December 2019 Progress Report Interstate Bridge Replacement Program December 2019 Progress Report December 2019 Progress Report i This page intentionally left blank. ii Interstate Bridge Replacement Program December 2, 2019 (Electronic Transmittal Only) The Honorable Governor Inslee The Honorable Kate Brown WA Senate Transportation Committee Oregon Transportation Commission WA House Transportation Committee OR Joint Committee on Transportation Dear Governors, Transportation Commission, and Transportation Committees: On behalf of the Washington State Department of Transportation (WSDOT) and the Oregon Department of Transportation (ODOT), we are pleased to submit the Interstate Bridge Replacement Program status report, as directed by Washington’s 2019-21 transportation budget ESHB 1160, section 306 (24)(e)(iii). The intent of this report is to share activities that have lead up to the beginning of the biennium, accomplishments of the program since funding was made available, and future steps to be completed by the program as it moves forward with the clear support of both states. With the appropriation of $35 million in ESHB 1160 to open a project office and restart work to replace the Interstate Bridge, Governor Inslee and the Washington State Legislature acknowledged the need to renew efforts for replacement of this aging infrastructure. Governor Kate Brown and the Oregon Transportation Commission (OTC) directed ODOT to coordinate with WSDOT on the establishment of a project office. The OTC also allocated $9 million as the state’s initial contribution, and Oregon Legislative leadership appointed members to a Joint Committee on the Interstate Bridge. These actions demonstrate Oregon’s agreement that replacement of the Interstate 5 Bridge is vital. As is conveyed in this report, the program office is working to set this project up for success by working with key partners to build the foundation as we move forward toward project development. Following the signing of a Memorandum of Intent by Governor Inslee and Governor Brown on November 18, WSDOT and ODOT signed a Memorandum of Understanding laying out the terms of their cooperation. December 2, 2019 Page 2 The DOTs are prepared to continue the necessary work to engage leaders, stakeholders and the community to arrive at a supported solution, and are eager to maintain momentum toward federal approval for construction. We look forward to your continued support and engagement during this process. Sincerely, Roger Millar, P.E., FASCE, FAICP Kris Strickler, P.E. WSDOT Secretary of Transportation ODOT Director CONTENTS EXECUTIVE SUMMARY .............................................................................................................................. 1 I. BACKGROUND: PREVIOUS INTERSTATE BRIDGE PLANNING WORK ........................................ 4 Previous Planning Efforts .......................................................................................................................... 4 Portland/Vancouver I-5 Trade Corridor.................................................................................................. 4 Portland/Vancouver I-5 Transportation and Trade Partnership Task Force .......................................... 5 Columbia River Crossing Program Development .................................................................................. 6 State Leadership ....................................................................................................................................... 7 Washington Substitute Senate Bill 5806................................................................................................ 7 Washington State 2019-21 Transportation Budget (Engrossed Substitute House Bill 1160) ............... 8 Oregon Governor and Transportation Commission Actions .................................................................. 9 Bi-State Memorandum of Intent ............................................................................................................. 9 FHWA Repayment Extension .................................................................................................................. 10 II. INITIATING INTERSTATE BRIDGE REPLACEMENT WORK ..................................................... 11 Stakeholder Reengagement .................................................................................................................... 12 Local Partner Agencies ........................................................................................................................ 13 Other Agencies and Governments ...................................................................................................... 13 Public and Other Parties ...................................................................................................................... 14 Bi-State Legislative Engagement ............................................................................................................ 14 State Transportation Commissions ......................................................................................................... 16 Program Office Establishment ................................................................................................................. 17 III. DELIVERING INTERSTATE BRIDGE REPLACEMENT ............................................................... 18 Planning ................................................................................................................................................... 19 Program Management Plan ................................................................................................................. 20 Reevaluate the Purpose and Need ...................................................................................................... 