Getting to Brunel University

Total Page:16

File Type:pdf, Size:1020Kb

Getting to Brunel University Getting to Brunel University BY BUS BY UNDERGROUND BY ROAD From Heathrow Central: A10 (London Transport) For Uxbridge Parking on the Uxbridge Campus and in “Heathrow Fast”, every 15 minutes, Station take the Metropolitan Line the local area is very restricted. Barriers journey time approx 25 minutes (alight from Baker Street (and Piccadilly Line control access to the site and all vehicles The Greenway and use river path). during peak hours). Then take a taxi, or must display a valid permit. On arrival, From Stockley Park: A10 “Heathrow bus U1, U3, U4 or U7. (Alternatively use visitors (NOT Open Day visitors) may Fast” as above, journey time approx 10 the 1-mile walking route shown on the apply for a permit for the day from the minutes. right.) main Reception Desk in the Wilfred Brown Building, alongside the From West Drayton railway station: BY RAIL Cleveland Road entrance. In addition, U3 (alight Cleveland Road), 222 (alight West Drayton (First Great Western Link) pay-and-display parking is available on Cowley Road and use path via is the nearest main-line station (approx site near the Cleveland Road entrance. University flats). 1.5 miles from the campus). Services Clamping is in operation for From Uxbridge (underground) from London Paddington or the West illegally parked vehicles. station: (Bristol). From West Drayton station take a bus towards Uxbridge: 222 M4: Leave M4 at Junction 4 and follow U1, U3 (alight Cleveland Road), U4 and signs to Uxbridge (A408). Straight (alight Cowley Road), U5 (alight Station A40/M40: At Swakeleys Roundabout M25: (From North or South) Join M40 U7 (alight Kingston Lane), 427 (alight across first set of traffic lights, continue Road) or U3 (alight Cleveland Road). take B483 exit to Uxbridge. Follow signs or M4 then see above. The Greenway and use river path), 607 on A408, crossing four roundabouts. across two mini-roundabouts. At major express (alight The Greenway and use West Ruislip Station (Chiltern Railways) Turn right at the next set of major roundabout bear left onto A4020 ACCESS BY CAR FOR REGISTERED river path), 222 and U5 (alight Cowley is the main-line service from London traffic lights. Continue ahead to next (Brunel sign), straight ahead at the first DISABLED VISITORS Road and use path via University flats). Marylebone and the North (Aylesbury, set of lights and, almost immediately lights, then almost immediately take Disabled parking bays are available at Banbury and Birmingham) and is take the right filter lane at second set second right filter turn onto Kingston various locations around the campus. approximately 4 miles from the campus. of traffic lights into Station Road. After Lane (signposted Brunel). The main Please collect a permit from Main Brunel University From West Ruislip Station take the U1 300 metres turn left into Cleveland entrance to Brunel is right at the next Reception, Wilfred Brown Building, Uxbridge, Middlesex UB8 3PH bus towards Hillingdon Hospital, alight Road and, after about 150 metres, turn roundabout. Follow signs for Main Cleveland Road on arrival. Tel 01895 274000 Fax 01895 232806 Cleveland Road. right into the University. Web www.brunel.ac.uk Reception as you enter the campus ..
Recommended publications
  • Pre-Departure Guide 2013
    PRE-DEPARTURE GUIDE 2013 University Programmes LIBT London IBT Pre-departure Guide 2013 1 PREPARING OVERVIEW FOR YOUR DEPARTURE to London, United Kingdom Contents Welcome . 1 London: the world in one city . 2 Student services . 4 Entry clearance and visa guide . 5 Preparing to leave home . 6 Arriving in the UK . 7 Your first weeks in the UK . 11 Getting started at LIBT . 12 Practical information . 13 Important websites . 13 Welcome I warmly congratulate you on your in education and understanding the acceptance at London IBT Ltd, established cultural adjustments required when in association with Brunel University, students move to a new country . London . All staff at LIBT look forward to welcoming you and will assist you with all LIBT Reception is open Monday to Friday, the important aspects of your time with us . from 8 .30am to 5 00pm. The office is closed on weekends, however if you have an This Pre-Departure Guide for International emergency then we have a 24-hour helpline Students contains important information where one of the team will be able to assist . regarding your arrival in the UK . Please read through this guide before your arrival On behalf of the staff of LIBT, I wish you in the UK as it provides you with some success with your studies, an enjoyable and important information . rewarding time in London and, above all, your move towards your degree qualification You may be assured that we are all fully and the start of a successful career . committed to ensuring that your studies Christine Vincent with us are successful and I hope you find College Director / Principal your time with us an enjoyable one .
