Beauty Point to Scots – TSC 4

Total Page:16

File Type:pdf, Size:1020Kb

Beauty Point to Scots – TSC 4 Beauty Point to Scots – TSC 4 Mornings Time Bus Stop Street 07:10am • Saint Therese Catholic Church, Spit Road, Beauty Point (L) Medusa Street • Medusa Street before Pindari Avenue (R) Pindari Avenue • Pindari Avenue at Euryalus Street • Pindari Avenue at Beauty Point Road (R) Beauty Point Road • Beauty Point Road at Marsala Street (C) Pearl Bay Avenue • Opposite Moss Lane, Beauty Point (C) Pearl Bay Avenue (L) Spit Road (R) Parriwi Road • Outside 33 Parriwi Road (C) Parriwi Road (L) Spit Road (R) Ourimbah Road (R) Countess Street 07:17am • Countess Street at Ourimbah Road • Countess Street at Awaba Street • Countess Street at Wyong Road (L) Wyong Road • Wyong Road at Congewoi Road • Wyong Road before Macpherson Street (L) Macpherson Street 7:30am • Macpherson Street before Ourimbah Road (C) Macpherson Street • Macpherson Street at Middle Harbour Public School • Macpherson Street opposite Montague Road • Macpherson Street before Prince Street (C) Macpherson Street (R) Gerard Street 7:32am • Gerard Street after Benelong Road • Gerard Street before Winnie Street (C) Belgrave Street (L) Ben Boyd Road (R) Ernest Street (L) Warringah Freeway (C) Bus Lane (C) Cahill Expressway (bus lane) (C) Sydney Harbour Bridge (L) Cahill Expressway (over Circular Quay) (R) Domain Tunnel (C) Eastern Distributor (R) Palmer Street exit (C) Palmer Street (L) William Street (C) Kings Cross Tunnel (C) New South Head Road • New South Head Road before New Beach Road (C) New South Head Road 7:50am • Ascham girls opposite Edgecliff Station (C) New South Head Road (R) Victoria Road 8:05am • The Scots College Senior School (C) Victoria Road 8:10am • The Scots College Preparatory School Updated December 2020 • Kambala and Kincoppal as required Times subject to traffic conditions Guide: (R) The bus takes a right turn onto the street (L) The bus takes a left turn onto the street (C) The bus continues onto the street Please note: • Routes will only change after due notification. • Buses will stop at all locations marked on the ‘Route’ and designated bus stops along the journey. For the inward journey students should ‘flag’ the drivers of the buses marked ‘The Scots College’ or ‘Telfords’ who have been advised of this practice. • Buses will not make an effort to ‘be early’, they will depart as indicated; students are asked to be at their stop at least five minutes before the published time. All times are dependent on traffic conditions. • For more information about transport at The Scots College, visit www.tsc.nsw.edu.au/transport. • Feedback: [email protected]. • Emergency: Telfords Tours: 0417 448 910 (before 8:00am and after 4:00pm), Mr Val Zele: 0438 558 909 (after school services) and Sport Department: 9391 7606 (sport transport issues). Updated December 2020 Scots to Beauty Point – TSC 4 Afternoons – Early Service Time Bus Stop Street 3:10pm/5:00pm • TSC 3 Pick up Kambala then Kincoppal (facing uphill) 3:15pm • Depart The Scots College Preparatory School Depart The Scots College Senior School, Victoria Road, before Ginahgulla 3:25pm • Road (C) Victoria Road (L) New South Head Road 3:35pm • Pick up Ascham girls at Edgecliff Station (C) New South Head Road • New South Head Road before Mahoney Lane (opposite New Beach Road) (C) New South Head Road • New South Head before McLachlan Avenue (C) New South Head Road (C) Craigend Street (C) Cross City Tunnel (L) Cahill Expressway exit (C) Sir John Young Crescent (C) Cahill Expressway (C) Domain Tunnel (C) Sydney Harbour Tunnel (C) Warringah Freeway (L) Falcon Street exit (bus lane) (R) Falcon Street (C) Military Road (L) Merlin Street (first left after Warringah Freeway overbridge) (R) Ernest Street (L) Ben Boyd Road (R) Belgrave Street (C) Gerard Street Updated December 2020 3:55pm • Gerard Street after Winnie Street • Gerard Street before Benelong Road (L) Macpherson Street • Macpherson Street opposite Prince Street • Macpherson Street before Montague Road Macpherson Street after Bariston Avenue