Dual Joys of Christmas at Ngong Ping 360 (Hong Kong, 27 November

Total Page:16

File Type:pdf, Size:1020Kb

Dual Joys of Christmas at Ngong Ping 360 (Hong Kong, 27 November Immediate Release CA27/2015 Dual Joys of Christmas at Ngong Ping 360 The world’s first Ip Man Experience Hall to debut at Ngong Ping 360 on 27 November with an aim to boost visitation The first local tourist attraction and movie project jointly present the use of AR technology to allow 3D interactions between actors and guests Ngong Ping 360 Managing Director Dr Stella Kwan shares the anticipated growth in number of daily guests during Christmas and visitation status in the peak travel season in Q4 (Hong Kong, 27 November, 2015) The grand opening of the world's first Ip Man Experience Hall has taken place on 27 November. The venue is open to the public from 28 November 2015 to 31 January 2016. The Ip Man Experience Hall is the key project of the cross-sectoral collaboration of Ngong Ping 360 x Ip Man 3, which opens up a new tourist experience, supports local cinema and art, and promotes the Hong Kong spirit. Despite of displaying the various movie sets, exhibiting the mains characters’ costumes and showcasing the rare authentic Wing Chun weapons in the hall, we provide a free Ip Man 3 smartphone app for guests to download. The app uses augmented reality (AR) technology to emulate Ip Man’s world on the smartphone screen which allows the guests to interact with 1:1 life-sized 3D images of the leading characters and they can also watch a “making of” version of the movie#. Ngong Ping 360 will donate 10% of proceeds from the designated package sales related to Ip Man Experience Hall, after deducting operating costs, to The Boys’ and Girls’ Clubs Association of Hong Kong, on behalf of both Ngong Ping 360 and Pegasus Motion Pictures Limited. While guests enjoy Ip Man Experience Hall, they can simultaneously contribute to those underprivileged strata of the community. Like other entertainment facilities in Ngong Ping 360, Ip Man Experience Hall brings an amazing and unforgettable sensory experience to our guests. Since the announcement of Ip Man Experience Hall on 2 October, people have been longing to see the grand opening of this experience hall which is pleasantly designed by Pegasus Motion Pictures Limited. It is the first ever Hong Kong movie themed exhibition held at Ngong Ping 360. The three must-see movie sets are the Tin Chi martial arts school, Frank’s underground boxing hall, and the Pharmacy in the 1940s. The movie props and weapons are specially shipped from the studio in Shanghai for exhibition, including the original Wing Chun symbol wooden dummy, the movie’s authentic weapon rack, “eight choppers” and “six and half point long pole”. Guests can commemorate the scenes of the movie and understand Hong Kong kung fu culture and art in the 1940s. Ngong Ping 360 Managing Director Dr Stella Kwan said that, “We look forward to conducting more cross-sectoral collaborations with various movie categories in the future so as to enrich the entertainment experience for our guests and the movie lovers. This winter, surely, it is a “Dual Joys of Christmas at Ngong Ping 360”. Apart from the Ip Man Experience Hall, a famous cartoon character will also come to Ngong Ping 360. With the purchase of a cable car ticket, guests will be able to have a 3D interaction with the leading characters of the movie and visit Ngong Ping Village with the cartoon characters. As we enter the peak travel season in Q4, our daily number of guests in November has been increased by 6% as compared to the same period last year. With these two thematic events to be held at Ngong Ping 360, we anticipate a 5% growth in daily number of guests during this Christmas as compared to the same period last year.” Chairman of Pegasus Entertainment Holdings Limited and Ip Man 3 Producer Mr Raymond Wong applauded the effectiveness of the smartphone app’s AR technology in promoting the movie and engaging the audiences. “By using the smartphone app to scan the designated AR point at each movie sets in the Ip Man Experience Hall, guests can interact with life-sized 3D images of the related movie leading characters. For an instance, at the fight set between Ip Man (Donnie Yen) and Zhang Tian Chi (Max Zhang), and Frank’s (Mike Tyson) underground boxing hall, through the AR technology, the 3D images of the leading characters appear on the guests smartphone screen. Guests can have a kung fu match against Ip Man and Zhang Tian Chi, or practise with a speedball alongside with Frank. Needless to say, this interactive way of exhibition can enhance guests’ engagement as compared to the traditional one. I have to thank the smartphone app designing team’s hard work and dedication who have devoted months in designing the app and testing it repeatedly in order to enrich the content. Ip