Water Access and Distribution in Dar Es Salaam, Tanzania
From Public Pipes to Private Hands Water Access and Distribution in Dar es Salaam, Tanzania Marianne Kjellén Department of Human Geography Stockholm University 2006 Abstract In cities around the world, public water systems have increasingly come to be operated by private companies. Along with an internationally funded investment program to refurbish the dilapidated water infrastructure, private operations were tested also in Dar es Salaam, Tanzania. Only about a third of the households, however, are reached by the piped water system; most households purchase water from those with pipe-connections or private boreholes. Thus, water distribution was informally privatized by way of water vending long before formal private sector participation began. This thesis explores individual and collective endeavors in water development, distribution, and access, along with the global and local influences that shaped the privatization exercise. With regard to the lease of Dar es Salaam’s water system, the institutional set-up has been found to mix the British and French models, having influenced the local situation through development assistance and conditionalities tied to loans. The institutional contradictions may have contributed to the conflictive cancellation of the lease arrangement. Due to the public utility company’s lack of operating capital and investment planning, infrastructure development has responded mainly to immediate individual demands, resulting in a spaghetti-like network and structural leakage. The long-standing under-performance and low coverage of the piped water system have forced many people to devise their own ways to access water. This thesis argues that the individually devised artisan ways of water provisioning constitute the lifeline of Dar es Salaam’s water system. -
Dar Es Salaam-Ch1.P65
Chapter One The Emerging Metropolis: A history of Dar es Salaam, circa 1862-2000 James R. Brennan and Andrew Burton This chapter offers an overview history of Dar es Salaam. It proceeds chronologically from the town’s inception in the 1860s to its present-day status as one of the largest cities in Africa. Within this sequential structure are themes that resurface in later chapters. Dar es Salaam is above all a site of juxtaposition between the local, the national, and the cosmopolitan. Local struggles for authority between Shomvi and Zaramo, as well as Shomvi and Zaramo indigenes against upcountry immigrants, stand alongside racialized struggles between Africans and Indians for urban space, global struggles between Germany and Britain for military control, and national struggles between European colonial officials and African nationalists for political control. Not only do local, national, and cosmopolitan contexts reveal the layers of the town’s social cleavages, they also reveal the means and institutions of social and cultural belonging. Culturally Dar es Salaam represents a modern reformulation of the Swahili city. Indeed it might be argued that, partly due to the lack of dominant founding fathers and an established urban society pre- dating its rapid twentieth century growth, this late arrival on the East African coast is the contemporary exemplar of Swahili virtues of cosmopolitanism and cultural exchange. Older coastal cities of Mombasa and Zanzibar struggle to match Dar es Salaam in its diversity and, paradoxically, its high degree of social integration. Linguistically speaking, it is without doubt a Swahili city; one in which this language of nineteenth-century economic incorporation has flourished as a twentieth-century vehicle of social and cultural incorporation for migrants from the African interior as well as from the shores of the western Indian Ocean. -
WORKING PAPER February 2012