opposite Middle Harbour • Public School 4:00pm • Macpherson Street after Ourimbah Road • Macpherson Street at Ellalong Road (R) Wyong Road • Wyong Road at Julian Street • Wyong Road at Congewoi Road (R) Countess Street • Countess Street at Wyong Road • Countess Street at Awaba Street 4:05pm • Countess Street before Ourimbah Road (L) Macpherson Street (L) Ourimbah Road (L) Spit Road (L) Medusa Street • STA Bus stop outside 26 Medusa Street • Medusa Street before Pindari Avenue (R) Pindari Avenue • Pindari Avenue at Euryalus Street • Pindari Avenue before Beauty Point Road • Pindari Avenue at Beauty Point Road (R) Beauty Point Road • Beauty Point Road at Marsala Street (C) Pearl Bay Avenue 4:10pm • Opposite Moss Lane Beauty Point Times subject to traffic conditions Updated December 2020 Guide: (R) The bus takes a right turn onto the street (L) The bus takes a left turn onto the street (C) The bus continues onto the street Please note: • Routes will only change after due notification. • Buses will stop at all locations marked on the ‘Route’ and designated bus stops along the journey. For the inward journey students should ‘flag’ the drivers of the buses marked ‘The Scots College’ or ‘Telfords’ who have been advised of this practice. • Buses will not make an effort to ‘be early’, they will depart as indicated; students are asked to be at their stop at least five minutes before the published time. All times are dependent on traffic conditions. • For more information about transport at The Scots College, visit www.tsc.nsw.edu.au/transport. • Feedback: [email protected]. • Emergency: Telfords Tours: 0417 448 910 (before 8:00am and after 4:00pm), Mr Val Zele: 0438 558 909 (after school services) and Sport Department: 9391 7606 (sport transport issues). Updated December 2020 Scots to Beauty Point / Seaforth / Warringah Mall Afternoons – Late Service Please refer to Mosman and Seaforth timetables. Friday – Late Service TSC 4 Beauty Point: Combined with TSC 2 Seaforth / TSC 3 Mosman. TSC 3 will service Woolloomooloo. Combined as required. Updated December 2020 .
Recommended publications
  • Rozelle Campus M1
    Berry St HUNTLEYS POINT The Point Rd Bay Rd NORTH SYDNEY Burns Bay Rd Bay Burns NEUTRAL BAY Pacific Hwy Kurraba Rd WAVERTON Y A W Union St E G TA CREMORNE POINT OT CHURCH ST WHARF RD C Y A W EN RD GA LAVENDER GLOVER ST BAY CAMPBELL ST Rozelle Campus M1 FREDBERT ST MCMAHONS MILSONS POINT POINT KIRRIBILLI BALMAIN RD PERRY ST 0 100 m Sydney Harbour Sydney HarbourTunnel A40 Sydney Harbour Bridge Victoria Rd Montague St Lyons Rd Sydney RUSSELL LEA DRUMMOYNE Opera BALMAIN Hickson Rd House MILLERS POINT Beattie St Darling St BALMAIN EAST Cahill Expressway Darling St THE ROCKS The Hungry Mile A40 Mullens St SYDNEY ROZELLE Pirrama Rd Royal Victoria Rd Phillip St Botanical Macquarie St Western Distributor Gardens RODD University A4 Cahill Expressway POINT of Sydney Mrs Macquaries Rd (Rozelle) Clarence St Bowman St Sussex St George St Leichhardt Balmain Rd PYRMONT York St The Henley Marine Dr Park Western Distributor Domain M1 See Enlargement Elizabeth St Art Gallery Rd WOOLLOOMOOLOO Rozelle D The Crescent A4 o b Campus POTTS POINT ro y Perry St d Hyde P Balmain Rd LILYFIELD Pitt St d Park MacLeay St A4 Darling Dr Harbour St e Jubilee Cross City Tunnel College St Lilyfield Rd Park Eastern Distributor Cross City Tunnel A4 City West Link William St Darling Dr The Crescent The Glebe Point Rd Wentworth Fig St M1 Pyrmont Bridge Rd Wattle St Park Liverpool St Hawthorne Canal Harris St Oxford St Goulburn St Norton St FOREST Darling Dr Johnston St Moore St LODGE ULTIMO Darlinghurst VictoriaRd St Minogue Cres Wigram Rd HABERFIELD ANNANDALE GLEBE Campbell St Eastern Distributor Balmain Rd HAYMARKET Bay St University of Tasmania 0 250 500 1000 m Booth St Bridge Rd www.utas.edu.au Elizabeth St Foster St Tel: +61 2 8572 7995 (Rozelle Campus) Collins St SURRY LEICHHARDT Central HILLS Leichhardt St Station © Copyright Demap, February 2017 Lee St Ross St Broadway Flinders St PADDINGTON City Rd CHIPPENDALE CAMPERDOWN STRAWBERRY HILLS.
