Frog Ferry Presentation
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Interstate Bridge Replacement Program December 2019 Progress Report
Interstate Bridge Replacement Program December 2019 Progress Report December 2019 Progress Report i This page intentionally left blank. ii Interstate Bridge Replacement Program December 2, 2019 (Electronic Transmittal Only) The Honorable Governor Inslee The Honorable Kate Brown WA Senate Transportation Committee Oregon Transportation Commission WA House Transportation Committee OR Joint Committee on Transportation Dear Governors, Transportation Commission, and Transportation Committees: On behalf of the Washington State Department of Transportation (WSDOT) and the Oregon Department of Transportation (ODOT), we are pleased to submit the Interstate Bridge Replacement Program status report, as directed by Washington’s 2019-21 transportation budget ESHB 1160, section 306 (24)(e)(iii). The intent of this report is to share activities that have lead up to the beginning of the biennium, accomplishments of the program since funding was made available, and future steps to be completed by the program as it moves forward with the clear support of both states. With the appropriation of $35 million in ESHB 1160 to open a project office and restart work to replace the Interstate Bridge, Governor Inslee and the Washington State Legislature acknowledged the need to renew efforts for replacement of this aging infrastructure. Governor Kate Brown and the Oregon Transportation Commission (OTC) directed ODOT to coordinate with WSDOT on the establishment of a project office. The OTC also allocated $9 million as the state’s initial contribution, and Oregon Legislative leadership appointed members to a Joint Committee on the Interstate Bridge. These actions demonstrate Oregon’s agreement that replacement of the Interstate 5 Bridge is vital. As is conveyed in this report, the program office is working to set this project up for success by working with key partners to build the foundation as we move forward toward project development. -
Union Station Conceptual Engineering Study
Portland Union Station Multimodal Conceptual Engineering Study Submitted to Portland Bureau of Transportation by IBI Group with LTK Engineering June 2009 This study is partially funded by the US Department of Transportation, Federal Transit Administration. IBI GROUP PORtlAND UNION STATION MultIMODAL CONceptuAL ENGINeeRING StuDY IBI Group is a multi-disciplinary consulting organization offering services in four areas of practice: Urban Land, Facilities, Transportation and Systems. We provide services from offices located strategically across the United States, Canada, Europe, the Middle East and Asia. JUNE 2009 www.ibigroup.com ii Table of Contents Executive Summary .................................................................................... ES-1 Chapter 1: Introduction .....................................................................................1 Introduction 1 Study Purpose 2 Previous Planning Efforts 2 Study Participants 2 Study Methodology 4 Chapter 2: Existing Conditions .........................................................................6 History and Character 6 Uses and Layout 7 Physical Conditions 9 Neighborhood 10 Transportation Conditions 14 Street Classification 24 Chapter 3: Future Transportation Conditions .................................................25 Introduction 25 Intercity Rail Requirements 26 Freight Railroad Requirements 28 Future Track Utilization at Portland Union Station 29 Terminal Capacity Requirements 31 Penetration of Local Transit into Union Station 37 Transit on Union Station Tracks -
Light Rail Transit (LRT)
