The United Republic of Tanzania

Total Page:16

File Type:pdf, Size:1020Kb

The United Republic of Tanzania THE UNITED REPUBLIC OF TANZANIA MINISTRY OF WORKS, TRANSPORT AND COMMUNICATION REGIONAL MANAGER’S OFFICE - TANROADS NJOMBE TENDER No. AE/001/2019 – 20/NJ/W/ 12 – 17 & 19 - 30. FOR ROUTINE/RECURRENT, PERIODIC MAINTENANCE, SPOT IMPROVEMENT REHABILITATION, UPGRADING TO DOUBLE SURFACE DRESSING WORKS, BRIDGE MAJOR REPAIR AND PREVENTIVE MAINTENANCE WORKS IN NJOMBE REGION. INVITATION FOR TENDERS. 20th July, 2019 1. This Invitation for Tenders follows the General Procurement Notice for these Projects which appeared in The Public Procurement Authority Journal, Tender Portal and TANROADS HQ Website Issued on Saturday 01st June, 2019 for Financial Year 2019 / 2020 2. The Government of Tanzania has set aside funds for the operation of the Tanzania National Roads Agency (TANROADS) - Njombe during the financial year 2019/2020. It is intended that part of the proceeds of the fund will be used to cover eligible payment under the contract for the; Routine/Recurrent, Periodic Maintenance, Spot Improvement, Rehabilitation , Upgrading to Double Surface Dressing and Bridge Major Repair & Preventive Maintenance Works in Njombe Region. 3. The Regional Manager TANROADS Njombe on behalf of the Chief Executive TANROADS now invites sealed tenders from eligible National Civil Contractors (Local) Registered in Class Seven (7) or above for the execution of works as indicated below; SNo. Bid No. Bid Name. Approximate Major Quantities CRB Class 2 • Grass Cutting 636,000.0m • De-silting of Mitre/ Side drains 6,400.0m • Heavy desilting of road side drains 5,000.0m3 Routine/Recurrent VII 1. AE/001/2019 - 20/NJ/W/12 • De-silting of structures 64.0m3 Maintenance Works along Idofi and • Concrete class 15 & 20 24.0m3 - Iyayi (TANZAM Highway above • Road Signs 13Nos. Long Term Contract) (Paved) • Stone Masonry 10.0m3 Routine/ Recurrent • Grass Cutting 172,000.0m2 Maintenance Works along • De-silting of Mitre/ side drains 16,608.0m Njombe (Ramadhani) - Iyayi, • De-silting of Structures 320.0m3 Chalowe - Igwachanya, Halali • Road Marking 1,795.0m2 VII 2. AE/001/2019 - 20/NJ/W/13 - Ilembula - Itulahumba, • Prepare Pothole for Patching 275.0m2 and Kikondo – Makete and • Premix Surface Layer for Patching 12.65m3 above Ndulamo - Nkenja - Kitulo I • Excavation of mitre drains 600.m3 Regional Road (Paved) Long Term Contract. Routine/ Recurrent • Grass Cutting 24,000.0m2 Maintenance Works along • De-silting of Road side drains 11,180.0m Ludewa - Lupingu Regional • Road Marking 250.0m2 VII 3. AE/001/2019 - 20/NJ/W/14 Road (Paved) and Itoni - • Prime Coat on base course 200.0m2 and Ludewa - Manda (Ludewa & 3 • Cement Stabilisation 40.0m above Nsungu Village) Trunk Road • Prepare Pothole for Patching 40.0m3 (Paved). Long Term Contract • Premix Surface Layer for Patching 100.0m3 • Concrete Class 20 36.0m3 • Repair Lined Ditch Slab 100.0m2 • Guard Rails 68.0m • Grass Cutting 6,100.0m2 Bridge Major Repair and • River Course Cleaning 1,000.0m Preventive Maintenance 2 4. AE/001/2019 - 20/NJ/W/15 Works along Njombe • Painting of Concrete element 165.8m VII 2 (Ramadhani) - Iyayi, Kibena - • Deck and drainage – Deck Cleaning 296.0m and • Concrete Class 