20 December 2019 Progress Report v Reevaluate the Vision and Values ....................................................................................................... 21 Identify a Range of Alternatives ........................................................................................................... 21 NEPA Reevaluation ............................................................................................................................. 22 Reevaluate Environmental Permits ..................................................................................................... 22 Develop a Bridge Authority Report ...................................................................................................... 23 Rule-making for Washington State Transportation Projects of Statewide Significance ...................... 23 Draft Supplemental Environmental Impact Statement ............................................................................ 23 Conceptual Engineering and Data Collection ...................................................................................... 24 Develop a Finance Plan ....................................................................................................................... 24 Publish Draft Supplemental Environmental Impact Statement ............................................................ 25 Final Supplemental Environmental Impact Statement ............................................................................ 26 Address Comments Received on Draft Supplemental Environmental Impact Statement ................... 26 Identify a Locally Preferred Alternative ................................................................................................ 26 Obtain environmental permits and approvals ...................................................................................... 26 Publish a Final Supplemental Environmental Impact Statement ......................................................... 27 Obtain a Federal Record of Decision ................................................................................................... 27 Pre-Construction ...................................................................................................................................... 27 Develop a Program Delivery Plan ........................................................................................................ 28 Complete a Program Finance Plan ...................................................................................................... 28 Begin Right-of-Way Acquisition ........................................................................................................... 28 Develop Construction Documents ....................................................................................................... 29 CONCLUSION ............................................................................................................................................ 30 APPENDIX A: KEY RESOURCES REFERENCED IN THIS REPORT ..................................................... 31 APPENDIX B: CONCEPTUAL INTERSTATE BRIDGE REPLACEMENT PROGRAM TIMELINE .......... 33 TITLE VI NOTICE TO PUBLIC AND AMERICANS WITH DISABILITIES ACT ACCOMMODATIONS ....34 vi Interstate Bridge Replacement Program EXECUTIVE SUMMARY As directed in the Washington State 2019-21 transportation budget (Engrossed Substitute House Bill 1160, Section 306), and the Oregon-Washington Memorandum of Intent on Replacing the I-5 Bridge over the Columbia River signed by Oregon Governor Kate Brown and Washington Governor Jay Inslee on November 18, 2019, this progress report provides a summary of the current and future work that must be successfully completed
Recommended publications
  • Interstate Bridge Replacement Program December 2019 Progress Report
    Interstate Bridge Replacement Program December 2019 Progress Report December 2019 Progress Report i This page intentionally left blank. ii Interstate Bridge Replacement Program December 2, 2019 (Electronic Transmittal Only) The Honorable Governor Inslee The Honorable Kate Brown WA Senate Transportation Committee Oregon Transportation Commission WA House Transportation Committee OR Joint Committee on Transportation Dear Governors, Transportation Commission, and Transportation Committees: On behalf of the Washington State Department of Transportation (WSDOT) and the Oregon Department of Transportation (ODOT), we are pleased to submit the Interstate Bridge Replacement Program status report, as directed by Washington’s 2019-21 transportation budget ESHB 1160, section 306 (24)(e)(iii). The intent of this report is to share activities that have lead up to the beginning of the biennium, accomplishments of the program since funding was made available, and future steps to be completed by the program as it moves forward with the clear support of both states. With the appropriation of $35 million in ESHB 1160 to open a project office and restart work to replace the Interstate Bridge, Governor Inslee and the Washington State Legislature acknowledged the need to renew efforts for replacement of this aging infrastructure. Governor Kate Brown and the Oregon Transportation Commission (OTC) directed ODOT to coordinate with WSDOT on the establishment of a project office. The OTC also allocated $9 million as the state’s initial contribution, and Oregon Legislative leadership appointed members to a Joint Committee on the Interstate Bridge. These actions demonstrate Oregon’s agreement that replacement of the Interstate 5 Bridge is vital. As is conveyed in this report, the program office is working to set this project up for success by working with key partners to build the foundation as we move forward toward project development.