    [Show full text]
  • Speed Camera Locations
    April 2014 Current Speed Camera Locations Fixed Speed Camera Locations Suburb/Town Road Comment Alstonville Bruxner Highway, between Gap Road and Teven Road Major road works undertaken at site Camera Removed (Alstonville Bypass) Angledale Princes Highway, between Hergenhans Lane and Stony Creek Road safety works proposed. See Camera Removed RMS website for details. Auburn Parramatta Road, between Harbord Street and Duck Street Banora Point Pacific Highway, between Laura Street and Darlington Drive Major road works undertaken at site Camera Removed (Pacific Highway Upgrade) Bar Point F3 Freeway, between Jolls Bridge and Mt White Exit Ramp Bardwell Park / Arncliffe M5 Tunnel, between Bexley Road and Marsh Street Ben Lomond New England Highway, between Ross Road and Ben Lomond Road Berkshire Park Richmond Road, between Llandilo Road and Sanctuary Drive Berry Princes Highway, between Kangaroo Valley Road and Victoria Street Bexley North Bexley Road, between Kingsland Road North and Miller Avenue Blandford New England Highway, between Hayles Street and Mills Street Bomaderry Bolong Road, between Beinda Street and Coomea Street Bonnyrigg Elizabeth Drive, between Brown Road and Humphries Road Bonville Pacific Highway, between Bonville Creek and Bonville Station Road Brogo Princes Highway, between Pioneer Close and Brogo River Broughton Princes Highway, between Austral Park Road and Gembrook Road safety works proposed. See Auditor-General Deactivated Lane RMS website for details. Bulli Princes Highway, between Grevillea Park Road and Black Diamond Place Bundagen Pacific Highway, between Pine Creek and Perrys Road Major road works undertaken at site Camera Removed (Pacific Highway Upgrade) Burringbar Tweed Valley Way, between Blakeneys Road and Cooradilla Road Burwood Hume Highway, between Willee Street and Emu Street Road safety works proposed.
    [Show full text]
  • Western Harbour Tunnel & Warringah Freeway Upgrade
    NSW Major Projects NSW Government 30th March, 2020. Dear Sir or Madame, RE: Western Harbour Tunnel & Warringah Freeway Upgrade I am writing in support of Bike North and their submission on the Western Harbour Tunnel & Warringah Freeway Upgrade.i Bicycle NSW has been the peak bicycle advocacy group now in NSW for over forty-three years, and has over 30 affiliated local Bicycle User Groups, including Bike North. Bicycle NSW exists to create a better environment for all bicycle riders and our advocacy is guided by three policy pillars to achieve this namely: Build it for Everyone: cycling infrastructure should be built suitable for all riders, and we say ‘from 8-80’ as a reminder that children through to elders should all be able to use it independently Safe Home: because everyone deserves to arrive home safely and laws, regulation and enforcement need to support this Invest Now for Health: calls for government to recognise the importance of investment in safe cycling to address the rising impact of inactivity on human health Bicycle NSW agrees with and supports the objections of Bike North to the proposal on the basis that: The proposal would entrench private, environmentally damaging transport at the expense of public and active transport The EIS fails to provide a full detailed business case to support this proposal over public transport investment The project fails to include delivery of the North Shore Cycleway as part of the project or at least the section between Naremburn and the Sydney Harbour Bridge. This directly contradicts Sydney’s Cycling Future (NSW Government, Dec 2013) that requires that the ‘needs of people on bike be included throughout the planning of new and upgraded road projects’, and that ‘bicycle facilities be identified and delivered parallel to major transport corridors’.