20 & 25 28.0m3 Lupembe and Igwachanya - above • Excavation for structures 60.0m3 Usuka - Mng'elenge Regional Road. • Road Signs 2Nos. • Stone Masonry 25.3m3 • Concrete Pipe Culverts 900mm.dia 7.0m • Grass Cutting 35,200.0m2 Bridge Major Repair and • River Course Cleaning 2,100.0m 5. AE/001/2019 - 20/NJ/W/16 Preventive Maintenance • De-silting River Course 2,100.0m VII Works along Makambako - • River Training 700.0m3 and Lukumburu Trunk Road 2 • Painting of Concrete element 60.0m above • Gabions Repair 10.0m3 • Plastering of Stone masonry elements 160.0m2 • Guard Rail 70.0m 3 • Common excavation to spoil 11,850.0m 3 • Fill and Improved Subgrade G15 6,240.0m 2 • Scarifying & compacting 22,000.0m 3 • Subbase Natural Gravel G45 4,000.0m 3 • Stabilization C2 2,700.0m • Prime Coat (MC30, MC70) 18,000 Lts Periodic Maintenance Works • 14mm & 7mm Aggregates 1st & 2nd layer- 6. AE/001/2019 - 20/NJ/W/17 (Upgrading to Bitumen IV 17,000.0m2 Standard) along Njombe and • Road Marking (modified alkyde) 600.0m2 (Ramadhan) - Iyayi Regional above Concrete pipe Culverts 900mm.dia. 50.0m Road • • Road Reserve Marker posts 36Nos • Concrete class 20 400.0m3 • Grouted Stone pitching 350.0m2 Routine/Recurrent, Periodic • Gravelling within FHD 9,255.0m3 Maintenance and Spot • Heavy Grading 78.2km Improvement Works along • De-silting of side drains 2,500.0m V 7. AE/001/2019 - 20/NJ/W/19 Njombe (Ramadhan) - Iyayi, • De-silting of mitre/Catchwater drains 16,986m and Mlevela - Mhaji - Lusisi - • Concrete pipe Culverts 900mm.dia 32.0m above Ibumila and Ilunda - Igongolo • Concrete Class 20 36.0m Regional Road (Unpaved) • Excavation for catchwater 1,700.0m3 • De-silting of Culverts 70.0m3 • End of Road Reserve marker posts 270Nos • Grass Cutting 640.0m2 8. AE/001/2019 - 20/NJ/W/20 Routine/Recurrent, Periodic • Cut and borrow to fill 850.0m3 Maintenance and Spot • Gravelling within FHD 13,800.0m3 V Improvement Works along • Heavy Grading 65.0km and Chalowe - Igwachanya - • De-silting of mitre/Catchwater drains 13,000m above Usuka - Mng'elenge and Halali • 3 Excavation for catchwater 1,700.0m - Ilembula - Itulahumba • De-silting of Culverts 95.0m3 Regional Road (Unpaved) • River Course Cleaning 320.0m2 • Painting of Concrete element 65.0m2 9. AE/001/2019 - 20/NJ/W/21 Routine/ Recurrent and • Site Clearance 48,000.0m2 Periodic Maintenance Works • Cut and Spoil & Gully Fill 7,500.0m3 along Mkiu - Lugarawa - • Gravelling within FHD 23,150.0m3 Madaba (Njombe/Ruvuma • Heavy Grading 44.0km Border) Regional Road • De-silting of mitre drains 9,000.0m V (Unpaved) • Landsilde Removal 2,200.0m3 and • Excavation for mitre drains 1,750.0m3 • Concrete pipe Culverts 900mm.dia 24.0m above • Concrete Class 20 24.0m3 • De-silting of Culverts 200.0m3 • End of Road Reserve marker posts 35Nos • Common excavation to spoil 11,780.0m3 • Rock excavation 600.0m3 • Fill and Improved Subgrade G15 9,820.0m3 • Crossfill 1,800.0m3 • Scarifying & compacting 17,000.0m2 • Subbase Natural Gravel G45 3,400.0m3 • Stabilization C2 2,295.0m3 10. AE/001/2019 - 20/NJ/W/22 Periodic Maintenance Works • Prime Coat (MC30, MC70) 16,830m2 IV (Upgrading to Bitumen • 14mm & 7mm Aggregates 1st & 2nd layer- Standard) along Itoni - Ludewa 14,450.0m2 and - Manda (Nsungu Village) • Road