Man’s fans should never miss it! I believe the application of innovative and interactive technology in movie promotions is the upcoming trend in the future,” said Wong. Besides, guests who use the app to locate the 8 lost wooden dummy scripts among the 108 scripts at Ngong Ping Village will receive a movie- themed souvenir. To match with the 1940s background of the movie and to bring all around experience to our guests, Ngong Ping Garden Restaurant has rolled out the Ip Man Kung Fu Meal presenting traditional Cantonese dim sum dishes, namely, the steamed chicken bun, quail egg shao mai, pork liver shao mai, steamed crystal shrimp dumpling and etc. — End — #For more details, please refer to the appendix of Ip Man Experience Hall Details of the Ip Man Experience Hall: Exhibition period: Visit method: 28 November 2015 to Guests who purchase the designated Pass or any 31 January 2016 sort of cable car ticket plus a receipt of a minimum spend of HKD100 at Ngong Ping Village to get free admission to the Ip Man Experience Hall. (Please refer to the company website or the notice at the Ticketing Office in Tung Chung Terminal for details) Ngong Ping 360 will donate 10% of proceeds from the designated package sales related to Ip Man Experience Hall, after deducting operating costs, to The Boys’ and Girls’ Clubs Association of Hong Kong, on behalf of both Ngong Ping 360 and Pegasus Motion Pictures Limited. Exhibition time: 10:00 am to 5:30 pm (Weekdays) 09:00 am to 6:00 pm (Saturdays, Sundays & Public Holidays) Special Offer: Guests holding a designated Pass will receive a price reduction of HK$10 when purchasing an Ip Man 3 movie ticket at designated theatres. Likewise, with every Ip Man 3 movie ticket, guests will receive a price reduction of HK$10 when purchasing a designated Pass. (Please refer to the Ip Man apps notice for details) Enquiries: 3666 0606 About Ngong Ping 360 As an important tourist attraction located on Lantau Island in Hong Kong, Ngong Ping 360 offers an exciting opportunity for guests to experience a unique natural and cultural experience. The Ngong Ping Cable Car stretches 5.7km from Tung Chung to Ngong Ping. Guests can visit the Chinese architecturally designed Ngong Ping Village, where they can enjoy a range of dining, shopping and entertainment options and culturally themed attractions including Stage 360, Motion 360 and Walking with Buddha. The Ngong Ping Cable Car is a rare example of a bi-cable gondola circulating lift system, and is also the biggest aerial cable car of its kind in Asia. It offers a visually spectacular 25-minute journey with panoramic views of the flora and fauna of North Lantau Country Park, Tung Chung Bay and the Hong Kong International Airport. Ngong Ping 360 received the CILT Award 2013 – Enterprise Award presented by the Chartered Institute of Logistics and Transport in Hong Kong (CILTHK) in May 2014. It was also selected as one of the “Cable cars: 10 amazing rides around the world” in June 2014 by The Daily Telegraph UK and named as amongst “10 of the world’s most amazing cable car experiences” by CNN.com USA in February 2015. About Pegasus Entertainment Holdings Limited Pegasus Entertainment Holdings Limited is a company listed on The Stock Exchange of Hong Kong Limited (HKEX: 1326). Pegasus is principally engaged in films and television series production, distribution and licensing of film rights in Hong Kong, the PRC and South East Asia. In recent years, the Group has diversified its businesses into international film production investment, film exhibition and post-production to develop a one-stop integrated cultural business. The principal business activities of our Group comprised production of films; distribution and licensing of our films to various channels including both local and overseas cinema circuits, video hosting websites, video-on-demand operators, VCD and DVD distributors, cable-, satellite-, pay- and free-TV channels, airlines and Internet platforms for various devices. Our geographical coverage includes Taiwan, Japan, the U.S. and Europe in addition to our major markets, namely Hong Kong, the PRC and South East Asia; deriving advertising income by offering product placement and sponsorship opportunities in our films; and distribution of films and TV series in a film library owned by Mr. Wong Pak Ming. Media Enquiries Vicky Lau Hilda Ma Head of Corporate Affairs Acting Corporate Affairs Manager Tel: (852) 3666 0610 Tel: (852) 6388 2360 Email: [email protected] Email: [email protected] Photos: 1. Ngong Ping 360 Managing Director Dr Stella Kwan (middle), Chairman of Pegasus Entertainment Holdings Limited and Ip Man 3 Producer Mr Raymond Wong (second left), the movie’s actors Mr Max Zhang (second right), Ms Karena Ng (first right) and Mr Danny Chan (first left) kicked off the “Ip Man Experience Hall” by practicing Wing Chun.