    [Show full text]
  • EDO Western Harbour Tunnel and Beaches Link Program
    Western Harbour Tunnel and Beaches Link Program What you need to know and how to have your say About the EDO • National Community Legal Centre • Specialists in planning and environmental law • Non-government and non-profit • Legal information , advice and representation • Community education • Policy and law reform expertise www.edo.org.au Information, not advice • The information in this workshop is a guide only and not a substitute for legal advice. • If you need legal advice, call our Environmental Law Advice Line on 1800 626 239 • Visit https://www.edo.org.au/get-advice/ By law we can only assist one client on any issue – We prefer to work with community groups Overview 1. The proposal 2. State Significant Infrastructure 3. Assessment pathway 4. Environmental Impact Statement 5. Community Participation: Submission writing 6. What to expect next 7. Legal avenues 1. The Proposal Western Harbour Tunnel and Warringah Freeway Upgrade Quick Overview: Who is the proponent? • Roads and Maritime Service What is being proposed? • New crossing of Sydney Harbour • Twin tolled motorway tunnels – approx. 7km long • Connecting WestConnex at Rozelle and the Warringah Freeway at North Sydney • Upgrade and integration works along the Warringah Freeway, including connections to the Beaches Link and Gore Hill Freeway Western Harbour Tunnel and Warringah Freeway Upgrade Where is the process up to? • EIS is being prepared 2017-2019 • EIS submitted and placed on public exhibition 2020 • Public submissions 2020 • Response to submissions • Possible preferred infrastructure report ? • Assessment and determination Scoping Report • Broad description of the project • Brief justification for the project • Selection process for project - do nothing - rejected - more lanes on Sydney Harbour Bridge or Tunnel – rejected - increase public transport – rejected • Reasons for selecting blue corridor • Brief description of community consultation process • Key issues briefly identified Design Development Corridor SEARs Key issues identified by the Department: 1.
    [Show full text]
  • Northconnex: Subsurface Stratum Acquisition
    Proceedings of the 21st Association of Public Authority Surveyors Conference (APAS2016) Leura, New South Wales, Australia, 4-6 April 2016 NorthConnex: Subsurface Stratum Acquisition Kit Panya Roads and Maritime Services [email protected] ABSTRACT NorthConnex is a proposed 9 km tunnel motorway designed to link the M1 Pacific Motorway in Wahroonga to the Hills M2 Motorway in Pennant Hills. The tunnel is part of the NSW Government’s State Infrastructure Strategy forming an essential link in the Sydney Orbital Network and expected to cost $3 billion. In January 2015, NorthConnex received official project approval by the NSW Government. The earliest access date required for tunnel construction was July 2015. The NorthConnex project team engaged the Roads and Maritime Services (RMS) Cadastral Survey Unit for the stratum acquisition of approximately 900 lots. The acquisition was predominantly subsurface, but also included surface land, strata title, and community title acquisition. Between the project approval date and the tunnel access requirements, we had a timeframe of two months to acquire the first 80 lots in the initial stage. This paper outlines how the RMS Cadastral Survey Unit was able to respond, using a plan production and lodgement strategy unique to previous motorways. With Land and Property Information (LPI), we developed the Subsurface Stratum Definition Strategy to allow for the compilation of boundaries for subsurface acquisition plans. Once the strategy was in place, the extent of acquisition was determined from analysis of spatial data and the tunnel model. Compiled plan production, and occasionally field surveys, could then take place to complete the acquisition process.