Marking (modified alkyde) 170.0m2 above Trunk Road (Paved) • Concrete pipe Culverts 900mm.dia. 72.0m • Road Reserve Marker posts 34Nos • Concrete class 25 & 30 295.0m3 • Grouted Stone pitching 500.0m2 • Hardcore for box Culverts 200.0m3 • Cut and Borrow to Fill 1,040.0m3 Rehabilitation works along • Gravelling Within FHD 4,000.0m3 Ndulamo - Nkenja - Kitulo - • Overhaul for Gravel 1,000.0m3km VII 11. AE/001/2019 - 20/NJ/W/23 Mfumbi, Njombe - Ndulamo - • Heavy Grading 18.0km and Makete and Kikondo - Makete • De-silting of Mitre /Side drains 8,900.0m above Regional Roads. • De-silting of structures 30.0m3 Opening up Lupembe - • Heavy Grading 18.0km Madeke - Taweta/Mfuji (53Km) • De-silting of Mitre /Side drains 4,500.0m and Rehabilitation Works • Concrete Class 25, Hard core & BRC 96.0m3 VII 12. AE/001/2019 - 20/NJ/W/24 along Kibena - Lupembe - • De-silting of structures 20.0m3 and Mfuji (Morogoro/Njombe 2 • Grouted stone pitching 1,800.0m above border Road Unpaved. Rehabilitation works along • Site Clearance 4,800.0m2 Njombe (Ramadhan) - Iyayi, • Gravelling within FHD 8,850.0m3 Igwachanya (Chalowe) - • Heavy Grading 13.0km VI Usuka - Kanamalenga - • De-silting of mitre drains 2,840.0m and 13. AE/001/2019 - 20/NJ/W/25 Ikingula (Mng'elenge) and • Excavation for catchwater 1,203.0m3 above Mlevela - Mhaji - Lusisi - • De-silting of Culverts 22.0m3 Ibumila Regional Roads – • End of Road Reserve marker posts 46Nos Unpaved Rehabilitation Works along • Cut and Spoil 1,000.0m3 Mkiu - Madaba (Ruvuma • Gravelling within FHD 6,100.0m3 Border) and Ikonda - Lupila - • Heavy Grading 9.0km VI 14. AE/001/2019 - 20/NJ/W/26 Mlangali Regional Roads • De-silting of mitre drains 950.0m and Unpaved. • Landsilde Removal 800.0m3 above • Gully Fill 100.0m3 • Excavation for mitre drains 1,530.0m3 • Cut and Spoil 5,600.0m3 Rehabilitation Works towards • Gravelling within FHD 1,440.0m3 Tea Plantation Farms in • Heavy Re- shaping 3.5km VII 15. AE/001/2019 - 20/NJ/W/27 Njombe Unpaved Roads along • De-silting of mitre drains 950.0m and Uwemba – Uliwa – Dunduli, 3 • Landsilde Removal 800.0m above (Uliwa – Dunduli Road 3 • Gully Fill 400.0m Section). • Excavation for mitre drains 220.0m3 • Concrete pipe Culverts 900mm.dia 8.0m • Concrete Class 20 8.0m3 • Common excavation to spoil 1,396.0m3 Upgrading to Double Surface • Fill and Improved Subgrade G15 1,172.0m3 Dressing along Ndulamo - • Scarifying & compacting 5,600.0m2 16. AE/001/2019 - 20/NJ/W/28 Nkenja - Kitulo - Matamba - • Subbase Natural Gravel G45 1,080.0m3 VI Mfumbi and Ikonda Hospital • Stabilization C2 750.0m3 and Regional Roads. • Prime Coat (MC30, MC70) 5500lts above • 14mm & 7mm Aggregates 1st & 2nd layer- 5,000.0m2 • Concrete class 20. 520.0m3 • Common excavation to spoil 3,470.0m3 Upgrading to Double Surface • Fill and Improved Subgrade G15 1,782.0m3 Dressing of Njombe Regional • Scarifying & compacting 5,600.0m2 Hospital Road, Igwachanya • Subbase Natural Gravel G45 920.0m3 VI 3 Township, Makambako • Stabilization C2 495.0m and 17. AE/001/2019 - 20/NJ/W/29 Township and Makambako • Prime Coat (MC30, MC70) 3,300lts above JWTZ Access Road • 14mm & 7mm Aggregates 1st & 2nd layer- 2,950.0m2 • Road Marking (modified alkyde) 330.0m2 • Concrete pipe Culverts 900mm.dia.
