UNION

H

D

H

1TH

T

T N

1

9

0 2

2

5 9

41ST

D

N

2

4

1 SR-503

I-5 159TH 159TH 159TH

156TH SEW ARD

H

T

4

6 154TH

149TH

CAPLES

BLISS 21ST

10TH

20TH

3

0

5

R

S 139TH 139TH

SR-501

36TH

H

T

0 119TH 5

LAKESHORE 119TH 117TH

H

T

6

1

109TH

T

S

1

3

T

S

1

2

D

H

T N

1 2

1 SR-501 7

99TH

JOHNS 99TH ST 93RD 94TH

H

T

5

2

9TH 88TH 88TH

H

T

D

7

N

0

2

1

D

5

1 LAKESHORE N

2

4

1

13TH 83RD

L

A

H

I

T

R

0

O

3

1 M ARD E W

M 78TH78TH DELL

H

R

T

E 78TH 4

9

G

I

E

L HAZE

R 78TH

O

N 3

I

0

5

W

-

R

R

E

S

BERNIE Extending To The North

68TH

D

N COVINGT

2

7 63RD ON MINNEHAHA SR-500 63RD The Crossing project (CRC) is expanding 102ND

transit options between Portland and Vancouver. This bi-state H

Columbia River Crossing T

58TH 9

0

1

H project will extend an existing 52-mile light rail system across T GHER T S

7

1

3

2

1 54TH CRC is a long-term, comprehensive solution to address 1 the Columbia River to connect the region’s largestROSS and most

N

L

H O

N

T

C

6 safety and congestion problems on I-5 betweenE Portland,

N

5 I concentrated employment area in downtown Portland with S ST

L

E

R

JAMES

H

D

T

N

5

A Vancouver. This extension will improve connections,1 reliability49TH and Vancouver, . The project willVANCOUVER MALL

49TH and travel times for riders.45TH

replace the I-5 bridge, extend47TH light rail to Vancouver, 48TH

H

T

7 7 44TH POPLAR

improve closely-spaced interchanges H and enhance

D T THURST

6

N

H

6

2

H

T 41ST 2 T

7

1

4

3

5 LOWER RIVER 39TH pedestrian and bicycle pathways. ON 1 40TH

39TH Benefits to local residents, the natural environment and

33RD VD the regional economy include: D N

2

KAUFFMAN

6

1

JOHNS BL ST • Improved safety TH PLAIN FOUR I-205 FOURTH PLAIN BLVD 28TH T F

S ALK

Y • A more reliable trip for freight, autos, and transit

A

W BURTON

D

A

N O

O R MAIN ST • Reduced congestion on I-5 and adjacent neighborhoods

S B

H

P

LINCOLN

T

M 8

I

3

S 20TH 1 MCLOUGHLIN BLVD • No bridge lifts 17TH ST Clark 18TH 18TH 15TH ST • Earthquake protection College BRANDT MCLOUGHLIN BL

T VD

13TH ST S

N

O • Supported and sustained jobs with improved access 138TH

T

G

N

I

H

Vancouver S

A to ports and highways VE ST

W MILL PLAIN BLVD 8TH ST

H

T

E RESER 2 • Reduced emissions and improved water quality 1 9TH

1 H

T

E

7

N

9

I

EVERGREEN BL V

108TH

E

H

D

T

6

VD 3

1 E 5TH ST

BLANDFORD

H

T

4

MACAR 0

1 Connecting Communities THUR VD W COLUMBIA HOUSE BL

ASHINGT 2ND 1ST D

V O

O O

H H L A T N A

Y W D WAY 5 SE COLUMBIA K

E H N 5

H T IS OREGON ON 1 L C A 5TH R

N 131ST D The Portland–Vancouver region is expected to grow significantly ST HELENS A DR E

LIESER HAYDEN H in the next 20 years, with a million more people projected to live 7TH ISLAND 10TH N JANTZEN here by 2030. Light rail will improve mobility for many people AVE N MARINE DR Highway Improvements N and provide a viable alternative to automobile travel, helping T T

H O S

T M E

R H A Existing Highway and Bridge R

O T C

H H

A 0

T K

to relieve congested conditions across the Columbia River. The W

W 6

4 R S

K 1 6

L

I A S Proposed Light Rail Alignment 1 L LAND P DR completed light rail extension will provide reliable transit service E Existing MAX Yellow Line TLAND

T

AL POR between many key regional destinations including: Proposed Park and Ride T

ON N MARINE DR Proposed Light Rail Stations EVERGREEN MCGILLIVRA A Y

T

• Vancouver and Portland central business districts, S

I

V

A

L

L

employment centers, and convention centers E

B UNION SR-14

33RD BRIAR WOOD

N • Entertainment and retail districts such as Esther Short

E

1

3

T H

A Park, Square and the Oregon Zoo

V CASCADE P E 34TH ARK

COLUMBIA I205

Portland MAR • Colleges and universities, including Clark College and TIN LUTHER KING JR Portland State University PHILADELPHIA