REPORT ON INVESTIGATION OF DAR ES SALAAM’S INSTITUTIONAL ACTIVITIES RELATED TO CLIMATE CHANGE WORKING PAPER February 2012 KASSENGA, Gabriel (ARDHI University) MBULIGWE, Stephen (ARDHI University) The project is co-funded by European Union How to quote: Kassenga Gabriel, Mbuligwe Stephen “Report on Investigation of Dar es Salaam‘s Institutional Activities related to Climate Change” Working Paper, February 2012 Dae es Salaam: Ardhi University. Available at: http://www.planning4adaptation.eu/ This work is licensed under a Creative Commons Attribution-NonCommercial 3.0 Unported License. http://creativecommons.org/licenses/by-nc/3.0/ Table of Contents Figures IV Tables V Annexes VI Acknowledgements VII 1 Introduction 1 1.1 Background and Rationale of the ACC Dar Projectt 1 1.2 Objective and Purpose o the Study 1 1.3 Study Methodology 1 1.4 Scope and Organisation of the Report 2 2 Dar es Salaam City 3 2.1 Introduction 3 2.2 Dar es Salaam City Physical and Social-Economic Characteristics 3 2.3 Survey Findings 5 2.3.1 Names and Details of the Interviews 6 2.3.2 Age Distribution 6 2.3.3 Education Profile 6 2.3.4 Period of Service 7 2.3.5 Competence and Responsibilities 7 2.3.6 Relationship between Institutions 8 2.3.7 Strategies and Programs in PU 8 2.3.8 Specific Policies and Strategies for PU 9 2.3.9 Financial Resources 10 2.3.10 Facility Supply in the PU 10 2.3.11 Development Changes in the PU in Past Years 11 2.3.12 Main Linkage and Interdependencies between City Centre, PU and Rural Areas 11 2.3.13 Informal and Formal Groups, NGOs, CBOs and -
Crime and Policing Issues in Dar Es Salaam Tanzania Focusing On: Community Neighbourhood Watch Groups - “Sungusungu”
CRIME AND POLICING ISSUES IN DAR ES SALAAM TANZANIA FOCUSING ON: COMMUNITY NEIGHBOURHOOD WATCH GROUPS - “SUNGUSUNGU” PRESENTED AT THE 1st SUB SAHARAN EXECUTIVE POLICING CONFERENCE INTERNATIONAL ASSOCIATION OF CHIEFS OF POLICE (IACP) DURBAN, SOUTH AFRICA: 27 – 30 AUGUST, 2000 Contents PREFACE:.........................................................................................................................................................................................I EXECUTIVE SUMMARY............................................................................................................................................................III 1.0 INTRODUCTION............................................................................................................................................................ 7 DAR ES SALAAM IN BRIEF............................................................................................................................................................. 7 1.1 GEOGRAPHICAL LOCATION:......................................................................................................................................... 7 1.2 HISTORICAL:.................................................................................................................................................................. 7 1.3 SOCIO-ECONOMIC AND ENVIRONMENTAL SETTING:.................................................................................................. 9 1.4 ORGANISATIONAL SETTING:.......................................................................................................................................13 -
Assessment of the Implementation of Land Surveyed
ASSESSMENT OF THE IMPLEMENTATION OF LAND SURVEYED PROJECTS FOR HUMAN SETTLEMENT DEVELOPMENT: A CASE OF ILALA MUNICIPAL COUNCIL GODFREY MLOTWA A DISSERTATION SUBMITTED IN PARTIL FULFILMENT OF THE REQUIREMENTS FOR THE DEGREE OF MASTER OF PROJECT MANAGEMENT OF THE OPEN UNIVERSITY OF TANZANIA 2015 ii CERTIFICATION The undersigned certifies that he has read and hereby recommends for acceptance by Open University of Tanzania, a dissertation titled; “Assessment of the Implementation of Land Surveyed Projects for Human Settlement Development: A Case of Ilala Municipal Council” in partial fulfilment of the requirements for the degree of Master of Project Management of the Open University of Tanzania. ……………………………… Dr. Salum Mohamed (Supervisor) ……………………………… Date iii COPYRIGHT No part of this thesis may be reproduced, stored in any retrieval system, or transmitted in any form by any means, electronic, mechanical, photocopying, recording or otherwise without prior written permission of the author or the Open University of Tanzania in that behalf. iv DECLARATION I, Godfrey Mlotwa, do hereby declare that this dissertation is my own original work and that it has not been presented and will not be presented to any other university for a similar or any other degree award. ___________________________ Signature ____________________________ Date v DEDICATION This work is dedicated to the memory of my late father Rodrick Edward Mlotwa who some 30 years ago, took me to school. He was happily fulfilled his parental responsibility without knowing I would reach this stage in my life. Rest in Peace my daddy, Amen. This work is also dedicated to my beloved wife Janeth Peter Mayanja who encourages me to undertake this study and our children Collin and Carlen who were not tired of saying bye “baba” and “pole baba” throughout the period of this study. -