Recommended publications
  • Mkoa Wa Njombe Orodha Ya Wanafunzi Waliochaguliwa Kujiunga Na Shule Za Sekondari Kidato Cha Kwanza Januari 2021 A.Shule Za Bweni 1
    MKOA WA NJOMBE ORODHA YA WANAFUNZI WALIOCHAGULIWA KUJIUNGA NA SHULE ZA SEKONDARI KIDATO CHA KWANZA JANUARI 2021 A.SHULE ZA BWENI 1. UFAULU MZURI (SPECIAL SCHOOLS) I. WAVULANA Na. NAMBA YA PREM JINA LA MWANAFUNZI SHULE ATOKAYO HALMASHAURI ILIPO SHULE AENDAYO 1 20141473414 EGAN GABRIEL NYUNJA MAMALILO LUDEWA DC KIBAHA 2 20143026593 DEUSDEDITH ADALBERT MGIMBA MAMALILO LUDEWA DC MZUMBE 3 20141421779 CLEVER KISWIGO MWAIKENDA ST.MONICA MAKETE DC MZUMBE 4 20140550889 FLOWIN VENANCE NGAILO SAINT MARYS' NJOMBE TC ILBORU 5 20141210886 MAKUNGANA ISDORY NYONI ST. BENEDICT NJOMBE TC KIBAHA 6 20141488623 GIDION HERMAN SHULI SIGRID MAKAMBAKO TC MZUMBE 7 20141488632 JOSEPH DAUD BEHILE SIGRID MAKAMBAKO TC KIBAHA 8 20140417413 OMEGA ADAMU KINYAMAGOHA IGIMA WANGING'OMBE DC ILBORU 9 20141421798 NASSAN CHRISTIAN KALINGA ST.MONICA MAKETE DC MZUMBE 10 20140821466 ABELINEGO FIDELIS MPONDA HAVANGA NJOMBE DC ILBORU 11 20140371530 KELVIN BEATUS MDZOVELA IGWACHANYA WANGING'OMBE DC ILBORU 2. SHULE ZA SEKONDARI UFUNDI Na. NAMBA YA PREM JINA LA MWANAFUNZI SHULE ATOKAYO HALMASHAURI ILIPO SHULE AENDAYO 1 20141210890 MARK - ERNEST ERNEST LUHANGANO ST. BENEDICT NJOMBE TC TANGA TECHNICAL 2 20141473370 BRIAN GABRIEL NYUNJA MAMALILO LUDEWA DC TANGA TECHNICAL 3 20141347868 ROBBY FRANK ILOMO UHURU MAKAMBAKO TC IFUNDA TECHNICAL 4 20140550884 ALPHA FAUSTINO MTITU SAINT MARYS' NJOMBE TC IFUNDA TECHNICAL 5 20141396387 MALIKI ALLY CHIEE MAMALILO LUDEWA DC TANGA TECHNICAL 6 20140156511 PETRO GODFRID MWALONGO MAMALILO LUDEWA DC IFUNDA TECHNICAL 7 20141488639 LOUIS NESTORY WILLA SIGRID
    [Show full text]
  • United Republic of Tanzania
    United Republic of Tanzania The United Republic of Tanzania Jointly prepared by Ministry of Finance and Planning, National Bureau of Statistics and Njombe Regional Secretariat Njombe Region National Bureau of Statistics Njombe Dodoma November, 2020 Njombe Region Socio-Economic Profile, 2018 Foreword The goals of Tanzania’s Development Vision 2025 are in line with United Nation’s Sustainable Development Goals (SDGs) and are pursued through the National Strategy for Growth and Reduction of Poverty (NSGRP) or MKUKUTA II. The major goals are to achieve a high-quality livelihood for the people, attain good governance through the rule of law and develop a strong and competitive economy. To monitor the progress in achieving these goals, there is need for timely, accurate data and information at all levels. Problems especially in rural areas are many and demanding. Social and economic services require sustainable improvement. The high primary school enrolment rates recently attained have to be maintained and so is the policy of making sure that all pupils who passed Primary School Leaving Examination must join form one. The Nutrition situation is still precarious; infant and maternal mortality rates continue to be high and unemployment triggers mass migration of youths from rural areas to the already overcrowded urban centres. Added to the above problems, is the menace posed by HIV/AIDS, the prevalence of which hinders efforts to advance into the 21st century of science and technology. The pandemic has been quite severe among the economically active population leaving in its wake an increasing number of orphans, broken families and much suffering. AIDS together with environmental deterioration are problems which cannot be ignored.