Recommended publications
  • Tung Chung - Ngong Ping Cable Car Project
    Tung Chung - Ngong Ping Cable Car Project PROJECT PROFILE 1. BASIC INFORMATION 1.1 Project Title Tung Chung - Ngong Ping Cable Car Project. 1.2 Purpose and Nature of Project The project comprises the construction and operation of a cable car system between Tung Chung Town Centre and Ngong Ping on Lantau Island. The development of the cable car system aims to further develop Ngong Ping as a major tourist attraction in Hong Kong. 1.3 Name of Project Proponent Hong Kong Island & Islands Development Office, Territory Development Department (TDD). 1.4 Location and Scale of Project A Preliminary Preferred Alignment (PPA) for the cable car system has been identified based on the findings of the feasibility study completed by the Mass Transit Railway Corporation and a subsequent desk top study conducted by TDD. The location of this project is shown on Drawing No. HKI-Z180. On the basis of the PPA, the scope of the project will include the following: (a) construction of a cable car system of about 5.7 km long between Tung Chung Town Centre and Ngong Ping on Lantau Island; (b) construction of associated pylons and other supporting structures, and ancillary works; (c) construction of two terminals, one at Tung Chung Town Centre and the other at Ngong Ping; and - 2 - (d) construction of an intermediate station on the Airport Island and a turning station in the Lantau North Country Park. 1.5 The Subject Site and its Surrounding Environments 1.5.1Based on the PPA, the proposed cable car route between Tung Chung Terminal and the Intermediate Station will run along the northern side of the Chek Lap Kok South Road Bridge.
    [Show full text]
  • Background Brief on Ngong Ping 360 (Updated Version As at 20 October 2006)
    立法會 Legislative Council LC Paper No. CB(1)121/06-07(04) Ref : CB1/PL/ES Panel on Economic Services Meeting on 23 October 2006 Background brief on Ngong Ping 360 (Updated version as at 20 October 2006) Purpose 1. This paper sets out the background to the development of the Tung Chung Cable Car system (“the Cable Car System”), and the themed cultural village and associated attractions and facilities in Ngong Ping (collectively known as “Ngong Ping 360”), the problems encountered during trial runs of the Cable Car System and the initial operation since its official opening on 18 September 2006. The paper also summarizes members’ deliberations over the related issues. Background 2. In 1998, the Financial Secretary announced Government’s decision to proceed with the construction of a cable car project (“the Project”) linking Tung Chung and Ngong Ping on Lantau Island as a tourist attraction. Under the framework approved for implementing the Project, the Government would grant a 30-year franchise for the financing, design, construction, operation and maintenance of the Cable Car System on a Build-Operate-Transfer basis. The Government also provided the land required for the Cable Car System. 3. In July 2002, the Government entered into a Provisional Agreement with the MTR Corporation Limited (“MTRCL”) to allow the latter to commence preparatory work on the Project before the grant of the franchise. Meanwhile, the Government proceeded with the enactment of the enabling legislation for the franchise and worked with MTRCL to prepare a Project Agreement to provide a legal framework for the granting of the franchise and the construction, operation and maintenance of the Cable Car System.