Dar Es Salaam Transport Policy and System Development Master Plan
No. Dar es Salaam City Council The United Republic of Tanzania Dar es Salaam Transport Policy and System Development Master Plan Final Report June 2008 JAPAN INTERNATIONAL COOPERATION AGENCY PACIFIC CONSULTANTS INTERNATIONAL CONSTRUCTION PROJECT CONSULTANTS EI J R 08-009 Dar es Salaam City Council The United Republic of Tanzania Dar es Salaam Transport Policy and System Development Master Plan Final Report June 2008 JAPAN INTERNATIONAL COOPERATION AGENCY PACIFIC CONSULTANTS INTERNATIONAL CONSTRUCTION PROJECT CONSULTANTS The exchange rates applied in this Study are: US$ 1.00 = Tshs. 1,271.26 US$ 1.00 = Japanese Yen 116.74 (as of December 2007) Dar es Salaam Transport Policy and System Development Master Plan Preface In July 2005, The Government of Tanzania (hereinafter referred to as GOT) officially requested the Government of Japan (hereinafter referred to as GOJ) to provide Japan’s technical assistance in developing a transportation master plan named the “Urban Transport Policy and System Development Master Plan for the City of Dar es Salaam” (hereinafter referred to as the Study). In response to the request from GOT, Japan International Cooperation Agency (hereinafter referred to as JICA) dispatched a preparatory study team, and the Scope of Work of the Study and the Minutes of Meeting were signed and exchanged between Dar es Salaam City Council (hereinafter referred to as DCC, the implementation agency of the Study) and JICA in December 2006. JICA has selected a consortium of consultant, consisting of Pacific Consultants International (hereinafter referred to as PCI) and Construction Project Consultants Inc. (hereinafter referred to as CPC), both of Tokyo, Japan, in February 2007. -
World Bank Document
The World Bank Report No: ISR11903 Implementation Status & Results Tanzania Second Central Transport Corridor Project (P103633) Operation Name: Second Central Transport Corridor Project (P103633) Project Stage: Implementation Seq.No: 10 Status: ARCHIVED Archive Date: 07-Oct-2013 Country: Tanzania Approval FY: 2008 Public Disclosure Authorized Product Line:IBRD/IDA Region: AFRICA Lending Instrument: Specific Investment Loan Implementing Agency(ies): Key Dates Board Approval Date 27-May-2008 Original Closing Date 31-Dec-2011 Planned Mid Term Review Date 27-May-2010 Last Archived ISR Date 27-Mar-2013 Public Disclosure Copy Effectiveness Date 28-Nov-2008 Revised Closing Date 31-Dec-2016 Actual Mid Term Review Date 30-Jul-2010 Project Development Objectives Project Development Objective (from Project Appraisal Document) The project development objective (PDO) is to support Tanzania's economic growth by providing enhanced transport facilities that are reliable and cost effective, in line with MKUKUTA and the National Transport Policy and Strategy. Following are the key monitoringindicators for the achievement of the PDO: (i) reduction of rush hour travel time of public transport users in Dar es Salaam; (ii) reduced vehicle operating cost on the Korogwe to Same trunk road; and (iii) satisfactory rating of Zanzibar airport facilities by both airlines and passengers. Has the Project Development Objective been changed since Board Approval of the Project? Public Disclosure Authorized Yes No Component(s) Component Name Component Cost The Dar es Salaam -
Ment of the World Bank