    [Show full text]
  • Columbia River I-5 Bridge Planning Inventory Report
    Report to the Washington State Legislature Columbia River I-5 Bridge Planning Inventory December 2017 Columbia River I-5 Bridge Planning Inventory Errata The Columbia River I-5 Bridge Planning Inventory published to WSDOT’s website on December 1, 2017 contained the following errata. The items below have been corrected in versions downloaded or printed after January 10, 2018. Section 4, page 62: Corrects the parties to the tolling agreement between the States—the Washington State Transportation Commission and the Oregon Transportation Commission. Miscellaneous sections and pages: Minor grammatical corrections. Columbia River I-5 Bridge Planning Inventory | December 2017 Table of Contents Executive Summary. .1 Section 1: Introduction. .29 Legislative Background to this Report Purpose and Structure of this Report Significant Characteristics of the Project Area Prior Work Summary Section 2: Long-Range Planning . .35 Introduction Bi-State Transportation Committee Portland/Vancouver I-5 Transportation and Trade Partnership Task Force The Transition from Long-Range Planning to Project Development Section 3: Context and Constraints . 41 Introduction Guiding Principles: Vision and Values Statement & Statement of Purpose and Need Built and Natural Environment Navigation and Aviation Protected Species and Resources Traffic Conditions and Travel Demand Safety of Bridge and Highway Facilities Freight Mobility Mobility for Transit, Pedestrian and Bicycle Travel Section 4: Funding and Finance. 55 Introduction Funding and Finance Plan Evolution During
    [Show full text]
  • Hood River – White Salmon Interstate Bridge Replacement Project SDEIS
    (OR SHPO Case No. 19-0587; WA DAHP Project Tracking Code: 2019-05-03456) Draft Historic Resources Technical Report October 1, 2020 Prepared for: Prepared by: In coordination with: 111 SW Columbia 851 SW Sixth Avenue Suite 1500 Suite 1600 Portland, Oregon 97201 Portland, Oregon 97204 This page intentionally left blank. TABLE OF CONTENTS Executive Summary ................................................................................................................................. 1 1. Introduction .................................................................................................................................. 1 2. Project Alternatives ....................................................................................................................... 3 2.1. No Action Alternative .......................................................................................................... 7 2.2. Preferred Alternative EC-2 ................................................................................................... 8 2.3. Alternative EC-1 ................................................................................................................ 14 2.4. Alternative EC-3 ................................................................................................................ 19 2.5. Construction of the Build Alternatives ............................................................................... 23 3. Methodology ..............................................................................................................................
    [Show full text]
  • Interstate 5 Columbia River Crossing Historic Built Environment Technical Report for the Final Environmental Impact Statement
    I N T E R S TAT E 5 C O L U M B I A R I V E R C ROSSING Historic Built Environment Technical Report for the Final Environmental Impact Statement May 2011 Title VI The Columbia River Crossing project team ensures full compliance with Title VI of the Civil Rights Act of 1964 by prohibiting discrimination against any person on the basis of race, color, national origin or sex in the provision of benefits and services resulting from its federally assisted programs and activities. For questions regarding WSDOT’s Title VI Program, you may contact the Department’s Title VI Coordinator at (360) 705-7098. For questions regarding ODOT’s Title VI Program, you may contact the Department’s Civil Rights Office at (503) 986-4350. Americans with Disabilities Act (ADA) Information If you would like copies of this document in an alternative format, please call the Columbia River Crossing (CRC) project office at (360) 737-2726 or (503) 256-2726. Persons who are deaf or hard of hearing may contact the CRC project through the Telecommunications Relay Service by dialing 7-1-1. ¿Habla usted español? La informacion en esta publicación se puede traducir para usted. Para solicitar los servicios de traducción favor de llamar al (503) 731-4128. Interstate 5 Columbia River Crossing Historic Built Environment Technical Report for the Final Environmental Impact Statement This page intentionally left blank. May 2011 Interstate 5 Columbia River Crossing Historic Built Environment Technical Report for the Final Environmental Impact Statement Cover Sheet Interstate 5 Columbia River Crossing Historic Built Environment Technical Report for the Final Environmental Impact Statement: Submitted By: Derek Chisholm Mike Gallagher Rosalind Keeney Elisabeth Leaf Julie Osborne Saundra Powell Jessica Roberts Megan Taylor Parametrix May 2011 Interstate 5 Columbia River Crossing Historic Built Environment Technical Report for the Final Environmental Impact Statement This page intentionally left blank.
