Notification

Notice of surveyor visits between Euston and West

January 2021 | www.hs2.org.uk

High Speed Two (HS2) is the new high speed railway for Britain. Duration of works Skanska Costain STRABAG joint venture (SCSJV) is HS2’s Main Works Between 25 January contractor responsible for building the new railway between Euston and and 7 February West Ruislip. We need to check our survey reference points to help us plan our works to build the new railway. From 8am to 6pm Surveyor visits from 25 January to 7 February Mondays to Fridays From 25 to 29 January, our surveying team will be visiting survey from 25 to 29 January reference points between Euston and West Ruislip to carry out surveys. From 7am to 7pm on A list of the locations is included below. Information about surveys on Sunday 31 January and 31 January and 7 February is included on the following page. 7 February while trains The surveys will take up to two hours at each location and we may visit are not running each location twice during the above dates. Our surveyors will use a tripod with a Global Positioning System (GPS) kit attached. The GPS kit What to expect works the same as an in-car satellite navigation tool. It operates silently and should not cause any disruption to you. Surveyors will visit each location for up to two Survey locations in Euston Area hours during the above Our surveyors will visit the following locations in the Euston area: dates • Euston Station / Euston Square • Junction of Euston Road, Hampstead Road and Tottenham Court What we will do Road North We will use handheld • Regents Park, Outer Circle (various locations) equipment and tripods Survey locations between Chalk Farm and Greenford placed on the ground to carry out the surveys Our surveyors will visit the following locations between Chalk Farm and Greenford: The dates for the surveys may change • Junction of Adelaide Road and Haverstock Hill • Adelaide Road, opposite our Adelaide Road site We will keep you • Junction of Chichester Road and Gorefield Place updated via the HS2 in • Junction of Canterbury Road and Canterbury Terrace your area website Further locations are listed on the following page. If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email [email protected]

Call our HS2 Helpdesk team on 08081 434 434

Notice of surveyor visits between Notification Euston and West Ruislip

www.hs2.org.uk

Survey locations between Chalk Farm and Greenford Our surveyors will visit the following locations between Chalk Farm and Greenford: • Corner of Albert Road and Canterbury Terrace • Grand Union Canal towpath (NW10 6RS) • Old Oak Common Lane, near the substation and Network Rail access gate • Park Royal Road, Victoria Road, North Acton, Old Oak Lane / Station Road, • High Street / Harrow Road in North Acton • Braybrook Street • Our Westgate site in Hanger Hill and neighbouring streets (West Gate and Priory Gardens) • Green Park Way and Greenford Road • Junction of A4127 Greenford Road and Rockware Avenue, UB6 0AA Survey locations between Northolt and West Ruislip Our surveyors will visit the following locations between Northolt and West Ruislip: • Opposite Northolt Station, Mandeville Rd • Opposite Belvue Close, Mandeville Rd • Corner of Lane / Mandeville Road • Near Asda Petrol Station, Old Dairy Lane, • Junction of Victoria Road / Old Dairy Lane, South Ruislip • Junction of Victoria Road/ Long Drive, South Ruislip, HA4 0HB • Opposite , High Road • Near Oak Avenue (Bus Stop L), High Road Ickenham • Junction of B466 High Road Ickenham/ Austin’s lane UB10 8LJ • At the entrance to the SCSJV Copthall North site • Harvil Road, opposite the Align JV site entrance Surveyor visits on 31 January and 7 February On Sunday 31 January and Sunday 7 February, our surveying team will be visiting locations between Hanger Hill and West Ruislip to carry out surveys on and near the railway tracks in this area. The surveys will be carried out during a track possession while trains are not running between 7am to 7pm on the above dates. There should be minimal disruption to you. Keeping you informed The dates for the surveys may change. We’ll provide further updates at: • HS2inCamden.co.uk • HS2inOldOak.co.uk • HS2inKilburn-Northolt.co.uk • HS2inHilingdon.co.uk Please visit the webpage for your area to find out about other HS2 works taking place in your area.

Contact our HS2 Helpdesk team on 08081 434 434

What else is happening in your area? www.hs2.org.uk Contact our new HS2 Helpdesk team Our new Helpdesk team is based in our Head Office in Birmingham. This is so that we can provide you with the best service possible. Our team is here to listen and respond to your enquiry, complaint or feedback to help us be a good neighbour. You can contact our Helpdesk team all day, every day of the year on: Freephone: 08081 434 434 Minicom: 08081 456 472

Email: [email protected]

Keep up-to-date with your local community website To find out more about what’s happening in your area and receive regular email updates, you can sign up to our local community websites at: www.hs2inyourarea.co.uk.

About our Community and Business Funds We are offering two funds that are available to local communities and businesses between the West Midlands and London, to help with the disruption caused by our construction work. These are the Community and Environment Fund (CEF) and the Business and Local Economy Fund (BLEF). The CEF is designed to give communities the opportunity to share in the benefits of HS2. It is an allocated fund that communities are able to apply for, to help to support local projects that aim to improve their local area. The BLEF is designed to support local economies that may be disrupted by the construction of HS2. BLEF grants are for local business support organisations and local authorities to help maintain business activity in local communities. For more information about each of these funds, including how to apply, please visit: https://www.groundwork.org.uk/hs2funds

Contact our HS2 Helpdesk team on 08081 434 434

Keeping you informed We are committed to keeping you informed about work on HS2. This includes ensuring you know what to expect and when to expect it, as well as how we can help. Residents’ Charter and Commissioner The Residents’ Charter is our promise to Contact Us communicate as clearly as we possibly can with people who live along or near the HS2 route. Contact our HS2 Helpdesk team all day, www.gov.uk/government/publications/hs2- every day of the year on: residents-charter We also have an independent Residents’ Freephone 08081 434 434 Commissioner whose job is to make sure we keep Minicom 08081 456 472 to the promises we make in the Charter and to keep it under constant review. Find reports at: Email [email protected] www.gov.uk/government/collections/hs2-ltd- residents-commissioner Write to: You can contact the Commissioner at: FREEPOST [email protected] HS2 Community Engagement

Construction Commissioner Website www.hs2.org.uk The Construction Commissioner’s role is to mediate and monitor the way in which HS2 Ltd manages To keep up to date with what is and responds to construction complaints. You can happening in your local area, visit: contact the Construction Commissioner by www.hs2inyourarea.co.uk emailing: [email protected]

Property and compensation Please contact us if you’d like a free copy You can find out all about HS2 and properties along of this document in large print, Braille, the line of route by visiting: audio or easy read. You can also contact www.gov.uk/government/collections/hs2-property us for help and information in a different Find out if you’re eligible for compensation at: language. www.gov.uk/claim-compensation-if-affected-by-hs2 HS2 Ltd is committed to protecting personal information. If you wish to know more about Holding us to account how we use your personal information If you are unhappy for any reason you can make a please see our Privacy Notice complaint by contacting our HS2 Helpdesk team. https://www.gov.uk/government/publication For more details on our complaints process, please s/high-speed-two-ltd-privacy-notice visit our website: www.hs2.org.uk/how-to-complain

Reference number: HS2-EW-SCS-Ph1-Ar-So-S1-Site-8-13/01/2021

High Speed Two (HS2) Limited, registered in England and Wales. Registered office: Two Snowhill, Snow Hill Queensway, Birmingham B4 6GA. Company registration number: 06791686. VAT registration number: 888 8512 56.