    [Show full text]
  • Diversion of the Ngong Ping Stream Provisi
    MTR Corporation Limited Tung Chung Cable Car Project & Tung Chung Cable Car Project – Diversion of the Ngong Ping Stream & Provision of Temporary Helipad at Tea Garden, Ngong Ping for Tung Chung Cable Car Project Environmental Monitoring & Audit Manual July 2005 Tung Chung Cable Car Project Environmental Monitoring & Audit Manual List of Contents Page Chapters and Appendices 1 INTRODUCTION 1 1.1 Background 1 1.2 Purpose of the Manual 2 1.3 Site Location 3 1.4 Sensitive Receivers 4 1.5 Environmental Monitoring and Audit Requirements 4 1.6 Environmental Management Organisation 5 1.7 Construction Programme 7 2 AIR QUALITY 8 2.1 Introduction 8 2.2 Air Quality Parameters 8 2.3 Monitoring Equipment 8 2.4 Monitoring Locations 8 2.5 Baseline Monitoring 10 2.6 Impact Monitoring 11 2.7 Event and Action Plan for Air Quality 11 3 NOISE 14 3.1 Introduction 14 3.2 Noise Parameters 14 3.3 Monitoring Equipment 14 3.4 Monitoring Locations 14 3.5 Baseline Monitoring 16 3.6 Impact Monitoring 16 3.7 Event and Action Plan for Noise 16 4 ECOLOGY 19 4.1 Introduction 19 4.2 Ecological Monitoring during Construction Phase 19 4.3 Ecological Monitoring during Operational Phase 20 5 VISUAL AND LANDSCAPE 22 5.1 General 22 5.2 Landscape and Visual Baseline 22 5.3 Construction and Operational Phase Audit 22 i Tung Chung Cable Car Project Environmental Monitoring & Audit Manual 6 WATER QUALITY 24 6.1 Introduction 24 6.2 Water Quality Monitoring during Construction Phase 24 7 WASTE 25 7.1 Introduction 25 7.2 Construction Phase Audit 25 8 SITE ENVIRONMENTAL AUDIT 26 8.1
    [Show full text]
  • Bsc (Honours) Tourism Management
    Sheffield Business School BSc (Honours) Tourism Management Title Visitors’ perceptions of safety problem of Ngong Ping 360 Name YEUNG Wing Shan Student No 91204597 Month Year April 2010 Sheffield Hallam University Sheffield Business School Title Visitors’ perceptions of safety problem of Ngong Ping 360 FULL NAME YEUNG Wing Shan STUDENT No 91204597 Supervisor: Dr. Vincent HEUNG In partial fulfilment of the requirements for the degree of Bachelor of Science in Tourism Management. Month Year April 2010 Acknowledgements I would like express my sincere to many people who provided support and suggestion to me for the completion of this dissertation. First, many thank for my supervisor, Dr. Vincent Heung who was guide me throughout the year. He is an experienced, patient and knowledgeable lecturer. I truly thank for his recommendation and instruction. I gained lot knowledge of tourism industry. I also like to give thank to Dr Connie Mok. She provided a lecture for touching SPSS program and explained clearly for using the program. Finally, I show my appreciation to all my friends for helping to collect the data. I believed that the research was hard to finish without their support. I Abstract Ngong Ping 360, a major tourist destination, has gained a reputation for being an unsafe transportation to travel. This study has investigated the visitors’ perception of safety and security problem about Ngong Ping 360.The purpose of this study examined the importance of visitors’ perception of safety and how they perceived safety and security in Ngong Ping, identified the effectiveness of existing safety preventive measures incidents and recommended ways for the improvement of Ngong Ping 360 services.
    [Show full text]
  • Mtr Corporation Limited (地 鐵 有 限 公 司)
    MTR Corporation Limited MTR CORPORATION LIMITED (地鐵有限公司) (Incorporated in Hong Kong with limited liability) (Stock Code: 66) ANNOUNCEMENT OF UNAUDITED RESULTS FOR SIX MONTHS ENDED 30 JUNE 2004 HIGHLIGHTS Financial • Revenue increased by 11.8% to HK$3,987 million • Operating margin before depreciation rose by 4.7% point to 55.6% • Property development profit of HK$1,153 million • Net profit attributable to shareholders increased to HK$1,175 million from HK$113 million • Gross debt / equity ratio at period end improved to 54.9% from 55.9% • Interim dividend of HK$0.14 per share Operational • Patronage increased by 12.2% to 407 million • All statutory operational targets have been met or exceeded • Good progress on retrofit of platform screen door and other asset improvement projects • Growth in property development and rental activities as market recovered • Continued to develop business