    [Show full text]
  • United Republic of Tanzania President’S Office Regional Administration and Local Government
    UNITED REPUBLIC OF TANZANIA PRESIDENT’S OFFICE REGIONAL ADMINISTRATION AND LOCAL GOVERNMENT WANGING’OMBE DISTRICT COUNCIL COUNCIL STRATEGIC PLAN FOR THE YEAR 2015/16 – 2019/20 Prepared by, District Executive Director, Wanging’ombe District Council, P.O.Box 64, WANGING’OMBE – NJOMBE REGION EXECUTIVE SUMMARY Wanging’ombe is a relatively newly established District council which was officially registered on 18, March, 2013. Like any other Council in Tanzania, Wanging’ombe district council operates with statutory powers and in line with legislation and regulations enacted by the parliament under the Local Government Act No. 7 of 1982. The council is given wide-ranging functions include: To maintain and facilitate the maintenance of peace, order and good governance in their area of jurisdiction, To promote the social welfare and economic well-being of all persons within its area of jurisdiction; Subject to the national policy and plans for the rural and urban development, to further the social and economic development of its area of jurisdiction. In fulfilling the Wanging’ombe district council’s functions, the district requires a comprehensive decision making to trigger sustainable local economic development through strategic planning at local level. This strategic plan will assist the District council to improve performance, to create more relevant institutional structures, to increase levels of institutional, departmental, and individual accountability; to improve transparency and communication between management, employees and stakeholders and to establish priorities for efficient and effective use of resource. This strategic plan document is divided into Five Chapters, where first chapter provides background information and strategic planning process, second chapter provides situational analysis of the district where a through diagnosis of the internal environment in 19 service areas was conducted, as well as the external environment which the district is operating under in executing this strategic plan.
    [Show full text]
  • An End of Project Review for the Agro-Dealer Development Project Funded by Agra in Tanzania
    AN END OF PROJECT REVIEW FOR THE AGRO-DEALER DEVELOPMENT PROJECT FUNDED BY AGRA IN TANZANIA FINAL REPORT Prepared by: Kobe Konsult Ltd JUED Business Centre, 34 Garden Road, Mikocheni A, P.O. Box 32187, Dar es Salaam Phone: +255 22 277 4436 / 0754 300 767 Fax: +255 22 277 4426 Email: [email protected] August 2012 TABLE OF CONTENTS LIST OF FIGURES .................................................................................................................. iv LIST OF TABLES ...................................................................................................................... v ACKNOWLEDGEMENTS ..................................................................................................... vii Executive Summary ................................................................................................................ viii 1.0 INTRODUCTION................................................................................................................. 1 1.1 Background and Rationale ....................................................................................... 1 1.2 Evaluation Objectives and Scope ............................................................................. 1 1.2.1 Specific objectives ........................................................................................................ 2 2.0 METHODOLOGY AND APPROACH ............................................................................. 2 2.1 Review of Secondary Data .......................................................................................
    [Show full text]
  • Potentials of Agrarian Cluster Development for Improving Smallholder’S Income – a Case Study from the SAGCOT Initiative in Tanzania
    _______________________________________________________________ Universität zu Köln Mathematisch-Naturwissenschaftliche-Fakultät Geographisches Institut Bachelorarbeit zur Erlangung des Grades „Bachelor of Science“ Potentials of Agrarian Cluster Development for Improving Smallholder’s Income – a case study from the SAGCOT initiative in Tanzania Veronika Charlotte Steffens Matrikelnummer: 5639913 [email protected] Richard-Wagner-Str. 22 Eingereicht am 21.11.2016 Erstgutachter: Prof. Dr. Peter Dannenberg 50181 Bedburg Zweitgutachter: Prof. Dr. Javier Revilla Diez Tel.: 0174 957 11 24 – 0 – . Table of Contents . LIST OF FIGURES ......................................................................................................... II LIST OF ABBREVIATIONS .......................................................................................... III 1 INTRODUCTION ......................................................................................................... 1 2 CONCEPTIONAL BACKGROUND: POTENTIALS OF CLUSTER-BASED DEVELOPMENT IN AGRICULTURE ............................................................................. 2 2.1 THE IDEA OF CLUSTER AND CLUSTER INITIATIVE – GENERAL DEFINITIONS ........................................ 2 2.2 CLUSTER-RELATED CONCEPTS FOR AGRICULTURAL AND RURAL DEVELOPMENT ............................... 4 2.3 TAKING THE CONCEPT TO THE GLOBAL SOUTH: CLUSTER DEVELOPMENT PROGRAMS IN AFRICA ... 6 2.4 FRAMEWORK FOR ANALYSIS ........................................................................................................................