Document of The World Bank FOR OFFICIAL USE ONLY Public Disclosure Authorized Report No: PAD1464 INTERNATIONAL DEVELOPMENT ASSOCIATION PROJECT APPRAISAL DOCUMENT ON A PROPOSED CREDIT IN THE AMOUNT OF SDR 316.2 MILLION (US$425 MILLION EQUIVALENT) Public Disclosure Authorized TO THE UNITED REPUBLIC OF TANZANIA FOR A DAR ES SALAAM URBAN TRANSPORT IMPROVEMENT PROJECT February 14, 2017 Public Disclosure Authorized Public Disclosure Authorized Transport and ICT Global Practice Africa Region This document has a restricted distribution and may be used by recipients only in the performance of their official duties. Its contents may not otherwise be disclosed without World Bank authorization. CURRENCY EQUIVALENTS (Exchange Rate Effective December 31, 2016) Currency Unit = Tanzania Shillings (TZS) US$1 = TZS 2,179.98 SDR 1 = US$1.344 FISCAL YEAR January 1 – December 31 ABBREVIATIONS AND ACRONYMS AFCS Automated Fare Collection System AfDB African Development Bank BRT Bus Rapid Transit CAG Controller and Auditor General CAS Country Assistance Strategy CBA Cost-Benefit Analysis CBD Central Business District CTCP2 Second Central Transport Corridor Project DA Designated Account DART Dar Rapid Transit Agency DBS Director of Business Support DCC Dar es Salaam City Council DMDP Dar es Salaam Metropolitan Development Project DUTA Dar es Salaam Urban Transport Authority DUTP Dar es Salaam Urban Transport Improvement Project EIRR Economic Internal Rate of Return ERB Engineers Registration Board ESIA Environmental and Social Impact Assessment ESMF Environmental -
Compulsory Land Acquisitions in Tanganyika: Revisiting the British Colonial Expropriation Principles and Practices
INTERNATIONAL JOURNAL OF SCIENTIFIC & TECHNOLOGY RESEARCH VOLUME 4, ISSUE 12, DECEMBER 2015 ISSN 2277-8616 Compulsory Land Acquisitions In Tanganyika: Revisiting The British Colonial Expropriation Principles And Practices Cletus Eligius Ndjovu Abstract: The British took over Tanganyika from the Germans in 1919 after the First World War. In facilitating colonial economic policies the British Colonial Government enacted Land Ordinance Cap 113 of 1923 and Land Acquisition Ordinance Cap 118 of 1926. These laws facilitated the acquisition of native lands and considerably changed the way expropriation was handled leaving behind permanent marks on the later practice. The colonial practice exposed the inner most economic intents of the British government. Use of legal phrases like “for public purpose” embedded in the ordinance had multiple legal interpretations and loose definition befitting the colonial economic cravings of the time. Although major provisions of the colonial acquisition laws are reflected in the later laws, evidence suggests that a few elements of colonial expropriation practices have also sneaked in as “silent laws” of expropriation but others have not. Quite a few practices had been deliberately discarded or inadvertently forgotten for lack of a political will to purify and emulate them or due to lack of good record keeping. Using historical data and archival records from the Tanzania National Archives, this study explored colonial expropriations, mainly by focusing on the principles, laws, practices and procedures used. The main objective of the study was to identify “good practices” used during the said era, the intended and unintended consequences of these unreported practices especially those which need to be emulated by the current laws and practices. -
Dar Es Salaam Bus Rapid Transit Project Country: Tanzania
Language: English Original: English PROJECT: DAR ES SALAAM BUS RAPID TRANSIT PROJECT COUNTRY: TANZANIA ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT SUMMARY Date: March 2015 Team Leader: P. Musa, Transport Engineer, TZFO/OITC.2 Team Members: J. Katala, Transport Engineer, OITC.2 J. Nyirubutama, Transport Economist OITC.2 N. Kulemeka, Socio-Economist, SARC/ONEC.3 E. Ndinya, Environmental Specialist, SARC/ONEC.3 Appraisal Team Sector Director: Mr. A. Oumarou, OITC Regional Director: Mr. G. Negatu, EARC Sector Manager: Dr. A. Babalola, OITC.2 Resident Rep: Dr. T. Kandiero, TZFO 0 ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT (ESIA) SUMMARY Project Title: Dar es Salaam Bus Rapid Transit Infrastructure Project Project Number: P-TZ-DB0-021 Country: Tanzania Department: OITC Division: OITC.2 Project Category: Category 1 1. INTRODUCTION The Government of Tanzania intends to establish, operate and manage a Bus Rapid Transit (BRT) system, which is a cost effective sustainable transportation system for Dar es Salaam City to ensure fast and orderly flow of traffic on urban streets and roads. The Dar es Salaam BRT project follows the current land use plan that shows an extension of planned residential areas in the north-west direction along Ali Hassan Mwinyi road, in the south direction along Kilwa road and in Tabata area. The plan also shows an extension of unplanned residential areas in the west along Morogoro road and in the south-west corridor along Nyerere road. There is also an extension of industrial areas north along Ali Hassan Mwinyi road, along Nyerere road and part of Mikocheni Area. These areas constitute Phase 1,2 and 3 of the BRT System. -
