinghy & One Design Racing 14 Everything from Prams to Sport Boats ■ Performance Cruising 18 For the Adventure Sailor ■ Traditional Rigging 24 For the Classic Sailor ■ New England Ropes Celebrates 50 Years 22 ■ Mega Yacht Rigging 28 For Luxury and Power Sail ■ Anchoring & Docking 32 For Vessels at Rest ■ Packaged Goods 35 Our Best Selection of Fabricated Items and Accessories ■ Mooring Pendants 36 Assorted Fibers and Constructions for your Individual Needs ■ Cords & Accesories 37 For Sailmakers / All-Purpose Application Line Selection Guide 38 Find the Perfect Line for your Vessel Fiber Types 40 The Differences Between Different Materials Rope Care 42 Taking Care of your New England Ropes Product WARNING The misuse of ropes can be dangerous. Our products may only be used for the purpose they are designed for. The user is responsible for the proper application and supervision of the rope‘s use and assumes the user is familiar with the necessary safety precautions. We recommend a splice as end connection for all of our products. For Dyneema® products (such as Endura 12 for example) a splice is the only option that should be used, as knots can come undone under a load. 3 Grand Prix Racing New England Ropes High Performance Lines have been featured in America’s Cup programs as well as on One-Design and Grand Prix Racing Circuits worldwide. Competition and regatta tested by the premier sailors in the industry, we have the right products to optimize your performance on all types of yachts.
    [Show full text]
  • Rigging Checklist
    SVB specialist for yacht and boat equipment Rigging Gelsenkirchener Str. 25 · D - 28199 Bremen Tel. +49 421 57290-0 · Fax: +49 421 57290-40 Checklist email: [email protected] · www.svb24.com○ Spring Checklist This checklist helps you systematically review your rigging, so that nothing is forgotten. Mechanical Holes & Blocks & Swaged Corrosion Fasteners Bolts Turnbuckles damage slots pulleys terminals Is everything running More Are there any Are there Check the smoothly? Check that the Is there any me- specifically, Check all of the tears, flat any tears or swaged ter- Is there any turnbuckles have chanical damage? is there any fasteners areas or bent deforma- minals for any mechanical clean threads pitting? parts? tions? damage damage or wear? Mast profile Base fittings Spreader fittings & spreaders Forestay fittings, Top- mast fitting -7/8- Additional mast fittings: Gooseneck fitting/ topping-lift bail Halyard exits Winch steps & win- ches/strength Cleats Spinnaker fittings Radar mount Steaming light/con- tacts & bulbs Main boom: Profile Tack fittings Boom-end fittings Reef fittings Attachment point/ boom vang Main sheet fittings Standing rigging Running rigging © SVB Spezialversand für Yacht- & Bootszubehör 2016 SVB specialist for yacht and boat equipment Rigging Gelsenkirchener Str. 25 · D - 28199 Bremen Tel. +49 421 57290-0 · Fax: +49 421 57290-40 Checklist email: [email protected] · www.svb24.com○ The following spare parts and tools should never be forgotten on board: Spare parts list: Tool list: • Cotter pins • Marlinspike • Bolts • Knife • Shackles • Pliers • Nuts • Files • Machine screws and self-tapping screws • Wrenches • Spacers and washers • Screwdrivers • Snap shackles • Hammers • Blocks and toggles • Hacksaw • Tensioning screws • Bolt cutters • Thimbles • Drill • Travellers • Metal tape measure • Wire and rope • Black adhesive tape • Duct tape Any other questions? Our experts are glad to help regarding any further questions on this topic.
    [Show full text]
  • Basic Sailing Terms
    Sailing Quick Reference Guide Basic Sailing Terms: Ease: To let out the sails. Trim: To pull the sails in Luffing: The flapping of the whole sail, flogging – when sails are over eased Windward: Towards the wind. Leeward: Away from the wind. Starboard Tack: wind is coming from the starboard (right) side of the boat Port Tack: wind is coming from the port (left) side of the boat Basic Right of Way Rules: Keep Clear - One boat keeps clear of another if the other boat can sail her course with no need to take avoiding action and, when the boats are overlapped on the same tack, if the leeward boat could change course without immediately making contact with the windward boat. 1. Starboard – Port: Port-tack boat must keep clear of starboard-tack boat 2. Leeward – Windward: Windward boat must keep clear of leeward boat. 3. Clear Ahead: Clear astern boat must keep clear of clear ahead boat 4. Tacking: A boat "past head to wind" (i.e., "tacking") must keep clear of other boats. 5. Sail vs. Motor: Boat using motor power must keep clear of boat using sails Points of Sail: Sailboat Maneuvers: Coming-About (Tacking): In this maneuver, the bow of the boat goes through the wind as one changes from a close-hauled point-of-sail on one tack (direction) to a close hauled point-of-sail on the other direction. Only the jib needs to be adjusted, the working sheet of the jib is changed and the new working sheet is placed on a winch. The mainsail is left alone and will by itself often assume the correct position.
    [Show full text]