    [Show full text]
  • (Interstate Tol1 Bridge) State Route 433 Spanning Langview Ca
    LONGVIEW BRIDGE HAER No. WA-89 (Lewis & Clark Bridge) (Columbia River Bridge) (Interstate Tol1 Bridge) State Route 433 spanning the Columbia River Langview Cawlitz County Washington > WRITTEN HISTORICAL AND DESCRIPTIVE DATA PHOTDBRAPHS HISTORIC AMERICAN ENGINEERINS RECORD NATIONAL PARK SERVICE DEPARTMENT OF THE INTERIOR P.O. BOX 37127 WASHINGTON, D.C. 20013-7127 r H*E£ HISTORIC AMERICAN ENGINEERING RECORD LONGVIEW BRIDGE (Lewis and Clark Bridge) I- * (Columbia River Bridge) (Interstate Toll Bridge) HAER No. WA-89 Location: State Route 433 spanning the Columbia River between Multnomah County, Oregon and Cowlitz County, Washington; beginning at milepost 0.00 on state route 433. UTM: 10/503650/5106420 10/502670/5104880 Quad: Rainier, Oreg.-Wash, Date of Construction: 1930 Engineer: Joseph B. Strauss, Strauss Engineering Corp., Chicago, IL Fabricator/Builder: Bethlehem Steel Company, Steelton, PA, general contractor Owner: 1927-1935: Columbia River—Longview Bridge Company. 1936-1947: Longview Bridge Company operated by Bethlehem Steel. 1947-1965: Washington Toll Bridge Authority. 1965 to present: Washington Department of Highways, since 1977, Washington State Department of Transportation, Olympia, Washington• Present Use: Vehicular and pedestrian traffic Significance: The Longview Bridge, designed by engineer Joseph B. Strauss, was at time of construction the longest cantilever span in North America with its 1,200' central section. Extreme vertical and horizontal shipping channel requirements requested by Portland, Oregon, as a means to prevent the bridge's construction created the reason for such an imposing structure. Historian: Robert W. Hadlow, Ph.D., August 1993 LONGVIEW BRIDGE • HAER No. WA-89 (Page 2) History of the Bridge The Longview Bridge was built as part of an entrepreneurial dream to make the city of Longviev a thriving Columbia River port city.
    [Show full text]
  • Frog Ferry Presentation
    Frog Ferry Portland-Vancouver Passenger Water Taxi Service Frog= Shwah-kuk in the Chinookan Tribal Language, Art: Adam McIssac CONFIDENTIAL-Susan Bladholm Version 2018 Q1 Canoes and Frog Mythology on the Columbia & Willamette Rivers The ability to travel the waters of the Columbia and Willamette rivers has allowed people to become intertwined through trade and commerce for centuries by canoe. The journal entries of Lewis and Clark in 1805 described the shores of the Columbia River as being lined with canoes elaborately carved from cedar trees. The ability to navigate these waterways gave the Chinook people control over vast reaches of the Columbia River basin for hundreds of years. The area surrounding the Columbia and Willamette rivers is steeped in a rich mythology told to us through early ethnographers who traveled the river documenting Native American inhabitants and their culture. According to Chinookan mythology, Frog (Shwekheyk in Chinook language), was given the basics of weavable fiber by his relatives, Snake and omnipotent Coyote. With this fiber, Frog was given the task of creating the cordage for the weaving of the first fishing net. With this net, made from fibers of nettle plants, Frog had made it possible for the new human beings to catch their first salmon. Coyote tested the net, with the guidance and wisdom of his three sisters, thereby establishing the complex set of taboos associated with the catching of the first salmon of the season. The Chinook people would never eat or harm Frog for his association to them would always protect him. That is why you should always step around frogs and never over them.
    [Show full text]
  • Interstate 5 Columbia River Crossing
    I NTERSTATE 5 C OLUMBIA R IVER C ROSSING Neighborhoods and Population Technical Report May 2008 TO: Readers of the CRC Technical Reports FROM: CRC Project Team SUBJECT: Differences between CRC DEIS and Technical Reports The I-5 Columbia River Crossing (CRC) Draft Environmental Impact Statement (DEIS) presents information summarized from numerous technical documents. Most of these documents are discipline- specific technical reports (e.g., archeology, noise and vibration, navigation, etc.). These reports include a detailed explanation of the data gathering and analytical methods used by each discipline team. The methodologies were reviewed by federal, state and local agencies before analysis began. The technical reports are longer and more detailed than the DEIS and should be referred to for information beyond that which is presented in the DEIS. For example, findings summarized in the DEIS are supported by analysis in the technical reports and their appendices. The DEIS organizes the range of alternatives differently than the technical reports. Although the information contained in the DEIS was derived from the analyses documented in the technical reports, this information is organized differently in the DEIS than in the reports. The following explains these differences. The following details the significant differences between how alternatives are described, terminology, and how impacts are organized in the DEIS and in most technical reports so that readers of the DEIS can understand where to look for information in the technical reports. Some technical reports do not exhibit all these differences from the DEIS. Difference #1: Description of Alternatives The first difference readers of the technical reports are likely to discover is that the full alternatives are packaged differently than in the DEIS.