    [Show full text]
  • Public Session
    PUBLIC SESSION MINUTES OF ORAL EVIDENCE taken before HIGH SPEED RAIL COMMITTEE On the HIGH SPEED RAIL (LONDON – WEST MIDLANDS) BILL Tuesday 23 June 2015 (Afternoon) In Committee Room 5 PRESENT: Mr Robert Syms (Chair) Mr Henry Bellingham Sir Peter Bottomley Ian Mearns _____________ IN ATTENDANCE Mr James Strachan QC, Counsel, Department for Transport Witnesses: Mr John Donovan Mr Robert Jones-Owen Mrs Beryl Upton Ms Kirsty Gibbs Ms KJ Alonso and Mr KJ West Ms Gayle Metcalfe and Pauline Woodham Mr Ian Phillips Ms Susan Crane and Mr David Crane Mr Henry Gardner, Governor, Vyners School _____________ IN PUBLIC SESSION INDEX Subject Page John Donovan, Beryl Upton, Robert Jones-Owen and others (continued) Closing submissions by Mr Donovan 3 Submissions by Mrs Upton 4 Submissions by Mr Jones-Owen 12 Response from Mr Strachan 18 Kirsty Gibbs and others Submissions by Ms Gibbs 28 Response from Mr Strachan 33 Ms KJ Alonso and Mr KJ West Submissions by Ms Alonso 36 Submissions by Mr West 37 Response from Mr Strachan 39 Gayle Metcalfe and Pauline Woodham and others Submissions by Ms Metcalfe 41 Response from Mr Strachan 50 Ian Phillips, Susan Crane and others Submissions by Mr Phillips 61 Submissions by Mr Crane 69 Submissions by Ms Crane 76 Response from Mr Strachan 79 The Governing Body of Vyners School Submissions by Mr Gardner 84 Response from Mr Strachan 99 2 1. CHAIR: Order, order. We’re back this afternoon with HS2 Select Committee, dealing with petitions 728, 717, 730, 729, 724 and 1264. Mr Donovan. John Donovan, Beryl Upton, Robert Jones-Owen and others (continued) 2.
    [Show full text]
  • Underground Diary
    UNDERGROUND DIARY AUGUST 2009 On Saturday 1 August, an unattended item in a cross-passage between the Piccadilly Line platforms at King’s Cross suspended services between Hyde Park Corner and Arnos Grove from 12.05 for 40 minutes. A signal failure at Heathrow Terminal 5 began at 21.10 but had little effect on the service. However, a total failure at 23.20 suspended services between T123 and T5 through to the end of traffic. There was nothing untoward to note for Sunday 2 August. Monday 3 August may be summarised as follows: A Metropolitan Line train from Neasden depot accepted a wrong signal and ended up in the northbound Jubilee Line platform at Wembley Park at 06.10, the train then being returned to depot. A ‘bridge bash’ between Gunnersbury and Kew Gardens suspended the Richmond branch of the District Line from 12.00 to 12.45. Metropolitan Line service to the City suspended 15.15 to 16.05 – signal failure at Farringdon. A multiple signal failure between Hammersmith and Barons Court suspended the Piccadilly Line between Acton Town and Hyde Park Corner from 18.05 to 18.40. A northbound Victoria Line train stalled in Victoria platform at 10.00 on Tuesday 4 August, suspending services south of Warren Street. The offending train was reversed back to Victoria sidings and services resumed at 10.25. The service south of Warren Street was again suspended from 10.45 because of a person under a northbound train at Victoria. The passengers on the train stalled approaching Victoria were walked forward to the station and were clear by 12.00.
    [Show full text]
  • In Your Area 3: Ruislip and Ickenham
    LOCAL AREA High Speed Rail Consultation In Your Area 3: Ruislip and Ickenham Find out here about: • what is proposed between Ruislip and Ickenham; • what this means for people living in and around Ruislip and Ickenham; and • what would happen during construction. What is proposed between What this means for people Ruislip and Ickenham? living in and around Ruislip and Ickenham. From Northolt Junction heading north west the proposed route for the high speed line would Property and Land be joined by the existing Chiltern Line from For much of its length the existing railway Marylebone, and from that point the two lines, corridor is bounded by residential and light and the Central Line, would run alongside each industrial or commercial properties. While we other to West Ruislip. have kept the amount of land needed to a minimum, we expect that around 10 homes This would mean widening the existing railway would need to be demolished. These are corridor to accommodate the two high speed scattered along this section of the route. tracks, which – from Northolt Junction Additionally, a number of properties could be westwards – would lie on the north-eastern at risk of having some land taken, generally edge of the existing railway. where gardens back onto the line although it The route would pass to the north of West may prove that many of these may not be Ruislip station and would pass under Ickenham affected after all. Road. It would then pass through the southern If a decision is taken to go ahead with the high edge of Ruislip Golf Course crossing the River speed line, we will carry out more detailed Pinn and Breakspear Road South on a new design of the route, including considering the bridge, before passing westwards into a cutting.
