Hunts Point Location 1300 Viele Avenue & 1301 Ryawa Avenue Bronx, Ny

Total Page:16

File Type:pdf, Size:1020Kb

Hunts Point Location 1300 Viele Avenue & 1301 Ryawa Avenue Bronx, Ny STRATEGIC HUNTS POINT LOCATION 1300 VIELE AVENUE & 1301 RYAWA AVENUE BRONX, NY PRIME LARGE BOX INDUSTRIAL LEASING OPPORTUNITY 120,775 SF AVAILABLE OVER 5 MILLION NEW CAPITAL IMPROVEMENTS $ FOR LEASE OCCUPANCY 1ST QUARTER 2018 OWNED AND MANAGED BY CO-EXCLUSIVE LEASING BROKERS SITE SURVEY 1300 VIELE AVENUE 1301 RYAWA AVENUE CEILING HEIGHT: ± 17-26 FEET CEILING HEIGHT: ± 20 FEET COLUMN SPACING: ± 100’ X 25’ COLUMN SPACING: ± 48’ X 31’ 600’ 250’ Outside storage 4 Interior loading 2,800 SQ FT CAR PARKING 55’ docks 100’ Ryawa Avenue Ryawa 1300 VIELE BUILDING 1301 RYAWA BUILDING 70,300 SQ FT 50,475 SQ FT 205’ Viele Avenue Viele Warehouse office 350 SQ FT 150’ 2 Interior loading 100’ docks Office Spacce Office area 7,050 SQ FT (incl. mezz space) 9,500 SQ FT Dock door 2 Dock doors Dock door Lighting Place - Private TOTAL BUILDING AREA 120,775 SQ FT CAR/VEHICLE PARKING CAR/VEHICLE PARKING IMPROVEMENTS INCLUDE New Roof • New LED Lighting • New dock doors and load levelers • Renovated o­ce areas with new windows • New metal-panel wall system • Freshly painted warehouse interior walls & ceiling Sprinkler upgrades - dry system • Upgraded electrical • New asphalt on Lighting Place PREMIER HUNTS POINT LOCATION WITH DIRECT HIGHWAY ACCESS AND VISIBILITY PROPERTY HIGHLIGHTS TOTAL BUILDING SIZE ± 120,775 SF - divisions possible 1300 Viele Avenue 1301 Ryawa Avenue • WAREHOUSE ± 104,225 SF • OFFICES Viele Avenue - Front: ± 7,050 SF Ryawa Avenue - Rear: (2 Story) ± 9,500 SF • LOADING - expandable 8 Interior Tailgate Doors 7 Drive-In Doors • STORAGE ± 2,800 SF fenced storage • ZONING M3 • CEILING HEIGHT ± 17-26 Feet • POWER Heavy power ideal for manufacturing or cold storage • PARKING Private Parking along Lighting Place & Viele Avenue • LEASE RATE Upon request PREMIER HUNTS POINT HUNTS POINT LOCATION REVITALIZATION Click here to learn more about the Bronx Revitalization Projects www.governor.ny.gov/news/governor-cuomo-announces-$1.8-billion-project-transform-south-bronx GEORGE WASHINGTON BRIDGE 95 95 HUDSON RIVER 87 HARLEM RIVER Hunts Point 895 Produce Market NEW JERSEY 278 BRONX 145th Street Bridge Hunts Point Madison Avenue Bridge Cooperative Market 278 Third Avenue Bridge 87 TOLL FREE BRIDGE TO/FROM MANHATTAN Willis Avenue Bridge TOLL BRIDGE TO/FROM MANHATTAN Robert F. Kennedy Bridge Drive Times to/from 1300 Viele Avenue Viele/ Hunts Point Food Distribution Center 0.3 Miles EAST RIVER 1300 145th Street Bridge 3.0 Miles 1301 Ryawa Avenue Madison Avenue Bridge 3.4 Miles MANHATTAN Third Avenue Bridge 3.1 Miles Willis Avenue Bridge 4.1 Miles Robert F. Kennedy Bridge 3.4 Miles LaGuardia Airport 8.0 Miles Midtown Manhattan 7.2 Miles QUEENS LaGuardia Airport John. F. Kennedy Airport 16.8 Miles Port Newark 23.0 Miles Newark Liberty Airport 24.7 Miles Stamford, CT 28.3 Miles Boston, MA 205 Miles FOOD CENTER DRIVEWAY PROPOSED HUNTS POINT LANDING TIDAL MARSH PROPOSED GREENWAY HUNTS POINT OPEN MARKET PRIME INDUSTRIAL LEASING OPPORTUNITY HUNTS POINT • BRONX, NEW YORK CO-EXCLUSIVE LEASING BROKERS JOHN REINERTSEN GARY CAPETTA MATTHEW CORPUEL CBRE Pantheon Properties Pantheon Properties Senior Vice President Principal Senior Vice President +1 718 289 7720 +1 212 277 7504 +1 212 277 7510 [email