In addition, the project will provide transit connections to the The Project (CRC) is expanding transit options in Vancouver and region’s other light rail lines, streetcar lines, Amtrak passenger will improve connections, reliability andN COLUMBI travelA times for riders. MARINE BLVD rail service and C-TRAN and TriMet bus routes. AIRPOR

T

LOMBARD WILLAMETTE

PORTLAND

D

N

2

8

GREELEY

POR TLAND

KILLINGSWORTH

G

N

I

K

R

E

H

T

U

L

D

N

I N

2 T

4 GOING R SANDY

A

M PRESCOTT PRESCOTT Y

CULL

SANDY YEON

ST GREELEY HELENS

FREMONT

D

N THOMPSON 2 8 I84 FWY-I205 FWY

H

T

7

5

21ST NICOLAI FRONT

VAUGHN

BROADWAY

D

N

2

NAIT 0

1 O WEIDLER WEIDLER

HALSEY LOVEJOY

D

GRAND H

R

3 T LLOYD

2

8 1

H

T GLISAN

0

6 I84

5

20TH 0

2

I

THORBURN ALDER BURNSIDE

1TH

1 STARK

MORRISON 103RD BELMONT STARK

12TH

H

SKYLINE T

A 8

4

1

VIST

HAWTHORNE D

N H

2

T

H

9

0 SUNSET 4TH T

6

6

R

7

O

I405 B

R

-SYLVAN A SUNSET H

H T H

0 MARQUAM T

2 0 BROADW 5

Y 6TH HUMPHREY AY

D

V DIVISION L

B

3RD KELL L SCHOLLS FERR L

E Y

W

O

D P

-

H N

Y

2 T

2 W 2

1 ROSS ISLAND 20TH 1 F

BARBUR 1

5

0

2

I

PATTON MCLOUGHLIN

D DOSCH D

N

N

H

2

2

T 5

I5 6

9

H 3

T

MIL

6

3

1 W POWELL AUKIE FOSTER TTUCK 17TH HOOD POWELL

SHA Light Rail Designs

The CRC project team is working closely with the community to create a light rail system that fits well into the adjacent neighborhoods.

The transit portion of the CRC project will include a 2.9- mile extension of TriMet’s Yellow Line from the existing in north Portland, Ore., through downtown Vancouver, Wash., to a terminus near the Marshall/Leupke Center. Hayden Island

A station is planned as part of the light rail extension. The Distinctive surfaces help define transit, auto and pedestrian areas. station will be located on the west side of I-5 a short distance from the Jantzen Beach SuperCenter. The station is being CRC is using design strategies proven to reduce the potential designed to support the goals of the Hayden Island Plan, which for crime at stations and on trains. Significant input from is a City of Portland neighborhood plan developed with local advisory groups, local jurisdictions and the public will help in input to reflect the long-term vision of the community. the design of a safe system. Recommendations include: Vancouver • Integrate stations into the community, near residential In downtown Vancouver, trains will travel north on Broadway and commercial buildings. Street and south on Washington Street in a dedicated lane. • Manage pedestrian access to stations through the Trains will travel east and west on 17th Street to the terminus thoughtful placement of entrances and exits, fencing, station near the Marshall/Luepke Center. Four transit stations lighting and landscaping. will be built along the line. In addition, three park and ride facilities are planned to accommodate about 2,900 parking • Design stations so that user activity is easily visible, with spaces. Park and rides will be built near Fifth and Washington clear lines of sight into and out of the station. streets, 15th and Washington streets, and across from the Marshall/Luepke Center. • Ensure stations are well-maintained and visually pleasing using high-quality materials, attractive design features and public art.

• Create a well-defined separation of stations and crosswalks from automobile traffic, using distinct pavement textures and traffic signals.

• Use visual and audible warning devices to alert pedestrians, bicyclists and drivers to approaching trains.