Transit Strategies Light Rail Transit (LRT) Light rail transit (LRT) is electrified rail service that operates in urban environments in completely exclusive rights‐of‐way, in exclusive lanes on roadways, and in some cases in mixed traffic. Most often, it uses one to three car trains and serves high volume corridors at higher speeds than local bus and streetcar service. Design and operational elements of LRT include level boarding, off‐board fare payment, and traffic signal priority. Stations are typically spaced farther apart than those of local transit services and are usually situated where there are higher population and employment densities. MAX Light Rail (Portland, OR) The T Light Rail (Pittsburgh, PA) Characteristics of LRT Service LRT is popular with passengers for a number of reasons, the most important of which are that service is fast, frequent, direct, and operates from early morning to late night. These attributes make service more convenient—much more convenient than regular bus service—and more competitive with travel by automobile. Characteristics of LRT service include: . Frequent service, typically every 10 minutes or better . Long spans of service, often 18 hours a day or more . Direct service along major corridors . Fast service Keys reasons that service is fast are the use of exclusive rights‐of‐way—exclusive lanes in the medians of roadways, in former rail rights‐of‐way, and in subways—and that stations are spaced further apart than with bus service, typically every half mile (although stations are often spaced more closely within downtown areas). Rhode Island Transit Master Plan | 1 Differences between LRT and Streetcar Light rail and streetcar service are often confused, largely because they share many similarities. -
Sustainable Urban Transport Index (SUTI) for Dhaka, Bangladesh
Final Report on Sustainable Urban Transport Index (SUTI) for Dhaka, Bangladesh Prepared By: NOOR-E-ALAM Superintending Engineer Roads and Highways Department Dhaka, Bangladesh October 2018 Sustainable Urban Transportation Index (SUTI) for Dhaka, Bangladesh Table of Contents CHAPTER 1: INTRODUCTION .............................................................................................. 1 1.1 Introduction ................................................................................................................. 1 1.2 Study area .................................................................................................................... 1 1.3 Objectives of the study ................................................................................................ 3 CHAPTER 2: CURRENT STATE OF URBAN TRANSPORT SYSTEMS ............................ 4 2.1 Major transport network and systems ......................................................................... 4 2.2 Key connection points of DMA .................................................................................. 5 2.3 Existing transport situation of Dhaka city ................................................................... 7 2.3.1 Major transport modes of Dhaka city .................................................................. 7 2.3.2 Modal share in Dhaka city ................................................................................... 8 2.3.3 Environmental perspective .................................................................................. -
Columbia River I-5 Bridge Planning Inventory Report
Report to the Washington State Legislature Columbia River I-5 Bridge Planning Inventory December 2017 Columbia River I-5 Bridge Planning Inventory Errata The Columbia River I-5 Bridge Planning Inventory published to WSDOT’s website on December 1, 2017 contained the following errata. The items below have been corrected in versions downloaded or printed after January 10, 2018. Section 4, page 62: Corrects the parties to the tolling agreement between the States—the Washington State Transportation Commission and the Oregon Transportation Commission. Miscellaneous sections and pages: Minor grammatical corrections. Columbia River I-5 Bridge Planning Inventory | December 2017 Table of Contents Executive Summary. .1 Section 1: Introduction. .29 Legislative Background to this Report Purpose and Structure of this Report Significant Characteristics of the Project Area Prior Work Summary Section 2: Long-Range Planning . .35 Introduction Bi-State Transportation Committee Portland/Vancouver I-5 Transportation and Trade Partnership Task Force The Transition from Long-Range Planning to Project Development Section 3: Context and Constraints . 41 Introduction Guiding Principles: Vision and Values Statement & Statement of Purpose and Need Built and Natural Environment Navigation and Aviation Protected Species and Resources Traffic Conditions and Travel Demand Safety of Bridge and Highway Facilities Freight Mobility Mobility for Transit, Pedestrian and Bicycle Travel Section 4: Funding and Finance. 55 Introduction Funding and Finance Plan Evolution During -