    [Show full text]
  • A Report on Avocado Value Chain Mapping in Siha And
    A REPORT ON AVOCADO VALUE CHAIN MAPPING IN SIHA AND NJOMBE DISTRICTS May 20th, 2014 Prepared by Hebron A. Mwakalinga P.O. Box 78496, Dar es Salaam Phone : +255 786 171 000 E-mail: [email protected] Report on Avocado Value Chain Mapping in Siha and Njombe ACKNOWLGEMENT AND DISCLAIMER The Consultant thanks UNDP and MIT for awarding this interesting and important assignment of mapping avocado value chain in Siha and Njombe. It is important because of the potential the crop has in improving rural household incomes, foreign exchange earnings, nutrition to Tanzanians as well as environment protection. The Consultant team acknowledges the support received from UNDP and MIT staff namely Mr. Ernest Salla – Practice Specialist Trade/Private Sector Development, Mr Yona Shamo – Procurement Associate and Ms Irene Kajuna – Procurement Analyst. At the Ministry of Industry and Trade the work was supervised by SME Department Staff particularly Dr. Fidea Mgina – Assistant Director and Mr. Deogratius Sangu – Trade Officer who also accompanied the team in the field. In Kilimanjaro we acknowledge RAS staff namely Mr. Simon Msoka and Frederick Mushi for their assistance in gathering production data from District Councils and Mr. Frederick Mushi for participating at the Siha’s stakeholders’ workshop. At Siha the Acting District Executive Director Mr. Jonas P. Moses is thanked by the Team for gracing the workshop. Special appreciations go to Mr. A. Siayo Agriculture Officer who coordinated all field activities in Siha. In Njombe special thanks are extended to Njombe Regional Commissioner Captain A. G. Msangi who dedicated about two hours of his precious time for consultation with the study team, alongside the Regional Commissioner were the Assistant RAS – Productive Sector Mr.
    [Show full text]
  • Evaluation of the Bringing Nutrition to Scale Project in Iringa, Mbeya and Njombe
    Evaluation of the Bringing Nutrition to Scale Project in Iringa, Mbeya and Njombe Regions (2013–2017) Evaluation Report 23 April 2018 Prepared by Stephen Turner (Team Leader) Bjorn Ljungqvist Joyce Kinabo Jim Grabham Proposal contacts: Evaluation of Bringing Nutrition to Scale in Iringa, Mbeya and Njombe ACKNOWLEDGEMENTS AND DISCLAIMER The evaluation team are grateful to the nutrition colleagues at the UNICEF Country Office in Dar es Salaam and the Sub-office in Mbeya for all their support in providing information and facilitating meetings throughout this assignment. Quality support for the evaluation has been provided by the QS team assigned to the evaluation: Stephen Anderson (Food Economy Group) and Stephen Lister (Mokoro Ltd). The authors take full responsibility for the contents of this report. The designations employed, maps and the presentation of the material in this document do not imply the expression of any opinion whatsoever on the part of UNICEF concerning the legal status of any country, territory, city or area, or of its authorities, or concerning the delineation of its frontiers or boundaries. ii Evaluation of Bringing Nutrition to Scale in Iringa, Mbeya and Njombe Contents Summary v 1. Introduction __________________________________________________ 1 1.1. Evaluation purpose and scope ___________________________________ 1 1.2. Country context ______________________________________________ 1 1.3. Nutrition in Tanzania and the project area __________________________ 2 2. The BNTS and ASRP projects _____________________________________ 5 2.1. Project description ____________________________________________ 5 2.2. Key stakeholders and linkages ___________________________________ 8 2.3. Summary of reported performance ______________________________ 10 3. Approach and methods _________________________________________ 11 3.1. Evaluation approach __________________________________________ 11 3.2.