    [Show full text]
  • UNDERGROUND DIARY JANUARY 2018 with Monday 1 January Already Covered in the Previous Issue, We Begin with Tuesday 2 January
    UNDERGROUND DIARY JANUARY 2018 With Monday 1 January already covered in the previous issue, we begin with Tuesday 2 January. At 23.35 the Bakerloo Line was suspended north of Queen’s Park because of items blown onto the track by the high winds south of Kensal Green – a metal obstruction and a tarpaulin under a southbound train. The service remained suspended until the end of traffic. A loss of all point indications in Morden Depot from 22.10 initially resulted in a 35-minute suspension south of Tooting Broadway, with delays continuing until the end of traffic following points being secured and restricted access to the depot, the last being 30 minutes late stabling, with several trains stabled elsewhere. The strong winds continued early on Wednesday 3 January. A tree blown onto the track from a private property on the approach to Ickenham was struck by the first eastbound Metropolitan Line train, suspending services on the Uxbridge line. The first eastbound Piccadilly Line train from Uxbridge, which follows the first Metropolitan Line train, was stalled to the rear until 06.20. Once cleared, services resumed at 06.55. The train was damaged in the incident but not seriously enough to prevent it being worked in service to Harrow, where it was detrained and worked empty to Neasden Depot. In the meanwhile, nine Northern Line trains were cancelled from Morden Depot because of stock imbalance (q.v.). An air burst on a southbound train at Kenton at 23.35 suspended the Bakerloo Line north of Stonebridge Park until the end of traffic.
    [Show full text]
  • River Pinn to Breakspear Road
    London West Midlands HS2 Hillingdon Traffic and Construction Impacts Contents Page number 1 Executive summary ................................................................................................. 1 2 Introduction ............................................................................................................ 2 2.1 General .................................................................................................................... 2 2.2 Traffic Flows ............................................................................................................ 3 2.3 Sustainable Placement ............................................................................................ 3 3 Options to be carried forward and to be considered by the Promoter for inclusion within contractual documentation ................................................................................. 5 3.1 Re-use of excavated material from Copthall Cutting to construct Harvil Road Embankments .................................................................................................................... 5 3.2 Construction of bridge structures instead of railway embankments – River Pinn to Breakspear Road ............................................................................................................ 9 3.3 Use of excavated material for interval embankment between HS2 and Chiltern Lines 19 3.4 Commence importation of material earlier in the programme ........................... 21 3.5 Retention of Railway ‘Up-Sidings’ at
    [Show full text]
  • West Ruislip Station – Zone 6 I Onward Travel Information Local Area Map Bus Map
    West Ruislip Station – Zone 6 i Onward Travel Information Local Area Map Bus Map 39 O N E AT S 17 R ACRE 56 C St. Martin’s 15 O L D P R I O R Y H SOUTHCOTE RISE 444 10 A Church R 50 47 D C 35 L H O Southcote 12 S I E E Clinic G U n 31 S n A K i N N E O H E E P S L A T H V r A R P A S H S e iv T 76 48 8 T R S R R H E 28 U A 1 D E 3 36 5 A 9 H O T R H R E N N O F A E I M 1 T L E 25 20 G L E 53 D A N 24 L R L 80 I 19 I L M S H A N O E R R O A D E 25 U S 19 N E H 20 O S E C L A E V 33 G R A TA 9 O T P F C H I S E FIELD CLOSE L 3 C D W L R 60 A 3 A Y U River Pinn N H Y A E C W 2 D L E I 96 F A D R O 12 16 28 D ’ S 27 A R 11 17 D W G E K I N Ruislip Heathfield Rise/Glenhurst Avenue 33 71 34 F I E R D ’ S R O A D L D N G E D WA W K I U10 AY E E 21 35 S 45 N I 15 A R Heathfield Rise Woodville Gardens L L King Edwards L Hill Lane L I L H 31 Medical Centre I 48 H Field Way E Y U A W H I L L R I S E N S 2 H ’ Ruislip E R C Westcote Rise Orchard Close V 15 A O N A M 1 Golf Course H C R 20 Manor Road U 15 H Southcote Rise 120 20 C Sharps Lane D A S 1 H O Sharps Lane Neats Acre Ruislip A R Ruislip R P Methodist S M 87 Golf Course A L H Church Ruislip A E N N I CK 33 Golf Course E 36 Ruislip High Street/The Oaks The Orchard, Premier Inn Ruislip Ruislip High Street/Midcroft The yellow tinted area includes every S H D bus stop up to one-and-a-half miles A A Ruislip High Street/Brickwall Lane R RO Ruislip P M Ruislip 44 from West Ruislip.