    [Show full text]
  • Western Harbour Tunnel and Warringah Freeway Upgrade - EIS SSI 8863
    25 March 2019 File No: 2020/065301 Naomi Moss Contact Planner Department of Planning, Industry and Environment 4 Parramatta Square 12 Darcy Street Parramatta NSW 2150 Via: NSW Planning Portal Dear Naomi Western Harbour Tunnel and Warringah Freeway Upgrade - EIS SSI_8863 Thank you for the opportunity to provide comments on the Environmental Impact Statement for the Western Harbour Tunnel and Warringah Freeway Upgrade State Significant Infrastructure Project. The key points that the City of Sydney wishes to raise are provided in the following pages. Should you wish to speak with a Council officer about the above, please contact Elise Webster, Manager Transport Major Projects on 9265 9333 or at [email protected] Yours sincerely, Graham Jahn AM Director City Planning I Development I Transport 2 Introduction The City of Sydney (the City) has been a long-time critic of WestConnex. This is primarily because this costly motorway project will fail in its primary objective of easing congestion. Urban motorways do not solve congestion; they induce demand for motor vehicle trips and any additional capacity created is quickly filled. This phenomenon applies equally to the Western Harbour Tunnel and Warringah Freeway (the WHT) Project, a component of the WestConnex expansion. The number of vehicles entering the city from the north and the Roselle area is currently limited by the capacity of the Sydney Harbour Bridge and the Anzac Bridge. These bridges also accommodate traffic which bypasses the CBD. When six separate bypass lanes are provided as part of the WHT project there will then be additional capacity on the Harbour Bridge and Anzac Bridge to access the CBD by vehicle.
    [Show full text]
  • Strategic Review of the Westconnex Proposal: Final Report
    Strategic Review of the WestConnex Proposal Final Report City of Sydney February 2015 140511-Final Report_150409 This report has been prepared for City of Sydney. SGS Economics and Planning has taken all due care in the preparation of this report. However, SGS and its associated consultants are not liable to any person or entity for any damage or loss that has occurred, or may occur, in relation to that person or entity taking or not taking action in respect of any representation, statement, opinion or advice referred to herein. SGS Economics and Planning Pty Ltd ACN 007 437 729 www.sgsep.com.au Offices in Canberra, Hobart, Melbourne and Sydney 140511-Final Report_150409 TABLE OF CONTENTS EXECUTIVE SUMMARY 1 1 INTRODUCTION 4 2 THE ECONOMIC AND TRANSPORT CONTEXT 5 2.1 Introduction 5 2.2 Recent employment growth 5 2.1 Historic population growth and distribution 7 2.1 Transport movements over time 8 2.2 Planning response to date 13 2.3 Significant future infrastructure 14 2.4 Key observations 14 3 ABOUT WESTCONNEX 16 3.1 Introduction 16 3.2 Project history 16 Original route (2012) 16 Updated WestConnex Route (2013) 18 Updated WestConnex Route (2014) 19 3.3 WestConnex Policy Alignment 21 3.4 Summary 23 4 STRATEGIC ASSESSMENT OF WESTCONNEX 24 4.1 Introduction 24 4.2 Strong population growth in Western Sydney with employment growth in Sydney’s East 24 Origin-destination evidence 24 Journey to work – to Sydney CBD 25 Journey to work – to Global Economic Corridor (GEC) 27 Journey to work – to Eastern Sydney 28 Journey to work – from Eastern Sydney 29 Employment type 30 Corridor growth 31 4.3 Urban renewal along Parramatta Road 32 4.4 The economic stimulus of WestConnex 34 4.5 The cost, benefits and risks of WestConnex 35 NSW Auditor-General Review (2014) 36 4.6 Summary of findings 37 5 STRATEGIC ALTERNATIVES TO WESTCONNEX 39 5.1 Introduction 39 5.2 Strategic alternatives 40 West Metro 40 Road Pricing 41 Wider Public Transport Investments 42 Other considerations 43 6 CONCLUDING REMARKS 44 APPENDIX 1.