opportunities in PRC and overseas • Construction of Disneyland Resort Line and Tung Chung Cable Car projects on schedule 1 MTR Corporation Limited The Directors of MTR Corporation Limited (“the Company” or “MTR”) are pleased to announce the unaudited interim results of the Company and its subsidiaries (“the Group”) for the half-year ended 30 June 2004 as follows: CONSOLIDATED PROFIT AND LOSS ACCOUNT (HK$ MILLION) Half-year ended 30 June 2004 2003 (Unaudited) (Unaudited) Fare revenue – MTR Lines 2,625 2,391 – Airport Express Line 246 176 Station commercial and other revenue 579 512 Rental and management income 537 488 Turnover 3,987 3,567 Staff costs and
    [Show full text]
  • Pt. 24 LEGISLATIVE COUNCIL BRIEF TUNG CHUNG CABLE CAR
    File Ref.: ESB CR 6/2091/98 (02) Pt. 24 LEGISLATIVE COUNCIL BRIEF TUNG CHUNG CABLE CAR PROJECT INTRODUCTION At the meeting of the Executive Council on 25 June 2002, the Council ADVISED and the Chief Executive ORDERED that - (a) the Administration should select the MTR Corporation Limited (MTRCL) as the successful proponent to take forward the Tung Chung Cable Car Project (the Project) in accordance with the agreed framework for implementing the Project; (b) the Administration should enter into a Provisional Agreement with the successful proponent; and (c) the Administration should grant to the franchisee the right to develop and operate tourist facilities at Ngong Ping complementary to the cable car system, and should further discuss with the successful proponent on the terms of a land grant. BACKGROUND AND ARGUMENT The Implementation Framework 2. In April 2001, the Executive Council approved the framework A (at Annex A) for implementing the Project. On this basis, we proceeded to invite detailed proposals for the finance, design, construction, operation and maintenance of the cable car system. - 1 - 3. In brief, the framework involves the grant of a 30-year franchise for the finance, design, construction, operation and maintenance of the cable car system. Since the choice of a cable car system and the business plan would dictate the design, construction, operation and maintenance of the cable car system, the Government only provided the broad parameters, including a “Preliminary Preferred Alignment” for the system, within which the development of the cable car system was considered feasible in inviting proposals. The successful proponent would be required to undertake detailed design of the cable car system, carry out requisite environmental and technical studies, and complete all the necessary statutory procedures, including those under the Environmental Impact Assessment (EIA) Ordinance (Cap.
    [Show full text]
  • Explanatory Statement
    Appendix III APPROVED DRAFT TUNG CHUNG TOWN CENTRE AREA OUTLINE ZONING PLAN NO. S/I-TCTC/18C EXPLANATORY STATEMENT APPROVEDDRAFT TUNG CHUNG TOWN CENTRE AREA OUTLINE ZONING PLAN NO. S/I-TCTC/18C EXPLANATORY STATEMENT Contents Page 1. INTRODUCTION 1 2. AUTHORITY FOR THE PLAN AND PROCEDURE 1 3. OBJECT OF THE PLAN 3 4. NOTES OF THE PLAN 3 5. THE PLANNING SCHEME AREA 3 6. POPULATION 4 7. LAND USE ZONINGS 7.1 Commercial 4 7.2 Comprehensive Development Area 5 7.3 Residential (Group A) 6 7.4 Village Type Development 7 7.5 Government, Institution or Community 8 7.6 Open Space 9 7.7 Other Specified Uses 9 7.8 Green Belt 10 8. COMMUNICATIONS 10 9. UTILITY SERVICES 11 10. CULTURAL HERITAGE 12 11. IMPLEMENTATION 12 APPROVEDDRAFT TUNG CHUNG TOWN CENTRE AREA OUTLINE ZONING PLAN NO. S/I-TCTC/18C (Being an Approveda Draft Plan for the Purposes of the Town Planning Ordinance) EXPLANATORY STATEMENT Note: For the purposes of the Town Planning Ordinance, this Statement shall not be deemed to constitute a part of the Plan. 1. INTRODUCTION This Explanatory Statement is intended to assist an understanding of the approved approveddraft Tung Chung Town Centre Area Outline Zoning Plan (OZP) No. S/I-TCTC/18C. It reflects the planning intention and objectives of the Town Planning Board (the Board) for various land use zonings on the Plan. 2. AUTHORITY FOR THE PLAN AND PROCEDURE 2.1 On 27 May 1993, under the power delegated by the then Governor, the then Secretary for Planning, Environment and Lands (SPEL), directed the Board, under section 3(1)(a) of the Town Planning Ordinance (the Ordinance), to prepare an OZP for the Tung Chung Town Centre area.