protected] [email protected] [email protected] OWNED AND MANAGED BY CO-EXCLUSIVE LEASING BROKERS © 2017 CBRE, Inc. The information contained in this document has been obtained from sources believed reliable. While CBRE, Inc. does not doubt its accuracy, CBRE, Inc. has not verified it and makes no guarantee, warranty or representation about it. It is your responsibility to independently confirm its accuracy and completeness. Any projections, opinions, assumptions or estimates used are for example only and do not represent the current or future performance of the property. The value of this transaction to you depends on tax and other factors which should be evaluated by your tax, financial and legal advisors. You and your advisors should conduct a careful, independent investigation of the property to determine to your satisfaction the suitability of the property for your needs. CBRE and the CBRE logo are service marks of CBRE, Inc. and/or its affiliated or related companies in the United States and other countries. All other marks displayed on this document are the property of their respective owners. Photos herein are the property of their respective owners and use of these images without the express written consent of the owner is prohibited..
Recommended publications
  • C 1000385 MMM: Willis Avenue Bridge
    CITY PLANNING COMMISSION July 27, 2011/Calendar No.2 C 100385MMM ___________________________________________ ________________________ IN THE MATTER OF an application, submitted by the Department of Transportation and the Department of Small Business Services, pursuant to Sections 1302, 197-c and 199 of the New York City Charter, and Section 5-430 et seq., of the New York City Administrative Code for an amendment to the City Map involving: • the modification of the lines and grades of the Willis Avenue Bridge, Harlem River Drive, and Marginal Street, Wharf or Place*; • The elimination of an elevated public highway; and • The delineation of bridge approach ramps, in Community District 11, Borough of Manhattan, in accordance with Map No. 30216 dated January 24, 2011 and signed by the Borough President. *This change to Marginal Street, Wharf or Place, where such Marginal Street, Wharf or Place is shown on any existing plans for the water front or portion thereof, shall be incorporated into the City Map. The application (C100385MMM) for an amendment to the City Map involving: the modification of the lines and grades of the Willis Avenue Bridge, Harlem River Drive, and Marginal Street, Wharf, or Place; elimination of an elevated public highway; and the delineation of bridge approach ramps was filed by the NYC Department of Transportation (DOT) and the NYC Department of Small Business Services (DSBS) on May 11, 2010. BACKGROUND The Department of Transportation and the Department of Small Business Services are requesting an amendment to the City Map involving the modification of the lines and grades of the Willis Avenue Bridge, Harlem River Drive, and Marginal Street, Wharf, or Place; elimination of an elevated public highway; and the delineation of bridge approach ramps, in order to facilitate the replacement of the Willis Avenue Bridge over the Harlem River and to provide a maintenance and emergency access area for both the Willis Avenue and JFK bridges, in the East Harlem neighborhood of Community District 11, Borough of Manhattan.