    [Show full text]
  • Annual Report 2013 Table of Contents
    SHIPO Annual Report 2013 Table of contents Abbreviations 1 The Board Chairperson’s foreword 2 Program Manager’s foreword 2 Intoduction 3 Where we work 5 The Board 6 Organisation achievements for 2013 7 Water Supply and Management, Hygiene and Sanitation 8 Education and Health 10 Home Based Care 12 SHIPO SMART Training Centre 14 CSR solutions for big companies 15 Independence Torch 16 Donors and Funding 17 Financial Performances 19 Network and alliances 20 Human Resources 21 Contacts 23 Abbriviations ACRA Asociación de Cooperación Rural en Africa CBO Community Based Orgasation CI Connect International COWSO Community Owned Water Supply Organisation CSO Civil Society Organizations CSR Corporate Social Responsibility GRL Green Resources Limited LRTT Limited Resources Teacher Training NGO Non Governmental Organization NJODINGO Njombe District Non Governmental Organization OVC Orphans and Vulnerable Children O&OD Obstacles and Opportunity to Development RWSN Rural Water Supply Network SACCOS Savings and Credit Cooperatives Societies. SHIPO Southern Highlands Participatory Organization SIDO Small-scale Industries Development Organization SMART Sustainable, Market based, Affordable and Reliable Technology SNV Netherlands Development Organization SWASH School Water, Sanitation and Hygiene TAWASANET Tanzania Water and Sanitation Network TLM Teaching and Learning Materials TZS Tanzanian Shillings VAG Village Action Groups WASH Water, Sanitation and Hygiene VETA Vocational Education and Training Authority WDMI Water Development and Management Institute of Tanzania 1 Foreword Board Chairperson’s foreword The Millennium Development Goals (MDG) has been guiding beacons for develop- ment for the past Decade. 2015 is the final year for implementation of the targets set down more than 10 years ago. As an organization, SHIPO has been striving to contrib- ute to reach the MDGs, especially MDG number one being; halve the proportion of people living below the national poverty line by 2015.
    [Show full text]
  • Ministry of Foreign Affairs (Danida)
    Ministry of Foreign Affairs (Danida) Impact Evaluation of HIMA Iringa Region Tanzania Annex 4 Part B: Village Coverage Prepared jointly by: Orbicon A/S Ringstedvej 20 DK-4000 Roskilde Denmark Goss Gilroy Inc. Management Consultants Suite 900, 150 Metcalfe Street Ottawa, Ontario K2P 1P1, Canada October 2007 A substantial and intensive field mission was carried out in the entire Iringa Region during the period from 22 October to 15 December 2006. In the first weeks of this period, the approach and logistics were planned in detail. The intensive field mission per se was initiated from 12 November. The field mission involved a team of eight international consultants, nine Tanzanian consultants, eight enumerators (students from Tsunaimi University, Iringa), four translators and four drivers. Summary of Planned Activities The planned approach included a mixed method of: Household survey (HH) in 12 Njombe villages (repetition of a baseline survey carried out in 1996); PRA (participatory rural appraisal) sessions in 13 HIMA villages (originally 12 but one more village was added during implementation) and six comparison villages; Focus group sessions on general and specific subjects; including on satellite images and interpretation of panoramic photos; Semi-structured interviews with key informants; Ad-hoc interviews in HIMA villages; Site observations The following table provides a complete list of villages visited, cross-referenced with the data collection methods. List of all villages visited District HH PRA Villages Focus Groups Interviews/Site
    [Show full text]
  • Impact Evaluation of HIMA Iringa Region Tanzania
    Ministry of Foreign Affairs (Danida) Impact Evaluation of HIMA Iringa Region Tanzania Annex 12: Bibliography Prepared jointly by: Orbicon A/S Ringstedvej 20 DK-4000 Roskilde Denmark Goss Gilroy Inc. Management Consultants Suite 900, 150 Metcalfe Street Ottawa, Ontario K2P 1P1, Canada October 2007 Bibliography 1. Ako, A.M.L. The Inventory of Indigenous Trees Existing Within The Local Community of Kilolo and Mazombe Divisions - Iringa District. Commissioned for the Environmental Data Bank, Royal Danish Embassy. Uni. Of Dar es Salaam. 1993. 2. Andersen, M.H. Community Participation in HIMA – Njombe. PMU Njombe. 1997. 3. Andrew, Dr. W. Identification report and Preliminary Project Proposal for Makete District. Danida. 1991. 4. ASPS, Agricultural Sector Programme Support (ASPS). Lessons learned and future strategic directions: A brainstorming sessions to be held in Dar es Salaam, the Courtyard Hotel 6th June 2001 8:30 am to 17:00 pm.2001. 5. ASPS/DADS. Makete District Council. Status Report for Makete District Field Officers. 2002. 6. ASPS HIMA Iringa. Annual Activity Monitoring Report. Jan – Dec 2002. 7. ASPS HIMA Iringa. Component Support to HIV/AIDS related activities in Iringa Region.2002. 8. ASPS HIMA Iringa. RPMU: Discussion Paper on Future Directions For the HIMA Programme in the Next Phase. 31 May 2001. 9. Athanase, Z., Monitoring Co-ordinator. ASPS HIMA: Monitoring Manual, Monitoring Procedures, and simplified Navision Monitoring Manual. HIMA- RPMU. 2002. 10. Bacas. ASPS Component E (HIMA). Impact Study. Danida.1999. 11. Bro, Carl. Evaluation Report Funds Control, Visit Concerning The HIMA Danida Project. 1997. 12. Bro, Carl. HIMA-Iringa. Monitoring System Specification. Danida.1996.