    [Show full text]
  • Forward Pesticide Application Program North East Sydney Period of Coverage To: 31 May 2016
    Forward Pesticide Application Program North East Sydney Period of coverage to: 31 May 2016 Downer EDI Works Pty Ltd ABN 66 008 709 608 www.downergroup.com Page 1 of 21 Contents General Information 3 Information Line: 1300 776 069 3 Warnings: 3 Round-up Bioactive Herbicide 3 Lynx WG 3 Forward Program 4 MSDS 11 Downer EDI Works Pty Ltd ABN 66 008 709 608 www.downergroup.com Page 2 of 21 General Information Pesticide use is used for weed and vegetation control. The pesticides used is a standard mixture of Lynx WG Round-up Bioactive Herbicide All pesticide spraying is programmed between: Sunday to Thursday 8pm – 5am Works will be rescheduled if rain is forecasted within 24hours or the wind speed is above 15kmph. Information Line: 1300 776 069 Warnings: Round-up Bioactive Herbicide Do not contaminate dams, rivers or streams with the product or used container. When controlling weeds in aquatic situations refer to label directions to minimise the entry of spray into the water. Lynx WG DO NOT use chlorine bleach with ammonia. All traces of liquid fertilizer containing ammonia, ammonium nitrate or ammonium sulphate must be rinsed with water from the mixing and application equipment before adding chlorine bleach solution. Failure to do so will release a gas with a musty chlorine odour which can cause eye, nose, throat and lung irritation. Do not clean equipment in an enclosed area. DO NOT contaminate streams, rivers or waterways with the chemical or used containers. A nil withholding period is applicable for LYNX WG Herbicide. It is recommended, however, not to graze treated areas for 3 days to ensure product efficacy.
    [Show full text]
  • Download the PDF
    DISPATCH FROM SYDNEY Transport in the Land of Oz BY JOHN LANDIS 23 A C C E S S NUMBER 30, SPRING 2007 USTRALIA —OR OZ AS IT IS KNOWN COLLOQUIALLY —IS INSTANTLY recognizable to visiting Americans, even those like myself who had never A been there before. As in the US, most of Australia ’s population lives in metropolitan areas within twenty miles of the coast. A majority of Australians live in sub - urban communities, and single-family homes are the dominant housing form. Australia ’s home ownership rate stands at seventy percent, slightly above the US rate. The transportation picture also looks familiar, at least at first glance. GM (through its Holden Division), Ford, and Toyota are Australia ’s biggest auto manufacturers, and four-wheel drives, minivans, and SUVs (known locally as “utes ” and “soft-roaders ”) are popular among suburban households. Urban and suburban traffic congestion is LA-like in its severity, especially in and around Australia ’s two largest cities, Sydney and Melbourne. After years of under-investment, Australia ’s urban transit systems are facing widening revenue shortfalls. In terms of new investments, light rail is popular with local elected officials, while transit professionals generally favor bus rapid transit. Support is also growing for transit-oriented development to combat auto dependence and better coordinate public transportation investments with private land use decisions. Early twentieth-century land use patterns in Australia ’s major East Coast cities — Sydney, Melbourne, and Brisbane —were shaped by a combination of privately and publicly developed streetcar systems. As a result, the inner ring of older suburban neigh - borhoods in all three cities is compact and walkable.
    [Show full text]
  • An Investigation of the Causes of Over-Optimistic Patronage Forecasts for Selected Recent Toll Road Projects 8 December 2011
    Revised Final Report Department of Infrastructure and Transport An investigation of the causes of over-optimistic patronage forecasts for selected recent toll road projects 8 December 2011 Executive Summary The Australian Government Department of Infrastructure and Transport is investigating the causes of over-optimistic patronage forecasts with the purpose of identifying potential remedies. This report contributes to that investigation via case studies of selected toll road projects to identify challenges in processes and opportunities for improvements, so that lessons from the past may guide practice in the future. Two major cases CityLink (Melbourne) and Lane Cove Tunnel (Sydney) with two supporting cases Westlink M7 (Sydney) and the Go Between Bridge (Brisbane) were chosen for coverage of geography, timing, physical characteristic and forms of funding. Desktop research supported by interviews with stakeholders covering the spectrum of stakeholders in the road procurement process found: PPP bidding processes for toll roads lead to selection of the most optimistic of optimistic forecasts: Government forecasts, erring on the high side to avoid under-estimating environmental impacts, may set a forecast ‘floor’ Traffic modellers in bid teams produce a ‘low’ forecast above this floor for debt lenders and a ‘high’ estimate of possible returns for those taking equity Equity forecasts are submitted with bids and the highest forecast almost always wins. Four-step models used in most toll road forecasts: Have some intrinsic positive biases when modelling toll road patronage More importantly they provide many opportunities for optimistic selection of parameters Optimism can more easily occur in the absence of data for example about values of time or traffic flow by day of week and month of year; and Estimates of ramp up in traffic after opening may be especially subject to optimism; and/or Deliberate selections to raise forecasts, such has high growth rates for population or the economy, may be applied.