    [Show full text]
  • Southwest Bronx (SWBX): a Map Is Attached, Noting Recent Development
    REDC REGION / MUNICIPALITY: New York City - Borough of Bronx DOWNTOWN NAME: Southwest Bronx (SWBX): A map is attached, noting recent development. The boundaries proposed are as follows: • North: Cross Bronx Expressway • South: East River • East: St Ann’s Avenue into East-Third Avenue • West: Harlem River APPLICANT NAME & TITLE: Regional Plan Association (RPA), Tom Wright, CEO & President. See below for additional contacts. CONTACT EMAILS: Anne Troy, Manager Grants Relations: [email protected] Melissa Kaplan-Macey, Vice President, State Programs, [email protected] Tom Wright, CEO & President: [email protected] REGIONAL PLAN ASSOCIATION - BRIEF BACKGROUND: Regional Plan Association (RPA) was established as a 501(c)(3) non-profit organization in 1929 and for nearly a century has been a key planner and player in advancing long-range region-wide master plans across the tri-state. Projects over the years include the building of the the Battery Tunnel, Verrazano Bridge, the location of the George Washington Bridge, the Second Avenue subway, the New Amtrak hub at Moynihan Station, and Hudson Yards, and establishing a city planning commission for New York City. In November 2017, RPA published its Fourth Regional Plan for the tri-state area, which included recommendations for supporting and expanding community-centered arts and culture in New York City neighborhoods to leverage existing creative and cultural diversity as a driver of local economic development. The tri-state region is a global leader in creativity. Its world-class art institutions are essential to the region’s identity and vitality, and drive major economic benefits. Yet creativity on the neighborhood level is often overlooked and receives less support.
    [Show full text]
  • Appendix E: History and Projection of Traffic, Toll Revenues And
    APPENDIX E HISTORY AND PROJECTION OF TRAFFIC, TOLL REVENUES AND EXPENSES and Review of Physical Conditions of the Facilities of Triborough Bridge and Tunnel Authority April 26, 2013 Prepared for the Triborough Bridge and Tunnel Authority A Constituent Agency of the Metropolitan Transportation Authority By TABLE OF CONTENTS Page TRANSPORTATION INFRASTRUCTURE ............................................................................. E-1 Triborough Bridge and Tunnel Authority (TBTA) .......................................................... E-1 Metropolitan Area Arterial Network ............................................................................... E-3 Other Regional Toll Facilities .......................................................................................... E-4 Regional Public Transportation ....................................................................................... E-5 TOLL COLLECTION ON THE TBTA FACILITIES ................................................................ E-5 Present and Proposed Toll Structures and Operation ...................................................... E-5 E-ZPass Electronic Toll Collection System ..................................................................... E-8 TBTA‘s Role in E-ZPass ............................................................................................... E-10 Passenger Car Toll Rate Trends and Inflation ............................................................... E-11 HISTORICAL TRAFFIC, REVENUES AND EXPENSES AND ESTIMATED/BUDGETED NUMBERS
    [Show full text]
  • Federal Register/Vol. 67, No. 199/Tuesday, October
    63546 Federal Register / Vol. 67, No. 199 / Tuesday, October 15, 2002 / Rules and Regulations Issued in Washington, DC, on this 8th day provided to the Coast Guard until the regulatory policies and procedures of October 2002. September 12, 2002, making it of the Department of Transportation Joseph H. Grant, impossible to draft or publish a NPRM. (DOT) (44 FR 11040; February 26, 1979). Deputy Executive Director and Chief, This closure is not expected to have a This conclusion is based on the fact Operating Officer, Pension Benefit Guaranty significant impact on navigation that the requested closures are of short Corporation. because vessel traffic on the Harlem duration and on Sunday when there [FR Doc. 02–26111 Filed 10–11–02; 8:45 am] River and Newtown Creek is mostly have been few requests to open these BILLING CODE 7708–01–P commercial vessels that normally pass bridges. under the draws without openings. The Small Entities commercial vessels that do require DEPARTMENT OF TRANSPORTATION openings are work barges that do not Under the Regulatory Flexibility Act operate on Sundays. Any delay (5 U.S.C. 601–612), we considered Coast Guard encountered in this regulation’s whether this rule would have a effective date would be unnecessary and significant economic impact on a 33 CFR Part 117 contrary to the public interest since substantial number of small entities. immediate action is needed to close the The term ‘‘small entities’’ comprises [CGD01–02–113] bridge in order to provide for public small businesses, not-for profit RIN 2115–AE47 safety and the safety of marathon organizations that are independently participants.