    [Show full text]
  • The Niombe-Makete Road: an Impact Assessment of an ATAP Funded
    The Niombe-Makete Road: An Impact Assessment of an ATAP Funded Road Improvement Project Kimberley Lucas, University of Kentucky, Team Leader Dr. Vedasto Rutachokozibwa, Sokoine University of Agriculture Elizabeth Tagora, Ministry of Works with : Njombe: Natalia Lubote S.S. Lwilila Charles Joseph Ernest Katemba Edwin Mwakabuta Makete: Elly Abdulah Addy Siwingwa Jumanne Majenzi Cleophas Lungwa September 1995 Dar es Salaam, Tanzania TABLE OF CONTENTS Executive Summary I. Introduction 11. The Njombe-Makete Area 111. The Social & Development Backdrop IV. General Village Characteristics *Population "Village Services "Education *Health *Water and Fuel v. Transportation and Roadworks VI. Business Surveys VII Household Surveys *Household Structure and Composition *Agriculture and Livestock *Income and Expenditure "Standards of Living VIII.Conclusions and Impact Summation Bibliography and Selected References Appendices: Appendix 1-Photographic Documentation Appendix 2-Survey Forms Appendix 3-Maps "b - -- Tables 1. Village Populations 2. Makete Village Services 3. Njombe Village Services 4. Retail Services 5. Skilled Trades Services 6. Primary School Teacher-Student Ratios 7A. Opinion Poll: Transportation: % Rated Bad or Very Bad B. : % Rated Good or Very Good Table of Contents (cont.) 8A. Makoga Traffic Count 1995, August 3-9 B. Makoga Traffic Count 1993, May 12- 16 and % Increase 9. Passenger Fares 1995 10. Vehicle Operating Costs (1995 vs 1993) 11A. Most Frequent Use of Road 1995: Men 11B. Most Frequent Use of Road 1995: Women Availability of
    [Show full text]
  • 2012 Population and Housing Census
    The United Republic of Tanzania 2012 POPULATION AND HOUSING CENSUS Population Distribution by Administrative Areas National Bureau of Statistics Ministry of Finance Dar es Salaam and Office of Chief Government Statistician President’s Office, Finance, Economy and Development Planning Zanzibar March , 2013 Foreword The 2012 Population and Housing Census (PHC) for United Republic of Tanzania was carried out on the 26th August, 2012. This was the fifth Census after the Union of Tanganyika and Zanzibar in 1964. Other Censuses were carried out in 1967, 1978, 1988 and 2002. The 2012 PHC, like others, will contribute to the improvement of quality of life of Tanzanians through the provision of current and reliable data for development planning, policy formulation and services delivery as well as for monitoring and evaluating national and international development frameworks. The 2012 PHC is unique in the sense that, the information collected will be used in monitoring and evaluating the Development Vision 2025 for Tanzania Mainland and Zanzibar Development Vision 2020, Five Year Development Plan 2011/12 – 2015/16, National Strategy for Growth and Reduction of Poverty (NSGRP) commonly known as MKUKUTA and Zanzibar Strategy for Growth and Reduction of Poverty (ZSGRP) commonly known as MKUZA. The census will also provide information for the evaluation of the Millennium Development Goals (MDGs) in 2015. The Poverty Monitoring Master Plan, which is the monitoring tool for NSGRP and ZSGRP, mapped out core indicators for poverty monitoring against the sequence of surveys, with the 2012 Census being one of them. Several of these core indicators for poverty monitoring will be measured directly from the 2012 Census.
    [Show full text]