    [Show full text]
  • H K Newsletter
    AUGUST 2017 H K NEWSLETTER Chairman’s message Dear members, Inside this Issue The branch has been serving IOSH members in Chairman’s message 1 Hong Kong for nearly 17 years. With the unfailing support from staff in our UK Branch Executive Committee 2 2017-18 headquarters, the branch helps more than 780 members to maintain and enhance their Visit by IOSH President & 6 Guangzhou delegation occupational safety and health (OSH) professional knowledge. Annual safety conference 2017 7 & 17th AGM cum annual dinner Each year, the branch organises and co- Mentorship training 11 organises numerous conferences, technical seminars and technical visits, and publishes regular newsletters to enable our MTR society link gathering on 12 “Exploring a world-class service” members to keep up to date with the latest developments in the industry. Meanwhile, our mentorship programme and student Work safety forum in Guangzhou 13 research project competition for accredited degree programmes are valuable for our young members and students. Network chairs meeting 14 The branch also serves as a forum for our members to exchange Visit by IOSH HQ staff 15 their views and expertise. On behalf of the committee, I would like External invitation 16 to assure all members that we will make every effort to continue Branch year plan 2017 17 providing excellent services in the coming year. Members’ benefit 2017-18 18 In the past few years, there has been increasing public awareness and concerns about health and safety, and more stringent legal Membership update 20 requirements. On the other hand, new approaches for system Editorial 21 formulation and emerging technologies are important to drive all professionals in the industry to redefine their approaches to OSH management and to equip themselves with new knowledge.
    [Show full text]
  • Ngong Ping 360 Ropeway
    Ngong Ping 360 Ropeway Incident occurred on 25 January 2012 Report of Investigation Electrical and Mechanical Services Department 3 April 2012 CONTENTS Page Executive Summary 3 1. Objectives 8 2. Background of the Incident on 25 January 2012 8 3. Approach of Investigation 9 4. Technical Information of Ngong Ping 360 10 Ropeway System 5. Observations and Findings 12 6. Remedial Actions undertaken by Ngong Ping 19 360 7. The Three Service Interruptions of the Ngong 21 Ping 360 in December 2011 8. Conclusions 21 Appendix 1 Sequence of Events 24 Appendix 2 List of Documents Inspected during the 27 Investigation Appendix 3 Incidents of Ngong Ping 360 occurred in 28 December 2011 2 Ngong Ping 360 Ropeway Incident occurred on 25 January 2012 Executive Summary of the Report of Investigation 1. Introduction The Electrical and Mechanical Services Department (EMSD) conducted an independent investigation on the stoppage incident of the Ngong Ping 360 Ropeway (the Ropeway) on 25 January 2012 with a view to identifying the root causes of the incident and recommending enhancement measures to prevent recurrence of similar incident. 2. Approach of Investigation The approach of the investigation is outlined as follows : (i) To inspect, check and analyse the ropeway components that were involved in the incident, in particular the return bull wheel No.4, its bearings and linings ; (ii) to conduct examination and specific laboratory tests on the bearings of return bull wheel No. 4 with support from an independent expert ; and subsequent to the finding of spalling on the upper bearing of return bull wheel No.
    [Show full text]
  • No Year Name of Company Project Title Address Lot No BD File Ref
    List of projects used in HKIA/ARB Professional Assessment 2007 - 2019 Date of Occupation No Year Name of Company Project Title Address Lot No BD File Ref. Permit / Practical Special Topic Completion (month/year) 1 2007 Aedas Limited Satellite Earth Station Dai Hei Street at Tai Po Industrial Estate Section G Tai Po Town Lot 13 BD 2/9141/01 (P) Jan 04 IL7076, IL7077, IL971, IL970 SARP, 2 2007 AGC Design Limited Proposed Hotel Development at 31E - 39 Wyndham Street, Central 31E, 31F, 33-39 Wyndham Street, Central, Hong Kong BD3/2058/94 PT IV Jul 04 IL970RP, IL970SBSS1 RP 3 2007 Aedas Limited Extension to the Church of Jesus Christ of Latter Day Saints at Tseung Kwan O Tseung Kwan O Lot 45, Area II, Po Lam Lane Tseung Kwan O Lot 45 BD 9106/04 31 Oct 2006 4 2007 P & T Architects and Engineers Limited Residential Development At 2 Lok Kwai Path Shatin, N.T. 2 Lok Kwai Path, Shatin, N.T. STTL 526 BD 9067/02 Jan 06 / May 06 5 2007 Leung King Partners Ltd Villa Rosa Residents 82 Peak Road, Hong Kong RBL 742 BD 2014/98 Aug 00 Dennis Lau & Ng Chun Man Architects & 6 2007 Tuen Mun Area 4C, TMTL 384 King Fung Path, Tuen Mun, N.T. Lot No. 384, Area 4C BD 6/9260/97H (P) Aug 02 Engineers (HK) Limited 7 2007 MLA Architects (H.K.) Limited Service Apartment Building at Nos. 116-122, Yeung Uk Road (H-Cube) 116-122 Yeung Uk Road, Tsuen Wan, N.T.