    [Show full text]
  • Willis Ave Bridge, NY 2012
    Boroughs of Manhattan & Bronx, New York, NY Willis Avenue Swing Bridge Over Harlem River Owner/Client: New York City DOT, New York Replacement of the Willis Avenue Bridge over the Harlem River connect- State DOT ing Manhattan to the Bronx, including the reconstruction of Willis Avenue over the Major Deegan Expressway and reconstruction of sections of the Major Deegan Expressway with entrance and exit ramps. Construction Engineer: Hardesty & Hanover included a new 2,400 ton, 363’ swing span bridge truss. Extensive plan- ning was required for the completion of the float-in of the new swing span Year Complete: 2012 and float-out of two 1100-ton existing trusses. Weeks Marine transported the new swing span 135 nautical miles and through 14 bridges from the Scope of Work: Demolition, Channel Dredging, erection site to the project site. Project involved 48” and 60” diameter Construction drilled caissons, 940-ton precast concrete cofferdam boxes for the con- struction of cast-in-place mass concrete bridge piers, large sheet pile walls, 6000 tons of steel tub and plate girder superstructures, 160,000 Project Cost: $636 Million square feet of cast-in-place concrete decks, submarine power cables, FRP pile and concrete fender systems, precast prestressed box beams, and precast T walls. Temporary construction included sheet pile walls with drilled tiebacks, sheet pile cofferdams with mass tremmie concrete seals, 24” to 48” driven pipe piles, steel jacket platforms, and temporary truss panel bridge erection. Channel dredging and the demolition of the exist- ing bridge approaches, piers, pneumatic caissons, and fender system also included. WEEKS MARINE, INC.
    [Show full text]
  • New York City Department of Transportation
    INNOVATIONS & ACCOMPLISHMENTS East River Bridges A $3.14 billion reconstruction program is underway to rehabilitate all four East River crossings. In 2005, these bridges carried some 498,213 vehicles per day. In 2002, working in coordination with the NYPD and other law enforcement agencies, the Division implemented enhanced security measures on these bridges. This work is ongoing. BROOKLYN BRIDGE The Brooklyn Bridge carried some 132,210 vehicles per day in 2005. The $547 million reconstruction commenced in 1980 with Contract #1, and will continue with Contract #6, currently in the design phase and scheduled for completion in 2013. This contract will include the rehabilitation of both approaches and ramps, the painting of the entire suspension bridge, as well as the seismic retrofitting of the structural elements that are within the Contract #6 project limits. Engineering Landmark Plaque. (Credit: Russell Holcomb) 1899 Plaque Near the Franklin Truss of the Bridge, Marking the Site of George Washington’s First Presidential Mansion, Franklin House. (Credit: Hany Soliman) Historic Landmark, 1954 Reconstruction, and Two Cities Plaques. (1954 & Cities Credit: Michele N. Vulcan) 44 2006 BRIDGES AND TUNNELS ANNUAL CONDITION REPORT INNOVATIONS & ACCOMPLISHMENTS The fitting of the remaining bridge elements requiring seismic retrofitting will be carried out under a separate contract by the end of 2013. Work completed on the bridge to date includes reconditioning of the main cables, replacement of the suspenders and cable stays, rehabilitation of the stiffening trusses, and the replacement of the suspended spans deck. The next work scheduled for the bridge is a project to replace the existing travelers with a state of the art technology system.