    [Show full text]
  • HS2 London to the West Midlands Appraisal of Sustainability
    HS2 London to the West Midlands Appraisal of Sustainability Main Report Volume 1 A Report for HS2 Ltd February 2011 HS2 London to the West Midlands: Appraisal of Sustainability Main Report Volume 1 HS2 London to the West Midlands Appraisal of Sustainability Main Report Volume 1 A Report for HS2 Ltd 55 Victoria Street London SW1H 0EU T 0207 944 4908 [email protected] Principal author Nick Giesler Key contributors Andrew Bryant, Andrew Mayes, Amanda Pownall, Sheenagh Mann, Sam Turner, Tony Selwyn, Yaser Ali Technical contributors Carbon and climate Matt Ireland, Tony Selwyn, Andrew Bryant, Water Environment Landscape & townscape Gillespies, Nick Giesler Cultural heritage Cotswold Archaeology Biodiversity Ecology Consultancy Ltd, Nick Giesler Water and flood risk Water Environment, Andrew Bryant Air quality John Rowland, Enan Keogh Noise and vibration John Fisk, Sasha Villa, Mark Southwood, Rob Adnitt Community integrity and accessibility Vicky Ward, Sheenagh Mann Equality Vicky Ward, Future Inclusion Health and well-being Institute for Occupational Medicine, Sheenagh Mann Socio-economics Derval Cummings, Stuart McCully, Colin Buchanan (consultants) Resources and consumption Andrew Mayes, Tony Selwyn, Sam Turner, Andrew Bryant Reviewers Mark Southwood, Stuart McCully, Roger Cooper This report was commissioned by, and prepared for HS2 Ltd and the Department for Transport (DfT) by Booz & Co. (UK) Ltd (www.booz.com) and Temple Group Ltd (www.templegroup.co.uk) ('The Consultant'). The findings and conclusions set forth in this report represent the best professional judgment of the Consultant based on information made available to it. The Consultant has relied on, and not independently verified, data provided to it by such sources and on secondary sources of information cited in the report.
    [Show full text]
  • Appendix 2 Appendix
    Appendix 2 IN PARLIAMENT HOUSE OF COMMONS SESSION 2013—14 HIGH SPEED RAIL (LONDON — WEST MIDLANDS) BILL Against—on Merits — Praying to be heard by Counsel, S.c. To the Honourabia the Commons of the United Kingdom of Great Britain and Northern Ireland in Parliamont assembled. THE HUMBLE PETITION of TRANSPORT for LONDON SHEWETH as follows: your 1. A Bill (hereinafter referred to as ‘the Bill) has been introduced and Is now pending in Honourable House intituled “A bill to make provision for a railway between Euston in London and a junction with the West Coast Main Line at Handsacre in Staffordshire, with a spur from Old Oak Common in the London Borough of Hammersmith and Fulham to a junction with the Channel Tunnel Rail Link at York Way in the London Borough of lslington and a spur from Water Orton in Warwickshire to Curzon Street in Birmingham; and for connected purposes”. “the 2, The Bill is presented by Mr Secretary McLoughlin (referred to in thIs Petition as Promoter), supported by The Prime Minister, The Deputy Prime Minister, Mr Chancellor of the Exchequer, Secretary Theresa May, Secretary Vince Cable, Secretary lain Duncan Smith, Secretary Eric Pickles, Secretary Owen Paterson, Secretary Edward Davey and Mr Robert Goodwill. CLAUSES OF THE BILL 16 make provision for the 3. Clauses 1 to 23 of the Bill together with Schedules 1 to construction and maintenance of the proposed works including the ‘Scheduled Works’ set to out in Schedule I (references in (his Petition to ‘Scheduled Work No.” are references those proposed works contained in Schedule 1).