Station lighting increases visibility for those on or approaching platforms. Designing a Safe System

Planning for safety and security on and around light rail is a top priority for C-TRAN, TriMet and the CRC project. The new light rail line is being designed to promote safe interaction between light rail trains, cars, pedestrians and bicyclists. A cooperative agency effort and the application of safety and security principles will ensure that light rail is designed and Transit police and fare inspectors help increase passenger safety. constructed to run safely, securely, dependably and efficiently.

www.ColumbiaRiverCrossing.org PROJECT PARTNERS Providing Passenger Security workshops were held in the communities to gather input on the light rail extension. Community input has resulted in the following work to date: CRC is working closely with the City of Vancouver and City of Portland police, and C-TRAN and TriMet security to maximize passenger safety at stations and park and ride • Design guidelines for the Hayden Island station, facilities, as well as on light rail trains. CRC’s security plan Vancouver stations and park and rides. will include: • Route for the Vancouver portion of the line • Monitoring stations and trains by transit security and local police officers • Station locations in Vancouver

• Enforcement of fare payment • Guidance on traffic and parking along the Vancouver route

• Installation of closed-circuit TV (CCTV) at light rail The community will continue to be consulted as light rail stations, park and rides and on trains designs are refined to gain input on appearance of the stations and streets, park and ride designs and security plans. • Partnerships with local law enforcement and the regional 9-1-1 system to have the closest available units available as “first responders” to any incident Did You Know? • Programs to remove graffiti, pick-up litter and maintain landscaping uAt opening, weekday peak service will provide

• Working with local government on appropriate land uses trains every 7.5 minutes, with 15-minute service near transit stations during off-peak periods.

Community Feedback Shapes Design uBy 2030, there will be about 18,700 trips crossing the Columbia River on light rail each day, with Community advisory groups have worked with CRC about 6 million boardings annually. project staff to ensure community preferencesCouplet and the Option #3 needs of transit riders are considered in light rail system uTravelers between Vancouver and downtown planning. Transit advisorySide- group membersRunning included business T rack and Station and neighborhood leaders, transit riders and agency Portland also will have the option of using a representatives. The groups met more than two dozen times C-TRAN Express Bus. between 2008 and 2011 to conduct field visits, review plans and provide feedback. In addition, seven open houses and

Design concept for light rail in downtown Vancouver.

Federal Transit Administration • Federal Highway Administration City of Vancouver • City of Portland • SW Washington Regional Transportation Council • Metro • C-TRAN • TriMet

Downtown Vancouver Rendering (above) and Plan View Sketch (lower right)

Similar Design: Denver, CO

US Department of Transportation: Federal Transit Administration • Federal Highway Administration City of Vancouver • City of Portland • SW Washington Regional Transportation Council • Metro • C-TRAN • TriMet Transit Funding HOW CAN I GET INVOLVED? The project is applying for $850 million in • Visit the website at www.ColumbiaRiverCrossing.org to sign up for Federal Transit Administration New Starts updates and view the project calendar funding. This funding includes the cost of building the light rail track, purchasing • Invite CRC staff to your group to discuss the project 19 new light rail trains, building stations and park and rides and expanding existing • Contact the project office to talk with a staff member light rail maintenance facilities. Long-term operation and maintenance of the new light E-mail: [email protected] rail line is proposed to be funded through Mail: 700 Washington Street, Suite 300 C-TRAN and TriMet. Vancouver, WA 98660 For its share of the operations and Phone: 360-737-2726 maintenance funding, C-TRAN is 503-256-2726 considering funding options, including a sales tax increase. Raising the sales tax Fax: 360-737-0294 would require a vote.

Final Environmental Impact Statement Schedule and Federal Record of Decision Next Steps Legislative review (2012) In July 2008, local project Transit final design phase begins partners reached consensus Legislative review (2013) that a replacement bridge Submit application for federal transit funding and light rail extension would Property acquisition process begins best meet project goals and Begin project construction community needs. Since then, partner agencies have Begin bridge construction worked collaboratively to Begin transit construction review and refine designs. New southbound I-5 bridge opens In December 2011, CRC Light rail service begins federal oversight agencies selected an alternative for New northbound I-5 bridge opens the project and signed a Demolition of old bridges begins record of decision which public outreach validated the technical and 2011 2012 2013 2014 2015 2018 2019 2020 public process to date.

CRC will continue to engage the community and local agencies as it finalizes designs and plans for construction. The record of decision enables CRC to apply for needed permits and seek construction funding.

AMERICANS WITH DISABILITIES ACT (ADA) INFORMATION Materials can be provided in alternative formats: large print, Braille, cassette tape, or on computer disk for people with disabilities by calling the Columbia River Crossing (CRC) project office at (866) 396-2726. Persons who are deaf or hard of hearing may contact the CRC project through the Telecommunications Relay Service at 7-1-1.

TITLE VI NOTICE TO PUBLIC WSDOT and ODOT ensure full compliance with Title VI of the Civil Rights Act of 1964 by prohibiting discrimination against any person on the basis of race, color, national origin or sex in the provision of benefits and services resulting from its federally assisted programs and activities. For questions regarding WSDOT’s Title VI Program, you may contact the Department’s Title VI Coordinator at (360) 705-7098. For questions regarding ODOT’s Title VI Program, you may contact the Department’s Civil Rights Office at (503) 986-4350.