    [Show full text]
  • 3. Affected Environment
    Draft Champlain Hudson Power Express EIS 3. Affected Environment This section provides a description of the existing environment within the proposed CHPE Project area. To facilitate discussion, this EIS divides the approximately 336-mile (541-km) proposed transmission line route into four segments: Lake Champlain Segment (Section 3.1), Overland Segment (Section 3.2), Hudson River Segment (Section 3.3), and New York City Metropolitan Area Segment (Section 3.4). This division is based on geographical and environmental similarities along the route, as described in Section 2.4.1. The Lake Champlain and Hudson River segments contain primarily aquatic corridors, the Overland Segment contains primarily terrestrial corridors, and the New York City Metropolitan Area Segment is a combination of aquatic and terrestrial corridors. The potential impacts associated with constructing and operating the proposed CHPE Project are discussed in Chapter 5 based on the environmental resource areas described in the following sections. Brief definitions of each resource area; laws, regulations, and guidelines potentially applicable to the resource; and existing conditions are discussed for each segment, as appropriate. A region of influence (ROI) for each resource area in which impacts would likely occur is also defined. The ROIs were determined based on regulatory requirements, where applicable, combined with the expected maximum area of measurable construction or operational impacts for that particular resource. 3.1 Lake Champlain Segment 3.1.1 Land Use 3.1.1.1 Background on the Resource Area This section describes existing land uses in the vicinity of the proposed CHPE Project route, and land use plans and policies applicable to the proposed CHPE Project area.
    [Show full text]
  • Draft Harlem River Watershed and Natural Resources Management Plan for the Bronx 2018
    Draft Harlem River Watershed and Natural Resources Management Plan for the Bronx 2018 Prepared by: NYC Parks Natural Resources Group Table of Contents Glossary..................................................................................................................................... 2 Introduction ................................................................................................................................ 3 Key Stakeholders ................................................................................................................... 3 Other Planning Efforts ............................................................................................................ 6 Vision & Goals ........................................................................................................................ 8 Watershed Characterization ....................................................................................................... 9 Geology & Soils .....................................................................................................................10 History of Land Use Changes ................................................................................................11 Land Use and Zoning ............................................................................................................14 Community Demographics ....................................................................................................14 Hydrology ..............................................................................................................................15
    [Show full text]
  • Visiting Student Resource Guide
    Lehman College Visiting Student Guide PREPARED BY THE OFFICE FOR SPECIAL ACADEMIC SESSIONS ( 3 4 7 ) 5 7 7 - 4 0 2 2 Lehman College Fast Facts A senior liberal arts college in The City University of New York, founded in 1968 and offering 69 undergraduate majors and programs and 39 graduate degree programs. Located on a 37-acre campus in the northwest Bronx across from the Jerome Park Reservoir and centered along a major educational corridor with four neighboring public schools Average class size of 19 students Lehman College’s faculty includes seven Distinguished Professors, including Billy Collins, Poet Laureate of the United States (2001-2003) and New York State Poet Laureate (2004-2006), and composer John Corigliano, winner of both the Academy Award (2000) and the Pulitzer Prize for Music (2001) For FY 2008, Lehman was awarded $18.77 million from Federal and State agencies as well as private sources to support scholarly research and to provide special services to local K-12 schools, community organizations, and residents of the Bronx and the metropolitan area. As a result, Lehman ranked fourth in this area among the 14 CUNY senior colleges Campus Map Getting to Lehman –Via Public Transportation By Train IRT No. 4 or the IND "D" line to Bedford Park Boulevard. The campus is a three-minute walk to the west. For more Information about subway service to the Lehman campus, call the New York City Transit Authority at (718) 330-1234. Metro North's Harlem line has a local stop at the Botanical Gardens station. The campus is about 12 blocks due west on Bedford Park Boulevard.
    [Show full text]
  • 2016 New York City Bridge Traffic Volumes
    2016 New York City Bridge Traffic Volumes TM NEW YORK CITY Bill de Blasio Polly Trottenberg Mayor Commissioner A member of the New York Metropolitan Transportation Council 2016 New York City Bridge Traffic Volumes Contract C033467 2014-2015: PTDT14D00.E01 2015-2016: PTDT15D00.E01 2016-2017: PTDT16D00.E02 2017-2018: PTDT17D00.E02 The preparation of this report has been financed through the U.S. Department of Transportation’s Federal Transit Administration and Federal Highway Administration. This document is disseminated under the sponsorship of the New York Metropolitan Transportation Council in the interest of information exchange. The contents of this report reflect the views of the authors who are responsible for the facts and accuracy of the data presented herein. The contents do not necessarily reflect the official views or policies of the Federal Transit Administration, Federal Highway Administration or the State of New York. This report does not constitute a standard, specification or regulation. NYCDOT is grateful to the Metropolitan Transportation Authority Bridges and Tunnels (MTABT), the Port Authority of New York and New Jersey (PANYNJ), and the New York Metropolitan Transportation Council (NYMTC) for providing data used to develop this report. This 2016 New York City Bridge Traffic Volumes Report was funded through the New York Metropolitan Transportation Council SFY 2017 Unified Planning Work Program project, Data Management PTDT17D00.E02, which was funded through matching grants from the Federal Transit Administration and from the Federal Highway Administration. Title VI Statement The New York Metropolitan Transportation Council is committed to compliance with Title VI of the Civil Rights Act of 1964, the Civil Rights Restoration Act of 1987, and all related rules and statutes.