    [Show full text]
  • Beaches Link and Gore Hill Freeway Connection Scoping Report BLANK PAGE Document Controls
    October 2017 Beaches Link and Gore Hill Freeway Connection Scoping Report BLANK PAGE Document controls Title: Beaches Link and Gore Hill Freeway Connection Scoping report Approval and authorisation Prepared by: Arcadis | Jacobs Accepted on behalf of Roads and Maritime Camilla Drover Services NSW by: Executive Director Motorways Signed: Date: 30/10/2017 Location File name BL_Scoping Report_Final Document status Date Final Scoping Report 30 October 2017 © Roads and Maritime Services NSW Executive summary Introduction and need The Western Harbour Tunnel and Beaches Link is a NSW Government initiative to provide additional road network capacity across Sydney Harbour and to improve connectivity with Sydney’s northern beaches. The Western Harbour Tunnel and Beaches Link program of works includes: The Western Harbour Tunnel and Warringah Freeway Upgrade project, comprising a new tolled motorway tunnel connection across Sydney Harbour, and the Warringah Freeway Upgrade to integrate the new motorway infrastructure with the existing road network and to connect to the Beaches Link and Gore Hill Freeway Connection The Beaches Link and Gore Hill Freeway Connection, including a new tolled motorway tunnel connection from the Warringah Freeway to Balgowlah and Frenchs Forest, and upgrade and integration works to connect to the Gore Hill Freeway. This scoping report relates to the Beaches Link and Gore Hill Freeway Connection (the project). A separate application and scoping report has been prepared for the Western Harbour Tunnel and Warringah Freeway Upgrade project. The project would involve construction and operation of a 7.5 kilometre, tolled twin tunnel motorway to improve transport connections to the Northern Beaches, reduce road congestion, improve amenity and provide better access to employment centres.
    [Show full text]
  • ENG4111 Preliminary Report
    University of Southern Queensland Faculty of Engineering and Surveying Own Identification of contributing factors for the success of toll roads in Australia under Public Private Partnerships A Dissertation submitted by Mr Luke Diffin In fulfilment of the requirements of Bachelor of Engineering (Civil) October 2015 ABSTRACT In Australia, Public Private Partnerships (PPPs) have been established as a common method for governments to deliver major road infrastructure projects. Success of PPPs has varied when measured against Government, Community, Market and Industry interests. Some projects have failed financially while still having a positive impact on the community. Other projects have failed to reach delivery stage as a result of community objections. The holistic success of PPP toll roads is ultimately determined by the needs of major project participants being satisfied in an unbiased equilibrium manner. PPP toll roads delivered in Sydney, Brisbane and Melbourne have had varying degrees of financial success, however there are other vitally important factors to be considered. Tollways directly contribute to travel time savings, vehicle operating cost savings, reduced accidents and vehicle emissions and can make a contribution to the overall economic performance of a city. Therefore these pieces of infrastructure contribute to society as a whole and not just the investors who provide capital for the projects. Even with recent financial failings of PPP toll roads, Governments within Australia are still actively pursuing the PPP model to deliver road infrastructure. Lessons must be learnt from past failures to ensure the successful delivery and operation of future projects. Overall success will be a result of finding a balance between the needs of Government, Private Sector and Society.
    [Show full text]