Port of San Francisco Water Taxi Feasibility Study
PortPort ofof SanSan FranciscoFrancisco WaterWater TaxiTaxi FeasibilityFeasibility StudyStudy Presentation to San Francisco Port Commission Water Taxi December 8, 2009 Veronica Sanchez Consulting Walther Engineering Services ScopeScope ofof StudyStudy ¾ IsIs therethere ridershipridership demanddemand forfor waterwater taxitaxi service?service? ¾ WhatWhat cancan wewe learnlearn fromfrom otherother otherother citycity’’ss waterwater taxitaxi systems?systems? ¾ WhatWhat areare capitalcapital andand operatingoperating requirementsrequirements forfor PSFPSF toto startstart thisthis service?service? Port of San Francisco Water Taxi Feasibility Study Veronica Sanchez Consulting September 2009 Walther Engineering Services IsIs therethere RidershipRidership Demand?Demand? ¾ #1 Market Niche: F-Line Diversions ¾ F-Line has overcapacity problems. Wait times are longer than travel time at peak. • Conservative Assumption: 522-576 daily riders • Aggressive assumption 1306-1440 daily riders Compare: Harbor Bay: 620 daily riders. Port of San Francisco Water Taxi Feasibility Study Veronica Sanchez Consulting September 2009 Walther Engineering Services IsIs therethere RidershipRidership Demand?Demand? ¾ #2 Market Niche: Repeat visitors (17.5%) may be looking for a different shoreline experience ¾ #3 Visitor Attractions & Destinations z Example: Exploratorium Opening in 2014. z Special events Port of San Francisco Water Taxi Feasibility Study Veronica Sanchez Consulting September 2009 Walther Engineering Services IsIs therethere RidershipRidership Demand?Demand? -
AMTRAK and VIA "F40PHIIS
AMTRAK and VIA "F40PHIIS VIA Class "F40PH" Nos. 6400-6419 - OMI #5897.1 Prololype phOIO AMTRAK Class "F40PH" Phase I, Nos. 200-229 - OMI #5889.1 PrOlotype pholo coll ection of louis A. Marre AMTRAK Class "F40PH" Phase II, Nos. 230-328 - OMI #5891.1 Prololype pholo collection of louis A. Marre AMTRAK Class "F40PH" Phase III, Nos. 329-400 - OM I #5893.1 Prololype pholo colleclion of lo uis A. Marre Handcrafted in brass by Ajin Precision of Korea in HO scale, fa ctory painted with lettering and lights . delivery due September 1990. PACIFIC RAIL Fro m the Hear tland t 0 th e Pacific NEWS PA(:IFIC RAllN EWS and PACIFIC N EWS are regis tered trademarks of Interurban Press, a California Corporation. PUBLISHER: Mac Sebree Railroading in the Inland Empire EDITOR: Don Gulbrandsen ART DIRECTOR: Mark Danneman A look at the variety of railroading surrounding Spokane, Wash, ASSOCIATE EDITOR: Mike Schafer ASSISTANT EDITOR: Michael E, Folk 20 Roger Ingbretsen PRODUCTION ASSISTANT: Tom Danneman CONTRIBUTING EDITOR: Elrond Lawrence 22 CPR: KINGSGATE TO KIMBERLEY EDITORIAL CONSULTANT: Dick Stephenson CONTRIBUTING ARTIST: John Signor 24 FISH LAKE, WASH, PRODUCTION MANAGER: Ray Geyer CIRCULATI ON MANAGER: Bob Schneider 26 PEND OREILLE VALLEY RAILROAD COLUMNISTS 28 CAMAS PRAIRIE AMTRAK / PASSENGER-Dick Stephenson 30 BN'S (EX-GN) HIGH LINE 655 Canyon Dr., Glendale, CA 91206 AT&SF- Elrond G, Lawrence 32 SPOKANE CITY LIMITS 908 W 25th 51.. San Bernardino, CA 92405 BURLINGTON NORTHERN-Karl Rasmussen 11449 Goldenrod St. NW, Coon Rapids, MN 55433 CANADA WEST-Doug Cummings I DEPARTMENTS I 5963 Kitchener St. -
Informing Subterranean Transit Station Design from Existing And