Urban Narratives from Dar Es Salaam and Berlin
TALKING CITIES Urban Narratives from Dar es Salaam and Berlin Diane Barbé I Richard Besha I Anne-Katrin Fenk Rachel Lee I Philipp Misselwitz Talking cities: Urban narratives from Dar es Salaam and Berlin editors: Diane Barbé Richard Besha Anne-Katrin Fenk Rachel Lee Philipp Misselwitz Universitätsverlag der TU Berlin Bibliographic information published by the Deutsche Nationalbibliothek The Deutsche Nationalbibliothek lists this publication in the Deutsche Nationalbibliografie; detailed bibliographic data are available on the Internet at http://dnb.dnb.de. Universitätsverlag der TU Berlin, 2017 http://verlag.tu-berlin.de Fasanenstr. 88, 10623 Berlin Tel.: +49 (0)30 314 76131 / Fax: -76133 E-Mail: [email protected] This work – except for quotes, figures and where otherwise noted – is licensed under the Creative Commons Licence CC BY 4.0 Licence: Creative Commons Namensnennung 4.0 http://creativecommons.org/licenses/by/4.0/ Cover image: Patrycja Stal Print: dbusiness Editorial and Design Team: Diane Barbé, Anne-Katrin Fenk, Benjamin Herfurth, MinJi Kim, Rachel Lee, Hannes Mundt, Maryam Poursafar and Patrycja Stal Layout/Typesetting: Simulizi Mijini, Urban Narratives ISBN 978-3-7983-2897-6 (print) ISBN 978-3-7983-2898-3 (online) Published online on the institutional Repository of the Technische Universität Berlin: DOI 10.14279/depositonce-5756 http://dx.doi.org/10.14279/depositonce-5756 ACKNOWLEDGEMENTS This book is an outcome of Simulizi Mijini / Urban Narratives, an exchange-based interdisciplinary enquiry into urban heritage from below in Berlin and Dar es Salaam. It was made possible by the generous contributions of many people, to whom we are very grateful. Firstly, thank you to the enthusiastic and hardworking students of Ardhi University and TU Berlin who participated in the summer schools and design studio. -
Chapter 4. DAR ES SALAAM, TANZANIA INTRODUCTION
Chapter 4. DAR ES SALAAM, TANZANIA Document(s) 6 of 11 J.M. Lusugga Kironde INTRODUCTION Africa is currently undergoing rapid change. In most African countries, a major population- redistribution process is occurring as a result of rapid urbanization at a time when the economic performance of these countries is generally poor. Besieged by a plethora of problems, urban authorities are generally seen as incapable of dealing with the problems of rapid urbanization. One major area in which urban authorities appear to have failed to fulfil their duties is waste management. All African countries have laws requiring urban authorities to manage waste. Yet, in most urban areas, only a fraction of the waste generated daily is collected and safely disposed of by the authorities. Collection of solid waste is usually confined to the city centre and high-income neighbourhoods, and even there the service is usually irregular. Most parts of the city never benefit from public solid-waste disposal. Only a tiny fraction of urban households or firms are connected to a sewer network or to local septic tanks, and even for these households and firms, emptying or treatment services hardly exist. Industrial waste is usually disposed of, untreated, into the environment. Consequently, most urban residents and operators have to bury or burn their waste or dispose of it haphazardly. Common features of African urban areas are stinking heaps of uncollected waste; waste disposed of haphazardly by roadsides, in open spaces, or in valleys and drains; and waste water overflowing onto public lands. This situation was reflected in articles in East African newspapers in 1985 that referred to Dar es Salaam as a “garbage city” (Sunday News (Tanzania), 2 Nov 1985, p.