    [Show full text]
  • Transit Technical Report for the Final Environmental Impact Statement
    I N T E R S TAT E 5 C O L U M B I A R I V E R C ROSSING Transit Technical Report for the Final Environmental Impact Statement December 2010 Title VI The Columbia River Crossing project team ensures full compliance with Title VI of the Civil Rights Act of 1964 by prohibiting discrimination against any person on the basis of race, color, national origin or sex in the provision of benefits and services resulting from its federally assisted programs and activities. For questions regarding WSDOT’s Title VI Program, you may contact the Department’s Title VI Coordinator at (360) 705-7098. For questions regarding ODOT’s Title VI Program, you may contact the Department’s Civil Rights Office at (503) 986- 4350. Americans with Disabilities Act (ADA) Information If you would like copies of this document in an alternative format, please call the Columbia River Crossing (CRC) project office at (360) 737-2726 or (503) 256-2726. Persons who are deaf or hard of hearing may contact the CRC project through the Telecommunications Relay Service by dialing 7-1-1. ¿Habla usted español? La informacion en esta publicación se puede traducir para usted. Para solicitar los servicios de traducción favor de llamar al (503) 731-4128. Cover Sheet Transit Technical Report Columbia River Crossing Submitted By: Elizabeth Mros-O’Hara, AICP Kelly Betteridge Theodore Stonecliffe, P.E. This page left blank intentionally. Interstate 5 Columbia River Crossing i Transit Technical Report for the Final Environmental Impact Statement TABLE OF CONTENTS 1. INTRODUCTION ..................................................................................................................................... 1-1 1.1 Background ..................................................................................................................................................
    [Show full text]
  • White Salmon Interstate Bridge Replacement Supplemental Draft EIS I
    ODOT Key No.: 21280 This page intentionally left blank. This page intentionally left blank. Notice of Document Availability This Supplemental Draft EIS is available for review at the following locations: Port of Hood River (by appointment) 1000 E. Port Marina Drive Hood River, OR 97031 Note: Washington residents can contact the Port to schedule an appointment to view the document in Klickitat County White Salmon Valley Community Library (limited services during the COVID-19 pandemic) 77 NE Wauna Avenue White Salmon, WA 98672 Stevenson Community Library (limited services during the COVID-19 pandemic) 120 NW Vancouver Avenue Stevenson, WA 98648 These documents are also available on the Project website: https://portofhoodriver.com/bridge/bridge-replacement- project/. At the time of publication, Port of Hood River offices are closed due to COVID-19. If you would like to review a hard copy of the Supplemental Draft EIS, please contact the Port at [email protected] or 541-386-1645 to make arrangements for review of the hard copy. The Supplemental Draft EIS can also be viewed at the White Salmon Valley Community Library and the Stevenson Community Library which are open with limited services during the COVID-19 pandemic. How to Submit Comments Written comments on the Supplemental Draft EIS can be submitted during the public comment period (November 20, 2020, through January 4, 2021) by email to [email protected] or regular mail to: Hood River Bridge Supplemental Draft EIS Kevin Greenwood Port of Hood River 1000 E. Port Marina Drive Hood River, OR 97031 Comments can be submitted orally and in writing at the public hearing for the Supplemental Draft EIS on December 3, 2020.