Portland State University PDXScholar University Honors Theses University Honors College 6-12-2019 Informing Subterranean Transit Station Design from Existing and Future Station Typologies; an Informative Exploration of how to Develop Underground Station Design for MAX Light Rail Antonio P. Ramos-Crosier Portland State University Follow this and additional works at: https://pdxscholar.library.pdx.edu/honorstheses Let us know how access to this document benefits ou.y Recommended Citation Ramos-Crosier, Antonio P., "Informing Subterranean Transit Station Design from Existing and Future Station Typologies; an Informative Exploration of how to Develop Underground Station Design for MAX Light Rail" (2019). University Honors Theses. Paper 797. https://doi.org/10.15760/honors.815 This Thesis is brought to you for free and open access. It has been accepted for inclusion in University Honors Theses by an authorized administrator of PDXScholar. Please contact us if we can make this document more accessible: [email protected]. Informing Subterranean Transit Station Design from Existing and Future Station Typologies; an Informative Exploration of how to Develop Underground Station Design for MAX Light Rail Image 1: MAX Red line crossing the Steel Bridge, which is a key piece of infrastructure that the regional connector aims to avoid with the implementation of a new tunnel. Image taken by Antonio Crosier. By: Antonio Ramos-Crosier Advisor: Jeff Schnabel 1 MAX Regional Connector Ramos-Crosier Research Question: In anticipation of TriMet and the City -
The Transfer Newsletter Spring 2013.Cdr
Oregon Electric Railway Historical Society Volume 18 503 Issue 2 Spring 2013 Reminder to members: Please be sure your dues In this issue: are up to date. 2013 dues were due Jan 1, 2013. Willamette Shore Trolley - Back on Track.................................1 If it has been longer than one year since you renewed, Interpretive Center Update - Greg Bonn...............................2 go to our website: oerhs.org and download an Vintage Trolley History - Richard Thompson.............................3 application by clicking: Become a Member Pacific NW Transit Update - Roy Bonn...............................8 Spotlight on Members: Charlie Philpot ................................11 Setting New Poles - Greg Bonn..............................................12 Willamette Shore Trolley ....back on track! See this issue in color on line at oerhs.org/transfer miles from Lake Oswego to Riverwood Crossing with an ultimate plan to extend to Portland. Also see the article on page 3 on the history of the cars of Vintage Trolley. Dave Rowe installing wires from Generator to Trolley. Hal Rosene at the controls of 514 on a training run emerging Gage Giest painting from the Elk Rock Tunnel on the Willamette Shore line. the front of Trolley. Wayne Jones photo The Flume car in background will be After a several-year hiatus, the Willamette Shore our emergency tow Trolley is just about ready to roll. Last minute electrical and vehicle if the Trolley mechanical details and regulatory compliance testing are breaks down on the nearing completion. With many stakeholders involved and mainline. many technical issues that had to be overcome, it has been a challenge to get the system to the 100% state. Dave Rowe and his team have been working long hours to overcome the obstacles of getting Gomaco built Vintage Trolley #514, its Doug Allen removing old stickers from side tag-along generator, track work, electrical systems, crew of Trolley training, safety compliance issues, propulsion, braking, and so many other details to a satisfactory state to begin revenue service. -
Tramway Renaissance
THE INTERNATIONAL LIGHT RAIL MAGAZINE www.lrta.org www.tautonline.com OCTOBER 2018 NO. 970 FLORENCE CONTINUES ITS TRAMWAY RENAISSANCE InnoTrans 2018: Looking into light rail’s future Brussels, Suzhou and Aarhus openings Gmunden line linked to Traunseebahn Funding agreed for Vancouver projects LRT automation Bydgoszcz 10> £4.60 How much can and Growth in Poland’s should we aim for? tram-building capital 9 771460 832067 London, 3 October 2018 Join the world’s light and urban rail sectors in recognising excellence and innovation BOOK YOUR PLACE TODAY! HEADLINE SUPPORTER ColTram www.lightrailawards.com CONTENTS 364 The official journal of the Light Rail Transit Association OCTOBER 2018 Vol. 81 No. 970 www.tautonline.com EDITORIAL EDITOR – Simon Johnston [email protected] ASSOCIATE EDITOr – Tony Streeter [email protected] WORLDWIDE EDITOR – Michael Taplin 374 [email protected] NewS EDITOr – John Symons [email protected] SenIOR CONTRIBUTOR – Neil Pulling WORLDWIDE CONTRIBUTORS Tony Bailey, Richard Felski, Ed Havens, Andrew