    [Show full text]
  • 6 | South Ruislip to Ickenham HS2 London-West Midlands May 2013
    PHASE ONE DRAFT ENVIRONMENTAL STATEMENT Community Forum Area Report 6 | South Ruislip to Ickenham HS2 London-West Midlands May 2013 ENGINE FOR GROWTH DRAFT ENVIRONMENTAL STATEMENT Community Forum Area Report ENGINE FOR GROWTH 6 I South Ruislip to Ickenham High Speed Two (HS2) Limited, 2nd Floor, Eland House, Bressenden Place, London SW1E 5DU Telephone 020 7944 4908 General email enquiries: [email protected] Website: www.hs2.org.uk © Crown copyright, 2013, except where otherwise stated Copyright in the typographical arrangement rests with the Crown. You may re-use this information (not including logos or third-party material) free of charge in any format or medium, under the terms of the Open Government Licence. To view this licence, visit www.nationalarchives.gov.uk/doc/open-government-licence/ or write to the Information Policy Team, The National Archives, Kew, London TW9 4DU, or e-mail: [email protected]. Where we have identified any third-party copyright information you will need to obtain permission from the copyright holders concerned. To order further copies contact: DfT Publications Tel: 0300 123 1102 Web: www.dft.gov.uk/orderingpublications Product code: ES/25 Printed in Great Britain on paper containing at least 75% recycled fibre. CFA Report – South Ruislip to Ickenham/No 6 I Contents Contents Draft Volume 2: Community Forum Area Report – South Ruislip to Ickenham/No 6 5 Part A: Introduction 6 1 Introduction 7 1.1 Introduction to HS2 7 1.2 Purpose of this report 7 1.3 Structure of this report 9 Part B: South
    [Show full text]
  • 2014 Improving Transport in Hillingdon
    DRAFT LOCAL IMPLEMENTATION PLAN: 2011 – 2014 IMPROVING TRANSPORT IN HILLINGDON London Borough of Hillingdon December 2010 DRAFT LOCAL IMPLEMENTATION PLAN 2011-2014: IMPROVING TRANSPORT IN HILLINGDON CONTENTS LIST EXECUTIVE SUMMARY 1. INTRODUCTION Background How has Hillingdon’s LIP2 been developed? The format of Hillingdon’s LIP2 2. TRANSPORT OBJECTIVES Introduction Local Context Local Challenges and Opportunities 3. DELIVERY PLAN Introduction Potential Funding Sources Delivery Actions Programme of Investment Risk Management 4. PERFORMANCE MONITORING PLAN Introduction Target Setting Programme Monitoring Process Before and After Scheme Implementation Monitoring TABLES 2.1 Journey Time Comparisons by Mode 2.2 Public Transport Journey Times between Metropolitan Centres and Central London 2.3 List of objectives/goals of relevant strategies/plans 2.4 Strategic LIP2 objectives 2.5 Conformity of LIP2 objectives with the Strategic Environmental Assessment 3.1 Total s106 funds held as at 30/9/2010 for transport/highways related schemes 3.2 Projected Funding Source Allocations 3.3 Asset Base - Desired and Current Levels of Service 3.4 Hillingdon’s Proposed Programme of Investment 3.5 Risk Management Matrix 4.1 Investment Programme Monitor 4.2 LIP Objectives and Respective Indicators by Target Category A Core Targets C1 Bus Service Reliability C2 Principal Roads Asset Condition C3 Road Traffic Casualties C4 Number of People Travelling In/Out of Hillingdon by Mode C5 CO2 Emission Reduction in Hillingdon B Local Targets L1 Congestion Hot Spots L2
    [Show full text]
  • Notice of Surveyor Visits Between Euston and West Ruislip
    Notification Notice of surveyor visits between Euston and West Ruislip January 2021 | www.hs2.org.uk High Speed Two (HS2) is the new high speed railway for Britain. Duration of works Skanska Costain STRABAG joint venture (SCSJV) is HS2’s Main Works Between 25 January contractor responsible for building the new railway between Euston and and 7 February West Ruislip. We need to check our survey reference points to help us plan our works to build the new railway. From 8am to 6pm Surveyor visits from 25 January to 7 February Mondays to Fridays From 25 to 29 January, our surveying team will be visiting survey from 25 to 29 January reference points between Euston and West Ruislip to carry out surveys. From 7am to 7pm on A list of the locations is included below. Information about surveys on Sunday 31 January and 31 January and 7 February is included on the following page. 7 February while trains The surveys will take up to two hours at each location and we may visit are not running each location twice during the above dates. Our surveyors will use a tripod with a Global Positioning System (GPS) kit attached. The GPS kit What to expect works the same as an in-car satellite navigation tool. It operates silently and should not cause any disruption to you. Surveyors will visit each location for up to two Survey locations in Euston Area hours during the above Our surveyors will visit the following locations in the Euston area: dates • Euston Station / Euston Square • Junction of Euston Road, Hampstead Road and Tottenham Court What we will do Road
    [Show full text]