    [Show full text]
  • FY 2010-11 Unified Planning Work Program
    FY 2010-11 Unified Planning Work Program Transportation Planning in the Portland/Vancouver Metropolitan Area Metro Tualatin Hills Parks & Recreation City of Damascus City of Milwaukie City of Portland City of Wilsonville (SMART) Clackamas County Multnomah County Washington County TriMet Oregon Department of Transportation Southwest Washington Regional Transportation Council Adopted April 15, 2010 FY 2010-11 Unified Planning Work Program Transportation Planning in the Portland/Vancouver Metropolitan Area Metro Tualatin Hills Parks & Recreation City of Damascus City of Milwaukie City of Portland City of Wilsonville (SMART) Clackamas County Multnomah County Washington County TriMet Oregon Department of Transportation Southwest Washington Regional Transportation Council This Unified Planning Work Program (UPWP) has been financed in part through grants from the Federal Highway Administration, Federal Transit Administration, and the Oregon Department of Transportation. The views expressed in this UPWP do not necessarily represent the views of these agencies. Table of Contents Page Overview i Metropolitan Portland Map iv Self-Certification Resolution v Metro Projects I. Transportation Planning Regional Transportation Planning* .............................................................................. 1 Best Design Practices in Transportation ...................................................................... 7 Making the Greatest Place Transportation Support* .................................................. 10 Transportation System Management
    [Show full text]
  • Hood River Bridge Replacement Environmental Studies, Design and Permit Assistance APRIL 25, 2018 April 25, 2018
    CONSULTANT SERVICES FOR Hood River Bridge Replacement Environmental Studies, Design and Permit Assistance APRIL 25, 2018 April 25, 2018 ATTN: Dale Robins Southwest Washington Regional Transportation Council (RTC) 1300 Franklin Street, 4th Floor Vancouver, Washington 98660 Re: Response to RFP Consultant Services for Hood River Bridge Replacement Environmental Studies, Design and Permit Assistance Dear Mr. Dale Robins and Selection Committee, For nearly 95 years, travelers have crossed the Columbia River using the Hood River Bridge, which connects Hood River, Oregon and the communities of White Salmon and Bingen in Washington state. While the travelers are diverse - farmer, hiker, trucker, tugboat operator, windsurfer - their need is the same: a safe, reliable connection between Oregon and Washington. Today, the Hood River Bridge is failing to meet modern transportation demands: deteriorating bridge members, combined with dimensional and weight restrictions for trucks, hamper the structure’s effectiveness and, quite possibly, the regional economy. The replacement of the bridge is a critical transportation improvement needed to support the interstate travel of motorized vehicles, pedestrians and bicyclists, and marine freight transport, which have significant local and regional economic and quality of life benefits. In 1999, a campaign to replace the existing bridge began, which then culminated into the 2003 Draft EIS, which was completed by Parsons Brinkerhoff now WSP. Following the Draft EIS, the firm conducted a Bridge TS&L study. From
    [Show full text]
  • I-5 Columbia River Crossing Stated Preference Travel Study Report
    I-5 Columbia River Crossing Stated Preference Travel Study Report Appendix C: Survey Comments November 2013 D AT A AN A LY SI S SOLUTIONS TABLE OF CONTENTS 1.0 PASSENGER VEHICLE OPEN-ENDED COMMENTS ..................................................... 1 2.0 COMMERCIAL VEHICLE OPEN-ENDED COMMENTS ................................................ 54 Resource Systems Group, Inc. I-5 Columbia River Crossing Stated Preference Travel Study-Appendix C November 2013 Page Ci Before clicking the “End Survey” button on the last page of the survey, respondents had the opportunity to leave open-ended comments. These comments about the project and the survey itself are included in this appendix for the passenger and the commercial vehicle survey. Comments have been edited for profanity only; no other changes have been made. Approximately 880 (760 passenger vehicle and 120 commercial vehicle) comments are included below. 1.0 PASSENGER VEHICLE OPEN-ENDED COMMENTS . We are in favor of the building of the i-5 interstate bridge between washington and oregon. It would be a good thing for all of us. Bridge lifts cause too many delays, especially during "peak" travel times. Bikes & walkers could 'share' toles also. reasonable tole could be accepted? . I generally use I-205 more than I-5 because congestion on I-5 can be so bad during high use periods. I would use I-5 more in the evening but fear of bridge raisings discourages my use of it. I think that the smart way to pay for the bridge fast would be to put toll on I205 as well as I5. It would work! . I think our representatives are living in a fantasy world.
    [Show full text]