Moglestue, Paul Nicholson, Herbert Pence, Mike Russell, Nikolai Semyonov, Alain Senut, Vic Simons, Witold Urbanowicz, Bill Vigrass, Francis Wagner, Thomas Wagner, 379 Philip Webb, Rick Wilson PRODUCTION – Lanna Blyth NEWS 364 SYSTEMS FACTFILE: bydgosZCZ 384 Tel: +44 (0)1733 367604 [email protected] New tramlines in Brussels and Suzhou; Neil Pulling explores the recent expansion Gmunden joins the StadtRegioTram; Portland in what is now Poland’s main rolling stock DESIGN – Debbie Nolan and Washington prepare new rolling stock manufacturing centre. ADVertiSING plans; Federal and provincial funding COMMERCIAL ManageR – Geoff Butler Tel: +44 (0)1733 367610 agreed for two new Vancouver LRT projects. -
Service Alerts – Digital Displays
Service Alerts – Digital Displays TriMet has digital displays at most MAX Light Rail stations to provide real-time arrival information as well as service disruption/delay messaging. Some of the displays are flat screens as shown to the right. Others are reader boards. Due to space, the messages need to be as condensed as possible. While we regularly post the same alert at stations along a line, during the Rose Quarter MAX Improvements we provided more specific alerts by geographical locations and even individual stations. This was because the service plan, while best for the majority of riders, was complex and posed communications challenges. MAX Blue Line only displays MAX Blue Line disrupted and frequency reduced. Shuttle buses running between Interstate/Rose Quarter and Lloyd Center stations. trimet.org/rq MAX Blue and Red Line displays page 1 – Beaverton Transit Center to Old Town MAX Blue/Red lines disrupted and frequency reduced. Red Line detoured. Shuttle buses running between Interstate/RQ and Lloyd Center. trimet.org/rq MAX Blue and Red Line displays page 2 – Beaverton Transit Center to Old Town Direct shuttle buses running between Kenton/N Denver Station, being served by Red Line, and PDX. trimet.org/rq MAC Red and Yellow displays – N Albina to Expo Center Red, Yellow lines serving stations btwn Interstate/RQ and Expo Center. trimet.org/rq. Connect with PDX shuttle buses at Kenton. MAX Red display – Parkrose Red Line disrupted, this segment running btwn Gateway and PDX. Use Blue/Green btwn Lloyd Center and Gateway, shuttles btwn Interstate/RQ and Lloyd Center. -
Grand Central Building Anchor Full Block Between Se 8Th & 9Th / Se Morrison & Belmont 808 Se Morrison Street | Portland | Oregon | 97214
GRAND CENTRAL BUILDING ANCHOR FULL BLOCK BETWEEN SE 8TH & 9TH / SE MORRISON & BELMONT 808 SE MORRISON STREET | PORTLAND | OREGON | 97214 APPROXIMATELY 20,617 SQUARE FOOT ANCHOR SPACE WITH OFF-STREET PARKING AVAILABLE ANCHOR SIGNAGE OPPORTUNITY PRIME LOCATION IN THE CENTRAL EASTSIDE INDUSTRIAL DISTRICT ANCHOR SIGNAGE OPPORTUNITY SE MORRISON STREET Looking East From SE 7th & Morrison CENTRAL EASTSIDE INDUSTRIAL DISTRICT | SE 8TH & MORRISON / SE 9TH & BELMONT THE GRAND CENTRAL BUILDING Building Overview | A Contributing Historic Property to Portland’s Fruitpacking District The Grand Central Building is a Spanish Colonial Revival building originally constructed in 1929 as a public market in Portland’s fruitpacking district and featured 23 separate vendors. Available Space | Anchor Space Total: Approximately 20,617 Square Feet First Floor: 15,617 Square Feet Mezzanine: 5,000 Square Feet Parking | The Grand Central Building features an underground parking garage with 76 parking spaces as well as a surface lot on the west side of the building with 28 additional parking spaces. Building Co-Tenants | West Face of Building Area Retailers | Building Location | Located between SE Morrison & Belmont Streets, SE 8th & 9th Avenues The Central Eastside Industrial District (CEID), the area bound by Interstate 84 to the North, the Willamette River to the west, Powell Blvd / Hwy 26 to the south, and NE/SE 12th Avenue to the east, was once the fruitpacking center of Portland. Located immediately east across the Burnside, Morrison, and Hawthorne Bridges from Downtown Portland, the CEID provides a convenient - and often more spacious - alternative to the CBD for office users and retailers looking to locate in the Central City.