    [Show full text]
  • ITP Continuous Development Visit to Ngong Ping 360 (NP360) (3 CPD Hours)
    ITP Continuous Development Visit to Ngong Ping 360 (NP360) (3 CPD Hours) Members and guests of ITP have the opportunity of visiting the Ngong Ping 360 in coming August. We can learn about the cable car operation, maintenance and training support systems in Tung Chung Cable Car Terminal Office; and visit the Garage, Control Room and parts of the terminal that are normally inaccessible to the public to gain a thorough view of its cable car operation. Includes a cable car ride between Tung Chung Terminal and Ngong Ping Terminal at special concession rate. Details of the visit are as follows: Date: 6th August 2011 (Saturday) Time: Guided Tour at 09:30 am-12:00 pm; Free time at Ngong Ping Village. (Last cable car from Ngong Ping Village to Tung Chung Terminal at 6:00 pm) Venue: Ngong Ping 360 Limited, G/F, 11 Tat Tung Road, Tung Chung, Lantau. Assembly: At 09:30am at the Tung Chung Cable Car Terminal Note: You can reach the Complex via the following routes: Taking any “E” bus route heading to Tung Chung Terminal, or Taking MTR Tung Chung Line alighting at Tung Chung Terminus Station Capacity: Maximum 20 persons Fee: Member: HK$100* Non-Member: HK$170* * 50% discount off the ticket price on Standard Cabin $115 inclusive. Enrolment: Please complete the Reply Slip and return by post together with your crossed cheque payable to “Institute of Training Professionals” before 25 July 2011. Enquiry: Dr. Denny Chow, GM ITP at Tel: 6100-0123 or Mr. Kelvin Sze, Event Organizer at Tel: 9477 3331 Remarks: Acceptance will be on a first-come first-served basis.
    [Show full text]
  • Minutes Have Been Seen by the Administration)
    立法會 Legislative Council LC Paper No. PWSC119/02-03 (These minutes have been seen by the Administration) Ref : CB1/F/2/2 Public Works Subcommittee of the Finance Committee Minutes of the 11th meeting held in the Chamber of Legislative Council Building on Wednesday, 23 April 2003, at 10:45 am Members present : Ir Dr Hon Raymond HO Chung-tai, JP (Chairman) Hon Albert CHAN Wai-yip (Deputy Chairman) Hon Kenneth TING Woo-shou, JP Dr Hon David CHU Yu-lin, JP Hon Cyd HO Sau-lan Hon Fred LI Wah-ming, JP Hon James TO Kun-sun Hon CHAN Kam-lam, JP Hon SIN Chung-kai Hon Andrew WONG Wang-fat, JP Hon WONG Yung-kan Hon YEUNG Yiu-chung, BBS Hon LAU Kong-wah Hon Miriam LAU Kin-yee, JP Hon CHOY So-yuk Hon Andrew CHENG Kar-foo Dr Hon LAW Chi-kwong, JP Hon TAM Yiu-chung, GBS, JP Hon Abraham SHEK Lai-him, JP Hon Henry WU King-cheong, BBS, JP Hon WONG Sing-chi Hon IP Kwok-him, JP Hon LAU Ping-cheung Action - 2 - Members absent: Hon Eric LI Ka-cheung, JP Hon CHAN Yuen-han, JP Hon Emily LAU Wai-hing, JP Dr Hon TANG Siu-tong, JP Public officers attending: Miss Elizabeth TSE, JP Deputy Secretary for Financial Services and the Treasury (Treasury)3 Mr John TSANG, JP Permanent Secretary for Housing, Planning and Lands (Planning and Lands) Mr Keith K K KWOK Acting Permanent Secretary for the Environment, Transport and Works (Transport and Works) W1 Mr Rob LAW, JP Director of Environmental Protection Miss Janice TSE Principal Assistant Secretary for Financial Services and the Treasury (Treasury) Mr Raistlin LAU Principal Assistant Secretary for the Environmental, Transport
    [Show full text]