    [Show full text]
  • Seismic Retrofit of Unreinforced Stone Masonry Bridge Piers and Discrete Element Analysis
    SEISMIC RETROFIT OF UNREINFORCED STONE MASONRY BRIDGE PIERS AND DISCRETE ELEMENT ANALYSIS Jaw-Nan (Joe) Wang1 ; Michael J. Abrahams2 Abstract The seismic behavior of unreinforced stone masonry structures can not be accurately studied by conventional force-based methods of analysis. The deformation and failure mechanism of this type of structures are governed by the mortar joints rather than the stone blocks. This paper discusses the discrete/distinct element method used in the seismic rehabilitation of the unreinforced stone masonry piers supporting the 145th Street Bridge over the Harlem River. It can be shown that this performance-based method is able to account for the important characteristics of the block interaction and mortar joint behavior. Introduction The 145th Street Bridge is a movable bridge crossing the Harlem River that provides access between Manhattan and the Bronx. The total length of the bridge is about 481.5 m, consisting of a 94.5 m steel through-trusses swing span, steel girder and truss approach spans and earth-filled approach ramps. The swing span is supported by a circular concrete pivot pier with a granite block fascia, as shown in Figure 1. The two river rest piers were built by unreinforced stone masonry blocks founded on concrete in- filled timber caissons. Figure 1 Swing Span Supported by Center Pivot Pier and Two Rest Piers A design has been completed by the New York City Department of Transportation (NYCDOT) to replace the existing bridge superstructure. Concurrent with this activity, a seismic analysis and retrofit design for the entire bridge has been carried out. According to the seismic criteria established by the Department (1998), the 1 Senior Engineering Manager, Parsons Brinckerhoff Quade & Douglas, Inc.
    [Show full text]
  • Directions to Other Sites (TSP, Worship/Warfare Week)
    Directions to Other Sites (TSP, Worship/Warfare Week) To Tompkins Square Park, (Ave A & 7th Street Lower East Side, Manhattan) By Subway: You can also go to the website www.googlemaps.com to get accurate directions from your starting location • Take the 4, 5 or 6 Train Downtown to 14th Street. • Transfer to the L train heading towards Brooklyn. • Get off at 1st Ave, walk East to Ave A • Turn right on 7th Street. The SLM truck will be on the corner of 7th St. & Ave A. By Car: Please note: We have provided the following directions, which we highly recommend for you to use, as opposed to GPS which often leads you into excessive traffic and indirect routes. From Queens, and Long Island: using the Long Island Expressway and Queens Midtown Tunnel • Take the Long Island Expressway West to Queens Midtown Tunnel. • Bear left out of the tunnel toward Downtown. • After the tunnel, stay LEFT toward 2nd Ave. • Make a LEFT at first traffic light. • Then RIGHT onto 2nd Ave • Make a LEFT onto 14th St • Make a RIGHT onto Ave A • Turn RIGHT on 7th Street. The SLM truck will be on the corner of 7th Street & Ave A. From Queens, and Long Island: using the Brooklyn Queens Expressway and Williamsburg Bridge • Take the BQE to the Williamsburg Bridge. • Once off the bridge, make a right onto Chrystie St. • Go to Houston St. and then make a right. • Go to Ave A and make a left. • Go down to 7th St. The SLM truck will be on the corner of 7th Street & Ave A.
    [Show full text]